Ivanhoe Mines Ltd. (IVN) Earnings Call Transcript & Summary
November 15, 2021
Earnings Call Speaker Segments
Operator
operatorWe appreciate everyone holding. I'm the conference operator, and I'd like to welcome you to the Ivanhoe Mines Q3 2021 Financial Results Conference Call. Just a reminder that everyone is in listen-only mode and that this conference is being recorded. Following the presentation, management will respond to questions that were submitted ahead of time. Those joining via webcast can also type their questions through the webcast. At this point, I'll hand the conference over to Bill Trenaman, Vice President, Investor Relations. Please go ahead.
Bill Trenaman
executiveThank you, operator. I'm truly delighted to have you join us for Ivanhoe Mines' very first quarterly earnings call. A brief presentation and a short overview from members of our senior management team are on today's agenda. You can view the presentation through the webcast. It's also posted on our website at www.ivanhoemines.com. A question-and-answer session will close out today's call. Feel free to submit a question whenever you like through the Q&A box on the webcast page. Before getting started, I want to remind everyone that forward-looking statements will be part of today's event. You'll find the details of those forward-looking statements in our third quarter MD&A and news release, both issued earlier today and available on our website or on SEDAR. I'll now hand the call over to our Founder and Co-Chairman, Robert Friedland, for a few introductory comments. Please go ahead, Robert.
Robert Friedland
executiveThanks, Bill. To everyone joining us from around the globe, I'm in Singapore. It's late at night here, and I'd like to welcome all of you to this call on what is an important occasion for the thousands of people who have contributed to the development of Ivanhoe Mines. The profits we're announcing today, along with the start of commercial production, belong not to an individual mine but to a mining district. This stratabound basin scale copper system ranks as the largest untested copper system in the world. It's a very momentous occasion to announce that the first phase concentrator is ahead of schedule, under budget and in production. We have members of our senior management team here who will be happy to take questions, and we'd remind you that we've been working for over 25 years, not only on this project but our two other tier one projects, Kipushi and Platreef, which we will also be touching on in this presentation. With that, introduction, I'll turn this over to Marna, our President, who's going to take you through the third quarter results and beyond. Thank you.
Marna Cloete
executiveThank you very much, Robert. Matt, could we go to the slide that presents the highlights? This has truly been quite a journey. We have gone from being well-known explorers to running what I consider the most thrilling copper discovery anywhere in the world. In a span of just five years, we turned Kakula into the impressive mine that stands today. A large share of the credit goes to the 7,000 people on site, every one of them contributing to getting this mine built within budget, ahead of schedule, and, let's remember, through a pandemic. You can be sure that those same people plan to produce comparable outcomes on the expansions, power and smelter projects we have ahead. The quarterly highlights shown on your screen right now represent merely the beginning of the continuous growth and improvement we are targeting over the decades ahead. Now that phase I commissioning is finished and given the strong ramp-up performance, we are confident enough to raise our guidance to a range of 92,500 to 100,000 tons of copper and concentrate for the 2021 financial year. Within just a few short months, it has become clear that phase I will comfortably beat design capacity, and the same will hold true for phase II.
Marna Cloete
executiveFor the year, we've generated more than 77,500 tons, and we anticipate that our C1 cash costs, which sit at $1.37 per pound right now, will come down over time as additional expansions come online and we sharpen our efficiencies. You'll hear more about our first set of earnings results later, when our CFO, David van Heerden — and David, by the way, congratulations on being appointed — walks you through the results. Matt, if you could flip to the next slide. I'd like to spend a few minutes on our ESG scorecard. This is only Ivanhoe's fourth year of publishing our sustainability metrics, and our MSCI index rating has already risen noticeably, with an A rating achieved and a goal of becoming a leader before long. A myriad of inputs drive ESG performance, and health and safety sits at the heart of Ivanhoe's focus. Our operational teams have worked tremendously hard to embed a zero harm culture, and we believe every employee deserves to go home safely each day, and our improved lost time injury-free hours stand as proof of that. As for CO2 emissions, bringing this copper mine into production when we did seems like divine intervention.
Marna Cloete
executiveWe’ll also give some visionary credit to our leader, Robert Friedland. It’s obvious that copper will be needed worldwide for all sorts of things—battery electric vehicles, EV chargers, solar panels, wind turbines, grid overhauls, to name a few. Many promises came out of Glasgow, and Ivanhoe will gladly help world leaders keep those promises. I’d like to remind everyone that the copper from Kamoa-Kakula is mined with clean, renewable hydropower. Earlier this year, Ivanhoe finished refurbishing six turbines at the Mwadingusha Power Plant together with SNEL, the DRC’s state-owned power utility. That plant is now producing 78 MW, which is enough for our phase I and phase II. We’ve now also broadened this partnership to include Inga II, turbine five, which will produce an extra 162 MW of power. That power will be enough for our future expansions and our smelter project. Today, the biggest source of emissions at the mine is the diesel fleet, which is why we announced that we’re looking into battery electric or even fuel cell underground equipment. It’s great to see how much progress equipment manufacturers are making when it comes to electrifying mining fleets, and we intend to adopt the technology ahead of the curve.
Marna Cloete
executiveAnother major factor in that choice is thermal efficiency, since 70% of the energy in conventional diesel gets lost as heat, which means extra ventilation management and exhaust gases. So we've already ordered Epiroc's battery electric underground fleet for Platreef, due to arrive early next year, and over time we'll transition Kamoa's fleet as well. That lets us apply what we learn at Platreef, where ramp-up will be somewhat slower, and then move those lessons across to Kamoa-Kakula and deep cost. Finally, a word on diversity. Ivanhoe plans to publish targets for female employment at every level of the organization. Beyond that, we'll keep focusing on minority groups and previously disadvantaged communities, consistent with the jurisdictions where we operate. I'll now pass things to David, who will walk you through our inaugural earnings.
David van Heerden
executiveThanks, Marna. We've been reporting quarterly results for a few years now, but now that our first project is in production, we felt this was the right moment to begin quarterly earnings calls, and we expect to keep doing these alongside each quarter's results from here on. Because Q3 2021 is the first quarter following commercial production, my focus will be on what we achieved during the quarter rather than on comparisons with earlier quarters. The comparisons of the three and nine months ending September 2021 against the same periods in 2020 are, naturally, set out in detail in our MD&A. Next slide, please, Matt. In recent months, quite a few questions have come to us regarding the way Kamoa-Kakula's revenue and eventual profit will flow through into Ivanhoe's statement of comprehensive income. So we concluded that this is likely the best place to begin the financial overview. Kamoa-Kakula is a joint venture involving Ivanhoe Mines and Zijin Mining, which each hold a 49.5% share interest in Kamoa Holding. Kamoa Holding in turn holds an 80% interest in the project, while the DRC government holds a direct 20% interest. As a result, Kamoa Copper's results get consolidated into Kamoa Holding, and Ivanhoe recognizes its 49.5% share as one line item on Ivanhoe's statement of comprehensive income.
David van Heerden
executiveMoving to the next slide. In the initial quarter of commercial output, the Kamoa-Kakula joint venture moved 41,490 tons of payable copper and booked $343 million in revenue. That revenue figure is net of a $12 million decrease stemming from remeasuring contract receivables as of September 30th. This reflects the effective mark to market on August and September sales at a copper price of $4.10 per pound. We anticipate further upside in Q4 should copper prices hold at today's levels. For Q3 2021, Kamoa-Kakula's cost of sales came to $99 million overall, or $1.08 per pound of payable copper sold, and cash cost per pound of payable copper was $1.37 per pound. I'll come back to that. General and administrative spending totaled $33 million for the quarter, which naturally takes in the expense of the outstanding site management team that labored tirelessly to deliver Kamoa-Kakula's first phase on time and within budget, and today is focused not only on operations but equally on the phase II and phase III expansions. Operating profit in the first quarter of commercial production reached $210 million, with EBITDA of $233 million. Kamoa Holding posted a finance cost of $52 million in Q3, chiefly interest on shareholder loans from Ivanhoe and Zijin, along with interest on Kamoa-Kakula's equipment financing facility and the short-term facilities accessible under the offtake agreements.
David van Heerden
executiveAll development and exploration costs accumulated since inception can be applied against taxable income, and for tax purposes Kamoa is permitted to amortize them across the initial two years after commercial production begins. Consequently, Kamoa's income tax expense amounts to just 1% of revenue, while the deferred tax portion—$47 million—does not involve any cash outflow. The $24 million non-controlling interest reflects the profit allocated to the DRC government's 20% stake in the Kamoa-Kakula project, which leaves $84 million of profit attributable to the joint venture partners. Ivanhoe's portion of that came to $41 million in the third quarter of 2021. Matt, next slide, please. Turning now to Ivanhoe's consolidated interim results for Q3, the chart in the slide deck picks up where the previous slide finished, beginning with Ivanhoe's $41 million share of profit from the Kamoa-Kakula joint venture during the quarter. Ivanhoe recorded $24 million in interest income from Kamoa Holding in the third quarter related to shareholder loans advanced to the joint venture. Over the quarter, the company allocated $9 million to the Kipushi project, $7 million to Western Forelands exploration, and $7 million to general and administrative expenditure.
David van Heerden
executiveExpenditures at Platreef are considered essential for getting the project to commercial production, so they get capitalized as development costs within property, plant, and equipment. The $55 million gain from fair valuation of a financial liability during Q3 reflects the shift in deemed fair value of the conversion feature tied to the $575 million, 2.5% convertible senior notes that Ivanhoe closed this March. That conversion feature functions as an embedded derivative financial liability, with fair value movements driven mainly by swings in our share price. Ivanhoe recorded $10 million in finance costs for Q3 connected to interest on the convertible notes at the effective interest rate, which ultimately contributes to Ivanhoe's $85 million profit for the three months ending September 2021. Matt, could we have the next slide, please? For Kamoa-Kakula's first quarter of commercial production, the cash cost per pound of payable copper produced for delivery to China came in at $1.37 per pound. Quarter costs mirror the measured ramp-up of output at Kamoa-Kakula toward steady state and should trend lower once the phase II concentrator plant is commissioned and fixed operating costs at the mine are distributed across greater copper production.
David van Heerden
executiveOver the longer term, we're examining initiatives such as the smelter, which could lower cash costs by as much as 15%. Cash cost is a non-GAAP metric, and the reconciliation from cost of sales to cash costs appears on page 39 of our MD&A. Once phase II begins, we plan to report all-in sustaining costs. Since the mine has just been commissioned, sustaining capital is modest, though it relates mostly to underground infrastructure and development. That said, because we're currently ramping up the Kakula mine in preparation for phase II, drawing a line between expansion and sustaining capital activities is somewhat arbitrary. In fact, at present we're mining above our phase I mining rate, and we also have the 3.7 million ton mining stockpile available to draw down on. Next slide, please. Our balance sheet is strong, and we're well-positioned for further development of our project, with $580 million in cash and cash equivalents on hand and consolidated working capital of $624 million. Our debt of $671 million relates mainly to the 2.5% convertible notes I mentioned earlier. These, however, don't come due until 2026, with possible earlier redemption. For the rest of the year, we forecast spending of $61 million on Platreef, Kipushi, continued exploration of the Western Forelands, and overheads.
David van Heerden
executiveAt this point I'll turn things over to Alex Pickard, Vice President of Corporate Development and M&A, who will give a short update on additional developments at our projects.
Alex Pickard
executiveThanks, David, and hello everyone joining us today. I'll walk you through an operations update covering Kamoa-Kakula and the Western Forelands, then hand things over to Marna, who will cover what we're doing at Platreef and Kipushi. Let's move to the next slide, Matt. Since we commissioned the concentrator at Kakula back in May of this year, we've had a remarkably smooth ramp-up to steady-state production. We have generated more than 77,500 tons of copper in concentrate so far, and that material has either been toll treated at the Lualaba Copper Smelter close by in Kolwezi to make blister copper, or our offtakers have shipped it for export to international markets. Because ramp-up performance has been so exceptional, our guidance for the year has climbed steadily — from an initial range of 80,000 to 95,000 tons up to the present range of 92,500 to 100,000 tons of copper in concentrate. We plan to give full guidance for 2022 in January, and that will include our first production forecast for phase II. Although the concentrator is now running at nameplate capacity, the Kamoa team is hard at work looking into a number of optimizations aimed at maximizing what the plant can do — not only in ore throughput but in copper recovery as well. One illustration of this: during the quarter we found that concentrate filter capacity at the back end of the plant was the main bottleneck in the process, especially when we are floating our exceptionally high copper grades.
Alex Pickard
executiveTo fix that, we got the phase II filter press in place well ahead of time, and it adds a lot of extra redundancy. Since we removed that bottleneck, we've often hit copper output above 700 tons per day, which shows you what's achievable. Let's go to the next slide. On phase II, just like with the phase I build, we're well ahead of schedule and on budget. Overall construction is over 60% complete, procurement is essentially finished, and nearly all deliveries are on site, which cuts the risk of project delay substantially. In the quarter, we narrowed our guidance for first production from phase II from Q3 to Q2 of next year. Phase II will double plant capacity to an annualized rate of 400,000 tons of copper in concentrates, or possibly more, depending on optimization. That means Kamoa-Kakula, within a year, will rank among the 10 largest copper mines worldwide. Our focus has now moved to phase III. We're busy with the design and engineering of phase III, but early signs are that we'll build a bigger concentrator than phase I and phase II, situated near Kansoko, our second mine, about 10 km north of the current Kakula mine and concentrator.
Alex Pickard
executiveWe're making plans for fresh access to the mining zones for phase III, beginning with expanding Kansoko and also opening up the Kamoa deposits toward the north. Phase III is going to be commissioned at the same time as the Inga II Power project that Marna spoke about, and it will involve putting money into a direct to blister copper smelter with a capacity of 500,000 tons per annum, so we can make copper metal on site at Kamoa-Kakula and cut our unit costs substantially. We'll share more specifics about the phase III plans by the second quarter of next year. Could we have the next slide, please. Turning now to the Western Forelands. It's our strong conviction that the DRC will be pivotal in providing copper for the global shift toward a low carbon economy. Alongside our world class Kamoa-Kakula mine, upcoming discoveries within the Western Forelands copper basin are set to carry genuinely global importance. Among Ivanhoe Mines' management team, the Western Forelands is possibly the project we're most enthusiastic about, and we're certain this ground holds the greatest copper exploration potential anywhere in the world, as shown by the initial discoveries we've made at Makoko and Kiala.
Alex Pickard
executiveIn the quarter, our work has centered on finishing key exploration infrastructure so we can reach the expanded land package of 2,500 sq km that Ivanhoe controls at a level between 90% and 100%. Part of this is a 70 km access road, close to being finished, which will permit drilling access to the licenses in both the wet and dry seasons. We have also almost wrapped up high-definition geochemical and geophysical surveys over the licenses, and those will greatly shape our drill targeting in 2022. With that, I'll turn things back to Marna to talk about Platreef and Kipushi.
Marna Cloete
executiveAlex, I might have to push back on you there. Honestly, Platreef gets me more fired up. I get the buzz around Western Forelands, and that excites me a great deal as well. There is a great deal happening at Platreef. Our management team has gained considerable depth, and we're now fully in execution mode, with production slated to begin in 2024 — which feels like tomorrow given how fast time is moving. The stream financing we announced earlier this year is in its final stages and ought to wrap up shortly. That, combined with the project financing facility we'll finalize following this stream, will provide the funding for our first phase mine. Early in 2022, our definitive feasibility study will be published. There are several very exciting developments at the Platreef project that we intend to announce, and we're planning to update the market within the next couple of weeks, so keep watching. If we could turn to Kipushi. Personally, I've been spending considerable time in Congo over the past couple of months, now that travel is possible again, and our talks with Gécamines have moved forward significantly, and I'm confident we should be able to reach agreement on a development path in short order.
Marna Cloete
executiveThe Kipushi feasibility study is likewise basically finished, and it will come out as soon as we agree on it. In addition, we're right now building up the Kipushi team with extra staff and organizing procurement on the critical path, so that we can start immediately and get this mine producing within 24 months after we conclude an agreement with our partners. We have also begun talks with financiers regarding third-party financing. I have to say, given that zinc prices are at all-time highs, the moment has arrived to bring this mine back to its former glory. Moving to the next slide. That takes us into the last part of today's presentation. Investors and analysts have been asking us a great many questions regarding our future cash flows and our capital allocation philosophy, so we decided to give you a sense of what we are currently thinking. Our recent modeling, backed by present copper prices, makes it clear that Kamoa-Kakula will produce cash flows more than adequate to fund every future expansion we are presently planning. That covers completion of phase II, phase III, the power project, and the smelter as well. Future cash flows will go to the shareholders of Kamoa — that is us, Zijin, and the DRC government — via shareholder loan repayments and, in the end, through dividend payments.
Marna Cloete
executiveAssuming today's market conditions hold, we anticipate adequate cash flows to begin repaying shareholder loans from Kamoa-Kakula right after phase II is fully commissioned in 2022. That money will go straight into Ivanhoe's treasury. Let's move to the next slide. David noted earlier in the presentation our robust cash position of $580 million. The cash flows from Kamoa-Kakula that I just referenced will add to this, helping us keep a strong balance sheet and finance our highly accretive growth projects. At Platreef and Kipushi, our plan is to fund the projects through third-party funding, whether that be streams, project finance facilities or prepayments. That will be combined with our existing cash resources. Once our tier one growth projects already in the pipeline are funded, our intention is to reward shareholders with a dividend from cash surpluses. I will now ask Bill Trenaman to moderate today's Q&A session. Over to you, Bill.
Bill Trenaman
executiveThank you, Marna. At this point, I'd like to express our appreciation to every shareholder and investor who sent in questions through the webcast. We've done our best to compile them and organize them into groups. There may not be enough time to address each person's question, and if we can't get to yours today, we'd encourage you to contact any member of our team for a follow-up. With that, we'll go to the first question, which comes from Andrew Mikitchook of BMO Capital Markets. For this first one, we'll have David respond. The question asks whether you can offer some further commentary on the $37 per pound C1 cash cost for the ramp-up quarter, and how that compares with what's budgeted in the mine plan. It goes on to ask which cost components you'd expect to offer the greatest savings potential as you establish a steady operating track record over the coming quarters. David, over to you.
David van Heerden
executiveThanks, Bill and Andrew. Since this is our first quarter of operations, the cash cost of $1.37 per pound leaves us quite encouraged, especially given that the mine was ramping up under its targeted throughput and efficiency levels. That $1.37 cash cost per pound came in below the cash cost the mine site team had budgeted. General and administrative expenditure stands out as one area where we'd anticipate a fairly quick saving, since fixed operating costs get spread across greater copper production. As we noted in the presentation, over the longer term the smelter project should deliver a meaningful cost saving in logistics as well as other realization costs. In the interim, we also see some room to save on logistics.
Bill Trenaman
executiveThanks, David. While we have you on the line, I’ll ask a second question from Andrew. Should we expect phase II startup to include a pre-commercial period in Q2 2022, like the phase I startup did in 2021? Or will it begin adding to joint venture earnings right away?
David van Heerden
executiveAndrew, we anticipate that phase II will begin adding to Kamoa-Kakula's joint venture earnings right away, as soon as the second concentrator plant begins producing copper and concentrate. This question also gives us a good chance to point out how fast the ramp-up with phase I has actually been — first ore went into the concentrator plant on May 20, and initial commercial production was declared on July 1, which I think, you know, is exceptional.
Bill Trenaman
executiveThank you, David. At this point I'll hand things over to Robert so he can respond to a query from Orest Wowkodaw at Scotiabank. That query comes in roughly three parts. First, does Ivanhoe Mines intend to build out every one of the three assets in its portfolio — the Kamoa expansions, Platreef, and Kipushi — at the same time? Second, if we take it that the Kamoa expansions rank as the highest priority, which of Platreef or Kipushi would probably become the next asset to move into development? And third, does the company possess both the capacity and the financial wherewithal to have all three assets under construction simultaneously? Robert, the floor is yours.
Robert Friedland
executiveThank you. So, Kamoa and Kakula are tier one mines. Barrick originated from a tier one mine in Nevada. BHP originated from a tier one mine at Broken Hill. Our clear intention is to grow a major mining company on the foundation of these tier one assets. We certainly possess the capacity to develop all three projects. As a matter of fact, they are quite far along. At the Kipushi mine, we have fully rebuilt the underground over the past five years. Everything visible there underground is new. We are constrained only by needing a dedicated team to begin stoping at some of the richest base metals ore anywhere in the world. At 45% zinc equivalent, with silver credits, germanium credits, and copper credits. It ranks among the highest grade ore bodies on this planet. Constructing a concentrator, with the underground already developed, is a fairly straightforward job for a dedicated management team. I would remind you that in the Congo, we have hydroelectric power, and we have no snow, and we have no ice. We enjoy natural advantages, and we have a population of close to 90 million people from which to choose our management team. Kipushi is something of a dream mine, and we can certainly develop it with a dedicated management team.
Robert Friedland
executivePierre, who serves as our Chief Technical Officer, previously operated that mine. He has an intimate familiarity with it, and it's ready to go. Platreef, too, has spent roughly 25 years in development. Shaft number one is already sunk. A very short drift takes you into ores that are extremely high-grade in platinum, palladium, rhodium, copper, nickel, and gold. The small mine—provided financing is in place—we're constructing a concentrator. Without question, our dedicated team living at the mine site and in South Africa is fully prepared for that. We have a standalone Congolese unit. Considerable cross-pollination occurred between Kamoa-Kakula and Kipushi. Both sit in the Katanga province. South Africa has its own deep, seasoned management group, with much of the underground development already progressing and with separate financing facilities. Yes, all three of these mines will be developed by us. Two of them we slowed at the onset of the COVID-19 panic. Nearly two years ago, when the first COVID-19 cases emerged in Canada, I attended the PDAC. You'll all recall that this was a rather frightening stretch. We chose to tighten our belt and sprint toward production at Kamoa-Kakula as fast as we could.
Robert Friedland
executiveEveryone is aware that we got this mine into production sooner than planned and for less money than expected. That is virtually unheard of across the worldwide mining sector. I might list a great many copper mines that either will never be constructed or are already behind by numerous years, yet there are sufficient analysts with us on this call to compile such a list on their own. Bringing a mine in on time is rather like finding a pink unicorn — never mind early, and never mind within budget, let alone beneath it. It shows that the finest projects draw the finest personnel. From every corner of the mining business, at every level, individuals are applying to join our company, since they recognize that we are going to construct a major mining company of world-class standing. Kamoa-Kakula possesses reserves sufficient to endure beyond 50 years, and Platreef is the same. These rank unquestionably at the very summit of tier one resources. Let me remind everyone that Platreef stands as the biggest precious metals development anywhere on earth, and it also holds a massive nickel and copper sulfide resource, something critically important for the planet's electric metals needs. Indeed, we are going to bring every one of these into production.
Robert Friedland
executiveEvery one of them will be debuting shortly at a cinema close to you.
Bill Trenaman
executiveGreat, thank you Robert. At this point I'll hand things over to Alex Pickard, who will take a question from Sam Crittenden at RBC Capital Markets. Alex, the question is whether you can add further detail on the planned Kamoa on-site smelter — specifically your approach to sizing, CapEx, and timing?
Alex Pickard
executiveAlright. Thank you, Bill, and thanks as well, Sam, for raising that question. Look, I think the initial point worth making regarding the smelter is that we'll be handing out the basic engineering contract for it very soon. This is a project we're enthusiastic about for a few reasons. First of all, I believe there's a significant effect on the overall economics at Kamoa-Kakula, and David mentioned that, but also when it comes to our environmental standing. We feel it's tremendous to run a smelter powered by hydropower in the DRC rather than, for instance, a coal-fired smelter in Asia. Beyond that, regarding the material we ship and what travels on the roads, we're able to cut the count of trucks we dispatch by half effectively. From a CO2 standpoint, we believe there's a substantial advantage too. As for how large the smelter will be, I think readers will have noticed in our press releases that we've raised the size from roughly 400,000 tons of blister copper capacity, which was what we previously contemplated, to approximately 500,000 tons of blister copper. I think that partly mirrors how greatly we've sped up phase I and phase II, and we intend to accelerate phase III.
Alex Pickard
executiveSo that 500,000 tons is going to handle most of the phase I, two, and three concentrates, while still leaving a bit of concentrate that can go to the Lualaba Copper Smelter, where our partnership has worked well. On CapEx, I believe we previously guided somewhere around $600 million, though that was for a somewhat smaller smelter. My sense is it'll come in a little higher, but not by much. We'll share more details on that. As for overall timing, with basic engineering underway, obviously we want to push this project forward as quickly as we can. On the actual execution timeline for engineering and building the smelter, that's roughly 3 years. Crucially, we'll align it with the startup of the new power generation at Inga II Dam. We'll return to the market with firmer timing on when that becomes possible. Thank you.
Bill Trenaman
executiveThanks, Alex. Since we have you on the line, Dalton Baretto from Canaccord Genuity has passed along a few questions, and you're probably the right person to field them. First off: considering how mining productivity has gone so far, the mill's seamless ramp-up, and all the optimization effort made to this point, do you expect Phase I to run above its design capacity? And if it can, by how much?
Marna Cloete
executiveThat's something I'd be glad to do.
Alex Pickard
executiveYeah, I believe we brought that up during the
Marna Cloete
executiveI apologize.
Alex Pickard
executiveMarna, the floor is yours.
Marna Cloete
executiveNo problem, Alex. Yeah. Yes, we certainly expect it to run above its design capacity. Our team is also right now pursuing several optimization efforts, and in the near term, an extra 15% of throughput is planned, with even more over the long term.
Bill Trenaman
executiveThanks, Marna. Regarding the latter portion of what Dalton asked: might it be feasible for you to commission phase II during the early portion of Q2, and which item on the critical path is required in order to make that happen?
Marna Cloete
executiveAbsolutely. That’s what we’re aiming for right now. The key bottleneck involves the electrical installation—specifically, getting the final batch of electrical components delivered to the site. At present, all of it is on the African continent, so we don’t anticipate any problem or hold-up, and we’re planning for a pour in Q2.
Bill Trenaman
executiveThanks. And then the third thing — the question is this: based on what you've taken away from phase I, do you expect phase II to be capable of running above design levels too?
Marna Cloete
executiveAbsolutely. Nothing suggests it will turn out any differently than phase I did. In fact, the lessons we took from phase I have been built into how we designed and are implementing phase II, and we expect the ramp-up to go even more smoothly than phase I's.
Bill Trenaman
executiveThanks. Final question from Dalton: since things are running so smoothly at the site itself, how is the logistics chain between the port and the location performing?
Marna Cloete
executiveThings are progressing nicely, though I wouldn't claim there have been zero snags. A handful of problems have cropped up at the Durban port, particularly given heavy pressure on ocean freight headed toward the U.S. alongside supply shortfalls arriving in Africa. Fortunately, every one of our procurement items was secured far in advance, so it has reached the site, and because of that we anticipate no effect on our timeline.
Bill Trenaman
executiveThanks, Marna. A question is coming in for Robert from Lawson Winder at Bank of America. Robert, given the 2022 exploration plan for the Western Forelands, when do you expect to have an initial resource, and would it take in existing deposits such as Makoko and Kiala? That's for either Robert or Alex.
Alex Pickard
executiveSince Robert doesn't seem to be on the line, I'll handle that question myself. Well, here's how I'd put it.
Robert Friedland
executiveRight, I'm back at the mic. Since I'm quite fond of Lawson, I'll do my best to field that one. So, what we have here is a joint venture covering 400 sq km inside a copper-bearing basin whose full extent is at least 3,000 sq km. The geology across the whole thing is identical. This is oil field geology we're talking about. These are strata-bound systems, and a single super giant geological event shaped them across the entire basin. Think of it the way the Witwatersrand Basin works for gold. After all, that basin hosts hundreds of gold mines. The potential to uncover further anomalies in this jungle is simply enormous. Consider those pictures — because of the earth's curvature, your view only reaches 26 km. That's why a ship vanishes at sea once it's 26 km away, owing to the curvature of the earth. Heading south, this Western Forelands license runs roughly six times the distance you can see out to the horizon there — 150 to 175 km. On top of that, we might pick up more ground within the basin. This jungle is full of all sorts of animals. You've got a Kamoa, which could be a zebra, or you spot a Kakula, which would be a lion.
Robert Friedland
executiveHeading into the jungle, you come across hairy aardvarks, anteaters, and elephants. Naturally, what we hope to discover are blue whales or brontosaurus. I wouldn't be overly concerned about Makoko or Kiala. Kiala sits quite near our northern concentrator. Its grade is very high. The Bonanza Zone's grade is absurdly high. Within a couple of million tons of rock, you have $1 billion or $2 billion. There's potential for extremely high-grade, structurally controlled copper deposits such as the Bonanza Zone, and there's potential to discover additional Kakulas or perhaps even something superior. I wouldn't really concern myself much with quantifying Makoko or Kiala, apart from the fact that they prove the basin is pregnant with copper. The step-out distance from Kakula to Makoko is 25 or 30 km. In my 40 years in mining, I can't recall any incident where a mining company made a 25 or 30 km step out and hit exactly the same style of mineralization as what they found when they began. The scale of the mineral exploration potential will be realized over decades. You know, mines here can be found faster than they can be built.
Robert Friedland
executiveWe are answering against what you might call a legendary copper build-up, since, to begin with, ice and snow are not factors for us. As you know, we are not situated in British Columbia's Cordillera at high elevation. The terrain we are on is essentially flat. Operation is possible throughout the entire year, 365 days a year. The starting point has to be constructing a road network across all of these lands. An initial spine road of 65 km into this entirely untested terrain has just been completed by us. A major military-style logistical campaign is presently under way simply to open up the area. Driving 65 or 70 km from an exploration camp back to Kakula, for instance, is not really something you want to do. Remote camps are going to be set up by us. This is a very serious military-grade undertaking, and our real purpose there is hunting very big game. The roster of financial institutions and major mining companies that have come to us seeking involvement in this asset would include, you know, nearly everyone you could imagine expressing interest, because there genuinely is no location on planet Earth where these kinds of copper assets can be found. That is simply a fact. Until Chile got invented in the 1970s, the copper belt east of Kolwezi stood as the largest producing copper zone on planet Earth.
Robert Friedland
executiveThose massive porphyry copper operations consume huge amounts of rock and huge amounts of power for every unit of copper they turn out. If you examine their greenhouse gas emissions per unit of copper produced, they are truly dreadful. Take Chile — a big share of the grid there, for instance, runs on coal. Those are coal-fired mines. Now that COP26 has taken place and folks are reading about Scope 1 and 2 emissions, not to mention Scope 3 — and our Scope 3 ought to be negative, since the copper we produce is fueling the energy transition — what we are doing here is absolutely essential to the world's effort to tackle the greenhouse gas problem head-on. That places a heavy responsibility on all of us on this call, because this is a scaled endeavor of legendary proportions. I really would not want to speculate about an anteater, a small anaconda snake, or a zebra. Our focus is genuinely on finding very large deposits and on understanding the basin. We have roughly 20 years of experience in this geological setting, and as a hint, I would say that about four factors must converge for a Kakula to come into being. We understand what those four factors are. Should you have three of them, you will end up with something resembling a Makoko.
Robert Friedland
executiveGo back a hundred years and Makoko would have ranked as the largest copper mine anywhere in the British Empire. It would be a tier one deposit, no question — it simply isn't the size of a Kakula, because at Kakula all four ingredients of our secret sauce are present. When it comes to surveying the basin and pinpointing the sub-basins where those four right factors line up, we believe we hold an early advantage in the hunt for truly enormous deposits. In a way, what you have here is three or four mining companies rolled into one. You have a cash generation machine set to grow more quickly than any other company in mining. No gold mine on earth can scale at the speed this copper mine can. No copper mine on earth can match the scaling speed of this copper mine, thanks to capital intensity that is very low. Consider that roughly $1.75 billion of copper is sitting at surface, already mined by us, that hasn't even passed through the concentrator yet. Building the mine you see before you required capital of just $1.3 billion. This is a mine capable of bending over and lifting itself off the floor by pulling on its own bootstraps, and our duty is to set the highest ESG standard that is humanly obtainable.
Robert Friedland
executiveThat’s the reason we’re investing so heavily in recruiting women, bringing in people from local communities, and training young workers according to how well they take to the job—so we can establish a very demanding ESG standard. Our view is that copper mines able to turn out copper with lower greenhouse gas emissions than anyone else will hold a commodity that trades at a substantial premium compared with an ordinary copper mine that emits a lot of greenhouse gas. We believe firms that hold themselves to a very demanding ESG standard will draw capital more cheaply and in greater volume than a conventional mining company would. Ivanhoe Mines amounts to rebuilding the mining sector starting from a blank sheet. Each element was deliberately considered. The team—the technical team—has remarkable breadth and depth. When it comes to the cultural shift, anyone who comes to see us will find it represents a considerable advance over the conventional mining sector. Extremely capable, deeply committed individuals. Much like a Silicon Valley culture—people who understand they’re making history and take pride in that. We ask all of you to stay on this journey alongside us, since the finest part is still to come. This is only our first earnings call.
Robert Friedland
executiveA great deal more will come later on, and we'll have plenty of additional news to share. Lawson, I'm eager for the day when you're able to visit Indaba. Perhaps we'll hop into a helicopter, fly across the Western Forelands, and show you just how enormous the geologic endowment is that lies before us to explore for the Congolese people and for all of our stakeholders. Thank you.
Bill Trenaman
executiveThanks, Robert. We're nearing the one-hour mark and time is running short fast. We'll do one final question. It's from Farooq Hamed at Raymond James, and I'll hand it to Alex and Marna to answer. It ties in nicely with what Robert mentioned regarding Kamoa-Kakula's excellent ESG credentials. The question: how will carbon emissions at Platreef and Kipushi stack up against Kamoa-Kakula? The second part is: what's your plan for managing carbon emissions across the asset portfolio?
Alex Pickard
executiveThanks, Bill. Maybe I’ll begin with Kipushi, and then Marna is probably best positioned to discuss some of the renewable initiatives we’re considering with Platreef. I mean, with Kipushi, look, I think from a unit of zinc per CO2 emissions per unit of zinc standpoint, it can be even better than Kamoa-Kakula, since it also operates 100% on hydropower. If you consider what actually uses the power, you know, at Kamoa-Kakula, we’re mining, let’s say, 6% rock, and we’re converting it into a concentrate of 55%, so you know, that’s a factor, let’s call it an energy factor of nine or 10. At Kipushi, we’re mining 35% zinc, and we’re converting it into a concentrate of 55%. The same energy factor is probably less than two in terms of what you actually have to do to turn that into a marketable product. From Kipushi’s point of view, you know, I think the CO2 emissions are fantastic in terms of the units of zinc that we will produce. Perhaps I’ll hand over to Marna to talk about Platreef.
Marna Cloete
executiveThanks. Thank you, Alex. Platreef is likely the trickier project when it comes to carbon emissions, simply because it sits in South Africa, which still relies on Eskom and coal. We're absolutely looking into solar options, and that forms part of the studies our team is carrying out right now. Earlier this year, President Cyril Ramaphosa said companies may now produce as much as 100 MW of power for their own projects, and we intend to make full use of that allowance down the road, once we're operational. The culture at Ivanhoe means we're making every effort to begin steadily cutting our carbon emissions. That's why, as I mentioned before, we're beginning with an electric fleet at Platreef and intend to deploy electric equipment across the whole mine. Each little bit counts, and I believe it demonstrates that we treat this seriously, building it into our design parameters, and that we've built it into every one of the group's designs for smelters. We make sure we apply the best global practice when it comes to emission standards. That will stay our priority so that in everything we do along the chain — Scope 1, Scope 2, Scope 3 — we strive to lower our emissions.
Bill Trenaman
executiveThanks, Marna and Alex. Robert, at this point I’d like to give you the floor for a few closing comments before we return the call to the operator and wrap up today’s conference call. Thank you.
Robert Friedland
executiveOkay, for anyone who follows the green energy space, I wanted to mention that a company we're affiliated with has constructed the biggest vanadium redox batteries out there. These are grid-scale batteries. State Grid Corporation of China was our customer. We're now launching a third-generation battery. That's vrbenergy.com. If we add a grid-scale battery in the Congo, it will remove any problems caused by brief power interruptions on the grid. They activate instantly — within a few billionths of a second. You can also add unlimited solar capacity to the hydro we already have. Since once a battery is in place, you can charge it using our hydroelectric power. Solar can charge that battery too, and that applies in South Africa. South Africa possesses an enormous vanadium endowment. We've been locating the cheapest vanadium pentoxide sources globally. South Africa's future involves installing solar and then constructing a large grid-scale battery, and after that you simply disconnect from the grid, because Eskom is somewhat of a disaster with its coal burning. For a green mine, you must build a grid-scale battery, and you include that in the capital cost.
Robert Friedland
executiveRoughly 60% of what that battery costs to build comes from the vanadium. Vanadium doesn't degrade, and it won't ignite the way a lithium ion battery can. Solar plus grid scale batteries that turn out these metals at the lowest point on the cost curve are where things are headed. An ore body needs really wide shoulders, and Platreef is remarkable. The rhodium credit by itself carries more precious metal than the majority of gold mines do. Apply the magic of by-product accounting and you get a nickel mine with deeply negative costs, or a palladium or platinum mine with deeply negative costs. A copper gold mine beats owning just one mine. With five or six payable metals at Platreef, it sits at the very top of tier one, the very top of tier one. Sulfide copper is needed, sulfide nickel is needed, platinum and palladium are needed — for hydrogen fuel cells. In the end it will be a very green mine, and we're very focused on doing exactly that. Really all that's required is to throw up the solar, which is cheap, and put up a battery solution, and you're there. With that, I welcome you all to this call.
Robert Friedland
executiveRight now we're giving out Moderna and Pfizer shots to our workforce. The medical operation we have in place there is genuinely world-class, in our view. Our position is that someone is safer at our mine site than they would be moving around downtown Toronto. We're eager to start welcoming visitors again, and my sense is that anyone who was at this site two or three years ago will be amazed by what they find when they land at the new Kolwezi Airport and take the new highway past those 220 kV lines to reach this tier one mine development. We can't wait to have you all there, and we want to thank every one of our shareholders who has had such a positive experience by staying with us — and we'd caution that the best is still ahead. Thank you very much.
Bill Trenaman
executiveThanks. Operator, please go ahead and take over from here.
Operator
operatorAll right. Thanks. That brings us to the end of today's conference call. Please go ahead and disconnect your lines. We appreciate your participation, and enjoy the rest of your day.
Robert Friedland
executiveThat’s all from me—thanks, and goodbye.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Ivanhoe Mines Ltd. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Ivanhoe Mines Ltd. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ivanhoe Mines Ltd. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.