Ivanhoe Mines Ltd. (IVN) Earnings Call Transcript & Summary
May 10, 2022
Earnings Call Speaker Segments
Operator
operatorHello, and thanks for joining the Ivanhoe Mines Q1 2022 Financial Results Conference Call. This call is being recorded today. Right now, I’ll hand things over to Matthew Keevil, our Manager of Investor Relations. Matthew, please go ahead.
Matthew Keevil
executiveThanks, operator. Hi, everybody. I’m Matthew Keevil, Manager of Investor Relations at Ivanhoe Mines, and I’m calling in from sunny Cape Town, South Africa. It’s a pleasure to have you join us for Ivanhoe Mines’ Q1 2022 financial results conference call. We’ll wrap up today’s event with a question-and-answer session. Questions can be submitted through the Q&A box on the webcast page, or through the conference operator using your phone line. Because of time limits, we probably won’t get to every question. Our apologies if time runs short—please follow up with the IR team with any further questions. Before we start, I’d like to remind everyone that this event will include forward-looking statements involving risks and uncertainties that could cause actual results to differ materially from those in the forward-looking statements. Details of the forward-looking statements are in our May 10th press release, as well as via SEDR and on our website at www.ivanhoemines.com. It’s now my pleasure to introduce our Founder and Executive Co-Chairman, Robert Friedland, for some opening remarks. Robert?
Robert Friedland
executiveI want to thank each of you for listening. A large portion of your management team is currently in Cape Town, South Africa, because the big Indaba Conference is taking place there. Tomorrow morning, I'll be giving a speech. We're delighted to share our Q1 2022 financial results. Many of the figures are self-explanatory, though I'd like to make a few remarks. The strongest figures tied to copper output at Ivanhoe Mines relate to the reality that, for each unit of copper we produced, our greenhouse gas emissions were lower than those of our competitors. That also explains why our cash costs are in fact falling for a fundamental reason — quite simply, we have those large yellow trucks, and we're hauling ever-greater volumes of rock in them, especially with regard to hydrocarbon. Whenever hydrocarbon prices rise, whether because of the war or some other development, there's no avoiding it — your costs must increase. Kamoa-Kakula purchases power essentially generated by hydroelectricity, and within two years, with our electric fleet, there will be zero exposure to hydrocarbon whatsoever. So, at $4 a pound copper — below where we're trading today — we have a very, very strong business. And at $3 copper, we have an exceptionally strong business positioned at the very bottom of the global cost curve.
Robert Friedland
executiveAs production keeps expanding sharply, we think we'll be spreading a bigger and bigger productive asset base across our fixed overhead costs, and once our green smelter starts operating late in 2024, cash costs are going to fall even more. So I'd like to express gratitude to the thousands of individuals who have put in such hard work to make this mining operation sustainable and unlike others, and because of exceptional circumstances that have nothing to do with us, there's a sale happening right now with <<inaudible>>. So we're going to introduce our management team along with our numbers. We'll then turn this over for questions, and I'm <<email_hidden>> if anyone wants to send me an e-mail directly. With that said, let's move on to the next part of the call. Thank you.
Marna Cloete
executiveThank you, Robert. Good afternoon, and good morning to all of you joining us from Katanga at Mining Indaba. If we could go to the following slide, we're delighted to report yet another outstanding quarter along our path toward becoming one of the biggest copper producers globally. Kamoa-Kakula consistently delivers impressive results. And this April, our Phase 2 plant reached commercial production — once more ahead of the initial timetable and even smoother than we had expected. Combined annualized output from the first and second fronts will come to 450,000 tonnes, along with completion of the debottlenecking project we announced earlier this year, which we expect to finish in the first quarter of 2023. We remain firmly on track to hit the upper end of our 2022 guidance of 340,000 tonnes of copper and concentrate. Through our Phase 3 expansion, we will raise copper production further to 600,000 tonnes with the addition of a 5 million tonne per annum plant next to the two new mines we will develop at Kamoa 1 and Kamoa 2. This expansion will be funded from cash flows from Phase 3, our plants and mines and smelter, and it is anticipated to be completed by the fourth quarter of 2024.
Marna Cloete
executiveMoving on to the following slide now. But prior to reviewing the financial results, let's take a brief moment to consider our ESG credentials. We released our fifth annual sustainability report on 2 May of this year, which underscores the meaningful efforts we undertake across environmental, social and governance matters. During our last earnings call, I noted that stakeholder capitalism is something we strongly believe in. To date, our group has generated and distributed over $1.1 billion in national value. Since 2020, when our operations at Kamoa-Kakula accelerated, that national value has risen to 43%, and it will keep growing as we develop and expand our Tier 1 assets. We presently have more than 12,000 employees, 97% of whom are local, and we are actively setting targets to raise that percentage further and bring more women into our operations. Throughout the 2021 financial year, we conducted more than 10,000 stakeholder meetings, keeping our communities and host governments informed and responding to any questions they might have. As an organization, we aim to be a net zero carbon emitter, and Kamoa-Kakula, our high-grade underground hydropowered mine, is well-positioned to lead the industry.
Marna Cloete
executiveAt this point I'll pass things over to David van Heerden, our CFO, who will walk you through the financial results for the quarter.
David van Heerden
executiveThanks, Marna, and hello to everyone on the call today. As Robert and Marna noted, Q1 2022 marked yet another period of outstanding operational results at Kamoa-Kakula. Commercial production at the Phase 2 concentrator was reached on April 7, and debottlenecking work is already well advanced. We're confident those strong trends will carry on in the periods ahead. For the moment, though, I'm glad to walk through the financial results for the quarter. This call, naturally, offers only a high-level overview of our quarterly numbers, and the presentation ought to be read alongside our quarterly financial statements and MD&A covering the period that ended March 31, 2022. During the quarter, Kamoa-Kakula sold close to 52,000 tonnes of payable copper in concentrate, which produced record quarterly revenue of $520 million, compared with $489 million in Q4 2021. Stronger average prices during the first quarter, together with the remeasurement of contract receivables as at March 31, drove the quarter's revenue increase. C1 cash cost kept moving lower, coming in at $1.21 per pound of favorable copper delivered to China for Q1 2022, while non-cash costs appear on a later slide. EBITDA at Kamoa-Kakula for the first quarter totaled $399 million, an impressive 12% rise relative to Q4 2021, powered by higher revenue and a lower cost per pound.
David van Heerden
executiveMoving on to the following slide, it shows how those points I just covered combine into the Kamoa Holding joint ventures' profit and how that ultimately flows through to Ivanhoe's share of the profit attributable to the joint venture partners. Revenue for Q1 2022 of 520 million includes a remeasurement of contract receivables amounting to $52 million, reflecting the effective mark-to-market of provisional sales at the copper price as of the period end. Kamoa-Kakula's cost of sales totaled $123 million for Q1, or $1.08 per pound of favorable copper sold, while cash costs on a payable copper basis came in reduced at $1.21 per pound; after deducting G&A, operating profit for the first quarter of the year reached $380 million, and Kamoa-Kakula's EBITDA was, as I noted, $399 million. Kamoa Holding reported finance costs of $55 million in the first quarter, principally interest on the shareholder loans from the Ivanhoe infusion along with interest on Kamoa-Kakula's equipment financing facilities. Of the $110 million tax expense, $105 million is deferred tax and does not represent a cash outflow, thanks to the ability to offset the acceleration. And certain development expenditure incurred from inception against taxable income over the first two years, five commercial production.
David van Heerden
executiveWhat's left is essentially the minimum tax on income, amounting to 1% of revenue. The $45 million non-controlling interest reflects the profit allocated to the DRC government's 20% stake in the Kamoa-Kakula mining complex, which leaves $176 million of profit attributable to the joint venture partners. Ivanhoe's share comes to $87 million for Q1 2022. Moving to the following slide, it covers Ivanhoe's consolidated Q1 financial highlights. On the chart, the deck picks up where the prior slide left off, in effect displaying Ivanhoe's share. In addition, Ivanhoe brought in $28 million of interest income from Kamoa Holding during the first quarter, tied to shareholder loans advanced to the joint venture. Over the quarter, the company laid out $9 million on the Kipushi project, $4 on Western Foreland exploration, and $6 million on general and administrative expenditure. Costs incurred at the Platreef project are needed to bring it to commercial production and are thus capitalized as development cost within property, plant and equipment. Ivanhoe booked $7 million of finance cost in Q4, related to interest on the convertible notes at the effective interest rate. The $66 million loss on fair valuation of the financial liability in the first quarter reflects the change in the deemed fair value of the conversion feature attached to the $575 million, 2.5% convertible senior notes, which Ivanhoe closed in March 2021.
David van Heerden
executiveThe conversion feature is a derivative financial liability that’s embedded, and its fair value moves mainly because of swings in our share price. So the loss comes from Ivanhoe’s share price rising between the end of December 2021 and the end of March 2022. All the items we’ve mentioned in full ultimately add up to Ivanhoe’s profit of $23 million for the 3 months ending in March 2022, with total profit before the fair value loss on the financial liability of $88 million for the first quarter. The following slide simply breaks out Kamoa-Kakula’s cash cost. Cash cost per pound of payable copper produced for delivery to China kept trending downward and came in at $1.21 per pound in the first quarter, down from $1.28 in Q4 2021 and from $1.37 in Q3 2021. The decline was mostly because the mine’s fixed operating cost was spread across higher production, and it’s extremely important to note that Kamoa-Kakula is already at the low end of our cash cost guidance of between $1.20 and $1.40 per pound of payable copper produced. With Phase 2 ramping up in the second quarter, we may see cash flow a little higher—but only a little—if that is what’s expected.
David van Heerden
executiveBut I'm eager to see what gets accomplished from Q3 onward, with the chance of dropping under the lowest end of our cash cost range. We're still optimistic about what this year holds, thanks to higher copper output from the Phase 2 concentrator and reductions in what we'll be providing, which could allow cash flows to grow even more. Cash costs, naturally, are a non-GAAP metric, and the reconciliation from cash cost to cost of sales to cash cost appears on page 40 of our MD&A. Next slide, please. This slide simply shows how we can position ourselves on the cash cost curve to emphasize how outstanding the project is. It's quite encouraging to sit comfortably in the first quartile while still planning substantial additional improvements. Next slide, please. Our balance sheet is strong, and we're well-positioned for additional development of our project, with $562 million in cash and cash equivalents on hand and consolidated working capital of $650 million, other liabilities of $922, $752 of which relate to the 2.5% convertible notes, with those due only in 2026 and possible earlier redemption. Our full cost spend for 2022 is $286 million on Platreef, Kipushi, continued exploration and overheads. And ore operating and capital expansion costs at Kamoa-Kakula are expected to be funded from copper sales and facilities in place at Kamoa.
David van Heerden
executiveWe also anticipate getting the second prepayment on the Platreef streams later this year, and that will boost the cash position at that plant by $225 million. At this point I'll pass things to Alex Pickard, our Vice President, Corporate Development, along with Marna, for a short update on what's happening with our projects.
Alex Pickard
executiveThank you very much, David, and hello to everyone joining us on the call. I'll walk you through the operational and project highlights at Kamoa-Kakula, and after that I'll hand things over to Marna, who will cover Platreef and Kipushi as well as our closing comments before we open it up for questions. Let's move to the next slide, please. Starting with Kamoa-Kakula Phase 1, we delivered a record operating quarter in Q1, milling 1.08 million tonnes at a grade of over 5.9% copper, which yielded 55,600 tonnes of copper in concentrate. Recovery came in at 87%, surpassing the 86% achieved in the prior quarter, and that figure also matches our design recovery. The Phase 2 concentrator was commissioned near the end of the quarter and reached commercial production on April 7, roughly four months ahead of the original timeline. The Phase 2 concentrator has performed strongly since then, and we anticipate that before this quarter ends, we will consistently match Phase 1's performance level, which runs 10% to 15% above design capacity in terms of throughput. On that basis, with all the re-commissioning and ramp-up updates, we feel confident pointing toward the upper end of our 2022 production guidance range of 390,000 tonnes to 340,000 tonnes of copper in concentrates.
Alex Pickard
executiveTo wrap up, as Marna said, our $50 million debottlenecking initiative is well underway. It capitalizes on both the strong front-end performance at the plant and the high grades we are seeing, and its goal is to hit an annualized output rate of 450,000 tonnes of copper by Q2 of next year. Let's move to the next slide. We are now squarely focused on the future, with Phase 3 of the Kamoa-Kakula projects in progress. We announced recently that we will construct an upsized concentrator with a capacity of 5 million tonnes per annum, situated near the existing Kansoko mine and the broader Kamoa mining footprints, roughly just over 10 kilometers from the mouth of Kekula. To feed this new concentrator, we are actively expanding mining operations at Kansoko and also preparing a new box cut that will unlock the Kamoa 1 and Kamoa 2 ore bodies. Contracts have also been awarded to break ground on the Kamoa-Kakula smelter, destined to be Africa's largest smelter, with a capacity of 500,000 tonnes of blister copper. To supply power for the Phase 3 expansion and the smelter, we signed an EPC contract recently with Voith Hydro, a leading German hydro power company, for upgrading the turbine size at the Inga II dam; works are now beginning and should be complete in time for our Phase 3 target production by the end of 2024.
Alex Pickard
executiveAlso, it's worth mentioning that a new prefeasibility study for Kamoa-Kakula will capture all of this work, and that study is due to come out later this year. Let's go to the next slide, please. What this slide does is place the Phase 1 and Phase 2 debottlenecking program, along with the Phase 3 expansion, into context. Our goal is to lift Kamoa-Kakula from roughly 400,000 tonnes of copper annualized at present to about 600,000 tonnes of copper production by the end of 2024. That would make Kamoa-Kakula the third largest copper producer worldwide, though ultimately we aim to become the second largest producer through a Phase 4 expansion. Next slide, please. Lastly, turning to Kamoa-Kakula, we are pushing forward the work program at our Western Foreland Exploration ground, which we own 100%. Given the recent uncertainty around the dry season in the DRC, we are fully restarting our drill campaign to explore four high-priority drill targets that were identified over the last year. Our initial budget for this year stands at $25 million, covering more than 90 kilometers of drilling across the license package, with four to five drill rigs in operation. I'll now hand it back to Marna, who will walk you through our other activities.
Alex Pickard
executiveI appreciate that.
Marna Cloete
executiveThanks, Alex. We also put out an update yesterday on what we're doing at Platreef, and that press release is available on our website. That said, we've finished equipping Shaft 1. On 22 April, we started the first draft at the 950 meter level, kicking off lateral development toward the ore body. Shaft 1 is going to be Platreef's initial production shaft, and it sits roughly 450 meters from the first high-grade zone of the ore body. Ivanplats is also moving well along on delivery of its first battery electric mining fleet, along with plans for an initial 5 megawatt solar plant. The rest of the 2022 spend comes to about $150 million, and we expect to break ground on the initial 750,000-tonne plant within the next month. First Phase 1 mine production is anticipated in the third quarter of 2024. Now turning to our Kipushi project. At today's prices, the Kipushi project economics are very compelling. Underground early works are underway, and we're currently recruiting key personnel for building the plant and running the mine. Our talks on financing and offtake are progressing with a number of interested parties, and we're aiming for an accelerated return to production in the next 18 to 24 months.
Marna Cloete
executiveSo, some closing thoughts here. To sum things up, we have full confidence in what our team can do — we're going to deliver the world's next diversified major mining company. With what we've achieved in production at Kamoa, plus the track record we've built in exploring for Tier 1 assets, we're certain to keep writing our growth and discovery story. Those are our closing comments for today. At this point I'll pass things back to Matt Keevil, who'll run the question-and-answer session for today. Thank you.
Matthew Keevil
executiveThanks, Marna. At this point we'll transition into today's question-and-answer session. Operator, are there any questions queued up on the line?
Operator
operatorOur first question comes from Andrew Mikitchook at BMO Capital Markets.
Andrew Mikitchook
analystHello, and depending on where you are, good morning or good afternoon. Congrats on an excellent beginning to the year and a solid path for Kamoa-Kakula. My focus was on Phase III. In your release, you guide toward a placeholder budget of slightly more than $480 million for Phase III across the rest of the year. Could we get a few broad remarks about how that might be distributed over the remainder of the year? And what are the main components of that spending for this year?
Robert Friedland
executiveThanks, Andrew. Robert here — I'll handle that question. On the first part of your comment, I think it's important to note that this is essentially just an acquisition amount of placeholder, plus a budget for what is expected at this point in time to be spent during this year. And obviously, that will be revisited once the previous relative study is finished, which is expected in the first quarter. The majority of that cash flow, we do expect to — to only come in during the latter part of the year. Some of the expenditure, less than $100 million, falls in Q2, with the remainder pretty weighted toward the end of 2022. But those funds are effectively being made available to the project team to ensure they can drive the timelines of Phase III, and then a split between the smelter, continued work on Ingest underground mining, but then also some allocations to general infrastructure and very early works on the concentrator.
Andrew Mikitchook
analystAlright, I think that answer is reasonable. And I suppose we'll receive somewhat more specifics as we move ahead, perhaps in Q3 or possibly a bit afterward, regarding the PFS. Just one final conceptual question about Phase III. Many of the enhancements you're pursuing — debottlenecking or optimization efforts for Phase I and Phase II — will those carry over directly into the Phase III PFS, or should we think there's some possibility of surpassing the 5 million tonnes that was recently highlighted for Phase III capacity?
Alex Pickard
executiveI'll take that question, Andrew — this is Alex speaking. To make things clear regarding what the PFS will contain, you're going to see 9.2 million tonnes per year coming from Phase I and Phase II, and that figure reflects the fully debottlenecked rate. On top of that, Phase III adds another 5 million tonnes, which takes the total up to 14.2 million tonnes. As for what you may be getting at with Phase III — whether extra performance beyond that 5 million tonnes should be expected — honestly, it's a little early to make that call. What I can say is that the potential does exist, since certain front-end components of that 5 million tonne mill will already be capable of running at twice the rate, which would accommodate a Phase 4 expansion down the road. So we do have the ability to push the front end of the circuit hard and then work out what additional steps are needed at the back end of the circuit to get more copper out. And clearly our experience on Phase 1 and Phase 2 was a good one, but giving guidance on this is simply premature.
Andrew Mikitchook
analystAll right. Well, that's encouraging to hear — you've got plenty of capacity across the board, and then we'll just see what the team ends up doing. I'll step aside and let other folks ask their questions.
Operator
operatorOur next question comes from Greg Barnes at TD Securities.
Greg Barnes
analystYes. Thanks. Alex, I got a bit ahead of myself there. I believe you just mentioned that you might potentially build enough infrastructure to double Phase 3's capacity. Would that location then be looking at 5 million tonnes a year?
Alex Pickard
executiveHey Greg. This is essentially identical to how we handled Phase 1 and Phase 2, in which the crushing circuit — the very front end — is built for 10 million tonnes per annum. Then at that point it divides into two parallel circuits of ultimately 5 million tonnes each. So that would be Phase 3 and, later, Phase 4. But it does mean that while Phase 3 runs, we have more crushing capacity.
Greg Barnes
analystAll right, so with Phase 4, will it basically mean mining at Kamoa and then delivering 5 million tonnes — or would ore be hauled in from other sites to that new mill, that parallel mill, similar to Kamoa?
Alex Pickard
executiveThat should be said mainly in terms of the various ore bodies we are opening up at Kamoa. So just keep in mind that this is Kansoko, where mining is already underway, but then two bigger mines will come at Kamoa 1 and Kamoa 2, which are fed by the same twin decline system. And afterward, we'll work out where Kakula West fits into the mix, because we do have somewhat higher grades in the West. So, as you'll have seen in the press release, there was a mention of the fact that later on, we will begin developing declines into Kakula West to try to get a head start on that ore body as well. But material from Kakula West will probably more naturally report to the Kakula mill.
Greg Barnes
analystNow, on the topic of inflation—there's been plenty of discussion about it from mining companies during this earnings season, and clearly you appear somewhat protected from it. That said, are you experiencing cost pressures from assorted inputs like reagents, and what's coming through for you?
Alex Pickard
executiveDavid, would you like to handle this one?
David van Heerden
executiveYes, thank you. Let me add something as well. Thanks, Alex. No, I believe that if you look at how our cash costs have kept coming down, we're handling this well. But I mean, we're certainly not in need, and processes are being put in place specifically just to limit the effects on field, et cetera. And I think one thing that has also helped us is simply the fact that the price of hydro power is fixed. So I think that's — and it's just one extra benefit you actually get from getting that well. But we're definitely not in need and — but the — I think the performance has been really exciting, and I think we do look forward to good numbers for the rest of the year.
Greg Barnes
analystAlright.
David van Heerden
executiveWhen it comes to grinding media reagent and similar items, if you've got inventory on hand or long-term agreements locked in at set prices and the like, that gives you a bit of a cushion against the cost inflation we're seeing out there.
Alex Pickard
executiveRight, precisely. It's something of a balance — carrying the proper level of stock while also simply inquiring about potential supply problems down the road at particular prices, and that has been working to our benefit.
Greg Barnes
analystAll right, that's excellent. I appreciate it.
Operator
operatorOur next question comes from Dalton Baretto at Canaccord.
Dalton Baretto
analystThanks. Hello everyone. I have two questions. First, with the recent flooding in Durban, it has clearly brought to light the fact that investments there faced difficulties. As you proceed with these phased expansions of Kamoa-Kakula, what is your thinking on the egress portion of the inflation? Thank you.
Robert Friedland
executiveMy apologies, Dalton. I missed the final portion of what you asked. What's your thinking on…
Dalton Baretto
analystRegarding egress, on the matter of getting product to that location.
Robert Friedland
executiveAll right, I'll take that question, and then maybe others can jump in afterward. So the first thing I'd note regarding the recent problems at Durban is that they had no real material effect on our operations — and it's worth keeping in mind that we recognize revenues at the point the material passes the mine gate, per the terms of our Phase 1 and now Phase 2 off-take agreement. What it does mean is that at the margin you may be paying somewhat more to hold the material in a warehouse somewhere while it awaits shipment. On that side, though, we've been doing considerable work alongside <<inaudible>> and all of our logistics service provider partners to streamline the Kamoa-Kakula concentrate logistics operation overall. So we're examining items such as warehousing capacity in Zambia, and also trying to distribute the load across various ports on the African continent. And over the longer term, we remain very keen to back the Western line project running to the Angolan port of Lobito, which would entirely transform the whole logistics chain in the DRC and would genuinely ease the bottleneck there. And then I think another thing to keep in mind is that this is also among the key advantages of the smelter, of course — that we, rather than shipping 1.3 million tonnes of wet concentrate in banks.
Robert Friedland
executiveRather than that, we get 500,000 tonnes of blister copper — clearly under half the volume, yet considerably simpler where handling is concerned.
Dalton Baretto
analystThat’s clear. Still, the Angola option remains completely unavailable. I have to say that, don’t I?
Robert Friedland
executiveSure — I mean, this isn’t going to take place within the next year, but it’s certainly still continuing behind the scenes.
Dalton Baretto
analystAlright, great. My second question concerns flat rate — considering what the decline in the Russian and Ukraine situation means for PGM and markets, is there an opportunity for you to speed up Shaft 2?
Robert Friedland
executiveWell, look, I think regarding the engineering work we released in our feasibility study, we were kind of indicating that Shaft 2 would be a 2027 project, which then lets you phase the expansions of the two concentrators to reach 5.2 million tonnes after that. What I can tell you is that the team on the ground, now moving from that sort of feasibility stage into really the detailed mitigation of the engineering, is examining everything possible as to whether we can speed up that thinking, looking at different methodologies such as raise boring rather than blind thinking, and we have that optionality when it comes to having access from the bottom of Shaft 2 and not just the top of Shaft 2. But it still takes time, and I don't think we're guiding that it will be any quicker, but we're really working hard on this.
Dalton Baretto
analystAll right. The way I hear it, though, what we're dealing with here is a matter for engineering rather than something that falls under capital?
Robert Friedland
executiveRight, yeah, precisely — that's it exactly. The thing is, there's only so many meters you can advance in a day when you're sinking a shaft, and no matter how much money you put behind it, you're still looking at one blast or two blasts per day.
Dalton Baretto
analystGot it — thanks a lot. That covers everything.
Operator
operatorWe have no more questions at this point.
Robert Friedland
executiveThanks, operator. We’re going to move over and check the questions from our webcast, and before we finish up, we’ll take a couple of the ones that came up most and respond to a few of them. So first of all, I think we’ll begin with one of the more common questions, which concerns the drilling program at Western Portland and, with respect to timelines, how many drill rates there are and when results can be expected. So I’ll hand that to management. And if anyone would like to offer some details on the Western Portland drilling, that would be great.
David van Heerden
executiveI'm glad to address that. I can't really offer much beyond what we covered in the presentation. But the thing is, during the first quarter we weren't doing a great deal when it came to drilling meters. It's always tough to operate out there in the wet season. On top of that, we're relocating toward the more distant sections of this enormous land package — keep in mind it spans almost 170 kilometers of strike across the whole of the Western Forelands. Now that the wet season has ended and we're well into the dry season, that's exactly why we'll be stepping up our drilling work considerably through what I'd call the winter months in the Southern Hemisphere. And as I said earlier, we're contemplating four to five rigs under what you might call a provisional budget. That said, I think our exploration approach is quite familiar to people — we won't hesitate to expand that budget if we begin to probe a trend that captures our interest, and we'll definitely bring in additional rigs at the appropriate moment.
Dalton Baretto
analystThat's excellent. Thank you….
Marna Cloete
executiveApologies, I can't hear you at the moment. Perhaps you could unmute.
Operator
operatorWe’ll be starting shortly.
Dalton Baretto
analystApologies for that, everyone — the call got interrupted briefly. Maybe this is more of a big-picture macro question, and it's probably for Robert. When you talk about creating the next big diversified mining company, Ivanhoe's portfolio looks substantial, but what about buying assets elsewhere and the possibility of pursuing fresh exploration opportunities?
Robert Friedland
executiveWell, Ivanhoe Mines already sits at the forefront of exploration in this industry — so we literally get hundreds of proposals landing on our desks each month, and we stay open-minded about every kind of opportunity. So the board is definitely wide open, certainly. And should anyone out there have a great idea and <<inaudible>>. Getting past the first three stomachs is a great idea <<inaudible>>, I'll give it a careful look and see whether our Board has any interest in finding something superior to what we already hold, though I rather doubt that, but we do keep an open mind. Thank you.
Matthew Keevil
executiveThanks, Robert. That brings us to the 45-minute mark, so we'll finish up here. Operator, I believe we'll end today's call at this point. Thanks so much to all of you for joining us, and we look forward to speaking with you again soon.
Operator
operatorToday's conference call is now finished. Thank you all for joining us.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Ivanhoe Mines Ltd. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Ivanhoe Mines Ltd. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ivanhoe Mines Ltd. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.