Golar LNG Limited (GLNG) Earnings Call Transcript & Summary

May 27, 2025

NASDAQ US Energy Oil, Gas and Consumable Fuels earnings 68 min

Earnings Call Speaker Segments

Operator

operator
#1

Welcome to the Golar LNG Limited First Quarter 2025 Presentation. After the slide presentation by the CEO, Karl Fredrik Staubo; CFO, Eduardo Maranhao; CTO, Morten Skjong; and Chairman, Tor Olav Trøim. There will be a question-and-answer session. Information on how to ask a question will be provided then. [Operator Instructions] I will now pass you over to Karl Fredrik Staubo. Karl, please go ahead.

Karl Staubo

executive
#2

Thank you, operator, and welcome to Golar LNG's Q1 2025 Earnings Results Presentation. My name is Karl Fredrik Staubo, CEO of Golar LNG, and I'm very pleased to be accompanied today by our Chairman, Mr. Tor Olav Trøim; our CFO, Eduardo Maranhao; and our Chief Technical Officer, Mr. Morten Skjong, to present this quarter's results. Before we get into the presentation, please note the forward-looking statements on Slide 2. As normal, we start on Slide 3 with an overview of Golar today. Golar is now a focused FLNG company. We own 3 units, of which 2 is on the water and 1 is under conversion. The key event of the quarter was securing of two 20-year charters, one for our FLNG Hilli following the end of our current charter in Cameroon in July next year as well as entering into definitive agreements for a 20-year charter for our Mark II FLNG under construction. As announced on our Q4 call, we have now fully exited LNG shipping with the sale of the Golar Arctic and our sale of the equity stake in Avenir LNG. We currently have a market cap of around $4 billion, a total net debt of shy of $800 million and a fully delivered net debt to EBITDA of around 2.8x. Our strong cash flow visibility, solid balance sheet and market-leading position as the only proven provider of FLNG as a service sets the company up for continued attractive FLNG growth. We have 3 FLNG designs available for growth, and we will elaborate on our growth ambitions as we go through today's presentation. Turning to Slide 4 and a focus on Hilli, which is still the best-performing FLNG globally. Hilli continued her market-leading 100% operational uptime during the quarter. Hilli has now delivered 132 cargoes since contract commencement in 2018 or more than 9.2 million tons of LNG produced. On May 2, all CPs for her 20-year redeployment in Argentina was concluded and final investment decision was given. This secures $5.7 billion of EBITDA backlog before commodity upside. We have now designated a dedicated team of project and operations people to the redeployment scope for Hilli's planned vessel upgrades and transit from Cameroon to Argentina to facilitate for 20 years of on-site operations. On Slide 5, we focus on our second FLNG, the Gimi, which is in her final stage of commissioning and to start her 20-year charter for BP offshore Mauritania and Senegal. The commencement of operations date will activate the vessel on our P&L statement. Golar's share of the contractual EBITDA is $151 million based on 90% capacity utilization. Any production above such level will translate into a pro rata increase in Golar shares of EBITDA generation by Gimi. Following the commercial reset announced in August last year, Golar has invoiced $196 million in pre-COD payments from the GTA upstream partners. This amount is recognized on our balance sheet and will be amortized over the contract duration. We have now successfully offloaded 2 LNG cargoes and expect COD to remain on track within this quarter. That should mark the start of the 20-year contract period. The picture on the bottom left is from Thursday last week, where we attended an official state visit by the presidents of Senegal and Mauritania to the GTA hub together with senior management from BP, Kosmos, SMH and Petrosen, marking the introduction of Senegal and Mauritania as LNG exporting countries. Turning to Slide 6 for an update on our Mark II FLNG conversion. The conversion of the LNG carrier, Fuji into a 3.5 million tons per annum Mark II FLNG is well into construction. During Q1, the Fuji arrived at the shipyard in China. The vessel has now been divided in 2 and skidded onshore. The liquefaction plant that will be built on a new midship section is well underway and a significant portion of our long lead items have arrived at the shipyard ready for installation. The project remains on schedule for delivery by year-end 2027. On May 2, simultaneous with the final investment decision for the FLNG Hilli charter in Argentina, we entered into definitive agreements for a 20-year charter for the Mark II to operate alongside Hilli in Argentina. The contract is subject to the same CPs as for the Hilli when we entered into her definitive agreements in July last year. These CPs include environmental assessment, export license, RIGI protection and final investment decision by the partners. All the CPs are expected to be lifted within 2025, and we expect the relevant approvals to benefit from the recent Hilli process. The CapEx to EBITDA for the Mark II is around 5.5x before commodity upside for a 20-year charter period with a further 5-year extension option in the charterer's favor. On Slide 7, we have visualized these substantial charter developments on a slide. Our contract backlog now stands at more than 60 years of combined contract backlog across our 3 FLNGs. Or in dollar terms, we have an EBITDA backlog of approximately $17 billion before commodity exposure. The existing fleet is now fully contracted, and we are progressing towards our expressed target to transform into a market-leading infrastructure company with attractive commodity upside. In the next section, we will elaborate further on the key attributes of our FLNG charters in Argentina. So turning to the next section on Slide #9, we illustrate the LNG value chain and Southern Energy's role in introducing Argentina as an LNG exporting nation. As part of the Argentina deal, Southern Energy has secured fixed price gas sales agreements for 20 years from the upstream partners of SESA to provide the project with natural gas sourced from the Vaca Muerta onshore field in Argentina. SESA will be responsible to facilitate for a dedicated pipeline to bring the natural gas from the Vaca Muerta to the FLNG location in the Gulf of San Matias, a distance of about 500 kilometers. This will equate into a fixed pipeline fee to SESA. SESA will then be responsible for chartering and operating the FLNGs as well as marketing of the gas. Hence, SESA's responsibilities include all activities to be taken from the Vaca Muerta until LNG is produced and ready for export. The export point price is referred to as free onboard. The difference between free onboard prices and the LNG prices you typically recognize on your screen is the shipping cost from the production site to its destination of consumption. The destination price is referred to as delivery ex ship or DES pricing as highlighted on the slide. As part of the charters, Golar will receive 25% of all achieved LNG prices above $8 per MMBtu in FOB price. Hence, when considering the upside element, the applicable methodology is to consider DES prices less $1 to $2 per MMBtu in shipping costs. In the current market, TTF and JKM spot prices are trading around $12. Hence, today, there's a $2 to $3 upside above the $8 threshold if the project was producing today. Turning to Slide 10 and some of the contract highlights. Both vessels have a 20-year contract term. Hilli will have an annual EBITDA of $285 million and $400 million for the Mark II. OpEx is passed through for both vessels. Both EBITDA tariffs are subject to a CPI adjustment equivalent to 30% of U.S. CPI from year 6. Both vessels have the same upside element of 25% above $8 FOB. And combined, the 2 contracts provide Golar with an EBITDA backlog of $13.7 billion before the mentioned CPI adjustment and the commodity upside. Turning to Slide 11 and further elaborating on the commodity upside element of the charters. As explained, Golar will have a 25% upside above $8. For every dollar above, we have an annual EBITDA of around $70 million. Over the contract lifetime, that would equivalent to $1.4 billion of EBITDA backlog for every dollar achieved pricing is above $8. Importantly, this calculation is based on monthly achieved prices. We have also introduced a limited downside element where Golar give a temporary discount should annual average FOB prices be below $7.5 and down to $6. This is capped at a total exposure of $105 million over 2 years, which is equivalent of $210 million. Hence, the total commodity exposure for the contract has a maximum downside of $210 million in return for no cap on the upside. If this contract was in place over the course of the last 5 years, you can see in the table on the bottom right that we would have meaningful additional EBITDA above the contracted amounts. If you take the extreme example of 2022, the commodity element alone would contribute $1.7 billion to $2.1 billion of additional EBITDA to Golar if the contracts were in place at that time. Even today, if the contracts were operational today, we would see an additional contribution above the contracted amount of an additional $250 million. So to summarize this simplistically, for every dollar FOB prices are above $8, Golar makes an additional $70 million of annual EBITDA. Turning to Slide 12 and a further commodity exposure that's been built into the contracts. Golar is a 10% shareholder in Southern Energy alongside our upstream partners, Pan American, YPF, Pampa Energia and Harbour Energy. Hence, Golar makes an additional 10% of commodity exposure. This has no downside cap or upside cap. So the true fully aligned shareholder, where a $1 change in the gas price impacts Golar's EBITDA generation by around $28 million. Hence, if you combine the $70 million upside tariff and the $28 million equity ownership, $1 change provides Golar with approximately $100 million of EBITDA upside. This is further illustrated on Page 13, where you can see our EBITDA buildup. Hilli has a base tariff of $285 million, Mark II of $400 million. Combined, that's $685 million. The downside element we have is linked to our equity ownership in SESA and the rest is upside. Every dollar above $8 equates to around $100 million. Every dollar below is a downside of around $28 million. We see this as a highly attractive risk reward. And also in light of current and future LNG prices, we expect meaningful additional EBITDA contribution from the commodity element. Turning to Slide 14. Contract in Argentina has historically not been fully without risk, and we have gone to a great extent to look at risk mitigation, both regulatory and legally in the framework supporting the charters. Some of the highlights include English law for all charters. All payments are made in U.S. dollars. The Milei-led government of Argentina has introduced several regulatory frameworks to boost domestic investment in Argentina, and we are pleased to have received the support of both the state and local authorities to achieve the first ever 30-year non-interruptible LNG export license in the case of FLNG Hilli. And we have also been accepted to the large investment incentive scheme under the RIGI Protection, which was a law introduced last year. The important highlights of the RIGI includes certainty and regulatory stability for the duration of the project. We cannot be subject to any new national provincial or municipal taxes, and we have full freedom to repatriate profits, dividends and capital during the life of the contract term. These are the same protections that are the CPs that we will meet for the Mark II charter. Turning to Slide 15 and looking at the global LNG market and how our SESA contracts are placed in the wider scheme of the market. When entering this year, the LNG market stood at around 430 million tons, where the U.S.A. is the largest current producer with a 23% market share. More importantly, the significant expected growth in the coming years is driven by volumes out of the U.S. Hence, we want to identify ourselves with projects that are highly competitive versus U.S. exports as the marginal producer. If you look on the cost curve on the right-hand side, you can see that the delivered price of U.S. export projects is north of $10 per MMBtu. If we then further elaborate on Slide 16, how the recently announced Argentina Golar contracts stack up versus U.S. liquefaction projects, there are some interesting data points to note. First and foremost, the gross tariff that we have achieved is significantly higher than that of recently entered into U.S. liquefaction projects. The EBITDA tariff you typically see in the U.S. is net of OpEx and maintenance costs hovering around $2, whilst we have secured around $2.45. The CapEx per ton is currently sitting of around $1 billion for U.S. liquefaction projects versus $600 million in the case of the Mark II. Inflation adjustment is typically hovering between 20% and 30% in the U.S., 30% for our contracts in Argentina. In addition, there's no commodity upside for U.S. liquefaction tolling arrangements, whilst we have the mentioned 25% above $8 of FOB. Hence, what does these characteristics mean? Well, if you have a higher EBITDA tariff and a lower CapEx per ton, you have a higher return on capital employed. Our commodity upside within the tariff provides us with strong upside participation without spot cargo risk. The fixed price gas sales agreement for 20 years provides SESA with a call option on international LNG offtake prices for 20 years. I think no one knows exactly where the gas price is, but you know it will be volatile, and we are there to capture 25% of monthly volatility. The OpEx pass-through, combined with our 30% CPI adjustment provides for improved inflation protection versus U.S. liquefaction projects. Hence, all in all, we believe we compare very favorably to the alternative infrastructure investments within LNG liquefaction. This is further illustrated on Slide 17, starting off with the graph on the far left. You want to have as low as possible CapEx per ton and as high as possible average tariff in dollars per MMBtu basis. And compared to some of the listed U.S. liquefaction alternatives, we compare favorable on both measures. Then you want long-term cash flow visibility. We now have 20-year across all of our 3 assets, and that's the remaining average life of our contracts. Lastly, to the far right, we've looked at capital markets pricing on a per -- on a liquefaction capacity basis. If you take total EV and divide over liquefaction capacity in operation, you can see that Golar is trading at just north of $1 billion per ton, whilst our U.S. colleagues are trading more favorably. If you were to include a fairly significant growth program across all the 3 companies, you can see that the capital markets pricing further reduces in the case of Golar to shy of $900 million per ton, whilst comparing to our U.S. listed peers have a significantly higher pricing. If you were to put that pricing into Golar's share price, that would be a very meaningful pickup from our current capital markets pricing. Moving on and turning to business update on Slide 19. The highlights of the quarter across the BD department is obviously the final investment decision for Hilli, the definitive agreements for the Mark II. However, we continue to see strong progress on further FLNG commercial developments. There are very few yard slots that can deliver within the 2020s, and we now see increased attention from the projects that lost out on the Hilli and the Mark II. We continue to target opportunities with competitive wellhead gas to secure an attractive base tariff with commodity upside participation. We are in detailed commercial conversations across our different vessels designs, Mark I, II, and III. And some of these discussions include projects where the charterer may want an equity participation in the FLNG. I'll now hand the call over to our Chief Technical Officer, Mr. Morten Skjong, to further elaborate on our service offering and the different designs available for growth.

Morten Skjong

executive
#3

Good morning, good afternoon. In Golar, we have 3 different FLNG designs, the Mark I, the Mark II and the Mark III. These range in LNG liquefaction capacity from around 2 million tons per annum up to a maximum of 5.4 million tons per annum. This depends on FLNG configuration, feed gas properties and ambient conditions at the site. The Mark I at Seatrium is a highly successful design with 2 units on the water and a stellar track record for the Hilli during its contract in Cameroon for Perenco. Meanwhile, our first Mark II conversion is progressing well at CIMC Raffles and the EPC contract contains an option agreement for a second vessel. Our Mark III reflects years of innovative engineering and Samsung's world-leading FLNG track record. Common to all 3 designs is Black & Veatch PRICO liquefaction technology, enabling Golar to harvest vital lessons learned between FLNG designs. The most important commonality is, however, the input and leadership from Golar's world-class projects and operations teams. With Hilli's FID and the signing of definitive agreements for the Mark II in Argentina, we are now advancing work with our contractors to confirm updated price and schedule for our FLNG designs. We have also completed ship inspections for potential donor vessels for either a Mark I or a Mark II, and we are confident that we can secure a conversion candidate with Fuji's LNG storage capacity or higher at an attractive price. Furthermore, we are in discussions with long lead equipment suppliers for slot reservations or preorders to ensure that lead times for critical equipment will support the overall schedule for our next project. The work we are doing now will enable us to proceed with at least 1 FLNG EPC award this year and whatever design we choose within the 2020s. With that, I'll hand over to our CFO, Mr. Eduardo Maranhao, for the Q1 group results.

Eduardo Maranhao

executive
#4

Thank you, Morten, and good morning, everyone. I'm pleased to provide an overview of Golar's financial performance for the first quarter of 2025. Moving to Slide 22. Let's go through some of the key financial highlights of the quarter. We achieved total operating revenues of $63 million, FLNG tariffs reaching $73 million in the quarter. Total FLNG tariff in the last 12 months ended in Q1 reached $336 million. We refer to total FLNG tariff to illustrate the total revenues generated from FLNG Hilli, including realized gains from TTF Brent-linked fees. In addition to this, Gimi has started to contribute to our cash flows. And as of May 2025, we have invoiced around $196 million of pre-COD fees under the commercial reset agreement, most of which has already been received. This amount is not shown in our P&L and is currently being recognized on the balance sheet until COD. Total EBITDA reached $41 million in Q1, largely driven by lower Brent and TTF prices. Total EBITDA for the last 12 months ended in Q1 was $218 million. This quarter, we reported net income of $13 million, in line with the previous quarter. This figure is inclusive of a total of $32 million of noncash items such as adjustments in the value of embedded TTF and Brent derivatives within the Hilli contract as well as changes in our interest rate swaps. Our liquidity remains strong with approximately $680 million of cash on hand at quarter end. I'll talk more about these and other initiatives on the financing front in the next slide. Lastly, we're pleased to declare a dividend of $0.25 per share this quarter with a record date of June 3 and payment scheduled for June 10. So this equates to around $105 million per year on a run rate basis. Now turning to Slide 23. We now take a closer look on our debt position. At the end of Q1, we had just under $1.5 billion of gross debt when adjusted for our 70% stake on Gimi. On an asset level basis, based on the existing $17 billion EBITDA backlog that Karl spoke about before, our units were still significantly under-levered, considering the cash flow visibility beyond 2045 with further growth from increased capacity utilization as well as commodity exposure. Last March, we signed a $1.2 billion debt facility to refinance the FLNG Gimi with a consortium of leading Chinese leasing companies. This facility features a tenor of 12 years and a 17-year amortization profile. Upon closing and repayment of the existing debt facility, we expect to generate net proceeds of approximately $530 million, of which 70% of these proceeds or an amount equivalent to $370 million will be released to us. We are currently working on the remaining closing conditions, which includes third-party stakeholder approvals, and we expect that closing could take place around summer. In addition to this initiative and to further evaluate the...

Operator

operator
#5

Ladies and gentlemen, please continue to stand by your conference. We resume shortly. Thank you.

Eduardo Maranhao

executive
#6

Okay. I think you may now hear me back. So if we go back to Slide 23, we now take a closer look on our debt position. At the end of Q1, we had just under $1.5 billion of gross debt when adjusted for our 70% stake on Gimi. On an asset level basis, based on the existing $17 billion backlog that Karl mentioned before, our units are still significantly under-levered, considering the cash flow visibility beyond 2045 with further growth from increased capacity utilization and commodity exposure. On March, we signed a $1.2 billion debt facility to refinance FLNG Gimi with a consortium of leading Chinese companies. This facility features a tenor of 12 years and a 17-year amortization profile. Upon closing and repayment of the existing debt facility, we expect to generate net proceeds of approximately $530 million, of which 70% of these proceeds are equivalent to $370 million will be released to us. We are currently working on the remaining closing conditions, including third-party stakeholder approvals and expect to close around the summer. In addition to this initiative and to further evaluate debt optimization alternatives, we have completed the rating process of the company with key rating agencies, allowing us to tap the capital markets in a more efficient way in the future. If we look at Hilli, for example, we have an EBITDA backlog of more than $6 billion, which gives us plenty of room to optimize its financing from the current levels of around $0.5 billion. In addition to that, Mark II remains fully unencumbered. And so far, we have invested around $700 million of equity in each construction. So moving to Slide 24. We currently maintain a net debt position of around $800 million, which is projected to increase to approximately $2.3 billion upon completion of the Mark II remaining CapEx. By 2028, with Mark II fully operational, our anticipated fully delivered run rate EBITDA is expected to reach $835 million before any further commodity upside. This positions us with a robust leverage ratio of 2.8x net debt to EBITDA, supported by clear earnings visibility extending through 2045. Assuming a conservative 5x net debt-to-EBITDA ratio and leveraging on our secured long-term contracts, the refinancing of our existing debt under optimized terms could potentially unlock over $1.9 billion of equity. This move aims to release additional equity, accelerating our growth initiatives, including the funding of additional FLNG units. Once these units are contracted, financing at similar leverage ratios of around 5x EBITDA becomes viable. This approach allows us to efficiently recycle capital, facilitating sustainable and self-funded expansion. That concludes my update. I'll now hand the call back to our Chairman, Tor Olav Trøim.

Tor Trøim

executive
#7

Yes. I'm not going to bother you for a long time. It's probably 10 years since I've been on one of these calls, but I thought it was useful to just give a little recap of what have happened in the 25 years since we took over and also give some credit to the people who have effectively created this company over the last years. I think Seatankers took over Osprey as a conglomerate in 1999, 2000. We then turned it into an LNG growth vehicle. We had the ambition that LNG was a high commodity growth. And it seems like we were right because at that time, it was around 130 ships. I think today, we have more than 600. Also the number of terminal has increased dramatically in the period since that time. So you were correct, but we were probably 15 years too early in many ways, and that was part of the problem. We -- in 2001, we decided to go for shipping. People -- we went to conference and we would change the market. We will do commodity shipping with spot tonnage. People thought we were crazy, but in 3, 4 years, we effectively had a situation where people followed us. I mean we were effectively 30 people in the same kind of group and the return went down. So we said we had to do something else. We then had some good technical experts in the company. We developed LNG terminals, carriers into terminals. And we met with President Milei in Brazil, and he wanted to be independent of Bolivian gas and then suddenly, we became an FSRU company. Good return in the beginning, same thing happened, Accelerate BV, [ Livanos ], everybody came after it, and there was no money there either. So when we came to 2014, a major transformation was necessary. We then worked on the FLNG concepts from 2010. However, there was a big dispute between Mr. Fredriksen and myself, and that led to my departure from Seatankers. We then arranged to buyout of the $1.8 billion stake from Seatankers with good support from institutional holders, and we went ahead with our first FLNG order. It was a challenging start, but when oil market dipped in 2014, but we got a contract with Perenco on the first vessel. And we also hired the Chairman from BG, Frank Chapman, who was helpful in setting up the second contract, which we then got with Kosmos initially, but which was later concluded with BP. Then as prices fell in 2014, we also kind of went into the power cycle with Eduardo Antonello and a 25-year power purchase contracts. So we were actually pretty widely spread at that time, including the FSRU business, the carrier business, the power business and everything. And we said, if you're going to achieve something in this world, we have to focus. We then decided to focus. We divested the KOOL company. We divested the power station when LNG prices came up again because the business was not that good any longer. And we also divested the kind of the carriers in KOOL when the market was strong, we sold it. So we were stuck with some LNG assets. And we had already, at that time, with what we now have done in the last year, built the largest FLNG company in the world. I'm also proud to say that Perenco are the people who have known us in the LNG business longest, which I consider to be the best oil company in the world when it comes to how they run their business. They've known us from 2012, I think. And I think they've done business with us on the site since 2018. And now they're also our largest shareholder, and they also, as of last week, represented on the Board. So then when Karl and the team concluded a backlog of $17 billion spanning over 20 years is then the Board disappointed that the latest deal has resulted in a higher share price. Yes. To some extent, we probably are. But it's the same Board who are there today who bravely rejected private equity offers pretty close to where we are today. At the time when the order book in this company was only 25% of what it is today because we knew at that time that we could deliver more value to shareholders over time. That said, if you want to run the growth company, you need over time an effectively priced equity, it's crucial to continue the growth. And if public investors are unwilling to wait 2 years before the strong cash flow comes in, the Board is convinced that alternative strategy exists for this company. One possibility, which we I think well into with Eduardo and his team is to look at the bond financing structure, which clearly will enhance the equity return in this company. Another one is to look at what came in coming last time. And I think we see some interest rate for it already, the interest private equity having a buying an order backlog of $17 billion. As I said, last time, they were close to paying what the share price is today. This time, the order backlog is 4x bigger. So I assume the number is significantly higher. But this is not what the Board really want. I think the Board wants to continue to build this company. We have confirmation of the Mark II later on this year, which has been told to the investors. We also have the possibility of concluding the commitment for vessel 4 and 5 within 4 and also maybe 5 within this year. We'll see what we -- and we're certainly going to build more. We are undoubtedly having the yellow leaders shirt in a business set for massive, massive growth. And I think to put it in cyclic terms, we are in a pretty strong breakout. I don't see any competition behind us. And I think if you look into what happened in the FPSO industry, it grew effectively from 2 units to 250 units in 40 years. I think we'll see a very similar track here. And the reason is the same. It's a lower cost economics to build floating units that it is to build this massive structure we build in the old days on the land-based LNG terminals, and it provides significant more flexibility when you can move things around. You can also take higher political risk by going to countries you couldn't go to with a fixed installation. My former boss, Torstein Hagen, and he told me when I was 13, don't focus solely on money. If you bring the right people together and you have a good business idea, money will ultimately come to you big time. He started in Viking Cruises 25 years ago. And today, the company's worth $20 billion. He started from scratch and Torstein probably have a fortune of more than $10 billion. And it was all because he had a good idea and he had great people. It's exciting to have an earnings secured of $2.5 million a day for the next 20 years, starting in '27-'28. But what is truly motivating me as a Chairman in this thing is the massive, massive opportunities we have to grow this company, along with some of the best people at least I ever worked together with. And I think some of them are extraordinary. If you think, for instance, about the Chief Executive we have in this company, I would say that probably by far up -- I think I've probably worked with 40, 50 different people and it's clearly among the top 2, 3 guys I ever worked with as a Chief Executive, fantastic guy. I think Maranhao, great financial mastermind, now working strongly on the financing. Morten is a brilliant CTO with continuously putting borders and trying to come up with innovation. We have Marcos Browne, who was the guy who created the whole Argentinian file together with [ Calciandro ] and [ Antonego ] unbelievable people [indiscernible] another guy who operates the Hilli and also the Gimi, who have perfect record. We have [ Ted Victor ] who delivered to BP better than other people can do. We have processing -- we have a fantastic team, as you see on the picture here, which describes the whole Golar team. I think it's unbelievable. And I think this, in many ways, forget the $17 billion in assets, we have the smartest people. We have the same people when the FPSO company, SBM said that we were going after FLNG. They made a stride and they put a crossover. It will never happen. That's the same unit in 7 years have delivered every day production according to schedule and not at any downtime. I'm super excited by what to come here, but I'm super excited because of the opportunities and the team we have together. But the reason why the opportunity is so much better now is the fact that we have $17 billion in backlog. So you have close to $1 billion to finance the growth going further. I think when you can find a business, everybody hates the kind of fossil industry these days. But I think the latest statistic from [ ER ] shows that the electric consumption in this world went up with around 4% year-on-year. Out of that, effectively 11% is fossil fuel and renewable is down 2.1%. Gas is a major driver with 8%. I think if you are in the gas business, we have a massive growth area ahead of us. And if you can -- I think we can really do something monumental here. I think if you build assets for 20-year contracts at 5x, 5x plus EBITDA and add on top of that, you have an upside on the equity, which in this case, Argentina is close to 30% if gas price takes up, I think you have created something absolutely unique. I don't expect people to see this from day to day. But I think as you go along this story, it will run for most of the people. It took us 25 years to get there. I'm sure it will take 25 years for us to have any serious competition in this business as well. I think when major oil companies, 1 of the 3 major oil companies in the world comes to us and say, we can't do this ourselves. Are you willing to do it for us?" And we said, no, we're going to do it for ourselves. I'm proud of what we have created. So I'll leave the word back to Karl. And I said, good luck, look at the situation. Don't judge us day by day, but the company we effectively over the last years have built $10 billion, $15 billion in order backlog, at least give us some credit. Thank you.

Karl Staubo

executive
#8

Thank you, Tor. Much appreciated for kind words. I truly echo especially the words around the organization. And it's also nice to know that I can stretch a bit further to further increase the stake versus the other CEOs that you've previously encountered. So we will keep working hard on our side. Thank you. So to the final remarks, turning to Slide 32. We now have 20-year plus charter on each asset, obviously, Hilli concluding her contract in July next year and then repositioning to Argentina, Gimi to just about to start up her 20-year contract for BP Offshore Mauritania and Senegal and Mark II to conclude her conversion and sail straight to her 20-year charter in Argentina again. So to highlight, we have more than $17 billion of EBITDA backlog with significant commodity upside as explained. So for the final slide of the prepared remarks, turning to Slide 33 and some of the key milestones and focus that you should expect to see for the rest of the year. Gimi has now concluded her 2 first LNG cargoes. The third cargo is underway and COD is expected within Q2. We've concluded the FID of the 20-year charter with Southern Energy for Hilli with an adjusted EBITDA backlog of $5.7 billion. We fully sold out of the shipping-related assets, including Avenir and Golar Arctic and delivered Arctic to her new owners. Some of the remaining actions that you should anticipate and is our target for the remainder of the year is to conclude the refinancing on Gimi, as Eduardo has explained, to conclude the conditions precedent for the 20-year charter for the Mark II, which are the same CPs as we have recently completed for Hilli, to further target balance sheet optimization on the back of 20-year charters and recycle the capital for attractive FLNG growth units. This concludes our prepared remarks for our Q1 call, and I'll now turn the call over to the operator for any questions.

Operator

operator
#9

[Operator Instructions] The questions come from the line of Alexander Bidwell from Webber Research & Advisory.

Alexander Bidwell

analyst
#10

Could you touch on the overall commercial strategy for offtake on the Argentina project? Is there a target mix of merchant and contracted volumes that you guys are aiming for?

Karl Staubo

executive
#11

Sure. So that work will be led by Southern Energy, where we are obviously a shareholder and will assist. The target is to have a basket offtake probably between -- a basket between Brent, JKM and TTF linked and then some volume left for spot. The interesting part is that there are no LNG exports in this region of the world, and there are some high-paying countries very close to Argentina that could boost earnings further. So the idea is to have a combination, yes.

Alexander Bidwell

analyst
#12

And I guess a quick one again on the Argentina contracts. Is there any sort of, I guess, additional upside on that base charter rate for excess production similar to the Gimi contract?

Karl Staubo

executive
#13

No. So they have chartered the full capacity. So the $685 million is for the full capacity. Similar to the Gimi, we only guarantee 90% of nameplate. And we capture any excess earnings above the 90% through our shareholding in Southern Energy.

Operator

operator
#14

We are now going to proceed with our next question. The questions come from the line of Sherif Elmaghrabi from BTIG.

Sherif Elmaghrabi

analyst
#15

Maybe starting with potential future units. If we're thinking about ordering one by year-end, when do we start thinking about ordering the long lead items for another new build? And if we order one this year, what's the delivery time line look like?

Karl Staubo

executive
#16

For the Mark I and II, which are both based on conversions, the conversion time is approximately 3 years. For the Mark III because you start from scratch, you need to add another year, so approximately 4 years. The reason why we're ramping up the shipyard activity at the moment is to safeguard that 3-year construction time. And at some point, you should expect to see long leads also being included in such preparations.

Sherif Elmaghrabi

analyst
#17

Got it. And then for the Southern Energy JV, just a couple of related questions. First, how do we think about the JV's breakeven price for the commodity exposure? And do you give through your 10% stake, do you have any CapEx obligations for the onshore infrastructure they need to put together?

Karl Staubo

executive
#18

So we haven't disclosed the exact breakeven of SESA, but I think it's fair to assume that the downside participation starts at $7.5 and the upside from $8. So within that region should be a very fair assumption. Keep in mind that both the gas sales agreements and the anticipated pipeline fee will be fixed for the 20-year term. So I don't expect significant changes to that breakeven over time. And yes, Golar is liable for 10% of the required investments by SESA. However, it's important to highlight that, that does not include any of the upstream work. That's only the infrastructure required to facilitate exports. So that's mainly port, port infrastructure in [indiscernible] relatively short pipeline connection of 19 kilometers and the mooring system for the FLNGs where we are applicable for our pro rata share.

Operator

operator
#19

We are now going to proceed with our next question. And the questions come from the line of Chris Robertson from Deutsche Bank.

Christopher Robertson

analyst
#20

Guys, obviously, the company just made a major announcement with the FID of the Hilli and entering into a definitive agreement for the Fuji. I think Tor hit on this. But just wanted to clarify, if the share price kind of stays here at current levels, is the company currently considering strategic alternatives? And would that process be made public if that's the direction that the Board chose to go down?

Karl Staubo

executive
#21

This is -- I'll kick it off from management and then Tor can add if he wants. But in terms of management, we are running the business to the best of our ability and trying to make the best possible decisions. It is our responsibility to also find out where the best bid for the company is. That said, our focus is on running the day-to-day business. And then we're obviously open for any outside investors, but we are not actively chasing any such bids in terms of management. Our focus is to run the business. When it comes to any strategic alternatives, that's a Board matter and should be commented on by the Board to the extent that they see that necessary. I don't know, Tor, if you have anything to add.

Tor Trøim

executive
#22

I think we -- the Board has a pretty good idea about what the current value of our backlog is. We also have a current good idea about the future opportunities we have ahead of us. We think there is significant value here. But if the stock market doesn't appreciate that value over time, I think we need to do something. We are here to create value for shareholders. We are not here for running a company. So from that point of view, but I wouldn't judge that based on 1 month's trading or 2 months' trading. I think we need to see a structure over time. And I think we need to see the end coming in on the contract on Mark II, which will then be in the second part of the year. And if you don't move the share price in that time, I think the Board needs to come together and discuss what to do. But I think we are shareholder-friendly. We are big shareholders, a lot of the people in the Board, and we think like shareholders. So I think you do what is necessary. But I also say that we rejected a bit last time because we thought it was better to run the company. But -- and a process like that normally starts from -- with some incoming letters, you don't go out and sell the company. But I think there is enough interest in the company today from people who see value in backlog. But my situation is just that I think the real company value here today is not necessarily $17 billion in backlog, if that's nice, it's what we can build with that basis and the people we have and the market position we have. But to answer you very clearly, if valuation stays low over time, we will do something.

Christopher Robertson

analyst
#23

I appreciate the comments there. A little bit more mundane question here for my follow-up. Can you guys clarify around any remaining CapEx associated with Gimi that you spent during the first quarter and second quarter here ahead of COD? And do you expect -- going back to a previous question, do you expect any CapEx related to SESA to be deployed this year?

Karl Staubo

executive
#24

Eduardo, do you want to cover that one?

Eduardo Maranhao

executive
#25

Yes, sure. So when it comes to the remaining CapEx on Gimi, we don't expect any material payments in the second quarter. So I think as alluded to on the call, all revenues that we have received pre-COD, they have been accounted for in our balance sheet, and this equates to around just under $200 million. We are nearing COD. And once we start operations, we will start to see contributions in our P&L from revenues under that contract.

Operator

operator
#26

We are now going to proceed with our next question. The questions come from the line of Fredrik Dybwad from Fearnley Securities.

Fredrik Dybwad

analyst
#27

Great results so far. My question revolves around the potential additional units to be ordered in this year or potentially next year. You comment that you consider Mark I, Mark II or potentially also Mark III. So just for me to get a feel or for us to get a feel of the differences of the sizes, can you get a high-level overview of the prospective suitable fields? For example, how many contract opportunities does the Mark I have compared to Mark II? I would assume that the Mark I is much more flexible.

Karl Staubo

executive
#28

Yes. That's a relevant question. So first and foremost, all 3 designs are based on a generic design. It's the same liquefaction methodology, which means that we will not tailor-made for one specific field. Hence, they can all be redeployed at various different opportunities. But to your point, the larger you go, the more gas reserves and gas flow is required to fully utilize the vessel. Hence, therefore, there are, by number, more commercial opportunities for the smaller sizes and then somewhat fewer for the larger. However, for some of these larger opportunities, you may also need this level of size to make the development economic. So what you should expect to see is that we are right now progressing conversations or negotiations which -- for all 3 different designs, and you could see us progressing with more than one ship this year. I think it's also fair to say that there are several people that we had advanced stages of commercial negotiations with that are now left without a liquefier as the Argentinian contract took both the Hilli and the Mark II and as such, there's no available FLNG. And those are obviously the counterparts that we are concentrating on from the commercial side right now.

Fredrik Dybwad

analyst
#29

And just one small follow-up on that. You have previously said that you want to just have one unit, call it, on speculative order that is one unit without a contract. Do you have the same stance now? Or are you open to potentially ordering 2 new vessels without the contract as you did on the Fuji?

Karl Staubo

executive
#30

So what we've said is that as long as we have visibility for charter, we will only have one open. The way we see it now, we think it's extremely likely that the Mark II will be fixed in Argentina. There's no coincidence that the definitive agreement on the Mark II was signed simultaneous with the final FID on the Hilli. It's economical for them to utilize both ships in the same area. There are significant operational synergies and further advantages in transporting the gas from the Vaca Muerta 2 site, which benefits from the 2 ships. Hence, in our view, we believe we can proceed with Unit #4 without adding -- without changing our express strategy of maximum one open ship. And even if we plan to or could order up to 2 vessels this year, we will still commit to our stated strategy of maximum one open ship. That means that one of those ships would effectively be built against contracts, if not both.

Operator

operator
#31

We are now going to proceed with our next question. And the questions come from the line of Petter Haugen from ABG Sundal Collier.

Petter Haugen

analyst
#32

A quick clarification to begin with. In terms of the CPI adjustments, I read it as if it's applicable to both, of course, the base EBITDA and to the upside of -- or to the upside ceiling of $8 per MMBtu. But I also understand it to be applicable for the $7.5 and $6 per MMBtu related to the downside potential. Is that correct?

Karl Staubo

executive
#33

I'm glad we have a clear presentation then, Petter. That's correct.

Petter Haugen

analyst
#34

And if I may, as we have the Chairman on the line here, we've already touched upon this, but -- is it possible to say something about what the Board would now perceive to be fair valuation of the business as it both stands and knowing about the growth opportunities ahead?

Tor Trøim

executive
#35

I don't think it's -- I think we have obviously, in Board documents, we kind of go through valuations in the different scenarios, but I don't think it's fair to speculate on it. The only thing I would say is I think -- and that should go for anybody who can do accounting should be significantly higher than 37%. So -- but I don't think we'd like to give any kind of guidance on value other than saying that if the undervaluation we have today persists over time, the Board will be forced to find ways to unlock that value. That could be -- it could be -- take all kind of forms. You can -- I think we have had earlier bids for part of the assets at the kind of good prices. We have -- so it can be selling the company. It can be kind of growing the company with different capital structures. But we're not going to sit and see on an undervaluation over time, but we can sit and undervaluation for a month or 2 or 3 that we are patient enough to that. I think everybody now talks about the 2 years we have of pain until we effectively get the cash flow turned on. But I think I've had 25 years of pain until I'm here. So another 2 years doesn't take me that long actually. And I think investors in this case should see that what we're trying to do is to build significant value over time. We not maximize the value short term.

Operator

operator
#36

We are now going to proceed with our next question. And the questions come from the line of Michael Webber from Webber Research.

Michael Webber

analyst
#37

I just wanted to follow up on SESA and specifically the gas that's heading to both the Hilli and another unit. I know the Hilli is teed up to utilize latent capacity from an existing pipeline network and then they're looking to build a dedicated pipe for the other asset. Is that gas already treated? And/or does there need to be treatment built for either the Hilli or subsequent assets onshore? -- or offshore?

Karl Staubo

executive
#38

That was done as part of onshore, but Vaca Muerta gas is extremely lean. So it's almost very, very little treatment needed and the necessary treatment facilities more or less in place, existing. So that's not an issue.

Michael Webber

analyst
#39

So the existing treatment is already in place for the Hilli or for -- is there enough excess treatment capacity to handle additional assets, too?

Karl Staubo

executive
#40

The gas specification of the Vaca Muerta, what we're talking about here is producing lean gas. So they will obviously require upstream investment, meaning wells that need to be drilled in Vaca Muerta to increase flow, extremely limited treatment that's required of that gas, and that's part of the attraction to use Vaca Muerta for exports.

Michael Webber

analyst
#41

Okay. So specifically, the I'm thinking about the timing of any treatment capacity that needs to be built in conjunction with when those charters would start. So do you see that as a significant risk factor for the commencement of those charters?

Karl Staubo

executive
#42

The pipeline and any associated infrastructure has a construction period of significantly less than 2 years. And we've already spent together with SESA more than a year on all the planning. So I think we're very well on track to facilitate that infrastructure.

Operator

operator
#43

In the interest of time, we have time for one last question. And the questions come from the line of [indiscernible].

Unknown Analyst

analyst
#44

Congrats on a great quarter. Just quickly on the capital structure. You mentioned that you're engaging with rating agencies to get the rating and that you could look at the bond financing. Should we expect a rating to benchmark bonds coming out of you guys soon? And also just to follow up on that, you indicated an asset level financing around 5x. Is that something you can look at the corporate level as well?

Karl Staubo

executive
#45

Eduardo, do you want to start?

Eduardo Maranhao

executive
#46

Yes, sure. So you're right. So we have started an exercise with rating agencies to pursue a bond rating. That exercise has been completed. However, any outcome of that rating is still confidential. We could potentially be looking at transactions at the corporate level or alternatively at an asset level basis as well. So I think we're using that 5x as a guidance, which takes as a proxy, the same leaseback financing that we have signed for Gimi, which was done just under 6x. So I think we view 5x as a leverage ratio as a conservative assumption of what can be done on the back of this 20-year agreement.

Operator

operator
#47

This concludes the question-and-answer session. I will now hand back to Mr. Karl Staubo for closing remarks.

Karl Staubo

executive
#48

Thank you all for dialing in and listening to our Q1 presentation. Much appreciated, and we look forward to reconnect during our Q2 presentation. Thanks again, and have a great day.

Operator

operator
#49

This concludes today's conference call. Thank you all for participating. You may now disconnect your lines. Thank you, and have a great day.

This call discussed

For developers and AI pipelines

Programmatic access to Golar LNG Limited earnings transcripts and 32,000+ others is available through the EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.