Good day, ladies and gentlemen, and welcome to the IndiGrid Q1 FY 2025 conference call, hosted by Nuvama Institutional Equities. Please be advised that all participant lines are in listen-only mode, and following the presentation's conclusion, you will have a chance to ask questions. If you require assistance at any point during the call, please alert an operator by pressing star then zero on your touchtone phone. Kindly be aware that this conference is being recorded. I'll now turn the conference over to Mr. Subhadip Mitra. Thank you, and over to you, sir.

Subhadip Mitra

analyst
#2

Thanks. Good evening, everyone. Speaking for Nuvama Institutional Equities, we welcome all of you to the conference call on India Grid Trust's first quarter FY 25 results. With us today is the company's senior leadership: Mr. Harsh Shah, CEO and whole-time director; Mr. Naveen Sharma, Chief Financial Officer; Ms. Meghana Pandit, Chief Investment Officer; and Mr. Satish Talmale, Chief Operating Officer. I'll now hand things over to Harsh for his opening remarks. Over to you.

Harsh Shah

executive
#3

Thank you, and thanks to all of you for being on this first call covering financial year 2025. I'll go by the slide numbers, then refer to and open the call, and after that the management team will speak about the business. I'm on slide number three. To restate it, our aim is to turn into Asia's most admired yield vehicle, with attention on the business model, value-accretive growth, predictable distribution, and optimal capital structure. Moving to slide number four, from these four pillars we have assembled a large portfolio spread throughout India. Taken together, that's INR 29,300 crore of AUM across 49 lines and 8,700 circuit km, 13 substations covering 22,500 MVA, over 1 gigawatt peak capacity in solar, and 400 MWh of battery storage projects we won recently. Our portfolio is one of a kind. The transmission assets provide perpetual contracts, on the solar side there's still a residual life of roughly 19 years, and we own a sizable amount of lithium within the portfolio. On slide number six, I'll walk you through the highlights for quarter 2024 and 2025. First, on the portfolio side, we have signed the battery energy storage purchase agreement for the 180 MW, 360 MWh BESS project awarded by GUVNL in quarter four 2024.

Harsh Shah

executive
#4

This matters a lot, since it means the project will get built, the customer is prepared to back it, and the agreements are signed for it once construction is done. Financially, this is the quarter where we're feeling the full effect of the VRET and RSTCL acquisitions we completed last year, so comparing quarter on quarter, this year against last year, we delivered revenue growth of 32.7% and EBITDA growth of 35.2%. On the AUM side, our AUM stands at INR 29,300 crore, with net debt to AUM at 61.3%, which leaves us a sizable amount of headroom to grow. Collections had a very good quarter. Quarter one is typically relatively weaker, but in transmission we had 94% collection, and in solar we have 104% collection, which resulted in a sizable amount of NDCF for this quarter as well. On the DPU, we have distributed the first DPU of three point seven five rupees a unit, which was in line with our guidance of fifteen rupees a unit for this financial year, and that is almost 78% higher than quarter one of last year.

Harsh Shah

executive
#5

A substantial portion of DPU growth has been delivered this year, driven by acquisitions and growth from last year. On the operating front, our average quarterly availability stands at 99.4, and solar's CUF remains at 25.6%. Moving to the next slide, I'll walk you through the opportunity landscape in India's transmission sector. We are very uniquely positioned across the entire energy transition journey. Energy transition is absolutely critical and imperative for India, given, first, the climate goals the country has committed to, and also energy security, which enables India to become energy independent if the energy transition is executed properly by 2030. The 500 GW target the government has set for 2030 is certainly steep, but along the path toward that goal, there is a significant amount of investment occurring in the areas we focus on, namely solar, transmission lines, which will enable the next energy transition, and battery energy storage, which will ensure renewable energy can be deployed during hours when natural resources aren't available. With that, as you can see on the slide, power demand is rising rapidly, which ... we are witnessing as a country, and the country is responding by adding greater capacity ...

Harsh Shah

executive
#6

That’s going to create a fairly large investment opportunity for us in transmission networks too. And on the renewable side, battery energy storage reaching grid parity is really adding a lot of momentum—putting wind in the sails, so to speak—making sure that more and more utilities are bringing forward battery and storage proposals, and we do view this as a meaningful piece of our transmission growth. On slide 8, if you take a look, given the tailwinds we’re seeing in the sector, there’s roughly INR 96,000 crore of transmission and subsector bid alone that we’re seeing over the next year or two. And to put that into perspective, I’d say this is one of the highest levels of bidding activity we’ve witnessed in the last 10 years. Just to give context, over the last 10 years, pretty much the total project size that was bid out was in the range of INR 100,000–INR 125,000 crore. So we’re seeing that kind of activity coming to market in the next couple of years, so that’s a significant opportunity for players like us to find great opportunities.

Harsh Shah

executive
#7

I'd pause for a moment on the summary, and then walk you through the quarterly performance — I'll take my team through it. I'll ask Satish, our Chief Operating Officer, to guide you through how we performed operationally.

Satish Talmale

executive
#8

Yes. Thank you, Ash, and good afternoon to all of you. I'm referring to slide nine. It's a pleasure to walk you through how we performed operationally during the first quarter. On safety, we recorded 0 incidents this quarter. That matters as we keep moving forward on our zero harm goal. Turning to performance, we delivered 99.4% availability across the overall portfolio. As the right side of the chart shows, three assets are behind that modest dip. Two of them, JKTPL and Parbati, I believe, are commercially indemnified — for a force majeure event and a line diversion event, respectively. At ENICL, a conductor snapped, and that has pushed availability down, but I'm confident that across the year we will return to our 99.75% target. For solar generation, we produced 472.6 million units, which is nearly in line with our plan, at a 25.6% CUF. On reliability, usually the shifts in climatic patterns bring more natural events such as lightning and thunderstorms, and we have observed this pattern over the last couple of years, and it is changing. As a result, the count of trips has risen somewhat, but we will more or less meet our annual target of 0.18 over the course of the year.

Satish Talmale

executive
#9

When you look at it substation by substation, the numbers are fairly low relative to the industry benchmark we hold. Regarding cybersecurity, I want to mention that across every one of our solar assets — the ones we acquired not long ago — we have finished the certification process covering measures to mitigate cybersecurity risk. All right, that covers my portion, and I'll now pass things to Mr. Naveen.

Naveen Sharma

executive
#10

Alright. Thanks, Satish, and good evening, everybody. We're now on slide 10. It was another solid quarter, with steady results. Revenue and EBITDA came in at INR 835 crores and INR 767 crores, respectively, representing 33% and 35% YoY growth. NDCF for the quarter was INR 313 crores, and the board has approved a distribution of INR 3.75 per unit, which works out to 9% DPU growth on a YoY basis. Turning to collections for the quarter, they were 94% and 104% for the transmission and solar businesses, respectively. Over the trailing twelve months, collection performance at the entity level was above 100%, with both business segments delivering similar collection performance. DSO as of 30th June was 51 and 45 days for transmission and solar, respectively. That shows a meaningful year-over-year improvement in DSO across both segments. Moving to the next slide, number 11. DPU for the quarter is INR 3.75 per unit. It will be paid out as interest, dividend, and capital repayment of INR 3.19, 0.21, and 0.35, respectively. Outstanding units at quarter end total INR 78.37 crore, and gross distribution to all unit holders amounts to INR 294 crore.

Naveen Sharma

executive
#11

The record date for this distribution is July 30th, and unitholders will tentatively receive their payout on August 8th. As of June thirtieth, NAV was INR 143.998 per unit. In the quarter, the independent valuer, as part of the standard process, examined comparative benchmarks for valuing the transmission and solar business. To broaden the index, PowerGrid InvIT was added to the peer set used for benchmarking. As a result, beta came down, which lowered the weighted average cost of capital and thus raised the value of AUM. That contributed to the quarter's increase in AUM and NAV. For this quarter's distribution, IndiGrid would have paid out INR 89.78 per unit, for a total distribution of around INR 5,240 crore... On the right-hand side, we show the distribution trend on a year-on-year basis, reflecting stable and scalable growth of 6% over the years. We move to the next slide, number 12. Here is a waterfall from our EBITDA to NDCF generation and distribution. At the SPV level, consolidated EBITDA is INR 770 crores, net of finance income, working capital movement, CapEx, and tax at SPV level. NDCF generated at the SPV totals INR 725 crores.

Naveen Sharma

executive
#12

After accounting for trust-level expenses, finance costs, the DSRA, working capital movement, tax and debt repayment, our NDCF came to INR 313 crores. During Q1 FY 2025, we added INR 19 crores to our reserve, and the closing reserve now sits at 483 crores — more than one quarter's DPU, which is the current guidance. That covers everything from my end. I'll pass it to Meghana to walk you through the following slides. Over to you, Meghana.

Meghana Pandit

executive
#13

Thanks, Naveen. Hello and good evening, everybody. I'm looking at slide 13, and that shows where we stand on the balance sheet. All three rating agencies still rate us AAA. For the quarter that just ended, our average cost of debt came in at roughly 7.74%. Cash stood at approximately INR 25.54 billion. Out of that, close to INR 10 billion was borrowed in June, and those funds had already gone toward repaying debt in July — that's the reason the cash figure looks a bit elevated. Fixed rate borrowings remain at nearly three-fourths of the borrowing book. Leverage, as shown by net debt to AUM, sits at about 61%, and EBITDA to interest coverage is a very healthy 2.03 times. Gross borrowing comes to roughly INR 203 billion, divided 50/50 between NCDs and bank loans. Both the NCDs and the bank loans are spread across a range of investors, including mutual funds, insurance companies, PSUs, plus private sector banks. At the bottom of the slide, you'll find the repayment schedule, and again, we've made sure maturities aren't bunched up. Refinancing never exceeds 12%-13% of gross borrowing in any single year, and that's the guidance we've given consistently.

Meghana Pandit

executive
#14

All in all, a borrowing profile that's well diversified and has turned out nicely, and that has carried on through the quarter as well. Moving to slide 14, looking at our total returns, which come from the distribution — that's the dark blue portion — and the price change. On an absolute basis, total returns have come in at roughly 125% from the moment we listed in 2017, which works out to an annualized return of around 12%. When compared against all pure play debt instruments and pure play equity, if I look at the risk-adjusted total return, with risk captured by beta — and IndiGrid's beta sits very close to 0.08 — you can see IndiGrid keeps outperforming all the other indices on a risk-adjusted basis. Moving on to slide number 15, regarding the business outlook we're looking at. From a portfolio strategy standpoint, our focus remains on making sure operations stay stable, so that we can deliver predictable and sustainable distribution, while at the same time pursuing value accretive acquisitions, which we've been doing. On the greenfield side, as all of you know, we have 13 transmission projects, along with certain augmentation works at our existing projects, so smooth execution on those projects remains our focus.

Meghana Pandit

executive
#15

Beyond that, the 2 battery energy storage projects that we also secured during the last quarter — those are still on track, and right now we are focused on getting them executed. Last, we are likewise examining partnership possibilities for these greenfield projects so we can figure out how to reduce risk while at the same time reaching scale. Naturally, taking part in further greenfield bidding opportunities — which we have observed in the form of the tremendous transmission bids now emerging — remains a priority area, on the debt side as well as the transmission side. We also intend to deliver DPU guidance of INR 15 for FY 2025. On the balance sheet front, as always, our focus will be on making sure that whenever refinancing opportunities or acquisition opportunities arise, we can optimize interest cost and extend tenure. Simultaneously, we will deliberately manage the leverage ratio so that sufficient headroom exists for growth purposes. Asset management remains a very important area, with our focus on maintaining 99.5% availability throughout the portfolio. We are pursuing self-reliant oriented practices, which we have embedded across the portfolio, and we keep optimizing the digital tools that will assist us with analytics and decision making.

Meghana Pandit

executive
#16

EHS and ESG again — that ties directly into how we manage assets, and those are areas where our attention is growing. Industry stewardship also stays a priority as we work out how the private sector can take on a bigger role in the electricity sector, on the greenfield side and through the national monetization pipeline as well. At the same time, and specifically for InvIT, raising awareness and educating investors continues to be something we focus on. If we go to slide 16, this shows how value accretive acquisitions — which we have kept making since we got listed — have let us steadily raise the DPU and also extend how long that DPU lasts. So the different colored graphs you see reflect the acquisitions completed over the last 6 to 7 years. And on the back of those acquisitions, how we have lifted the DPU, and you can see how the DPU longevity has stretched out, supported by those acquisitions and the Virescent DPU we have provided for. I will pause here and open the room for Q&A now. Thank you.

Operator

operator
#17

Thanks. We’re moving into the question-and-answer portion now. If you’d like to ask something, press star and one on your touch-tone phone. To take yourself out of the queue, press star and two. We ask that participants use handsets when posing a question. Ladies and gentlemen, we’ll pause briefly while the queue is put together. Our first question comes from Ravichandra, an individual investor. Please go ahead.

Analyst

analyst
#18

Okay, good morning to Mr. Harsh and the team. Congrats on the strong revenue, P&L, and DPU growth. In fact, from what I see, going from 11.75, 12 rupees up to 15 is quite an achievement. Congrats. Also, I believe management bought units quite recently during this quarter. That really is excellent, given how much confidence investors are showing on this front. But my question is — and it may be a bit of a repeat each time — right now we have AUM of roughly INR 29,000 crore, so the potential is very large, INR 96,000 crore over 2 to 3 years. So we only have headroom to go up to 40% of that. At present we're at 16%. So if you have a very large asset in the bidding process and you get it, then right away we might need to do something like a rights issue or similar. How can we actually work through that situation? And the second point: recently the finance minister said asset monetization doesn't have to mean only selling. I think it seems that way — last year we discussed that an asset sale might not happen, that an asset lease could be in the pipeline. Is that true? Any thoughts on that? Thank you.

Harsh Shah

executive
#19

Thank you. Thanks, Ravichandra. On your first question, I believe you're correct. Should we target an asset of substantial size, additional capital issuance could be required. That figure, though, sits around INR 7,000 crore to INR 8,000 crore. So we don't anticipate any single acquisition worth INR 8,000 crore happening soon enough to genuinely create a need for raising capital. We're reviewing multiple growth opportunities, yet none comes close to roughly INR 8,000 crore — the level of capital at which we would have to consider raising funds. That said, we have raised capital previously through a rights issue, a preference issue, a QIP, and various other methods, and unit holders such as yourself have kindly backed us across those different capital-raising processes. So should we ever, and I hope we do, find opportunities of INR 8,000 crore or more, we would return to the market at the appropriate time, and that would be a favorable situation as we move forward. Turning to your next question, on monetization, broadly speaking the government's monetization program has swung between active and inactive, drawing mixed responses from many quarters, and on the transmission side specifically it has been, I would say, lukewarm at best.

Harsh Shah

executive
#20

And there are structural problems when it comes to that. That said, if the government has already put out a policy on monetizing transmission assets and lease bonding, we'd be eager to take part in it. So whenever that happens, we would really be looking forward to participating. Still, when it occurs will stay up to the government.

Analyst

analyst
#21

Right, I hear you. Thanks. Let's hope things work out as well as they can. Thanks.

Harsh Shah

executive
#22

Thanks.

Operator

operator
#23

Thanks. We’ll take the next question from Pradyumna Choudhary at JM Financial. The line is yours—go ahead.

Pradyumna Choudhary

analyst
#24

Hi there. I hope you'll forgive me if a few of my questions come across as fairly basic — I'm still pretty new to the company. So, to start off, I wanted to ask about the assets you've been picking up recently. You've been buying solar assets, and at this point we're also setting out on greenfield BESS projects, along with transmission assets. And that's happening while we're talking about a really large transmission opportunity. So, at what point do we expect this transmission pipeline to come online, so that we're in a position to acquire some of the transmission assets that are already in operation?

Harsh Shah

executive
#25

Okay, I'd break my answer into two parts. First, transmission projects usually follow a life cycle — more precisely, a construction period of 24 to 36 months — and monetization generally happens 6 to 12 months afterward. So it works out to roughly a 3-year cycle. That means the entire pipeline that eventually gets bid out, if it goes to players and developers who want to monetize, reaches the market around 3 to 3.5 years from the bid date. That said, as you can see on the outlook slide Meghana walked through, and we have also been taking action on this, we are bidding for transmission assets ourselves, which means we don't have to depend on the scale of transmission line, because we control the quality, we control the returns, and we bid on the asset upfront. That said, we have limited capital to deploy on the under-construction side, and so we are also looking into partnership opportunities on the development projects, which reduces risk at IndiGrid, since we share the risk capital with other investors, and which lets us take on much larger and more projects, right?

Harsh Shah

executive
#26

We’d therefore aim to take part on the transmission side, in greenfield projects, on a standalone basis, so that we secure those assets once construction is finished. That said, we’re conscious that the amount of capital we’re able to put to work on the development side will be limited. Our approach would be to team up with developers who join us during the development phase and supply risk capital, and once the work is done, we’ll acquire those projects and bring them into our pipeline. So how much ends up in the pipeline will hinge on how successful we are in bidding and, ultimately, in execution. Either way, the pipeline we’re currently looking at — roughly INR 100,000 crore — moves from bid to bid, with build and bid taking about one year, one year and a half, and then roughly three years to monetize. So I’d say it will begin delivering results in a meaningful size within three to four years.

Pradyumna Choudhary

analyst
#27

So in the near term, at least when it comes to transmission assets, adding those into our operational portfolio would be somewhat on the slower side too, correct?

Harsh Shah

executive
#28

It depends. We currently have roughly INR 2,000 crore in assets under construction, correct? Those could be the next to come through — in fact, they should reach completion within the next 12 to 18 months, at which point we'll begin generating EBITDA. We won those projects last year, right? So over the coming year they'll start producing and begin contributing to our NDCF line. Beyond that, some projects that were bid out earlier may come up for monetization, though the timing isn't something we control, right? That makes giving guidance difficult. Still, we already hold about INR 2,000 crore in assets that we're executing at present, and those will be the source of NDCF yield for us.

Pradyumna Choudhary

analyst
#29

Got it. And then, second, regarding the solar asset side, I just wanted to get a sense — since all of us know that solar tariffs are tied more to production, which tends to vary somewhat. And there are also questions about how productive these cells are; solar cells do degrade a bit, perhaps from wear and tear across the years. So how does one address this? Operational variability on solar assets would be greater than on the transmission asset. That's the first thing. And second, what kind of IRR do we end up earning on solar assets?

Harsh Shah

executive
#30

Sure. So I think, first, you answered that question correctly. There's very little variability here. Variability isn't what we need to be concerned about, particularly when we're able to — we're assuming the correct assumption at the time of acquisition. We're purchasing projects that are bid well, and I'd say we're doing the technical diligence well. Solar projects show limited variability. I'd compare it with any other renewable energy projects — whether hydro, wind — solar has the least amount of variability. Second, solar generation now has a very, very long track record in India. I've been tracking this sector since 2008, when solar plants came in. It's been 16 years, and I think the worries we carried in 2008 to 2010 are all gone because solar generation is one of the most predictable resources. Yes, there have been variations on account of cloud cover, on account of unseasonal rains, but they aren't the ones that can really impact the end result massively, unless the developers are extremely levered, where 1% lesser generation and you have to default, right? So, so I think we aren't taking a sizable amount of risk in solar.

Harsh Shah

executive
#31

We’re looking at roughly 20% maximum, with 30% on that line. And when it comes to a 1% or 2% variation in solar, that’s what we’ve observed historically and it’s very, very uncommon, it doesn’t affect our bottom line. So on that front we’re reasonably protected. That said, you have to make sure you’re purchasing the correct modules, that you’re putting money into that, that you’re cleaning it properly, and all of those parameters. So I’d say the reliability of solar modules and panels and delivery results is pretty well established now compared with 10 years ago. So we anticipate a high level of confidence in that.

Pradyumna Choudhary

analyst
#32

The internal rates of return on these—

Harsh Shah

executive
#33

Well, yeah. The IRR — it really hinges on the circumstances, doesn't it? What I can say is that IRR shifts quite a bit based on interest rates and based on how desperate the seller happens to be. So it's tied to the macroeconomic cycle during which we acquire the asset. We'd have purchased an asset at 13% as well, and we've also bought — we've also acquired an asset where we earn 20%, correct? So it comes down to the opportunity that comes our way. And I believe IndiGrid — and really anyone aiming for a differentiated return — has to be patient. Given our size, our scale, and our assets, we can afford that patience. We're active in the market. We don't get desperate when prices move. We're out there to acquire every asset provided the pricing is right, and that gives us windows of opportunity to pick up projects with reasonably good IRR, right? So, if I were to give you a range, it could be 13%, it could be 20%. That hinges on the situation. What we concentrate on is delivering a differentiated IRR.

Pradyumna Choudhary

analyst
#34

Okay. And this will be my final question before I rejoin all of you. So, even though I think roughly 78% of our debt carries a fixed rate, correct? So how... Like, if interest rates do get cut down the road, would the advantage of that lower rate not really reach us? Like, what's our plan for-

Harsh Shah

executive
#35

So that's opportunistic, correct? If rates drop by 1%, we've got roughly INR 20,000 crore of gross borrowing, but that doesn't mean our interest cost falls by INR 200 crore the following month, right? There's a transmission mechanism at work there. Roughly 28% is 22% immediate pass-through, so that portion would be immediate pass-through. Then the next part, as things mature and the refinancing window and reset window arrive, we can exercise certain options to genuinely capture that advantage. And some debt is structured so we can never refinance it, because we prefer long-term or fixed borrowing, so we've made certain choices that are already at very good rates, so we may never refinance those. So the precise math, we haven't worked out, but my guess is that with a 1% move in interest rates, it will take about a year or two before we get 50% of the benefit on the portfolio from that.

Pradyumna Choudhary

analyst
#36

Okay, got it. Thanks — that’s genuinely useful.

Operator

operator
#37

Thanks. Our next question comes from Sarvesh Gupta at Maximal Capital. The line is yours — go ahead.

Sarvesh Gupta

analyst
#38

Good afternoon, and well done on a solid set of results. I have two questions. First, regarding visibility into the asset pipeline: you referred to INR 2,000 crore that will come through next year. Beyond that, from the bid pipeline or similar, could you give some sense of how much visibility we currently have on additions to our AUM? That's the first one. Second, on this jump in NAV — my guess is it reflects the beta of PGCIL, sorry, Power Grid, which was far lower than the others. So roughly what beta figure, or what amount of beta, has gone into these calculations, and what was it approximately before that?

Harsh Shah

executive
#39

Okay, regarding your first question, we don’t provide growth forecasts. We don’t issue projections about how many assets we’ll purchase. We bid, we win, and we report back. Still, to give you some context, it has been 7 years since our listing. Since that listing, we’ve become 7x larger. So roughly speaking, each year we’ve expanded by INR 3,000 crore to INR 4,000 crore at any given time, and occasionally by more. The reason I mention this is that we rely on the opportunities available in the market on the M&A side. Also, on the bidding side, although we do place bids, that doesn’t mean we must win every bid. Our focus is always on this: Are we achieving a differentiated return? Are we achieving a risk-adjusted return that is superior to where we are trading? If so, we have a greater appetite to bid. And I think the dependence for you, as well as for us in management, rests on a core belief: as long as we stick to that philosophy, there will be businesses in the market for us to acquire and grow.

Harsh Shah

executive
#40

Past that, I think it's—I won't call it impossible, but as management we simply don't provide guidance on it, saying that in this year we'll acquire INR 5,000 crore of assets, or eight thousand, or that we're evaluating INR 4,000 crore in BD and various things. So we don't like to project that, but if history is any guide at all, we've grown by INR 3,000 crore each year. So we're confident the market is huge. There's a tailwind in the sector. Investment is taking place across the sector, across every part of the electricity value chain that we see. We believe we have the right team, acquisition growth, and engineering capability. So I think when all of this comes together, we'll end up growing the portfolio. I think that's the belief we operate under, so I think that's the more prudent thing to follow. On the beta front, I think I'll ask Naveen to read the exact number, but I would urge you to look at the valuation report, which contains our exact methodology and the numbers and everything, so that if we're on the phone about some numbers, et cetera, you can check the valuation report itself for what is done.

Harsh Shah

executive
#41

And with that, I'll hand things over to Naveen.

Naveen Sharma

executive
#42

Right. So on the whole, the PGCIL beta — the early bird beta — came in at roughly 25 bits, and that was taken during March, while the power grid index has since come down to about 0.19 or 0.20.

Sarvesh Gupta

analyst
#43

A 20% reduction in that?

Naveen Sharma

executive
#44

Yeah, roughly a 20% cut, but on the overall method, on the overall working, this has an impact of about INR 10 on NAV.

Sarvesh Gupta

analyst
#45

Got it. Got it. So Harsh, regarding that first response to the opening question, I think in the transmission sector, we were noticing some... I mean, acquiring new assets was, generally speaking, difficult. So are you noticing any favorable or unfavorable shifts in that environment compared with what existed before, perhaps a few quarters ago?

Harsh Shah

executive
#46

Yeah.

Sarvesh Gupta

analyst
#47

Has anything shifted in that environment, or is it broadly the same as of now?

Harsh Shah

executive
#48

No, I think — I think what's different across the last four quarters, if I look at it, is that the pipeline of assets is tremendous, right, and bids are taking place. There are a few bids each month, and all of these are public bids, so bidding is happening. So overall, the sector's effects have increased. Is it competitive? Yes, it is competitive. So I think that level of competitiveness stays, so you have to identify assets where we're better positioned than others, and we bid for them. So I think it remains a competitive place. That said, the market has grown large, so that creates opportunities for everyone.

Sarvesh Gupta

analyst
#49

Also, if the bid pipeline is considerably larger for the newer assets too, then wouldn't that likewise imply that the parties holding those assets on their books — since they'd now be compelled to kick off additional greenfield developments — should, ideally, in an environment like this, have a greater inclination to offload those assets to third parties such as yourself?

Harsh Shah

executive
#50

Yeah, that's what I'd hope for. In theory, sure — but circumstances shift, and it takes a while for anything to actually come about, doesn't it? Still, I'd say my guess lines up pretty closely with the one you're putting forward.

Sarvesh Gupta

analyst
#51

Got it — thanks very much, and best of luck.

Operator

operator
#52

Thanks. Our next question comes from Subhadip Mitra. Please go ahead.

Subhadip Mitra

analyst
#53

Thanks. Harsh, my question has two parts. The first part is that, following on from the previous participant, along the same lines, might we be looking at somewhat of a lean stretch over the next 2 years when it comes to the ability to bring in additional assets — or perhaps I should say the opportunity to bring in additional assets, given that most of these newer transmission assets are likely either in the bidding stage or in the construction phase right now?

Harsh Shah

executive
#54

Right.

Subhadip Mitra

analyst
#55

And, and—

Harsh Shah

executive
#56

Please continue.

Subhadip Mitra

analyst
#57

Right. And then, second, when you look at the parties likely to bid on these new large ISTS assets, a big share is naturally PGCIL, with some of the bigger private players after that. A number of these larger private players also appear to be more the hold-to-maturity type of holders-

Harsh Shah

executive
#58

Mm.

Subhadip Mitra

analyst
#59

Who might never actually download those assets, right? So are you noticing some shrinkage when it comes to the transmission, the ISTS opportunity — and because of that, do you perhaps need to diversify into other areas to a greater degree?

Harsh Shah

executive
#60

Well, yes and no. Sure, some players are hold-to-maturity types, so they'll be looking for time. But here's the thing: the one lesson we've picked up across the seven, eight years since our listing is that market conditions can shift in all sorts of ways. So our task is to be patient and keep waiting until the right moment and the right assets show up. We don't view our business year by year, as in this year being lean and the next one active. So a lean year is fine by us, whether that's two years or one year. We've got sufficient assets already acquired, and even if we do nothing at all — right, we don't acquire any assets — our DPU won't decline for forever, for eight, 10 years. It will keep delivering results, or rather it will rise once interest rates come down. So there's enough — there is enough that we've accomplished over the last seven years that lets us, I'm not sure how to phrase it, but let's say time the market, right? So what's the right moment to acquire assets. So that's, that's one. So, so we don't, we don't, we don't have to acquire something purely to grow year by year, to deliver a fact.

Harsh Shah

executive
#61

The funding for that will come out of our current assets. Next, rather than acting as a reactive participant in the market — one where projects get put out to bid and then hinge on whatever strategy the developer who shows up brings to monetization — we are, as we have already done, attempting to bid on projects on our own behalf. So we have already completed the first project. During this year, we will be commissioning 2 to 3 additional projects. So we are already placing projects on our own, and on top of that, you could probably describe it as organic growth, correct? So across the last 7 years, for roughly the first 5 years, we neither discussed nor pursued any organic growth. But 2 years ago, when we began on the first under-construction bid, that marked the start of our organic growth. And just as we have always done, we begin small with anything new, and once we deliver it, we scale up big. That is exactly what we did with solar. Starting at 100 MW, we waited 3 years, and we reached 1 GW. With BESS, we installed a proto in a substation, and then last year we raised it to 400 MWh, and this year will probably raise it further.

Harsh Shah

executive
#62

On transmission, we completed a small project worth INR 200 crore, and at present we're executing one of INR 2,000 crore, correct? Those will be commissioned over the coming 12 months as the work finishes. That leaves us room to do more in this space on greenfield, particularly when the size is large. That said, we fully understand—as I mentioned—that we won't put all of our risk capital into under-construction projects. Yet given a pedigree and track record, a tremendous amount of development capital is sitting on the sidelines waiting to partner with developers. So we're working on whether we can set up something of that kind, which lets us actively participate in the large transmission market rather than reacting to it.

Subhadip Mitra

analyst
#63

Got it, got it. Now, when it comes to those solar projects and the ones tied to BESS, how much of your AUM do you figure you'd be looking at, at most, for that kind of investment?

Harsh Shah

executive
#64

Okay, so look — BESS, BESS is transmission. We're adhering to MoP guidelines on this. Whenever BESS sits co-located alongside transmission assets, it counts as transmission. Then second, the nature of the BESS asset is similarly like transmission and substation, correct? The contract resembles sub-transmission. You've got a take-or-pay arrangement, a capacity-based arrangement. O&M resembles substation work, so as an asset it's closer to transmission than to renewable. That means there's enormous appetite there on RM. We're developing plenty of scale capabilities both to execute and to manage these projects. So I'd say BESS, BESS forms part of our base plan. We can do as much as we want, provided the returns are good. On the solar side, we'll hold roughly a 25% ratio at this point in time. And again, opportunistically, if people quote prices and it doesn't make sense, we may not acquire. And if there are assets returning to us, you know, substantially good returns, we may acquire. So it's something we'll weigh out.

Subhadip Mitra

analyst
#65

Got it. Last thing — do you see any opportunities approaching on the intrastate transmission side?

Harsh Shah

executive
#66

Perhaps where greenfield projects are concerned, yes—but those are quite tiny next to what TBCB and ISTS present to us. The opportunity in ISTS is really substantial. When it comes to the intrastate side, opportunities do exist, though they're modest in size. So we'd take a look at them, but at present they're comparatively small.

Subhadip Mitra

analyst
#67

Got it — thank you very much.

Harsh Shah

executive
#68

Alright.

Operator

operator
#69

Thanks. Our next question comes from Krishna Kumar Nalamwar, who is an individual investor. Please go ahead.

Krishna Kumar Nalamwar

executive
#70

Thank you — I'm not very fluent in English, so please bear with me. I'm a senior citizen, a senior. My question is this: the transmission assets follow a build, operate, own and maintain model. So what happens afterward — once the agreement ends? One project, for instance, runs 15 years, while certain projects are 30 or 5 years. So what takes place after that? That's what I'd like to ask, sir.

Harsh Shah

executive
#71

Sure, absolutely. So let me offer a perspective here. I wouldn't claim to know exactly what will happen, since no project has yet been through the full cycle, but I'll do my best to predict what might occur. Our contracts are take-or-pay, and once those contracts finish, the asset goes to the company, and the company belongs to IndiGrid. So the asset belongs to you. That said, transmission assets have an extremely long life — 40 years, 50 years, sometimes even longer. And in our view, the replacement cost of such assets when the concession period ends is going to be extremely high. So it would make a great deal of logical sense for the government, for regulators, for utilities to extend the contract and compensate the existing licensee — that is, the SPVs — so the projects continue and they get paid under a regulated tariff mechanism or whatever other mechanism is deemed suitable. Absent that, I think this is the most likely outcome, right? That we keep getting paid. And I don't believe any alternative to extra high voltage transmission has been discovered as yet, and we're confident that none exists.

Harsh Shah

executive
#72

So even 25 or 50 years from now, we'll still have relevant, meaningful play going on.

Krishna Kumar Nalamwar

executive
#73

Sir, one more question. What's the NAV for this asset at that point—so after the completion period—but does that asset go to zero, or is it something that gets factored in while NAV is being calculated? What's happening with that, sir?

Harsh Shah

executive
#74

Right. So the asset doesn’t go to zero. There are two ways to calculate the NAV, or another value for the asset after its life—after the concession period ends. The one we use is this: we follow a regulated tariff mechanism model, where once the concession period is over, if the project’s CapEx was, say, INR 100 crore, then INR 30 crore was equity. On that INR 30 crore, we earn roughly 15% ROE under the current regulated tariff mechanism, and we believe that model is justified after the original concession is completed. So we keep getting paid 15% on 30% of the equity that is deployed, right? And the rest is appreciated. So that’s something we believe will happen, right?

Krishna Kumar Nalamwar

executive
#75

Alright, thank you, sir.

Harsh Shah

executive
#76

Yeah. Yeah, thanks for that.

Krishna Kumar Nalamwar

executive
#77

Alright.

Operator

operator
#78

Thanks. We’ll take the next question from Ketan Jain at Avendus Spark. Go ahead, please.

Ketan Jain

analyst
#79

Yeah, can you hear me?

Operator

operator
#80

Yes, sir.

Harsh Shah

executive
#81

Correct.

Ketan Jain

analyst
#82

Yeah, so I'd just like to get from you the fundamentals of the BESS project — for instance, where are we sourcing the battery from, and at what cost? What would the replacement cost be, meaning at what future point would there be a need to replace it? And what might the battery cost, say, 1 or 2 years from now?

Harsh Shah

executive
#83

Alright, this is quite tough. I'll take the final question. I have no idea what a battery will cost a year from today — is that clear? If I had that kind of foresight, I'd be trading, so I simply don't know. What I can say is that our business is a certainty, so we want to lock in the orders and place the battery order soon, so that our economics are retained. As for where we'll order the battery from — we're going to import the batteries, because India right now doesn't have the capacity to manufacture utility scale battery storage batteries. A lot of investments are happening. Hopefully, a year or two from now, we'll be able to procure locally. What's the cost of the battery? I'm sorry, but I can't share that, given that it's confidential information and, you know, competitively, bid processes take place. So that's difficult information to share, but there are widely available public resources to look at for that. I can tell you we'll be in a similar range or even better than that, but we haven't concluded the order yet, so it's difficult to disclose the price as well as disclose where we are going to end up at.

Harsh Shah

executive
#84

But what I can say is that our ordering is moving very quickly, and we intend to commission our first project during this financial year. As soon as commissioning happens, the data will be made public, correct? So my encouragement is that you hold off until then. On replacement, our usual assumption is that none is needed. We carry out all capacity augmentation at the outset. The projects we hold are not 20-year projects that would call for augmentation. These are 12-year projects, and the entire bid process permits a certain amount of battery degradation, which falls within the allowable range. So when we size the battery, we do so in such a way that no future augmentation is required.

Ketan Jain

analyst
#85

So what you're saying is that in your scenario, you haven't factored in any degradation, or is it going to run for 20 years with no replacement?

Harsh Shah

executive
#86

No, no, not 20 years. 20 years — that doesn't even, we've got a 12-year contract. And—

Ketan Jain

analyst
#87

My mistake — 12 years. Right.

Harsh Shah

executive
#88

Twelve-year. We handle augmentation at the start. What that means is that any additional battery capacity required, we put that investment in upfront. So for a 100 MWh battery, rather than 100, you go to 110. We do that at the beginning instead of waiting to do it in year three, year four, year five. The reason is that the logistics of purchasing 2 MWh annually are much more complex than purchasing 110 all at once. So essentially, we build in overcapacity from the start.

Ketan Jain

analyst
#89

Got it. My next question concerns transmission. The National Monetization Policy, as I understand it, provided direction to certain major companies — Power Grid among them — regarding asset monetization. They intended to place assets into their own InvIT, though that effort was suspended for policy-related reasons. So looking ahead, would our prospective bidding pipeline for transmission encompass those Power Grid assets that are ultimately expected to be monetized? And if that is the case, at what point would it occur?

Harsh Shah

executive
#90

Sure, I can say this: we do have an interest. We've also sent letters to Power Grid and the Ministry stating that once monetization takes place, we'd be keen to take part in a competitive, transparent bidding process. As for timing, that decision rests with the Power Grid board, the Ministry of Power, and the Government of India. That part isn't ours to control. Still, should it ever come about, our interest will remain.

Ketan Jain

analyst
#91

What was the challenge at the policy level that came up and kept Power Grid from monetizing it through their own InvIT, and will that be a constraint for our assets that we are bidding on ourselves going forward?

Harsh Shah

executive
#92

Not really, no — those are two separate matters. From what I know, and again this is secondhand, Power Grid said on the call that they have no interest in running a competitive bidding process for their assets. I'm not sure why, since they're a public company and ought to hold an auction when monetizing, and I don't know about the call, but then they chose not to monetize rather than hold an auction. That's what I've gathered from their transcripts, right? I have no other direct knowledge of it.

Ketan Jain

analyst
#93

Alright, thanks — that clears it up for me. Best of luck.

Harsh Shah

executive
#94

Thanks.

Operator

operator
#95

Thanks. Our next question comes from Pradyumna Choudhary at JM Financial. Go right ahead.

Pradyumna Choudhary

analyst
#96

Yes, thanks for the follow-up. One thing was following up on a question from an earlier participant about what essentially happens once the contract ends. Given that this is a regulated equity model in which we've already earned 15 to 15.5% equity on the project cost, don't you think the government would cut tariffs substantially at the end of the contract life, since anything extra we earn would be a bonus, right? After the contract ends.

Harsh Shah

executive
#97

That really hinges on the calculation method you use. The contract here made it quite explicit that those assets are owned by the transmission licensees. So the transmission licensees do have the choice to walk away and not carry that out, correct? For instance, you know, in the absence of proper tariffs being offered, and that is precisely why we show the quantum of metal on the investor deck. If you check that figure on slide number four, roughly 530,000 tons of steel and aluminum sit there — actual metal above the ground that can genuinely be monetized. Simply taking today's metal price, right, or, I mean, clearly, we would have satisfied our debt obligations and all of that, that works out to 50% of our market cap as of today. So that gives you the scale of metal we hold in IndiGrid. Now, what price will prevail at the close of the 35th year or the 30th year? I cannot say, but it is going to be meaningful, right? So when that magnitude of capital has been invested, someone might argue, "No, you earn a very slim return on it. Why would anyone want to run that asset?" Right? And the response would be, "I would prefer to liquidate." Okay.

Harsh Shah

executive
#98

That being said, the principle inside the regulated tariff mechanism is quite clear: equity is never depreciated. Only your debt gets depreciated. So if you put in INR 100 crore, INR 30 crore stays deployed, since the INR 70 crore of debt is amortized by you when the concession period ends. That INR 30 crore of equity carries the right to earn the ROE in perpetuity. That is the principle enshrined in the RTM mechanism, the regulatory mechanism. So equity is never depreciated, and hence, if one earns 15.5% or 15% of ROE on that equity after paying all the tax, all O&M costs, everything taken together, I think that is a reasonably good return. So we are fine with that continuing forever.

Pradyumna Choudhary

analyst
#99

Got it. And for the second one, could you help us understand roughly how much, in rupees, of transmission assets are operational in India at present?

Harsh Shah

executive
#100

In India?

Pradyumna Choudhary

analyst
#101

So, to get a grasp of the industry.

Harsh Shah

executive
#102

That is a really tough one to answer, since you have depreciated assets and so on, which makes it quite complicated. At a high level, I would put the figure at roughly INR 300,000 crore for the interstate side. When it comes to the intrastate level, those numbers aren't collated, which makes calculation very difficult, but it is probably again INR 200,000 crore to INR 300,000 crore. So at a minimum — and this is my own estimate, drawing on my experience and what I have read, since there are quite few publicly available sources where all of this is set out — I think the range would be INR 500,000 crore to INR 600,000 crore. That is the total, taking in state transcos, the central side, and everything else combined.

Pradyumna Choudhary

analyst
#103

Got it. Got it. What would the amount be if private players were involved?

Harsh Shah

executive
#104

Very limited. It’ll be less than at least 10% — yeah, around 10%. Maybe 15.

Pradyumna Choudhary

analyst
#105

Got it.

Harsh Shah

executive
#106

Yeah, somewhere in that range.

Pradyumna Choudhary

analyst
#107

Got it. That was useful. Thanks.

Harsh Shah

executive
#108

Thanks.

Operator

operator
#109

Thanks. Our next question comes from Tanvir Surve, an individual investor. You have the floor.

Analyst

analyst
#110

Yeah. Hello — can you hear me okay?

Harsh Shah

executive
#111

Correct.

Analyst

analyst
#112

So, with that recent change, where the STCG period has now come down to 12 months, does that create any kind of tailwind when it comes to integrating more mutual fund participation from the equity side, now coming in?

Harsh Shah

executive
#113

Thanks, Tanvir, for that question. I'm surprised no one had raised it until now.

Analyst

analyst
#114

Yes, I agree — I was expecting that too.

Harsh Shah

executive
#115

Yeah. No, so this has been a policy asked for the last 5 years, and we are pretty—

Analyst

analyst
#116

Yeah.

Harsh Shah

executive
#117

We're really pleased this has finally happened. One major point for unitholders, I think, is that a lot of liquidity can come in, since people are actually able to monetize after a year if they feel the timing is right, and liquidity will then increase.

Analyst

analyst
#118

That's right.

Harsh Shah

executive
#119

The second point is that we've been collaborating with regulators and exchanges regarding inclusion in the index.

Analyst

analyst
#120

Mm-hmm.

Harsh Shah

executive
#121

Given how large we are—though I can't say the precise figure—we'll likely end up among the top 200 to 250 entities, or perhaps even in the utilities index.

Analyst

analyst
#122

That’s right.

Harsh Shah

executive
#123

However, there are structural obstacles to getting IndiGrid into indexes, given that 2 to 3-year holding period, and that makes it genuinely hard for fund of funds and mutual funds to permit it. So the exchanges weren't prepared to, shall I say, put us in the index. And being in the index would have brought more passive flows, so that's probably a positive. While this is being worked through, a couple of other policy hurdles remain with the regulators. Once those are resolved, I'd certainly expect a tailwind from greater liquidity that comes with index inclusion. So this marks the first step in that direction. We sincerely hope we get included in the index.

Analyst

analyst
#124

That's great, because I believe worldwide many REITs and infrastructure names sit in frontline indices. So that's a significant advantage. And I'd say the other box to tick is simply interest rates. Once those come down as well, I think the REIT and infrastructure index really takes off.

Harsh Shah

executive
#125

Yes, that's our view as well.

Analyst

analyst
#126

Alright, thanks — and best of luck to you.

Harsh Shah

executive
#127

Thanks.

Operator

operator
#128

Thank you. Since there are no more questions, at this point I'd like to pass the conference to management so they can offer their closing remarks.

Harsh Shah

executive
#129

Thanks. Thanks to all of you for being on the call and for raising all the questions that matter. We're quite excited about the growth opportunities sitting in front of us, and we'll keep delivering what we said we would, and we look forward to seeing you at the next investor call. Thank you.

Operator

operator
#130

I appreciate that.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Indigrid Infrastructure Trust transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Indigrid Infrastructure Trust earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Indigrid Infrastructure Trust or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.