Golar LNG Limited (GLNG) Earnings Call Transcript & Summary
August 15, 2024
Earnings Call Speaker Segments
Karl Staubo
executiveAppreciate it, operator. Hello everyone, and thanks for joining us for Golar's call covering results from the second quarter of 2024. My name is Karl Fredrik Staubo, and I serve as chief executive officer at Golar LNG. Our chief financial officer, Mr. Eduardo Maranhao, is here with me, and the two of us will guide you through what we achieved this quarter. Before we get into the presentation itself, please review the forward-looking statements that appear on Slide 2. Now, if you turn to Slide 3, you'll see a snapshot of Golar as the company stands right now: we own two FLNG units that are already producing — the Hilli, which is known as the very first FLNG anywhere in the world and which is supported by an operating record that no competitor can match, and the Gimi, which is just about to begin a 20-year charter for BP off the coast of Senegal and Mauritania. We're getting close to the stage where we'll put in an order for a third FLNG — the Mark II — which is built to liquefy 3.5 million tonnes per annum. When it comes to converting the Mark II FLNG, the LNG carrier Fuji is going to act as the donor vessel. Turning to finances, our investments include a 23.5% stake in Avenir LNG plus Macaw Energies, a wholly owned subsidiary and start-up focused on liquefying onshore flare gas into LNG. What's happening at both of those companies has us feeling optimistic. During this earnings call, Avenir was described as a top-tier player in small-scale LNG shipping. According to the speaker, supply and demand conditions in that niche look positive, which is pushing charter rates higher. Those contracts can run as long as five years and are signed with highly dependable counterparties, the speaker said, adding that the company feels quite optimistic about where this segment is headed. Turning to Macaw, the speaker noted that its first F2X — the flare-to-LNG liquefaction unit — has been put into service at an active well site in Texas, U.S. At present, Macaw is focused on fine-tuning how the unit runs so it can handle shifts in the gas makeup that comes from the flare gas well. The speaker also pointed to other figures shown on the page, mentioning that the company's market capitalization is presently about $3.5 billion. Our net debt figure is slightly below $600 million. Meanwhile, EBITDA backlog stands near $11 billion, which counts the LNG contract with Pan American Energy in Argentina that we told you about back in July. Moving on to Slide 4 now. When it comes to owning and running FLNGs, Golar ranks as the biggest player globally, and we're also the sole provider with a proven track record of offering FLNG as a service. Looking at how many units each company has, ENI and Petronas each match our count of two operating units, but if you measure by liquefaction capacity, we hold the top spot in the market. By concentrating on creating repeatable designs that can be built again without huge capital spending, we've been able to put these units together at construction costs that lead the market when you look at capital expenditure for each tonne, and we've also achieved a top operational record. The other companies already in the FLNG space concentrate on using their floating vessels for gas they're able to pull, or where they intend to serve as the buyer of that gas to feed their own downstream LNG holdings. So Golar stands alone as the one established supplier of FLNG as a service, and that standing lets us give owners of gas resources a way to monetize while still keeping significant ownership stakes and exposure to what they hold. Now let's move to Slide 5. Our growth plan is grounded in the assets we already hold and the yard slots we've locked in. Thanks to Gimi coming online, there's already growth baked into the cash our existing assets generate — commissioning ought to get underway this quarter, and next year she should reach full operations. More earnings growth should come from improved capacity utilization at Hilli once she leaves her present charter, which wraps up in July 2026, and moves to the announced 20-year charter in Argentina, where startup is estimated for Q1 2027. Once these two existing assets have each entered their 20-year charters, they are projected to deliver combined yearly EBITDA of roughly $515 million before any commodity exposure. Thanks to how tightly we run the business, a strong balance sheet, and customer appetite for our FLNG offerings, we're setting our sights on growing the fleet. The objective is to more than double the operating FLNG capacity we have by 2030, pushing it to a bit over 12 million tonnes per annum. We've secured a yard slot for a Mark II conversion at 3.5 MTPA, scheduled to be delivered in 2027, and we also hold an additional yard option for a second Mark II FLNG of 3.5 MTPA, with delivery inside 2028. Our aim is to submit the order for the first of these Mark II LNGs within the current quarter. Each Mark II FLNG unit carries 3.5 million tonnes of capacity, which works out to about 180 TBtu per annum. If we assume a tariff consistent with the FLNG project recently announced in Argentina, one Mark II could deliver EBITDA of about $500 million before commodity exposure. So, combining our existing assets with these identified growth ambitions, Golar might be positioned to produce yearly EBITDA of approximately $1.5 billion, after the expansion program grows from 2 to 4 units and liquefaction capacity rises from 5 to 12 MTPA. All of this is expected to be fully operational by 2030. On Slide 6, we observe a continuing need for more LNG supply projects to be brought online. Since older gas fields are running down and appetite for natural gas and LNG keeps climbing sharply — mostly on account of Far Eastern Europe — the market needs more supply to stay in balance. Market research indicates that the additional volumes required to meet projected demand come with a landed cost exceeding $10 per MMBtu, and that underpins long-term LNG pricing. With Golar's FLNG technology, stranded or associated gas fields can be monetized, and the cash breakeven involved sits far below what most of those incremental LNG gas export projects require. The distance between where we are able to produce gas exports and other incremental supply opens up an appealing price spread, one to be divided between the owners of the gas resource and Golar in its role as the FLNG provider. Looking ahead, LNG prices are still making it worthwhile to swap oil for gas, and there are also helpful environmental benefits. In our view, this market situation strongly backs the expansion goals we laid out. Now for the business update, which is on Slide 8. Hilli kept up its industry-best operating record during the quarter, and right now it's unloading cargo number 117 — that's over 8 million tonnes of LNG shipped out since the contract began in 2018. One big achievement this quarter was wrapping up a commercial reset with BP that resolved all contractual disagreements and aligned economic compensation starting from when Gimi arrived in the country on January 10th up through COD. That reset likewise opens the door to our goal of refinancing Gimi on better terms than the current facility, plus delivering a liquidity release we plan to direct toward the FLNG growth ambitions we've already discussed. On Mark II, we made considerable headway this quarter, and as noted we now aim to have contracting done within the quarter; we've also locked in a slot for the option. Signing a 20-year definitive agreement to deploy an FLNG in Argentina stood out as the quarter's key milestone. Under that contract, Hilli is envisioned for use once our present charter wraps up, though ahead of a final investment decision Golar holds an option, for a set period, to substitute a Mark II FLNG for that vessel. We'll go into more detail on this further along in the presentation. Our FLNG growth pipeline keeps showing robust momentum, and we've added 2 senior resources to our FLNG commercial team to help assess and advance project opportunities. At present we're holding discussions regarding FLNG deployment chances across West Africa, South America, the Middle East and Southeast Asia. Financial highlights for Q2 feature adjusted EBITDA of $59 million for the quarter, along with a liquidity position of roughly $600 million.
Karl Staubo
executiveLater in this presentation, Eduardo is going to walk us through more detail on how the finances came in for this quarter. Let's move to Slide 9. Here we've set out a number of the contract particulars regarding the Pan American FLNG charter over in Argentina. Agreements are now in place for a 20-year LNG export project located in Argentina. As has been described on multiple occasions, the intention is for this project to make use of Hilli. That said, before a final FID happens — and we expect that later this year — we hold swap rights allowing us instead to employ a Mark II FLNG. Roughly $300 million in annual adjusted EBITDA would come from running Hilli, prior to any commodity exposure. Gas feeding the project will come from the onshore Vaca Muerta field in Argentina. In terms of shale gas discoveries globally, Vaca Muerta ranks second, with resources estimated at approximately 300 TCF. The project is targeting start-up during Q1 '27, which opens the door to potentially redeploying, upgrading and hooking up Hilli once her present charter wraps up in July '26. Under the terms of this transaction, Golar takes a 10% stake in South American Logistics. That adds more commodity exposure on top of the commodity component of the FLNG tariff. Customary closing conditions apply to the charter, among them regulatory and environmental approvals. As we hinted at, we anticipate those being met by year-end. Slide 10 holds additional details about the project. San Matias gulf, located in Argentina's Rio Negro province, has been chosen as the site for the FLNG. The plan is for the project to draw on spare capacity within the current pipeline network, meaning only very limited additional infrastructure would be needed for operations. Even so, the goal is to lock in a dedicated pipeline spanning roughly 600 kilometers so that expansion past a single FLNG unit becomes possible. Pan American Energy, a top-tier South American energy company, stands as the counterparty to these agreements. BP holds 50% of Pan American and Bridas Energy Corp. holds the other 50%; Bridas Energy Corp. is itself a 50 to 50 joint venture involving CNOOC of China alongside Bridas Energy, an Argentinian holding company acting for an Argentinian family. Pan American's workforce numbers about 21,000 employees. Among Argentina's oil and gas producers, they rank second. And at year-end — year-end '23 — the company had total assets under its control of approximately $17 billion, alongside book equity of roughly $12 billion. We're very happy about the mutual benefits this project creates, for Pan American as owner of the gas resource and for reestablishing Argentina as a gas exporter, opening a route for the enormous resources of the Vaca Muerta field to serve global gas demand. Let's turn to Slide 11. We keep seeing robust progress toward additional FLNG deployments — in Argentina, as already noted, and in other places too. At the moment, we are holding talks about possible deployment chances in West Africa, South America, the Middle East, and Southeast Asia, and those projects sit at differing phases of development; work continues on ventures in Nigeria; and during June we executed a project development agreement alongside NNPC, which serves to broaden the arrangements already in place between Golar and NNPC. As noted earlier, we recently added more strength to our commercial group by bringing in two senior personnel to support the advancement of these growth projects. We stay upbeat about how comparatively appealing our FLNG growth projects are, whether measured against other ways gas resource owners might monetize their assets or against the cost competitiveness of this project relative to rival LNG export projects. Moving to Slide 12, for a bit more granularity on the commercial reset agreement that was struck with BP. That commercial reset puts to rest every earlier disagreement concerning payment mechanisms for pre-COD contractual cash flows involving Golar and BP. Golar now holds a contractual right to obtain daily payments starting January 10 of this year through to commercial operations date. Those daily payments carry step-up mechanisms tied to project milestones leading up to COD, and long stop dates provide security for them as well. Golar will additionally have rights to particular lump sum bonus payments, contingent on hitting specified project milestones. All told, under these new arrangements and drawing on the operator's most recent timeline, Golar anticipates collecting roughly $220 million in payments spanning 2024 and 2025 as pre-COD compensation, milestone bonuses included, with about $130 million to be invoiced during 2024 and the rest falling in 2025. The $110 million Golar handed to BP through January 10 of this year as liquidated damages is going to stay with BP. Beyond that, the parties agreed to an accelerated commissioning plan, under which the operators, BP and Kosmos, have secured an LNG cargo that should reach the hub later this month. That commissioning cargo made it possible for commissioning activities on the hub FPSO and the Gimi FLNG to run in parallel. Taken together, this should cut, or is aimed at cutting, how long it takes to reach COD. The commercial reset also stands as a key milestone that opens the door to refinancing Gimi. Our aim is a debt facility carrying markedly improved interest and amortization terms relative to the current facility, sized appropriately for the project's strong cash flow visibility, and from this refinancing alone we anticipate unlocking as much as $500 million in liquidity. Moving to Slide 13, a look at operations across our two current assets. As previously explained, Hilli carried on its market-leading operational record, and cargo number 117 is now being offloaded. The current contract lasts through July '26, after which the vessel is meant to relocate to Pan American and the Argentina contract, where capacity utilization will be higher. Gimi sits on site at the hub offshore Senegal and Mauritania, getting ready to begin commissioning activities under the accelerated commissioning plan referenced earlier in this month. To start, gas from the FPSO should arrive in Q4, with full COD in '25. A 20-year contract term will begin under the COD, which frees up Golar's portion of that $3 billion EBITDA backlog. Now looking at Slide 14, where we cover our Mark II expansion strategy. At this point we're in the last phases of the yard EPC contracts. We've confirmed that the first planned Mark II FLNG will be delivered sometime in 2027, at an all-in FLNG cost of $600 million per tonne, which leads the industry; so far we've spent roughly $277 million on this project, including buying the intended donor vessel, Fuji LNG, and all of that is funded by equity. Long lead items ordered so far have reached 63% completion, and a few examples appear at the bottom right of that slide; our target is to place the order for the first Mark II during Q3 of this year, meaning this quarter, and through the yard agreements we obtained an option on a second vessel, to be delivered in '28. Moving to Slide 15, we return to Macaw. Our pilot unit finished early in Q2 of this year. That unit demonstrated the technology functions, through both nitrogen leak testing and successful LNG output from pipeline quality gas, which entered the facility close to its construction factory. Deployment of the unit has now happened at a live well in Texas, U.S. Right now we're focused on adjusting operations to accommodate swings in gas composition coming from flare gas, which clearly differs from a steady gas quality stream derived from pipeline quality gas in that respect.
Karl Staubo
executiveLike we said before, once the Macaw growth phase unit demonstrates reliable operations on live well production, we'll look at strategic alternatives for it. At this point I'll pass things over to Eduardo, who will walk us through the results for Q2.
Eduardo Maranhao
executiveMorning, everyone, and thank you, Karl. I'm glad to walk you through how Golar performed financially in Q2 2024. If you'll turn to Slide 17, I'd like to cover a few of the quarter's key points. Operating revenues on a total basis came to $65 million, while total FLNG tariffs hit $88 million, which is an increase over the $86 million we booked in Q1. The rise is due to stronger realized earnings linked to Brent and TTF relative to the prior quarter. Our preferred measure is always the FLNG tariff, since it captures all realized liquefaction revenues, including the gains on fees tied to oil and gas from Hilli. Total net income for Q1 came in at $35 million. After adjusting for other noncontrolling interest, net income attributable to Golar was $26 million. On a year-on-year basis, that's a substantial improvement versus Q2 2023. Adjusted EBITDA was $59 million, a modest decline from last quarter, largely driven by recognition of preoperational expenses tied to pre-commissioning work on FLNG Gimi. Our liquidity remains solid, with roughly $630 million in cash on hand plus anticipated receivables from our TTF hedges. On that basis, net debt at the end of the quarter was $569 million. As Karl mentioned, we hit a major milestone with BP through the commercial reset of FLNG Gimi. We can now refinance the existing $700 million debt facility, of which just $630 million has been drawn so far. Talks with prospective lenders are at an advanced stage, and the new facility is in the credit approval process. Compared with the current one, this potential facility carries better terms, lower financing costs, and an improved repayment profile; once it closes, we anticipate releasing as much as $500 million in additional liquidity net to us. Finally, for this quarter we're declaring a dividend of $0.25 per share, with a record date of August 26 and payment on or about September 3. Now let's move to Slide 18. Hilli kept up 100% economic uptime, continuing its market-leading operational record. Here you can see how Hilli's EBITDA contribution has evolved across recent quarters. We're looking at it quarterly. Hilli produced $64 million in Q2; that figure includes $29 million of base tolling fees and about $35 million of Brent and TTF-linked fees. Since Brent and TTF prices have risen lately, it's worth repeating that our exposure to Brent and TTF continues. So if prices keep strengthening over the next few quarters, we'd expect larger distributions from Hilli through the end of its present contract. Let's go to Slide 19. Given current forward prices, Hilli should deliver adjusted EBITDA net to us of roughly $275 million in 2024. One thing I want to point out is that this number exceeds what we recorded in 2022, a year when Brent and TTF contributed more heavily thanks to elevated energy prices worldwide. For 2024, debt service at the asset level, principal amortization included, should decline to $88 million, which would leave total free cash flow net to Golar at roughly $190 million in 2024. As of the close of Q2, Hilli's total outstanding debt was $577 million. There's also another appealing aspect of the Pan American contract announcement: it may open the door to refinancing that existing facility, potentially unlocking substantial liquidity for us and giving our balance sheet added flexibility. With that, I'll pass the call to Karl for some closing remarks.
Karl Staubo
executiveThanks, Eduardo. That brings us to Slide 21, which covers the summary and next steps. So, on Hilli, we kept up a market-leading operational track record, and we're very happy to have signed definitive agreements for a 20-year redeployment in Argentina, beginning at the end of the existing charter. On Gimi, another milestone in finalizing the new pre-COD commercial arrangements and accelerated commissioning. Our focus now is on getting the unit into COD and refinancing the existing debt facility on improved terms. As explained, we're entering or nearing the ordering of our third unit, the first Mark II FLNG conversion, which we expect to order later this quarter, with delivery within '27. We're also pleased with how our FLNG growth ambitions are developing, and we see strong interest from prospective clients for additional FLNG projects. As Eduardo explained, we have a very healthy financial performance and a balance sheet that supports our growth ambitions, with liquidity of just around $600 million, a continued focus on shareholder returns, and strong potential for cash flow generation in new FLNG contracts. Overall, we're very pleased with the progress made during the quarter, especially on our existing assets, business development, and engagement with both existing and prospective FLNG clients. We're excited about the company's next phase of development and our focused growth ambitions to more than double our FLNG capacity by 2030. That wraps up the quarterly presentation, and we'll now hand the call over to the operator for any questions.
Chris Robertson
analystKarl, I'd like to return to what you said regarding the possible swap option for Mark II in Argentina. If you choose to proceed with that, should we consider the anticipated yearly EBITDA contribution, on a pro forma basis for a bigger asset, as being above $400 million?
Karl Staubo
executiveYes; in that case it would be pro rata according to the size, yes.
Chris Robertson
analystAll right, understood. Now, regarding the talks you're currently engaged in — you've clearly identified multiple areas you're evaluating at this point, among them South America, Africa, the Middle East, and Southeast Asia. Could you help us understand the approximate count of possible counterparties you're negotiating with? The geographic breakdown is useful, sure, but perhaps the extent of the discussions you're involved in?
Karl Staubo
executiveIt's reasonable to state that counterparties remain mostly clustered in West Africa as well as South America. The Middle East and Southeast Asia opportunities involve a smaller number of clients. Even so, we remain quite pleased with how good those conversations are in both of those places. Yet when it comes to the scale of activity, West Africa and South America are where it's concentrated.
Ben Nolan
analystI'd like to dig a bit deeper into Argentina. You provided helpful detail regarding the possibility of several units, which, as I understand it, essentially hinges on that new pipeline being available. Yet clearly, a number of businesses and consortiums are chasing FLNGs. How do you view the broader set of opportunities in Argentina, and where do you see Golar ultimately fitting into that build-out?
Karl Staubo
executiveGood question. To begin with, there's no shortage of gas resources. If you set this beside what are considered truly giant gas finds — the Greater Tortue region where Gimi is active, for instance, which holds a 25 TCF reservoir — Vaca Muerta comes in at 300 TCF. So the gas available is more than enough. It sits onshore, and getting it out is comparatively straightforward. As a result, the market chance for Argentinian gas exports is enormous, likely larger than Golar alone could ever serve. In our view, the appeal of what we bring is supply certainty, backed by assets with a proven track record and very concrete delivery timelines. We know the date Hilli's contract ends. And should we submit the order for Mark II during this quarter, we know the delivery date for that vessel, and the risk there is further reduced by how far the long lead items for that asset have progressed. So we regard our part as being the initial enabler for Argentina — or more precisely Vaca Muerta — gas exports. There's ample gas. The single essential hurdle to clear is having a committed pipeline that can carry the gas to the export point. Today's infrastructure can handle at least one FLNG; to move past that, you'd have to enlarge the current pipeline network.
Ben Nolan
analystAll right. And would — ideally, I can squeeze in another one. But for Mark II compared to the Hilli, would a larger pipeline be required? Or could the infrastructure already in place serve either of them?
Karl Staubo
executiveThat's the reason substitution is there for us on the initial one; so on that initial one, either the Hilli or Mark II could be used. Should you move past a single unit, meaning past 3.5 MTPA, then the pipeline infrastructure becomes something you have to examine.
Ben Nolan
analystUnderstood. For my follow-up, regarding all those other possibilities — clearly Argentina could support more than one unit. Yet when you consider the broader set of opportunities, recognizing how varied they are, could you walk us through how many you'd classify as essentially single-unit cases? Or do you find many cases where several units might be feasible and, in fact, required?
Karl Staubo
executiveIf you chart where stranded gas exists globally, it's abundant in the extreme, though the most evident location is West Africa. Enormous volumes of stranded gas lie underground there, which could be tapped at a far lower cost than, say, additional U.S. LNG export ventures. The distance by ship to destination markets, in both Europe and the Far East, is reduced, and we think we're able to build FLNG units at a CapEx per tonne roughly 50% of what it costs to generate added tonnes on a CapEx per tonne basis in the U.S. These projects carry a very substantial competitive edge. The gas is confirmed and abundant. That's where the greatest opportunity lies. And clearly, beyond regions such as the Middle East, where gas is more than sufficient, the same holds for particular pockets of South America. But essentially it's South America, West Africa and, to a degree, the Middle East, where multiple units could emerge. The Southeast Asian prospects amount to one unit at first.
Craig Shere
analystSo what kind of timeline would you be looking at to get a refinancing done for Hilli? Is it possible that would happen in the first half of 2025?
Karl Staubo
executiveYes, it definitely could take place in '25. So my thinking is that after every one of the conditions is met and FID has been reached on the project — which, as we've said, we expect to happen later in this year — then it would make sense to consider refinancing efforts going into the following year, yes.
Craig Shere
analystGreat; and have you identified a second Mark II that's been sold for conversion? And to hit that 2028 delivery, when would FID need to be issued for a second Mark II?
Karl Staubo
executiveYes, plenty of what are called Moss designed ships exist that you can buy in today's market, and those are currently running as LNG carriers. We've also pinpointed a number of vessels that might work as suitable candidates. Some of them we've even looked at before. If we moved ahead with the second Mark II, FID would need to rest on current positions, unless we can better them around — inside Q1 '25.
Liam Burke
analystKarl, we noticed a new fortress join the FLNG providers. Clearly, the capacity is smaller, and it serves internal consumption. Yet, are you observing any others — I get that these are difficult projects, though the economics look quite appealing. Do you see anyone else coming forward, attempting to offer FLNG as a service?
Karl Staubo
executiveWell, there is — one project has reached FID out of Samsung at this point, known as Cedar LNG, which Pembina backs for an LNG export in Canada. So that's what they're doing, yet they're pursuing it with offtake locked in. It's fairly — I believe that project has taken 15 years to develop. Former Golar employees run it, and it was initially launched under Golar. Beyond that, we do observe folks launching initiatives, but so far we haven't seen other contenders possessing the in-house engineering, operational, or financial balance sheet strength to advance such projects, no.
Liam Burke
analystGreat. Now, regarding the investments you hold outside the core business — what's your framework for evaluating upcoming FLNG ventures? As things stand, you might end up with two more of those on the books, alongside external projects like Macaw, Energies, and Avenir.
Karl Staubo
executiveLook at where Golar has been over the last 3 years — basically from the moment Eduardo and I came in, our effort has been about simplifying the business, shifting away from a broad collection of vessels toward a sharply defined FLNG operation. Avenir LNG counts as one remaining legacy holding we haven't exited, and there are a few reasons for that, even though it dates back to the period when Golar Power was ours. The supply/demand fundamentals appeal to us. We have invested approximately $50 million so far, and right now it's a position we have a lot of conviction in and therefore wish to retain; our plan is not to put additional capital into it, though we do want to realize the returns from that investment. Now, regarding Macaw. In our view, Macaw takes what we're doing offshore in the maritime setting and applies it on land at a smaller scale; the key, though, lies in capturing flare gas that would otherwise be released through burning into the air. In other words, the input cost is remarkably low, and if you can successfully solve this, the environmental upside is considerable. What Macaw allows us to do is take the technology that the Golar organization has and apply it onshore at a smaller scale, going after the same market opportunity we already capture at large scale in the maritime setting. Still, let's be clear: growing FLNG is where Golar is focused, that remains our priority, and we have no intention of steering any meaningful capital toward other areas.
Alex Bidwell
analystLet me return to Argentina for a moment. Given that this project needs only a small amount of infrastructure spending, might you give us additional detail regarding which infrastructure is in fact needed? Is it mainly offshore mooring, or perhaps an offshore jetty plus subsea infrastructure? Also, what portion of that infrastructure would be tied specifically to whichever asset gets deployed, whether Hilli or Mark II?
Karl Staubo
executiveWhat is mainly needed is, as you rightly note, mooring — and South American Logistics handles the mooring — along with a brief pipeline running from the current grid to the sites, plus choosing the site.
Alex Bidwell
analystOkay, and just one quick additional question. Regarding Mark II and that swap choice in Argentina, I believe I heard you mention that the swap needed to be completed prior to FID. Is that right?
Karl Staubo
executiveThat's right.
Chris Robertson
analystI'd like to go back to Macaw briefly. Karl, you brought up not getting mixed up about the emphasis on FLNG. So when it comes to Macaw, since you hold the patent rights, is there any chance you might license the technology out instead of carrying out the work on your own?
Karl Staubo
executiveOf course. Since we launched Macaw, we've stated very plainly that our plan is to finance it through proof-of-concept. Once that proof-of-concept is reached, ideally before too long, our goal at that point is to explore strategic alternatives for the growth phase. Golar does not plan to let Macaw compete for our balance sheet resources. So we're examining every kind of structure that might benefit the technology developed at Macaw while not undermining any of our FLNG growth ambitions.
Karl Staubo
executiveThanks, everybody, for joining the call. We're really thrilled about the quarter we just wrapped up and where the business is headed, and we can't wait to speak with you again next quarter — and hopefully, by then our FLNG growth phase work will be finished. Thanks once more, and enjoy the rest of your day.
Operator
operatorThis concludes today's conference call. Thank you for participating. You may now disconnect.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Golar LNG Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Golar LNG Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Golar LNG Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.