Golar LNG Limited (GLNG) Earnings Call Transcript & Summary

November 21, 2023

NASDAQ US Energy Oil, Gas and Consumable Fuels earnings 49 min

Earnings Call Speaker Segments

Karl Fredrik Staubo

executive
#1

Thank you, operator, and hello everyone. It's a pleasure to welcome you to Golar LNG's presentation of our third-quarter 2023 earnings. I'm Karl Fredrik Staubo, the company's CEO, and joining me today is our Chief Financial Officer, Mr. Eduardo Maranhão, to walk through the results for this quarter. Before we begin the presentation, I'd like to draw your attention to the forward-looking statements shown on slide 2. Moving to slide 3, which gives an overview of Golar as it stands today. We are the owners and operators of 2 FLNG units: the Hilli, which is working for Perenco in Cameroon, and the Gimi, which left Seatrium Shipyard in Singapore this past Sunday and is now underway toward Mauritania and Senegal, where it will begin a 20-year contract with BP. In the first quarter of next year, we anticipate taking delivery of the LNG carrier Fuji, which we purchased in May and plan to convert into a 3.5 MTPA Mark II FLNG vessel. We also hold ownership of one LNG carrier, the Arctic, which has just completed its five-year class survey. The Arctic is fitted with a membrane storage system, making it unsuitable for conversion to FLNG, so we are presently evaluating options for this vessel, among them chartering it out or selling it. Our dedication to FLNG growth remains strong, and beyond the Mark one FLNG design used for Hilli and Gimi, we have invested substantial time and resources into creating two further designs: Mark two, offering 3.5 million tons of yearly liquefaction capacity, and Mark three, offering 5 million tons of yearly liquefaction capacity. We'll go into more detail about our growth plans later in this presentation. We also hold two investments: Macaw Energies, a land-based liquefaction business aimed at monetizing flare gas with a focus on operations across the Americas; and Avenir LNG, a small-scale LNG company that owns 5 small-scale LNG carriers, serves local distribution trades and the expanding maritime LNG bunkering market, and also owns an LNG terminal in Sardinia, Italy. Now on slide 4, we're happy to report that Gimi has finished construction at Seatrium Shipyard in Singapore and is presently en route to the GTA field, located offshore Senegal and Mauritania. Completing an FLNG build is a significant milestone for Golar. We've included some key figures to provide a sense of the magnitude of the conversion work that is now finished. Over the course of the conversion, 44,000 tons of steel were added, which equals 3,650 double-decker buses. The liquefaction topside needs 215 megawatts of power, matching the output of 150 wind turbines and enough to supply 80,000 homes; we installed 1,500 km of cabling, which is nearly 8 times the distance around Singapore, where the vessel was built. The conversion has required 37 million man-hours, or 18,500 working years. By adding sponsons, we created deck space equivalent to 20 basketball courts to accommodate all the topside equipment required to liquefy natural gas; this work took place during COVID, which presented major difficulties for the conversion project. Even so, we're very satisfied with how the vessel turned out and look forward to putting it into service for BP on the GTA field under a 20-year contract. Now, if you go to slide 5, we have yet another milestone to discuss for the quarter. On October 16, Hilli made its 100th cargo delivery, becoming the first FLNG globally to reach that mark. That vessel keeps performing, having just unloaded cargo number 102 — which means over 7 million tons have been shipped since operations began in 2018. The steady performance from Hilli since it started up, which you can see illustrated on the right side of this slide, really demonstrates the design quality and operational excellence of the Golar team and our execution approach. We're currently seeing growing interest in rechartering Hilli once the existing contract expires in July 2026, and that includes detailed commercial negotiations for 3 separate recontracting possibilities involving greater capacity utilization than the present contract, along with more attractive economics. Now moving to slide 6, which gives an overview of the worldwide FLNG fleet. Golar possesses the biggest FLNG fleet globally, as measured by millions of tons of installed capacity, and we're on par with Petronas and Eni when it comes to the count of FLNG units. Golar was the pioneer of the FLNG concept through building and delivering Hilli, and we've also shown the lowest CapEx per ton of liquefaction capacity. At present, we are the sole provider of FLNG as a service. Every other owner of FLNG tonnage uses FLNG technology either for gas reserves they own or control, or to serve their own downstream LNG demand portfolio. Golar's standing as the only maritime liquefaction service provider lets us present a distinctive value proposition to those who own stranded and associated gas reserves; we provide gas monetization via a focused, integrated strategy, in which Golar matches its commercial model with the gas resource owner through a partnership. We guarantee aligned economics across commodity cycles and price volatility. It's useful to understand the relative scale of the companies that control FLNG assets, for instance, by market cap. Golar's market cap stands at approximately $2.3 billion, while NFE and Petronas are at $7 billion-$8 billion, Eni is at $55 million, and Shell is at $215 billion. We're not claiming that FLNG valuation by itself accounts for the value of these companies, but it does provide insight into the relative scale of the participants in maritime liquefaction. Now turning to slide 7, and the reasoning behind our view that FLNG developments in Africa are well positioned for FLNG exports. Africa holds 620 TCF of proven maritime gas reserves, which is the energy equivalent of 110 billion barrels of oil, and today those reserves are either stranded, flared, or reinjected. A substantial share of these reserves can best be monetized using FLNG technology. Golar's demonstrated market-leading CapEx per ton, when compared with other liquefaction solutions such as shore-based developments, establishes an attractive cost of production. Africa's greater proximity to key LNG markets in Europe and Asia, relative to U.S. export projects, brings down shipping costs. So if you have a business with three cost drivers, and African FLNG projects come out cheaper on all three inputs, we think the ingredients for an attractive business model are there. With FLNG as a service, Golar stands alone as a proven provider, and that puts us in a strong spot to play an active part in growing gas exports from Africa further. If you turn to slide 9 now, we'll go through the business update. As mentioned, Hilli kept up its industry-leading operational record, and cargo number 102 has now been delivered. Gimi departed Singapore on Sunday, bound for the GTA field, where our 20-year contract will begin. On the business development side, an integrated model remains our target, one in which FLNG economics are aligned with the upstream partner so that exposure to LNG offtake prices is shared. Regarding Hilli, our aim is still to secure a commitment on rechartering the vessel at some point within 2024. Talks at present cover detailed terms for three separate redeployment opportunities. When it comes to Mark II, we keep advancing design, long lead items, and delivery of the donor vessel, which is expected in Q1 2024. Before we move ahead with the final investment decision, the next step is to secure commitment on commercialization projects. On corporate and other matters, adjusted EBITDA for the quarter reached $75 million. Golar's cash position sits at roughly $840 million, and above $920 million once the TTF swap receivable is included; during the quarter, we closed the sale of the LNG carrier Gandria for net consideration of $15 million.

Karl Fredrik Staubo

executive
#2

Our attention remains fixed as well on giving back to shareholders, and we've announced a quarterly dividend of $0.25. We kept up our repurchase efforts too, taking in 0.2 million shares during the quarter, which leaves 105.9 million shares outstanding in total. Logas, a well-established natural gas distribution business in Brazil, had a majority stake picked up by our wholly owned subsidiary, Macaw Energies. The first flare-to-LNG pilot for Macaw in the US is still expected to be delivered at some point in 2024. Moving to slide 10. Now that Gimi has been delivered, we anticipate a shift from CapEx toward cash flow; we're eager to begin operations and to watch Gimi move from money going out via CapEx to money coming in via earnings. Since construction risk has been removed from the project, our attention will go to optimizing debt for the unit; our targets include growing the facility size, lowering the debt margin, and extending both the repayment profile and duration relative to the existing facility. Talks are underway with prospective lenders, and we've gotten term sheets offering better terms for possible new vessel debt; on top of that, we foresee additional earnings upside when Hilli is recontracted at limited incremental CapEx, capturing the complete value of the installed liquefaction capacity across our portfolio. Moving to slide 11, where I'll go into more detail on the upcoming steps toward contract startup for Gimi. Gimi is currently sailing under its own propulsion, with one tug assisting. Refueling and crew changes are set to happen during two stopovers, in Mauritius and Namibia. We expect the whole voyage to the site to take roughly 60 days, though weather conditions could make it shorter or longer. After arriving on site, we'll inform BP that we are ready for mooring and the physical connection of the FLNG. Upstream work will then begin- the project will kick off upstream, commissioning and supply of gas to the FLNG. After first gas enters the FLNG, our target is a commissioning period, originally set at six months, though we're working closely with the GTA partners to achieve additional efficiencies during that period. When commissioning wraps up, we'll hit commercial operations date and begin the 20-year contract at the GTA field. Moving to Slide 12, and our progress on the Mark II FLNG. Key long lead items have been placed on order and are being built; as the image on the right-hand side shows, a number of the equipment pieces are starting to take form. Together with over 250,000 engineering hours logged so far, this supports fast-track project execution, cutting execution risk and trimming construction time by roughly 12 months from the point we take FID. Delivery of the Fuji LNG to us is anticipated in Q1 2024. That vessel is meant to serve as the donor vessel for the project. Negotiations on the EPC contract plus the engineering work have moved ahead considerably, and Mark II can go into execution the moment we get a commitment regarding commercialization of a unit. Interest in Mark II keeps growing, in our view, and multiple work streams related to project-specific applications are underway. Moving to Slide 13 and Macaw Energies: as we explained, the business remains on schedule to make the first flare to LNG liquefaction pilot available within the US during Q1 of next year. In addition, we recently partnered with Pilot Gas to deliver the first LNG to EV charging, which is anticipated to happen in Q2. Operational startup of the midstream core commercialization platform in Brazil should now begin in Q4. Beyond that, we are actively evaluating ways to further expand Macaw's asset portfolio, and that might involve a potential separate listing of Macaw Energies as a standalone entity at some point in 2024. At this point I'll pass the call to Eduardo, who will walk us through the group results.

Eduardo Maranhão

executive
#3

Good morning to all of you, and I appreciate that, Karl. It's a pleasure to walk through how Golar performed financially in Q3. A number of important milestones stood out in this quarter, among them the handover of Gimi along with Hilli's ongoing strong operations. If you'll move with me to Slide 15, I'd like to highlight a few of the quarter's financial results. Operating revenues on a total basis came to $67 million, while total FLNG tariffs hit $95 million. FLNG tariff is an essential non-GAAP measure, capturing a broad view of liquefaction income, such as realized gains on oil and gas derivatives. Even though there was a slight decline versus Q2, this strong showing highlights how resilient our commercial model is. Adjusted EBITDA landed at $75 million, held back by weaker realized contributions from fees tied to commodities; even so, we look for a favorable turnaround in Q4, helped by stronger Brent and TTF prices. Worth remembering that these fees get computed using a rolling average over the prior three months for Brent, plus one month ahead pricing for TTF; net income for this quarter reached $114 million, a considerable gain relative to Q2. Within that number is a total of $39 million in non-cash items, including $34 million of unrealized gains from oil and gas derivatives, plus a $5 million lift from unrealized gains on our interest rate swaps. Our liquidity stays strong, at nearly $1 billion, covering cash on hand along with other receivables tied to unwinding our TTF hedges earlier in the year; since total contractual debt sits just below $1.2 billion, our net debt came to $251 million. Now if we turn to Slide 16, we can observe how Hilli stacks up against earlier quarters. Looking at it year over year, Hilli brought in $73 million during Q3, which is 14% higher than the equivalent quarter a year ago. Breaking these figures down against Q2, we stay consistent with a fixed tolling tariff of $32 million. Brent-linked fees dipped somewhat to $13 million from $15 million in the prior quarter, while TTF-linked fees at $28 million fell from $30 million in the prior quarter. As I noted on the earlier slide, we see plenty of tailwinds from these variable fees and anticipate a favorable effect from stronger oil and gas prices, pushing tariffs higher through the remainder of 2023. Turning to slide 17, it's clear we stay exposed to TTF prices through the rest of 2023 and into 2024. At the same time, we anticipate gaining from locked-in benefits stemming from our earlier swaps. Those locked-in TTF gains, which come from effectively unwinding our hedges, will be applied on top of our fixed tolling fees along with variable Brent and TTF revenues. Thus, in Q4 of 2023, we anticipate recognizing roughly $23 million of EBITDA from those locked-in gains. And across the entire year of 2024, we anticipate roughly $49 million of EBITDA secured, or about $12 million each quarter. To show how this boosts what we earn, each $1 per million BTU shift in TTF should translate into $3.2 million annually; thus, using forward prices for the coming year, that alone ought to bring us roughly $39 million. Beyond that, on Brent, we gain an extra $2.7 million for each dollar per barrel move above $60. So, looking at forward 2024 prices, next year's combined contribution ought to reach about $56 million. As we said in Q2, we succeeded in bettering some terms on the existing Hilli financing, among them reduced margins and a longer repayment schedule. Thanks to that, and using today's forward prices, Hilli by itself should deliver a striking $650 million in free cash flow to equity across 2022 through 2024, which this slide shows. Turning now to slide 18. Our balance sheet is still solid, and we enjoy considerable flexibility to finance bigger shareholder returns while also supporting our growth goals. Liquidity right now, counting cash receivable from TTF hedges, comes to slightly below $1 billion and amply covers the development and equity needs for building new FLNG units, as Karl described on the Mark II slide. We keep looking into options that might boost liquidity further in the near term, among them optimizing and refinancing Gimi, since she has departed the yard and construction is finished. Possible asset sales, like Arctic and Avenir, the Macaw spin-off, plus more optimization and refinancing of Hilli once a new contract is in place, along with other efforts; during this quarter, we declared a dividend of $0.25 per share, with a record date of December first and payment on or about December eleventh; we bought back 0.2 million shares this quarter, which leaves 105.9 million shares outstanding. Of the $150 million approved share buyback program, $117 million is still open for additional repurchases, which we will keep pursuing when opportunities arise. Hilli's robust free cash flow generation will go on supplying the foundation for the current dividend and buyback program. Furthermore, Gimi's anticipated start up next year will open the door to higher shareholder returns. I'll now pass it to Karl for a few closing remarks.

Karl Fredrik Staubo

executive
#4

Appreciate that, Eduardo. Now we go to slide 20, where we cover the summary along with what comes next. Hilli's revenue streams have become more varied compared with its original base, including earnings tied to Brent and TTF, which Eduardo just walked through. Next, since Gimi is on the verge of beginning its contract, the number of FLNGs generating cash flow will grow by two times. We're seeing greater interest in rechartering Hilli past July 2026, and we are engaged in detailed commercial talks regarding three separate opportunities, while a number of other parties also have interest in the vessel. Work on long lead items for a Mark II FLNG is advancing well. The yard contract, along with design and engineering, is complete, so our attention is now fixed on securing the charter commitment. Our aim remains integrated projects that carry exposure to commodity prices. Operations might potentially begin in 2027. As Eduardo laid out, liquidity stands at approximately $900 million. Following Gimi's delivery, we can now pursue debt optimization. Additional potential liquidity exists through possible sales of non-core assets, and we aim to spin off Macaw Energies at some point in 2024. The dividend has room to rise once FLNG Gimi begins generating cash flow. Debt refinancings and debt optimization could deliver further increases in liquidity. On top of that, capacity remains available under the share buyback program already in place, letting us keep returning value to shareholders via buybacks; that wraps up the prepared remarks for the Q3 presentation. Thank you all for joining by phone. I'll pass the call to the operator so we can take any questions.

Ben Nolan

analyst
#5

Excellent. Thanks so much, and Karl, Eduardo, congratulations first on the Gimi being delivered. Seeing it depart the yard must come as quite a relief, I'm sure. Regarding the Gimi, perhaps you could walk me through how revenue and cash flow shape up ahead of the commissioning period? I realize some payments come in, but any detail on what those might look like before commissioning would help.

Karl Fredrik Staubo

executive
#6

Hello, Ben, and thank you for asking. Commissioning revenue kicks in only once commissioning begins, and at that stage we receive a fixed amount each day, along with a tolling fee tied to whatever LNG is actually produced during that period. As mentioned, the aim is for commissioning to last six months, yet as was also noted, our goal is to cut that duration and collaborate with the GTA partners to trim the timeline and reach COD sooner. You're right that additional contract mechanisms exist which would give Golar extra day rates on top of commissioning revenue. Those day rates fall under the contract mechanisms whose applicability we're presently discussing with BP, and since those talks are ongoing, we'd share specifics about them at a future date.

Ben Nolan

analyst
#7

Okay. All right, well, I suppose I'll simply hold off on that one. Moving to my next question, I'm interested in the Gimi refinancing. Can you get that done, or do you expect to be able to get it done, before final commissioning wraps up? And then you brought up possibly directing a portion of those proceeds toward returning capital. Just wondering. To me it looks like a buyback would be by far the simpler route compared with a dividend, though maybe share how you're thinking about it.

Karl Fredrik Staubo

executive
#8

Regarding the first portion of your question, yes, we believe refinancing can be accomplished prior to completion of commissioning. As we've discussed on a number of earlier quarterly calls, we've examined various options for refinancing this vessel for quite a while, yet it's mattered to us to remove the construction risk factor from consideration as we pursue securing the most favorable terms we can; with the vessel now having sailed, our attention on those refinancing options is growing, and as we've noted, we've already gotten term sheets that we consider attractive for refinancing this vessel. Our main priority is returning operating cash flow to shareholders while deploying other liquidity toward appealing growth, growing our FLNG portfolio.

Ben Nolan

analyst
#9

All right. When you weigh dividends against repurchases?

Karl Fredrik Staubo

executive
#10

Ultimately, the board is the one that decides that, though roughly $117 million of authorization remains available to us for buying back stock. And right now, the amount going out to shareholders from free cash flow sits below 50%. So in our view, there ought to be room to keep doing both, and while the stock changes hands below what we consider the company's fair value, repurchases strike us as a reasonable component of ongoing returns to shareholders.

Ben Nolan

analyst
#11

Okay, thanks for that. Appreciate it, Karl.

Karl Fredrik Staubo

executive
#12

You're welcome, Ben.

Greg Lewis

analyst
#13

Yes, thanks, and good afternoon, plus I appreciate you fielding my questions. I suppose this one might be directed at Eduardo. When we consider the day-to-day costs associated with the Gimi, is there any sort of discrepancy compared with what it takes to operate the Hilli, and does the contractual wording vary significantly when it comes to the operating expense aspect?

Eduardo Maranhão

executive
#14

Hello, Greg; so as we examine the projected operating costs for Gimi, and since it is essentially identical to what we have on Hilli, the majority of those costs stem from crew. Based on the terms of our agreement with BP, essentially all operating expenses get passed through according to the contract, so they ought to adhere to that structure, once operations commence.

Greg Lewis

analyst
#15

Alright, and I suppose — the ship is still out there sailing, so I imagine it's reasonable to figure that while the commissioning work is happening, at the very least, we can hand that cost along, or we'll end up recording a revenue figure above that level?

Eduardo Maranhão

executive
#16

Yes, that's right when it comes to the commissioning period. The operating expenses will be passed along to our customers.

Greg Lewis

analyst
#17

All right, that's helpful. My next item ties to the information you provided regarding those ongoing talks about possibly re-chartering the Hilli. I suppose there are two parts here. First, when we consider those negotiations, could any of them extend to the Mark II should the Hilli secure a contract? And then, more generally, since the Gimi operates under what is essentially a tolling structure, can we safely assume that going forward, that kind of work no longer interests us?

Karl Fredrik Staubo

executive
#18

Hello, Greg, Karl here. Regarding your first point, across every commercial possibility we are currently negotiating, there are crossovers involving the Hilli and the Mark II. Certain ones fit one vessel better, certain ones fit the other better, yet a lot of projects could work with either. Clearly the CapEx differs, the sizes differ; therefore, what matters most to us is gas flow along with reserve size, and partly how much pre-treatment is needed prior to the gas going into the FLNG. Since a Mark II would be newly constructed, we'd have greater room to handle pre-treatment compared with what the Hilli offers. So gas quality, gas flow, and reserve size essentially determine which of the two is chosen, though yes, crossovers do exist. If you recall a bit of Golar's past, the Hilli was ordered on spec, and the Perenco contract was secured even though the unit wasn't completely utilized, in order to prove the concept. The Gimi contract was signed with BP. It's widely recognized across the industry that following the Macondo incident, BP likely maintains the strictest operational standards for maritime equipment anywhere in the world. So if our technology can satisfy BP's operating standards, that represents a major proof of concept for applying the same technology to essentially every other possible FLNG chartering opportunity. That's likewise why we agreed to a tolling fee with BP; and you're right to note that in the future, we wouldn't be seeking tolling fees, but instead mostly more integrated solutions, because of the highly attractive risk reward we perceive in that kind of contract structure, and also since we're the sole FLNG service provider capable of monetizing these assets.

Greg Lewis

analyst
#19

That's really useful, Karl. Thanks a lot, and yes, we'll speak again before long.

Karl Fredrik Staubo

executive
#20

Thank you, Greg.

Chris Robertson

analyst
#21

Hello, good morning and good afternoon, Karl and Eduardo. I appreciate you both taking the time for my questions. This one, folks, pertains to slide 10 regarding the adjusted EBITDA guidance for 2024. I was just hoping you might clarify the gap between the update from last quarter and the one we have now. Is that variation in the 2024 figure tied to, say, when the Gimi startup occurs, or what exactly is feeding into that number that has shifted compared with the previous occasion?

Karl Fredrik Staubo

executive
#22

Would you care to take that one, Eduardo?

Eduardo Maranhão

executive
#23

Yeah, absolutely. So, I'd say the key thing that's changed for 2024 is that we've refreshed those numbers using the latest forward curves for Brent and TTF; so my sense is those are mainly what will push around the variable fees on Hilli, and that's really where most of the gap comes from.

Chris Robertson

analyst
#24

Chris, thanks. When the existing deal wraps up on the Hilli, what kind of off-hire period and what sort of capital spending range do you figure would be needed to get that unit ready for whatever comes next? I realize there are open questions about the destination and the nature of the project, but at this point are you sketching out some bracket for the required CapEx?

Karl Fredrik Staubo

executive
#25

Hi, Chris. Yes. Essentially, the range depends. It truly hinges on where the next deal takes place and how long it runs; however, if we assume a 10 to 20-year deal when it gets recontracted, plus a move to a different region outside Cameroon, then we'd probably be looking at somewhere between 6 to 12 months of downtime, and that figure would cover the transit legs to the new location as well as any upgrades the vessel might need; and on the CapEx side, the figure might land anywhere from, I'd say, at the very bottom, $50-$200 million.

Chris Robertson

analyst
#26

All right, understood. That makes sense. And to follow up regarding the CapEx guidance, could you remind us how much has been put in so far for the long lead items on the Mark II project, and roughly what the remaining total projected CapEx would be if an FID decision is made?

Karl Fredrik Staubo

executive
#27

Eduardo?

Eduardo Maranhão

executive
#28

Right, of course. So up to now, we've committed roughly $300 million toward long lead items, and of that, about 50%, or $155 million, has already been spent; with each of those suppliers, we have a payment schedule that's been agreed on, and essentially that ought to be paid out across the coming quarters and stretching even past the close of 2024; so the price is agreed, and that price tracks a schedule we've agreed.

Karl Fredrik Staubo

executive
#29

After that, the extra $100 million mostly has to do with the ship and engineering costs. That brings the total commitment, or the commitment as it stands now, on Mark II to roughly $400 million. And then the additional—

Chris Robertson

analyst
#30

Understood.

Karl Fredrik Staubo

executive
#31

If we reach FID, that figure would come to roughly $1.6 billion, which would push overall CapEx to about $2 billion.

Chris Robertson

analyst
#32

Okay, that makes sense. Thanks, everyone.

Analyst

analyst
#33

Hi, everyone, Matt here on behalf of Chris. Appreciate you taking my question. I was hoping to dig into a few specifics regarding the Gimi schedule. Right now it's on its way to reach the GTA hub sometime around mid to late December. Is that still what you're expecting? And then, just to get a bit more clarity on when we might first see gas start to flow and eventually hit that full commissioning rate. If I've got this right based on the press release and what's been said today, that process takes roughly six months, correct? Starting from when Gimi shows up at GTA on site, which would place it around the middle of next year when that full rate would be achieved. I'm just looking for a bit more clarity here, since my understanding was that this might happen closer to the end of Q1 2024. So any additional detail would be appreciated. Thanks.

Karl Fredrik Staubo

executive
#34

Yes. Hello, Matt; the voyage should take roughly 60 days counting from today; so we're anticipating, let's say, late December or early January. It could be done faster. The main variable is really the weather conditions rounding the Cape, which is the critical sensitivity. That said, 60 days factors in a weather allowance. After that, assuming the project can supply us gas, we'd connect and begin sending gas into the FLNG once we're on site, and commissioning would then require as much as 6 months. As was covered in Greg's question a moment ago, during that time we'd receive a commissioning fixed day rate along with a tolling fee tied to the actual liquefaction achieved over the commissioning window. Once again, we're coordinating with the GTA partners to reduce that duration. Should the project be unable to provide us gas, a separate contractual provision would apply instead, essentially a standby day rate, whereby we get compensated for remaining on site until the project can deliver gas to us and commissioning gets underway. That standby day rate follows a staircase structure, beginning at a fairly modest level that covers OpEx plus a small margin, then stepping up the longer we remain on standby day rate. Nevertheless, both we and the GTA partners share a clear goal of achieving gas flow and reaching commercial operations date at the earliest opportunity.

Analyst

analyst
#35

Great, that level of detail is much appreciated. Yeah, no, that is quite useful. Then, as a quick follow-up, could you expand a bit more on the additional contracting—or rather, recontracting—possibilities for Hilli? I understand there's a possible 2024 commitment that seems to be emerging, which looks like a change from the prior quarter. Any specifics would help, just so I can grasp the full picture and how likely it is that this commitment actually comes through.

Karl Fredrik Staubo

executive
#36

Yeah. There's consistently a tension between what we believe maximizes the asset's industrial return and what the financial markets seek in terms of visibility, and we aim to strike a balance between those. Yet ultimately, this is the sole FLNG open for gas monetization at the close of 2026 and the start of 2027. And we believe the commercial worth of that is highly appealing, and that's further backed by the commercial talks we're engaged in. As we mentioned, we're in detailed commercial discussions regarding three opportunities, and several other gas resource owners are performing technical work on the feasibility of FLNG monetization for their resources. Once we achieve commercial agreement, which honestly isn't the hardest piece of an FLNG commercial deal, we then must coordinate with the upstream partner, along with all the regulatory approvals that are required. So depending on geography, that involves everything from PSC terms, fiscal regime, environmental sign-off, confirmation of mooring location, and these, let's call them steps needed for FID. So commercially, we believe we'll have line of sight much earlier than when we'd officially have a firm commitment. So we're now actively working to finalize commercial terms and to build a clear timeline alongside the upstream partner and local regulators regarding where the ship would operate. At present, we see the competitive tension around interest in the vessel working to our advantage, and that's what we're trying to balance alongside the financial markets' anxiety—or rather their need or desire to see clarity on recontracting.

Analyst

analyst
#37

That's quite useful. I'm grateful for the specifics. With that, I'll pass it along.

Craig Shere

analyst
#38

Greetings, everyone, on New York time. Congrats on the headway you've made. To clear up one point from what was said regarding Ben's inquiry about the Gimi refi: it seemed as though your operating cash flow is meant to fund shareholder capital returns, while one-off items—such as asset sales or cash outs, for instance the Gimi refi—are meant to go toward future growth investment. Therefore, what I'd like to ask is this: for a Mark Three FID, how much cash on hand do you anticipate will be required? Also, should you end up with significantly greater liquidity following the Gimi refi, would that simply assist in covering a Hilli redeployment stretch, or are you already considering something past the Fuji conversion?

Karl Fredrik Staubo

executive
#39

Alright, here's how we're looking at it: operating cash flow has the potential to go back to shareholders via buybacks plus dividends. Right now, our view is that the cash on hand could be directed toward redeploying Hilli, reaching FID on a Mark Two, and depending on how the timing works out, possibly additional FLNGs after that. When it comes to what a Mark Two would need in terms of capital, we estimate CapEx at roughly ±$2 billion. We figure debt that can be accessed during construction ought to land somewhere around ±1 to 1.2; so we, our estimate is approximately $800 million. Since we're also holding onto a portion of operating cash flow at present, we believe our liquidity is more than sufficient to handle an FLNG FID, the Hilli redeployment, and then some. Should we proceed with asset disposals, the board will determine how that capital gets allocated. But broadly speaking, our view is that operating cash flow ought to fund a sustainable dividend, while other cash should go toward attractive growth projects.

Craig Shere

analyst
#40

Understood. So after recontracting, when it comes to sending the Hilli somewhere else, perhaps to commence operations at a different site, maybe early in 2027 — if that opportunity turns out to be far more appealing than, say, certain elevated guaranteed cash flows paired with some upside participation, are you able to complete a refinancing on it too and take money out?

Karl Fredrik Staubo

executive
#41

Yes, that's correct. Right now, the vessel runs at roughly 1.4 million to 1.44 million tons a year, while its installed capacity stands at 2.4. Under a fresh contract, we'd normally apply a discount to the committed volumes, bringing them to somewhere in the range of 2 million to 2.2 million tons, and that's what would account for most of the earnings uplift compared with the existing contract. It comes down simply to running at a higher rate of capacity utilization. That factor, paired with pursuing stronger or more favorable economics in a new agreement, ought to lift earnings from Hilli — so higher capacity utilization plus better economics. And yes, that ought to set off refinancing of Hilli. the vessel runs at roughly 1.4 million to 1.44 million tonnes a year, while its installed capacity stands at 2.4 million. the vessel runs at roughly 1.4 million to 1.44 million tonnes a year, while its installed capacity stands at 2.4 million.

Craig Shere

analyst
#42

So then, on the follow-up side, when it comes to a Hilli refinancing, similar to what you already talked about with the Gimi — is that just extra gravy, or could it maybe go toward returning capital?

Karl Fredrik Staubo

executive
#43

So yeah, it ought to be. I suppose that holds as of that moment, provided we continue to witness the same appeal in FLNG growth projects; however, based on how we currently view the outlook, we would still allocate that toward FLNG growth, since in our view the market opportunity is very substantial and considerably larger than 1, 2, or even 3 units.

Craig Shere

analyst
#44

Thanks.

Karl Fredrik Staubo

executive
#45

Thanks, everyone, for joining the call. The third quarter marked a significant moment for Golar, featuring both the operational achievement of Hilli's 100th cargo and, just as crucially, Gimi's delivery. We're eager for what comes next, and we'll be speaking with you again in the following quarter. Appreciate you joining, and goodbye.

Operator

operator
#46

This concludes today's conference call. Thank you for participating. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Golar LNG Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Golar LNG Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Golar LNG Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.