Alberto Sánchez

executive
#1

Good morning, all, and thanks for joining Grenergy's presentation of our full year 2023 results. I'm Alberto Sánchez, Head of Investor Relations, and with me today are David Ruiz, our CEO, Daniel Lozano, our Chief of Strategy and Capital Markets Officer, and Rocío Fernández, Head of Sustainability. They'll walk us through the review of our business, finances, and ESG. Once the presentation wraps up, we'll hold a Q&A session for sell-side analysts. I'll now hand things over to our CEO, David Ruiz.

David Ruiz de Andrés

executive
#2

Thanks, Alberto, and good morning to all of you. Turning to the highlights, which you'll find on slide 3 of the presentation. I want to call out, really, the strength of our operational execution, right? Our solar pipeline, I'd say, is holding steady at 15.3 GW. In BESS we've seen additional expansion, reaching 11.3 GWh. That compares with 10.7 at the last quarterly update. In solar, I expect further increases over the coming quarters, though in certain markets we're truly arriving at our sweet spot — the volume of projects we think will be required in the years ahead. On the flip side, BESS still offers plenty of space for expansion. Our flagship projects continue to move forward: Oasis de Atacama, Quillagua, the second portion of Quillagua, and phase II of Oasis de Atacama, which is now in construction. That, I'd say, is excellent news. Before long, we'll also shift phases III and IV, Víctor Jara and Gabriela, into under construction status. Over the past few weeks, I think we've had excellent news on PPAs, M&A, and financing, with solid headway at Oasis de Atacama. We've just signed a new 15-year hybrid premium PPA totaling 720 GWh annually.

David Ruiz de Andrés

executive
#3

Here's what we refer to as phase IV. A global investment-grade utility has signed it, and for us it's a very significant milestone. It stands as the largest and most important PPA we have ever signed. It's the biggest one the company has ever signed. We're talking about close to $600 million in revenues over 15 years. This is way bigger than the PPA we signed with Amazon last year, and well, similar to all the PPAs we've signed with Copec. Yeah, and it's the third important PPA we've signed in the last 12 months, and we keep working on new PPAs in all 3 regions. I'd like to remark that we already have EUR 3.7 billion in revenues contracted for the next 15 years, which is something I believe quite remarkable and growing every quarter. I think it's important to outline also our strategic deal with BYD for the supply of the first two phases of Oasis de Atacama for the battery supply. We keep negotiating hard to reduce CapEx, and I believe we might announce the procurement agreements for phases III and IV in the next few weeks. Could be either with BYD or other premium manufacturers. Going to M&A, well, we recently also announced the sale of 174 MW of solar, both solar and wind assets in Peru for roughly $150 million.

David Ruiz de Andrés

executive
#4

That works out to a ratio of 1.3x enterprise value to invested capital. Following this transaction, the equity proceeds we've already generated from our build-to-sell activity have now hit EUR 340 million. That represents 55% of the EUR 0.6 billion goal we set out at our Capital Markets Day. We're only at the start of 2024, and we've already delivered 55% of the proceeds we laid out for the 2023 to 2027 period. I'd say that's pretty remarkable. Moving on... We've taken another step forward on our investment plan within project finance. Yesterday we announced the close of EUR 175 million in non-recourse financing to build 300 million — 300 MW in Spain. Those projects will be transferred to Allianz in Q2, at the close of Q2 next year. Still, it's been a significant milestone for us. A strong set of results for 2023. Revenues above EUR 400 million, which is 37% higher than the same period a year earlier. EBITDA came in 2x higher, thanks to asset rotation and the energy business. For the first time, that's over 100 million — 105 for 2023. And net income is 5x higher, even with higher financing costs during the period. To put things in perspective, we're coming from EUR 101 million-EUR 113 million in revenues and EUR 23 million in EBITDA back in 2020.

David Ruiz de Andrés

executive
#5

To give you just one illustration, okay, in a span of merely 3 years this company has grown revenues fourfold, and EBITDA by 4x and 4.5, simply to frame things a little. We're likewise delivering meaningful deleveraging, particularly on a pro forma basis, presuming the Peruvian divestments that closed in December, though those will show up in Q1. With that in mind, total leverage stood at 3.7, and pro forma corporate level leverage at 1.1. Really significant ESG accomplishments, as Rocío will share far more detail on our fresh ESG roadmap covering 2024 to 2026. Our Net Zero 2040 strategy has received approval. Our sustainability report 2023, which involved a great deal of work, was published today. I believe this marks the second year we obtain third-party verification. Well, also major gains in ratings. Turning to the next slide, on the platform overview. Well, I've already described that we hold 15.4 GW of solar, 11.3 GWh of BESS. I think we're providing increasingly more information each time, right? And you'll see that on the slide that follows. I think we already possess one of the finest global platforms across the regions where we operate in PV, and we truly aim to make a difference in BESS and in storage.

David Ruiz de Andrés

executive
#6

I believe we're building a BESS project portfolio that's both highly appealing and well balanced. Onto the next slide. Solar shows no significant shifts versus the numbers we gave at Capital Markets Day. Our BESS efforts, I feel, are substantial and delivering results. The overall platform has grown by 0.6 GWh, with a 0.5 GWh rise in assets under construction, reaching 1 GWh already across phases I and II of Oasis de Atacama. Many players discuss BESS these days, as you're aware, yet only a handful of us are truly constructing and finalizing PPAs for BESS on PV plus storage, and we take real pride in what we're delivering. Also, as the chart and the table on the BESS project portfolio show, there is indeed life after Valkyria. Our entire Chilean portfolio — whether already under construction or in backlog — will move into construction shortly. That's Oasis de Atacama. But take a look at our Spanish pipeline. A two-hour BESS system at the Escuderos project has qualified for Next Generation Funds aimed at the energy transition. That's a very significant accomplishment.

David Ruiz de Andrés

executive
#7

Take a look at Italy, the U.K., and Poland. So we can say our BESS pipeline is moving forward at a very good pace across Europe, and it's also quite well balanced in the U.S., where you can see 3 GW at an early stage. So it's our intention to have a very balanced portfolio of BESS projects as well. Moving to the next slide on PPAs. We have, you know, we truly have a defensive business model. We want earnings that are visible and predictable, and thanks to our contracting strategy, we are contracting most of the energy we produce. PPAs are really critical for obtaining financing and therefore for delivering projects, right? Again, we like to show what we've achieved over the last few years and how this is gaining the acceleration we're seeing. We have a PPA signed for 3.5 TWh. That's 75% of our production from 2026 being hedged with PPAs. Compare these 3.5 TWh to 1.2 TWh that we are reporting for 2023. And we're also achieving much higher prices in some of these PPAs, given that we're delivering energy at night. So we, you know, in terms of energy delivery, the size of the company will become 3 to 4x bigger than it is now, only 3 years from now.

David Ruiz de Andrés

executive
#8

Just 25% of what we produce is sold at solar merchant prices, and in places such as Spain, merchant exposure at the Escuderos plant comes to only 5%. Everything else is contracted. As I said earlier, we've already locked in EUR 3.7 billion of revenues across the coming 15 years. That figure, of course, takes in the new PPA signed for Oasis de Atacama. Turning to the slide on Oasis de Atacama, more good news. A new PPA is already in place for phase IV. This is the most important PPA we have ever signed. Just phase five remains pending, and a PPA announcement could come within the next few weeks. That means every phase will be fully contracted. Phases one and two are already under construction. We also announced, as I mentioned, the procurement of battery packages for phases one and two with BYD. So we're very, very happy. Everything is progressing smoothly, and we'll keep updating any information regarding this project, given that it's very, very important for us. And finally, a quick update on M&A, on build to sell. We already mentioned that at Valkyria, we've sold 447 MW in Spain for EUR 445 million.

David Ruiz de Andrés

executive
#9

That's the enterprise value. It implies close to 1.5x EV/IC. Very recently, we announced a very important deal for us in Peru. Under no circumstances are we exiting the country; we are simply rotating our 1.0 assets and focusing on new projects and new PPAs. So hopefully, in 2025 and 2026, we will have some new build-to-sell activity there. The Peruvian projects carry no associated debt, so the proceeds will immediately cut our corporate debt by the same amount. So it's net proceeds of $150 million — sorry, US. Taking into account all the asset rotation of $643 million, that implies 40% of our target. We set out between $350 million and $450 million for the period 2023 to 2026. But speaking of proceeds, as I mentioned, we have already hit 55% of the EUR 0.6 billion target we outlined. So I think we are really, really on track on this side. So I hand over to Daniel for the financial review. Thank you.

Daniel Herrera

executive
#10

Thanks, David. Now let's turn to the financial review, which begins on slide 9. New capacity and improved load factors drove a 24% rise in total output. Contracted volume also grew 34%, reaching 797,000 GWh in 2023, and accounted for 64% of the electricity we produced overall. Our realized price climbed 13%, reflecting both higher merchant prices and higher PPA prices during the period. On the right-hand side, you'll find a summary of the key financial KPIs, which we'll walk through later. Turning to slide 10, you can see that total revenue came to EUR 400 million in 2023, up 37% YoY, while EBITDA rose to EUR 104.5 million, over double the prior-year figure. The development and construction division was powered by the Q3 disposal of the Belinchón project, which generated close to EUR 70 million of EBITDA, plus two distribution assets in Chile sold to PMGDs for EUR 11 million at very high margins. No asset rotation took place in Q4. As I mentioned, the energy division benefited from greater output and a higher realized price. Lastly, on the retail and supply business in Chile, it was once more slightly positive this quarter, at close to EUR 1 million.

Daniel Herrera

executive
#11

For 2023, total EBITDA came in at EUR -0.4 million, and that was because of the first semester, while we anticipate this business will be EBITDA positive over the course of 2024. If we turn to slide 11, you'll see full year 2023 total CapEx hit EUR 366.3 million. That's 88% above the prior year's figure, which mirrors how our execution has sped up. Project CapEx amounted to EUR 337.2 million, divided 37% in Spain and 63% in Latin, chiefly PMGDs and Gran Teno, the utility-scale project we've just hooked up. This figure also takes in CapEx from rotated projects, Matarani in Peru along with Tabernas and José Cabrera in Spain. Development CapEx stood at EUR 29.1 million. As for CapEx per megawatt, it's at all-time lows, with panels at 10 cents per dollar. CapEx now sits around EUR 0.4 million, leaving out the interconnection line, which we owe to expansion of global industrial capacity plus polysilicon production. Given CapEx deflation and the PPA levels we're closing, IRR stays stable... and appealing at double-digit levels, more than offsetting the hit from higher interest rates. Next, on slide number 12, we have cash flow for the period. A few key messages: working capital outflows were EUR 27 million in 2023, which implies a substantial improvement over the EUR 76 million of outflows registered in the first nine months of the year.

Daniel Herrera

executive
#12

On top of that, our CapEx has risen, and that's been financed largely through project financing plus the corporate facility we signed with Santander, which Erste backs. And to wrap up, we end the period with EUR 120 million in cash. The net proceeds from Belinchón gave our treasury balance a lift of just about EUR 90 million. Now, turning to slide 13, net debt went up to EUR 579 million, driven mostly by the faster CapEx spending, even though total leverage fell to 5.6x from 6.4x a year before. That said, once you count the sale of our Peruvian assets, pro forma net debt would come to EUR 460 million, with a pro forma leverage ratio of 3.7 in 2023. In the same way, corporate net debt would stand at EUR 170 million, and pro forma corporate leverage at 1.1x. Also keep in mind that our recent news about closing the financing for Tabernas and José Cabrera means, implies, moving corporate debt into non-recourse debt for CapEx we've already incurred. That will help push our corporate leverage ratio down further. As we announced at our Capital Market Day in November, the investment plan for 2023 to 2026 will fund itself, thanks to our asset rotation strategy, as David mentioned — 55% of it is already done — along with the corporate and non-recourse financial deals plan.

Daniel Herrera

executive
#13

That covers the financing section. Thanks. I'll now pass things over to Rocío, who will walk you through our ESG portion.

Rocío Flores

executive
#14

Thank you, Daniel, and good morning to all of you. I'd like to invite everyone to review how our ESG progress unfolded during the fourth quarter of 2023. It's a pleasure to report that all three goals we committed to for this period were accomplished successfully. First, we produced an internal report on climate change risks and opportunities, prepared in line with the TCFD recommendations. Second, we presented the findings of the work environment surveys, with the goal of putting actions in place to strengthen talent retention. Finally, the board of directors approved the Net Zero strategy by 2040. That Net Zero strategy of ours means hitting specific targets for cutting greenhouse gas emissions, covering not just Scope 1 and 2 but Scope 3 of the carbon footprint as well. Let me now walk you through more detail on the Net Zero strategy. Turning to the following slides. For Scope 1 and 2 — that is, direct and indirect own ESG emissions — we have committed to a 60% reduction of these emissions by 2030. When it comes to Scope 3, which refers to indirect emissions stemming from our value chains, the objective is a 50% cut in these emissions measured in a relative unit by sales. Reaching this ambitious target will require a great deal of action.

Rocío Flores

executive
#15

Take, for example, buying 100% renewable energy or choosing environmentally friendly suppliers of panels and batteries. Now, turning to where we stand in ESG ratings, I want to stress that Grenergy, broadly speaking, keeps its leading position across the most prestigious ESG ratings. In the final quarter of 2023, several scores were refreshed, giving us better results than the prior year at EthiFinance and S&P as well. CDP was likewise updated during Q4, and as for the remaining indexes, including Sustainalytics, MSCI, and ISS, our score improved in 2023 relative to the year before, and also when set against our key peers. That covers everything from me. Many thanks for your attention.

Alberto Sánchez

executive
#16

Thank you so much, Rocío. At this point we'll begin the Q&A portion. Should you have a question, kindly message the administration through the chat feature within the tool. Simply tell her you'd like to take part, and there's no need to type out your questions. In this first round, please keep it to a single question per analyst, and you may get a chance to ask a follow-up afterward. We'll wait about a minute for questions to come in. All right, the first one is from Fernando García at RBC. Fernando, the floor is yours.

Fernando García

analyst
#17

Is this coming through? Yes, or not?

Alberto Sánchez

executive
#18

Yes.

Fernando García

analyst
#19

Alright, thanks Alberto, and thanks for taking my question. My apologies — I actually have 2, so—

Alberto Sánchez

executive
#20

Yeah.

Fernando García

analyst
#21

... this time. First off, could you bring us up to date on the Valkyria asset rotation plan, and specifically on Ayora? And if there happens to be any slippage relative to what you anticipated there, do you have alternative ways to fund your business plan? Then for the second question, well, I was going through your presentation, and it says 75% of the 4 phases of the Atacama project is already contracted. I'm not sure — perhaps that suggests you're running ahead of schedule on that front. So if you could give us an update on how this project is being executed. Thank you.

David Ruiz de Andrés

executive
#22

Hello, Fernando. Good morning. Hi, how are you? Thank you for your questions. I believe the first one concerns Valkyria. Well, as you're aware, at the moment we launched Valkyria, right at the start, one possibility involved rotating 49% of a big portfolio of one. I think it was around 1.1 GW. And that also included, besides Belinchón and the plants we've transferred to Allianz, it also included Escuderos, Ayora, and I believe the first phase of Clara Campoamor. We've completed two transfers already. We've already obtained the proceeds we were aiming for through the transfer of 100% of Belinchón and Allianz. But we've already made clear that we continue working on additional rotations, and in particular at Ayora. It's, I think, quite far along, but you know, these deals really take some time. I think we have a fantastic PPA, and the Ayora plant also shares the same PPA as Tabernas José Cabrera with Amazon. I think it's best in class. And we're very confident, so we have several options on the table. One is quite advanced, and I think we'll provide information in the coming weeks. That's regarding Valkyria.

David Ruiz de Andrés

executive
#23

On Oasis de Atacama as well, we remain quite pleased with the progress. This slide in the update comes from our Capital Markets Day, which took place under three months ago. The key PPA economically speaking — phase IV — has already been signed. The only one still pending is the final PPA for phase V, though that relates to our 2025 construction line for 2026. Construction is already underway on all of phase I and phase II. Procurement of the battery packs from BYD for phases I and II is already happening. Well, we provided guidance at the Capital Markets Day on when we expect CODs. So phase II is Q3 2025, and phase III and phase IV are Q4 2025. Phase I could come as early as Q4 of this year. We are holding to those dates. Clearly, there is a strong incentive for us to get ahead and begin producing energy as soon as we can, since each month represents a meaningful amount and truly makes a difference. So we will do everything within our power to bring the COD forward, or at minimum begin selling energy to the grid as early as we can.

Fernando García

analyst
#24

Thanks, David.

David Ruiz de Andrés

executive
#25

I appreciate that.

Alberto Sánchez

executive
#26

All right, thanks a lot, Fernando. Our next question is from Jorge Guimarães at JB Capital. Jorge, good morning. Go ahead, please.

Jorge Guimarães

analyst
#27

Morning, everyone, and thanks for the solid presentation. Since we're limited to one question, mine concerns how battery CapEx costs are evolving. You're now quoting EUR 180,000 per MWh, so I'd like to ask: when do you think battery CapEx will become profitable enough for merchant arbitrage in the Spanish market? In other words, when will battery LCOS be competitive in Spain?

David Ruiz de Andrés

executive
#28

Hi, Jorge. Thanks for asking — this is always a really interesting topic. So, when we mention $180, that figure covers everything, not only the battery but the entire balance of plant, all of it included. That's already lower than — you know, when we launched our Oasis de Atacama project, the numbers we discussed were $220, $230, and even so, we still managed to achieve an IRR. So costs are coming down. We anticipate seeing additional reductions, correct? But bear in mind, for Spain the economics differ from those in Chile. It isn't solely about battery CapEx, which clearly is a very significant factor, and in my view batteries will certainly become cheaper over the coming few quarters, right? At least that's what we expect. But we also require a capacity market to be in place. That's another crucial point, and we still lack visibility on it. The government has pledged that at some stage this year — Q2, Q3 — a capacity market will exist. Essentially it's occurring in every European country, but the mechanisms vary, and it might resemble Chile's approach, where you receive an automatic capacity payment, or it could involve auctions, or, you know, there are various systems.

David Ruiz de Andrés

executive
#29

That's one more factor. And clearly, the second factor in each market is the spread between daytime and nighttime pricing, correct? The larger that spread is, the more—you know—the better, and the simpler it becomes to bring storage into that market. We have a great deal of confidence, and I am quite certain it will take place in Spain. Whether the surge comes in 2025, 2026, or 2027 will hinge on things like CapEx movement, regulation, and other considerations.

Jorge Guimarães

analyst
#30

Thanks so much.

David Ruiz de Andrés

executive
#31

Thanks, Jorge.

Alberto Sánchez

executive
#32

Thanks a lot, Jorge. We’ll take our next question from Paul Sarram at Kempen. Morning, Paul. The line’s yours — go ahead.

Paul Sarram

analyst
#33

Good morning, and thanks for taking my question. I believe you said that you've already hit 55% of your target revenues for BTS while having just 40% of target volumes. So does that suggest there might ultimately be some upside on the revenues you could obtain from BTS? Or would you rather stay perhaps more conservative and keep more asset on the balance sheet by holding to 100% of target revenues? Thank you.

David Ruiz de Andrés

executive
#34

Thank you. That's a really interesting question. Well, first off, I think it's great that we do have flexibility. First, we obviously want to make sure we hit that EUR 0.6 billion target. We're really on track, considering we're in early 2024. But if we reach that level and we see opportunities to go beyond it, if we have chances to accelerate our build-to-own plan, and if we believe the right way to finance those opportunities is through further asset rotations, then we will, of course, look at whatever we think is better for the company and for the shareholders, right? But first, we want to make very sure that we meet our targets in terms of proceeds, and we will obviously study any other alternatives. Right?

Paul Sarram

analyst
#35

Thanks.

Alberto Sánchez

executive
#36

All right, many thanks, Paul. Moving on, Anis Zgaya from Oddo has our next question. Anis, the floor is yours.

Anis Zgaya

analyst
#37

Yeah, so thanks, Alberto, and thanks everyone for the presentation. I've got one question — well, I'll keep it to just one. Could you give us some indication of what EBITDA you expect in 2024, already including the disposals that have been announced, and factoring in the contribution from the energy business? Thank you.

David Ruiz de Andrés

executive
#38

Thanks. Thank you, Anis. Thanks for the question. Honestly, we’re not in a position to give guidance. Of course, we do have guidance in mind, but I think this was the first time we provided some guidance, at our Capital Markets Day, for 2026. Alberto, correct me if I’m wrong, but we were targeting 150 — between 150 and 200 EBITDA from energy sales-

Alberto Sánchez

executive
#39

Okay.

David Ruiz de Andrés

executive
#40

So that's in 2026, with a run rate of EUR 250 million to 300 million, obviously, once all four initial phases of Atacama are in place. On EBITDA, last year it came in at EUR 105 million. Clearly, we'll aim to push that number higher. That's really all I can say. It's genuinely going to hinge on our build and sell, right? Alberto, I don't know whether you'd like to add anything here, but we truly don't give guidance for the year. You analysts have other peers, right?

Anis Zgaya

analyst
#41

Thanks, David. Alberto, did you want to add anything?

Alberto Sánchez

executive
#42

No, I believe David has covered everything. Yeah, it’s too early and there are too many different moving parts, so it’s still early days. We’re not ready to give guidance for the full year.

David Ruiz de Andrés

executive
#43

I think it'll be straightforward — after we release the first quarter, you'll be able to see the build and sell EBITDA that comes out of our Peruvian rotation there, right?

Alberto Sánchez

executive
#44

Mm-hmm.

David Ruiz de Andrés

executive
#45

That should give you a sense of it.

Alberto Sánchez

executive
#46

Mm.

David Ruiz de Andrés

executive
#47

And I think we're giving quite a bit of visibility into the plans that are going to be operational this year. So it might be—

Alberto Sánchez

executive
#48

Mm.

David Ruiz de Andrés

executive
#49

Kind of simple to guess, isn't it? So perhaps Ayora will change things, right? But that is. I believe it's going to be a highly predictable year, right?

Alberto Sánchez

executive
#50

Yeah. All right.

David Ruiz de Andrés

executive
#51

Alright.

Alberto Sánchez

executive
#52

I appreciate that.

David Ruiz de Andrés

executive
#53

Appreciate it.

Alberto Sánchez

executive
#54

Thanks a lot, Anis. At this point, we don’t have any further questions. I’m not sure whether anybody would like to ask something else.

Paul Sarram

analyst
#55

Yes, if I could, if nobody else is jumping in first — this is Paul Sarram from Kempen. My question is really conceptual, about Oasis de Atacama, since it's a big project and also the first of its type for you. Phase I, I think, will matter most when it comes to establishing a track record of what you're able to deliver and whether you can deliver, say, on schedule. Conceptually, in your view, what would be the biggest risk, or the biggest execution risk, for this project? Is it, I don't know, perhaps not receiving the battery packs on time? Is it the construction side? Anything — yeah, any insight into what the most significant risk there would be?

David Ruiz de Andrés

executive
#56

Okay, that's a really good question. Over roughly the past 2 years, we've been evaluating every possible risk. That's something fairly new for us. I'd say the market is more mature than a lot of people believe. Yeah. I mean, compared with when we entered solar back in 2007, 2008, solar is really new, right? But what we're purchasing, batteries, I believe, is a fairly mature technology. Keep in mind, it's very similar to the technology in the batteries found in EVs. Some operational projects already exist in Chile. There's a large project—not as large as Oasis de Atacama, but quite a relevant one—from AES Gener, which has been operating for a few months. We're watching that closely, and so far things are going fine. It's not exactly with our manufacturer BYD. I think Fluence supplied it. There's another one now operational, from a Canadian developer, Innergex, yeah, and it's already been running for 3 months, quite well. The first phase of Oasis de Atacama, the first 2 phases, well, the PV plant is already connected.

David Ruiz de Andrés

executive
#57

There's no risk on that front since it's already interconnected, correct? So from our perspective, we want to be sure — this project matters enormously to BYD, because, you know, they've generated a great deal of publicity around this deal, and I think they have a lot to lose if, if... This really is a flagship for BYD, and we truly believe it's great that they view it as a flagship project. They're establishing local teams in Chile. I think they might secure a lot of business for themselves, right? And I don't know, I think we feel very, very confident. BYD is supplying only the battery pack, the battery packs. Those will get shipped in Q2. They will arrive at Quillagua in Q3, during Q3 for phase I, during Q4 for phase II. Everything is fine. We have already procured and signed all the contracts, the bonds are in place. I think we have a very good set of guarantees. I don't know. I don't see any concern, but it's true that it is the first project, so we are monitoring. It's also very important that all the technology regarding inverters, converters, is being supplied by Ingeteam, which is a Spanish company.

David Ruiz de Andrés

executive
#58

Storage is an area where they bring a great deal of experience, and they will serve as our partner. They'll be right there alongside us. As a major supplier, they've been providing us with inverters for a number of years already, which means the relationship between us is quite close. So in my view, BYD and Ingeteam — this is a flagship for each of them. I don't know, really, nothing can go wrong. That's our belief.

Paul Sarram

analyst
#59

All right, that has been approved. Thanks.

David Ruiz de Andrés

executive
#60

Right.

Alberto Sánchez

executive
#61

Thanks a lot, Paul. There aren't any additional questions that have come in.

Jorge Guimarães

analyst
#62

Sánchez, could I come in here?

Alberto Sánchez

executive
#63

Absolutely. Yes, Jorge, go right ahead.

Jorge Guimarães

analyst
#64

Thanks. This is a follow-up question. I’m not sure whether you’ve already addressed it, but do you think the recent drop in power prices might create... I know you’ve been selling in Spain rather than buying, and the prices you secured probably now look vindicated, with prices likely to decline. Do you think the market, after all this correction, already offers opportunities for you to purchase projects in Spain again? Or would you rather stay on the sidelines until prices effectively reach long-term levels? So ... You were the first to exit. Are you thinking about re-entering?

David Ruiz de Andrés

executive
#65

Right. OK, so my view is that Spain is going to be a country full of opportunities — though mostly for hybrid plants, PV plus storage, or standalone plants paired with storage. Just look at the boom taking place right now in Chile. Chile is, shall we say, 2 years ahead of Spain: daytime prices collapsed, and the PPA market became pretty tough for the solar profile. But look at the boom today. No plant can be conceived now without BESS. And we are truly capitalizing on our position in the market. I think a similar situation could eventually unfold in Spain, so it would be fantastic — I mean, the great news is that, OK, we contracted our entire portfolio, all of Iberia, and I think that is one of the best decisions we have ever made. And I think our projects are very well hedged and protected with PPAs. Well, this wave in Spain will end one day, and a new wave will begin, or arrive, similar to the one we are seeing in Chile. That is what we believe, but we need to do our homework. We need to make sure we execute, and we deliver Oasis de Atacama in 2025.

David Ruiz de Andrés

executive
#66

I have no doubt that we will. There will be additional jurisdictions and other geographies where this success can be replicated, whether that's Spain or Texas. Our portfolios include plenty of sunny locations.

Jorge Guimarães

analyst
#67

Thanks.

David Ruiz de Andrés

executive
#68

Alright, moving on to the following one—

Jorge Guimarães

analyst
#69

Yeah.

David Ruiz de Andrés

executive
#70

Moving on to the next question.

Jorge Guimarães

analyst
#71

Sure.

Alberto Sánchez

executive
#72

If anyone would like to pose a question, just message the chat administrators and we will hand you the floor. Anis Zgaya from Oddo is our next questioner. Yes. Anish, the floor is yours — please continue.

Anis Zgaya

analyst
#73

Yes, thanks Alberto. So I have a follow-up question about the PPA market in Europe, since I see you're beginning PPA negotiations in Italy and Poland. Could you update us on the PPA markets in those countries? In Germany too, if possible. Thank you very much.

David Ruiz de Andrés

executive
#74

Okay. Okay. Well, as you know, when we sign PPAs, it's also very much about credibility, and I've seen that we're gaining a lot of it. Considering we're a small company, right? But we rank very high. In the Pexapark ranking for 2023, I think we were number 3, after Iberdrola and Statkraft, but very close. That was just in Europe, considering the PPAs we have closed with Amazon and LyondellBasell. And we are now talking to, I would say, everyone. As you know, some of the large, larger. Well, now, the larger buyers of energy are technology companies like, you know, Microsoft, Apple, Amazon, the Magnificent Seven, as they are called now. We are basically talking to all of them in all the regions, right? You know, sometimes it's driven by data centers, AI. Microsoft is extremely active. Amazon has so far been the largest buyer, but followed by Meta, but I think Microsoft is catching up. AI is very, you know, they need a lot of more energy due to their new AI data centers, right? And, and this is great news, right? They, they, you speak to them, and they say, "Okay, I need, energy north of Italy, Lombardia.

David Ruiz de Andrés

executive
#75

I need power in Spain — Madrid or Aragón — since my data center is going to be in Zaragoza, and I also need it in the Berlin area. I might need 100 GW in Poland." Those are the kinds of conversations we're having. So I think there's also a chance that, you know, in our business normally the project comes first and then you find the right PPA. But I think the business might change, and in some cases the PPA comes first, and then you search the market for the right project to match that PPA. Germany is definitely... The trouble with Germany is that very few projects are really ready to build. More will be coming, but it will be a very interesting market for matching PPAs, especially with large technology and industrial companies. It will be the largest PPA market in Europe. So far it has been Spain, but that's because there were so many projects, yet I think Germany will be a very interesting market for PPAs.

Anis Zgaya

analyst
#76

Alright, thanks. Thanks a lot, David.

David Ruiz de Andrés

executive
#77

Thanks.

Alberto Sánchez

executive
#78

All right, that’s all the questions we have.

Analyst

analyst
#79

Hey there — actually, I’ve just got one thing, a quick question.

Alberto Sánchez

executive
#80

Of course.

Analyst

analyst
#81

So when you look at solar pricing in Spain, for a week now they've basically been at zero. Even if you wanted to offer a cheap price, can you still sign a PPA there? And then, a lot of developers have made down payments on grid connections. If that grid connection doesn't get developed, what happens? Is the down payment lost? Do you get it back? Does the connection get put out to tender again? And what happens to the pipelines as a result?

David Ruiz de Andrés

executive
#82

Mm.

Analyst

analyst
#83

So what do you expect will actually happen? That covers the question about PPAs and the pipeline. Then there's the other one, which is about demand from data centers. After talking it over with Pexapark, it appears that data centers need a stable power supply around the clock, and you have a strong offering with the hybrid PPA, but that only delivers to you, I'm not sure, 3, 4, 5 hours. How are you able to put together an offering for data centers through the night hours? Or could you perhaps team up with somebody, with some other flexible solutions? How can you figure out the offering for data centers?

David Ruiz de Andrés

executive
#84

Alright, those are quite interesting questions. On the first one, regarding Spain — as you know, the government brought in some flexibility around the CODs. So my sense is that this has eased some of the pressure, since previously we were all thinking, oh, most of the projects have to be connected by June or July 2025, and that is no longer the situation. In many cases you now need to specify the semester in which you plan to connect, but you can, you know, push things out to 2026, even 2027, or early 2028. And I think that is relieving some of the pressure, right? And, well, a lot of us believe that... Okay, if you look at prices right now, wind has really been affected a great deal, right? On a windy day, prices drop to zero, right? It's, let's see, this spring and summer, with a lot of solar coming in. There will be pressure on merchant prices, right? We believe that you need to be... But at the same time, there are many new e-projects, industrial projects, mainly data centers. There are some battery projects. There's a large one in Valencia, there's another one. There are 3 to 4 large projects. They are seeking energy, and they need energy, right?

David Ruiz de Andrés

executive
#85

They’re ready to purchase energy from solar plants for whatever portion fits their curve, and after that they seek the rest from wind or other sources, correct? Moving on to the other question regarding data centers. Yes, data centers require 24/7 power, but if you need substantial energy and you require guarantees of origin, there’s a fast route to obtain those from solar plants, and that’s how Microsoft and other buyers approach it, right? Even so, there are locations such as Chile. In Chile, we are in discussions with Microsoft, with Google, and with Amazon. They require 24/7, and it’s the first market where we are already… They have all the energy they need during the solar profile, so no more PPAs there. And we are already holding conversations about PPAs at peak hours or, you know. But you can have, for instance, a very large project, and the energy you store, you can… You deliver that energy at night at the highest price, and then you can hedge at 24/7 with a client, that’s no problem, right? So that’s another approach. It will eventually happen here, right? But still we don’t see — we are being approached by some buyers.

David Ruiz de Andrés

executive
#86

All right, so they're picking up on the fact that we're finalizing hybrid PPAs in Latin America. That's among the first regions where this is genuinely taking place. Australia, too, perhaps, along with certain parts of California. Still, these hybrid premium PPAs built around PV plus storage are fairly new, and several big buyers have been coming to us, but the price we require is still... Okay, if a solar PPA costs around EUR 40, a hybrid might require EUR 100, and they're ready to pay somewhere in the 60s, though not EUR 100. So there's a gap, a shortfall of money. Once capacity regulation exists, that figure will come down. Should storage CapEx decline, it will be reduced. My sense is we'll get there in the end, correct? Yet in Europe, I'd say we aren't there at this point.

Analyst

analyst
#87

Perhaps, just to put a size on the opportunity, is there sort of a rough guideline — if you could help us investors understand how large it might get, or, I don't know, teraflops per megawatt hour, or whatever metric folks apply to measure how much additional power demand data centers could create?

David Ruiz de Andrés

executive
#88

That's a genuinely tough one. A lot of nations are turning down new data centers at this point. I believe the Netherlands fits that pattern. Sure, Ireland gained plenty, but not long ago they came out and said, "Alright, there's no space left for anything new. We don't have the energy," correct? And to my mind that's a fantastic opening for Spain and Portugal, right? Especially when it comes to PV and BESS. And I think a lot of data centers are relocating to various places. Hungary is another example. I believe there's also some geopolitical backing from China behind the big battery projects in Hungary, right? BYD, CATL — they're making announcements. But Spain has a huge opportunity, given that our interconnection with France is very small, so power prices in Spain and Portugal will be cheaper than elsewhere in Europe. And that's a tremendous chance to draw in data centers, and I think it's already underway, right? Where do you expect that demand growth to show up? Yeah, my sense is it kicks off in 2025, 2026. Another thing we asked was, okay, to the buyers: how much time do you need before a new data center is up and running? And their answer was roughly 30 to 36 months. So that isn't all that much, it isn't all that long.

David Ruiz de Andrés

executive
#89

Yeah, that's something that could be developed pretty fast. But it's really interesting. They're the biggest purchasers of energy, and everything is moving very quickly. And a lot of countries in Central Europe lack the ability to supply energy to additional data centers.

Analyst

analyst
#90

Much appreciated.

Alberto Sánchez

executive
#91

Thanks so much, Alexis. That brings our results presentation to a close. Should you have any additional questions, please raise them offline via the Investor Relations team, and we will follow up with you. Thanks a lot, everyone, for joining us — you may now disconnect. Thank you.

Analyst

analyst
#92

I appreciate that.

Anis Zgaya

analyst
#93

Thanks. Thanks. Enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Grenergy Renovables, S.A. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Grenergy Renovables, S.A. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Grenergy Renovables, S.A. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.