Thanks a lot, and good afternoon to all of you. I appreciate everyone for being on Ideal Power's call for the third quarter of 2020. Joining me are Dan Brdar, our President and Chief Executive Officer, along with Tim Burns, our Chief Financial Officer. The press release for Ideal Power's second quarter of 2020 can be found on the company's site, idealpower.com. Prior to starting, I want to remind all of you that remarks given during this call and webcast, which include those about upcoming financial results and industry prospects, are forward-looking, and could be impacted by various risks and uncertainties that might lead actual results to differ materially from what is discussed here. For a list of related risks, please look at the company's SEC filings, and we'd also direct you to the company's website for additional supporting industry information. At this point I'll hand the call over to Ideal Power's President and CEO, Dan Brdar. Dan?

Dan Brdar

executive
#2

Thanks, Carolyn. Hello, everybody, and good afternoon. You're all welcome to the conference call for our third quarter of 2020. First, I'll provide an update regarding how things stand with the program sponsored by the U.S. Navy, along with what we've achieved under our B-TRAN commercialization strategy, and then I'll outline where we're concentrating for the rest of 2020. After that, Tim Burns, who serves as our CFO, will walk you through the financial figures. Our efforts alongside the United States Naval Sea Systems Command, known as NAVSEA, through the partnership we have with diversified technologies, remain on schedule as they progress. The program's first major milestone was just finished by us. Wafers from the initial fabrication run, which Teledyne carried out, have arrived, and testing is underway right now so we can figure out which die will be put into packages as B-TRAN devices. Results from the analysis and device simulation efforts we've been doing to refine the device design are built into this first wafer fabrication run under the program. To remind everyone about this program: during the second quarter, we signed a contract worth $1.2 million to work with diversified technologies on developing and demonstrating a direct current circuit breaker enabled by B-TRAN, which forms part of the U.S. Navy's strategic focus on electrifying ships. Funding for the contract comes from the Department of Defense's Rapid Innovation Fund, whose purpose is speeding commercialization of high value, high impact technologies for NAVSEA. The aim of the project is to demonstrate a B-TRAN-enabled, high efficiency, 12 kilowatt medium voltage direct current circuit breaker for the U.S. Navy, with the follow-on objective of bringing out a family of meaningful DC circuit breaker products that incorporate B-TRAN for sale into military and industrial markets. Within the Navy, this initiative carries high priority, since electrifying ships can greatly improve energy efficiency for ship operations while also boosting operational flexibility and lowering operating costs. When power is distributed on ships, they become less vulnerable to attack because the noise signature drops and stealth capabilities improve. Moreover, compared with continuously conducting semiconductor devices like IGBTs, B-TRAN technology delivers substantial reductions in size, heat and loss, and it does so without relying on complex, large and heavy liquid cooling systems. Once wafer testing concludes, the following step involves dicing into dies and then packaging B-TRAN die so they can undergo testing and characterization. For dies coming from the initial wafer run, which is now entirely complete, our current lab based packaging design will be used. Findings from this testing were fed into device design and manufacturing process improvements for later rounds. Across the two-year program, a total of five rounds spread over six quarters have been planned, with the goal of optimized device delivery in late 2021, followed by the final demonstration of a 12 kilovolt MVDC breaker in early 2022. Deploying multiple wafer fabrication rounds within the program serves to evaluate the trade-offs between maximum theoretical device performance and how manufacturable it is. Whenever we modify the design to boost performance, the device yield from a given wafer fabrication round can suffer as a result. With each round we go through, we expect both device performance and device wafer yield to rise as we move closer to a design optimized for performance and manufacturability. The next big milestone in the NAVSEA program involves finishing the upcoming fabrication at Teledyne; work on that should start soon and wrap up during 2021's first quarter. In addition, as part of NAVSEA, we are working alongside the Microelectronics Research Center at the University of Texas at Austin on a fresh packaging design. That design will be applied to die coming from later wafer rounds in the program. Compared with the lab based packaging used before and still being used for wafer round one, the new one is an improvement. Its purpose is to supply the electrical connections, form factors and thermal management needed for putting the semiconductor device into an end-user product design. Under the new approach, the B-TRAN die gets encapsulated in a package resembling what is typically on the market for commercial IGBTs. To make B-TRAN adoption easier, we aim with this design to deliver a packaged device physically comparable to ones usually seen in the IGBT market. UT Austin has finished its first version of the package design and prototypes are in production; we are also working with packaging assembly companies to gather their input on whether the design suits high volume manufacturing. Input from those assembly firms, plus results from the first build using the new design, will be folded into the final packaging design that the NAVSEA program will deliver. Beyond that, we built a new high power test rig that lets packaged B-TRAN devices undergo testing under high voltage, high current conditions, which is part of the device characterization NAVSEA calls for. With this rig, we can test and characterize package parts, produce the conduction and switching data required for a product datasheet, and verify the performance margins designed in. On the whole, NAVSEA remains on schedule, and we have been through several project reviews that drew favorable responses. The progress under this program, and the good effect it is already having on our validation and commercialization work, has us quite excited. In the third quarter, we likewise advanced considerably toward being ready to start engineering prototype sampling. As we told you on the previous call, we are additionally teaming up with the University of Texas at Austin's Microelectronic Research Center to create a new B-TRAN driver. An initial version of that driver has now been designed and fabricated. Because B-TRAN is a double sided device, it calls for an enormous driver specially built to control and coordinate how both sides operate at the same time. A gifted post-doc designed the new driver, working under the tight oversight of Dr. Alex Huang, who heads the Microelectronic Research Center and is a globally recognized authority on power semiconductor devices and power electronics. This first driver is going to work together with the high power test rig we've just brought in, so we can produce the information required for a datasheet that prospective end-users need, covering characterization as well as devices. After our testing wraps up within the coming weeks, the University of Texas is going to build a second iteration of the driver, drawing on what we tell them; they are going to strip out certain features that existed only to support our debugging, and they will also modify things to shrink the driver's physical dimensions while adding extra operating capabilities into its programming. The packaging design for the device we developed for NAVSEA, which I mentioned to you before, is likewise going to serve our engineering sampling program, and when combined with a packaged B-TRAN plus a purpose-built driver, it speeds up how readily and willingly potential end-users can evaluate the technologies, since the obstacle of driver development gets eliminated. Once a packaged device, complete with a driver and a datasheet, is in our hands, we are able to start building greater awareness of B-TRAN among the technical community as well as growing interest in the sampling program. Multiple inquiries have come in from potential customers who want to join the sampling program, and for a large number of them, supplying a datasheet is the following step in that process.

Dan Brdar

executive
#3

By providing samples to end-users and gathering their feedback on the device, as well as on the driver design, its features, and what matters most, we'll be able to determine the requirements across target applications that commercial B-TRAN enabled devices would likely meet. Then we can incorporate that feature set into an intelligent module design. Now let's look at the current state of the B-TRAN patent portfolio. As of now, 57 B-TRAN patents have been granted to us, an increase of one from the previous quarter, with 21 of those issued outside the United States, up from 20, and an additional 25 patents are pending. Our geographic reach includes North America, China, Japan, and Europe, and we could expand into South Korea and India as well. Over the remainder of this year, our focus may be on two parallel tracks under Phase 2 of the commercialization strategy we're executing. The first track is a full-scale demonstration of an application in which B-TRAN acts as the enabling technology for NAVSEA. The second track involves getting our engineering sampling program up and running. Thanks to our partnership with diversified technologies, Ideal Power has a potentially catalytic opportunity of significant size, and we're continuing to quantify how B-TRAN power semiconductor technology performs relative to conventional power switches — better efficiency, less cooling required, fewer components, and a smaller footprint. This could really transform how DC networks are built across a wide range of military, industrial, and utility uses — including transmission and distribution systems that operate at medium to high voltage, micro grids, and power generation connected to solar and wind renewables. What the NAVSEA program does is more than give a boost to our efforts to commercialize both military and non-military products. It also raises our profile among other military and government buyers, who are typically quick to embrace new technology and who cover a significant portion of development expenses as well as the steps needed to bring products to market. From there, we shift into Phase 3, the commercialization stage, where the focus is on forming strategic development and commercial partnerships, generating commercial momentum, and preparing the groundwork for B-TRAN revenue streams down the road. Our initial commercial push is going to focus on the IGBT market, which sits at $5.4 billion. By 2025, that figure is expected to reach $9.4 billion, driven by data centers, UPS, renewable energy, and EV charging — sectors where technology evaluation and development cycles tend to be shorter, and where power switching demands are immediate. As we move from Phase 2 into Phase 3 commercialization, the approach will differ based on which customers and applications we're targeting, since we'll continually bring new prospects and use cases into the engineering sampling program while simultaneously bringing B-TRAN to market in our initial target segments. How long each of these stages takes will differ from one potential client to the next, since even companies pursuing comparable uses tend to move through technology assessment and product design at their own pace when folding new tech into what they sell. A quick word about COVID-19: the partners handling our manufacturing, joint development work, and chip assembly are following safety rules and proven methods very closely — that means masking up, keeping distance from one another, and adhering to the advice we've laid out so our shared workspace stays protected. Thanks to that approach, we've come through the pandemic in good shape and nothing in our supply chain has broken down. We intend to stay watchful, doing everything we can to hold to our schedule for moving toward commercialization while making sure everyone on the team stays healthy. Everyone here shares the view that Ideal Power's technology could be transformative, thanks to its distinctive bidirectional switching capability and its capacity to address urgent requirements in power electronics involving bidirectionality, reduced switching and conduction losses, cost savings, and better, more compact thermal management. Progress is going quite smoothly; we are reaching our milestones and keeping up strong momentum toward our commercialization objectives, and the results so far have been pleasing, with a differentiated technology that serves a large and expanding market. At this point I'd like to turn the call over to our Chief Financial Officer, Tim Burns, for a look at the quarter. Tim?

Tim Burns

executive
#4

Thanks, Dan. I'll go over our financial results for the third quarter of 2020. During that quarter, we booked roughly $150,000 in grant revenue, along with offsetting costs tied to that grant revenue, as we carried on with the NAVSEA program that got underway in late June. Operating expenses for the third quarter of 2020 came in at $1.2 million, versus $0.7 million for the third quarter of 2019. The rise in operating expenses during the quarter stemmed from greater research and development spending tied to B-TRAN wafer fabrication and driver development, plus higher general and administrative expenses from hire bonus expense, since certain performance objectives were met during the quarter, and from hire non-cash and stock compensation expense. As we talked about last quarter in August, we closed an early warrant exercise transaction with certain of the company's Series A warrant holders, bringing in $2.5 million in net proceeds. As part of that deal, we issued 705,688 Series C warrants to these warrant holders at an exercise price of $8.90 as an inducement. The estimated fair value of these Series C warrants, $3.7 million, was recorded within other expenses as non-cash warrant inducement expense on our income statement. Leaving out warrant inducement expense, our net loss for the third quarter of 2020 was $1.2 million, versus $0.8 million for the third quarter of 2019, driven by higher operating expenses. Cash used in operating activities in the third quarter of 2020 was $0.8 million, a bit above the cash used in operating activities in both the second quarter of this year and the third quarter of 2019, because of the timing of cash outflows. We will see quarter-over-quarter variability in cash used in operating activities, but we aim to hold our quarterly cash burn inside our parameters, even in quarters when expenses are higher on an accrual basis. During the nine months ended September 30, 2020, we brought in $2.5 million of net proceeds from the early warrant exercise transaction, plus an additional $0.5 million from other warrant exercises; these inflows bolster our cash position. We were putting the net proceeds to work funding B-TRAN commercialization and development, as well as for working capital and other corporate purposes. Cash and cash equivalents came to $3.8 million as of September 30, 2020. Our debt outstanding stayed at $0.1 million, the same as in the second quarter, when we received the Paycheck Protection Program loan to temporarily subsidize payroll and facilities costs amid the business landscape impacted by the COVID-19 pandemic. Our present expectation is that this loan will be forgiven, although we cannot provide assurance that forgiveness of the loan will be granted in whole or in part. We will apply for forgiveness as soon as our bank, BBVA, activates their loan forgiveness portal. We remain singularly focused on developing and commercializing our B-TRAN technology and are well-positioned, with a strengthened balance sheet and an asset wide operating model. Our cash burn rate remains approximately $0.75 million in cash per quarter, subject to both the timing of the variability and expenditures and refinements to the B-TRAN development and commercialization plan. We're ready now to take questions from participants. Operator, please go ahead.

Jim McIlree

analyst
#5

Thank you very much, and good afternoon. Dan, during the remarks you prepared, you mentioned pursuing additional government customers, so what I want to know is this: must we finish the NAVSEA program, or at least reach its later stages, before the in-house capabilities exist to do that? Or is it necessary to show government clients generally, through NAVSEA, that the technology works? I'm simply attempting to figure out what must occur prior to chasing other government customers, and whether that ties back, once more, to NAVSEA succeeding?

Dan Brdar

executive
#6

Yes. On the NAVSEA matter, that program definitely provides us with exposure and trustworthiness, given that we were placed into the Rapid Innovation Fund. There's — a number of steps are required on our part for that. Thus it assists us regarding how we're perceived as something headed toward commercialization, particularly as we examine other areas of DoD. Yet nothing major within that NAVSEA program actually needs to be finished by us in order to seek out additional possibilities. As a matter of fact, conversations have been underway with certain other firms regarding different uses we may wish to collaborate on. So we see those as activities capable of happening simultaneously. The team as such does not need substantial expansion; based on which opportunity we pursue, we would continue depending on Teledyne's resources. We would depend on whichever technical partners we team with for a given application, so no large resource requirement is created on our side. Hence what we truly aim for is to start capitalizing on that to secure further opportunities inside either DoE or DoD, since this technology is now regarded as genuinely prepared for commercialization. And provided we can concentrate on certain application-specific items, especially those tied to renewable energy or things like vehicles, I believe we can put together rather strong proposals and team up with — and form partnerships with certain other firms.

Jim McIlree

analyst
#7

Thinking about what’s coming up on the government side, when would it be fair to expect those proposals to be released, and at that point you’d need to reply, since my assumption is that bid and proposal work follows some seasonal pattern tied to the government’s fiscal year end?

Dan Brdar

executive
#8

That’s right. Yes. Certain cycles do show up around the first quarter and mid-year, especially when it comes to small business–type applications. Once again, there’s that drive to award things before the fiscal year closes. But our preference is to do what we did with the NAVSEA program, where we never replied to a solicitation. Instead, we examined what some of the requirements were. We zeroed in on the Navy and asked: what are some of the needs in that area? We built — Ideal Power built — the partnership required to bring in the circuit breaker technology. A white paper was put together and handed to the Navy. They were pleased with it, told us to send in a proposal, and provided funding outside a normal solicitation. So our preference is to aim at situations where the B-TRAN’s characteristics let us pitch something genuinely high value and generate the opportunity on our own, instead of sitting around until a solicitation appears.

Jim McIlree

analyst
#9

Understood, understood, excellent, that's useful. And Tim, regarding the fresh warrants that got issued, is there any sort of price protection built into them?

Tim Burns

executive
#10

There isn't. No.

Jim McIlree

analyst
#11

All right. That covers my questions. Many thanks, everyone, and best of luck with all of it.

Dan Brdar

executive
#12

Thank you.

Orin Hirschman

analyst
#13

Hello, how are you doing? Regarding the government contract, what's the status of the cash coming in, how much have you actually received so far, and how much is still to come, and which milestones does this depend on?

Dan Brdar

executive
#14

Essentially, our NAV program operates as cost reimbursement. What I mean is, there are a few slight timing gaps regarding when we issue invoices. We do invoice according to milestones, yet that also lines up quite tightly with those that are on schedule for when the costs are truly being incurred by us. As a result, there's no net gross profit generated by this activity. You might notice a modest AR balance or a modest deferred revenue figure at the close of any particular quarter, but for all practical purposes it functions as cost reimbursement.

Orin Hirschman

analyst
#15

So roughly how long a stretch are we talking about, and what kind of amount, if you're able to share a figure?

Dan Brdar

executive
#16

The contracts come to $1.2 million. Through 9/30, we booked a little more than $150,000. The bulk of it lands in what's likely the opening five quarters of this program. That means Q4 plus the first three to four quarters of next year, rather than stretching across the whole two-year process, since the majority of our effort wraps up and gets transferred over to DTI on the circuit breaker design once our rounds are finished.

Orin Hirschman

analyst
#17

Understood. Regarding timing, when do you expect you'll be able to actually sample those file packet chips to the companies interested in sampling them, and which kinds of companies would be first in line to get samples?

Dan Brdar

executive
#18

Sure. I'd say we're in conversations with quite a range. We've gotten requests from auto manufacturers, from businesses in the renewables sector, from firms working on micro grids and power switching technology. A significant portion of that demand is going to come from them. Since we're rolling out a new driver design along with a new packaging design, certain ones among them will voice a preference for the new driver design specifically — in fact, there are organizations we're sitting down with this week that said they'd like to adopt the new driver design. So what matters most right now is getting the packaged devices back from that initial wafer run. Those should arrive in a few weeks. We'll run some characterization testing on them, then begin working with each company on a firmer schedule regarding the quantity of devices they want, the quantity of drivers they want, and how much support they'll require. So we expect we'll be launching fairly intensive collaboration with particular companies to move this forward.

Orin Hirschman

analyst
#19

All right. Thank you so much.

Analyst

analyst
#20

I appreciate you taking my question. I'm only a retail investor, and it sounds like maybe you already addressed a portion of what I wanted to ask with that final piece. You mentioned a meeting with somebody in roughly the next 7 days regarding design, die packaging? During the earlier portion of this year, in webinars, you both said that ideally, come Q4 of this year, there could be some contracts inked. I'm simply wondering — it appears you keep tweaking your die packages. Was that something the companies asked for, or are you discovering it's somewhat more involved, perhaps, than you assumed back when you spoke earlier in the year? So a bit more detail on that, since it appears earlier that you are…

Dan Brdar

executive
#21

It really comes down to what developing…

Analyst

analyst
#22

…at this point?

Dan Brdar

executive
#23

…component. If you run simulations, say, on how a component is going to behave, what you see is an idealized picture of that component. Then once you build it, no two fabs — no two semiconductor fabrication operations — are identical when it comes to their tools, their processes, and the recipes they apply for any particular step. What happens is reality diverges somewhat from your simulation, so you keep iterating to see how tiny a feature you can produce. My goal is to shrink them so much that suddenly wafer yield falls off a cliff. What you're after, though, is the smallest feature sizes possible, since that lets you achieve the greatest current density in the component. So by nature, this is simply a process of iteration; and in our case especially, because it's a double sided component, we pile on more complexity, since you also have to get good alignment from front to back. But what we've been through with the rounds — the rounds genuinely consume a fair amount of time, and getting through that optimization seems to take a while — yet that's just the normal course of business when developing a new semiconductor component.

Analyst

analyst
#24

So each time a new vendor comes in, do you have to repeat that whole procedure, meaning there’s a ton of optimization involved, or do you eventually reach a die package that virtually anyone is able to work with? How is that going to function?

Dan Brdar

executive
#25

Eventually what you arrive at is a die package that any fab can make great use of. A new fab might need to run through a runner to, depending on some distinct equipment differences that exist between one fab and another, but ultimately you land on a recipe that is able to be read compute.

Analyst

analyst
#26

Okay. All right. Thank you.

Dan Brdar

executive
#27

You’re welcome.

Dan Brdar

executive
#28

I simply want to express my gratitude to all of you for being on today's call; next week we will be presenting at the Craig-Hallum Alpha Select and The Benchmark Discovery Conferences; please join those webcasts. I hope the remainder of your year is enjoyable and that you remain safe, and we can't wait to talk with you once more when we share our fourth quarter results. Thanks to each of you.

Operator

operator
#29

And this concludes today’s call. Thank you for your participation. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Ideal Power Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Ideal Power Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ideal Power Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.