Grenergy Renovables, S.A. (GRE) Earnings Call Transcript & Summary

February 27, 2025

Bolsa de Madrid ES Utilities Independent Power and Renewable Electricity Producers earnings 64 min

Earnings Call Speaker Segments

Rubén Gómez

executive
#1

Alright, let's get started. Good morning, and welcome to Grenergy's full year 2024 results presentation. I'm Rubén Gómez, Head of Investor Relations. Our Executive Chairman and CEO, David Ruiz de Andrés, will lead the presentation, along with Daniel Lozano, our Chief of Strategy and Capital Markets Officer, and Maria Coimbra, a senior member of the ESG Team, since Rocío is on maternity leave. They'll walk you through our business, financial, and ESG review. Once the presentation wraps up, there will be a Q&A session for sell-side analysts. David, please go ahead.

David Ruiz de Andrés

executive
#2

Thanks a lot, Rubén, and good morning to all of you. Good morning, Europe. Daniel and I, along with other Grenergy directors, are in China at the moment, so for us it's the afternoon. Each year we make this trip, primarily to see our partners BYD and CATL, plus some other up-and-coming top players, and to learn about the highly impressive technological advances we're seeing in the industry. On Grenergy itself, I'd say we delivered a very solid set of results overall, with growth across all the main metrics: revenues, EBITDA, and net income, and, very importantly, as we flagged at the previous results conference, we also brought down our debt level compared with last year, and, well, let's begin with the business highlights. As we note on this slide, we are crystallizing the value of Oasis de Atacama. As we've explained thoroughly, we sold a total of 23% of the project for approximately EUR 1 billion before the end of 2024. The transaction multiple came in at 1.6 times EV versus invested capital, so I'd say that's a very noteworthy ratio. In addition, right at the close of the year we completed the project finance for Gabriela. To date, we have reached financial closing on phases one, two, three, and four.

David Ruiz de Andrés

executive
#3

As we'll get into more thoroughly, we're securing project finance totaling EUR 1 billion for Oasis de Atacama together with eight international banks. That strikes me as quite noteworthy. Operational execution keeps getting better on our end. The platform overall reached 16.6 GW of solar and, even more significantly, nearly 27 GW hours of hybrid projects. That's an increase of close to one GW and 1.9 GW hour compared with the prior quarter, and we'll go through that in greater depth later. When it comes to what's in operation and under construction, we stand at 2.3 GW and 3.6 GW hours — the same number as last quarter — but one very significant distinction is that a number of projects come online during this Q4, including some additional PMGDs and distribution assets in Colombia, and of course Quillagua, whose first phase one was allocated under construction while the batteries were being installed. With the asset rotations carried out in 2023 and 2024, along with the project finance we've already obtained, I believe we've genuinely demonstrated that the EUR 2.6 billion investment plan is now entirely secured, and in fact, as one slide will lay out in more detail, we hit the EUR 0.6 billion asset rotation target two years ahead of schedule.

David Ruiz de Andrés

executive
#4

So I think we'll go into this in greater depth. We believe the timing is right, which is why we're announcing today a new Capital Markets Day for the 28th of May. It'll be held in London. And I think the timing is perfect for the company because, well, we'll provide more visibility on Oasis de Atacama with new PPAs. We'll lock in new PPAs across new geographies, and we'll also reveal our strategy for a standalone segment. So I believe this really is a transformation of the company. We're truly crystallizing value, and we'd like to give visibility on 2027, on the next three years from 2025 to 2027, and set our new goals for CapEx. So I think it will be a very interesting event. And again, the company is transforming itself, and I think it's the right moment to explain this to the investor community. Moving on to our financial highlights, which Daniel will later explain in more detail, the results have been very positively impacted by the M&A deal of Oasis de Atacama. Revenues came in at EUR 643. That's plus 61%. EBITDA of EUR 160 million. That's plus 53% year-over-year. And net income of EUR 60 million.

David Ruiz de Andrés

executive
#5

That's a 17% increase compared with a year earlier. Right? On CapEx — and this matters a lot — we hit EUR 650 million, a substantial rise of 77%. And I think that genuinely reflects how big this company is becoming. Only 2 years back, our CapEx spending was just EUR 200 million, and then we jumped to EUR 400 and something, and EUR 650 this year. And, well, this year, in 2025, we'll come very close to EUR 1 billion. On leverage, well, as expected, once again we saw a huge decrease in Q4 thanks to the asset rotation. Again, that's something we had planned, so we laid it out in the last results presentation, and as expected, net debt now stands at EUR 566 million versus EUR 975 million in September, at the close of September 2024. Total leverage sits at 3.6 times, and looking at corporate debt alone, leverage is just 0.7 times EBITDA, right, compared with the double-digit ratios we had at the end of September. We expect those ratios to keep falling further when we file the Q1 results this year. We announced a share buyback worth EUR 40 million.

David Ruiz de Andrés

executive
#6

We can provide further specifics on how that process is progressing, and to wrap up this slide, the key ESG points—which Maria will later cover in greater depth—are as follows. Our ESG roadmap has been successfully completed. Our annual sustainability report is out. We encourage you to take a look. It happened this year, and although it wasn't required, we chose to align with this year's CSRD regulation—which was, as it happens, updated yesterday—but we think it's better to move ahead with it, with almost 600 data points taken into account and audited by EY. Once again, we take great pride in being named among the 50 most sustainable companies in the utility sector by MSCI, and we also sit in the top 16% of the electric utility sector per Standard & Poor's. Sustainalytics has likewise given us a very low ESG risk score, and I believe all of this mirrors our firm dedication to sustainability and business practices. Turning to the business review, we'll go through it very, very briefly, as I mentioned. Our solar platform hit 16.6 GW, up 0.9 GW. And the backlog rose substantially, to 1.1 GW of solar and 6.0 GW hours. So these are plans that will enter under construction very soon—within the coming months, even weeks.

David Ruiz de Andrés

executive
#7

So, on the right-hand side, what you're seeing is a nicely balanced solar portfolio spread across three key geographies. And once more, LATAM stands out as a region where our partners have greater maturity, and we've already kicked off hybridization projects there. But we'll follow up, and we'll aim to repeat the success we're enjoying in Chile and other markets. My expectation is that this happens quite soon. The majority of projects we hold at present are hybrid already. We've talked about this before. Finding standalone PV projects is getting tougher. Across all geographies, most projects, to some degree, are being hybridized, or we're building them as hybrid PV assets right from the start. Moving to the next slide, slide number five, you can see in detail, broken out by geography and by country, our main pipeline at its various stages, and once again, solar PV grew by close to one GW, mostly in Latin America and the U.S. And even more significantly, since we're crystallizing substantial value in our hybrid projects, those rose by two GW hours, chiefly in Europe and Latin America. It's fair to say that near-term our exposure leans mainly toward markets that are more mature for us, such as Chile or Spain, but when you examine the stages of advanced development, early stage and identified opportunities, you'll see how our push to diversify the pipeline is crystallizing.

David Ruiz de Andrés

executive
#8

I believe that over the medium and long term, we'll get to a more balanced geographic diversification. Yeah. Turning to our flagship project, Oasis de Atacama, this is what we present here as we do each quarter. We refresh the key data and the planning for a flagship project. I think it's once again, for sure, the biggest and best project in the Americas, with a total capacity of 2 GW and 11 GW hours. Right? We sold the first three phases, totaling 450 MW of solar and 2.54 GW hours. That's, again, equivalent to roughly one quarter of the total. We sold that to ContourGlobal, which is a KKR company. And I think it's been a fantastic deal for both of us. The remaining projects are still in our hands and amount to 1.5 GW and 8.6 GW hours. Right? We're looking at more opportunities to grow these numbers, these figures, and also to replicate the success of Oasis de Atacama in central Chile. The next slide is where we show our main achievements in 2024 and at the start of 2025 and what we expect for the whole of 2025. In 2024, we signed strategic agreements for BESS supply for phases one, two and three with BYD, and phase four with CATL.

David Ruiz de Andrés

executive
#9

Things are moving on schedule — honestly, I'd even say we're a few weeks ahead. We're wrapping up mechanical completion on phases one and two right now. As a matter of fact, phase one has already been re-energized. Keep in mind, that was a PV plant that already existed, and now it's been re-energized, and I believe this is the first time we're actually evacuating some of the energy. We're testing the plant. Commissioning is underway, yet we're already supplying energy during the night. And I'd call that a really significant milestone for Oasis de Atacama. Yeah. We also signed the hybrid PPA covering phase four. Soon we'll give visibility on new PPAs in Chile for the remaining phases. And, well, financing has been closed for as much as EUR 1 billion. I think this is, I think it's by far the deal of the year across the Americas — raising EUR 1 billion for PV assets together with five international banks. Another three banks took part in the syndicate. And I think we're extremely proud of this deal. More will be coming for the remainder of the platform. And as you know very well, at the end of the year, we announced the M&A deal with ContourGlobal covering the first three phases.

David Ruiz de Andrés

executive
#10

Correct? For the remainder of the year, we expect to continue signing PPAs for phases five and six. Our negotiations in Chile are at a very, very advanced stage. We'll be visible soon, and beyond that, we also expect to complete commissioning of phase two and phase three at some point in 2025, ahead of year-end. Turning to, well, that's the recap of, as I said earlier, the recap of the financing. At the outset we mandated five international banks. Collaboration with them has gone extremely well, and we're very, very pleased to have worked alongside Natixis, Scotiabank, Société Générale, BNP Paribas, and Sumitomo. And once more, other top-tier names have joined the syndicate solely for phases one and two, namely Bank of America, Bank of China, and BBVA. And, well, we expect to wrap up financing for phases five and six over the course of the year. Market interest is very strong, and it isn't only these eight names — plenty of others are eager to take part in our break financing in Chile. Lastly, on this slide, we'd like to add further detail on the successful asset rotations we completed during 2024. That comes to, in total, an enterprise value of EUR1.1 billion.

David Ruiz de Andrés

executive
#11

We've rotated assets for this EV. That means 625 MW of solar and 2.5 GW hours of BESS, at an enterprise value to invested capital ratio of 1.5 times. Thanks to this asset rotation, along with the ones we registered during 2023, we've obtained proceeds of more than EUR 640 million. I think, if you remember, our target for asset rotation for the period between 2023 and 2026 was 600. We've hit that target two years ahead of schedule. I think this gives us a lot of flexibility on our CapEx plans. We'll update our plans now considering 2027, both in CapEx and in asset rotation. Regarding 2025, let me remind you that we will deliver José Cabrera and Tabernas to Allianz. This mechanical completion has been achieved. We are in the process of reaching COD before the end of Q2. We will transfer, as planned, these plants, I guess, at the end of June or July to Allianz. Well, I turn the call to Daniel.

Rubén Gómez Martínez

executive
#12

Thanks a lot for going over the business. Appreciate it.

Daniel Lozano Herrera

executive
#13

Thanks, David. Let's aim to get through this quickly. Moving on to the financial operating figure. On this slide, it's visible that total installed capacity has dipped slightly, falling by roughly 3%. Gross additions came to nearly 500 MW, sourced from a number of assets in Peru — Matarani — in Chile, Gran Teno, Tamango, Elena, PMGDs, plus certain Colombian assets. So, well, we've demonstrated that our execution continues to expand. And here, we chose to rotate a few of those assets. That explains why production saw a 3% decline in total output. As you can see, this is mostly attributable to the wind asset from last year, Duna Huambos, in Peru, which we divested and which generated substantial equity value for the company. Realized price fell to EUR 50 per MW hour. But, well, there's encouraging news on merchant prices thanks to the gas price situation, and also because we're moving merchant volume to nighttime, so the nighttime price, as you can see, is considerably higher. Over on the right-hand side, there's a summary of the financial KPIs I'll walk through later, but I'd like to call out the company's robust performance in 2024, operationally and financially — growth along with continued execution and expansion of the business.

Daniel Lozano Herrera

executive
#14

Let's go on to the following slide. On slide 11, it's visible that total revenue came in at EUR643 million, which is a really strong rise of 61% year-over-year. As you can see, that growth was driven by the M&A transaction, which David walked through, 1.1 billion EV. Those revenues sit within the development and construction division, which expanded 77%. On the energy side, revenue will have increased 2% organically, once you exclude the asset rotation we did last year. Retail and service were up 27% and 56%, respectively. I'll turn to the next slide. That's slide 12. Sorry, sorry. I'd like to point out that, naturally, that revenue shows up in EBITDA, which this year we've again been able to deliver growth in, reaching EUR 160 million in development and construction, with the asset rotation being the main contributor. But the energy division is contributing EBITDA as well, and even retail and services continue to deliver solid EBITDA growth. Then on to CapEx, slide 12. This slide is a really good one, since it demonstrates the strong execution the company is delivering. The company went from the 2022 figures, which at the time were near EUR 200 million of CapEx, to EUR 350 million in 2023, and EUR 650 million in 2024.

Daniel Lozano Herrera

executive
#15

We've achieved an impressive CAGR of 83% per year. And at this moment, we're demonstrating those execution capabilities thanks to the opportunities that storage lets us invest in. The vast majority of the money put into projects is in the Americas, specifically Chile, at EUR 443 million. The rest of the CapEx has gone into Spain and a small amount into other Latin countries, such as Colombia. EUR 54 million has been allocated to development initiatives. That's the crucial piece for being able to deliver the growth we're experiencing. On the right-hand side, we present CapEx per MW in solar and wind. We keep observing CapEx deflation, but we'll update this figure at the Capital Markets Day we're holding in a couple of months in London. On slide 13, that's the cash flow that, well, we're finishing the year with a cash position of EUR 374 million, okay, versus EUR 121 million at December 2023. Well, CapEx has mainly been self-funded via asset rotation for the equity and project financing for the bulk of it. As David mentioned, we've managed to close over EUR 1 billion for this Oasis de Atacama project financing.

Daniel Lozano Herrera

executive
#16

We've also done some M&A. We can now move into certain assets to hybridize them with storage. And we completed a very strong M&A transaction with Repsol and Ibereólica, EUR 82 million. And, well, even so, we have additional operations in the pipeline — Tabernas, José Cabrera — plus a drawdown bank financing line, and these will let us finish the CapEx plan we have for 2025. Now turning to slide 14. And, well, this is also really impressive, the way we managed to bring net debt down in the quarter to EUR 566 million. The leverage ratio fell to 3.6 times and corporate to 0.7 times. If we count the already agreed sale of José Cabrera and Tabernas and the pending proceeds from Oasis de Atacama, net debt would come to EUR 245 million. Corporate net debt will be positive. So this demonstrates how we generate cash flows, how fast we can bring that leverage ratio down through asset rotation. And that's everything from me. Now I'll hand over to Maria, who will present the main ESG highlights that have been — even though the situation regarding ESG is not, at the moment, the best one to talk about — we managed to complete the sustainability report with CSRD and many more milestones that we will keep advancing.

Daniel Lozano Herrera

executive
#17

Maria.

Maria Coimbra Carmelo

unknown
#18

Thank you, Daniel. Good morning, everyone. I'm happy to provide an update on how our ESG progress went during 2024. Under our ESG roadmap 2024, we managed to complete a number of key initiatives during the final quarter of the year. First, we have released our biodiversity strategy, which follows the recommendations of the Taskforce on Nature-related Financial Disclosures, or TNFD. In addition, we have put together a strategy for embedding the achievement of our ESG roadmap goals into the variable compensation plan covering all of our employees, which links remuneration to ESG performance starting in 2025. We have likewise refreshed our ESG risk map so that non-financial risks are identified and managed on the basis of our double materiality analysis, which strengthens our capacity to handle environmental and social risks. Finally, we revised our corporate purpose so that our mission, values, and goals line up better with the changing expectations of our stakeholders while encouraging long-term sustainability. Let's now turn to the next slide. I'd like to point out where Grenergy stands in ESG ratings, a area where we have consolidated our leadership further. As you can see, our CSA score was updated in 2024 and showed better results than last year.

Maria Coimbra Carmelo

unknown
#19

MSCI singled us out as one of the 15 most sustainable companies globally in the utility sector, and S&P placed us within the top 16% of the electric utility sector as well. These achievements are something we genuinely take pride in. Now, moving to the next slide. I'd also like to draw your attention to the key KPIs from our 2024 exercise, which are available for review in our non-financial information statement and sustainability report. As you'll notice, we keep expanding quickly — our workforce has grown 137% since 2021, and women now hold 30% of our STEM positions. Through our solar PV projects, we've avoided over 300,000 tons of emissions, which supports decarbonization and the energy transition. At Oasis de Atacama, 28 social and environmental initiatives have been put in place, reaching more than 2,000 people. Biodiversity remains a commitment for us, as I noted earlier, with definite 2030 goals. Those goals align with the EU Biodiversity Strategy and target no net loss, a positive impact, and zero deforestation. That wraps up my update. Thank you for your attention.

Rubén Gómez

executive
#20

Alright, thank you so much, Maria. We're moving into the Q&A portion now. Should you have a question, kindly send a message to the administrator through the chat feature in the tool. Simply let us know you'd like to ask something — no need to type the question itself. Okay, so let's give it 30 seconds. Alright, I believe we're ready to begin. Our first question comes from Bank of America, Alexandre Roncier. Go ahead, please.

Alexandre Roncier

analyst
#21

Good morning, everyone. Thanks for taking my question. I just have one, if I may. And I'm actually going to talk about the share price performance this morning, which obviously I don't think really reflects your result nor your execution. And debating that with a few clients and with myself, first, I'm wondering, how do you ascribe this very poor share price performance? And implicitly, also asking, what do you plan to do in terms of addressing liquidity? Because ultimately, I think that's also what's at play there for the share price reaction. So is that something ultimately that you're thinking about addressing as well for the Capital Markets Day? Do you have something in mind? Because, yeah, I mean, it's really quite striking today that that has a play on the share price performance. So very happy to hear your thoughts on this.

David Ruiz de Andrés

executive
#22

All right, thanks. Many thanks, Alejandro. And yes, given that we're posting the strongest results in the company's history, we're carrying out our CapEx plan, we're delivering projects with a higher IRR than anticipated, and we're rotating assets two years ahead of schedule — so we're more than pleased, right? And ever since we announced that latest rotation with KKR in December, I believe our stock is up roughly 35%, maybe close to 40%. Today is definitely a bad day. Honestly, I don't think it's all that connected to our stock, to Grenergy. There's a very significant player in the renewables sector that I believe is down 14 to 15%, and it's a big name. And I think that's somehow weighing on all the smaller peers, right? That's my reading of today, I believe. But it is a bit frustrating, right? Because we'd been rising every day, and today, when we publish results, this hits us. But anyway, we'll see how the day and the week finish, right? Let's remember that we're not only posting very good results from 2024 — but if you look at 2025, not even 50% of the EBITDA from the KKR deal has shown up in the accounts yet, plus the transfer and asset rotations we've already closed, and we'll deliver in Q2 or the start of Q3 with Allianz.

David Ruiz de Andrés

executive
#23

So for 2025, we're expecting very good results as well in our case. On liquidity, I think we're not doing badly lately — I mean, we were at like a million and one million, 1.5 just three, four months back, and now most days we're at like two, three million. So obviously that's something we're working on, it's a top priority for us, and it will be one of the main focuses at the Capital Markets Day. We really need to attract some investors who really can't buy our stock and buy our story because of liquidity. And that's something we need. It's a top priority for us, definitely. And we'll do what it takes to increase liquidity.

Alexandre Roncier

analyst
#24

All right, I’m looking forward to that, then. Thanks.

Rubén Gómez

executive
#25

Alright, thanks a lot. RBC, Fernando García, you have the floor.

Fernando García

analyst
#26

Hello, and good morning. Thanks for the presentation and for taking my questions. Regarding Oasis de Atacama phases five and six, I understand you've indicated that financing and PPAs are expected to occur during 2025, but could you give us a more precise idea of when that might happen — whether in Q2 or Q3, for instance? Then, David, I noticed your great photo on my LinkedIn feed today alongside the founder of CATL. I believe the BYD logo is now visible there as well. So, I mean, this presentation clearly demonstrates that you've generated substantial value in the co-located large batteries project. And now you're shifting somewhat toward a standalone project, where additional elements must be handled, such as grid connection and probably smaller projects. I'd like to hear your perspective on how you can stand out in that space too and generate value. Thank you.

David Ruiz de Andrés

executive
#27

Thanks, Fernando, for those questions. So, yesterday we met with Robin. Robin Zeng founded CATL. In my view, he has been the industry's most significant figure. He built CATL from nothing, and he holds a 40% share of the market in ESS — well, the batteries that we use — and in electric vehicles. He truly is the key player and the key disruptor in something as vital to the energy transition as batteries are, both for mobility — right, electric vehicles — and for storage tied to energy generation. And they have reached a 40% market share globally. That really is remarkable. He is genuinely the big name in this industry. And I was very fortunate to spend almost one hour with him. Also a very nice person. He is quite humble. And it has truly been an experience, right? We are working with CATL on phase four, Gabriela, or the phases of Atacama. We have been working very successfully with BYD. Just today we were in Fujian, at CATL's headquarters. Today we are at BYD in Shenzhen. I think that is the other big name. They hold close to a 25% market share. I think that is the other big name. That is something I believe we should keep pursuing with the leaders and invest.

David Ruiz de Andrés

executive
#28

The market and the industry are shifting significantly. These days, people are discussing sodium batteries rather than LFP, possibly two years from now for large ESS plants. We're going to see some very significant disruptions. During the Capital Markets Day, I believe we'll take some time to explain how the new batteries are going to disrupt things in the next year, as early as next year. Nobody's talking about placing 12 today.

Rubén Gómez

executive
#29

Although this is publicly available information, BYD has just revealed that they'll offer a product delivering 12 MWh per 24-foot container. The containers are custom-built by them. Two containers will be combined. On a very small plot of land, they'll site 24 MWhs. That is extremely impressive, truly. This is moving ahead at great speed. It's genuinely going to transform the storage sector. Turning to PPAs, Fernando, we're active across all geographies. We're active in Chile. I believe we continue to have quite strong momentum. CapEx has fallen substantially. PPA prices will likewise sit at lower levels. Overall, I believe we'll maintain the same IRR — possibly even better — as the first PPAs we closed. We'll announce some PPAs, I believe, as early as the start of Q2. I think we'll certainly try to bring something for capital markets day, right? And in Europe, well, we're working on both hybrid PPAs, as you know, comparable to Oasis de Atacama. And I believe Escuderos plant will be the first one we announce in Spain. We have a 200 MW PV plant that we'll hybridize. And we're examining hybrid plants in the U.K.

Rubén Gómez

executive
#30

As you know, though, our primary emphasis is going to be on standalone. And we'll be providing plenty of visibility. We've been putting a lot of effort into the standalone pipeline. Up to now, we haven't made any public information available regarding that pipeline, but it's going to be a central subject at our capital markets day.

Rubén Gómez Martínez

executive
#31

All right, thanks a lot. We'll take the next question from Berenberg. Henry, go right ahead.

Henry Tarr

analyst
#32

Hello, and thank you for taking my questions. There are two. First, to build on what was said about the standalone BESS pipeline you are developing: what do you look for in a country or jurisdiction that makes the economics attractive for BESS there? Is government support needed, such as capacity payments and the like? Or are there areas and regions where the day-night price spread is attractive enough that you believe you can earn good money? Second, I think some impairments were announced in Q4 on certain projects. Could you give me a bit more detail on those projects and what was happening there? Thank you.

David Ruiz de Andrés

executive
#33

All right. Turning to the standalone question — that goes back to the first Capital Markets Day we held, in November 2023 if I recall correctly, right? About a year and a half has passed since then, and we devoted considerable time to walking through Oasis de Atacama and how the hybrid plants — the PV-BESS economics — would function, and I believe over the past year we've delivered, right? We've financed, we've rotated assets, and it's genuinely happening, right? Even quicker than we anticipated and at a higher IRR. Everyone finds it easier to grasp, right? Since it's fairly straightforward. It leans more on storing the energy and then delivering that energy during peak hours or overnight at the highest potential price. So at the Capital Markets Day we'll devote considerable time to explaining how the economics of standalone projects function, right? And as you point out, it's more complex, right? You've got different revenue stacks. I'd say the main driver today is storage, right? Regardless of what you examine. Sorry, that's trading. It's trading. So essentially, storing the energy at times when that energy is cheaper and delivering that energy when you obtain a higher price for merchant.

David Ruiz de Andrés

executive
#34

There's also a way to lock in that level with a long-term contract. These are what we refer to as tolling agreements, correct? They'll be comparable to the PPAs, though we tend to label them tolling agreements, right? So over the long term, we obtain a hedge against the day-ahead market. These can extend for as much as 10 years, right? That's the core revenue stack. In certain markets, though — the U.K. being one example — I think either you've got access to a capacity payment or a capacity market, or the economics don't work as well. Other markets exist, such as Spain, where we think that simply trading and tapping into all the other markets — frequency regulation, secondary and tertiary and ancillary services — will make the economics work pretty well. We also have some subsidies on certain projects coming from EU funds. So it's harder to explain, but we believe we're going to see very, very good returns. And in some markets, trading alone will be attractive enough, as is the case with Spain, even if Spain has announced some capacity auctions too, right? Germany has announced some capacity auctions as well, but I think that will take place a year and a year and a half from now.

David Ruiz de Andrés

executive
#35

My guess is Spain comes through within the next 2 months, correct? Yet even if those capacity payments aren't there, I believe the numbers hold up. We'll be investing plenty of effort country by country — what's our strategy, and where do the gains lie? And once more, speed to market matters a great deal, correct? Connecting a single project 1 year sooner carries more value than reaching a market 1 year later, correct? As for the impairment, correct? I believe Daniel can provide further specifics on that topic. It's also crucial to make clear that the larger we become, the greater our development CapEx spending, correct? And we generate substantial value, correct? Because of this DevEx, we can deliver projects such as those we have in Oasis de Atacama, correct, along with other geographies. But at year-end, we also review which projects we lack confidence in or where there's a very strong likelihood they move forward. So we write them off, even though in some instances such a write-off might be reversed, correct? And I believe there has also been an impairment in Colombia.

David Ruiz de Andrés

executive
#36

Daniel can provide more clarity on that, though.

Daniel Lozano Herrera

executive
#37

Right, exactly. It comes down to this: we recorded a EUR 5.5 million write-off tied to development CapEx on projects we've decided not to pursue, and we're developing a lot of GW. We're fortunate — our development team is very strong and is getting the most out of the pipeline we're building. Still, certain projects ultimately fail to reach ready-to-build status. In this instance, that amounted to EUR 5.5 million. Beyond that, the remainder is project asset deterioration, primarily in Colombia, at EUR 11.6 million. Keep in mind, though, that this can be reversed. It's a contingent impairment test we ran in case we, for example, choose to sell those Colombian assets we've discussed openly — which we don't want to do. We'd like to put equity into some of the Latin market, but mainly Chile and Colombia assets could potentially be sold. If we get the valuation we're referring to and would normally achieve, this will be reversed, and the total impairment would come to just that EUR 5.5 million deterioration.

Rubén Gómez

executive
#38

Alright. Thanks. We'll take the next question from Alantra. Fernando Lafuente, the line is yours.

Fernando Lafuente Seseña

executive
#39

Hi there, and good morning to everybody. I’ve got two short questions. First, David, a follow-up on the PPA strategy. Looking at what’s been signed in Atacama, the initial three PPAs were standard night PPAs, while the fourth was a hybrid structure. For the upcoming phases, what’s the direction now? Will you be pursuing hybrid PPAs, or shifting back to night PPAs again? I’d just like a bit of detail there. Second, regarding cash movements for 2025, it would be helpful to get some color on the CapEx you expect this year, as well as proceeds from disposals that are already agreed. Also, are you considering further disposals, so we can get a sense of what might be sold? Finally, do you have an estimate for where Net Debt should finish 2025? Thanks very much.

David Ruiz de Andrés

executive
#40

Thank you, Fernando. Maybe I'll leave that second one for Daniel, right? I'm not certain whether we're able to provide that guidance, right? What I can tell you, though, is that new disposals are underway, and we will see new disposals, especially in segments that are no longer a priority for us, such as PMGD in Chile, where we still hold roughly 200 MW. And, well, the counterpart to PMGD in Colombia, where we have a deal at a very, very advanced stage, as we've discussed for quite a while. It takes longer than in other markets, but I believe we'll have some visibility even by the end of this quarter or early next quarter, right? But at times it's opportunistic, right? And I think the Spanish market is heating up strongly once again. So I don't know. Our plan had been to keep Escuderos. Escuderos might be hybridized, right? So that one stays in our portfolio. Ayora could be another candidate for rotation, potentially, right? There's very strong interest in the Spanish market as well, again. Turning to, well, your question about the PPA strategy, PPAs get more complex when storage is involved. No two PPAs are alike. It's true that the earliest ones were night PPAs.

David Ruiz de Andrés

executive
#41

Essentially, we were only selling the energy during nighttime hours. The one we built for phase four was also a hybrid PPA. We charge one price for power supplied in daytime, and then there's a separate sort of tolling arrangement covering whatever we store, correct? As for the new PPAs we've announced, I believe those will lean more toward night PPAs, right? Some hybrid deals are in the works too. I also expect we'll announce some brand-new PPAs that are purely PV. The market is shifting considerably, right? At present, a major change is underway in the matrix in Chile, and eventually that will reach other markets because PV-BESS is being introduced so rapidly. So once again, we'll see very strong appetite for daily PPAs that are purely PV. The market therefore moves extremely fast. Regardless, anytime we announce PPAs, we'll provide greater visibility.

Daniel Lozano Herrera

executive
#42

Alright. On my end, what I can say is this: despite the fact that we've already reported EUR 110 million of EBITDA for 2024 stemming from the Oasis de Atacama transaction, well, as you can see, we've brought forward the majority of the cash flow generated by that operation. Roughly EUR 17 million more is still to come from that transaction. And regarding, well, we have additional operations, José Cabrera and Tabernas — I believe the EBITDA from that deal, the capital gains, will land at approximately EUR 70 to 80 million, subject to the final earnout. And cash flow ought to be EUR 110 to 120 million, counting both the capital gain and equity recycling. Then when it comes to Net Debt, that will hinge on the CapEx we put to work during this year. This is something we'd like to walk through at the Capital Markets Day. What I can say is that we have invested EUR 650 million this year. If you run some calculations, you'll find the number should come in even above EUR 1 billion of CapEx investment this year. That will show up partially in Net Debt, depending on supplier facilities. So it won't be 100% hitting the 2025 figure. In any case, plenty of cash flows are coming in, and plenty of CapEx is there to be invested.

Daniel Lozano Herrera

executive
#43

And then, as you're aware, we're constantly pursuing asset rotation at attractive valuations, and capital gains along with equity recycling could show up and give Net Debt another positive boost.

Rubén Gómez

executive
#44

All right, thanks a lot. We'll take the next question from Bernstein. Tibo, the line is yours.

Analyst

analyst
#45

Good morning, everyone. Thanks so much for taking my question. My first one is about the load factor. On slide 10, I can see a lower load factor for 2024. Could you tell me what's driving that? And what impact might we potentially see from Gran Teno and Tamango, which I believe aren't fully in operation yet, though I think they were already commissioned last year. So that's my first question. My second one concerns the procurement cost. Are you expecting it to come down or to stabilize? Those are my first two questions.

David Ruiz de Andrés

executive
#46

All right. Thanks — thanks a lot, Tibo. I’ve got slide 10 in front of me. That’s my understanding, and Daniel may be able to add to it.

Daniel Lozano Herrera

executive
#47

Sure, that's pretty straightforward. Our load factor comes in lower mainly because the Duna Huambos wind project in Peru ran at an extremely high load factor — close to 5,000 hours. That's really the key driver. When you set that against solar, which sits around 2,000, it makes the figure look larger.

David Ruiz de Andrés

executive
#48

Right, and Gran Teno, Tamango — I believe those slipped by a few months, especially Gran Teno, before it's fully operational, correct, Daniel? So when you stack that against the figures. In any case, both plants are in good shape. They ought to be. We're likewise examining hybridization at those two facilities, correct? And we'll soon provide visibility as well regarding PPAs and what we're doing in Central Chile, correct? Since, once more, we perceive substantial value — considerably more value — in hybridizing the plants so they deliver energy at a much higher price during nighttime hours. So every plant of ours that is purely solar, I believe, will end up hybridized to some degree. I think your — apologies, what was the second question?

Analyst

analyst
#49

It concerned procurement cost and how CapEx per MW evolves for solar as well as.

David Ruiz de Andrés

executive
#50

Yeah, that's a really good one — yeah, yeah, I remember. Very good question, Tibo. If you ask me about solar, I'd say we're at record lows. Well, it's time to — I wouldn't really speculate, you never really know, but there's a possibility of even some increases in solar, in solar panels. Remember, right now we're buying panels for as little as EUR 0.08 or EUR 0.085, right? Some spot prices are even under EUR 0.08. I don't think that's really sustainable. If you just look at the results of the main manufacturers, it's very clear — I don't think that lasts much longer. Whether that increase goes to EUR 0.09-$0.10 or, well, they stay at EUR 0.08, we'll see. But I think it's a good moment to hedge all your panel needs for the year. That's what we're seeing. That's solar. On BESS, well, we've seen a decrease much faster than any of us expected, right? I still believe we'll see further decreases when it comes to BESS. And that's the feeling I get, because efficiency gains are happening in the industry much faster than anyone expected, right?

David Ruiz de Andrés

executive
#51

My expectation is that further reductions will occur before long. However, that outcome hinges on numerous variables.

Analyst

analyst
#52

Thanks a lot. I just want to double-check on load factor — on the farms you already have, are you hitting the load factor you targeted? You provided the expected hours figure. Is that still on track?

David Ruiz de Andrés

executive
#53

Yes, I think we're on track there. Nothing notable has shifted.

Analyst

analyst
#54

Thanks a lot.

Daniel Lozano Herrera

executive
#55

Perhaps I could jump in here.

Analyst

analyst
#56

Thanks.

Daniel Lozano Herrera

executive
#57

Quillagua's output took a modest hit for a few months, because at that specific facility we had to halt operations during the Hybridization so the substation work could go ahead, alright? That applies only to Quillagua. Production was impacted, though revenue wasn't hit much, and with the Hybridization project coming up, this won't be an issue, okay? To hybridize Quillagua, we needed to take the substation offline for roughly 2 months, Daniel, 3 months. But those were summer months, with lots of very low prices and at times even curtailment payments. So the production number really felt it, but turnover essentially didn't. The plant got reconnected, as I mentioned earlier, I believe last week, yes.

Analyst

analyst
#58

Thanks a lot. On the 2025 guidance, should we be looking for that at the CMG? Can you share any color on that?

Rubén Gómez

executive
#59

Pardon me? What kind of guidance are you asking about?

Analyst

analyst
#60

Regarding this year, for both net debt and net income as well as EBITDA, are you expecting to provide any guidance at the CMD?

Rubén Gómez

executive
#61

Since we don’t give yearly guidance, what we’ve done is lay out a three-year plan — right — involving EUR 2.6 billion of CapEx, and we now say we’re more than ready to hit that. That covered the period from 2023 through 2026. We also set out EUR 600 million in rotation proceeds, which we’ve already delivered two years early — right, on target — and we’ll give visibility on 2027 at the Capital Markets Day, but we don’t provide guidance, I’m sorry, for — though many analysts do put out their own estimations.

Analyst

analyst
#62

Thanks.

Rubén Gómez

executive
#63

Thanks. Alright, and our final question comes from Temi at Barclays. You have the floor.

Temi Akinremi

analyst
#64

Hello there. Am I coming through okay?

Rubén Gómez

executive
#65

There's a bit of an echo, but yeah.

Temi Akinremi

analyst
#66

My apologies.

Rubén Gómez

executive
#67

All right. Temi, feel free to send that question to us via the chat if you'd like.

David Ruiz de Andrés

executive
#68

Yeah, I'm on the chat.

Rubén Gómez

executive
#69

Then we can go through it, all right? We still haven’t gotten the question. Let’s check whether he types it. All right. He’d like some color on PPA prices. And whether you have already addressed the expectations for the targets from the previous capital markets day — those are the two questions from Temi. The color on how we are seeing PPA prices evolve.

David Ruiz de Andrés

executive
#70

So look, the market's shifting pretty significantly, and we're increasingly shifting toward hybrid PPAs, night PPAs, and tolling agreements. So we're dealing with different animals here, right? So comparing apples with apples is tough. If you focus purely on solar PPAs in Europe, I believe pricing has dropped 15%-20%. But CapEx has fallen by roughly the same amount, right? So I think that's just how things look in Europe. If you turn to Chilean PPAs, we closed those in the — well, we don't disclose the price, but they were definitely in the high 80s, and they might be in the high 70s, right? So keep in mind those are indexed, right, to CPI. But again, CapEx has fallen even drastically. So we expect to stay at the same IRRs. So that's how things look in the PPA market.

Rubén Gómez Martínez

executive
#71

All right, thanks so much for joining us, and we’ll see you again at our next quarterly results presentation. If you have any further questions, please reach out to the IR team. So thank you very much. Thank you very much. Have a great day.

David Ruiz de Andrés

executive
#72

Thanks.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Grenergy Renovables, S.A. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Grenergy Renovables, S.A. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Grenergy Renovables, S.A. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.