Sa. It. Ladies and gentlemen, good day and welcome to Q3FY26 TAM Q3FY26 SAM India Project Limited earnings conference call hosted by ICIC Securities Limited. As a reminder, all participants lines will be in listen only mode and there will be an opportunity for you to ask questions after the presentation concludes. Should you need assistance during the conference call, please signal an operator by pressing star then zero on attached on phone. Please note that this conference is being recorded. I now hand the conference over to Ms. Nidhi from ICIC Securities Limited. Thank you. And over to you ma’.

Nidhi

executive
#2

Am. Thank you. Uskant. Good evening, everyone. Speaking for ICIC Securities, I'd like to welcome all of you to the Q3FY26 earnings call for SEM India Projects Limited. Joining us today from the management team are Mr. Jayanta Basu, Managing Director, and Mr. Nitesh Sharma. The CFO, Mr. Ritesh Agarwal, Head of Investor Relations. We'll start with opening remarks from management, and after that comes a quick Q and A. Thank you, and I'll hand it over to you, sir.

Nitesh Sharma

executive
#3

Good evening, everyone, and thanks for being with us on the Q3 FY26 results Concord. I'm Nitesh Sharma. Before we get started, I want to note that today's discussion might contain some forward-looking statements regarding SAM India Projects Limited. Such statements rest on management's present expectations and assumptions, and they carry assorted risks and uncertainties. Actual outcomes could differ materially from what those statements express or imply. Let me begin with the financial performance for the quarter, and after that our MD, Mr. Jayanta Basu, will walk you through how the company performed operationally. We're glad to report that Q3FY25 26 was yet another quarter of solid performance for the company. Here are the main highlights for Q3FY26. Total operating income came in at 2,315 crore in Q3FY26, versus 2270 crore in the prior corresponding quarter of last year. EBITDA was 245 crore in Q3, compared with 217 crore a year earlier, which works out to 13% growth on a year on year basis. The EBITDA margin came in at 10.6%. We posted a PAT of 111 crore in Q3FY26, against 87 crore in the same quarter of the prior year. That's again 27 growth on a year on year basis.

Nitesh Sharma

executive
#4

Turning to how we did financially over the nine months finishing on 31st December: operating income came to 7,087 crore for those nine months, versus 6,714 crore a year earlier — that's 6% growth year on year. EBITDA for the nine-month stretch was 749 crore. Again, 668 crore the year before. Over the nine-month period that works out to 12% growth, with an EBITDA margin of 10.6%. PAT was 356 crore across the nine months, compared with 259 crore last year. That's 37% growth year on year. On a base like that, the company is very conservatively financed, with net debt equity at 0.26x. Now, in this 9-month period ending 31st December, the company secured orders valued at 9725 crores. After December 25th, up to today, we've also brought in orders worth 2000-odd crores. So the total order book for the current year comes to 11,700 crores. The overall pending order book in hand as of today is 21,800-odd crores. That covers things from my end. I'd now like to hand over to my RMB, Mr. Jayanta Basu, to take you through operational performance. Thank you.

Jayanta Basu

executive
#5

Good evening, everyone, and welcome to this Hong Kong Q3 2526 call for India. I believe Nitesh has already gone through all the parameters tied to the last quarter's results. As you can see, revenue grew moderately, by roughly 5.676%, versus the same nine-month period in 2024. There's a reason for that, and I'll explain it. But I'm very pleased to share that our profitability has risen a great deal. Our PAT now stands at around 5%, compared with 3.9% a year ago. In the same period, 259 crore has become 356 crores. Likewise, EBITDA is near 11%. And you may have noticed that for several years, our EBITDA used to hover around 9 to 9.5. Over the last few quarters, we've managed to keep it above 10%. These are encouraging signs. On revenue, I think two factors had an impact. Otherwise, it could have been a little higher. We secured a job at project Vadavan — the port job that was won a year back, not quite a year back, say the beginning of this year, last year. And we would have expected some revenue from this project. But due to certain issues connected with local problems and all — we must be aware that the newspapers every day — we were able to make hardly any progress, and that has really affected our revenue.

Jayanta Basu

executive
#6

And the same applies to the water flow order — the flows order. By now we've secured roughly 9,000 crore in orders. However, that order inflow will make itself felt in the quarters ahead. Over the past year — if you look at our order position through Q2, it stood at just 2,000 crores. And in quarter four, 834 crores. So whatever orders we booked last year are only now maturing into revenue, and that figure is lower by comparison, as it naturally should be. So these issues stem from some deferred revenue caused by delayed orders. And Bhagawan port not being as really implemented or revealed — otherwise we would have been very happy to report even around 18 to 20% more revenue than the last quarter of last year. That said, profitability is better, and I should share that some significant, good things happened last year. We finished the Mumbai Metro tunnel. We handed over a beautiful building to the government of West Bengal — that's the new High court building at West Bengal. They have completed Biringham port. They have completed Ulanguri port. We have completed Calcutta Metro. You know how difficult it was a few years back. So some big challenging job we have completed last year which is a good, good achievement.

Jayanta Basu

executive
#7

It's all been quite a demanding task. At present, our primary emphasis is on managing a couple of tough assignments—a few additional difficult ones such as the Barsa project and Pune Metro. An order came in for you a few months ago. Plus the head of Petronet, Ruiz, and Abu Dhabi—all of them reported that our work is progressing nicely. I believe quarter four beats quarter three. And in terms of opportunities, you know, it's somewhat like that. You might land a single order that could affect you significantly, since the large-ticket assignments are pending. Every one of those jobs will run 5,000 to 10,000 crores. A handful of jobs fall in that range. Should we be fortunate and secure one or two of those large-ticket assignments, the entire picture would transform. We hope so, we're putting in a lot of effort, and we hope some of them will be won by us. So solid orders have been booked thus far, opportunities lie ahead, more orders to be secured, large-ticket assignments. Profitability has improved, finances are healthy. That's what I have to say from my end—if you have any questions as we move forward. I think that's everything from my side.

Nidhi

executive
#8

With that, we can open the floor for questions and answers.

Nitesh Sharma

executive
#9

Yes. Indeed.

operator

operator
#10

Thank you so much. We'll now start the question-and-answer session. Anyone who wants to ask a question can press char and one on the dash turn telephone. If you want to take yourself out of question Q, you can press char and two, and participants are asked to use handsets when asking a question. Ladies and gentlemen, please wait a moment while the question queue assembles. The first question comes from the line of Dhananjay Mishra from Sunidi Securities. Please go ahead.

Dhananjay Mishra

analyst
#11

Thanks for giving me the chance to ask. Can you hear me okay? I just wanted to check something—you mentioned that quite a few projects were finished during this quarter, and we've seen really strong margin expansion. So I'm wondering whether that's sort of a one-off, given all those orders that got completed, or whether double-digit margin is something you can sustain in the quarters ahead as well?

Nitesh Sharma

executive
#12

Yeah, I believe by the end of the year we'll definitely have double-digit margin, which is what's expected next quarter or going forward. Yes. And that's what we're consistently doing. If you look at last quarter, it was also double-digit margin. I'm talking about EBITDA — this quarter as well, a little bit more than last quarter.

Dhananjay Mishra

analyst
#13

Since a 1% gain does count for something — I mean, on the higher side — and that's even with the new labor port provision of 15 crore. So that's where it stands. Also, could you share some roadmap on order inflows and the pipeline for the next three to six months? Will those orders come from the group or from outside, from the private environment, and which sectors are we taking orders in on a six-to-nine-month basis?

Nitesh Sharma

executive
#14

Okay, so at this point we've completed 9,000 workout jobs so far, and we've put in our bid and are now waiting on the results. Such as the Metro jobs in Delhi and a port job in Odisha. There are plenty of jobs coming from the group, including the data center. So I think the tender. But we still have to open, and another 30 to 40,000 ports. So that gives you a sense of the. The upcoming quarter. This quarter. There are a few jobs for the group that are under discussion. In terms of the roadmap. If you look at it, that will hold at another 2,3000 this year, which is February and March, and in Q4 or Q1 Q2 of next year there are some big-ticket jobs. It all depends on when the government opens the tenders, the timing. If that happens, then there are some very big-ticket jobs that would transform the entire scenario.

Dhananjay Mishra

analyst
#15

And finally, turning to guidance — given that Q3 revenue came in soft, or as you put it, the development occurred in the Wadwan board order — what's the situation there? Are we still holding to the 11,000 crore mark, or perhaps the 10 to 5,900 crore mark? To get there, we'd need to hit something like 4,600 crore in turnover during Q4. So what's your view on that?

Nitesh Sharma

executive
#16

We can't really be certain how Vadawan will play out, since it's entirely outside our control. Still, the Pune Metro ought to begin generating something, and that project has recognized it is producing something. So my sense is it will come in roughly 15 to 20% above the quarter, at minimum.

Jayanta Basu

executive
#17

From the quarter we're in right now.

Nitesh Sharma

executive
#18

Regarding the current quarter, yes.

Dhananjay Mishra

analyst
#19

Twenty percent more.

Nitesh Sharma

executive
#20

Yeah, yeah. Estimate, estimate.

Dhananjay Mishra

analyst
#21

That covers everything I wanted to say. Thanks.

Nitesh Sharma

executive
#22

I appreciate it.

operator

operator
#23

Thanks. Our following question comes from Neeraj Mansingha at White Pine Investment Management. You have the floor.

Analyst

analyst
#24

Thanks for taking the question. I just wanted to get some clarity on the data center side. Adani has its own data center plan, and also a joint venture with global scale and hyperscalers. First, I'd like to understand how much you're prepared and able to take on those orders. And second, what kind of visibility do you have on those orders coming through, and on executing them?

Nitesh Sharma

executive
#25

So this data center has actually been under discussion for at least seven or eight months now, ever since AD started — I mean, since they took over this company. And over these past few months, we've been ramping up our capabilities. We've brought on several engineers who have experience with data centers. We've gone to a lot of sites around the world to see how this has happened, how it happens, what the method is, what the nuances of this business are. And we've already begun two data center builds in Mumbai, and the foundation work is done. The precasting work has also been completed. So we're ready to take up this activity. The visibility is that Azari has a big plan. And even if we do half of that, it will be quite big for our company.

Analyst

analyst
#26

Understood. And regarding any potential opportunity around data, do you have any thoughts on how large that might be for you? Perhaps expressed per megawatt. That would help me get a sense of how much of a presence you have in the data center.

Nitesh Sharma

executive
#27

Your question is about the cost.

Analyst

analyst
#28

No—what I'm trying to get at is how many of those kinds of projects you could actually handle.

Nitesh Sharma

executive
#29

A 120 to 130 megawatt project usually takes two years from start to commissioning—two years, or up to 27 months. So we've already locked in three data centers with comparable capacities. We might add another two or three this year. In terms of prison capacity, you can handle roughly 500 megawatts.

Analyst

analyst
#30

This year refers to the period ending March 26.

Nitesh Sharma

executive
#31

It really hinges on whether you’ve got the project secured. If you lock in the job now, what happens once it’s secured? There are two components. The first is civil. The second is the balance. The civil portion is barely 20%. You won’t see revenue ramp up in year one. In year two, definitely, with the electromechanical piece—that’s 70% or 80%. All those figures have to be factored in when we work out the revenue from the data set.

Analyst

analyst
#32

And so what sort of figure are we talking about? If you look at, let's say, 120 megawatts — suppose an order for 120 megawatts comes in, how much revenue would you be able to book from that order? Is there a potential range you could give us on that side?

Nitesh Sharma

executive
#33

If you're asking me directly what the price for 120 megawatts would be, that's very hard to answer, since it hinges on the circumstances. It hinges on location, on what the project's terms and conditions are, and on things like the supply fee. What I can tell you, though, is that a 120-megawatt timeline might take 2 to 27 months, with 20% of revenue in the first year. In the following year, 80% of revenue.

Analyst

analyst
#34

Alright, I’ll return to the queue. Thanks.

operator

operator
#35

Thanks. We'll now take the next question from Abu Shah at JM Financial, who is on the line. Please go ahead.

Abu Shah

analyst
#36

Sure, could you give us some clarity on where the Bangladesh order stands at the moment?

Nitesh Sharma

executive
#37

Activity is continuing. Absolutely. Okay, I mean, there are obvious reasons why anyone would be worried. I understand that. But the local government gives us real support — and not just to us, but to any overseas firm with staff working there. And our people are doing fine. We're delivering the work according to schedule. Payments are coming through on time, and we'll have essentially finished the piling work by the end of May. So the bulk of the job will be done.

Abu Shah

analyst
#38

What does the Bangladesh order's book stand at as of December?

Nitesh Sharma

executive
#39

Excellent — I need to look into that.

Abu Shah

analyst
#40

All right, sir. And the second thing — what's our target date for finishing the Bangladesh order?

Nitesh Sharma

executive
#41

This order gets finished during FY27. The physical work, as you can see, will be done before the next monsoon arrives — that means May or June of next year.

Abu Shah

analyst
#42

Alright, if I have the figure right, then our order inflows for the year to date, including the 2000 crores we secured in January, ought to come to roughly 11,700 crores.

Nitesh Sharma

executive
#43

Yeah, you're 100% right.

Abu Shah

analyst
#44

Alright. Alright. Sir, what's your view on how margins will trend going forward? So it ought to be in double digits, correct — somewhere between 10 and 11.

Nitesh Sharma

executive
#45

I think you shouldn't get too carried away with the hype. Still, that same margin pattern is going to hold, at 10%.

Abu Shah

analyst
#46

Alright, and then just one final item on the numbers side—what figure should we expect for gross debt at December?

Nitesh Sharma

executive
#47

Gross debt stands at roughly 920 crores.

Abu Shah

analyst
#48

All right. All right. Thanks. That covers everything I wanted to ask.

operator

operator
#49

Thanks. Our next question comes from Vinay Chaudhary at Invexa. Captain, go ahead, please.

Vinay Chaudhary

analyst
#50

Hello.

Nitesh Sharma

executive
#51

Hello there.

Vinay Chaudhary

analyst
#52

Yeah. Yeah, so.

operator

operator
#53

My apologies for cutting in. Sir, we can’t hear you.

Vinay Chaudhary

analyst
#54

Can everyone hear me?

operator

operator
#55

Yes, sir.

Vinay Chaudhary

analyst
#56

Right. So during the quarter just ended, our inflow came to roughly 7,100. And we had a couple of L1s — Pune Metro and Sea Veg Plant — worth around 3,000-odd crores. So what's the status on those L1s, since that also added up to something like 11,000-plus? And right now we're at about 11,000 as well, counting the two projects you mentioned. So I just wanted some clarity and to fill in the gaps there.

Nitesh Sharma

executive
#57

I can't provide a comparison against last year or the prior quarter. What I can share is where things stand right now. To this point, we've booked roughly 11,700 crores in total. That figure also takes in the Pune metro work worth 1,500 crores. We don't have any job where we've exited at L1. There's one small job in Seabark. Even so, there are plenty of jobs out there. We've put our bids in, so the outcome will depend on how things turn out. I believe we've submitted bids totaling about 25,000 crores. Of that, we've already secured one job, or reached L1 on it. It's the group company project called Adani Moore Sagar in Rajasthan, which is a job of around 3,500 crores. So that will be joining the kitty very soon.

Vinay Chaudhary

analyst
#58

So roughly 15,000 or so is what we had been anticipating. So is any upward revision expected for this year?

Nitesh Sharma

executive
#59

So I'd still put it at about 14,15,000 crores. The reason is that a few government tenders you'd have expected to be finished by now are still running late. And some group jobs are also slipping a bit as a matter of timing. Apart from that, we've hit 50,000 crore this year.

Vinay Chaudhary

analyst
#60

So will this — you know, will that delay come up over the next year, or is it, well, kind of a lost — kind of a bid for us.

Nitesh Sharma

executive
#61

So it’s not lost. It will come next year. It’s a matter of time, time lag. That’s all. Yeah. I mean if you get, you’ll get now. You can get later on also. So that is the issue whichever you get or do not get. But if you get now, if you get later on that is not going to affect much in our progress. Financial progress.

Vinay Chaudhary

analyst
#62

Alright, thanks a lot.

operator

operator
#63

Thanks. Our next question comes from Aditya Sahu at HDS Securities. Go ahead, please.

Analyst

analyst
#64

Hello there. I hope you can hear me clearly.

Nitesh Sharma

executive
#65

Yes.

operator

operator
#66

Yes, sir.

Analyst

analyst
#67

Thanks a lot, sir, for giving me the chance. I’ve got a few questions. I believe it might be this. For FY26, what would the revenue guidance be, along with the revenue EBITDA margin and the order info guidance?

Nitesh Sharma

executive
#68

Honestly, to address what you're asking, this is a significant matter, since we've been spending month after month working out the size of it. It wouldn't be right for me to hand you an exact figure. Still, as I've kept saying, it should come to roughly a 15 to 20% increase in revenue.

Analyst

analyst
#69

And regarding the EBITDA margin, 10, 11 — that's what I'm picking up.

Nitesh Sharma

executive
#70

Yes. Yes.

Analyst

analyst
#71

Regarding the influence orders, you brought up 15,000 crores. My hope is that this figure is accurate.

Nitesh Sharma

executive
#72

Yeah, I think so. Look, there are a handful of jobs that are pretty large. And if you happen to land one of those, the number can be anything — I mean, it could be 10,000 or 12,000, or even 20,000 or 21,000 as well, so I get it.

Analyst

analyst
#73

From that total, what amount do we expect to come from group entities, and what share should group entities represent?

Nitesh Sharma

executive
#74

Yes, I believe we’ll keep a figure of 20 to 28% from group.

Analyst

analyst
#75

Alright, alright, 2025% from. And what does the current bid pipeline look like, and how much of that also comes from the group entities? If you could shed some light on that.

Nitesh Sharma

executive
#76

In terms of the current pipeline, there are a handful of data center projects from the group that they're developing in a number of locations, and then some work like the one I just mentioned — more of a sale, one irrigation project in Rajasthan, and possibly some road projects should they secure them. If they do get them.

Analyst

analyst
#77

Got it—if you’re able to share those value terms, that works.

Nitesh Sharma

executive
#78

Regarding value terms, I can't say what will happen going forward, but right away perhaps somewhere in the neighborhood of 10 to 12,000 crore job.

Analyst

analyst
#79

Regarding capital expenditures, my understanding is that we spent roughly—I believe the prior guidance stood at 300 crores for FY26. Is that guidance still the same as what we have at present, and how much have we deployed so far?

Nitesh Sharma

executive
#80

It really hinges on which type of job you land, because during the past year we picked up a lot of building contracts that require substantial spending on farmwork material. It isn't as pricey as plant equipment, granted, but it's still expensive, since these days everyone opts for system forward, so we have plenty there, and we've acquired a few general plant items as well, so those stand on their own too. As for whatever we laid out last year on Export, that figure runs 10% 15% above the prior year — 15% higher across 9 months — he has spent roughly 2200 odd crores toward the.

Analyst

analyst
#81

Got it, got it. And out of the 21,000 cr order book we're holding right now, what portion comes from the group entities?

Nitesh Sharma

executive
#82

Twenty-seven percent.

Analyst

analyst
#83

On the port you brought up, 27%, is there any visibility into when that will take place? And also, how much would that particular order contribute to the overall order?

Nitesh Sharma

executive
#84

Yes, it's 1600 crore, out of 21,000 work in hand — under 10% — and we have got. We can. We can't speculate about what might happen; that isn't in our control.

Analyst

analyst
#85

Thanks a lot. I really appreciate it.

operator

operator
#86

Thanks. Our next question comes from D. Shah at Ohn Portfolio. Please go ahead.

Analyst

analyst
#87

Hello sir, and thanks for the chance to ask. My question once more has to do with the Wadhvan port delay you mentioned during this quarter, where we apparently saw a revenue loss, yet your margins are actually better, so how should we think about that? Because if the revenue loss stems from work not being done, that means you weren't able to deploy your people or equipment, and you turned that into a revenue loss. Then is there also a matching expense that should have come in, or does it mean the rest of the business was at much higher margins? That's my first question. Thank you.

Nitesh Sharma

executive
#88

Well, what about revenue loss—because what hasn’t happened? So that’s a direct one. You can see it. I think—and I’m sure—another 200, 300 crore in revenue would have meant more at this operation. And as for margin betterment, you’ve done well. We handled the project efficiently. That’s how this.

Analyst

analyst
#89

No. So, is our understanding that the 2 to 300 crore revenue loss is the unbilled item, and in that case the expenses are also booked? So perhaps your margins are better than what you have reported.

Nitesh Sharma

executive
#90

To be clear, we have definitely not incurred 200 crore in expenses. In Bhagawanpur, we're being quite cautious. Our setup on site is very, very small and scanty. That's because the expenses mostly come from the material we source and what we've done, and that converts into revenue.

Analyst

analyst
#91

Even so, your teams can be shifted over to different projects.

Nitesh Sharma

executive
#92

So at Bhagwanpur, it was added toward the engineers. That’s it.

Analyst

analyst
#93

Okay, so even shifting staff around didn’t end up producing more revenue when you look at the whole picture, right?

Nitesh Sharma

executive
#94

Sorry, sir, I didn't catch that.

Analyst

analyst
#95

I made the point that if — if you weren't able to move forward with that Wadhwan port order and some materials were lost or whatever happened — but you could redeploy your team, then that team ought to have helped you recover that revenue from other projects. Or did they sit idle during the quarter?

Nitesh Sharma

executive
#96

I mean, in a big organization like ours, having 5 or 6 engineers move around here and there really doesn't change much. So just because you've got a team of another one operating in some other place, that doesn't necessarily mean they're bringing in additional revenue.

Analyst

analyst
#97

Got it. Got it. And then in the next quarter, you can work out where to redeploy and recover the data on overlocks during this quarter.

Nitesh Sharma

executive
#98

So essentially, tomorrow, assuming conditions hold.

Analyst

analyst
#99

No, no — what I mean is your wadwan has slipped, but you can shift your team to other work. And that's exactly what you're counting on. You expect revenue to come in 15% higher across the quarter.

Nitesh Sharma

executive
#100

It's not that deploying resources elsewhere would somehow produce a better result. The reason is the time cycle. As you know, in the first 5 or 6 months of a project, progress tends to be slower, and after that it picks up. There's also higher permanent turnover and all of these factors. When you add them all up, you'll see that Revenue comes in a bit above what we saw this quarter.

Analyst

analyst
#101

Got it? Got it. All the best with that. Then my final question: at what point should we expect a significant step-up in the quarterly revenue run rate? I'm not after specific guidance, but since your order book is very large, maybe you're able to grow by at least, say, 20, 30% off the current base. Of course, that depends on how your projects scale up and on the milestone. Is that likely within the next few quarters, or will it still take time?

Nitesh Sharma

executive
#102

It really comes down to what kind of order it is and how quickly those orders turn into revenue. That said, in my view, our company has the ability to increase the progress by 30% using the resources we already have.

Analyst

analyst
#103

Okay. But given the orders you have now, plus the milestone and the commitment on execution, do you expect a meaningful ramp-up over the next few quarters?

Nitesh Sharma

executive
#104

Actually, I meant quarter four — apologies. Quarter four is fine. Quarter one, quarter two — yes, that will be better compared with quarter three. Quarter four for sure. The reason is that a handful of jobs such as Pune Metro will be running at full swing. Abu Dhabi port, similarly, will be at full swing. And some additional work you've recently won — Data center — will bring in more revenue. So this 11,000 crore order that you have secured is now at the threshold stage, the initial stage. Revenue from it will start coming next year, quarter on quarter two.

Analyst

analyst
#105

Alright, thank you so much. That’s everything. All the best.

operator

operator
#106

Thanks. We'll take the next question from Weber Shah at JM Financial. Your line is open.

Analyst

analyst
#107

Thanks for the follow-up. So given the weaker Q3, what would our revenue growth guidance be for FY26?

Nitesh Sharma

executive
#108

18%.

Analyst

analyst
#109

Still, hitting that 18% would require a much higher ask price during the fourth quarter. So we feel confident about roughly 3738 crore in revenue for Q4.

Nitesh Sharma

executive
#110

No, this isn't about Q4. What I mean is the year after this one.

Analyst

analyst
#111

All right, then — turning to FY27.

Nitesh Sharma

executive
#112

Fiscal year 27.

Analyst

analyst
#113

Alright.

Nitesh Sharma

executive
#114

And regarding 26, that isn’t right — it’s not correct. Revenue growth next year will be around 16 or 20.

Analyst

analyst
#115

That is exactly what I stated regarding FY26.

Nitesh Sharma

executive
#116

For FY26, we have just one quarter remaining, and we've perhaps reached 2300 crore. Possibly it'll be 15, 20% higher. Let's say 15% higher.

Analyst

analyst
#117

When you compare it with Q3, in Q4.

Nitesh Sharma

executive
#118

In comparison with Q3, looking at Q4.

Analyst

analyst
#119

All right, all right. So then how much would you have outstanding in receivables from Bangladesh? Last quarter it stood at roughly 120 crores.

Nitesh Sharma

executive
#120

Yes — 1,170 crore on this, as of December.

Analyst

analyst
#121

Alright. Alright. Thanks, sir.

operator

operator
#122

Thanks. Our next question comes from Aditya at HDS Securities Case Corporation. Please go ahead.

Analyst

analyst
#123

Hello sir, thank you very much for taking my question. Once more, only a single question here. I did observe that the figures, you know, so for instance historical figures for, say, Q2 or the FY25 for that matter came in slightly different, if you could shed a bit of light on that. So because I notice some of the figures that appear for Q2 in the Q2 disclosures versus those that appear for Q2 in today's current disclosure are slightly different. Could you explain that one?

Nitesh Sharma

executive
#124

I honestly didn't catch what you asked — could you say it one more time?

Analyst

analyst
#125

Hold on one moment. OK, so I was saying that the historical figures, say for Q2, differ slightly from what we disclosed then compared with the disclosure we're giving today versus the Q2 disclosure we made. Uh, in the same way, I noticed this one for the FY24.5 origin numbers — if you could, you know, shed some light on that.

Nitesh Sharma

executive
#126

Right, so there’s a change in how accounting is represented — the jointly controlled operations we had across various JVs. So the net line items have been crossed up, and for the whole of this year the figures have been restated in Tumblr’s line accordingly. The profit figure and the P&L, though, won’t change. Profit and loss stays the same. That’s an accounting treatment that took place, and it’s what led to a difference in what was disclosed before.

Analyst

analyst
#127

Got it, and the reason is that, you know, I noticed this in the audited numbers as well. So that's the reason, you know.

Nitesh Sharma

executive
#128

So it’s more of a situation where we have a benchmark based on the best practices in the industry, and we formed a view, and then a judicial decision was made to.

Analyst

analyst
#129

So what you're describing, then, is that this was a one-time exercise, specifically regarding the crossing of Netline items, as you put it.

Nitesh Sharma

executive
#130

Correct, correct, correct, definitely.

Analyst

analyst
#131

Alright. Alright, thanks a lot. Thanks.

operator

operator
#132

Thanks. Assuming that was the final question today, I'll turn the conference back to management now for any closing remarks. Sir, the floor is yours.

Nitesh Sharma

executive
#133

Thank you very much. We really appreciate you joining and attending this call, and we hope each of you has a very, very happy and good day. We also hope that whatever we expect comes to pass and that the next period's performance would be in line with the expectations which we have told to the investors. Thank you very much. Thank you very much for joining us.

operator

operator
#134

Thank you. That brings this conference to a close on behalf of ICIC securities limited. We appreciate your participation. And at this point you're welcome to. Thank you.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete ITD Cementation India Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to ITD Cementation India Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in ITD Cementation India Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.