Gujarat Themis Biosyn Limited (506879) Earnings Call Transcript & Summary

May 15, 2023

BSE IN Health Care Pharmaceuticals earnings 62 min

Earnings Call Speaker Segments

Operator

operator
#1

Ladies and gentlemen, good day, and welcome to the Gujarat Themis Biosyn Limited Q4 FY '23 Earnings Conference Call. This conference call may contain forward-looking statements about the company, which are based on the beliefs, opinions and expectations of the company as on date of this call. These statements are not a guarantee of future performance and involve risks and uncertainties that are difficult to predict. [Operator Instructions] Please note that this conference is being recorded. I now hand the conference over to Mr. Sachin Patel, Director.

Sachin Patel

executive
#2

Thanks very much. Good morning, everyone. I would like to wish you all a very warm welcome to GTBL's earnings conference call for the fourth quarter and year ended 31st March '23. I would like to begin by expressing my gratitude to you all for taking time to join us today. We have on call with us, Mr. Rajneesh Anand from GTBL, Mr. Tushar Dalal Group CFO, and Ad Factors our Investor Relations team. Before we get into the business and financial performance, I would like to briefly share the recent development -- key recent developments in our strategic focus areas. The slowness in tendering business last quarter continued during this quarter as well, keeping the product uplifting mildly subdued. One of our 2 products, Rifamycin-O, continued to see decent demand in the market, leading to sufficient dispatches of these products. However, Rifa-S off take remained on the lower side during the quarter since this is largely a tender-driven segment. Several tenders continue to be delayed in Q4, and that reflects in lower sales volumes year-on-year. Tenders are now opening up gradually, which is why there is a slight growth quarter-on-quarter. Otherwise, based on the inherent demand in the system, we have continued the production of Rifa-S to build inventory to be ready once the tenders open up entirely. Also, based on the bullish demand outlook, we plan to continue with our ongoing levels of production for both the products. As mentioned in the last quarter, this year, we have not undertaken a plant shutdown as we had in the last 2 years so that we can continue to build inventory for the anticipated demand. I'm happy to share that despite these challenges, we registered a robust growth in top line as well as profitability vis-a-vis the previous financial year. Our revenue realizations improved during the year, which helped offset higher input costs, including substantially high utility expenses. Our CapEx plan of INR 200 crores spanning over 2-plus years is progressing as per plan. We have capitalized about INR 16 crores, while another INR 20 crores is in CWIP and about INR 10 crores of capital advances for the equipment have been given. The new warehouse, R&D and API block is expected to be ready by September '23. The last leg of our CapEx will be the new fermentation facility, which are expected to be ready by the end of the next calendar year. As already stated in earlier calls, these new facilities will be compliant with global regulatory loans since we shall be targeting export markets in addition to the domestic market. In conclusion, we believe that with our state of art manufacturing facility and our expanded R&D base, we are well positioned to deliver innovative solutions to the healthcare market and create substantial value for our stakeholders. Now I will hand this over to Mr. Rajneesh, Mr. Rajneesh Anand to take us through the financial performance of the quarter and the year. Thank you very much.

Rajneesh Anand

executive
#3

Thank you, Sachin bhai. Now turning to our financial performance for fourth quarter financial year '23. We reported INR 28.17 crores in revenue during Q4 FY '23, vis-a-vis INR 28.76 crores in the previous corresponding period. Our EBITDA for the quarter stands at INR 14.93 crores, increasing 14.12% year-on-year. EBITDA margin is 52.98%, which is up by 751 bps. Better realization and lower R&D investment of about INR 3 crores helped improve the profit margins. Our PAT during this quarter is INR 11.69 crores as against INR 9.79 crores in the fourth quarter of financial year '22. PAT margin stood at 41.50%. Earnings per share for this quarter is at INR 8.05. Coming to the full year performance, we reported INR 148.97 crores in revenue during the financial year '23, a 29.71% year-on-year rise over the previous fiscal year. Growth was mainly driven by rise in volumes, coupled with better realizations. Our EBITDA for the period stands at INR 74.22 crores, increasing 27.86% year-on-year, while EBITDA margin is 49.82%. Our PAT for this year is INR 57.97 crores, growing 32.88% year-on-year as against INR 43.62 crores in FY '22. PAT margin stood at 38.91%. EPS for the fiscal is INR 39.90. The Board has recommended a dividend of 20% per equity share of face value of INR 5, subject to approval of shareholders. Moreover, the Board considered the proposal for subdivision of one equity share of the company having face value of INR 5 each, into 5 equity shares of face value of INR 1 each, subject to regulatory, statutory and shareholder approval. That is all from our side. We can now take questions. Thank you very much.

Operator

operator
#4

[Operator Instructions] Our first question comes from Vishal Prasad with VP Capital.

Vishal Prasad

analyst
#5

So, we have been a fermentation company until now. However, we have decided to get into APIs, where we would be producing fermentation-based APIs as well as synthetic APIs, could you share your thought process behind our decision to get into synthetic APIs?

Sachin Patel

executive
#6

Yes. So on the whole, our philosophy still remains that we are going to be a fermentation company. But at the same time, we see that including the products that we produce and the future pipeline that we have, it may be until the intermediate stage that fermentation is required and then we would need to do a few synthetic steps to make the final APIs. So essentially, just makes a lot of common sense, we feel to be a part of the value chain, which is as advanced as possible and not just be at the intermediate level. So, in a way, if we did not have or if you do not have the capability of synthetic chemistry along with fermentation, we might find ourselves short in the market in the future.

Vishal Prasad

analyst
#7

So sir, if we have to manufacture the API -- and which is fermentation based, so all the intermediates would be fermentation or it could be mix of synthetic as well as the fermentation-based intermediates?

Sachin Patel

executive
#8

Our plan as of now is essentially only to work on products where the intermediates are fermentation based because that is where we see we can add maximum value as a company in GTBL.

Vishal Prasad

analyst
#9

Okay, So sir, out of 200 crore CapEx, how much we are planning to spend on the furmentation blocks?

Sachin Patel

executive
#10

I will hand this over to Mr. Rajneesh Anand to give you details on this. Hello. Have we lost Mr. Anand?

Operator

operator
#11

No, he's connected with us, sir.

Sachin Patel

executive
#12

I think he's probably on mute.

Operator

operator
#13

Let me go ahead and call him back. Just give me a moment.

Vishal Prasad

analyst
#14

Yes. Meanwhile, I'll ask other questions. So during our last call, we mentioned that in the API block, we would be doing on high-value product, but many small value products. So these small value products would be -- and these will provide us good margins. So are we trying to get into a job what kind of scenario for some other companies? Or this will be just -- we're trying to fill the capacity?

Sachin Patel

executive
#15

No, we are not intending to get into any job work scenario, at least in the foreseeable future. If circumstances change, we will look into that particular possibility. And if there is a prospect opportunity which is very interesting, we may consider that. But for now, all the plans are based on our own manufacturing and sales, which are there. And we say that these are small products, but we feel that it can add significant value to our bottom line and hence, those are the products that we would be -- we will be considering.

Vishal Prasad

analyst
#16

So I'm guessing we are not -- we would not get into a related party transaction with our parent as well?

Sachin Patel

executive
#17

No, these are all independent businesses that are being looked into. Is Mr. Rajneesh back with us?

Rajneesh Anand

executive
#18

Yes, I am back. Please tell me.

Sachin Patel

executive
#19

Perhaps we could just give a perspective on the CapEx plan and what percentage or what value of that is allocated to fermentation out of the INR 200 crores?

Rajneesh Anand

executive
#20

So out of the INR 200 crores, we are going to invest INR 80 crores in the Phase 1 of the fermentation block. And rest of it is into the API block. We are putting up 2 R&D pilot suits, and we are putting up a new R&D lab. With all this, we will require a wastewater treatment system with zero discharge and we will require a solvent yard. So will require some surrounding infrastructure with the fermentation block also. So rest of the investments would go into these things, plus the API block and our synthetic pilot plant for developing processes.

Vishal Prasad

analyst
#21

Okay. And how much we are spending on the R&D block?

Rajneesh Anand

executive
#22

In R&D block, this will be like 1 pilot suit, 1 is INR 25 crores. The rest -- the 2 is INR 8 crores and the lab is INR 9 crores. So INR 17 crores plus INR 25 crores, that will be about INR 42 crores in all.

Vishal Prasad

analyst
#23

So sir, last question from my side on the R&D block. I mean, we are spending a lot of money in R&D. So -- could you share your thought on where do we see our R&D effort going in the next few years? What kind of people you would be recruiting and what kind of products we would be focusing on?

Sachin Patel

executive
#24

So I'll put it this way, that with regards to the people we already have, a fair number of people in our team. Of course, with this block coming in, we will be expanding the teams from where we have right now. But we don't expect that there will be a significant change happening over there. And in terms of our plans over there, the reason why the R&D block is quite high in terms of cost because strategically, we have decided to put in a cGMP pilot facility. In fact, 2 cGMP pilot facilities over here. So that's all the products that are being developed at a lab scale can be actually scaled up from these particular pilot plants and also filed for regulatory filing. Because as Mr. Anand said, the cost of putting a fermentation facility in Phase 1 is about INR 80 crores, and we have 3 phases to go through after that. So we would like to make sure that we have maximum filings from our cGMP pilot before we move to the large scale commercial.

Vishal Prasad

analyst
#25

So, INR 80 crores for first phase and then 2 more phases, additional INR 160 crores, we will be spending apart from INR 200 crores, is it?

Sachin Patel

executive
#26

Yes. So that is something that we have not planned as yet. That is not included in the INR 200 crores. So that will happen as year goes by.

Operator

operator
#27

Our next question comes from Keshav with RakSan Investors.

Unknown Analyst

analyst
#28

Sir, I wanted to have some clarity regarding Rifaximin. So the product has been under patent till 2029 in U.S. and there's a Lupin product available in India. So can you help understand what the patent status for Rifaximin for different geographies apart from U.S.?

Sachin Patel

executive
#29

So I think the way we see it in ROW markets, a fair amount of markets have opened up, and that is why we see the volumes of Rifaximin and our sales of Rifa-O that we see right now. We understand that certain parts of Europe will be opening up over the next year or so. And then the rest of the world will open up with the U.S. So I think we have 2 stages to boost -- go through. One is Europe, at least a few countries in Europe, which open up in the near future. And U.S. is '28, '29, maybe a bit earlier depending upon what some of the formulators can do with the patent.

Unknown Analyst

analyst
#30

So sir, currently, whatever Rifa-O we are supplying, does some of it also go for the innovator supply or it's for the ROW market?

Sachin Patel

executive
#31

It is all for the ROW markets.

Operator

operator
#32

Our next question comes from Yogesh Tiwari with Aryan Capital.

Unknown Analyst

analyst
#33

Sir, I had some few balance sheet questions for modeling purpose basically. So if I look at the balance sheet at the end of March, there is a component of others under current assets. of about INR 90 lakhs, which has dropped from about INR 11 crores last year. And correspondingly, there's an other financial asset under assets -- noncurrent assets which has increased from INR 9 crores to about INR 41 crores. So first is like what I understand is this is all deposited financial institutions with the different tenures like a long-term tenure, short-term tenure. Am I correct?

Sachin Patel

executive
#34

Mr. Anand , would you be able to answer this question should we pose it to Tushar Dalal?

Tushar Dalal

executive
#35

Im Tushar Dalal. So as you rightly say, that we have part of our surplus funds to be financial institutions and some of the money that we also kept with the Union Bank of India, as a short-term deposits system.

Unknown Analyst

analyst
#36

Sure. So, These others in the current assets, that has declined from about INR 11 crores to INR 90 lakhs. And correspondingly, the long term has increased from about INR 9 crores to INR 41 crores. So have we moved from short-term assets to like a short-term tenure to long-term tenure of the deposits?

Tushar Dalal

executive
#37

Yes, some of the deposits, which were due within this year. So now we have taken it for a period of, say, 15 to 18 months. So that is why, once it goes beyond 12 months on, it goes to noncurrent assets rather than the current assets. So that is the composition is undergo change. Whenever some renewals have taken test has been external for that because we get some higher rate of interest, and that's what this particular adjustment has been made.

Unknown Analyst

analyst
#38

So this is reviewed every year like -- or is there a policy for it?

Tushar Dalal

executive
#39

No, whenever the renewal taxes, then we review come how much money will be required in the current year and how much money will be required in the future. And accordingly, that we carry out this particular transaction.

Unknown Analyst

analyst
#40

So sir, just to model for FY '24, can we consider that the short term or the current portion will remain at lower levels, like around INR 90 lakhs and the long term will be the major portion like?.

Tushar Dalal

executive
#41

It is quite possible, but we'll be also utilizing this particular money for the purpose of our expansion plan. So we have to view every quarter, every month, how much money will be required. This represent 100 by only our internal approvals. So we utilize this month so that only the time will tell us by how much will be in the long term and how much will be in the short term.

Unknown Analyst

analyst
#42

So sir, for modeling purpose, any assumption we can take for FY '24, whether long term will be a bigger amount than short term?

Tushar Dalal

executive
#43

Quite possible, quite possible.

Unknown Analyst

analyst
#44

And we can take it as a percentage of total assets for modeling -- total assets or it will be like noncurrent?

Tushar Dalal

executive
#45

It is Yes.

Unknown Analyst

analyst
#46

And sir, the other point on the loans under current assets. So about INR 17 crores we have, loan under current assets. And I understand it is -- this is all intercorporate deposit, and it is our constant. So can you share some details on this component? And like can we take it as constant going forward around the current number? The loans, the current assets INR 17 crores?

Tushar Dalal

executive
#47

So we have parked some money with the ICDs with some companies which are known to us, which are done at -- these are all the public companies where in that we have given by way of ICDs, where in we also get a good amount of interest on this.

Unknown Analyst

analyst
#48

So can we assume the same -- like it will be a similar range next year also?

Tushar Dalal

executive
#49

It should be. Yes.

Unknown Analyst

analyst
#50

Sure, sir. And sir, lastly, on the component, other noncurrent assets under noncurrent assets, which has increased from about INR 3 crores to INR 10 crores. Other noncurrent assets, INR 2,77 lakhs to INR 1,069 lakhs.

Tushar Dalal

executive
#51

That is because some of capital advances have been made by us, to purchase the equipment. So those things are major, say, nearly a INR 10 crores of rupees. We have a -- we have given buy-off in advance to the capital suppliers. so that is coming under the noncurrent assets.

Unknown Analyst

analyst
#52

Sure, sir. And this is part of the CapEx program, which we are doing -- so like advance to -- and sir, prepaid -- Okay. And the prepaid would be a small amount, right, in that other noncurrent?

Tushar Dalal

executive
#53

It's a very small amount.

Unknown Analyst

analyst
#54

Major is capital advance?

Tushar Dalal

executive
#55

Yes, yes major is INR 883.50 is the capital advances. And to some of the creditors also that we are getting some advanced to get the material on time. It is also INR 100 lakhs. And the some security deposits are there to the extent of the INR 75 lakhs. That you have you to give it to the -- some of the statuary bodies.

Unknown Analyst

analyst
#56

Yes, sir. So sir, like we are still in the process of CapEx going forward. So can we assume the percentage that percentage of noncurrent assets to the total asset would remain the same going forward also about something over 6%?

Tushar Dalal

executive
#57

It may come down, noncurrent asset may come down because we might be utilizing over some of our fixed depostis, which we are part in the financial institutions. It may come down to some extent.

Unknown Analyst

analyst
#58

What I meant is like the capital advance which we have given? If we would like to model it for next year, it would be in the same range? That is the percentage of total assets?

Tushar Dalal

executive
#59

It should be. But then everything depends upon how far that we take on this particular payment to the parties to get the materials, to get our machineries and equity.

Sachin Patel

executive
#60

I think it really depends upon as we move along the projects, which are the vendors which would require advances and which are the vendors that should not require advances for procurement.

Unknown Analyst

analyst
#61

Okay. So just for modeling purpose, can we take the ratio of noncurrent asset to total asset in that similar range, which is for this year? Around 6% for FY '24, for modeling?

Rajneesh Anand

executive
#62

So we have not worked out the balance sheet for the whole year, but we should.

Operator

operator
#63

Our next question comes from Saloni with Molecule Ventures PMS.

Unknown Analyst

analyst
#64

My first question is regarding the tender path. So I wanted to understand the nature of the standard really, how often will we come across this because since we have shifted our business model to manufacturing, we hardly have seen these kind of delays happening on the business side. So I just wanted to -- wanted you to describe more about it?

Sachin Patel

executive
#65

So these are global tenders for tuberculosis, which come in and the biggest one is the global fund. And once these tenders open up, usually the supply on practice for 2 years, it's not a bit more. And depending upon when the last tender has opened up, what is the inventory, what is the requirement? And how much time the authority take in terms of processing it. There would be delays from a quarter or 2 quarters that we have seen. As I mentioned during my brief, this now started opening up. Global Funds has started opening up, which means that the requirements should be steady over the next couple of years.

Unknown Analyst

analyst
#66

Okay. Next question is regarding the CapEx part. So you mentioned you capitalized INR 16 crores, 2 WIP INR 20 crores and 10 crores, you can call it. So the crores you have already spent, right?

Sachin Patel

executive
#67

I will ask, again, Mr. Rajneesh.

Rajneesh Anand

executive
#68

Yes, yes, that's right.

Unknown Analyst

analyst
#69

Okay. So how much more CapEx are we expecting to spend till September '23? The remaining out of it, right? So INR 30 crores, we'll be still till september '23?

Rajneesh Anand

executive
#70

Yes. I think we will spend another INR 30 crores or INR 40 crores by that time.

Unknown Analyst

analyst
#71

Okay. Okay. Sir, can you tell me the current capacity utilisation? could last for a...

Sachin Patel

executive
#72

Your voice is -- that voice is breaking, can you...

Unknown Analyst

analyst
#73

Can you -- is it clear now?

Sachin Patel

executive
#74

yes, yes. Let's give it a try.

Unknown Analyst

analyst
#75

Okay. The current capacity utilization of Rifa-S and Rifa-O?

Rajneesh Anand

executive
#76

We are running the plant at full capacity right now. And whatever surplus production is there, is in inventory, and we are hopeful of liquidating the same in the near future, once the tenders open up, I think everything will be sold out.

Unknown Analyst

analyst
#77

Okay. Sir, so what is the time line that you are expecting for these tenders to open up?

Sachin Patel

executive
#78

They have started opening up. Now it will depend upon what is the supply chain inventory at various of our customers, how the thing stands. But as Mr. Anand said, we will not be able to tell you whether it's this month or next month. But this we opened up now, which means that the inventory is inventory build up that we had because as I mentioned again, we did not close down our facility this year as we did for the last few years for 2 months, which means that we have stocks in our warehouse, which are ready for dispatch, and those dispatches are happening and will keep on happening as months go by.

Unknown Analyst

analyst
#79

Okay. Also, my last question is regarding our growth estimates that we had already given in the last 25% to 30% that we were expecting after the API blocks comes in the picture. So are we sticking to that?

Sachin Patel

executive
#80

So you have seen that -- you're talking about probably 80% capacity utilization. So the previous year, we had about 70%, 75% capacity utilization, this time is higher. I'm talking now in terms of sale. In terms of the production, it's in 100% capacity utilization. So one would expect that if this year, we have higher capacity utilization only on the fermentation part, we should have both growth on the top line and the bottom line. The API block once it becomes it's commissioned and we start manufacturing, which will take some time because we are starting the API block in September. And then we will start validation backs. We will have to go through stability. So there's a new process involved in that. So I think realistically speaking, one can expect the API block to start giving us both top line and bottom line in the next financial year or perhaps in the -- a little bit in the -- towards the end of this financial year.

Operator

operator
#81

Our next question comes from Tarun Sancheti with Sanchay Capital.

Unknown Analyst

analyst
#82

Well, congratulations for a good set of numbers. First question I have is based on some of the research reports and information available on the public domain, et cetera. It looks like that WHO and also some of the funding agency, et cetera, have adopted to a medication regime change where in they are preferring 3HP rifapentine based treatment as compared to the current prevailing Rifampicin based or treatment regime. So any perspective on that one? How big that could be, if not in the near term, at least in the medium to long term?

Sachin Patel

executive
#83

So there are two aspects to this. One is the WHO recommendation for move from Rifampicin to rifapentine is a very recent, very recent development. I think happens during the course of last year. I think WHO will also go cautiously because they need to figure out on a larger population side, how Rifapentine is actually affected. But let's put it this way. We consider a scenario where Rifapentine is going to be the main stage instead of Rifampicin tomorrow. It should really affect us very positively, if I may say so because the dose. So first of all, Rifa-S that we currently supply to manufacture Rifampicin is the same intermediate that is required to manufacture the Rifapentine. So that's a good part. The second, this is that the amount of Rifapentine, which needs to be given as per the new WHO treatment is quite significant. So albeit it is for a shorter period of time. So it's 4 months instead of the 6 month therapy with Rifampicin. The amount of Rifapentine which needs to be given in terms of grants is quite high. Coupled with that, the ratio of conversion of Rifa-S to Rifapentine is lower than that of Rifampicin, which means you need more Rifa-S to make that amount of Rifapentine vis-a-vis Rifampicin. So both the factors in summary. One, you need more Rifapentine. And the second is the amount of Rifa-S that you need to manufacture Rifapentine is higher than that the manufacturer Rifampicin. Both of them are very, very positive outlook from Rifa-S manufacturer perspective. And of course, not to lose sight of the fact that we are coming out of the API block. So we also are very much planned to manufacture Rifapentine at GTBL.

Unknown Analyst

analyst
#84

That's very encouraging. Another follow-up question to that would be that, is it right to conclude that we'll have to go through some environment clearance or regulatory approval, et cetera, before we really go into the Rifapentine? Essentially, I'm trying to understand if we really decide to go towards that. How much of a lead time it would take?

Sachin Patel

executive
#85

So I would put it this way that certain regulatory requirements would definitely required -- will have to be put into place. And hence, I said that realistically speaking, we can expect Rifapentine business to start in the next financial year, or the API business will start in the next financial year or end of this financial year because we would -- our APIs will be ready in September, which means we start taking validation. It will take a month, 2 months to take validation from which we need 6 months stability, after which we can move to the regulatory authorities and get approval for the particular API. And the good news again is that there is a market locally for this, because as in line with WHO, even the Indian government is moving from Rifampicin to Rifapentine. Now, how much? We don't know. We have to wait and see. But, we believe that there is going to be a reasonably good requirement for Rifapentine in years to come.

Unknown Analyst

analyst
#86

Just last question related to this topic. How this is going to impact our customers today? Say, predominantly there are 2 clear who -- who are very significant on Rifapentine treatment will there be any change in customer mix or the contribution of customer mix, if at all we move to Rifapentine?

Sachin Patel

executive
#87

So there are two aspects. Rifapentine in no way affects Rifaximin. So the Rifa-O business remains as it is, there is no impact that one gets from there. With regards to Rifa-S, whether it is Rifampicin or Rifapentine, as I said, both the products need Rifa-S. And whatever we plan, whether it is in terms of Rifaximin or Rifa-O, Rifa-S, Rifapentine, Rifampicin, it will all be in cooperation with our current customer base, because I think we have a relationship which is built over for a significant period of time, and it has worked well for us. We hope it has worked well for them also. So I think there will be things that we will do, but only in consultation and cooperation with our customers.

Unknown Analyst

analyst
#88

Sure. That's very helpful. And last question, and I can come back to the queue again. One of the high-value APIs that you all get towards. I do understand you may not really give a directional view as to what therapeutical area etcetera it is going to be. But is it still going to be a B2G kind of business arrangement or is it going to be able to be or B2B?

Sachin Patel

executive
#89

Sorry, B2G? what is B2G?

Unknown Analyst

analyst
#90

There is also government or tender agencies, et cetera. So the end out will be towards tender or it would be a commercial product?

Sachin Patel

executive
#91

No, It will be so much product. I think tuberculosis is where globally all the countries have come together and said that it will be countries that controls this particular disease treatment and not private enterprises. But the other areas that we are working in will most certainly not be in the tender area.

Operator

operator
#92

Our next question comes from Rikin Shah with Omkara Capital.

Unknown Analyst

analyst
#93

So can we please reiterate on some of the time lines for the CapEx?

Sachin Patel

executive
#94

On some of the time lines?

Unknown Analyst

analyst
#95

Yes. When the API block comes in, then the fermentation block can come in?

Sachin Patel

executive
#96

Okay. So I had mentioned this in my talk and also I think Rajneesh Anand threw some light on it , but I'll repeat. Our API block, our R&D center and all the things which are required to support these two cases, these two initiatives come into effect in September of this year. And our fermentation block, we expect will be up and running by the end of next calendar year.

Unknown Analyst

analyst
#97

Okay. So is there any impact in the recent time from the supply side that we have faced? Has the supply side has changed in the existing products?

Sachin Patel

executive
#98

Not really, but Mr. Rajneesh Anand can comment if indeed, there has been any change in our suppliers.

Rajneesh Anand

executive
#99

No, no. I think we have got very smoothly -- we have actually multiple vendors for every product. So we don't have any such issues.

Unknown Analyst

analyst
#100

So I mean that for Rifamycin-S and Rifamycin-O are we seeing new supplies sort of coming in or any pricing correction that we might have faced?

Sachin Patel

executive
#101

No, we haven't.

Rajneesh Anand

executive
#102

Prices do fluctuate many of the inputs are seasonal. They are seasonal products. So their prices do fluctuate from time to time, but not very major fluctuations. So this is normal. We face this kind of fluctuation every year.

Sachin Patel

executive
#103

Rikin, I think your question was with regards to the -- if there are any other producers of this particular product, right?

Unknown Analyst

analyst
#104

Like a lot of chemical and pharmaceutical products have seen impact from Chinese flooding in the recent time. So, trying to get this, we are also seeing something like that?

Rajneesh Anand

executive
#105

All our inputs as of today are domestically available. We are not going to China for anything.

Unknown Analyst

analyst
#106

No, I'm saying they might be dumping. Is that, something that we are seeing?

Rajneesh Anand

executive
#107

Well, so far as our products are concerned, the prices from China have only gone upwards.

Unknown Analyst

analyst
#108

Okay. And in terms of the new products, our pipeline was earlier, we were just in two products and perhaps six more in the R&D. So can we have an understanding of what stages they are in?

Sachin Patel

executive
#109

So in the lab, the work has been done and continues to go on. Really, the next stage will be one cover CGMP pilot is ready, which we are expecting in September, as I mentioned. And that is a critical time line that we are also working towards because that is when not only the API block task, but also from the product which are an R&D, start getting scaled up from where we can do some filing and also supply quantities to our future customers for their respective filing.

Operator

operator
#110

Our next question comes from the line of Keshav Garg from CounterCyclical PMS.

Keshav Garg

analyst
#111

So, I'm trying to understand that last quarter, we mentioned that in FY '24, we'll operate at full percent, at 100% utilization. Which basically maintains 25% to 30% revenue growth Y-on-Y. So are we on track in your judgment to reach a top line of around INR 190 crores to INR 200 crores in FY '24?

Sachin Patel

executive
#112

So, I think that will involve us speculating in terms of what the pricing model is going to be like and a lot of other things. I think, what we can tell you is on the basis of what we see right now. We don't see the need of stopping our facility in the foreseeable future. We did not stop our facility last year as we traditionally have done for the last 2 years for 2 months. We did not lose that because we saw -- or we anticipated demand. And right as we speak, we don't see any reason to change that decision in the near future. And if we do happen to take that decision, we will most definitely keep everyone informed.

Keshav Garg

analyst
#113

So are we already operating at 100% utilization?

Sachin Patel

executive
#114

In terms of production? Yes.

Keshav Garg

analyst
#115

Okay. And sir, I also wanted to understand that if we see our other expenses for this quarter, fourth quarter, sir, it is INR 1.86 crores versus INR 4.15 crores quarter-on-quarter. So what has led to other expenses happening quarter-on-quarter even though the top line is the same?

Sachin Patel

executive
#116

We had in the quarter where the expense was high, we had a couple of expenses on the R&D side, which are not expected to be repeated again and again. So those expenses will come in, in burst, but they will not be constant. And that is why there is there's a reduction in this particular quarter because that particular expense was not there.

Keshav Garg

analyst
#117

And sir, also, we did a peak quarterly revenue of around INR 48 crores in the second quarter of last year. So like you mentioned in your opening comments that now tenders have started opening up. And meanwhile, we have built in inventory also from the past 2 quarters. So you think in your judgment, sir, when can we surpass the top line of around INR 48 crores that we did in last quarter -- in second quarter of last year? You think in first or second quarter of this financial year, we'll be able to surpass this?

Sachin Patel

executive
#118

Let's see how it goes. We all work towards maximizing sales and profit and making sure that our production is as efficient as possible.

Keshav Garg

analyst
#119

Sure, sir. And sir, just lastly, sir, how close are we to commercialize the one API that we were expecting by March or April 2024. Are we on track to reach that goal?

Sachin Patel

executive
#120

So as I mentioned, our API block will be operational in September, the is start validation. So it may not be March, but it would certainly be Q1 of next year.

Operator

operator
#121

Our next question comes from the line of Debjoy Bhowmick. An investor.

Debjoy Bhowmick

shareholder
#122

Sir, I just wanted to know that how much will be the expected top line growth this year?

Sachin Patel

executive
#123

As I mentioned in as I mentioned on the previous question also, I think that was really speculating in terms of where we are going from here, and that is not something that we've been doing traditionally and even now.

Debjoy Bhowmick

shareholder
#124

And are you focusing on domestic market or international market? The main focus of the market.

Sachin Patel

executive
#125

Currently, our business is all domestic. And our partners would then be selling it in other markets because we are selling intermediate so we will be converting and selling the finished API into multiple markets.

Operator

operator
#126

[Operator Instructions] Our next question comes from the line of Keshav from RakSan Investors.

Unknown Analyst

analyst
#127

Sir, in your opening address, did I hear is right that we intend to get into innovative molecules going forward?

Sachin Patel

executive
#128

No, we did not -- I did not mention innovative molecules.

Operator

operator
#129

Our next question comes from [ Gunpal Chaudhary ] an Investor.

Unknown Shareholder

shareholder
#130

Actually, I want to understand the INR 24-odd crores of investment. So in which areas you have invested amount and what type of asset turnover we can expect from that?

Sachin Patel

executive
#131

I'll hand it over to Mr. Rajneesh Anand to answer the question.

Rajneesh Anand

executive
#132

You see the investment that has happened until now. We have built a new warehouse. This is a GMP warehouse and this was a prerequisite for us to do future business in the regulated markets. So as such, this is not going to contribute directly into any increase in turnover. But over a period, when we implement all the other projects, this would be an essential paraphernalia essential infrastructure requirement there.

Unknown Shareholder

shareholder
#133

Right. Understood. And second, sir, we are operating at 100% efficiency. So I was taking year-on-year employee cost. So it has not moved much. But the revenue has increased around 30%. So any comment on that? Are we using more automization?

Rajneesh Anand

executive
#134

Not automization. But as we explained in the previous years, we had to take shutdowns to upgrade the plant and to do renovation work in the plant. Because fermentation plant, it's working around the clock. It doesn't have any holidays. It's a microbiological process. Once we start, we had to run through the year. And in this year under discussion, we have not taken the shutdown. So that is one of the -- that means we had excess production and also we had excess revenue and excess sales.

Operator

operator
#135

Our next question comes from Ankit Gupta with Bamboo Capital.

Unknown Analyst

analyst
#136

Sir, can you please provide us any update on the new products, which we are developing, any progress on that? They will come to know about the status only post, completion of the new CapEx?

Sachin Patel

executive
#137

No, we will come out to the products that we are launching when we are launching it. We will not discuss the product list.

Unknown Analyst

analyst
#138

But. Right, I think 6 products we were developing. So any update on like how confident you are for commercializing all of the 6 molecules or some of them are expected to not commercialize also?

Sachin Patel

executive
#139

So we are making reasonable progress in terms of developing these products. We feel in terms -- from a commercial perspective, I think we have selected the products reasonably well. But we have to take this with a bit of caution because we are still at the lab and fermentation is a tough cookie. We need to move to the next page, which we will be able to only after September once our pilot facilities are ready and then subsequently on the commercial side. So it is a step-by-step process. And it's not straightforward. The only thing I can say is that we have the and an experienced team with the prerequisite knowledge to be able to do that. But I don't think in science, I would give a guarantee that everything will work out the way we wanted.

Unknown Analyst

analyst
#140

Sure, sir. And just, let's say, a product is successful on the pilot phase. Can we expect that most probably, it will also be successful at the commercial stage? But there are failures commercial stage after successful pilot stage also.

Sachin Patel

executive
#141

It is possible. It is possible that scale up from pilot to fermentation is tricky. But as I said, we have dealt with multiple products in the past. Our team has dealt with multiple products in the past. And we are confident enough, let me put it this way, to invest in this whole project. So that's -- I think that should give us kind of an indication of what is our confidence level.

Operator

operator
#142

Our next question comes from the line of [ Naitik Mohata ] with Sequent Investments.

Unknown Analyst

analyst
#143

Congratulations on a good set of numbers. I have just a couple of questions on adding on to the plant shutdown that we haven't taken this year. So are we obligated to take a shutdown or a maintenance shutdown in next quarter or next year, probably for the fermentation plant?

Sachin Patel

executive
#144

Rajneesh Anand, can answer this question.

Rajneesh Anand

executive
#145

Yes I don't think so. I think the plant is in very good health. And the shutdown which we took in the last 2 years, we had taken practically after 7 years. We split our work in 2 parts, and then we finished it in 2 years. So in my view, we will continue to produce through the next year.

Unknown Analyst

analyst
#146

Okay. Also on this CapEx front, so the API block that we are coming up with and also the fermentation capacity. So I understand that it will take time to ramp up these capacities. But at probably at peak capacity utilization, what are the kind of asset terms we are expecting from these units?

Sachin Patel

executive
#147

Hard to give numbers at least at this particular stage. I think as we go through a few quarters, we have our -- these pilot facilities in place, and we have done some trials, we'll be able to give better numbers, simply because there will be some numbers -- will be some products which are very high value, but low in terms of volume but high in terms of DCs. And some would be on very low value. But again, the DCs would be would be low. So it's a mix and match and hence, we are more looking at in terms of how quickly can we get the ROI rather than asset turnover.

Operator

operator
#148

Our next question comes from the line of Tarun Sancheti with Sanchay Capital.

Unknown Analyst

analyst
#149

One follow-up question related to the API block. I think last quarter, you mentioned that this was suppose to come online by Q2. Any color as to why the delay is?

Tushar Dalal

executive
#150

Hello. I can't hear properly. I'm sorry, can you repeat?

Sachin Patel

executive
#151

The question was essentially related to the delay in the API block by a quarter.

Tushar Dalal

executive
#152

Yes. So basically -- yes, so this kind of fluctuations can happen when you are doing such a big project. Sometimes we come up with intricacies, and we have to do some modifications and additions as we go along. So this was because of the delay. And plus at a little later date, we decided to put up a pilot inside the same block, one floor level. So that is how this delay in one quarter happened.

Sachin Patel

executive
#153

I think I would say that as a primary reason. We -- our project was going on reasonably well. If we were matching up with all the time lines. But within the project, we decided to make some modifications because we felt that they would be important for the long-term future of our business. And those modifications essentially led to the delay of a quarter or so, which, in a way, we expected when we decided on this particular call, but we still felt it would be -- it will be worthwhile the delay, considering the capabilities that now we would have in this particular block. It could be that flexibility.

Unknown Analyst

analyst
#154

That's very helpful. Another question to this will be, we do understand that right from, say, completion of the CapEx there would be an exhibit batch, there will be standardization, et cetera. So right how CapEx till utilization, how much of a time do you anticipate complete?

Sachin Patel

executive
#155

So I would put it this way that it will be product by product, but if our CapEx is getting over for the drop in September, one can consider 2 months max of 3 because it's a new infrastructure to be the exited backend from there, we have to wait for 6 months profitability to get completed before we can start selling this particular product in the domestic market.

Unknown Analyst

analyst
#156

Probably we are talking about June or July of next year.

Sachin Patel

executive
#157

That's right.

Operator

operator
#158

Our next question comes from the line of Yogesh Tiwari with Arihant Capital.

Unknown Analyst

analyst
#159

Sir, just one question. When I look at the balance sheet, under current assets, we have bank balance, we had bank balance of INR 12 crores last year. And others, we have of INR 11 crores. So INR 11 crores has declined to about INR 90 lakhs and INR 12 crores to about INR 3 crores. So just to understand both our bank deposits with less than 12 months. So what would be the difference between the 2 line items? What -- is there any policy of the company with regards to the bank balance and others?

Sachin Patel

executive
#160

Tushar?

Tushar Dalal

executive
#161

Yes. Last year, the deposits which are maturing less than 12 months was shown under the current assets. Now this time, now whenever the renewals have taken place, we have renewed it for more than 12 months or a year. And that is why it has moved from current assets to the noncurrent assets.

Unknown Analyst

analyst
#162

Yes, sir, actually, my question was regarding the current asset itself. So if I look at bank balance, last year was towards INR 12 crores, and there's a just component of INR 11 crores. Now if I get into schedules, both the [indiscernible] -- I'm talking about last year.

Tushar Dalal

executive
#163

So you are talking about the bank balance?

Unknown Analyst

analyst
#164

Bank balance and the other components. Yes. So other is about INR 11 crores, which has declined to about INR 90 lakhs now. And bank balance has declined from INR 12 crores to INR 3 crores. What I understand is both bank balance and the other components. Both are bank securities, the bank deposit with less than 12 months. So what would be the difference between the 2 line item? I mean, both are the same component, or is there any company policy while taking bank balance, there's something else and other something because both are at the end of day, bank deposit of less 12 months maturity.

Tushar Dalal

executive
#165

Yes. So whatever has been shown under the bank balance. So the INR 11 crores or INR 12 crores has come down to INR 93 crores as the bank balance and the bank deposits which are less than 12 months. [indiscernible] from the UBI to the where we get a higher rate of interest.

Unknown Analyst

analyst
#166

Yes. So sir, what I understand like others and bank balance, both would be less than 12 months, correct?

Tushar Dalal

executive
#167

Yes. On the current assets, we just come from INR 11 crores to INR 12 crores to INR 90 lakhs out of that of the INR 10 crores have moved from current to the non-current one.

Unknown Analyst

analyst
#168

Okay. I just wanted to understand what is the difference. So what is -- what would be the difference between others and bank balance because both are less than 12 months of maturity. So what would be the difference between the 2 line items? That would be my question, actually.

Tushar Dalal

executive
#169

Now let me tell you. The bank balances are always with the Union Bank of India. That is a bit of a with the bankers only. And as of other INR 10 crores is concerned, that is with the HDFC Bank and all other the finance and institutions. That is why that we are showing it separately. That is the financial assets.

Unknown Analyst

analyst
#170

Got it. So bank balance would be mainly with your main bank accounts were in and others would be like with the others you are investing, right?

Tushar Dalal

executive
#171

Yes, yes. It is with the financial institutions.

Operator

operator
#172

Thank you. As there are no further questions, I now hand the conference over to Dr. Patel for closing comments.

Sachin Patel

executive
#173

Thank you. Thank you. So finally, I would like to thank the entire team of GTBL for their untiring efforts, hard work and dedication, which drives the company forward to various market conditions. Also, I appreciate all of you for participating in our conference call. Please do get in touch with our Investor Relations team for any further questions that you may have. Thanks, and good afternoon. Good morning.

Operator

operator
#174

Thank you. On behalf of Gujarat Themis Biosyn Limited, that concludes this conference. Thank you for joining us, and you may now disconnect your lines.

Rajneesh Anand

executive
#175

Thank you very much.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Gujarat Themis Biosyn Limited transcript — plus 256,000+ transcripts from 12,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Gujarat Themis Biosyn Limited earnings transcripts and 256,000+ others is available through the EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Gujarat Themis Biosyn Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.