Golar LNG Limited (GLNG) Earnings Call Transcript & Summary
November 12, 2024
Earnings Call Speaker Segments
Karl Staubo
executiveGood morning, everyone, and thank you for joining. This is the Q3 2024 Earnings Results Presentation for Golar LNG, and we're glad to have you here. Karl Fredrik Staubo here — I serve as CEO of Golar LNG — and joining me is Mr. Eduardo Maranhao, our CFO, who will help take us through what happened this quarter. Ahead of getting into the presentation itself, please review the forward-looking statements found on Slide 2; our starting point will be Slide 3, where we give an overview of Golar. During Q3, we booked an order for a Mark II FLNG — our third FLNG unit — capable of liquefying 3.5 million tonnes per annum. This represents a 70% increase in Golar's liquefaction capacity, and delivery of the Mark II FLNG is expected sometime in 2027; it will become the first FLNG unit worldwide to be offered for charter. Later on, we'll provide additional information about what the Mark II FLNG offers in terms of value. In addition, we've observed promising progress regarding our 2 existing FLNGs that are currently on the water. Hilli maintained her industry-leading operational results during this quarter, and there has been favorable advancement on the conditions precedent for redeploying her under a new 20-year charter in Argentina, once our current contract in Cameroon ends at the conclusion of July '26. During this quarter, we reached an agreement on a commercial reset covering pre-COD contractual arrangements tied to the FLNG Gimi's 20-year deal with BP. Commissioning work is now moving ahead at an accelerated pace, and based on BP's most recent schedule, we anticipate that the commercial operations date — the point at which the full cash flow from that 20-year contract begins — will arrive in Q2 of next year. Within our fleet, we retained 2 LNG carriers. The first, the Golar Arctic, is a legacy asset that we are evaluating for either a long-term charter or a sale. As for the second vessel, the Fuji, she remains on charter until the end of Q1 '25; once that charter concludes, she will head to the CIMC shipyard in China, where she will be converted into the Mark II FLNG. When it comes to our financial holdings, we hold a 23.5% stake in Avenir LNG, plus Macaw Energies — a wholly owned startup that Golar launched, which is centered on converting onshore flaring into LNG liquefaction. Looking at our Q3 numbers, market capitalization sits at roughly $4 billion, we're holding a bit more than $800 million in cash, net debt comes to about $650 million, and our EBITDA backlog stands near $11 billion. That backlog figure takes in the Pan American Energy deal in Argentina while leaving out the commodity exposures embedded in the Hilli contracts. Now let's turn to Slide 4, where the quarter's big achievement was placing the order for the Mark II. With the Mark II, Golar enters its next stage of expansion, this time as a company focused purely on FLNG. With the Mark II, we're going to boost our liquefaction capacity by 70%, and there's potential to double our EBITDA generation at project costs, which is around 50% of our current EV. So at a 50% increase, we can increase liquefaction capacity by 70% and EBITDA generation by 100, so by definition, accretive. The overall cost of the project for converting the FLNG and getting her to the sites where she'll operate comes to roughly $2.2 billion. That works out to a cost per tonne of liquefaction capacity of slightly more than $600 million, which leads the market. We expect the vessel to be delivered in Q4 '27, and because of that, she'll be the first FLNG capacity available anywhere in the world, giving us a head start of at least 2 to 3 years before any rival FLNG deliveries could come online. When it comes to the Mark II FLNG, it's a further development of the very same liquefaction technology that we've already put to work on the Hilli and the Gimi. When you put together the unit — the earliest FLNG capacity available on the planet — with our construction cost per tonne that leads the market, and the fact that we're building on technology that has produced market-leading operational performance ever since our FLNG operations began in 2018, we think these 3 factors will create value for Golar when it comes to contracting the Mark II; right now we're in talks regarding a number of potential FLNG opportunities for deploying the vessel, and our target is to charter her during 2025. Under the yard agreements, we've locked in an option for a second Mark II FLNG, to be delivered sometime within 2028. Slide 5 gives you a picture of the global FLNG fleet. Golar remains the leader in this space, tied with ENI and Petronas on how many assets each has, while sitting at the top when it comes to liquefaction capacity. What this overview really shows is that no other company has proven itself as an FLNG-as-a-service provider the way Golar has. As for the other FLNG players now in the market, their focus is on directing their floating liquefaction units toward gas they already control, or toward becoming the offtaker of that gas to feed their own downstream LNG portfolios. And there's another important takeaway: the FLNG sector continues to grow. Right now, four vessels are under construction, while eight are already operating at sea. What Golar introduced—FLNG technology—has gained market traction as the cheapest route for turning stranded and associated gas reserves worldwide into revenue. Beyond that, the only available slot across the whole FLNG fleet sits with the Mark II FLNG we ordered not long ago. Like we said, a potential charterer could start making money off gas two to three years earlier than if they went with another FLNG option ordered today. That's because we put serious money and effort into engineering and securing long lead items ahead of this FID — roughly $300 million — and that work started over a year and a half ago. That's what makes delivery in '27 possible. Now on to Slide 6, where we've laid out what we're aiming for in terms of growth, built on the assets we already have and the yard slots we've locked in. We expect cash flow to grow nicely, powered by organic expansion — both from squeezing more capacity out of the FLNGs we already have on the water and from our Mark II growth units. Within that organic growth figure, you've got the Gimi startup — accelerated commissioning is actually already underway, but first gas from the FPSO should come late in Q4, with full operations following in Q2 of next year. Another organic growth driver is squeezing more utilization out of Hilli's capacity: once the current Cameroon charter ends in July '26, she relocates to the 20-year Argentina contract we announced, which should begin sometime in '27. When both of these 2 existing assets are operating under their 20-year charters, the estimate is that together they will produce roughly $515 million of annual EBITDA prior to any commodity exposure. With the Mark II currently ordered for delivery in '27, plus one more option for a Mark II FLNG that could potentially be delivered in '28, we believe there is room to more than double our liquefaction capacity, taking it above 12 million tonnes per annum, and to triple the EBITDA we could potentially generate. If we take it that the Mark II FLNG is chartered on conditions similar to what was agreed in the definitive agreements signed in July under the Pan American contract in Argentina, then every Mark II FLNG could generate roughly $500 million in EBITDA each year prior to commodity exposure. So with Hilli and Gimi both signed to their 20-year contracts, plus the Mark II chartered on comparable terms, Golar would be positioned to produce $1 billion in run rate EBITDA beginning in '28. If a second Mark II were added on top of that, we can picture run rate EBITDA of $1.5 billion by 2030. Let's now turn to the business update on Slide 8.
Karl Staubo
executiveHilli kept up her record of operational leadership in the market, and right now she is discharging cargo number 122, with over 8 million tonnes of LNG shipped out since the contract began in '18. As we explained, Pan American Energy acted as the reservation notice in October to take the FLNG Hilli for the 20-year definitive agreements, with start-up in 2027. We keep making solid headway toward satisfying the conditions precedent in those definitive agreements, and we anticipate that all subjects will be lifted during Q1 of next year. The quarter's key milestone involved finalizing the commercial reset with BP, which settled every contract disagreement and aligned economic compensation for Gimi's arrival in country on January 10, 2024 through COD. That commercial reset also opens up our goal of refinancing Gimi on better terms than the existing facility, and of delivering the liquidity release we plan to put toward FLNG growth projects; following the commercial reset, BP and Kosmos have obtained an LNG cargo that allows accelerated commissioning, while we await gas from the BP-owned FPSO. In October, gas came from the accelerated commissioning cargo into Gimi, launching the accelerated commissioning. As was mentioned, the quarter's major milestone was placing the order for the Mark II FLNG, which will be converted at CIMC Raffles Shipyard in China. We additionally locked in an option for a second Mark II delivering in 2028, provided we order during '25. We observe ongoing robust advancement of our FLNG growth pipeline, spearheaded by activity in South America and West Africa. We anticipate closing a charter for the Mark II FLNG we recently ordered during 2025. Q3 financial highlights take in adjusted EBITDA of $59 million for the quarter, an unsecured bond issue of $300 million and a cash position above $800 million. Eduardo will give more detail on this quarter's financial performance afterward in the presentation. Macaw Energies has now generated and sold its initial ISO containers made from flare gas in Texas U.S. to industrial clients. We keep refining operations to account for gas quality variability from associated U.S. shale gas production. Moving to Slide 9 and the highlights of the Pan American Energy Charter in Argentina; in July, we signed agreements for a 20-year LNG export projects. In October, a reservation notice came through reserving the Hilli at the FLNG for use under the 20-year definitive agreements. Annual adjusted EBITDA tied to the Hilli will come to $300 million before commodity exposure. The project will draw on gas from the Vaca Muerta field onshore Argentina. Vaca Muerta ranks as the second largest shale gas discovery worldwide, with an estimated resource of roughly 300 TCF of gas. Startup is targeted within '27, which lets us upgrade and hook up the Hilli between charters finishing in July '26 and start-up in '27. Under the transaction, Golar will hold a 10% stake in South American logistics. South American is going to be the offtaker as well as the gas marketing division of this structure, which will deliver additional commodity exposure on top of the commodity component of the FLNG tariff. As we explained, the charter remains subject to customary closing conditions, which include approvals on the regulatory and environmental side. Our progress toward satisfying those conditions remains strong, and we anticipate closing the deal during the first quarter of next year. Alongside Pan American, we are also in advanced talks aimed at bringing in more local and international partners to the project, which would further enable possible expansion. Initially, the Hilli will draw on spare capacity within Argentina's current pipeline network. Efforts have likewise been underway to build a dedicated pipeline that links the FLNG terminal straight to the Vaca Muerta shale formation. That could underpin a project involving multiple FLNG vessels in Argentina, including possibilities for the Mark II currently on order. Moving to Slide 10, here is an operational overview of our 2 existing assets. Beginning with Hilli. She kept up her market-leading operational track record, and cargo #122 is currently being offloaded. The current contract with Perenco offshore Cameroon lasts through July '26, and after that the vessel will move to the Pan American contract in Argentina, with higher capacity utilization after a planned maintenance that will allow 20-year continuous operations at the site in Argentina. Gimi is on site, and commissioning activities have begun under an accelerated commissioning plan, with gas introduced in October. Every one of the ongoing commissioning activities is proceeding in line with plan and design specifications. According to the latest guidance from BP, first gas from the BP-owned FPSO is now anticipated in Q4 this year, with full COD in Q2 next year. COD, meaning commencement of operations date, will mark the beginning of the 20-year contract duration, kicking off Golar's share of the $3 billion of EBITDA backlog. Moving to Slide 11. We are seeing strong positive momentum for new FLNG opportunities; we keep advancing these opportunities, covering commercial and technical work, primarily in the Americas, West Africa, Middle East and Southeast Asia. As covered earlier in the presentation, the most active regions at the moment, in our view, are South America and West Africa. Growing project development is fueled by Golar's position as the only proven provider of FLNG as a service, our market-leading operational performance, our competitive construction cost advantage and the fact that we have the first available FLNG globally. We stay encouraged by how relatively attractive these FLNG growth projects are compared to alternative monetization solutions for owners of gas resources, and by the cost competitiveness of these projects versus other LNG export projects out there; and again, we are targeting to fix the Mark II FLNG within 2025. I'll now hand the call over to Eduardo to present our Q3 results.
Eduardo Maranhao
executiveThanks, Karl, and hello everyone on this call. It's my pleasure to take you through how Golar performed financially during 2024's third quarter. If you'll turn with me to Slide 13, I'd like to guide you through several of the quarter's key financial points. Our total operating revenues came in at $65 million, while FLNG tariffs hit $89 million — up modestly from $88 million in Q2. That improvement stems from greater realized variable earnings tied to Brent and TTF pricing. In our view, FLNG tariffs offer the most precise gauge of all liquefaction revenues actually realized, which encompasses the gains generated by our oil- and gas-linked fees from the Hilli operations. Total adjusted EBITDA came to $59 million, which was mostly in line with the prior quarter, even though we recognized certain preoperational expenses tied to commissioning work on Gimi as we move toward COD. For this quarter, we recorded a net loss of $35 million, driven mainly by noncash adjustments to the value of embedded TTF and branded derivatives in the Hilli contract, which mirrored lower oil and gas prices relative to Q2. Those movements represented roughly $90 million. On top of that, mark-to-market changes in our interest rate swap portfolio affected results by around $16 million. Although these items weighed on our quarterly results, we stay strategically well positioned to gain from future market improvements, and we keep concentrating on building a solid long-term earnings backlog. After issuing our $300 million bonds in September, our share of contractual gross debt came to just under $1.5 billion by quarter end. Even with major commitments to the Mark II project — which as of today has been entirely equity funded, with about $400 million put in so far — our liquidity remains strong, with roughly $807 million in cash on hand. On that basis, our net debt position finished the quarter at $646 million. That affords us considerable flexibility to push forward our growth initiatives and generate future value. Finally, we're happy to announce a dividend of $0.25 per share for this quarter, with a record date of November 25 and payments set for on or around December 2. Now to Slide 14. Hilli kept up its remarkable performance, posting 100% economic uptime and further cementing its market-leading operational track record. Here, we illustrate how Hilli's EBITDA contribution has evolved across recent quarters. Q3 proved to be an excellent quarter for Hilli, generating total EBITDA of slightly more than $68 million, comprising $33 million from base tolling fees plus roughly $35 million from variable realized Brent- and TTF-linked fees. I'd like to point out that we continue to be positively exposed to Brent and TTF prices. So should those prices keep improving over the quarters ahead, we would expect to see distributions from Hilli rise throughout the duration of each current contract. Now let's move to Slide 15. Hilli's operational track record has been remarkable. Starting in 2018, we have successfully produced more than 8 million tonnes of LNG, delivering just over 122 cargoes as of today. Looking at the right side of this slide, you can see the way commodity prices affect the earnings we get from Hilli. So if we take forward Brent and TTF prices as the basis, Hilli should produce adjusted EBITDA net to us of roughly $273 million in the current year, along with total free cash flow of $185 million. Looking ahead, debt service for 2025, which includes principal amortization, should decline to $80 million, which leaves total free cash flow net to us of about $126 million from Hilli by itself. Moving to Slide 16. During this quarter, we hit an important milestone on our Gimi contract when we executed the commercial reset with BP. Through this contract amendment, all outstanding disputes were settled and the contractual cash flows during the commissioning phase became much simpler. We now anticipate receiving roughly $220 million in pre-COD compensation, milestone bonuses included, with approximately $130 million of that being invoiced during 2024. Out of that figure, $78 million had been received in '24 as of today. Because of this commercial reset, we can also move ahead with refinancing the existing Gimi debt facility, which could free up as much as $500 million in liquidity for us, and I'll go into more detail on that on the next slide. Our balance sheet is still strong, giving us plenty of flexibility to back our growth initiatives. Following the $300 million bond issuance in September, we are well set to handle the bond maturity coming up next year, and we don't expect any meaningful debt repayments past our asset level debt until 2029. The substantial backlog of $4.3 billion that exists at Gimi supports additional debt optimization beyond the $700 million facility we currently have. We are in active, advanced talks with prospective lenders, and we're making good progress toward obtaining credit approvals and wrapping up contract negotiations. In a similar way, with Hilli's backlog nearing $7 billion, we see considerable potential to release significant liquidity from it. At present, asset level debt is sitting at about $570 million, which also leaves us plenty of room for optimization. As for the Mark II project, we have fully equity funded roughly $400 million so far. We've also obtained indicative financing terms covering about $1.2 billion of asset level debt for the Mark II. That said, we think that once the charter is in place, we are confident we can raise a substantially bigger amount on even better terms, potentially aiming for a financing amount equal to 4 to 6x its contracted EBITDA; so to sum up, our robust backlog of more than $11 billion from Gimi and Hilli, together with the possibility of substantial liquidity release from the ongoing disclosures for additional debt financing, gives us considerable financial flexibility. This puts us in a very good position to optimize our capital structure and keep supporting our growth initiatives going forward; with that, I'll pass the call to Karl for his closing remarks.
Karl Staubo
executiveAppreciate that, Eduardo. Now if we look at Slide 19, covering several important milestones from 2024 along with what we're prioritizing in 2025 — during this year, Golar's development has hit some significant markers. Our second FLNG unit went to BP off the coast of Mauritania and Senegal back in January. Because the project wasn't prepared to begin supplying gas to us at that point, we started talks with BP to settle on a commercial reset of the pre-COD contractual terms; we're happy to report that this reset was achieved in August, delivering the advantages Eduardo described a moment ago; then in July, we marked another important company milestone by executing definitive agreements for a 20-year charter alongside Pan American Energy in Argentina. Given the reservation notice we received not long ago, this means Hilli will be used, carrying an adjusted EBITDA backlog of $6 billion prior to commodity exposure; September saw us issue a $300 million unsecured bond; and right after that, we took FID on our third FLNG, the Mark II FLNG, which has a 3.5 MTPA capacity. Our to-do list, or priorities, for 2025 includes refinancing the Gimi, which Eduardo just walked through, wrapping up the conditions precedent tied to the 20-year contract with Pan American, landing a charter for the Mark II FLNG, and after that, obtaining asset-level financing for that vessel. Once everything is finalized, our plan is to move ahead with exercising our option for a second Mark II, which would deliver additional FLNG growth. So let's go to Slide 20, the final slide in the deck, to walk through what this might translate to in terms of figures. Assuming we hit our goal of obtaining a charter for the Mark II currently on order, Golar might double its FLNG earnings along with its EBITDA backlog during the coming year. With the 20-year contracts now secured for Gimi with BP and Hilli with Pan American, our EBITDA backlog sits at roughly $11 billion prior to commodity exposure as of today. Should we presume a Mark II contract on terms comparable to the Hilli contract signed in July, we might witness the EBITDA backlog climbing past $20 billion prior to commodity exposure. Once again, our aim is to land that charter during 2025. Thanks to a solid balance sheet and financial flexibility, this growth in cash flow and backlog is achievable, all while sustaining the shareholder returns already established and continuing to boost them as we reduce backlog risk and bring more units online. Additional upside to the backlog comes from commodity-linked earnings, which would serve as a supplement to the total earnings we're seeing. Every Mark II unit could potentially contribute roughly $500 million in annual adjusted EBITDA, assuming contracts match the terms of the Argentina deal signed recently. We've locked in an option for a second Mark II slated for delivery in 2028, which would then more than double our capacity, reaching a 12 MTPA run rate; that wraps up the prepared remarks for our Q3 presentation. I'll pass the call to the operator now for questions. Thank you.
Ben Nolan
analystGreat. To start off, I'd like to get a bit more detail on the situation in Argentina, if that's possible. To be specific, it seems the Hilli is definitely departing and relocating it somewhere else isn't truly an alternative — I just want that confirmed; beyond that, quite a bit has been going on involving Pan American, YPF, and the different projects. Could you perhaps just establish clearly how, from where you sit, you expect the Argentina LNG development to unfold?
Karl Staubo
executiveBen, as we laid out, Vaca Muerta ranks as the world's second biggest shale find, holding 300 TCF. Argentina's own demand runs at roughly 1 TCF annually. That leaves ample room to serve exports, yet those 300 TCF remain trapped by the Argentinian home market; with the new administration now seated, a powerful push exists to make LNG exports possible. You're correct that numerous discussions are underway regarding the scale at which it ought to be led, and similar matters. Everyone appears to agree on one point: the contract with Pan American that uses Hilli is going to serve as the initial route for Argentinian LNG exports. As was covered earlier in the presentation, Golar together with Pan American would be glad to have additional owners of Vaca Muerta gas resources join the project, supplying more gas and enabling FLNG expansion as well. Our view is also that, were we to obtain the Mark II currently on order, it would represent the second quickest liquefaction capacity available to Argentina, surpassed only by Hilli; therefore, should they genuinely follow through on the ramp-up of their export ambitions, both assets ought to find a home in Argentina, though above all else, Hilli is now committed via the reservation notice we received in October.
Ben Nolan
analystAlright. And that can't be relocated anywhere else, is that right?
Karl Staubo
executiveRight. We've already provided the notice of reservation.
Ben Nolan
analystFor my second question, maybe I'll direct this to Eduardo. You mentioned — first off, making continued headway on the Gimi refinancing, which would release cash. And then you spoke about possibly, once a contract is secured for the Mark II, being in a position to finance more than what you're actually paying for it. Could you perhaps walk through your thinking on capital allocation if you can pull those off — because then you'd have far more money flowing in than going out. What do you consider the right use of that capital? How do you expect it to unfold?
Eduardo Maranhao
executiveYes. Ben. Let me begin with that first item. Regarding the Gimi refinancing, you're correct — we're making additional headway on the proposed refinancing we've been talking about over the past quarter. At this moment, our target is $1.4 billion in total financing, and we're in advanced talks with prospective lenders. Turning to the Mark II financing, the figure we gave in the presentation of between 4 to 6x the contracted EBITDA — I'd say that's mostly a function of the reference points, or data points, that we have from the current Gimi finance. So if we're aiming at $1.4 billion on the basis of a $250 million EBITDA, that sits inside that range, in my view. And we believe that once a charter is in place for the Mark II, we could be positioned to hit such amounts. We've also received, as we stated in the presentation too, indicative terms for a proposed $1.2 billion asset level financing for the Mark II. That financing, though, would rest on the situation <<inaudible>>. So essentially on a situation with no contract; thus we believe that once we lock in a charter, we could also be positioned to meaningfully enhance the commercial terms of that facility. And on that last item regarding capital allocation, I believe Karl addressed it in the presentation as well; we continue to — we have plans to keep our dividend policy as it stands today, and we expect to raise dividend payments further as soon as we derisk our existing projects. So we're moving ahead with commissioning of Gimi. And as soon as we hit COD, or near that point, we could be positioned to raise our dividend payment further. And I'd say our ambition is to keep growing our FLNG portfolio. So we hold an option to develop a second Mark II further, which, provided that we have visibility into the earnings of that contract and we keep executing on our commercial strategy, we would have the financial capacity to undertake that project.
Chris Robertson
analystI wanted to ask whether you might elaborate a bit further regarding the option you hold for another Mark II at the CIMC Raffles facility. At some stage, I believe you mentioned that this option would lapse once the first quarter wrapped up. Yet it now seems you enjoy somewhat greater leeway on that front, which is encouraging. So, could you perhaps discuss the timing of when this specific option runs out? Does it extend across all of 2025, and could you add a bit more detail about precisely what conditions must be satisfied before you can proceed with converting a second Mark II asset?
Karl Staubo
executiveChris, indeed you're correct. I follow what you mean by referring to Q1. What was conveyed back then was that achieving delivery in '28 hinges on certain long-lead components; much like what you observed us doing with the initial Mark I, where we began locking in commitments for selected long-lead items prior to reaching FID on the project. For us, this reflects a degree of prudence aimed at holding onto a favorable delivery window while avoiding shouldering the entire EPC risk before a charter had been secured for the first Mark II. Consequently, there's added room to maneuver regarding the EPC contract with the yard during Q1, though we still expect to see commitments on long-lead items get underway in Q1. That truly serves as the decisive factor. Naturally, as a repeat purchaser of identical equipment—given that we are constructing 2 units, or potentially 2 units running fairly concurrently—there are certain benefits with the equipment vendors concerning lead times compared to those we got during the first Mark I. So it's invariably simpler when you're a returning client rather than a fresh one. Still, during Q1, we ought to finalize certain long-lead commitments; and as for the EPC contract in particular, our flexibility extends beyond Q1.
Chris Robertson
analystAll right. That's useful. Then for my next question, let me shift briefly to Tortue. As I understand it, BP and Kosmos had been looking at LNG technologies other than FLNG for the Phase 2 development. Given how the commercial situation has recently been reset, and the chance that another Mark II unit might become available by 2028 and might suit that Phase 2 goal, are you in any talks with the Tortue partners about possibly using an FLNG unit rather than some of those other technologies they had been weighing earlier?
Karl Staubo
executiveIt's not our practice to discuss particular projects in that way, except where we have signed contracts that are already public. What I can say is that during the first phase, Kosmos and BP determined FLNG was the most economical and best viable route for monetizing that unit. Since that time, in my view, the FLNG market has shown it is becoming even more of an industry standard, and more parties such as BP and Kosmos have concluded FLNG is the best route for monetizing gas reserves. Of course, plenty of neighboring countries in West Africa are using FLNG technology; so it would seem quite natural that FLNG is at least among the options they weigh, and there are advantages to using the same operator, obviously, plus many synergies, whether in offloading, crewing, spare parts and so forth; but when it comes to discussions, we aren't disclosing anything. And neither are our counterparts.
Analyst
analystCould you share some thoughts — a few comments, if you would — regarding that 10% interest in Southern Energy? Looking ahead, what ought we to anticipate on the CapEx side? Also, when it comes to CapEx, does it scale in line with the size of the ownership position? On top of that, what's a reasonable CapEx figure to assume for Hilli, taking into account both the Perenco contract that's already in place and the one signed with Pan American Energy? My guess is that upgrades and relocation come with some associated cost.
Karl Staubo
executiveChris. I'll handle the opening portion, and after that, Eduardo, feel free to chime in on the second leg. Regarding the expense side of redeployment, here's how we see it: disconnection has to happen in Cameroon. From there, the unit must physically move to a shipyard, which has to carry out comprehensive work so that 20-year continuous operation is possible. After that comes sailing to Argentina for hookup. Our present estimate sits at $200 million to $300 million covering the entire voyage; bunkering crew, tug and FLNG upgrading work are all included in that figure. That's the all-in cost of moving, $200 million to $300 million. As for the South American Logistics, Eduardo, would you like to take that one?
Eduardo Maranhao
executiveYeah, absolutely. Regarding Southern Energy, through our 10% ownership position, we've signed — as part of the definitive agreements — the finalized versions of the joint venture agreement alongside Pan American Energy, and that agreement set out an indicative budget for the project. That budget still needs to go through additional review. However, as things stand right now, we're looking at somewhere in the range of $50 million to $100 million in CapEx commitments that would fall to us.
Alex Bidwell
analystSo if we turn to Mark III, what's the strategy for that new-build unit? And what specific factor would make you choose Mark III instead of a Mark II?
Karl Staubo
executiveAlexander, as far as the Mark III goes, it's a unit of 5 million tonnes per annum. And like you say, it's built new from scratch rather than a conversion of a vessel. That means construction takes longer, CapEx per tonne comes in higher, and clearly the capacity is very large. So ordering a Mark III on speculation isn't something we're likely to do. Only with a firm contract in hand would we proceed. At present, then, there are no immediate plans to FID such a unit, for the reasons you raised — it's costly, it takes more time. And given the yard capacity at the shipyard we'd use, if ordered today delivery would probably land at the very end of the 2020 — so late '29, early 2030; therefore we view the Mark II as offering a better value proposition. Do you think that would shift if we secure a back-to-back contract for the Mark III that we consider attractive.
Alex Bidwell
analystAlright. For my follow-up, I want to turn to Macaw. During Q1, you mentioned that you would examine the possibility of a separate listing at some point around late 2024. So where do things currently stand with your Macaw plans? Is there a chance a listing could take place in 2025?
Karl Staubo
executiveYes, you're right — these things do shift over time, and when you transition from the design phase into actual hydrocarbon testing, certain engineering tweaks inevitably arise. As we showed in the presentation, the unit has by now sold its inaugural ISO containers derived from flare gas production, though we are still refining it so it can manage the significant intraday fluctuations in gas quality flows that come from U.S. shale gas. Once we feel that has reached a more settled state, we will take another look at pursuing a separate listing or a business separation for that unit. At this point that's a 2025 event, yet industrial parties have come to the site to examine the unit and the technology, and they have indicated interest in continuing to — or in obtaining exposure to the technology and Macaw as a business. That represents roughly $215 million in potential value. So that gives us an alternative to a separate listing.
Liam Burke
analystThe second Mark II is scheduled for 2028, correct? How does the pipeline of possible serious inquiries look? And could you give a sense of the pace we'd see as additional FLNGs are introduced?
Karl Staubo
executiveAround the globe, there are lots of stranded gas reserves, and I'd say a number of the projects we're talking about involve more than a single unit, and that includes the conversations we've had in Argentina. So with certain of these reserves, the only thing needed is to reach first gas. Once that happens, expansion becomes visible. That holds for BP's intentions at the Tortue field, regardless of whether an FLNG is used for the expansion plans. It also holds in Argentina and at a number of other places where talks are underway right now. So beyond fresh developments, of which there are many, expansion of what already exists strikes us as the largest opportunity. And as was mentioned earlier in response to one of the prior questions, certain operational synergies deliver a genuine cost benefit to the owner of the gas resource when you locate more than a single unit relatively close together. Regarding demurrage for loading crew boats, tugboats, spare parts and similar items, that amounts to an actual saving measured in dollars per MMBTU, and it makes the FLNG option still more competitive. So we believe the reality that more parties are now examining FLNG, plus the design and operational track record gaining wider acceptance, is something we see as backing our growth ambitions, along with the fact that what we're building comes in at roughly half the cost of where you find incremental capacity being started up in the U.S.
Liam Burke
analystAll right. And to build on something asked before, those conversations — I mean, is there sufficient interest — for capacity beyond 3.5 MTPA?
Karl Staubo
executiveYeah, it truly comes down to two factors: how big the reserve is, and the flow, the gas flow; so originally the GTA project Phase 1 had been planned at 10 MTPA. The Gimi accounts for only about 2.5 of production. So in theory, there's ample room there. When it comes to Vaca Muerta, we're discussing — or rather YPF in LNG Argentina is discussing — 15, 20 MTPA. And you find multiple fields similar to these, not multiple fields similar to Vaca Muerta, but multiple fields similar to the GTA across the globe, so roughly 25 to 30 TCF, which comfortably underpins 10 MTPA of yearly output. So yes is the answer.
Sherif Elmaghrabi
analystTo start, over the summer you entered into an FLNG deal with NNPC. Could you provide an update on where those talks stand? And do you still expect a Nigerian LNG project might get the green light before the year is out?
Karl Staubo
executiveYou're correct that we signed that development agreement with NNPC. According to the project development agreement, the aim was to have it done by year-end; it now looks to us as less probable that the Nigerian projects will advance during this year, largely since I don't believe they currently have a project that fits the FLNGs that are on offer; however, Nigeria certainly holds sufficient reserves, and those under NNPC's control, for a Mark II to be used, yet for that to occur during '24, we consider it unlikely, though they remain among the contenders when we say we expect to have the unit contracted during '25.
Sherif Elmaghrabi
analystUnderstood. So if we look at other possible players, going back to Argentina, what would it take for the onshore infrastructure to be ready for a second FLNG unit? And even more crucially, can you give any indication of the timeline for that?
Karl Staubo
executiveWhat's required is a dedicated pipeline, since Hilli is drawing on unused capacity within the current network, yet that network doesn't have enough unused capacity to support anything past Hilli. Therefore, if you wish to grow beyond that point, a dedicated pipeline running from Vaca Muerta to the FLNG site becomes necessary. Efforts on finding that pipeline have begun. Together with the regional pipeline operators, we put the build period at roughly 2 years. The intention would be to lay the pipeline next to an oil pipeline that is presently nearing completion. As a result, both the right of way and the precise route have already been determined, so what remains is securing financing and reaching FID on it. It's somewhat of a chicken and the egg problem, since without additional FLNGs there can be no pipeline, and without the pipeline there can be no additional FLNGs. They therefore have to be advanced together, though building the pipeline takes less time than building the FLNG.
Karl Staubo
executiveAlright, thanks to everyone for joining the call. This quarter has been quite eventful; the progress has us feeling very good, and I believe our priorities for the coming year are very well defined. We are putting in strong effort to get things done. I appreciate you calling in and hearing about our current position, and we’re eager to speak with you again next quarter. Thanks once more, and enjoy the rest of your day.
Operator
operatorThat brings today's call to a close. We appreciate everyone joining in. At this point you're free to hang up. Enjoy the rest of your day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Golar LNG Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Golar LNG Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Golar LNG Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.