Golar LNG Limited (GLNG) Earnings Call Transcript & Summary

August 14, 2025

NASDAQ US Energy Oil, Gas and Consumable Fuels earnings 56 min

Earnings Call Speaker Segments

Karl Staubo

executive
#1

Thanks, operator, and welcome everyone to Golar's presentation of our Q2 2025 earnings results. I'm Karl Fredrik Staubo, serving as CEO of Golar LNG. Joining me today is Eduardo Maranhao, our CFO. Prior to diving into the presentation, kindly take note of the forward-looking statements found on Slide 2. As usual, we begin on Slide 3 with an overview of Golar as it stands today. Golar is a focused FLNG company. We possess three units, with two currently on the water and 1 undergoing conversion. The quarter's key event involves securing the 20-year charter for the Hilli, along with signing definitive agreements and the subsequent final investment decision for the Mark II FLNG. Once we locked in 20-year charters for the fleet we already have, we started paying even more attention to bringing in additional FLNG units, since we're seeing demand pick up for FLNG solutions that let producers monetize stranded associated and reinjected gas opportunities. During the quarter, we shored up our cash through a $575 million convertible bond issuance, and our cash position now sits at just under $900 million. With a fully delivered net debt-to-EBITDA ratio of about 3.4x, $17 billion in EBITDA backlog before any commodity upside, and 20-year cash flow visibility, we have what it takes to fund incremental FLNG growth units using financing proceeds. Now let's turn to Slide 4, where we'll review our EBITDA backlog and how much visibility we have into cash flow. With the contracting events from Q2 behind us, the entire fleet we currently operate is now locked into contracts spanning 20 years. Among the highlights we mentioned were the satisfaction of every CP along with FID for the Hilli, the definitive agreements signed in May for the Mark II, and most recently, FID achieved on August 6. Regulatory approvals and standard conditions precedent still need to be secured for the Mark II FLNG charter. We expect to satisfy all of those CPs at some point during 2025, and our progress toward meeting them remains on schedule. Before you factor in inflation-related adjustments and commodity exposure tied to the SESA contracts, the backlog sits at $17 billion. Those two elements combined could push the backlog considerably higher. Now let's turn to Slide 5, where we'll walk through the global FLNG fleet. When you look at liquefaction capacity, Golar remains the leader in the market. Across the worldwide fleet, there are 7 units currently on the water, plus 4 more being built. Among the FLNG owners already in the market, we anticipate more newbuilding work, and if all of their announced FLNG project plans stay on schedule, that could mean as many as 5 additional units. On top of that, we're seeing growing interest from owners of gas resources, who are showing more and more appetite for FLNG solutions as a way to monetize gas. What this shows is how appealing the price point, the demonstrated reliability in operations, and the adaptability of FLNGs really are when you set them against conventional onshore liquefaction options. As a service, FLNG has one proven supplier, and that's Golar. Every other firm listed on this slide only turns a profit on gas that sits within their own control. That means if Golar moves forward with a fourth FLNG unit, it would probably be the only uncommitted FLNG capacity out there able to be delivered before this decade ends. We think the greatest value comes from committing to build our next unit before we've locked in a charter for it. That's exactly the playbook that worked for us with the Hilli order and, later on, the Mark II FLNG. After we land a possible long-term contract for that next unit, our plan is to keep pursuing our growth ambitions through the fifth unit. Our strategy stays the same — only one open FLNG at any given time — and we anticipate being able to finance every visible growth plan through debt financing proceeds from the current fleet plus overall balance sheet flexibility. Our growth trajectory should continue for as long as we can achieve accretive and solid economic returns for our shareholders. Moving to Slide 7, quarterly highlights and developments. For Golar, the second quarter proved very active and very successful, with a number of key milestones reached. To repeat what's been said previously, all of the conditions precedent plus the final investment decision tied to the Hilli's redeployment charter in Argentina were satisfied. Simultaneously, we executed a definitive agreement covering the Mark II, with the FID following on August 6. In June, a convertible bond issuance of $575 million took place, and roughly $103 million from that raised capital went to repurchasing 2.5 million shares — equivalent to slightly less than 2.5% of the company. Eduardo will walk through certain advantages of the CB later in this presentation. Our annual ESG report came out in July, and it offers thorough details on our operations along with the value delivered to the nations where we do business. If you'd like to learn more about the progress we bring to the nations in which we do business, it's a worthwhile read. Two people who had been serving on our Board left during the quarter: Georgina Sousa and Thorleif Egeli. We'd like to express our gratitude for all they gave to Golar's Board over the years. In addition, we were pleased to add three fresh Board members: Benoît Fouchardiere, Mi Hong Yoon, and Stephen Schaefer. It's exciting to have these three on board, and we anticipate what they'll bring to Golar's ongoing success. In line with the approach we've shared — bringing in value-adding FLNG growth after the current fleet has had its risk removed and been secured under long-term charters — our work toward our fourth unit has intensified. We've now got signed agreements in place with the shipyards we were targeting, locking in the EPC price as well as the delivery timeline for the next unit, and over the next few months we anticipate making our decision on the design, the size, and which shipyard will build it. Moving on to Slide 8, which covers the Hilli update. Once again, the standout milestone for Hilli this quarter was wrapping up that 20-year redeployment charter over in Argentina, which brings in $5.7 billion of EBITDA backlog before any commodity upside is factored in. While operating under her current contract, Hilli kept up her flawless economic uptime, and since the contract started up she has now delivered 137 cargoes, meaning more than 9.5 million tons of LNG have been exported out of Cameroon. We've reached the last stage of signing a contract covering redeployment, upgrades, and life extension for the shipyard portion, which sits between the units contract in Cameroon and the launch of the 20-year contract in Argentina. Our expectation is that this yard contract will wrap up during the third quarter of this year, and its scope matches what we budgeted for redeployment. Moving to Slide 9 regarding Gimi. For Gimi, the standout achievement this quarter was hitting commercial operations date in June. That represents an enormous milestone for Golar alongside our partners, BP, Kosmos, Petrosen, and SMH, and it brings a long-awaited project start-up to a close. Right now, the unit is in a period of appraisal, and during this time we'll make adjustments to the FLNG so that its liquefaction capacity is used as efficiently as possible. So far, the vessel's performance has pleased us, and as of when operations started, we are now handling the offloading of cargo number eight. More time was needed for the proposed $1.2 billion Chinese sale leaseback refinancing facility than our stakeholders had approved. Between Golar and our Chinese counterparts, that facility has been completely finalized. The delays that came up originated with stakeholders outside our control. Even so, since commercial operations date has now been achieved, we will look into alternative refinancing structures, and we are confident that we can obtain facilities with better terms than the $1.2 billion Chinese sale leaseback facility.

Karl Staubo

executive
#2

That image in the lower left corner comes from the inaugural cargo festivities at the GTA field, held on May 22. Among those present were the Presidents of Mauritania and Senegal, along with chief executives and top leadership from every company holding a stake. This represents the initial stage of the GTA project, and the partners are now shifting focus toward subsequent stages, with anticipated output growth that could call for further FLNG vessels. Moving to Slide 10 and the Mark II FLNG. As was mentioned, the second quarter proved quite eventful for the Mark II FLNG that was ordered in September of last year. We executed a binding contract on May 2 for a charter lasting 20 years, under which the unit will operate alongside Hilli for SESA in Argentina. Then on August 6, we reached a final investment decision for that charter. As previously explained, we anticipate that the outstanding CPs will be satisfied at some point in '25. The conversion work is advancing on schedule and is now close to 19% finished. Delivery of the unit is planned for Q4 '27, and once that happens, the FLNG will travel to Argentina, where our 20-year operations are set to begin during 2028. The photos make clear that the donor vessel — the LNG carrier Fuji — has been split in two and moved onto land via skidding. The image in the lower right shows work on the sponsons, which will be attached to increase the vessel's width. Of the $2.2 billion conversion budget, we have so far funded roughly $800 million entirely through equity. With a long-term charter now secured, we are moving ahead on financing efforts for this unit and anticipate bringing in asset-level debt during 2026. Funds raised that way will cover the full cost of delivery plus an equity contribution toward Golar's next FLNG. Under the yard contracts, we also retain an option for a second Mark II FLNG, which would take an estimated 38 months or so to build from the point of ordering. Now to Slide 11, which lays out an overview of the main commercial terms across our current FLNG contracts, along with certain risk mitigations and built-in upside contained in those agreements. Golar has no say over where in the world appealing gas reserves happen to sit, yet we are able to craft our contracts so that risks are reduced and returns for our stakeholders are maximized. This slide points to several of the ways we accomplish that. Every one of our FLNG contracts falls under English law, is denominated in U.S. dollars, and is paid offshore. We partner with robust charter counterparties, which in effect establish a cushion separating us from the governments of the countries where we conduct operations. When it comes to Hilli in Cameroon, that cushion is Perenco. For Gimi, located offshore Mauritania and Senegal, it is BP. And for our Argentina contracts, it is SESA, a consortium made up of Pan American Energy, YPF, Pampa Energia, Harbour Energy and Golar LNG. A number of our contracts carry significant upside by way of commodity links. When it comes to Hilli over in Cameroon, each dollar that Brent trades above $60 translates into $3.1 million of excess cash earnings for Golar. On top of that, for every additional dollar per MMBtu on the TTF gas price, we generate $3.7 million of annual free cash flow, and there's no cap on that. With Gimi, there isn't any commodity-linked upside, though we do get an upside tied to utilization if commercial utilization goes beyond 90% of nameplate. As for the CEA contracts covering Hilli, Mark II, and our stake in Southern Energy, roughly $100 million in excess annual earnings comes our way for each dollar that offtake exceeds $8 per MMBtu. Downside totals about $28. That leaves us with a $28 million downside below $7.5 per FOB, against $100 million of upside. The risk reward is therefore heavily skewed, and in our view it could deliver meaningful excess value to Golar. Moving to Slide 12, covering the progress on our FLNG growth units. Three key vessel designs exist, which we distinguish as Mark I, II, and III. What separates them is essentially liquefaction capacity, so you can think of them as small, medium, and large. Up to 2.7 million tons per annum is what Mark I can produce, Mark II does 3.5 million tons, and Mark III reaches 5.4 million tons. Vessel conversions would apply to both Mark I and II, while Mark III would be a new build. Since the construction approach differs somewhat, shipyard selection would follow accordingly. Hilli and Gimi were both built at Seatrium Shipyard in Singapore. Should we move ahead with the Mark I, that shipyard is the probable choice; together with Seatrium, we are now working to confirm an updated EPC price and delivery schedule. Construction of the Mark II FLNG is underway at CIMC Raffles. As previously explained, we hold an option for a second unit at CIMC Raffles, and since we have just ordered this unit, the design and the price are already known to us. For Mark III, the conversion timeline looks a bit longer. We estimate roughly 38 months for the first 2 and 48 for the Mark III, since you begin from scratch rather than with a conversion vessel. Agreements have also been signed with Samsung Heavy Industries to work out updated pricing and a delivery schedule, should we place an order for such a vessel before this year ends. As noted earlier in the presentation, we anticipate receiving the final price and delivery schedule over the coming months, after which we will make a design decision on where to proceed with our fourth unit; long lead times for critical components are lengthening, so we intend to lock in slot reservations during Q3 2025. In the quarter, we also finished inspections of potential donor vessels, in case we go forward with the Mark I and Mark II FLNG conversion. If we manage to lock in a charter for a fourth vessel under consideration, our expectation is that we would move quickly afterward to place an order for a fifth one, and that is the reason we are currently advancing conversations with all three yards about construction slots. Moving on to Slide 13, where we want to point out a few of the cost advantages that FLNG holds over solutions built on land. Looking at the graph on the far left, you can see that a great deal of proven gas reserves exists around the world that is not being extracted today. When reserves are proven but not being extracted, you generally can acquire them at a low price. The next chart shows liquefaction costs. Because we are constructing a generic standardized design in the far East, we can achieve a much stronger CapEx per ton than a land-based solution, which is mainly built in the Middle East and in the U.S. Our expectation remains that new FLNG orders will carry a CapEx of roughly $600 per ton fully delivered, against approximately twice that figure for greenfield developments in the U.S. The final cost element in gas production is the shipping distance separating end users from the location where the gas is produced and where it will be consumed. Depending on which field we are talking about, we observe meaningful shipping advantages — advantages in shipping distance — relative to the key global exporter, which is the U.S.

Karl Staubo

executive
#3

So, if your business has 3 cost drivers — gas cost, liquefaction cost, and shipping distance — and you come out cheaper on each one, then in our view you've got a solid business that can last. Now moving to Slide 14, where we dig into this further. As we came into this year, worldwide LNG output stood at roughly 430 million tons, and about 23%, or 100 million tons, of that came from the U.S. Between today and 2030, global LNG supply should expand by roughly 40%. That said, the bulk of those additional volumes will likely originate in the U.S., pushing its share of the worldwide market up from 23% to 37%. That's notable, since the U.S. already serves as the marginal LNG producer worldwide. So if you more than double that volume, while domestic natural gas demand rises thanks to Trump's America First policies and more data centers being built in the U.S., we anticipate upward pressure on Henry Hub. Rising costs for land-based liquefaction facilities point to higher tolling fees, and shipping distances clearly haven't changed. Still, when 2 of the 3 cost drivers for the incremental global LNG producer face upward pressure, we view that as solid backing for international LNG prices. And if you can then secure cheaper feed gas, cheaper liquefaction, and a shorter distance to ship, we think there's meaningful upside in our commodity exposure through our Southern Energy contracts. Now to Page 15 and a slide our Chairman first showed on our Q1 call. Just how large is the FLNG opportunity? The very first FLNG ever delivered was Golar's Hilli, in 2018. At the time, the industry doubted whether complex liquefaction technology could work in a maritime setting. Since then, we've got 7 vessels operating, 4 newbuildings in construction, and at least 5 more vessels being planned by that same set of existing owners. In our view, this path mirrors what happened with the FPSO industry during the 1980s. The first FPSO anywhere was delivered in '85. We figure we're roughly where the FPSO industry was in the early '90s; today that industry has over 250 units. Essentially, it's cost competitiveness, flexibility, and construction time that increasingly drive recognition of FLNG technology and the build-out of what we consider a strongly growing industry. That's why we're quite comfortable continuing to add units, and we'll keep doing so as long as we remain the sole service provider and can lock in economics comparable to those on our existing contracts. I'll now pass the call to Eduardo, who will walk us through the group results and key developments on the financial highlights for the quarter.

Eduardo Maranhao

executive
#4

Thanks, Karl, and good morning to all of you. I'm happy to walk you through how Golar performed financially in the second quarter of 2025. If you'll turn to Slide 17. We'll go over a few of the main financial highlights from this quarter; total operating revenues came in at $75 million, while FLNG tariffs hit $82 million during the quarter, which is a substantial jump versus the prior quarter, driven by Gimi COD on June 12. From here on, whenever we talk about total revenues generated from FLNG — Hilli and Gimi — including realized gains from TTF and Brent-linked fees plus all revenues under the Gimi contract, we'll refer to FLNG tariffs. In Q2, total EBITDA came to $49 million, helped by Gimi COD. For the 12 months ending in Q2, total EBITDA was $208 million. Net income reported this quarter was $31 million. That number includes certain non-cash items, like adjustments to the value of embedded TTF and Brent derivatives in the Hilli contract and changes in interest rate swaps, plus a $30 million gain recognized on day 1 following start-up of Gimi's contract; we treated the Gimi contract as a sales-type lease. And now that COD has been reached, on our balance sheet we derecognized the capitalized amounts under assets under development into a net investment as a sales type lease. A detailed walk-through of the accounting treatment for the Gimi contract can be found in the appendix of this presentation. During June, we raised $575 million of convertible bonds and bought back 2.5 million shares for total consideration of just under $103 million. As a result, our liquidity position has been considerably bolstered, with just under $900 million of cash on hand when the quarter ended. I'll cover this transaction in more detail on the next slides. In addition, net debt at quarter end was just under $1.2 billion. Finally, we're happy to declare a dividend of $0.25 per share for this quarter, with a record date of August 26 and payment expected around September 4. Let's now turn to Slide 18. Here you can see how our Q2 EBITDA breaks down and what Hilli and Gimi contributed, giving total FLNG tariffs for the quarter of $82 million. As shown on the slide, Hilli revenues are divided among Base, Brent, and TTF linked fees, whereas going forward Gimi revenues will be recognized between a capital element and an operating element, as the graph below illustrates. Total EBITDA from FLNG operations alone was $57 million, after certain project development expenses tied to our growth projects, which Karl explained earlier. Once corporate costs and other overhead expenses are factored in, our total reported EBITDA for the quarter came to $49 million. Let's now move to Slide 19. During June, we raised $575 million of convertible bonds. Alongside this deal, we repurchased 2.5 million shares for a bit less than $103 million, at an average price of $41.09 each. A fixed coupon of 2.75% was set on the notes, along with a 40% premium. One key thing to keep in mind is what the buyback does. Taking those into account, the notes dilute our share count on a net basis relative to before the notes offering, but only if our share price goes above $76.7 when they mature in December 2030, prior to any adjustment for dividends paid during that stretch. That works out to a premium of nearly 87% over the $41.9 reference price. Following the repurchase, net proceeds totaled roughly $464 million, which gives us added flexibility to finance our growth developments with a fourth or fifth unit, as Karl explained. Now let's move to Slide 20. If we look back over the last 4.5 years, our track record on shareholder returns is visible. A few things I'd like to point out. Across that span, we returned $787 million through dividends, share buybacks, and asset buybacks, against operating cash flow after debt service of about $500 million during the same stretch. Over that period, more than 9.3 million shares were repurchased at an average price of $125, which left the total share count at 102.3 million shares as of the end of Q2. We've also put over $560 million into dividends and asset buybacks across that same stretch. Looking ahead, we intend to direct the liquidity released from debt financing proceeds toward funding accretive FLNG growth, while our free cash flow generation gets used to substantially boost shareholder returns; let's examine that more closely on Slide 21. Once all three of our vessels have been delivered and are in operation, we anticipate fully contracted EBITDA growing to more than 4x what we show for the current last 12 months. That enormous jump comes even before any additional commodity upside from Hilli, Mark II, and our SESA stake. As the slide shows, in 2028, when Mark II starts up, our contracted free cash flow generation might exceed $600 million, or about $6 per share, ahead of any further commodity upside. Additional free cash flow generation from the SESA charters can be estimated at roughly $100 million annually, or $1 per share for each dollar per million BTU that LNG FOB prices rise above $8. Looking at things once everything has been delivered, the net debt we estimate at that moment would sit at 3.4x adjusted EBITDA, and long-term 20-year charters fully back all of it; this gives us plenty of financing capacity to support yet more additional FLNG growth units; turning now to Slide 22, and as Karl explained earlier, after our Argentina contracts were confirmed with the FIDs of Hilli and Mark II, we can now see the complete breakdown of our total firm EBITDA backlog, which exceeds $17 billion across the coming 20 years. One thing worth pointing out is that this figure is still prior to additional commodity upside and additional inflation adjustments that will occur over time. On the following slide, we can see how LNG price movements could favorably impact our contract with SESA. Our downside is limited while our upside is very significant. Take, for instance, FOB LNG prices of $10 per million BTU — our estimated EBITDA could exceed $1 billion annually, as the graph shows. That figure could grow even more; so, for instance, at $15 per million BTU, it would rise to $1.5 billion of annual EBITDA. Just to illustrate the potential scenario and as a reference, if every one of our units had been operating in 2022 and assuming average LNG prices during that period, we would be earning close to $3.5 billion in that particular year; this really demonstrates the scale and significant upside potential of the embedded kickers in these contracts. That now wraps up my update. I'll hand the call back over to Karl.

Karl Staubo

executive
#5

Thanks, Eduardo. Now we move to the last part of the prepared remarks and the summary. Slide 25 lays out the key milestones for '25 and where we're focusing for the rest of the year; during this year, we reached commercial operations status at Gimi, and cargo #8 is being offloaded right now. We've secured FID as well as the satisfaction of every condition precedent tied to the 20-year charter with Southern Energy for the Hilli, once her current contract in Cameroon wraps up. We've likewise landed a 20-year charter plus the FID for the Mark II FLNG. As Eduardo walked through in detail, we issued $575 million in convertible bonds and bought back 2.3% of our company. And the remaining non-core assets have been sold, among them our stake in Avenir Shipping and our final LNG carrier, the Golar Arctic. Looking at the rest of the year, our plan is to optimize the FLNG financing now that the 20-year charters are in place, close out the regulatory conditions precedent on the 20-year contract for the Mark II, and bring in additional FLNG growth units as covered in detail. Now to Slide 26, where we summarize some key developments after a very strong quarter. During this quarter, we brought in $13.7 billion of EBITDA backlog, which puts our total backlog at roughly $17 billion. Our adjusted — fully delivered adjusted EBITDA is on track to grow 4x compared with the last 12 months EBITDA before any commodity upside. That opens a pathway to raise dividend distributions to shareholders by more than — or significantly more than 4x, since fully delivered adjusted EBITDA far exceeds the increase in debt service. Our balance sheet, with fully delivered net debt to EBITDA at 3.4x, gives us the capacity to fund additional FLNG growth while keeping free cash flow to equity attractive and rising. Our focus now is on ordering an accretive fourth FLNG unit, and that's what we'll be turning our attention to. That wraps up the prepared remarks, and we'd like to hand the call over to the operator for any questions.

Chris Robertson

analyst
#6

Karl, regarding those three new board members you brought up, I was hoping to get a bit more detail. Specifically, what kinds of expertise, networks, and connections do they offer Golar, and are they currently involved in pushing any commercial conversations forward?

Karl Staubo

executive
#7

Absolutely, Chris. To start, Mi Hong Yoon essentially steps in for Georgina Sousa as our Bermuda representative. She brings a solid accounting background and already has a deep familiarity with the company. Next, Thorleif Egeli has left, and in a sense, Stephen Schaefer can be viewed as taking that place. Stephen serves as Chairman of Talen Energy in the U.S. He possesses a broad financing background and has spent his whole career working with large energy infrastructure assets, such as natural gas and gas-fired power plants. As a result, we anticipate he will contribute substantial capabilities, both in financing and through other industry relationships. Finally, we have the addition of Benoît. Benoît previously served as CEO of Perenco, and Perenco happens to be Golar's single largest shareholder, with ownership just under 10%, and is also the charterer of the Hilli currently in Cameroon. Beyond that, Perenco ranks among the world's largest independent oil and gas producers, and they hold multiple fields globally that might be suitable for FLNG deployment. So we believe Benoît's experience will be extremely pertinent for us, especially regarding spotting promising gas fields and upstream expertise.

Chris Robertson

analyst
#8

For my follow-up, I believe you said before, regarding the Gimi, that there's consideration of perhaps a second asset at that location. When it comes to talks, suppose a Mark III were being considered that was big enough to cover any growth or expansion of GTA. Would it be possible to then replace the Gimi and make it available for use somewhere else? Or would it be something added on top?

Karl Staubo

executive
#9

At this moment, in my view, every option is under review. Should a Mark III be brought into the project, it might either replace the Gimi or come as an addition. That hinges on the remaining infrastructure. Our understanding is that doubling the FPSO's throughput capacity comes at a fairly low cost. So doubling capacity from the current 2.5 to 5 MTPA ought to be highly accretive. Arguably, among the simpler approaches to achieve that is placing an order for Mark III and having us take — having us replace Gimi with it. Pending final commercial arrangements, we would welcome such a deal, since we observe very strong demand for that kind of size in other places. So that is definitely not something we'd dismiss, though it could likewise be an addition, except then other upstream constraints would need to be resolved.

Frode Morkedal

analyst
#10

I was hoping to get your thoughts on valuation. You clearly have an enormous backlog. And from my perspective as an analyst, many conversations I have with investors wind up centering on how that backlog should be valued, correct? In particular, what discount rate makes sense, which really comes down to evaluating the risk, right? So I'd like to hear which framework you consider helpful for valuing that backlog.

Karl Staubo

executive
#11

Sure. When it comes to grasping the valuation, which I take it is what's being asked regarding the backlog here, we clearly have a set EBITDA that's fixed, made up of Hilli, Mark II, and Gimi. And once you put them together net of G&A, that comes to roughly $800 million each year prior to CPI adjustment and commodity upside. As for the correct discount factor applied to those, that decision we'll leave in your hands. But based on what we've observed historically with some peers of ours, such as Cheniere and Venture Global and companies of that sort, trading at levels we see as probably above 10x, though the market gets to determine what multiple factor is appropriate. In our view, the largest misunderstanding, or perhaps mispricing, lies in appreciating the upside from our commodity exposure; we think what makes that exposure unique is that we've locked in the breakeven at which we receive a profit share at approximately $8 per MMBtu across 20 years. If you consider how Henry Hub is likely to evolve given the substantial rise in Henry Hub gas, both within the U.S. and for exports, as discussed earlier, we anticipate upward pressure on Henry Hub. And consistent with what Cheniere, Venture Global, and other U.S. liquefaction providers have said on every call they hold, the tolling fees for U.S. exports are trending higher. And per Venture Global, going north of $4 is necessary to justify any exports. Should both of those hold true, the $8 fixed profit share mechanism that we have, we believe, is unmatched in the market. There's nowhere else you can get it, and we believe having that for 20 years out is worth a great deal. Beyond that, we also don't believe the market prices our platform as the sole proven FLNG service provider globally, and definitely not growth. And I don't think we want to get into a discussion today about precisely what we believe it's worth, but we do think it's as much as if we purchased 2.3% of the company at $41.09 as recently as June. So I think that indicates where we believe it stands. So I'd say across the past four and a half years, we've repurchased 9.3 million shares, plus we've acquired assets in situations where the deal was more accretive than repurchasing our own stock — in practice, that means acquiring Hilli from NFE and Hilli from the minority interest held by Black & Veatch and Seatrium. So on the whole, we're backing up our words with capital, and we're still doing that as recently as June.

Frode Morkedal

analyst
#12

Yes. That's excellent. Nice detail. I suppose your point is, naturally, that you believe this stock's intrinsic value exceeds what the market currently prices it at, correct? So I suppose — and you've been repurchasing shares, like you mentioned. But broadly speaking, how crucial is it for you to narrow that difference, if you will? Would you rather simply let cash flow do the talking and let market prices correct themselves eventually? Or do you genuinely contemplate actively pushing that value even higher, correct?

Karl Staubo

executive
#13

So as management, our options are to operate this company as well as we possibly can; that's what we attempt each day when we walk into this office. It's also our responsibility to ensure that, that value gets mirrored in the equity market or in what the business is worth. Like our Chairman, who participated in our quarterly call for the first time in quite a while during the prior quarter, hinted, should the market not acknowledge that value, the Board will pursue alternative routes to unlock it. I'll leave it to him to defend that remark, but I noticed he restated those intentions in newspapers as recently as July of this year; so I believe as management, our task is to do the — operate the business as well as we possibly can. And should price gaps exist between private and public money, we'll aim to spot it. Yet for us, the main focus each day involves running the business as well as we possibly can. And we believe there's plenty of appealing growth we can carry out. I think we demonstrated that with this most recent order for our third unit in September and securing it in May, and we plan to follow a comparable kind of arrangement for unit #4.

Alex Bidwell

analyst
#14

Might you give us additional detail regarding the commercial possibilities for a fourth unit? What level of demand are you observing with respect to contract start-up? Also, do you notice any leaning toward a specific FLNG specification?

Karl Staubo

executive
#15

Yeah; so the answer comes down to — regarding start-up, my view is that the build period we have of 3 years, or approximately 3 years, for Mark I and II is enough to deliver the necessary upstream infrastructure. Therefore, in our view, upstream infrastructure is not the bottleneck. The majority of the opportunities we're talking about in West Africa are probably Mark I or II. Then a number of the projects we're discussing in South America and in the Middle East might be a Mark II, so that's roughly how we see things. Of course, simply because of size and throughput, there are greater commercial opportunities at the smaller sizes. However, provided you have a few players competing at the larger size, you can still generate competitive tension, and that's our focus; as for count, the smaller end is where there are more, and at the larger end you still need to create — have sufficient for competitive attention.

Alex Bidwell

analyst
#16

Absolutely, thanks for that context. Now, shifting to the long lead items — you noted that certain schedules have been stretching out. I'm wondering whether there's any shared compatibility among the long lead items across the Mark I, II, and III. In other words, could you place orders for particular long lead items and afterward, I suppose, switch which asset direction you pursue?

Karl Staubo

executive
#17

That's a great question, and yes is the answer. They are compatible. Essentially, for all three designs, we rely on Black & Veatch topside technology. What varies is simply how much equipment gets installed. The main long lead items where timelines have stretched are gas turbines, driven by extremely robust demand coming from the aviation sector and data centers. Those are therefore the first ones we're probably going to place slot reservations on, and that can be swapped among the designs. What differs is only how many turbines are required. So the entire approach is to secure the slot reservation and then determine the turbine count at a later point.

Sherif Elmaghrabi

analyst
#18

To start, I'd like to build on what Chris asked earlier. A GTA partner said last week that Gimi might be debottlenecked so output could go up. Could you explain what that process would involve?

Karl Staubo

executive
#19

Sure. During my prepared remarks, I noted that the appraisal period is where we are right now, and we are making adjustments to how the FLNG runs. In highly technical terms, this relates to the chilling of air at the inlet. It also involves the turbo expander, which is something we can adjust, along with additional equipment we are tuning at present in order to raise output. Those are essentially the main technical points. Beyond that, some gains can be realized through how the FPSO and the FLNG work together, since a liquefaction facility's throughput depends heavily on the surrounding temperature and the quality of the gas. Therefore, by using air inlet chillers to affect ambient temperatures, and by adjusting gas composition via the FPSO-FLNG interaction, you are able to increase throughput.

Sherif Elmaghrabi

analyst
#20

That's helpful context. And then, regarding what falls between a Mark I and a Mark III — I appreciate that you provided us with a rough dollar-per-ton figure, since pricing remains somewhat uncertain; but do economies of scale come into play when choosing a larger option, such as a Mark III rather than a Mark I?

Karl Staubo

executive
#21

You mean CapEx per ton?

Sherif Elmaghrabi

analyst
#22

Alright, yeah, when it comes to capital expenditure per ton.

Karl Staubo

executive
#23

On the CapEx per ton figure, I'd honestly say it's lower, since you're saving considerable time and money by beginning with the conversion unit instead of constructing everything new. That said, when you look at operating costs, you get substantial economies of scale, given that running a Mark III doesn't require double the staff needed for a Mark I — you likely need the same headcount. So from a unit economics standpoint, it comes out more efficient, whether you're looking at OpEx, demerge, or offloading.

Liam Burke

analyst
#24

Karl, what I mean is, you went from the Mark I up to the Mark IV — Mark III, sorry — and you basically doubled the capacity. Do you expect more capacity increases on next-gen FLNGs? Or does it just come down to what the offshore reserves allow?

Karl Staubo

executive
#25

No, we don't — correct. We aren't looking at — we don't expect to pursue something like a 10 MTPA unit, if that's what you're asking, since at that point you'd be dealing with far too few fields. For one, you require large reserves. For another, you have to be capable of handling the throughput. I'm no upstream expert, but with certain wells, even when the reserve is massive, draining it too fast can cause pressure losses and ruin how much of the whole reserve can ultimately be recovered. So things get quite delicate once you move past this size.

Liam Burke

analyst
#26

All right. When we’re talking about larger capacity levels, I mean, the FLNGs in general — the first ones produced returns on invested capital in the mid-to-high teens. Once capacity doubles, in what way do you expect those returns to rise?

Karl Staubo

executive
#27

If you consider what we achieved in Argentina using the Mark II, we can enter 20-year contracts at roughly — that project is 5.5x CapEx to EBITDA prior to inflation adjustment and prior to commodity upside, with OpEx and asset level tax passed through to the offtakers; so I believe if we can secure 20-year business at about 5x with commodity exposure and CPI adjustments, we view that as a solid business for 20-year contracts. And that is kind of comparable to what we would aim for on any new project.

Craig Shere

analyst
#28

It sounds like you're targeting developments that include commodity upside. With that in mind, could Gimi eventually be a candidate for a sale? And if BP has to expand that project to twice its current scale, would they be open to a subsequent stage carrying commodity kickers comparable to those you're evaluating in Argentina and other locations?

Karl Staubo

executive
#29

On your first point, we've covered this during earlier calls, yet the Gimi agreement is — or rather was extremely significant for demonstrating the concept. Hilli holds the distinction of being the very first FLNG unit ever handed over. Everyone in shipping knows that BP maintains the strictest operating benchmarks of anyone in the sector. So when a Golar FLNG proves safe and dependable enough for BP's operations, that validates the concept. From our standpoint, the BP deal is appealing precisely because it primarily serves as validation, and it has unlocked opportunities for many additional FLNG projects. To add further detail, Pan American Energy — the biggest partner in SESA — has BP owning 50% of it. Because they've witnessed what our units and our organization are capable of achieving in Mauritania and Senegal, they now feel confident broadening the collaboration. At present we have no intention of selling that asset. Given how the contract is structured, you can clearly employ it in different ways and still achieve highly attractive equity returns. Regarding expansion at GTA, that depends on commercial discussions, though we anticipate that any added liquefaction capacity would carry a tariff above Gimi's.

Craig Shere

analyst
#30

And on top of a steeper tariff, would there also be a commodity tie-in, similar to whatever else you're concentrating on?

Karl Staubo

executive
#31

Correct. What happens is, whenever we enter into contracts, there's invariably a balancing act pitting the fixed piece against commodity. Consequently, should customers prefer no commodity exposure, they'll have to pay more on the fixed side. That's the balancing act.

Craig Shere

analyst
#32

Understood. Alright, and for my final question, I'd like clarity on the sequence you described. So before the next FID and before contracting, you're using cash from the balance sheet for long lead items — you mostly brought up the turbines. However, you won't make an FID on a fourth FLNG shipyard commitment without a contract already secured; yet once that contract exists, you'll draw on the balance sheet for a fifth FLNG project. Is that accurate?

Karl Staubo

executive
#33

Correct; we're handling long leads at present. After that, when our comfort level is high enough, we place the order for unit #4. As soon as unit #4 is secured under a 20-year or long-term contract, we proceed to place the order for unit #5. That said, we'll always make certain we retain plenty of financial flexibility to accomplish this. Under no circumstances will we ever place this company in a growth position that strains the balance sheet.

Karl Staubo

executive
#34

That wraps up Golar's second-quarter earnings call. Thanks to everyone for joining us, and enjoy the rest of your day.

Operator

operator
#35

That brings an end to the conference call for today. We appreciate everyone for joining in. You're free to disconnect your lines at this point. Thanks, and enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Golar LNG Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Golar LNG Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Golar LNG Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.