Golar LNG Limited (GLNG) Earnings Call Transcript & Summary
February 29, 2024
Earnings Call Speaker Segments
Karl Fredrik Staubo
executiveAppreciate it, and good afternoon, everybody — glad to have you with us for Golar LNG's Q4 2023 earnings results presentation. Karl Fredrik Staubo here, CEO of Golar LNG, and alongside me to go through this quarter's results is our CFO, Mr. Eduardo Maranhão. Prior to getting into the presentation, please take note of the forward-looking statements on slide two. Starting on slide three, we'll give an overview of where Golar stands today. We have two FLNGs in our ownership: Hilli, which is operating for Perenco in Cameroon, and FLNG Gimi, which was delivered from Seatrium Shipyard in November of last year and is now moored at the GTA Hub offshore Senegal and Mauritania, where she'll stay for the next 20 years. Also in our fleet are a pair of LNG carriers. The Fuji is one we've reached an agreement to purchase, with the plan being to convert it into a Mark II FLNG, and delivery of that ship should happen next week. The other, Golar Arctic, is a non-core holding that doesn't fit within our FLNG strategy, and at present we're evaluating what to do with it — whether that means finding a charter or selling it. On the financial side we have two investments: Avenir LNG, which operates in small-scale LNG shipping, and Macaw Energies, a land-based liquefaction business aimed at monetizing flare gas with a focus on the Americas. Macaw's prospects have us especially enthusiastic, and later in this presentation we'll provide additional detail on how things are developing there. Now on slide four, you'll see that Golar holds the title of the biggest FLNG owner and operator globally, and we're the sole company in the FLNG space providing floating liquefaction as a service. Why does that matter? Because owners of gas resources with proven reserves — whether that gas is stranded, being reinjected, or getting flared — want to turn those proven reserves into money while still keeping significant ownership and exposure to their own resource. Since Golar is the one service provider for maritime liquefaction, we can give these resource owners a value proposition that nobody else offers. Our FLNG fleet is the largest in the world when measured by liquefaction capacity, and we're on equal footing with Eni and Petronas when it comes to the number of units. On the FLNG side, Golar was first to develop the concept — we built and delivered Hilli — and we've shown both the lowest capital expenditure per ton and an operating record that leads the market. If you look at slide five, it gives a picture of worldwide LNG supply along with why FLNG projects look appealing. Today's global LNG market sits at roughly 400 million tons, and when you count projects already being built or still waiting on a final investment decision, supply is projected to increase by as much as 220 million tons, which works out to over 50%, between now and 2030. The country adding the most LNG production will be the U.S., which currently holds 22% of worldwide volumes and accounts for 57% of the additional output that's planned. Looking at the rightmost section, you'll see a comparison of what it costs global suppliers to bring their volumes into Europe. Inside that cost stack you've got source gas expenses, liquefaction costs, and shipping. If you use Henry Hub forward curves, then a big chunk of U.S. volumes end up with a landed price in Europe around $300,000 per MMBTU, and that gives LNG prices some support. What we're targeting are LNG projects where feed gas can be obtained at a far cheaper level. Because we've demonstrated lower CapEx per ton, and because the locations we're watching involve shorter shipping distances, we figure landed gas prices come out to approximately $5 per MMBTU for the projects currently being discussed. What this tells us is that Golar's present FLNG build-out could generate a margin of $5 per MMBTU when measured against the break-even landed costs for U.S. exports. Given that break-even landed cost — the figure that applies to the majority of American projects — the EBITDA from the FLNG project we're discussing lands somewhere in the range of $600 million to $875 million, with the exact figure hinging on whether a Hilli or a Mark II FLNG is chosen, and with resource owner and Golar dividing those economics between them. These projects' attractive break-even cost likewise ensures the business model holds up even if gas prices remain volatile. In the next session we'll turn to the business update, together with a recap of Q4 and events that followed, found on slide seven. Hilli has continued to perform at a high standard operationally — since we started operations back in 2018, we've now delivered 108 cargoes, and to date that's more than seven million tons of LNG. As we described, Gimi is now moored at the GTA Hub and is ready to start operations under its 20-year contract with BP, offshore Senegal and Mauritania. We're continuing to move our Mark II growth project forward; we've invested $187 million so far, and next week we're set to take delivery of the Fuji LNG, which is our vessel conversion candidate. We're seeing strong development for FLNG projects, including redeployment opportunities for Hilli and new projects for Mark II FLNGs. Talks are happening at this moment about charter possibilities lasting between 12 and 20 years, and it's a pleasure for us to be getting commercial terms in line with the owners of gas resources. Now over to the right-hand side, corporate and other. The standout financial item for the quarter was Adjusted EBITDA reaching $114 million, a figure that factors in the catch-up tied to 2022 underutilization of the FLNG Hilli. Right now our liquidity stands at about $800 million, and Eduardo will walk through more specifics regarding how the quarter performed financially later on in this presentation. Returning capital to shareholders stays our priority, so we've declared a dividend of $0.0025 for the quarter and bought back 1.3 million shares in Q4; on top of that, we resold $61 million worth of our unsecured treasury bonds. Following that transaction, our bonds remaining in circulation total $200 million, while $100 million is held in treasury. Turning now to slide eight. On November 19th, the Gimi departed from Seatrium, bringing to a close a construction phase that lasted four years. COVID's impact on the conversion work caused that timeline to stretch out. An efficient tow brought us from Singapore to Senegal and Mauritania, and we arrived at the GTA field on January 10th, 2024. At present, the vessel sits moored at the GTA Hub, secured by all 26 mooring lines, which will keep her in place and act as her residence over the coming 20 years. To reiterate what we said, the ship is set to begin work, and right now what we're awaiting is the hookup of the feed gas pipeline along with the start of those operations. According to the client, the first gas should arrive during the third quarter of 2024, assuming the upstream work is finally wrapped up and the FPSO is installed. Moving to slide nine, where we shine more light on the main steps remaining for Gimi and the GTA field on the path to COD. Since the initial pair of major milestones has been completed, what lies ahead is getting into LNG production. Roughly half a year is the anticipated length of the commissioning phase, after which commercial operations should follow. Before the commencement date arrives, Gimi anticipates collecting a standby day rate plus daily commissioning payments. Once that commencement date lands, the 20-year lease and operate agreement kicks in, which frees up roughly $3 billion in Adjusted EBITDA backlog for Golar, equivalent to about $150 million in annual EBITDA. Now on to slide 10, where the focus shifts to Hilli. During 2023, Hilli hit the highest output level she has achieved since startup; all told, the unit delivered 1.46 MTPA across 2023, which factors in the underproduction from 2022 and also beats the contractual volume by roughly 300,000. Since being delivered, the vessel has maintained its industry-leading operational uptime, and our satisfaction remains very high with the unit itself, the technology, and the operating teams who handle the day-to-day running. Let's move to Mark II on slide 11.
Karl Fredrik Staubo
executiveLike we said before, we've put over $400 million toward the next FLNG vessel we have planned, a Mark II FLNG capable of 3.5 MTPA of liquefaction. Long lead items are 55% done at this point in terms of construction, and $187 million of that commitment has been used so far. In the coming week, we anticipate taking delivery of the LNG carrier Fuji, which we intend to use as a conversion candidate for this project. Our plan is to run Fuji as an LNG carrier up until the point when her conversion work begins. Pricing and yard availability have been reconfirmed for a possible Mark II FLNG order, and we anticipate delivery in 2027, as long as final investment decision is taken during 2024. There's also been movement on a possible Mark II debt facility, with terms in the process of being finalized, and that facility won't hinge on a charter for the unit. If you turn to slide 12, we've witnessed robust advancement of new FLNG projects over the quarter. It's pleasing that we are converging on commercial terms with owners of gas resources, along with the appeal of these possible gas developments, which have enough resources to back charters running 12 to 20 years. A framework agreement for a possible new FLNG project was signed recently, and it can use either the Hilli or a Mark II FLNG; beyond the commercial headway made with these counterparts, technical and fiscal terms are being worked on at the same time. As talked about before on our quarterly calls, these are big infrastructure projects requiring approvals from environmental bodies and governmental sign-offs, plus commercial agreements with gas resource owners; we're enthusiastic about the development and headway on all these elements of the possible projects under discussion. Moving to slide 13 and an update on Macaw, one more part of our portfolio where developments look very positive. Just to remind everyone, Macaw is a wholly-owned Golar subsidiary. The company is going after land-based flare-to-LNG mobile solutions that we've called F2X, and the ISO containers holding the LNG will be called Liquid Flare. On the right-hand side of the slide, as you can see, construction of the first units has been finished on time and on budget, and production testing will begin in Q2 2024. We're seeing considerable interest from prospective clients aiming to monetize flare gas, for both the economic and environmental advantages this technology makes possible. After production has been proven, we will assess a separate listing of Macaw to enable an accelerated rollout of this technology. I'll now pass the call to Eduardo, who will present our Q4 results.
Eduardo Maranhão
executiveGood morning, everyone, and thank you, Karl. It's a pleasure to walk you through how Golar performed financially in the fourth quarter. If you'll turn to slide 15, I'd like to highlight a few things from this quarter. Our total operating revenue came to $80 million, while total FLNG tariffs hit $106 million, which is 12% higher than what we saw last quarter. The FLNG tariff is an important measure — it captures a broad view of liquefaction revenues, including realized gains on oil and gas derivatives. Adjusted EBITDA reached $114 million, a 52% jump versus the prior quarter, helped by Hilli's results, which beat her contracted 2023 production volume and led to the release of the remaining 2022 underutilization balance of $29 million. We recorded a net loss of $31 million in Q4. That number reflects $117 million in known cash items, including changes in the value of TTF and Brent derivatives in our interest rate swaps. We ended the year with total cash of $753 million and total contractual debt of $1.2 billion. If you factor in the value of remaining receivables from our TTF hedges, net debt at year-end stood at $411 million. Now on slide 16, you can see how Hilli's EBITDA contribution has evolved across recent quarters. On a year-over-year basis, Hilli produced $84 million in Q4, which is 15% more than the previous quarter; that includes $33 million from base tolling fees. Brent-linked fees rose to $20 million from $13 million last quarter, and TTF-linked fees were $31 million, up from $28 million in Q3. Turning to slide 17, you'll see we're still exposed to TTF prices through the rest of 2024, though we also expect to gain from locked-in benefits tied to our earlier swaps. Those locked-in gains from unwinding our TTF hedges will be added on top of our fixed tolling fees and variable Brent and TTF revenues. That works out to roughly $49 million of EBITDA, or about $12 million per quarter in 2024. Total debt service, including principal amortization, should decline to $87 million in 2024, which gives total free cash flow to equity of approximately $174 million, based on forward prices for Brent and TTF. As this graph shows, total free cash flow to equity generated just between 2022 and 2024 should exceed $620 million, with potential for further upside depending on oil and gas prices. Now to slide 18; we're still dedicated to returning capital to shareholders, and as you can see, during 2023 we paid more than $430 million in dividends, share buybacks, and the purchase of NFE's stake in FLNG Hilli. This quarter, we declared a dividend of $0.25 a share, with a record date of the 12th of March and payment on the 20th of March; we also bought back 1.3 million shares this quarter, leaving 104.6 million shares outstanding. We still have $88 million left to use under the $150 million share repurchase authorization that was approved, and we'll keep looking for chances to buy back stock when it makes sense. Now I'll pass things to Karl, and then I'll share a few final thoughts.
Karl Fredrik Staubo
executiveThanks, Eduardo. Now let's move to slide 20, where we'll cover the summary and what comes next. We keep seeing our revenue mix broaden, thanks to the delivery of Gimi. As a result, we now have all three parts of Hilli: the base revenue, the Brent link, and the TTF link, plus Gimi's 20-year contract with BP getting underway. When it comes to FLNG business development, we're seeing solid headway on both redeploying Hilli and the possible employment of Mark II. As we explained, a framework agreement has been signed with a prospective customer that could use either of the two liquefaction solutions. The contracts being discussed involve commercial terms, with opportunities lasting 12 to 20 years. Regarding the potential FID for Mark II, long lead items are advancing well. The yard contract design and engineering is FID-ready, and if we place the vessel order during 2024, we expect delivery during 2027; we continue to hold a robust liquidity position of roughly $800 million. Delivering Gimi opens the door to debt optimization. We're looking at possible asset sales among non-core assets, especially the Golar Arctic, and we're aiming for a separate listing of Macaw once the unit has proven itself. We stay dedicated to appealing growth and returns for shareholders. We anticipate dividend upside once Gimi begins her contract, and we also foresee the possible unlocking of substantial liquidity when we move to refinance the unit. On top of that, we still have remaining capacity under our current share buyback program, a significant portion of which we used during 2023. That wraps up the prepared remarks for the Q4 call. Thanks for joining us. I'll hand things over to the operator now for any questions.
Ben Nolan
analystThanks, and good morning, everyone, or perhaps good afternoon. Let me check. I have 2 questions. The first one concerns the Gimi, and I appreciate the schedule you provided regarding commissioning and so on. What should we expect in terms of the income statement effect before commissioning takes place? Do we see any revenue or any expense, or does all of that simply get offset against the balance sheet?
Eduardo Maranhão
executiveHi, Ben. This is Eduardo. How are you?
Ben Nolan
analystGood.
Eduardo Maranhão
executiveExactly as you noted, throughout the commissioning and integration stage, we'll be capitalizing that revenue up to the point when COD actually begins; consequently, those amounts are going to appear on our balance sheet right until COD. Upon reaching COD, they'll be amortized, spread evenly across the contract's duration.
Ben Nolan
analystUnderstood. It's the same situation with cost, right? Those costs get capitalized?
Eduardo Maranhão
executiveYes.
Ben Nolan
analystOkay, understood. That's helpful. I'd like to shift over to the Hilli for a moment, specifically regarding that framework agreement you've got in place. I was curious whether you could shed a bit more light on where things stand procedurally, and whether you have any read on when it might transition into something with firmer commitments.
Karl Fredrik Staubo
executiveThe way we see it, the point of this framework agreement — and we're happy to have signed it — is that it lays out agreed commercial terms along with quite concrete milestones each side has to hit. Our confidence is high that both sides can hit the deadlines laid out in that framework. The bigger question mark concerns how this dovetails with government agencies and their approvals. Those processes are already underway. We've held joint sessions with the pertinent authorities. Judging by the signals we've gotten so far, they appear to line up with the schedule we've proposed, though that piece remains the wild card when it comes to pinning down precisely when this will happen. Something we've consistently stated over a long stretch is our desire to gain clarity on Hilli at some point in 2024 — partly because that clarity is valuable in itself, and partly because it assists us in mapping out the following stage, assuming a relocation away from the present site becomes necessary. So as far as the timeline goes, that goal hasn't changed.
Ben Nolan
analystAll right. Is this one in West Africa? Only Perenco.
Karl Fredrik Staubo
executiveWe are discussing possibilities in both locations, and in a number of locations, but at present this particular framework agreement is not situated in West Africa.
Ben Nolan
analystAll right, got it. That's helpful — thanks.
Liam Burke
analystSure, thanks. Hello there, Karl — how's everything going?
Karl Fredrik Staubo
executiveAll right. Appreciate it.
Liam Burke
analystKarl, beyond the FLNG and the Mark II, you hold additional investments. In what way do you weigh your investment priorities — your main FLNG focus — against those other ancillary opportunities?
Karl Fredrik Staubo
executiveThat's a good question. So regarding Golar, as you're aware, over the past 2.5 years, we've undergone some restructuring, concentrating our work on FLNG. Along those lines, we hold one legacy investment in Avenir LNG, a small-scale shipping business that mattered greatly to us back when we owned Golar Power or Hygo Energy Transition. Today it matters less; so how you should view Avenir is as something we're fond of, yet we don't intend to put additional capital toward it, and we'll remain opportunistic regarding our stake in Avenir. As for Macaw Energies, we regard it as closely matching our floating operations. What it involves is liquefying proven reserves, specifically flare gas in this case. We're able to apply the know-how gained through FLNGs to seize what we believe is an enormous market chance — economically, environmentally, and politically — to capture flare gas. We view that as a quicker route to putting capital to work or earning a return on it, which explains why we launched Macaw at this moment; nonetheless, the vast bulk of our money will go toward FLNG growth projects. Therefore, we're looking at a distinct spin-off of Macaw to speed up that business. It isn't one where we at Golar anticipate committing any meaningful capital past what's already there. Our capital is meant for FLNG and nothing else.
Liam Burke
analystUnderstood. Alright. Now regarding the dividend policy, do you intend to keep that dividend going throughout the cycle, or might that be something you would weigh once these other investment opportunities come along down the road?
Karl Fredrik Staubo
executiveAt the point when we brought back dividends during the prior year, we stated that stability, predictability, and growth over time matter enormously to us. That's why we initially set the amount at $0.0025 — in our view, that level can be maintained quite comfortably. Our expectation is that we'll be able to raise dividends down the road, though any increase needs to be at a level we can sustain. So we'd like to see Gimi reach COD before we make any increase, unless other chances to raise it come along. Still, returns to shareholders sit very high on our list right now and in the future.
Liam Burke
analystAll righty. Thank you, Karl.
Karl Fredrik Staubo
executiveThank you.
Ben Moore
analystHello, and good morning. Ben Moore here, dialing in on behalf of Chris Robertson at Deutsche Bank. When we consider how the LNG sector shapes up over the next several years, additional capacity is set to start up along the U.S. Gulf Coast as well as in Qatar before long. Given that backdrop for FLNG prospects, have your views shifted at all across the most recent few quarters regarding which kinds of opportunities exist out there?
Karl Fredrik Staubo
executiveAbsolutely not. In our view, it's quite advantageous. Essentially, once LNG prices surged after the Russia-Ukraine conflict, especially with what happened to the Nord Stream pipeline, whether you call it an accident or an incident, you observed gas prices reach a point that gave end users a really powerful reason to move away from LNG and natural gas. Our belief is that having abundant, long-term LNG supply along with a growing number of supply sources serves the industry's interests. A price environment that's more stable, then, strikes us as highly beneficial for end-user demand, and that ought to be quite positive for the industry. Specifically, when we discuss Qatar's expansion and volumes from the U.S., and U.S. volumes in particular, we devoted some time on slide five to lay out that we view the landed cost for those volumes as roughly twice what the FLNG projects we're presently negotiating would deliver. So we regard this as self-regulating: when such a big share of LNG supply growth carries a break-even that's double what we're hoping to achieve, that ought to act as a self-regulating mechanism, further reinforcing how attractive the projects are, so we view this development favorably.
Ben Moore
analystThanks. Perhaps to build on that, could you describe how the Hilli is set up right now when it comes to what makes up the gas stream? Does the way it's built today allow it to take on wet gas chances, or could it be modified down the road as you consider recontracting possibilities? We were simply hoping to gain a clearer sense of the kinds of fields and opportunities where this asset might be put to work.
Karl Fredrik Staubo
executiveOne core principle behind every FLNG design we offer is that the design stays generic. We don't tailor anything to a particular gas composition. What the liquefaction plant assumes is pipeline-quality gas coming aboard the vessel. If the gas composition from the fields under evaluation falls outside that quality, then the units rely on a pretreatment facility that strips liquids from the gas before it reaches the FLNG; that partly explains how we get the CapEx per ton we get and the operational efficiencies we've delivered. Whenever substantial gas treatment is needed, our view is that keeping the two separate is much more beneficial and safer for operations.
Ben Moore
analystGreat, I appreciate it.
Karl Fredrik Staubo
executiveI want to thank everyone for calling in and hearing what the company had to share about this quarter. We feel good about the progress being made, and we can't wait to speak with you again when the next quarter comes around. Enjoy the rest of your day, everyone, and take care.
Operator
operatorThanks so much. That brings us to the end of today's call. We appreciate everyone for joining in. You're welcome to disconnect at this point. And for our speakers, please remain on the line.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Golar LNG Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Golar LNG Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Golar LNG Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.