Thanks, operator. Hello everyone, and thanks for joining IREN's FY 2026 Results Presentation this afternoon. I'm Mike Power, VP of Investor Relations, and joining me today are Daniel Roberts, Co-Founder and Co-CEO; Anthony Lewis, CFO; and Kent Draper, Chief Commercial Officer. A quick note before we start: this call is webcast live along with a presentation. If you're on the phone, you can choose to submit a question via the moderator once our prepared remarks wrap up. I want to remind you all that some of what we say today may be forward-looking. Such statements rest on current expectations and assumptions, and they carry risks and uncertainties that might make actual results differ materially. For more on that, please see Slide 2 of the presentation that accompanies this call, as well as our SEC filings; and now I'll hand things over to Dan Roberts.

Daniel Roberts

executive
#2

Thank you, Mike, and I appreciate all of you being here. Will and I launched this company based on one fairly straightforward insight. The digital realm can expand nearly overnight, while the physical realm cannot. Power, land, and data centers — those require years to permit, finance, and construct; and this past year was when that ceased being a theory and turned into the central bottleneck for the entire sector. If you look at the chart displayed on the screen, covering 8 models monitored by OpenRouter, weekly token consumption for large language models rose almost 17x over 8 months. Each of those tokens depends on physical infrastructure. Serving that kind of demand curve is extremely hard when your infrastructure comes with 3-year lead times. And we're at the beginning of this cycle, not the finish. Less expensive compute doesn't improve the efficiency of what already exists. It makes new things viable. Infrastructure makes applications possible, and applications generate demand for additional infrastructure. That's how every build-out throughout history has functioned, and that's the structural mismatch — one that keeps widening. Let me now explain how we're positioned for that environment. We function across 3 layers, building from the ground up. To start with, there's the physical infrastructure — data centers, meaning the property, electricity, substations, and cooling systems. That's probably the hardest part to build out, and the scarcity begins at that level. Then you have compute: the GPUs, storage, and networking that get installed inside those facilities. Finally, on top, there's software — managed services along with enterprise support. That's exactly where Mirantis fits into our picture. And as of today, Mirantis has been named an inaugural NVIDIA-Certified Hypervisor. So we now have NVIDIA's validation covering the software tier as well as hardware. Why do we want all three? Because each layer boosts what the layer beneath it is worth. When you put a data center on a grid connection, that connection is worth more. Add GPUs inside, and it's worth even more. Then wrap services around the customer, and the value climbs again. Most players in this market rent out at least one of those layers. We own every layer. So, let me walk through how the year played out. Operator, please take us to the highlights. Thanks. There are four things I want you to take away from this update, and I'll go quickly because you'll get more specifics in just a bit. Starting with customers: we signed new cloud deals spanning multiple years, including with Cohere, Prometheus, Perplexity, Figure AI, Fal AI, and Higgsfield AI, and on top of that, a leading frontier AI lab whose name we can't disclose yet. Revenue: $4 billion of ARR is now under contract for our 2026 capacity, with $1 billion of that already operating today. This excludes revenue anticipated to ramp during 2027, including the $700 million of ARR tied to our NVIDIA cloud contract. On delivery: Horizon 1 went to Microsoft this month, the first among 4 50-megawatt deployments, with Horizon 2 through 4 aimed at the December quarter. And then on the funding side, we now have $6.5 billion in GPU financing arranged over the last 3 months. Once you factor in prepayments, that covers over 100% of the GPU CapEx tied to it. And $2.8 billion of that required no investment-grade offtake at all, yet still came in at single-digit pricing. Let me begin with customers, since everything else flows from them. Our 2026 capacity is essentially fully committed, so the questions we're getting now concern 2027 and 2028. We keep signing future capacity on purpose. Each contract opportunity is evaluated against 3 things. First, who is this counterparty and what do they bring to the platform — the strategic value, beyond just the revenue. Second, what do the economics look like — price, prepayment, term, and so on. And third, what could it unlock over the longer term for managed services and software; we've been making this point for some time. In this market, the bottleneck isn't signing deals — it's getting GPUs online. Also, an investment-grade offtake is no longer a prerequisite for us when it comes to financing GPUs. That means we're not out there pursuing flashy announcements; instead, we're taking a long-term view on where we want this business to go. Once we do sign something, you'll hear about it from us. Right now we're in advanced talks with a number of new customers covering a meaningful chunk of our 2027 capacity, and discussions about 2028 — on both the customer side and the financing side — are already moving along well. Looking further ahead, our goal is to keep growing a broad, diversified customer base throughout the AI ecosystem, and every one of them will hold a master service agreement with IREN. Each megawatt we bring online is scarce. Ahead of bringing any new cluster online, our goal is for it to be sought after by both our current clientele and fresh prospects — meaning it shouldn't hinge on a single customer, a lone negotiation, or one particular moment in the pricing cycle. Now, let me share who is currently using the platform. As I noted previously, the big news is the multiyear agreement we signed with a top-tier frontier AI lab. To be clear, this is a brand-new contract. It stands apart from Prometheus, whom we are now able to identify as the AI developer we hadn't named back in our July announcement. The world's most discerning purchasers of AI infrastructure continue to select us. It also demonstrates that our strategy is paying off. Our initial focus was on concentration since large clients with urgent needs offered us the quickest route to scaling up. As our platform has matured, we've intentionally expanded our reach. That now includes hyperscalers, enterprises, AI developers, and most recently frontier labs working on both training and inference. Yet truthfully, what matters most to us is that third bullet point. Customers we already have keep returning. Both Together AI and Fireworks AI have renewed their commitments and grown them. Fresh customer wins are demonstrating that demand exists, while renewals keep showing that we deliver consistently and execute reliably over time. After we've gone live with a client, we expand alongside them across locations, GPU generations, and service tiers. When we look at the customers who are committing and expanding with us, Prometheus and Figure stand out—they're developing offerings aimed at the physical world, including robotics and real-world automation, and they're purchasing our compute capacity to support that work. AI has progressed far past simple chat. This is something we keep emphasizing to people: it's impossible to gauge how large this market will be by looking only at present-day usage. That's exactly why the market continually winds up structurally short on compute. All right, let's move on to pricing. Pricing has changed enormously—deals with a 3-year term cost about 125% more than they did in November, while 5-year agreements are up roughly 70%. Lately signed 3-year deals carry a price tag above $20 million for each megawatt of IT load, recovering the compute investment in roughly 2 years, whereas live negotiations currently sit near $25 million per megawatt. Prepayments from recent customers are covering 45% to 55% of the GPU CapEx. Why is that happening? The market has definitely gotten tighter, yet it also comes down to whom we sign, the way deals get put together and what we layer on through managed services, which Mirantis continues to broaden. Deals of shorter length plus on-demand represent additional upside later on. Revenue per megawatt is just a convenient label, incidentally. We evaluate the entire return: price, term, prepayment, utilization, quality of the customer and room to expand. And just so there's no confusion about our approach, we don't hold back capacity trying to catch a spot price; we assign capacity toward growing the customer base and the platform however we judge best. Pricing is a consequence of that. Alright. Now shifting from customers to what we're constructing. The goals are approximately 300 megawatts of IT load delivered during 2026, plus another 0.5 gigawatt in 2027.

Daniel Roberts

executive
#3

By 2027, that brings the platform to roughly 1.2 gigawatts of gross capacity, and we keep building in Texas, British Columbia, Oklahoma, South Australia and Spain; and as of today, over 4,000 people are mobilized across our active sites. Horizon 1 is the clearest illustration right now. As we said earlier, Horizon 1 went to Microsoft. It's the first among 4 50-megawatt liquid-cooled deployments at Childress, and it earned NVIDIA Exemplar Cloud status on GB300 NVL72, which is important because we — it demonstrates our ability to integrate and run the entire platform, hardware, networking and software, not merely construct the shell. Delivery is significant, but the template is more significant. Every Horizon site is built to the same blueprint, draws on the same suppliers, uses the same on-site crew, and each new phase takes what was learned from the previous one. Commissioning is the goal for Horizon 2, and Horizons 3 and 4 are well into construction. That puts all three on track to be delivered during the December quarter. This same approach is being applied across every location. Turning briefly to 2026: at Childress, crews are doing retrofit work and installing GPUs at the same time in the air-cooled halls. Over at Mackenzie, GPUs have been racked in the first 2 buildings. In Prince George, the air-cooled fleet has finished commissioning, and liquid-cooled installation is underway. The rest of that capacity is all slated for the December quarter. Now for 2027: Sweetwater 1 is now in full swing. Construction has begun on the initial building, and work on the main substation keeps moving forward. Out at Childress, the civil work for Horizons 5 and 6 is actively in progress, alongside an additional 250 megawatts of air-cooled conversion that's also advancing. Another point worth mentioning: at Canal Flats, we've decided to switch the entire site over to liquid-cooling for GB300s, which lets us capture more value from the power at a location we already have in hand. Beyond all that, the pipeline takes another step up. In 2028, we have Sweetwater 2 and Kiowa in the U.S., Bundey in South Australia, and Badajoz in Spain — about 300 megawatts total — plus the flagship site within the Nostrum portfolio that we closed on during the quarter. All told, we've announced over 5 gigawatts, and there's a multi-gigawatt development pipeline sitting behind that, which includes additional Texas power, since a more stringent interconnection queue ought to benefit projects that are genuine and have solid financing. Now, a brief note on design, since it addresses something people have begun asking us about frequently. The skeptical argument we keep hearing about this sector is that AI data centers will need to be rebuilt within 10 years. We've devoted this year to ensuring ours won't be. Sweetwater 1 is turning into the reference design for Sweetwater 2, Kiowa, Bundey, and whatever comes after them. Shared layouts, shared equipment, greater use of modularization and prefab. Every new project picks up where the previous one left off rather than beginning at zero. The architecture is designed to accommodate future GPU generations and changing cooling methods, 800-volt DC among them, and all of this work has been done alongside NVIDIA. We recognize that computing advances faster than construction does, so our buildings were planned accordingly, while we continue to squeeze more value out of the assets already in place. Across our existing sites, there is more power than our current rollout plans require. That surplus can support extra GPUs and bring in more revenue, with no new grid capacity needed. Across the entire sector, the scarcest thing you can get your hands on is additional grid capacity. Because of that, expansion that doesn't require new grid capacity is essentially the best possible variety. To kick things off, we'll be bringing new liquid-cooled deployments online at Mackenzie, Canal Flats and Prince George during 2027. Over time, technologies like NVIDIA MaxLPS, which smooths out how much power GPUs pull, let us pack additional compute into the very same electrical footprint without compromising safety. Still, none of this gets done without the right people. During FY '26 our workforce grew to roughly three times its previous size, including hundreds of team members who joined through Mirantis and Nostrum, and we expect a similar level of growth again in FY '27. Five C-suite hires spanning development, product, marketing, innovation and information security, drawn from NVIDIA, AWS, Oracle, Google and other top data center operators. So growing our organization in advance of the revenue is clearly intentional. It requires spending before it generates returns, but that's the direction we're headed. One final item before I hand things over to Anthony is the way we're financing this expansion; so GPU financing comes first, since the model has now been validated at both ends of the credit spectrum. Regarding the Microsoft contract, we secured $3.6 billion in investment-grade GPU financing, priced at a weighted average of about 6%. When you add customer prepayments on top of that, it funded roughly 96% of the GPU CapEx tied to that deal. Here's what's really interesting, though: on the non-investment-grade side — which is basically the rest of the AI ecosystem — we just closed $2.8 billion in equipment financing. Within that total, $2.4 billion carries a 9% fixed rate for Mackenzie, with Blue Owl leading and PIMCO-managed funds participating. That structure pairs a delayed-draw term loan with senior secured notes, and together they cover 90% of the GPU CapEx involved. Factor in the fact that on deals done lately, customers are paying 45% to 55% upfront, and the money coming in exceeds what the GPUs underneath those deals cost us. That's a good thing, since the extra is helping cover data center CapEx tied to those very deployments as well as ones still to come. As for data center CapEx, we've deliberately kept 100% of our data centers free of encumbrances until now. That asset base keeps growing, and we can finance it any time the timing works for us. Given all that, Anthony is going to take you through how the plan gets funded and what the results look like. Thanks, Anthony.

Anthony Lewis

executive
#4

Appreciate that, Dan, and good evening to all of you. Across the last 12 months, we've locked in around $19 billion of funding — close to $16 billion coming from customer prepayments, GPU financing and convertible notes, plus equity of roughly $3 billion. Most of that money sits either as cash or hasn't been drawn yet, which leaves us with considerable headroom. When it comes to FY '27, our guidance points to CapEx somewhere between $25 billion and $30 billion. That figure covers delivery of the contracted Microsoft capacity, the remaining deployments needed to hit 2026 ARR, and GPU plus data center CapEx tied to air-cooled build-outs planned throughout calendar year 2027; it also backs new liquid-cooled data center capacity at Childress and Sweetwater 1, set to come online in the back half of calendar year 2027, along with earlier-stage spending for 2028 and beyond. Naturally, what we actually spend during the year hinges on many variables — final costings, construction schedules, GPU and long lead item delivery time lines, the broader contracting climate, and the fundraising climate overall. Inside that CapEx figure, we anticipate data center and CapEx GPU needs rising by about 15% to 20% for continuing and fresh deployments, with revenue growth ultimately expected to outstrip those increases. As for the funding plan, like I said earlier, we begin from a solid position. Roughly $14 billion in existing cash plus committed GPU financing and prepayments; that figure includes $7.6 billion of cash on the balance sheet as of 30 June, $1.7 billion of which is restricted, with the bulk of that $1.7 billion earmarked for Microsoft GPU CapEx. We're aiming for about $8 billion more in GPU financing and prepayments to cover GPU CapEx needs, and we're encouraged by the healthy prepayments showing up in recent contracting and the expanding GPU financing market Dan mentioned. The rest of what we need, we expect to cover via data center financing, operating cash flows and corporate sources. On data center financing, as Dan discussed, every piece of our data center portfolio remains unencumbered right now, Horizons 1 through 4 included. So clearly there's a substantial and expanding asset base available to raise asset finance against. With the GPU financing market growing and customer prepayments looking attractive, we believe we're well positioned to ramp up our fundraising to fuel the platform's rapid growth. Now let's move to quarter 4 results and outlook. This quarter's numbers still show the continuing shift toward AI cloud. For the June quarter, revenue came in at $137.2 million, which included AI cloud revenue of $70.5 million; that's a decline of $7.6 million versus the previous quarter, driven by decommissioning mining hardware ahead of GPU installations, partly offset by AI cloud growth. Cost of revenue dropped $6.6 million as well, largely because reduced mining activity meant lower electricity usage. For the quarter, our net loss came to $684 million. That was primarily due to noncash impairments totaling $450.4 million — mainly tied to decommissioning mining hardware — along with a $102.1 million drop in fair value of mining hardware held for sale. Both of those reflect the costs of moving our existing sites over to AI cloud. As things stand, we anticipate mining operations will be effectively decommissioned by the end of December 2026. Looking ahead, we expect first quarter cash SG&A to rise sequentially by roughly $40 million to $50 million, since we'll keep investing for growth throughout sales and marketing, R&D, development, site and cloud operations and other functions ahead of significant revenue growth in the periods to come — which brings me to ARR. We finished Q4 at approximately $0.5 billion of ARR; today it stands at $1 billion after Microsoft's acceptance of Horizon 1, and that will carry through to the end of the September quarter. By the end of the December quarter, we expect more than $4 billion of ARR, which is already under contract and includes delivery of Horizons 2 through 4. A significant amount of the December capacity is expected to come on late in the quarter, so we will see the reported revenue effect come through predominantly in the March quarter; with that, I'll hand back to Dan.

Daniel Roberts

executive
#5

Appreciate that, Anthony. We'll wrap up with a single slide here. Looking at 2026, it's essentially fully committed, with that $4 billion in ARR already under contract. When we look at 2027 and past that, that's intentional runway for the company; this represents capacity we keep turning into a wider customer base and, naturally, a service mix that's richer. Revenue per megawatt keeps climbing, driven both by structural demand and by optimizing sites, and that $4 billion derives from under 10% of our portfolio of grid — secured grid connections, which exceeds 5 gigawatts. So 8 years back, we set out to close the distance between digital demand and physical supply. It's fair to say that distance is now here. The power belongs to us, the land belongs to us, the data centers belong to us, the compute belongs to us, the software belongs to us, and we've got the people to service it; so from Will's perspective and mine, this is just the start. That said, operator, please open the line for questions.

Michael Ng

analyst
#6

Two things I'd like to ask. To start, could you expand a bit on Mirantis and the way it assists with getting your compute out into the market commercially? Did Mirantis get used, or did it help make possible, any of the deals signed or under negotiation that were discussed today? Do you see a future where Mirantis plays a role in selling some capacity to market aggregators such as OpenRouter? Then I've got one quick follow-up.

Kent Draper

executive
#7

Sure, glad to weigh in, and thank you for asking. When it comes to what Mirantis offers as a service, there are, I'd say, several pieces of it that benefit our business right now. The first is that, exactly as you pointed out, it effectively brings new classes of customers within reach for us. Like we've discussed many times before, the really big hyperscaler or frontier AI lab clients tend to prefer consuming compute on a bare metal basis. However, smaller AI developers, labs, and enterprise customers place value on having an orchestration layer delivered on top of bare metal compute. So the Mirantis service offering, insofar as it involves that orchestration layer, can assist in unlocking that segment of the market for us. Beyond that, it gives us the means to deliver compute in a different fashion. That means we can not only supply reserved managed services clusters, but it also creates the possibility of supplying on-demand compute, for instance. Alongside the orchestration layer itself, Mirantis carries a lengthy history of serving enterprise customers within the cloud computing arena, and they contribute several other kinds of expertise, such as enterprise support, monitoring, and deployment capabilities, which can assist us in monetizing our platform faster and in continuing to deliver extremely high standards of customer service. So those are a handful of the places where Mirantis strengthens the platform we already have.

Daniel Roberts

executive
#8

Apologies, I just want to tack something onto that. With what was announced today, I believe we've become the sole neocloud with a certified hypervisor from NVIDIA. So that integration up and down, that complete stack, is unfolding right before our eyes.

Michael Ng

analyst
#9

I'd like to ask a follow-up about the CapEx guidance for the coming year, that $25 billion to $30 billion range. Does all of that go toward the 800 megawatts you're expecting to sign next year? Or does some of it stretch past next year? Also, could you walk through how the rest gets funded, beyond that $14 billion of cash, the GPU prepayments, and the other debt financing you mentioned, I believe?

Anthony Lewis

executive
#10

Absolutely. Regarding the — and I appreciate the question. Regarding your first question: the $25 billion to $30 billion clearly sits within — it spans the fiscal year ending June '27. So it accounts for every CapEx need tied to the 2026 deployments that — the ones feeding into the $4 billion ARR goal. It accounts for anticipated data center CapEx plus GPU CapEx for, roughly speaking, air-cooled — the remaining air-cooled deployments we expect to arrive across calendar 2027. And it likewise accounts for a meaningful share of the CapEx needed for liquid-cooled deployments during the back half of calendar 2027; it leaves out the CapEx needed for GPU compute at those new liquid-cooled sites, since that falls under the capital plan for the year after; on the financing side, clearly, we mentioned the $14 billion, and that piece is secured. I also mentioned roughly $8 billion of extra GPU-related CapEx we estimate. So that money will back the GPU deployments captured inside that $25 billion to $30 billion. Clearly, the fundraising prepayment backdrop has been very strong, and that clearly feeds into the $8 billion figure. And clearly, conditions in GPU financing have been strong. Clearly, Dan covered the outcomes from the recent transactions, though clearly there have also been additional deals in the market, for investment-grade as well as sub-investment-grade clients. We've likewise had NVIDIA's recent announcement together with 6 of the largest capital allocators globally, unveiling JVs and partnerships, to back more financing of AI compute as an asset class. Beyond that, we clearly have 1 to 4 substantially built and being delivered across the year. That is clearly unencumbered, along with other opportunities under review, both asset-backed and other group level initiatives too.

Paul Golding

analyst
#11

Great work on everything you've accomplished. My first question is about the pivot to liquid cooling in British Columbia. Could you break down how that choice came about a little? It sounds like there's extra power on hand, and clearly a chance to earn revenue. But how are you weighing the return on that against other options, and did it come about organically, from demand you've actually observed, or is it speculative? Then I have one more question.

Kent Draper

executive
#12

Paul, it's mostly a response to the demand we're seeing. And for the conditions we encounter in British Columbia, we have a design that works very well for liquid cooling. As customers increasingly consider future workloads, it's something where over time we do see most of them moving toward liquid-cooled GPUs; so we're definitely accounting for that in the mix across our portfolio.

Paul Golding

analyst
#13

Great. So Anthony brought up that the rising compute expenses are being more than offset by growth in revenue. Given how compute costs just keep climbing, I'm curious what the calculation looks like and how you're thinking and what your strategy is when it comes to using some of that extra liquidity from prepayments and the financing you've arranged — putting it toward building out data centers versus perhaps buying compute with longer maturities, and maybe doing so speculatively, in light of the price trend we've observed in compute?

Kent Draper

executive
#14

Yes. Basically, we're pursuing both, I'd say; as Dan noted, this is — every layer of the stack is needed if you want to sell compute, you've got to have the data center capacity. And within the industry we keep seeing demand that's extremely strong alongside insufficient capacity to meet it. So we'll keep building out data center space. Over time we'll keep making compute purchases and keep layering that software on top so we can widen our addressable market and lock in better economics down the road; so we anticipate a mix of speculative purchases plus some that might be linked to customer contracts. But as Dan said, in this industry the contracts aren't what drives things. What matters is getting the compute online. And that's what we're heavily focused on, on the execution side of the business.

Daniel Roberts

executive
#15

Paul, let me jump in on your CapEx question as it ties to that revenue, and this extends a bit on what Anthony mentioned before. If we take a step back and consider the trade-off between revenue and CapEx, the deals we're announcing right now, along with the price per megawatt, involve GPUs that were purchased a good while back. So you could say those prices reflect natural increases beyond the inflation in CapEx for those GPUs. Looking ahead, costs for future GPU generations are rising, yet on the revenue per megawatt we've just announced, we didn't necessarily have to absorb those cost hikes, since these are older generations, if that tracks. There's additional nuance in what our CapEx requirements look like, though. Yes, we've given guidance of $25 billion to $30 billion in total CapEx for FY '27. However, we intentionally avoid splitting that out or tying it to a set number of megawatts of IT load that will come online, because in truth, data center CapEx tends to run a year or 2 ahead of delivery — that's just how substations and steel work. So the mix in any particular year really depends on what we deliver that year versus what we're constructing for the following one. So I'd say we're focused on how we sequence data center CapEx and how we fund data center CapEx. As we said in the presentation, every bit of our data center portfolio is unencumbered right now, which opens up a future opportunity. And when prepayments we receive equal 50% of the GPUs, that's about the same as 100% of the data centers, since GPUs make up roughly 2/3 of your fully loaded cost for the data centers plus the GPUs. And if you're already financing the GPUs at 90% gearing, then you can see how this funding flywheel is emerging that arguably needs little equity over time to finance it. But then we have to layer in that our ambitions keep growing. We're building at a faster cadence than we have in the past. So those funding needs keep expanding. Still, we have flexibility around growth by optimizing the funding available to us at any given point in time.

Paul Golding

analyst
#16

Thanks for those details, Dan. If I could slip in one brief administrative question right after that. Regarding the split of 2/3 for compute against data center CapEx, does that change at all given compute's higher expense? Or does the constrained labor market, along with other inputs for building data centers, hold that relationship roughly unchanged?

Daniel Roberts

executive
#17

No, it remains fairly steady. What I mean is, we continue to observe inflation and expenses rising across different components; so from a big-picture standpoint, I'd expect that proportion to stay about the same.

Brett Knoblauch

analyst
#18

Hey everyone, congratulations on the quarter. It's really encouraging to watch demand patterns heading into '26, and definitely '27 and '28. What I'd like to dig into is, as Horizon 1 continues to get built out — we've been seeing quite a few deals lately that perhaps carry lower PUEs — is there anything shifting on the design side that could bring lower PUEs to other locations you have coming online, or to other buildings launching in '27 and '28? Or is it better for us to treat that PUE tied to the Microsoft deal as basically fixed?

Kent Draper

executive
#19

Well, PUEs are never fully fixed, though for the most part they're a function of what the ambient conditions look like where your data centers run. As we've mentioned previously, we rely on a closed-loop liquid-cooling system that's extremely efficient. That gives us PUEs that stack up quite well against the wider industry, and we do witness some ongoing gains as time goes on. Some of that comes from things such as NVIDIA's DSX reference architecture, in which they've examined running chips hotter without sacrificing any compute performance, while letting you steer a greater share of your total megawatts toward the IT load rather than cooling. Still, those sit at the margins instead of serving as the real material forces behind reductions over time.

Daniel Roberts

executive
#20

Also, I'd like to mention that when it comes to the headline PUE figures we've put out, we've intentionally taken a cautious approach. There was even a slide in the deck focused on this topic — the idea being that we hold power in reserve past what our present build-out plans call for, and part of that involves improving PUE over time. The truth is, the PUE you average across a year sits well under the peak PUE you need. So a handful of small adjustments can unlock a pretty significant amount of capacity on their own. On top of that, we have the NVIDIA DSX MaxLPS opportunity. And we recognize that other players are oversubscribing megawatts through power management tools too. Within that envelope, there's considerable room to maneuver. Up to now, we've stayed simple — 200 megawatts of IT load against 300 megawatts of gross capacity — but as of today we're also making it clear that within the portfolio there's a fairly sizable chance to release some of that reserved power.

Brett Knoblauch

analyst
#21

Great. Then perhaps I can just build on a few of the pricing points that came through pretty powerfully, I think, in the prepared remarks and the release — the sort of $20 million deals you're seeing or have signed. Now it's kind of around $25 million. Could you clarify over what duration? And is it more of a one-off? Or do you think that's kind of the ballpark of maybe the average across all the conversations you're having with customers?

Kent Draper

executive
#22

No, right now we're seeing that consistently across live conversations with customers. And a range of factors feed into it. Like Dan said, we consider term length, prepayments, the type of customer, likely growth needs over time. But what we're seeing on pricing is fairly consistent at the moment. It keeps showing an upward trend. We're seeing really strong competitive tension for near-term megawatts. So we definitely think those figures we put out are indicative of where the market sits right now, with upward pressure over time.

Daniel Roberts

executive
#23

Just so we're clear on this, these agreements run 3 to 5 years — they aren't 2-year commitments, and they aren't spot capacity either. If your goal were to squeeze the near-term quarterly P&L, there's a meaningful chance to go out and sell spot on demand. As part of a portfolio strategy, that's something we could consider down the road. But as of today, we're happy simply growing the customer base, spreading ourselves across the AI ecosystem, securing longer-term contracts, and bringing really accretive financing back into those contracts. Eventually, that gives us the license to dabble more in on-demand, shorter-term contracts, roll out software, and use Mirantis along with other capabilities to reach higher revenue profiles.

Michael Donovan

analyst
#24

Let's return to that $20 million to $25 million of revenue for each IT megawatt. When you look at the economics in the U.S., how do they stack up against what you're hearing from the first conversations in Spain and Australia?

Kent Draper

executive
#25

My sense is it's quite consistent. Ultimately, compute is mostly a worldwide market. Many of the customers obtaining compute from North America are located abroad. That genuinely creates a global marketplace for compute. And in some of those other regions, there could even be an extra scarcity element, particularly when it comes to something like sovereign AI. So the pricing we observe in North America, I'd say, is a strong indicator of conditions around the world.

Michael Donovan

analyst
#26

If I could just ask one additional follow-up. I was hoping you could clarify something about the Nostrum acquisition. The way I understand it, that deal added about 490 megawatts, while in your prepared remarks you said Badajoz accounts for roughly 300 megawatts. As for that gap, does the 190 megawatts come from a few separate sites? Or what's the right way for us to frame that?

Kent Draper

executive
#27

Right. There are several other development sites within the Spanish portfolio where we've locked in capacity, but the site we picked to highlight today is Badajoz, since it's the closest to being built out and the biggest one in that portfolio.

Nick Giles

analyst
#28

I just want to ask a question regarding Texas. I realize this isn't a pleasant subject, but I was wondering whether you might speak to what a few of these dynamics have made possible on the commercial side, simply because you already have 2 large-scale energized sites in that state.

Kent Draper

executive
#29

And when you say the dynamics, do you mean Governor Abbott's directive, or is it something different in particular, Nick?

Nick Giles

analyst
#30

Yeah, Kent, that's right. It's only the directive, and considering how much is still up in the air regarding some of those earlier-stage locations, whether that could have shifted a few possible deals in your direction.

Kent Draper

executive
#31

Yeah. When it comes to Governor Abbott's directive, I think if you examine what it's aimed at, it covers items such as transparency, grid reliability, water usage, and concerns about impact on local communities. And from day 1, these have all been areas we've specifically concentrated on and have consistently mattered to us. So, take Childress as an illustration — we paid for all the grid upgrades that project required. As you're aware, we sit a number of miles beyond the main town area there, where there are no residential neighbors, and from an operational standpoint we aren't affecting neighbors or the local community. We rely on a highly efficient closed-loop water-cooling system, which means very minimal ongoing water usage as time goes on. So I believe everything we've done in establishing our sites and our portfolio aligns with what Governor Abbott put forward in his directive. So in that regard, I think we actually welcome the extra transparency in the market. And then, as you said, we already have 2 very large sites energized in Texas, which I think puts us in an extremely good position beyond just those dynamics I mentioned as we proceed from here.

Nick Giles

analyst
#32

That's useful. And perhaps, just to build on that. We've observed many transactions featuring some initial contracted capacity, followed by what may be an expansion option, potentially with exclusivity for a certain duration; and my recollection is that IREN hasn't had any such expansion options included. Are you thinking about that for upcoming deals? Or have you deliberately avoided those kinds of options?

Kent Draper

executive
#33

Yes. Historically, we've deliberately avoided that, though it's clearly a bespoke discussion with every customer. As you'd expect based on our thesis, which Dan laid out once more earlier on this call, we perceive very substantial worth in infrastructure and compute going forward. And so should we surrender an option to anyone over that, we must receive compensation for doing so. So it truly boils down to that dynamic. But yes, we've typically steered clear of it before, since we usually see greater value than the counterparty.

Mike Colonnese

analyst
#34

Congratulations on all the impressive momentum you've built across the AI cloud business. I've just got one question. I was hoping you could give us more detail on how you intend to dole out future uncontracted capacity. Specifically, which customer segment are you most keen to go after as we head into 2027, and how are you weighing pricing against financing costs when you look at bigger versus smaller customer contracts? It seems like with this acquisition you're attempting to capture a bit more value higher up the stack. I'm just trying to understand how you assess these deals.

Kent Draper

executive
#35

Yes. I believe Dan covered many of the factors we consider earlier during the earnings overview. What we examine is the kind of customer, which industry they operate in, and the growth rates they've planned for going forward. As you've probably noticed from our customer mix, it's been moving toward direct end users of compute. We've since brought in more names in the AI-native space, a large leading frontier AI lab, plus a few of those physical infrastructure-related AI developers. So we come across plenty of highly appealing profiles throughout the sector; and as far as we're concerned, like Dan said, we've been working to diversify our customer base as time goes on. Within the portfolio we hold a variety of appealing long-term contracts that now position us for very attractive economics going forward. That in turn gives us extra flexibility to explore various monetization approaches, be it selling on a shorter-term basis through reserve contracts that generate additional economics, be it pursuing actual delivery of on-demand compute, be it managed services offerings as opposed to bare metal. And one great thing about the position we find ourselves in today is that we have optionality across all those areas, especially given how the financing market for sub-investment-grade counterparties has developed, which is something we always anticipated would happen, and now we're truly seeing it proven. What that means is we can keep securing very attractive financing across a range of different customer types; so we're definitely thrilled about the prospects ahead, being able to monetize the platform in various ways and capture additional economics as time passes.

Ben Sommers

analyst
#36

I'd like to dig a little into the discussions we're currently having regarding 2027 and 2028. It's logical that right now we might not be looking at those very short-duration options. However, when you consider what customers are telling you about that 3- to 5-year contract window, where do you think the bulk of them are leaning within that span? And from your team's standpoint, what would be the perfect duration, if there is one?

Daniel Roberts

executive
#37

Let me take that, Kent. What I believe we're beginning to observe is talks extending further out — apologies, discussions centered on longer terms rather than merely 3 to 5 years. Still, it comes down to balance, correct? We essentially manage this as a portfolio: anchor tenants such as Microsoft deliver the scale, the duration, and inexpensive capital through that 6% GPU financing, while AI developers across the broader market deliver somewhat better pricing, solid prepayments, and represent much of where growth is coming from; so staying flexible is what we want. Ultimately, the way we evaluate new customer contracts, as laid out during this call, is: who is the counterparty and what do they bring, what do the economics look like, and what does it unlock over the longer term? And sure, there is a trade-off. The investment-grade anchor receives 6% money; non-investment grade receives 9%. So it appears the investment grade comes out ahead on that, until you examine the pricing, until you examine the prepayments covering roughly 50% of the GPU CapEx; and I'd say those prepayments are likely the most thrilling piece for us, when they cover half the GPU CapEx upfront in addition to the 90% financing we already secure, these folks are sending a very clear signal. It isn't merely about contracting capacity; they're beginning to fund our build-out on our behalf. And I think that reveals plenty about demand, more so than any pricing chart in the presentation.

Ben Sommers

analyst
#38

Really useful; and then only one additional thing, if I may. Could you share any insight regarding early-stage talks about possible data center financing? I realize you all mentioned potentially going after that at some point. So I simply wanted to inquire about whatever early-stage discussions you've been having on that front.

Daniel Roberts

executive
#39

Indeed, plenty of early-stage discussions, and we'll inform you once we complete one. Yet we have been occupied. A great deal is happening with customers, a great deal has been happening with GPU financing; that has been the simpler opportunity. We've said before that we'll examine refinancing Horizons essentially once they're commissioned, since it's sensible to hold off until they've stabilized in order to secure a stronger financing arrangement. We'll aim to finance data centers once they're commissioned, though possibly even before commissioning. And among the difficulties we face, along with the chance that comes from vertical integration, is that you have this uneven GPU CapEx, which begins a couple of years before commissioning — pardon me, not GPU, data center CapEx, which begins a couple of years before commissioning, since you must order the steel, you must order the transformers. You must order a large number of long-lead items. And certainly, many of those payment milestones come later, yet CapEx gets incurred ahead of commissioning, and discovering effective methods to finance that so we can scale into that 5 gigawatts very rapidly, never mind the multiples of that which sit behind it within our pipeline, well, that's the major unlock for us. As for the customers, they exist. I don't believe anybody is arguing about that any longer; thus for us, everything comes down to that capital flywheel and running it well so we reach a point where we can satisfy that market demand, since we occupy a truly, truly distinctive position given that we began 8 years ago, we secured all the land and power. We've brought together the team, the expertise, the partnership and collaboration with NVIDIA to build and operate these things. And capital efficiency represents a very significant component of the next unlock. And GPU CapEx efficiency has now arrived. Objectively speaking, the data we've released today, what we've completed, that is efficient, and it will just keep improving. Regarding the data centers, that's the following frontier, and we're going after it, and we're thrilled about it.

Joseph Vafi

analyst
#40

Congratulations on everything you've achieved so far. Dan, I'm aware you mentioned that power is still the biggest limiting factor, which is clear. While we're on this call, we're engaged in plenty of conversations about financing. Of course, you have plenty of options at your fingertips, but this is a massive sector, and many players are arranging plenty of funding deals at this moment too. Just at a broad level, perhaps Anthony or Dan could speak to the financing climate, and whether the industry can keep sustaining this wider build-out at such a rapid clip — is there anything that keeps you up at night there, and how might IREN hold certain edges because of the distinct components of its business? Then I have a brief second question.

Anthony Lewis

executive
#41

Appreciate the question. I suppose we've already addressed some of the basic dynamics currently. I suppose what we're observing is how the market has developed — regarding GPU financing, we've noticed that it began as a product led by private credit with returns around the mid-teens, and now investment-grade cost of capital sits around the 6% mark. Clearly, we've watched the market expand when it comes to the various pools of capital taking part in GPU financing. That includes private and public markets, investment grade, sub-investment grade — all of which is encouraging. As I mentioned, we've also had other factors to consider, like the major announcement from NVIDIA involving 6 of the largest global allocators, which will give the market additional backing. We've also discussed prepayments, which clearly represent a significant element of the overall funding position too. We've clearly witnessed the data center financing market develop as well, in order to support the infrastructure build-out, in both the high-yield and investment-grade segments. And clearly there is — there is clearly quite robust conviction within capital circles regarding the sustainability and prospects of, I suppose, this fundamental transformation we've experienced in technology and the investment that will — that must be undertaken, along with conviction about the returns that will eventually materialize; so I suppose it's really that conviction which I believe will draw capital and keep drawing capital. Clearly, we must keep evolving our plans depending on market conditions. And clearly, market conditions can fluctuate. And clearly, we must stay nimble and flexible regarding how we respond to that environment and tweak our plans as needed.

Daniel Roberts

executive
#42

Joe, we get asked this fairly often — whether financing can keep up with the asset class. Well, consider where things stood just 12 months back: GPU financing hardly counted as an asset class at all. Then over the past 3 months, we raised $6.5 billion across both ends of the credit spectrum. That isn't luck on our part when it comes to financing — that's a market taking shape. And every market takes shape in the same manner. Take real estate financing: nobody wonders whether an office tower with a signed tenant can secure a mortgage. Construction finance, term debt, institutional money — an entire capital stack exists for it, since the cash flow is contracted and the collateral is real. Building that stack for property took years, likely a decade, whereas AI infrastructure is coming together in months and quarters, because the same ingredients are present: hard assets, contracted revenue, institutional counterparty. Blue Owl and PIMCO aren't minor participants. They rank among the biggest infrastructure lenders globally, and they've now underwritten us, plus we have a dialogue going at the highest levels with them. Though honestly, the analogy slightly undersells things, because a building leased for a few decades at a few percent yield — meanwhile our contracts return this compute investment in around 2 years, with customers prepaying half the CapEx upfront. So lenders see their money come back within really short time frames, and property finance never enjoyed economics like that. So whenever a new emerging market appears, if demand is genuine, financing will follow; that's always been true — for railway, for telecoms, for property, for power. And as for demand being genuine, the customers are demonstrating it. They demonstrate it through prepayments, through their end markets, their results, their revenue, their customer market traction. So the layer that hasn't truly begun or developed to the same degree as the GPUs is the data centers. In traditional terms, though, data centers are actually the simpler ones, since they align more closely with property and real-world infrastructure. And cash is there. We're aware of that, it's waiting for us to pull the trigger, and we'll examine that more closely over the coming months.

Daniel Roberts

executive
#43

Appreciate it, operator. And thanks to all of you for being here. The brief take on FY '26: we've contracted $4 billion of ARR, with $1 billion of that operating today. Microsoft is receiving Horizon 1. And as we've already discussed at length, our funding model performs efficiently across both ends of the credit spectrum. All of that was accomplished on a small portion of the platform we have now; and I suppose I should give a shout out to the IREN team worldwide and to everyone who's come aboard in recent months, Mirantis, Nostrum, and various other participants in the market, keep doing what you're doing. The plan stays the same. We'll keep delivering capacity, we'll keep turning it into lasting customer relationships, and we'll keep funding it with discipline. Thanks, everyone; see you at the next results.

Operator

operator
#44

We appreciate your joining us for today's call. That brings the program to an end. You're free to hang up at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete IREN Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to IREN Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in IREN Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.