Ideal Power Inc. (IPWR) Earnings Call Transcript & Summary
August 13, 2026
Earnings Call Speaker Segments
Jeff Christensen
executiveThanks, Jenny, and hello everybody on this morning's call. We appreciate you taking part in Ideal Power's Second Quarter 2026 Results Conference Call; joining me are David Somo, our President and Chief Executive Officer, and Tim Burns, our Chief Financial Officer. You can find Ideal Power's second quarter 2026 financial results press release on the company's website, idealpower.com. Prior to getting started, I want to caution all of you that certain remarks made today are forward-looking statements. Any statement during this call that isn't grounded in historical fact counts as a forward-looking statement. Although management has built any forward-looking statements upon its present expectations, the information serving as the basis for those expectations could shift. Such forward-looking statements rest on various assumptions about future events and carry numerous risks, uncertainties, and other factors, a great many of which lie beyond the company's control, that might lead actual results to diverge materially from those statements. For a look at some of the related risks, uncertainties, and other factors, please consult the company's SEC filings. We'd also point you toward Ideal Power's website for additional supporting company information. At this point I'll hand the call over to Ideal Power's President and Chief Executive Officer. David?
David Somo
executiveThanks, Jeff, and I'm glad everyone could join us today. To kick things off, I'll bring you up to speed on where our commercial situation stood as we moved into the second quarter. Tim will then take everyone through the financials, and after our prepared remarks wrap up, we'll gladly answer whatever questions you have. First, let's talk about our lead customer over in Asia. Development work on our low current solid-state circuit breaker, which we call SSCB for short, is nearly finished, and the prototype heads out to that customer before this month ends so their team can run internal testing. Our projection is that this account's B-TRAN equipped SSCB prototypes will be finished for their own clients within the 800-volt AI data center plus energy grid markets around the fourth quarter of 2026, and we also expect to book the initial modest purchase volumes tied to prototype construction during those same three months. Past that first initiative, we are working with this same customer on two more programs, ranked in the order we prioritize them: number one is a medium current SSCB serving 800-volt DC data centers, energy storage, EV charging, and industrial microgrids, and number two is a low current SSCB intended for smart industrial buildings. Regarding that medium current SSCB, technical conversations have already begun. Next, following the letter of intent that was signed in Q2, we proceeded with joint development work with an industry partner on an intelligent SSCB prototype built around B-TRAN, which a U.S. hyperscaler intends to assess as it develops the NVIDIA Rubin Ultra 800-volt DC data center power system. Delivering this prototype by Q4 2026 is our goal. Beyond that, there are intentions to make the prototype available for assessment by other hyperscalers, along with further AI data center operators who implement the NVIDIA Rubin Ultra Power Architecture or similar 800-volt DC AI data center power distribution systems. Come October, Ideal Power's team will be at the Open Compute Project Global Summit alongside our industry partner. At that point, we'll present this intelligent SSCB prototype idea to providers of AI data center and infrastructure, so they can assess it. Also, a second shipment of Gen 2 B-TRAN custom package samples has gone out to Stellantis, along with development kits, for their assessment. Together with this customer, we're collaborating closely on an in-depth examination of the system-level specification for their solid-state contactor, aiming to improve the solution and determine the remaining items to deliver under the purchase order. While this has shifted the timing for finishing the PO deliverables, it has not postponed or in any other way impacted our expectations for the EV contactor opportunity with Stellantis. Everything we've delivered so far backs the upcoming project milestone set for Q4 2026. As we reach agreement with the customer on what's still to come, we'll move quickly to finish those remaining items so later milestones stay on track. Number four: we hit a major operational landmark. We entered a long-term supply deal with a wafer foundry in Asia—outside China—that handles high volumes. Talks with them began in Q1 of this year, and we've now gotten functional first silicon. That fab carries automotive qualification and has produced more than 1 billion power semiconductors. Our foundry can handle large-scale industrial and automotive clients, and the cost structure we've built should let us hit the gross margin targets we're aiming for once we reach scale. Number five: demand keeps building for 800-volt DC architecture support, and it's coming from an expanding pool of prospects — among them top-tier global makers of electromechanical breakers who are now looking for SSCB options. People have been asking me what we're doing to help customers adopt this faster, so let me walk through where we stand. We rolled out a new SSCB reference design kit — an RDK — so customers can evaluate what we've built and move quicker on their own SSCB development. Adoption hinges on this, because firms that historically made electromechanical breakers might lack in-house know-how on solid-state approaches, or they might not have begun work on SSCB products at all; given that 800-volt AI data center power architectures should begin rolling out during next year's second half, those firms require something close to market-ready so they can launch on time. Traction is already showing up — a distribution partner of ours just submitted its initial stocking order for these SSCB RDKs, with delivery expected over the next few weeks, and we've had multiple customers ask for access to the new RDKs. Point six: after bringing on a sales director located in Europe recently, the team attended PCIM in Germany and met with more than 20 potential customers. Some initial business has already resulted from this European sales effort, involving a worldwide automaker whose headquarters are in Europe as well as Tier 1 automotive suppliers. We recently met with the pre-production and production groups at one of those worldwide Tier 1 suppliers, because interest is strong in our solid-state EV contactor and battery disconnect unit offerings. A new engagement has also begun with a circuit protection firm in Europe that is looking at many different applications — among them solid state breakers serving data centers and energy storage, in addition to battery disconnect units for EVs. They're moving quickly to target markets in both the U.S. and Europe. Seventh item: Dr. Sanjai Parthasarathi has become the first person on the advisory board we put together not long ago. He serves as Chief Marketing Officer at Coherent Corporation, which is an important supplier for AI data center infrastructure. Sanjai brings more than 35 years of leadership experience across data centers, optical networking, and related technology sectors — a background that matches the near-term revenue opportunities in front of us. His extensive market knowledge and industry connections give direct backing to our effort to speed up commercialization of solutions that carry high value and high impact. Let me take a moment to discuss the data center market. Whenever someone imagines the AI boom, the first things that come to mind are graphics chips, processors, and servers. Still, the real constraint increasingly comes down to electricity — bringing it into the data center, and then handling its distribution and management once it's on site. The upcoming shift toward 800-volt DC power architectures in AI data centers, along with the energy infrastructure that backs them, is a catalyst pushing up demand for high-voltage power semiconductors. Evidence of this shows in the growing order books throughout the power semiconductor sector, which ought to drive rapid growth over the next several years. In high-voltage DC systems, solid-state circuit breakers play a vital role, because they allow faults to be cleared at very high speed, which keeps reliability intact. When it comes to solid-state circuit protection, B-TRAN offers the best solution, thanks to its inherent bidirectional design, very low conduction losses, fault reaction times in the microsecond range, and a 1,200-volt operating rating — which provides ample safety margin for 800-volt systems. We are only at the start of a long-term structural mega-trend in power semiconductors, creating an exciting opportunity for growth. Now, let me briefly walk through our product reliability testing and qualification plans. One easy way to frame this: qualification for industrial and automotive uses generally mirrors what each end market demands. JEDEC industrial qualification backs our near-term chances in AI data centers, energy storage, and grid infrastructure markets, whereas AEC-Q — that is, automotive qualification — is built for automotive use cases. Because demand keeps speeding up for power semiconductors supporting AI data centers and energy infrastructure, which are our closest revenue prospects, we're putting industrial reliability testing and qualification first; our intent is to kick off the industrial qualification process this quarter and wrap it up in Q4. Automotive reliability testing and qualification will be scheduled so that it lines up with customer timelines.
David Somo
executiveWhat matters most here is that while automotive qualification is usually needed before parts can go into vehicles that are sold, it isn't a prerequisite for pushing product development forward on automotive chances — and that includes the EV contactor chance we have with Stellantis. Because of that, shifting when automotive qualification happens shouldn't have any impact on the sales opportunities we have. The commercial progress we're making can be seen in how big and how strong our sales funnel is: it has reached more than $400 million in total revenue opportunity, which is up from roughly $300 million when we held our call in mid-May. That funnel breaks down at about a 50/50 split, with half coming from automotive and the other half coming from AI data centers combined with other industrial applications, and it spans the globe. The applications are mostly SSCBs along with solid-state EV contactors, and there's rising interest in solid-state transformers as well — all of these fit broadly within circuit protection. Even though a bigger funnel is a good sign, our number one priority is still turning it into design wins, production orders, and revenue. Execution is where our attention is, and we're collaborating closely with customers to get their evaluations, product development, and testing finished so that projects can move along the funnel and become volume production orders and revenue growth. To wrap up, commercial momentum kept growing during this quarter: prototype SSCB units are being completed for internal testing by our lead customer in Asia, we're making headway toward the scheduled evaluation of a co-developed intelligent SSCB prototype for a U.S. hyperscaler, we have a pipeline of engagements that keeps expanding with regional and multinational customers spanning multiple markets, and we've rolled out our new SSCB reference design kit — built to speed up customer adoption — and received its first stocking order. On top of that, we hit a significant operational milestone by signing a long-term supply agreement with a foundry that is automotive-qualified and high-volume, and we anticipate this partner will be cost-effective for us for many years ahead. Taking a step back, the industry's shift toward high voltage DC power architectures, along with AI data centers and energy infrastructure, is acting as a catalyst for power semiconductors and solid-state circuit protection solutions. B-TRAN makes a differentiated solution possible that can meet that need. Our attention stays on moving customer opportunities forward into volume production orders, revenue growth, and the creation of long-term shareholder value. At this point I'd like to pass the call to Tim Burns so he can go over our financials. Tim?
Tim Burns
executiveThanks, David, and good morning to all of you. I'll start with a recap of the capital raise we completed recently. From a registered direct offering of common stock and pre-funded warrants that closed on May 18th, we brought in $27.7 million in net proceeds. It's exciting to us that the company's largest institutional shareholders led this financing. Our balance sheet was meaningfully strengthened by the offering. As of June 30th, 2026, cash and cash equivalents came to $41.3 million. After the offering, our capital structure remains clean, and we carry no debt. Cash burn for the second quarter of 2026 came in at $2.5 million, which was flat versus $2.5 million in the second quarter of 2025 and higher than $2.3 million in the first quarter of 2026. Our Q2 cash burn landed at the low end of the $2.5 million-$2.7 million guidance we provided. Despite the flexibility our recent capital raise gives us, we'll keep managing expenses in a prudent and aggressive manner. For the third quarter of 2026, we anticipate cash burn of roughly $2.7 million-$2.9 million, and for the full year 2026, roughly $10.3 million-$10.5 million. That's against a 2025 cash burn of $9.6 million. The reason 2026's forecasted cash burn is higher than 2025's is mainly that we've hired additional sales and engineering personnel. We booked modest revenue in the second quarter of 2026. We expect initial orders from the companies evaluating our products for possible inclusion in their OEM products to be small, and order sizes should grow as customers move through their design cycles, complete product qualification, and build inventory ahead of commercializing their B-TRAN-based products. Operating expenses in the second quarter of 2026 were $3.6 million, versus $3.1 million in the second quarter of 2025. That increase came mainly from higher stock-based compensation expense, personnel costs, and non-cash patent impairments tied to our proactive rationalization of the pending patent portfolio. None of our 105 issued patents were affected by this rationalization, and streamlining the portfolio reduces what we'll spend on patents going forward. We anticipate a modest rise in operating expenses over the coming quarters, reflecting growth in our sales and engineering teams to support commercialization efforts and our expanding number of customer engagements. We still expect some quarter-to-quarter variability in operating expenses, especially research and development spending, because of the timing of semiconductor fabrication runs, product development, and other research and development activities, along with hiring. The timing of equity award grants and performance stock unit vestings, and the related recognition of non-cash stock-based compensation expense, will also create variability in our quarterly operating expenses, just as it has over the last two quarters. Net loss for the second quarter of 2026 was $3.4 million, versus $3 million in the second quarter of 2025. At the close of June, shares outstanding stood at 16,421,520, with 1,238,553 options and stock units outstanding and 3,410,086 pre-funded warrants outstanding. As of June 30, 2026, our fully diluted share count was 21,070,159 shares. With that, I'd like to open the call for questions. Operator?
Casey Ryan
analystMorning, David and Tim. I appreciate the update today. I'd like to ask about the opportunity with hyperscalers. Do you have partnerships with other companies that make components? I'm simply curious whether they're actually developing their own solutions now, seeking superior products and superior parts. If a single hyperscaler takes that route, do we expect every one of them to follow, or does it come down to that particular hyperscaler's personality regarding how much control they desire versus handing it off to outside players such as ourselves?
David Somo
executiveYes. Hello, Casey. I appreciate the question, and I'll handle that one. To borrow your word, it really comes down to the personality of the hyperscalers.
Casey Ryan
analystOkay.
David Somo
executiveEach of them participates to varying degrees, based on the manner in which they collaborate with partners providing various components and systems deployed within the data center. Some are engaged right down to the component tiers that get incorporated into larger systems that are subsequently deployed. Others remain at a more elevated level. The chance we have in collaborating with our industry partners to provide something more at a circuit protection tier, yet incorporating some intelligence meant to assist with controlling how power gets used and optimized throughout the power distribution architecture within hyperscalers, which explains why we think it holds relevance for them. Showing up with a B-TRAN for them to assess would probably be less relevant for us; however, once it sits at more of a system tier that they might be able to integrate into their environment, that turns into something potentially more interesting, and that is what we are striving toward.
Casey Ryan
analystRegarding the evaluation period, does it seem reasonable to assume it might last around 1 year, or could it be either shorter or longer?
David Somo
executiveYeah, it's hard to predict for those aiming to be at the forefront of the 800-volt DC data center power evolution. That shift is expected or forecast to begin in the second half of next year, with some aggressive uptake occurring as we move toward the end of the year and into 2028. So if their evaluation timeline is meant for early use in that setting, it would need to align with that schedule.
Casey Ryan
analystRight, that lines up with feedback we've gotten from several other businesses that may not operate in your exact segment but still have data center exposure. Do you have discussions with additional data center component firms that you either sell alongside or work with as partners? I'm not attempting to connect this directly to Coherent, though I noticed you brought someone from there onto your advisory board, which seems like a good sign. Still, Coherent is clearly a major data center player too. So, are you working alongside a partner or a collection of companies jointly selling solutions, or is each of you continuing to chase your own direct route to, for instance, a particular hyperscaler or a specific customer opportunity within a data center?
David Somo
executiveI'll frame it like this, using an analogy from the automotive market.
Casey Ryan
analystAll right.
David Somo
executiveWhen you consider how the automotive sector operates these days — in the past, it was component suppliers, and semiconductor suppliers such as ourselves, that would sell to Tier 1s, and those Tier 1s would in turn sell to the automotive OEMs. Roughly 8 to 10 years back, a change started to take place: the OEMs were looking for direct relationships with certain semiconductor suppliers, so they could find out what's coming down the pipe and assess newer technology sooner, and then exert some influence over what their Tier 1 suppliers are providing them at a systems level.
Casey Ryan
analystRight.
David Somo
executiveThere’s an opening in this, I believe. In our usual approach, we would sell semiconductor parts—B-TRAN—to a company that will make a solid-state circuit breaker or a solid-state contactor for automotive, which is later incorporated by the customer at the next tier and ultimately ends up in a data center setting or an industrial grid or similar. Given how quickly innovation is moving, I believe the chance we have is to bring something closer to the circuit breaker or circuit protection tier and present fresh ideas straight to those handling higher-level system integration or, in certain instances, even the hyperscalers themselves, who are evaluating emerging technology and figuring out how to get ready for this HVDC shift; we intend to engage at every level, working directly with our more conventional customers that produce circuit protection devices or contactors for EVs. After that, their customers, who might be operating at the integration tier, and in the end, to the hyperscaler if we can, where interest might exist, and they wish to engage at that tier.
Casey Ryan
analystAlright. Thanks. It genuinely helps me to hear that, and to gain a clearer picture of it. Regarding the capacity agreements, securing them seems like a good sign, and it also comes across as encouraging, since it may mean customers had been asking about capacity and wanted you to show a plan, which would hint at some interest from their end. I'd like to know how much of working this out and getting it under contract played a role in maybe addressing some of the sales discussions you're having with particular prospective end customers.
Tim Burns
executiveYes; so with the fabs we currently operate, we had capacity for more than 2 years with the relationships we already had. But for us, especially when you take a longer view, you consider areas such as the automotive market. Our new long-term supply agreement truly underpins the long-term scaling of our business, and perhaps even more significantly, it comes at a cost structure that we think backs our targeted gross margins. So we've said publicly before that we're aiming for gross margins of 40%+ , and we now have a long-term relationship that we believe will deliver that.
Casey Ryan
analystUh-huh. Right, more than 40%. Okay, great. So my final question — regarding Stellantis, any movement on that front always gives us reason for optimism, but tell me, do you view Stellantis as somewhat hard to predict, and is it impossible to state when they might begin incorporating certain of these products or reach a firm decision? How should we frame that? Also, has the chance grown or shrunk compared to when we initially began discussing them, say 18 months back, or 24 months back?
David Somo
executiveSure, Casey, I'll handle that one. The degree of thoroughness in our talks with Stellantis, as we push toward the SSCB program, has certainly grown across the last couple of months. We're collaborating with them extremely closely on defining what their system solution level looks like, in order to grasp how B-TRAN could fit within their setting and allow us to maximize the performance and capabilities of their system, examining and assessing various options that go past what we bring to the system. That covers areas such as packaging and similar items that must be factored in as part of the complete system solution. So the greater depth of our conversations encourages me as we keep working hand in hand with them on the contactor program. For me, that helps clarify that when talks go deeper, you reach additional specifics, which usually signals a favorable direction for how matters are advancing.
Casey Ryan
analystYeah, I'd have to say I'm with you on that. Taking everything into account, I'd call this a really strong update. That covers what I wanted to ask, and thanks for making room in your schedule today.
David Somo
executiveSounds good. Appreciate it.
Tim Burns
executiveI appreciate that, Casey.
Jeff Christensen
executiveThank you, Jenny. Our initial submitted question asks this: for what reason do the foundry arrangement and working first silicon matter so greatly to Ideal Power?
Tim Burns
executiveSo, I sort of covered that when I answered one of Casey's questions. First off, this is a supply agreement that runs long term, correct? It's going to let us do more than just make it through that first ramp, which we'd already made plans for using the fabs we currently have — it actually puts us in position where, a number of years down the road, once things like automotive volumes could be far bigger, we've now got a relationship in place to back that up. Then there's the other piece, which is that with a bigger, more established fab, you get a superior cost structure, right? As I said when replying to Casey, we have reason to think we can reach the gross margins we're aiming for once we're at scale, thanks to this new foundry partnership. It also gives customers confidence, since they'll know the fab if we tell them which one it is under NDA, and they'll understand we're able to supply them even if their volumes expand extremely quickly.
Jeff Christensen
executiveThanks. People who want to ask something can do that through the webcast, where you'll find a button labeled Ask A Question. The question we received most recently is this: what makes management feel sure that Ideal Power will make it to market successfully?
David Somo
executiveSure, Jeff, I'll handle that question. I believe I covered this in my prepared comments, but basically there are 3 points I'd point to. First, B-TRAN has benefits and advantages for the applications we're going after, mainly in solid-state circuit protection across data centers, energy infrastructure, and EV applications. We believe we hold some unique and differentiated capabilities, which I went through earlier on the call, that serve us well and keep us very competitive in those applications. Second, there's ongoing growth in customer engagements within our sales opportunity funnel. I keep seeing progress when it comes to adding new opportunities into the funnel and making engagements with customers deeper. That assists us in moving along that development timeline and working toward production systems. Last, we truly are in the right place at the right time from a market standpoint, when it comes to the growth outlook and the secular megatrend happening around HVDC for data centers and energy infrastructure, and that aligns well with where we've aimed B-TRAN from an applications standpoint and from a growth opportunity standpoint.
Jeff Christensen
executiveThanks. With the money we've just brought in, are there one or two milestones Ideal Power is going to hit?
Tim Burns
executiveSo yeah, in terms of how we go after the market, the approach stays the same for us. Just because there's additional capital sitting on the balance sheet, that doesn't mean we're anticipating huge spending hikes. Being aggressive about how we manage cash outlays is something we'll keep doing. What it does mean is that as of June 30th, we're holding over $40 million — actually more than $41 million — on the balance sheet. So going forward, both vendors and customers will look at that strong balance sheet quite positively. That leaves us better positioned to bring our technologies to market, and it gives our partners confidence that we've got enough capital to last several years.
Jeff Christensen
executiveAppreciate it. A shelf registration was filed by the company on July 10th. Is there anything further you'd like to say about that?
Tim Burns
executiveYeah. In my view, this is just sound upkeep. The shelf we had before was running out, or it had already lapsed, and we wanted a new one in place. At this moment, we have no plans to bring in capital. It will be there so we can issue registered shares should a strategic investment arise. We are currently talking with companies about that possibility. Of course, that would be excellent both as validation for the technology and for bringing in revenue too. But once more, none of this signals any intention on our part to raise capital. This is merely good housekeeping. Because it is a 3-year instrument, should there be a reason for us to raise capital 2 or 3 years down the line, or should a strategic investment opportunity appear, it simply provides us with the flexibility to use registered shares.
Jeff Christensen
executiveThanks. We have another question that came in, and it relates to something in the press release and the presentation: among the strategic priorities, the company lists continuing to look into strategic opportunities together with global market leaders. What the questioner wanted to know was whether that refers to corporate investors acquiring equity stakes, or whether it means the investment community.
Tim Burns
executiveThe customer would be the one, correct? A customer that might end up bringing our technology on board. That creates a motivation on their side for us to do well. There's a real chance of a strong, mutually beneficial link when it comes to pushing revenue higher. Among the big firms we're in discussions with as possible customers, many have equity arms that put money into important suppliers and important technologies for their OEM products; that's the kind of thing we may be considering there.
Jeff Christensen
executiveThanks once more. And just a reminder — for any questions you'd like to send in, use the Ask a Question button. Up next from those submissions: what outside validations are there for B-TRAN? Would anyone like to speak to that?
Tim Burns
executiveAs David covered in detail during his remarks, we are currently working through JEDEC qualification for the industrial markets, and that's essential to the revenue opportunities we see near term. In addition, our timeline for automotive qualification will be matched to the automotive opportunities sitting in our pipeline, Stellantis among them. We've engaged several actual third-party testing houses to produce a substantial amount of data on B-TRAN. Much of that appears in the data sheets we've posted on our website. Our customers never simply accept what a data sheet says. They assess the technology, bring it into their own lab, and run their own tests to grasp the operating conditions and how it behaves under varying conditions. Looking at it that way, I'd say we're in a really good position.
Jeff Christensen
executiveThanks. The following question that came in asks whether you could give investors some clarity on what kinds of engagements are currently paid for by customers.
Tim Burns
executiveAt this moment for our company, honestly, there are two main ones. The first would be product sampling along with development kits, and typically these end up being smaller orders since the goal is getting the technology into their lab so they can test it for their applications. The second possibility involves NRE fees tied to custom development work. Say a potential customer is looking for a custom package designed for what they need — that's a project we might take on and bring in NRE dollars by completing it. So near term, those represent the primary revenue sources. Over a longer horizon, clearly, we'd expect significantly larger volume orders should any of these businesses ultimately choose to incorporate our technology into their finished products.
Jeff Christensen
executiveAppreciate it — that wraps up the Q&A portion. At this point, I'd like to hand things back to David Somo, who has some closing comments for us.
David Somo
executiveAppreciate that, Jeff. Our team deserves recognition. The creativity and dedication they bring are powering the advances we're making; and my thanks go out to each of you who tuned in today, along with your backing. I'm eager for the next earnings update in November, when we'll be carrying out our strategy to bring B-TRAN to market. Operator, please go ahead and close out the call.
Operator
operatorThanks so much. That brings us to the end of today's conference call. Everyone is free to hang up now, and have a wonderful day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Ideal Power Inc. transcript — plus 131,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Ideal Power Inc. earnings transcripts and 131,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ideal Power Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.