Golar LNG Limited (GLNG) Earnings Call Transcript & Summary

May 28, 2024

NASDAQ US Energy Oil, Gas and Consumable Fuels earnings 44 min

Earnings Call Speaker Segments

Karl Staubo

executive
#1

Thanks, operator, and hello everyone — welcome to Golar LNG's presentation of our Q1 2024 earnings results. Karl Fredrik Staubo here, CEO of Golar LNG, and joining me today is our CFO, Eduardo Maranhao, to take you through the results for the quarter. Before we get into the presentation, please note the forward-looking statements found on Slide 2. Starting on Slide 3, we give an overview of Golar as it stands today. We own 2 FLNG assets: Hilli, the first FLNG anywhere in the world, which has an operational track record that leads the market — 100% economic uptime since operations began in 2018; and the FLNG Gimi, which was recently delivered to the GTA Hub Offshore Senegal and Mauritania, where it will start a 20-year contract for BP. We're looking at whether to place an order for a third FLNG, the Mark II, which would have liquefaction capacity of 3.5 MTPA per year. During Q1, we accepted delivery of the LNG carrier Fuji LNG, the vessel chosen as the conversion candidate for FLNG; in addition, we hold an older shipping LNG carrier called Golar Arctic, and at this point we're weighing options for it — either a long-term charter or selling the vessel if a good opportunity comes along. There are a couple of financial investments we hold. One is Macaw Energies, which is a compact, land-based approach to capturing flare gas and turning it into value. The other is Avenir LNG, a modest-sized LNG carrier business; Golar was one of its founding shareholders, alongside Stolt-Nielsen and Hoegh LNG. Over on the right side of this slide, we've laid out a few of Golar's key figures. Financially, we're in a solid spot: market capitalization sits at $2.8 billion, we hold roughly $700 million in cash, net debt stands at $550 million, and we have considerable flexibility when it comes to optimizing the debt on our existing assets. During 2023, our EBITDA came in at $356 million. That figure doesn't yet reflect Gimi coming online, and her 20-year charter with BP is anticipated to bring roughly $150 million in yearly EBITDA to Golar. We enjoy substantial visibility into cash flows, given an EBITDA backlog of around $5 billion, and there's additional potential once Hilli gets recontracted and we proceed toward a contemplated FID on our Mark II FLNG project. Returning capital to shareholders remains a key priority for us. In the past year, we brought back a quarterly dividend and sped up a share buyback program. We feel quite optimistic about where the business stands and the strides we've made this quarter on appealing FLNG growth opportunities. Now let's move to Slide 4. When it comes to FLNG offered as a service, Golar is the sole company doing this, and no one else has a fleet bigger than ours in terms of production capacity. That matters because owners of gas resources with proven reserves — whether that gas is stranded, being reinjected, or getting flared — want to turn those reserves into revenue while still keeping a significant stake and exposure. Because Golar stands alone as the demonstrated maritime liquefaction service provider, we can bring a distinctive value proposition to those resource owners and governments. Measured by unit count, our fleet is the biggest, matching ENI and Petronas, and by liquefaction capacity it ranks first globally. The FLNG idea itself started with Golar, through building and delivering Hilli. We've shown too that no one beats us on capital expenditure for each tonne of liquefaction capacity, plus a top-tier operating record. Given where talks with the yard stand right now on the Mark II FLNG project we're contemplating, our expectation is that we hold onto that appealing figure of roughly $600 million for every MTPA of production capacity. Let's move to Slide 5. The demand picture for LNG stays robust, with a solid outlook. Our constructive stance on the LNG market continues, since the demand outlook is healthy and we anticipate growth near 70% in traded volumes from 2023 through 2040. Renewables aside, LNG ranks as the energy source growing second-fastest. Geographically speaking, it's Asian countries that propel LNG demand, accounting for over 85% of the growth in expected demand out to 2040. Decarbonization pushes in energy-heavy sectors — steel, cement and fertilizer among them — are what fuel LNG demand. Because it offers emissions and flexibility advantages relative to other fossil fuels, LNG is preferred; switching from coal and oil to LNG and natural gas plays a major role in hitting the targeted cut in energy-related emissions by 2050; that underpins long-term offtake demand for the FLNG units we build. On top of that, growing attention to data centers and AI is lifting energy demand across both the Eastern and Western Hemisphere, which offsets part of the lower energy demand coming from greater efficiency among other energy consumers. We're also observing broader growth in power consumption among developing nations, with industrial production expanding as outsourced overseas production shifts away from China toward other low-cost regions. Nations like Thailand and Bangladesh are quickly ramping up LNG consumption, with demand growth projected to go from 20 million to 60 million tonnes out to 2040. Now to Slide 7, covering the quarter's highlights. Hilli kept up her operational excellence, and has delivered 112 cargoes since start-up along with over 7 million tonnes of LNG produced. Gimi sits moored at the GTA Hub, set to begin operations. On this mega project, the GTA FPSO stays on the critical path for LNG production. We've moved the contemplated Mark II growth projects nearer to FID, with solid progress on all 3 parameters that must be satisfied for FID. Those 3 consist of a final yard EPC contract, construction financing — Eduardo will go into that later — and commercial opportunities for FLNG deployments. Should we reach FID on the Mark II during '24, our expectation is delivery of the FLNG in the second half of '27. Back in Q4, we told you about a framework agreement covering a possible FLNG deployment. That has now moved forward, and we're in detailed talks over documents for a potential charter of as long as 20 years, with operations beginning in 2027. Later in this presentation, we'll share more specifics on that. On the corporate and other side, Eduardo will take everyone through the quarterly results in a moment. Turning to Macaw Energies, the pilot LNG production unit, which we call F2X, has been built successfully. Testing has already seen the F2X unit generate LNG, and right now it's on its way to a flare gas location in Texas, where it will undergo live testing and be used commercially. After we've completely validated the Macaw technology, we'll look at options for spinning list Macaw off as its own standalone business and accumulating a collection of F2X units. Moving to Slide 8, here's where things stand with the FLNG Gimi. Over on the right side of that slide, Gimi is shown secured at the GTA Hub. The vessel is positioned behind a breakwater measuring 1.2 kilometers, fastened to the steel structure that forms the hub. On that same right-hand side, you can observe the FPSO owned by BP leaving Tenerife as she heads toward our offshore site. Getting the FPSO hooked up and commissioned now sits on the critical path toward first gas, and we expect that to take place during Q3 '24. While we're waiting on first gas, Golar has begun collecting the standby day rate. We're happy to report, too, that we achieved constructive headway with the GTA operators, BP and Kosmos, in settling the contested pre-COD contractual mechanisms, along with aligning our interests and cooperating to develop options for cutting down the planned 6-month commissioning window; we'll keep building on the productive partnership among the partners to shorten the timeline to COD. Slide 9 lays out in more detail the essential milestones for Gimi and the GTA field on the road to COD.

Karl Staubo

executive
#2

So as you can see, we've wrapped up the first 2 milestones, and now we're getting ready to move into LNG production. As we explained, commissioning should take roughly 6 months, and commercial operations are expected to follow after that. As we explained, until COD we're receiving a standby day rate plus daily commissioning payments. Once COD hits, it kicks off a 20-year lease and operate agreement, which releases the equivalent of roughly $3 billion in adjusted EBITDA backlog for Golar, or about $150 million each year. Moving to Slide 10 and Hilli. Hilli kept up her market-leading operational performance, delivering yet another quarter at 100% economic uptime. Beyond the economic gains for Hilli stakeholders — the host government, upstream partners and Golar shareholders among them — our FLNG operations bring substantial environmental advantages to the regions where we work, particularly when the source gas would otherwise be flared. Through a range of initiatives, including local purchasing and hiring of domestic staff, we also support the communities in which we operate. At Hilli today, Cameroonians make up 90% of onshore support staff and 40% of offshore staff. We run local education programs and infrastructure support projects, such as water wells, streetlights and other efforts, that deliver benefits to the communities where we operate well past the contract duration of FLNG operations. With the start-up of operations in 2018, Hilli made Cameroon the world's 20th LNG exporting country, and it remains the only LNG facility there. Today, several nations holding proven or associated gas reserves want access to these benefits, and that is currently driving demand for recontracting Hilli when her current charter ends in July 2026. Turning to Slide 11 and Mark II. We keep advancing Mark II toward FID. As previously guided, we have committed more than $400 million to our planned next FLNG vessel, with $266 million spent to date, all of which is currently covered by equity. Long lead items are now 58% complete. During the quarter, we have continued working with the topside provider and the shipyard to reconfirm the yard slot and pricing. We still expect an all-in FLNG price in the industry-leading range of around $600 million per MTPA of production capacity. If we order the vessel within the summer of '24, we expect sailaway in the second half of 2027. Turning to Slide 12 and the business development update. Our focus remains on redeploying the FLNG Hilli after her current charter ends in July '26, and after that, ordering and securing commercial terms for the contemplated Mark II FLNG. We are very positive about the development of the framework agreement announced in our Q4 '23 earnings release, which has now progressed to detailed contract negotiations for an up to 20-year FLNG deployment. We observe a robust fit regarding the prospective charter, the host government, and the location chosen for bringing FLNG production into service. Beyond that particular prospect, we kept pushing forward with other FLNG projects, with the bulk of activity still concentrated in West Africa and South America, yet we are likewise encouraged to witness additional regions eagerly moving ahead with FLNG development. Given this uptick in FLNG business development work, we have brought on board a Chief Commercial Officer, Federico Petersen, along with 2 more deeply seasoned colleagues from the maritime and upstream development fields. Together, those 3 individuals bring over 70 years of business development expertise, and we are delighted to have them join the team, and we are already seeing gains when it comes to growing the FLNG pipeline. We anticipate providing further updates to the market as soon as we have substantive news on this matter. Moving to Page 13, shifting focus to Macaw Energies. In the upper right corner, the F2X unit is shown installed outside the factory in Texas, U.S., where it is built. This modularized system makes it possible to capture and monetize flare gas from land wells, with a particular focus on markets across the U.S., South America and the Middle East. We are happy to report that the initial unit was handed over on schedule and within budget and has already demonstrated the ability to produce LNG from natural gas inputs. Right now, the unit is in the process of being moved to a location in Texas for a commercial demonstration of the technology. We regard the business opportunity as highly appealing. The span from CapEx to cash flow came to roughly 10 to 12 months for constructing 1 unit. Under the present planned commercial model, we anticipate a CapEx to EBITDA ratio of approximately 3 to 4x, drawing on the existing commercial opportunities we have pinpointed; at present, several sizable prospective clients of Macaw and the F2X technology are carrying out due diligence on the company, and a number of them have shown interest in adopting multiple units. As covered earlier in the presentation, we will look at separating out Macaw into a stand-alone entity at some point during 2024 in order to roll out the business model and assemble a portfolio of F2X units. Now to Slide 14. Earlier today, Golar published its 2023 ESG report. That ESG report shines a light on several key accomplishments made across the past 12 months, among them finishing Gimi with 38 million man hours worked without any lost time incident, and reducing Golar's risk as it went from a single asset FLNG company to 2 FLNGs in operation, with a third unit under consideration. We go into more detail about the advantages of the F2X system at Macaw and a few of the advances in our carbon capture investments at Aqualung. We provide further detail on some of the initiatives already referenced in the Hilli section that we carried out in Cameroon, and we would urge every one of you to visit our website to learn more about Golar's ESG performance across the past 12 months. At this point, I'll pass things over to Eduardo, who will walk us through the group's Q1 results.

Eduardo Maranhao

executive
#3

Morning to all of you, and I appreciate it, Karl. It's a pleasure to walk through how Golar performed financially in the first quarter. If we move to Slide 16, I'd like to highlight a few key items from this period. Operating revenues on a total basis came to $65 million, while total FLNG tariffs hit $86 million, a decline from the $110 million we posted during the equivalent quarter a year ago. The drop stems from weaker realized earnings tied to Brent and TTF relative to last year. Our practice is to treat FLNG's tariff as the right measure, since it captures all realized liquefaction revenues, including the gains from fees linked to oil and gas; net income for Q1 was $66 million. On a year-over-year comparison, that's a meaningful step up. Adjusted EBITDA landed at $64 million, a 24% decrease versus the same quarter in 2023, driven by softer Brent and TTF prices, which in turn weighed on Hilli's earnings. Our liquidity stays robust, with roughly $700 million in cash on hand plus anticipated receivables from our closed TTF hedges. On that basis, net debt as of quarter end was $550 million. During this quarter we kept carrying out our buyback program, bringing outstanding shares down to 104 million by the close of the period. Now let's turn to Slide 17. Hilli achieved 100% economic uptime, continuing its industry-leading operating record. Here you can observe how Hilli's EBITDA contribution has evolved across the last quarter. On a year-over-year basis, Hilli produced $64 million in Q1. That figure comprises $31 million from base tolling fees, while Brent-linked fees fell to $15 million and TTF-linked fees to $18 million. Since we still hold exposure to Brent and TTF, if prices keep strengthening over the upcoming quarters, we ought to see larger distributions from Hilli through the end of its present contract. Let's proceed to Slide 18. As you can see, we stay exposed to oil and gas prices through the rest of 2024, and at the same time we anticipate gaining from marketing benefits related to our earlier TTF swaps. Given current forward prices, Hilli should produce around $274 million this year, whereas debt service, principal amortization included, is projected to decline to $87 million in 2024, yielding total free cash flow to equity of slightly below $200 million annually. So now on to Slide 19. We stay dedicated to returning capital to shareholders and carrying out our buyback program. As is visible, during 2023 we distributed more than $168 million through dividends and buybacks. With the dividend of $0.25 just announced for this quarter, dividends plus buybacks in '24 will total more than $40 million. We repurchased about 0.7 million shares this quarter, which left 104 million shares outstanding at quarter end. Of the $150 million authorized last year, $74 million is still open for additional repurchases, and we'll keep pursuing those as opportunities arise. During this quarter, we're announcing a dividend of $0.25 per share, payable on the 17th of June to holders of record as of the 10th of June. Let's move on to Slide 20. With the 20-year Gimi contract with BP set to begin soon, we see a chance to strengthen our existing debt arrangements and free up a substantial amount of equity that is currently committed to that project. We've maintained close discussions with a range of lenders and have lately signed term sheets covering refinancing options, from roughly $1 billion up to as much as $1.4 billion. Right now, we've drawn $630 million against the existing $700 million facility; therefore, if you calculate using our 70% interest, a possible refinancing might release over $0.5 billion net to Golar. That represents yet another step forward in our funding plan for the Mark II project. We've been actively working to secure a new long-term financing package for the Mark II of about $1.2 billion. So, taking into account the anticipated net proceeds from a possible Gimi refinancing, plus roughly $300 million, which Karl referred to earlier today, which has been entirely equity funded up to this point, which covers the purchases of long-lead equipment and the acquisition of the donor vessel, the LNGC Fuji, this proposed financing will underpin our funding strategy to proceed with the Mark II project FID over the next few quarters. I'll now pass the call to Karl for some closing remarks.

Karl Staubo

executive
#4

Thank you, Eduardo. Moving on to Slide 22, I'd like to walk through the summary as well as what comes next. Regarding Hilli, our top priority is preserving that best-in-market operating record and securing a new deal for the unit once the present charter wraps up. We're quite encouraged by how the possible 20-year charter is shaping up, and detailed talks on it are underway right now; when it comes to Gimi, we aim to finalize the pre-COD cash flow arrangements with BP and keep up the highly encouraging momentum toward COD. As Eduardo mentioned moments ago, we're likewise centered on optimizing debt via a possible refinancing of that unit. Now for Mark II: $270 million has been invested so far. Our goal is FID, contingent on a finalized yard contract, an available construction facility, and charter visibility tied to either Hilli or the Mark II. As was covered earlier in this presentation, we've received confirmation once more of $600 million per MTPA in CapEx per tonne, along with a targeted 2027 delivery should an order be placed this summer. Within corporate and investments, our aims include a separate listing for Macaw Energies, a sale or long-term charter of Golar Arctic, and we stay dedicated to robust shareholder returns, underpinned by today's strong cash flow generation plus meaningful upside, coming both from recontracting Hilli and from ordering and contracting Mark II. We hold considerable financial flexibility through debt optimization and remaining room under the share buyback program already in place. That wraps up the prepared remarks, and we're glad to take any questions now.

Ben Nolan

analyst
#5

So for my first question, given the progress you've made on this framework agreement, and there's still a small amount remaining, but it appears likely to go ahead. I hope that isn't saying too much. I was hoping you might be able to provide a bit more detail on a few points. To start with, does it relate to Mark II? Should we be thinking about it that way? And in addition to that, might it cover more than 1 unit?

Karl Staubo

executive
#6

Ben, yes, over time it might cover more than 1 unit. And at the outset, both we and the clients are considering whether Hilli or Mark II ought to be the first one out.

Ben Nolan

analyst
#7

Okay, got it. Thanks for that. Now, regarding the Hilli — its contract expires midway through 2026. Could it possibly begin a fresh agreement within that same year, or would some downtime be required for upgrades and similar work?

Karl Staubo

executive
#8

That depends entirely on where we secure the next contract. Naturally, if we remain at the site in Cameroon, there's clearly no need to visit a shipyard. Should we move to a country nearby, depending on water depth, vessel upgrades might not be necessary at all. It also ties back to how long the recontracting lasts; if you're aiming for operations lasting nearly 20 years, we think a fairly brief yard stay would be advantageous — that way, continuous operation across the 20-year span is assured, with no maintenance required during it.

Alex Bidwell

analyst
#9

This is Alex covering for Greg Wasikowski during this quarter. I just have one quick question about Hilli. Could you help us understand roughly what timeline you'd be considering for redeployment? Once it comes off contract in July, I'd appreciate a bit more detail on the path toward first gas at whichever new project that might be. You've said previously that you might bring the vessel into a yard for maintenance and refit work. But should we anticipate a commissioning timeline similar to what was seen on Gimi once it arrives at the site?

Karl Staubo

executive
#10

Assuming it doesn't remain in the country, you'd need to decommission the vessel from the sites where it currently operates. Most likely we would then sail it to a yard — going to a dry dock isn't necessary at all. So the probable destination would be Dubai Dry Docks, Tenerife or something comparable. The main driver for this is life extension ahead of a longer-term contract; we anticipate the yard stay taking roughly 3 months, give or take, after which you sail to where operations will take place. Once at the site, we don't anticipate a commissioning period of 6 months. When Hilli first began operating in Cameroon, its commissioning period was considerably less than 6 months. And since the vessel has been producing for 8 years, we're aware that every system, pump, generator and so on functions properly. So our expectation is a much shorter commissioning period. We'd anticipate something closer to 1 to 2 months. Keep in mind, though, that during commissioning you're producing LNG, so the commissioning period isn't a period without revenue.

Alex Bidwell

analyst
#11

Okay, and a fast follow-up regarding Mark II. What kind of takeaways have you fellas been putting into practice from the Mark I configurations onto this fresh configuration? And do you fellas anticipate observing, let's say, a design tuned for simpler upkeep or bringing down your upkeep expenses at the facility?

Karl Staubo

executive
#12

That is an excellent question; so depending on the level of detail we ought to get into during this call, my suggestion is that we stay fairly high level. However, the primary advantage of Mark II versus Mark I is that the whole liquefaction facility sits atop a completely new mid-section. So when you look at the diagram here, it's clear that the entirety of the liquefaction is placed on a new unit, measuring 80 meters long and 60 meters wide; this means we could modularize the full construction of the liquefaction plant and afterward attach the storage, which is the ship. That is what Mark II brings. With Mark I, the liquefaction sits on one side of the vessel and support vessels sit on the other. This means there is much more stick building in a Mark 1 than in a Mark II. Therefore, with Mark II, it's faster, simpler to operate, has fewer space constraints, and allows for modularized build, which is, to a greater degree than Mark I, repeatable. So indeed, there are considerable learning effects, additional space, yet the identical technology.

Chris Robertson

analyst
#13

What I'd like to ask about is perhaps some more hypothetical situations, specifically regarding what you'd consider optimal contract conditions, say, for the Hilli's recontracting. Since you'd probably be after maximum use of that asset, but when we consider the options and the way LNG pricing looks right now, what proportion do you feel would be perfect for the fixed tolling component compared with exposure to commodity prices, just in terms of capacity?

Karl Staubo

executive
#14

Chris, that's a fascinating balance to strike. I'd say it's reasonable to note that the greater the base you request, clearly the smaller the upside participation you receive, and the reverse holds true as well. Typically, we observe that prospective charter or upstream collaborators are much more willing to participate in gains rather than shield against losses. Consequently, overall, our aim is to protect debt servicing plus a bare minimum equity return through the fixed tolling structure, and afterward secure a favorable breakeven point from which we divide the upside.

Chris Robertson

analyst
#15

All right, that makes sense. And Karl, I believe you brought up additional regions going after FLNG outside those 2 main areas you usually focused on, West Africa and South America. Could you elaborate a bit more on where you're noticing that?

Karl Staubo

executive
#16

The additional regions take in areas farther north across the Americas as well as the Middle East.

Chris Robertson

analyst
#17

All right, understood. Then, for my final question, a follow-up. You've added a new commercial officer, plus some development staff, and you mentioned that you've already seen certain benefits, or at least some assistance there. Could you elaborate a bit further on precisely what they contribute — whether through their connections or their know-how? Or in what ways do they move things ahead on a daily basis?

Karl Staubo

executive
#18

Regarding what you asked about the upside sharing, having individuals with deep expertise in upstream business development is extremely valuable for our commercial group, since it gives us better understanding of where and how much upstream we're able to share. And clearly, given their combined 70 years of successful industry experience, they possess substantial ties to possible upstream partners; so we get both advantages — thorough knowledge of the upstream portion of the value chain, and the relationships.

Liam Burke

analyst
#19

Karl, when you talk about the talks regarding the Mark II, are you negotiating with several counterparties? Or is that rivalry actually on the other side, competing for access to the first Mark II? Or could it be a single prospective charterer evaluating several projects?

Karl Staubo

executive
#20

On the chartering side, it's definitely more than one. There are a number of different folks we're in discussions with on Mark II. What we observe both across Hilli and Mark II and in this market overall is that the time it takes to reach cash flow matters, and so we believe it's important to protect delivery. Obviously, everyone in the market knows when Hilli becomes available, and that's from July '26 onwards. And we believe it's important to protect a '27 delivery for Mark II, since that's well ahead of where we think others could bring on liquefaction capacity. We also observe a constraint on yard availability broadly for maritime assets, and locking in the yard slot, we believe, is a key step toward also securing attractive commercial results.

Liam Burke

analyst
#21

Understood. Excellent. Now regarding Avenir — I realize you touched on this already — would you say you're happy with how things are going there? Or does that represent a cash source you could put into other ventures?

Karl Staubo

executive
#22

You could say Avenir mattered more to our core when Golar Power was ours, or as it was renamed afterward, Hygo, yet we're pleased with this investment, and Avenir just brought 2 additional newbuilds into the fleet. As things stand, then, 5 vessels are operating on the water and 2 newbuilds are being built. In our view, the balance between supply and demand for small-scale LNG ships looks extremely appealing, since a big portion of the commercial fleet — spanning cruise liners, container vessels, dry bulk carriers, tankers and so on — is now being ordered with LNG dual fuel, while LNG bunkering infrastructure remains quite scarce. Taken together with small-scale distribution of LNG, that creates, in our view, a highly appealing backdrop for small-scale LNG. Still, you're correct that this investment is less strategic for us than it once was, back when we had greater involvement on the downstream side.

Greg Lewis

analyst
#23

Karl, I was hoping you could shed a bit more light on something — in the press release, the prepared remarks, and the presentation, you brought up the advanced negotiations. When we did the Hilli, I believe roughly 10 years back, we basically were after proof of concept, so hey, we had a unit with perhaps just 2 trains running. Clearly, you performed really well and expanded it to 3. Is there a way to think about this, in terms of lessons learned, if we proceed with the new project, would we even consider a situation where the vessel might not be fully utilized, similar to the Hilli, making sure that fourth train was operational.

Karl Staubo

executive
#24

Naturally, if we construct additional units, the intention is to utilize them fully, no question. But ultimately, provided the client pays for it, we can utilize whatever they choose to use; still, we're certain the goal is full utilization. I think one reason behind the present contract structure for Hilli was that it's the world's first FLNG deployment, and it served as a proof of concept. And when the facility was entered into, the gas reserve and the flow rates from the existing wells did not permit higher production. Naturally, we aim for full utilization of every one of our units across all commercial discussions.

Greg Lewis

analyst
#25

All right. And I realize this has sort of come up already, the trade-offs involved in any negotiation. Would you prefer a bigger base rate? Would you prefer a bigger tolling fee? What sort of upside is there? Is there any particular reason, given that the unit is essentially — we're able to borrow against it. If we consider potentially borrowing against it, are there any floor levels we ought to have in mind regarding EBITDA generation for the Hilli, just if we think about being able to borrow against it and then pursue the next project?

Karl Staubo

executive
#26

Our focus, clearly, is to maximize economic returns on the basis of the resources we have available, and that's what we aim for across all our projects. And we understand that a higher firm base gives you more appealing debt financing compared with a lower base and earnings that vary more; so we're clearly examining equity returns under what we believe are probable gas price scenarios. And that's how we handle that side. When you mention guiding on base, we currently have a base, and it rests on 57% or 58% utilization. I believe we wouldn't enter talks on a new contract if it came in below at least 90% utilization. So I think it's reasonable to expect that you'll see at least a pro rata increase in the base rates that you see today.

Karl Staubo

executive
#27

We appreciate everyone joining the call. Hopefully the update was of interest to you. We are definitely quite happy about what has been happening with the company. We can't wait to talk with all of you before long, and enjoy the rest of your day.

Operator

operator
#28

Thanks. That wraps up the conference call for today. We appreciate everyone joining in. You're free to disconnect at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Golar LNG Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Golar LNG Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Golar LNG Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.