Operator
operatorHello, and thanks for being with us today. Welcome to the conference call covering Ivanhoe Mines' financial results for the third quarter of 2023 <<operator_script>>. I'd like to let everyone know that this call is being recorded. At this point, I'll turn things over to today's speaker, Matthew Keevil, who serves as Director of Investor Relations and Corporate Communications. Sir, the floor is yours.
Matthew Keevil
executiveMany thanks, operator. Hello, everyone, and good day. Matthew Keevil here, speaking to you live from Vancouver. I'm delighted to welcome all of you to Ivanhoe Mines' conference call covering third quarter 2023 financial results. Joining us on the line today from Ivanhoe Mines are Founder and Executive Co-Chair Robert Friedland; President Marna Cloete; Chief Financial Officer David Van Heerden; Chief Operating Officer Mark Farren; and Senior Vice President, Corporate Development and Investor Relations, Alex Pickard. Today's event will wrap up with a question-and-answer session. Once again, you may submit a question through the Q&A box on the webcast page, or via the conference operator using your phone line. For any follow-up questions not addressed during the call, please reach out to our IR team directly. Before we get started, I want to remind everyone that today's event will include forward-looking statements involving risks and uncertainties that could cause actual results to differ materially from those in the forward-looking statements. Full details of the forward-looking statements appear in our news release issued today, November 6th, as well as on SEDAR+ and at www.ivanhoemines.com. It is now my pleasure to introduce Ivanhoe Mines' Founder and Executive Co-Chairman, Robert Friedland, for some opening remarks. Robert, please go ahead.
Robert Friedland
executiveThank you, and welcome to everyone joining this call. It’s my good fortune to be in California, on the US West Coast. Ivanhoe Mines has had an outstanding third quarter. We’re delighted to present our prospects. We begin with an opening image from the 5th of October, when His Excellency Felix Tshisekedi, President of the Democratic Republic of the Congo, along with a senior government delegation headed by Prime Minister Sama, visited our campus and the opening of our Kamoa Center of Excellence—an educational institution we established because this will be a 100-year mine and for generations of young Congolese. I’m very happy to report that more than 97% of our employees come from the Democratic Republic of Congo, and one of our key commitments is investing in the workforce—both women and men—for doing such a fantastic job developing a copper district the world desperately needs. In recent weeks, we’ve had the tragic situation in the Middle East compounding the conflict over the fate of Ukraine, along with considerable tensions in the world economy against the backdrop of the Federal Reserve Board raising rates. On Friday, there was some indication that the Fed’s ability to raise rates may be on pause, perhaps permanently, at a time when copper inventories are extremely low.
Robert Friedland
executiveIt's hard to convey to this audience just how many parties have come to Ivanhoe Mines seeking a stake in the unmatched potential of the Western Forelands, which is, without question, the finest underground copper asset on the planet we all inhabit. Anyone who follows my public comments knows our view that a meaningful energy transition simply cannot happen without far more copper mining. And mining copper makes no sense if you're going to produce copious amounts of global warming gas in order to obtain the metal needed to cut the generation of global warming gas. So the reinvention of mining by the women and men who run our company, under the leadership of our President Martie, who speaks next, stands as a beacon for the industry, proving that we can do things differently. During this quarter, we announced that an independent audit has shown us to be the greenest major copper producer in the world. We're building the greenest major copper smelter in the world, which will greatly reduce our Scope 3 emissions to essentially the best in the industry. And I'm very happy to welcome the support from the G7 nations, President Joe Biden and his emissary on all things energy transition, Amos Hochstein, who announced European and American support for the Lobito Corridor.
Robert Friedland
executiveThat corridor is going to stretch from Polwayze to Angola’s border and onward to the seaport of Lobito, and it will cut our Scope 3 carbon dioxide emissions sharply. It will lower how much capital we need in order to develop new mines in the Western Forelands, and in fact that railroad will pass directly across our Western Forelands, Polwayze and the route to Angola, and that means our cutoff grades are able to come down and the threshold for spectacular economics in the Congo will only get better. So a number of trends are underway that are producing a better and better Democratic Republic of the Congo. I have stated unequivocally that the DRC is the best place in the world to be mining copper metal, and I have said repeatedly that, having operated in 64 countries, I find it perplexing, the discount rates that people are applying in some banks for the World’s Best Place to Go Mining. When people actually go there and see the 5G wireless, the young labor force, the availability of hydroelectric power, the extremely high grades, the lack of ice and snow and the engaged labor force, everybody working there with such dedicated efforts. I can tell you, at my age, nothing can make us happier than the progress we are making for all of our stakeholders.
Robert Friedland
executiveCredit goes to Marna and her remarkable group of managers, who have built the finest corporate culture anywhere in mining, and credit also goes to this remarkable quarter, in which we can report that we are comfortably and well ahead of schedule on construction of our Stage 3 concentrator, and we are likewise well ahead of schedule for start-up of the Kipushi zinc, copper, silver mine, which carries as well a very significant potential endowment of gallium and germanium — 2 metals we have not even factored into the project's economics but from which there is potential for recovery during refining. Let me just remind everyone that what Ivanhoe Mines is doing has no precedent. We are building up several major projects simultaneously: the Kamoa number one mine and the Kamoa number two mine, now co-joined underground; the Phase 3 concentrator; the world class smelter, a direct to blister smelter, state-of-the-art and very, very clean and powered by hydroelectric power; the Kipushi mine; and the Platreef mine, all going into production, with Platreef now at an ever expanded rate opening soon in a theatre near you. And on top of that, we have our exploration efforts in the Western Forelands and are now initiating at the Mokopane feeder, probably the world's largest potential mineral target in South Africa.
Robert Friedland
executiveAs a result, the road before us looks quite promising. We’ll discuss this further in the months to come. Later this week, I’ll be traveling to Abu Dhabi to give a talk at a conference. With that said, I’ll now hand things over to Marna, whose work last quarter has been truly outstanding. Marna?
Marna Cloete
executiveThank you, Robert. Those remarks mean a lot. I believe your introduction already touched on the majority of our key points, though perhaps we should all take a look at the picture displayed here — it shows our mining management team after finishing the hauling work linking Kamoa 1 and Kansoko, the two operations that will become part of our Phase 3 mine, and you can tell how proud each person is of what was accomplished. Once again we delivered a strong quarter, and I always feel slightly guilty about being the one to walk through the headline items in this opening portion, but we set another production record during the third quarter. Our copper output came in at nearly 104,000 tonnes. What makes us proudest, I would say, is our cash cost of $1.46 per pound of copper — £1.46 per pound — with the year-to-date average sitting at $1.43. In our view we have managed our costs very well, and we will keep doing that while remaining inside guidance as we move through the fourth quarter. As Robert said before, Kipushi is running ahead of plan, with production targeted to begin in the second quarter of next year. Platreef remains on track to produce in the third quarter.
Marna Cloete
executiveAs we noted, Kamoa Phase 3 — the concentrator plant — is running ahead of schedule for Q3, which should let us capture some early tonnes next year. Our guidance will be released in January of next year, so watch for that. Moving to the next slide, our total recordable injury frequency rate across all three sites sits well below the industry average, though sadly we experienced a fatality at Kamoa-Kakula caused by a fall of ground; we investigated that fall of ground and put mitigating measures in place to prevent it happening again. Safety in mining demands ongoing attention from every single employee and contractor, and we share what we learn across the industry and our operations as we keep working toward a zero-harm culture, which is what we aim for at every site. Robert briefly mentioned our greenhouse gas emission intensity study. Our team recently announced the results of an updated greenhouse gas emissions assessment that we commissioned from Skarn Associates and WSP Group. That report confirms Kamoa-Kakula, in 2022, generated among the lowest carbon emissions per unit of copper anywhere in the world and the lowest of any major mine — of any major copper mine.
Marna Cloete
executiveA big part of this comes from the very high grade at Kamoa-Kakula, where we average a grade of 5.5% in 2022 — that's roughly 10 times the estimated global average copper head grade of 0.6%. It also reflects the fact that the DRC grid ranks among the cleanest in the world, with 99.5% of grid power coming from hydroelectricity. And on a Scope 1 and 2 basis, Kamoa-Kakula's greenhouse gas emissions intensity in 2022 was among the lowest anywhere — it puts Kamoa at the bottom for Scope 1 and Scope 2. With the smelter commissioned, we will also see a 46% reduction in emissions once Scope 3 emissions are included. And then, last from me but not least, we had the privilege of hosting the president, his excellency, President Felix Tshisekedi, the first lady, the prime minister, the governor of the province, along with a host of other delegates at Kamoa-Kakula during October. The president spent about two hours on-site. He spoke to our first cohort of students at the center of excellence and spent some quality personal time with each of them. He then took — two of the mines saw what we are busy constructing at the smelter and addressed our staff in our concentrator sheet.
Marna Cloete
executiveThis did a great deal to lift the spirits of every one of our employees, and the president was genuinely taken aback at finding a facility of world-class standard right on his doorstep. When he made his announcement about the presidency, he brought up Kamoa-Kakula, and I believe that is a genuine point of pride on our journey, demonstrating that in the DRC we truly are changing the game in the way we conduct our operations. Our mining is carried out with a larger purpose in mind. Having said that by way of introduction, I will now pass things over to David Van Heerden, our CFO, who will walk you through the quarterly financials. <<inaudible>>
Alex Pickard
executiveWe're doing a quick check since David's audio isn't coming through for us. Kindly give us a moment.
David van Heerden
executiveAlex, are you able to hear me at this point?
Alex Pickard
executiveHello, David. All right, I see you now. Go right ahead.
David van Heerden
executiveOkay, I was mid-sentence there. Thank you, Marna, and hello to everyone on today's call. During the third quarter of 2023, Kamoa-Kakula sold a little more than 96,500 tonnes of payable copper. That represented a 5% decline versus the 101,500 tonnes sold during the second quarter. Although output came in somewhat higher, copper and concentrate sitting in inventory rose to more than 10,000 tonnes by the end of the quarter, and over 7,000 tonnes of that was copper contained in work in progress, with the same applying to tolling at the local smelter during Q3. We anticipate that the excess inventory will be drawn down in the fourth quarter. Given the modest reduction in tonnes sold, revenue at Kamoa-Kakula declined by only 1% quarter over quarter while climbing by over 50% compared with Q3 of last year, as the realized copper price for Q3 came in at $3.84 per pound, a touch above Q2. Sales during Q3 2023 lift Kamoa-Kakula's year-to-date figure to comfortably beyond $2 billion, compared with $1.5 billion across the same stretch a year earlier. Costs in Q3 were a bit higher, with the third quarter at $1.36 per pound of payable copper produced, only 3% above the average for the last year. The quarter-on-quarter rise in cash cost mirrors some inflation effect on maintenance and operating costs at Kamoa-Kakula, along with higher processing costs caused by greater diesel consumption to power generators.
David van Heerden
executiveFor the year to date, cash cost comes in at $1.43 per pound, which sits below the midpoint of the guidance we reiterated. Kamoa-Kakula generated $423 million in EBITDA during the third quarter of 2023, a figure that was 7% lower than Q2 2023. The quarter-on-quarter decline in EBITDA and EBITDA margin stemmed from fewer tonnes sold along with realized foreign exchange, and the next slide illustrates this well. That 5% drop in tonnes sold, which I mentioned earlier, accounted for a $34 million reduction in EBITDA, and we anticipate Q4 will benefit as inventory unwinds. The lower up price at which provisionally priced sales were recorded in Q3 had an $8 million effect, while the quarter-on-quarter change in revenue remeasurement — a gain of $13 million in Q3 versus a loss of $28 million in Q2 — carried a $41 million impact. The $32 million decrease shown to the right came from the somewhat higher cash cost in Q3 and also from realized foreign exchange, which drove a $14 million swing quarter-on-quarter. As you would expect after seeing the previous slide, Ivanhoe's group level adjusted EBITDA for Q3 fell from Q2, with that decline tied directly to the drop in Kamoa-Kakula's EBITDA explained on the prior slides and to the resulting decrease in Ivanhoe's share of it.
David van Heerden
executiveFor the nine months that ended on 30th September 2023, Ivanhoe's adjusted EBITDA came in at $496 million, compared with $325 million during the equivalent stretch of 2022. From Kamoa-Kakula in Q3, we recognized aggregate income of $121 million — made up of Ivanhoe's portion of the joint venture's profit, which you can see illustrated in the chart at the bottom left of your screen, plus $51 million of interest income in Q3 on the loans extended to that joint venture. Ivanhoe posted a quarterly profit of $108 million in the third quarter, and that was driven by the income from Kamoa-Kakula. Over on the right hand side, we've again set out our reported net profit next to normalized net profit, which strips out fair value adjustments on the convertible notes for each period. Profit has climbed steadily as Kamoa-Kakula's Phase 2 was commissioned and ramped up and debottlenecking took place, yet this slide captures only a very small slice of what Ivanhoe was doing during the quarter. Far more is underway that will deliver short term growth across all of Kamoa-Kakula, Platreef and Kipushi. In the third quarter we carried on expanding Phase 3 at Kamoa-Kakula, putting more than $320 million into it during the quarter, bringing total investment in 2023 to just over $1 billion.
David van Heerden
executiveWe're also making continued headway on developing both Platreef and Kipushi, with capital expenditure of $64 million and $74 million, respectively, invested during the quarter, and as Alex and Mark will walk you through in more detail on the slides coming up, both projects are performing very well. At each of these projects, 2023 CapEx guidance and spending plans are unchanged. And at the end of the period, Ivanhoe Mines holds a healthy cash balance of $303 million with limited debt apart from the $575 million convertible notes maturing in 2026, which gives us plenty of balance sheet flexibility. Additional standalone facilities at each project are well advanced, and most of them are expected to close in the very near term. I'll now hand things over to Alex Pickard, our Senior Vice President, Corporate Development and IR, to begin the operations and projects update.
Alex Pickard
executiveThanks, David. Good to know we could reach you. And hello to everyone joining from London. Mark Farren, our Chief Operating Officer, is with us today, connecting live from Kamoa-Kakula. So I'll begin with Kamoa-Kakula, then pass things to Mark, who'll walk you through the newest developments on the project and what's happening in construction. As you've also heard, our executive Co-Chairman, Robert Friedland, is here as well; he'll give an update on the Western Foreland and wrap up the call ahead of Q&A. So, beginning with Kamoa-Kakula, as Marna said, we're delighted to report yet another record quarter — we just edged past the second quarter, producing close to 104,000 tonnes of copper and concentrates. That takes our year-to-date copper production to 301,336 tonnes, putting us firmly on track to hit our initial guidance range for the year of 390,000 to 430,000 tonnes of copper and concentrates. On recoveries, they stayed very consistent — in fact, precisely in line with the prior quarter at 87.2%. That's again above our design recovery rate of 86%. And on the next slide, I'll say a little more about the tailings recovery project we announced a couple of months ago.
Alex Pickard
executiveIt's also worth pointing out that the <<inaudible>> and the strong recovery rates we've managed to deliver have come about even with the power problems that kept occurring at Kamoa-Kakula. So basically, we're generating those volumes yet still forfeiting a fair amount of production. Mark Farren will likewise provide further information on the steps we're taking to tackle those problems throughout the operation. Turning now to the tailings recovery project — during the previous quarter we discussed the preliminary test work we had finished. That work delivered an extremely encouraging outcome: it's feasible to lift our recoveries from 87% at present to somewhere in the mid-90s by putting in fairly standard dedicated grinding and flotation for the tailings stream. Since that press release came out, we have progressed to basic engineering. That will be finished in Q1 of next year. Following that, we'll proceed to implementation in order to retrofit the required equipment onto the Phase 1 and 2 modules. Perhaps, just to remind everyone of the scale of the opportunity we have at Kamoa-Kakula, you can look at the chart on the right-hand side.
Alex Pickard
executiveMarna went over those figures before, so I won't repeat them in detail. Still, one challenge we face—and honestly, it's a nice one to have—stems from mining at roughly 5.5% copper grade: our tailings currently sit at a grade of about 0.7 to 0.8 copper. That means the grade of our tailings is considerably above the average grade of a copper mine anywhere in the world these days. That leaves us with an enormous chance to boost both output and margins. There's a statistic at the bottom of the page showing that, for the Phase 1, 2 concentrators by themselves, as a rough rule, each extra percentage point of recovery we manage translates into about 5,000 tonnes more copper produced each year. We've also had a great deal of media attention lately focused on the Lobito corridor. The reason is that the G7 and the European Union have both come alongside the United States in backing this big project, along with funding expected from the Africa Development Bank and the Africa Finance Corporation, on top of the financing the US, through the DFC, has already identified. So the initial stage of this Lobito corridor effort involves rehabilitating the line running from Kolwezi—located just east of Kamoa-Kakula—which connects to Angola's Atlantic seaports at Lobito.
Alex Pickard
executiveAs we said before, a consortium led by Trafigura is running that operation, and our goal is to be among the main anchor customers of the railway. As we've disclosed previously, trial shipments will get underway later in the year. The initial quantity is modest — approximately 10,000 tonnes is what we intend to move — yet it will give us considerably more cost data. And, picking up on the emissions footprint point Robert raised earlier, this Lebito line represents a major further step toward zero carbon copper: from a first principles standpoint it is far more efficient than hauling by truck, and the distance to port is also about half of what the alternatives involve, such as trucking to Durban. A second step, also announced recently, is the plan to link the line from Lobito into the <<inaudible>> copper belt, which would turn it into a full service line joining Africa's west and east coasts. With that, I'll hand over to Mark Farren, who will update us from Kamoa-Kakula on our project's construction activities, beginning with the Phase 3 concentrator.
Mark Farren
executiveThanks, Alex. Perhaps as a place to begin, Robert got the presentation underway. The Phase 3 concentrator is actually running ahead of plan. I believe we've announced it this time by roughly a quarter. So what we're indicating is that it's slated for quarter three. My hope, I'm saying, is the early part of quarter three next year. So it will operate, but clearly that also sets in motion everything else. So it's the ramp-up, the crew ramp-up for mining, the management of hauling has taken place, that's been early as well. The scheduling and getting the oil reserves in place across all three mines, so the Kansoko, Kamoa 1, Kamoa 2, getting them ready for mining and getting them ramped up early next year. I suppose in our back pocket, we've always kept quite a large stockpile that's still about 4 million tonnes, which will clearly begin feeding into that brand new concentrator to get things moving. And then the following step and challenge, I suppose, is logistics, because we're going to be moving far more concentrates. I think initially placing some of that new concentrates here locally, but that would clearly displace some of the Kakula concentrators that's been fitted to the LCS local smelter at the moment.
Mark Farren
executiveMy sense is we'd need to apply a fair amount of pressure on logistics and ensure everything gets sorted out — and we have a great team here handling that. As Alex noted on that last slide, the Lebito corridor becomes strategically important over the long term, and important in the short term just to get something moving, but strategically important over the long term. So overall, I think Kamoa itself is progressing very well. If we could move to the next slides, Alex. The smelter. Let's discuss the smelter itself — that unit is on track for commissioning in quarter four next year, which ties in quite nicely with the Inga project we're also working on. No major red flags there, and a big focus now is getting the operational team in place. We've recruited the executives, and we're busy recruiting the middle management and then, obviously, the labor force that comes with it. There's no major smelting of this size or magnitude or type in the DRC itself. So we'll be training some of the leadership all over the world — some here at LCS, Zambia, and in particular, China.
Mark Farren
executiveSo we're putting together what I believe is a really strong team of onus. And we also have, I think, a very solid project team and the people we'll rely on to ramp up that smelter in the fourth quarter of next year. The smelter itself is complex — as everyone knows, it's the largest in Africa. It's among the biggest anywhere in the world, and I think ramping it up is going to take some time. But we've placed a very, very good team in position to handle this on that smelter. So I genuinely believe we'll complete it on schedule. We can go to the next slide. Inga — we're going to discuss power a little. So there are two things I'll cover here. The first is the Inga refurbishment we're actually carrying out: we're installing a 178 megawatt turbine at that Inga. That project is also progressing well. We set that project up two years ago with commissioning planned for the fourth quarter of 2024, and so it's absolutely on track. That turbine is now arriving on-site in the next month. It's a huge turbine, and assembly of that turbine will begin in January this year.
Mark Farren
executiveBeyond that, we carried out a thorough assessment of the network starting at Inga — roughly 1,700 kilometers from the mine — covering every location where the DC line converts back to AC in this province, in Kolwezi province, right from Inga. Upgrading that line so we have a stable electrical system, an electrical reticulation system feeding the mine, calls for approximately $73 million-odd in extra work. We've identified that work and placed it into the same loan as Phase 1. So in Phase 2 we've actually adjusted the scope a little. We're executing the Inga project plus the added upgrade work to ensure a stable electrical grid. Alex noted that stability has been a struggle and power has been a struggle. It's been somewhat continuous throughout the year. Things are going okay. I believe we've put in a great deal of effort to get it in place. Inga remains on track, and SNEL's board has now approved that additional scope of work. So we'll move into execution and proceed as fast as we can.
Mark Farren
executiveAlso, regarding power — I just want to wrap up on that topic. We're bringing in a substantial amount of additional generating capacity, meaning diesel generation, onto our mine grid, purely to guarantee stable electricity in every situation. So come the end of next year, we'll have the ability to operate all three concentrators using diesel power in the event that — if for whatever reason a full blackout occurs. That isn't the plan, not the plan whatsoever, but we want that assurance, since this mine is so valuable and these concentrators generate so much value each hour that we simply cannot permit being offline owing to any form of power interruption. So we'll have roughly more than 200 megawatts installed by the close of next year, and it's being delivered in stages, essentially quickly enough to have my Phase 3 concentrator operational ahead of the Inga turbine coming online. So overall, I believe we've made some solid choices regarding power — to repair Inga, to ensure we've brought stability to the DRC grid, and second, to have sufficient generating capacity at our mine should any problems arise.
Mark Farren
executiveI believe that covers essentially everything regarding Kamoa-Kakula and Inga. Shall we proceed to the following item? That would be Platreef Phase 1, the operation I refer to as the baby mine. This is a mine producing 800,000 tonnes annually. That project remains on schedule as well, with operations set to begin in quarter three 2024. Underground development is underway, as you all are aware from Shaft 1, and we have that progressing rather well. We have carried out certain underground modifications. A crushing system has just been put in place to assist with all movement, and we have upgraded the hoist, the winder and the loading system underground for that shaft. We are currently engaged in an optimization study there, referred to as Shaft 3. That is a ventilation shaft. It used to serve as a ventilation shaft, but in all likelihood we will repurpose it so it can handle both ventilation and hoisting to the order of roughly 3 million tonnes per annum. That provides us with the capacity to accomplish two things. The first is to derisk Shaft 1, which was never actually designed as a wasting shaft. And then, clearly, the concentrator processing 800,000 tonnes of ore will carry no risk of wasting that. Beyond that, it enables us, should we choose, to speed up Phase number 2.
Mark Farren
executiveMoving into Phase 2, we're able to begin hoisting from Shaft 3 even as Shaft 2 is still being synced and equipped. A detailed study is currently in progress, and I believe a press release will come out in roughly a month or so. Marna, I think it's around a month. And I expect that will be an exciting upside press release coming on…
Marna Cloete
executiveCorrect, Mark — that will happen prior to the end of the year.
Mark Farren
executiveAll right, thanks, Marna. Regarding Platreef, there isn't much more to add. As I've said repeatedly and will say once more, this mine is the finest platinum orebody anywhere in the world, if you understand platinum and PGM metals. Compare it with anything in the east or the west <<inaudible>>, where they're extracting 1 meter, while at Platreef we'll be mining 24 meters at comparable grades, with elevated nickel and copper content. So I believe this will deliver an enormous competitive edge. I don't anticipate much visible in the coming year, since it's a small operation. But keep your eyes on this project across the next couple of years — it will rank as the premier platinum asset globally, and we're advancing it very well. Next, I believe, is a few remarks about Kipushi. Robert already discussed Kipushi. Kipushi is an excellent zinc orebody. Grade of 35% odd. It remains firmly on schedule for commissioning in quarter two of next year, which I think puts us two quarters ahead of what we promised. Quarter three, quarter four, somewhere around there. So it will definitely be operating in quarter two. The stoping — the initial stoping is in fact taking place right now.
Mark Farren
executiveWe've completed slots for a couple of the longhaul stopes. Right now, we're essentially drilling the fans. We have roughly seven levels open—seven and a half levels open—fully developed and ready to go. And construction of everything both on surface and underground has gone exceptionally well. The development is stable. I mean, the underground physical development is stable. It's actually already at its operating steady state. So it's really just a question of how much we want to open up in terms of footprint. I think the underground infrastructure is working beautifully. There's no problem with hoisting. The plant will be early, as I said, and everything else is more or less on track to be in place and running by quarter two next year. So no issues around Kipushi that I can think of. When you do come visit, those of you who visit, you'll see a beautiful modern mine from March next year, a very nice looking for Kipushi. Won't look anything like what you might have seen before if you've ever been to that site. It's a really nice modern mine. Completely transformed. I think that's it on the projects. Is there anything else? Yes, that's it from me.
Alex Pickard
executiveI believe it’s time to turn things over to Robert for the Western Foreland. Is Robert with us?
Operator
operatorSir, in case your line is muted, kindly unmute it.
Alex Pickard
executiveSince Robert isn't here, I'll begin and he can pick things up once he's back. So here's a quick update on what's happening with drilling at the Western Foreland. By the end of the quarter, we had finished 37,500 meters of drilling. Diamond core drilling made up the vast majority of those meters, so we're really moving forward on the schedule we laid out at the beginning of the year. We've also raised the count of contractor rigs drilling at the Western Foreland right now to six, plus one Land Cruiser rig that Ivanhoe owns. We've mentioned this over the last couple of quarters, but the Maiden Mineral Resource estimate for Makoko and Kiala is now fully complete on the QA/QC side, and you should expect that resource to be released imminently. And then, as a result — I should say — of the drilling we've finished at the Western Foreland to date, I believe we began with a budget of just under $20 million. We recently added another $2 million to the budget for the rest of 2023, and that's meant to push forward certain new targets we've been examining more recently.
Robert Friedland
executiveIs this coming through clearly for you gentlemen?
Alex Pickard
executiveGot it, Robert. That’s right.
Robert Friedland
executiveYes, I’m not sure what’s going on with this conference system, but I’m back—in case you lost me. We have several major projects underway at the same time. I’m not aware of any company that has been this ambitious, with Kansoko and the Kamoa mines underground being developed, and the third concentrator being developed, and the smelter being developed, and the hydroelectric capacity in the country being developed, and the backup power in the country being developed, and the largest precious metals mine in the world being accelerated and developed in South Africa, and the richest zinc mine in the world being developed. And we don’t really like to say much about the Western Forelands. But since Christmas is coming and our shareholders have so much interest in our discussions, I’ll begin by saying that we have recently increased our landholding in the Western Forelands. We completely dominate the important parts of the basin based on our proprietary geologic knowledge of how the creator put all this metal here in the first place. If you came from another planet in a flying saucer and your Martian boss told you to come find copper on this metal, there really is nothing to compare to this part of the DRC.
Robert Friedland
executiveThe copper found in this basin is comparable to the oil at Saudi Arabia's Ghawar field — on a geologic scale, nothing has ever equaled it. These aren't porphyry copper deposits. They're sedimentary deposits, closer in character to oilfield geology. Once you discover one of these, it can extend for miles upon miles upon miles upon miles, and tectonic forces haven't disturbed them after emplacement, lying west of a key fault that we refer to as the zipper fault. Wherever we hit copper, it simply continues and continues and continues, and that lends itself to bulk-scale mechanization at very low cost. What's different now is the new railroad system being built through the Western Foreland that brings us nearer to the coast, meaning the mineralization keeps becoming more and more appealing, and we now have a trained labor force. We've got 5G wireless. We have food production domestically, construction skills. And as each of these elements develops, the Western Forelands only become more attractive. It would be hard for me, and not appropriate on this call, to detail how many mining organizations around the world — the biggest ones — along with how many sovereign wealth funds and financial institutions have shown interest in coming to the Western Forelands, but let's just begin with the Japanese.
Robert Friedland
executiveJapan's reigning emperor, back when he was crown prince within the imperial household, dedicated a dam for the Japanese government during the 1970s, and today he sits on the throne. Well, now the Japanese have arrived in the Congo, seeking to fund copper output as one piece of their push to cut greenhouse gases. A lot of you who hold our shares might remember that we disposed of a 10% stake in Platreef for roughly $300 million to a consortium spearheaded by the Japanese government — JOGMEC, JGC and Itochu. So Japanese parties hold an interest, Middle Eastern sovereign wealth funds hold an interest, and the big mining firms hold an interest. I'd love to share this little story: one of the biggest mining companies anywhere sent people to look at what we're up to, and they determined Kamoa-Kakula ranks as the finest mine on earth. They admitted they could never pull it off on their own, since they lacked the foresight to be present in the Congo 25 years back, when we labored beneath the net present value model's oppression. Copper mining worldwide will follow this path. And therefore, quite soon, we'll begin by revealing the effort we've put in at the Makoko system along with another high-grade zone nearby, Kiala.
Robert Friedland
executiveThose two things, taken together, are now under study for a mine that Ivanhoe Mines would run through an 80/20 joint venture with the government in the local Congolese. So my expectation is that we can bring you those numbers, independently vetted, in the very near future. After that, we're tossing around the notion of a second disclosure covering some work underway that falls outside the Makoko area. For strategic reasons, we might prefer not to get too specific, but I believe we'll have more to say in that second press release — let's say before Christmas. So more news on this is coming soon, at a theater near you. When it comes to the geologic potential lying beneath the Western Forelands, we couldn't be happier, and I don't think even a fraction of 1% of the geologic potential there has been delineated, as our knowledge and understanding of how the creator put the copper in this area has grown. Now that the president and the prime minister have come along, with the first lady and so many important people in the country, and now that the country is engaging in another democratic election, and now that the country has support from the European Union and the United States, as well as China, all parties around the world are looking to the bright future of this country.
Robert Friedland
executiveWhat I'd say is that the country's most valuable resource is its people — the young women and young men who turn out to be excellent geologists. They can look at a core sample and recognize what they're seeing, and on top of that there's the natural endowment the creator gave the Western Foreland. I have a lot of confidence that we will still be discovering new mines in the Western Forelands a 100 years from now. So, coming soon to a theater near you, we'll share more details about the Western Foreland. Thank you, everyone.
Matthew Keevil
executiveThanks, Robert. We're going to start the Q&A portion now. As we always do, I'll pass things back to the operator so the phone lines can be filled with questions from analysts. After that, we'll check the web to see whether any online questions are there for us to take up. So operator, please go ahead with the phone line.
Operator
operatorWe'll take our opening question from Lawson Winder at Bank of America Global Research.
Lawson Winder
analystThere are a couple of items I'd like to cover. First, transport costs appear to have leveled off in that roughly $0.45 to $0.46 per pound range, which is great to see considering every difficulty you folks have encountered. As we look ahead to Q4 and 2024, should we anticipate that same kind of level until the blister is prepared for shipment?
Robert Friedland
executiveDavid, would you like to handle that question?
Marna Cloete
executiveThe question didn't come through for me. There are audio problems on our end — no sound is getting through. Could you ask it again one more time…
Robert Friedland
executiveI'd say that's a fair figure, Lawson. What we're actually doing is examining the possibility of putting longer-term contracts in place at the moment, along with a somewhat different entity — so there's potential to bring costs down as we move forward. And then, as Robert mentioned, over the longer term I believe that Lobito corridor will deliver a genuine solution. Another point worth keeping in mind is that once we begin selling the blister, we essentially cut the volume in half — we cut by half the number of tonnes we release. So that has an enormous influence on logistics cost per pound, roughly $0.20 per pound. It therefore does decline once we move to the blister. Thank you.
Lawson Winder
analystThen, if I could just get your take on the election that's coming up—it's practically here now. From either side, as I see it, matters appear to be moving along as usual. Still, is there anything internally at Ivanhoe that worries you and that you'd point to, or any observations about how the election is unfolding? That would be really useful. Thank you.
Marna Cloete
executiveI can probably handle that question. Honestly, things have been pretty calm in the run-up to the elections. I mean, we were there for the 2018 elections, and that period was far more turbulent. We witnessed many more demonstrations in the major urban centers. I'd say campaigning has been relatively subdued. Altogether, 24 candidates are in the race, and of those 24, roughly four are serious contenders. The elections are certainly going to go ahead as scheduled — that's what people on the ground are saying right now — on 20th December. And there's substantial international backing for having free and fair elections. Voter registration has taken place. The presidential flight has been arranged. And every sign suggests the election season will be peaceful. So I've spent the last couple of weeks traveling there; it's marked at the moment, and aside from banners all over the place and seeing people using platforms to make political speeches, it's genuinely been very quiet. But we're fairly optimistic that the election season will be a peaceful one.
Robert Friedland
executiveLawson, in my view the vote that ought to concern you is the one taking place in the United States.
Operator
operatorAnd with that, operators, the queue shows no additional questions from speakers. I'll hand things back to Matthew Keevil so he can pick up with the questions coming in through the webcast.
Matthew Keevil
executiveThanks very much, operator. Yes, just taking a few here. There are a couple of repeats, so we'll group them together and just cover a few before closing the call. First and foremost, I have a few questions here. David, Alex, Marna, maybe best suited for you. On the sort of expedited or advanced expectation on the Phase 3 concentrator ramping up, and sort of Mark touched on this a little bit, but the impact on the operations and the logistics supply chains on having that concentrator Phase 3 come in a bit ahead of schedule?
Marna Cloete
executiveMatt, perhaps I can take the first pass at that. As we see it playing out, we'll aim to put a significant share of that concentrate with the local smelter, <<inaudible>>, simply to reduce the logistics strain. We'll also need to accumulate a stockpile for blending at the smelter once we begin commissioning it. That should open up some cash flow next year that we hadn't really counted on. Our timing for the concentrator has always been aligned with smelter commissioning. Since the concentrator is arriving somewhat ahead of schedule, we believe we'll have more tonnage from it available next year, and that will be reflected in the guidance we issue in January of next year. Naturally, this brings extra logistics work. We're currently putting long-term agreements in place with logistics providers so we can secure dedicated supply. We're approaching this by leveraging our combined negotiating strength across both Kipushi and Kamoa, since we anticipate higher volumes as the two projects ramp up alongside each other along the same corridor—but we have the situation under control.
Matthew Keevil
executiveMoving to the next topic, since several questions came in about Platreef, I'll address them together. Alex, you may have a decent read on this particular matter, but here's a question about the outlook for platinum — specifically the supply and demand fundamentals — and what's happening in South Africa and more widely as Platreef starts up.
Alex Pickard
executiveHonestly, I'm not sure — for us, this mine isn't being built around what platinum costs today or what it might cost tomorrow. The reason we're building it is that it's going to be the lowest cost producer in the PGM industry, given the features Mark described, which make this a totally unique orebody within the PGM sector. So even at the current basket price, which has clearly risen substantially over roughly the last 12 months, we would still be a very comfortable high margin producer. That's essentially what we have to look forward to. More broadly, though, what I'd say is that plenty of people are clearly feeling the pain at the moment if you look across the PGM sector, and clearly a large number of producers are underwater on a cash cost basis or certainly on an all in sustaining cost basis. And I think that supply side response and contraction is already beginning to show. So for me — I actually feel relatively sanguine about it. It doesn't seem like a bad time to be building a world class PGM mine that will one day be the future of the industry.
Robert Friedland
executiveAnd I want to mention that you keep referring to it as the PGM mind, but next to our competitors, our nickel endowment is uniquely high. As a matter of fact, the entire system ranks among the biggest nickel resources on the planet, which is the reason we are drilling the Mokopane feeder. That district holds an astronomical quantity of sulfide nickel that dwarfs every other nickel target. So the extremely high nickel endowment, the bulk mining, the flat geometry of the orebody, the incredible thickness in grays, the favorable metallurgy — well, for the rest of the industry that is a problem, but for humanity it is a benefit, since these metals have plenty of uses, and there is also plenty of gold in the system. So you have gold, rhodium, platinum, palladium, nickel, and copper. It is very important to grasp that here is a naturally hedged basket of metals. Now South Africa has plenty of challenges. The currency has been weakening, but this is a mine whose costs are in South African rand and whose revenues are in dollars. So our intention is simply to be the best platinum, palladium, nickel, copper, cobalt producer with gold and rhodium anywhere in the world, and this is a 100 year mine.
Robert Friedland
executiveYou simply keep pushing forward and get it done—that's how this industry works, and it's what we have to do. These metals need to be produced in a green and sustainable manner that delivers direct benefits to local communities, and that is exactly what we're doing. In my view, this Tier 1 mine often gets overlooked. I'm not sure why it's frequently called a copper company. But very soon, we will rank among the world's major precious metals producers, and to underscore the point, using Shaft 3 for hoisting means this will become a really large mine much faster than we've previously indicated. So, as another gift for our shareholders, we should release a detailed plan before Christmas explaining how quickly Platreef is arriving on the scene. We've recently begun the tailings—there's a sewage retreatment plant where Mokopane City sewage water is being recycled to produce clean water for the mine. That's a very green water source and lets us move forward, and we have uninterruptible power from Eskom, uninterruptible industrial power. So this giant project is opening soon at a theater near you, and I'd urge all of our shareholders and stakeholders to get to know it a lot better.
Robert Friedland
executiveThere will be another chance to hear from us at Endava in February. And if any of you are interested in a tour, there's really no reason not to visit and see the remarkable progress and everything we've accomplished there in February. So please get in touch—I'm <<email_hidden>>—if you'd like to come take a look. Thank you.
Matthew Keevil
executiveMuch appreciated, Robert and Alex. Excellent work. We’ll finish up with a single additional question, and it’s one that comes up quite a bit. Perhaps we can direct this to Marno or Mark, since it touches on execution. The question is this: across the mining sector, companies struggle to deliver both small and large mines within schedule and budget. So to what do you credit your capacity to approve, sink, shaft, construct mines and smelters in frontier as well as established jurisdictions? And at this point you again have both the Phase 3 and Kipushi mine running ahead of schedule. What would you say is Ivanhoe’s secret sauce, so to speak?
Marna Cloete
executiveI'll take a first crack at this, since I know Mark tends to be pretty modest, but I believe the execution team deserves a lot of the credit. We've got a group that collaborates really effectively. By now, we've been through this before. We understand how to stay nimble. We understand how to make decisions quickly. There isn't much bureaucracy or red tape around here, yet we maintain solid governance. And then I think it comes down to leveraging the same equipment and contractors you've worked with previously, assuming they delivered good results, as long as the pricing stays competitive. But honestly, people are the real key. When a team clicks together, you can accomplish remarkable things. And when everyone is pulling toward the same objective and each person understands their destination, anything becomes achievable. But, Mark, feel free to chime in on this as well.
Mark Farren
executiveRight, Marna, that's correct. We have a great team, and we've got plenty of solid, skilled contractors. Over time, we've essentially secured the capabilities we required here in this country and in South Africa, and things are going well. Thank you. So, you're correct — it comes down to the team, the people, and leadership.
Robert Friedland
executiveLet me add a note of thanks to our Chinese friends for the raw material, fabricated steel, and other critical elements supplied to the Chinese economy on time and on schedule. So when that steel shows up punctually from the opposite side of the globe, that is extremely helpful. And a great deal of engineering capability and skilled labor has come from our Chinese partners. You know, nobody can produce movies the way Hollywood does. Hollywood blends every imaginable ethnic group and every cultural background, and that is how James Cameron can create an Avatar while no one else can produce movies the way Hollywood does. And there is enormous strength in that cultural diversity. You bring together people from different cultures and different backgrounds to work toward a common goal. Our local Congolese speak the local language and grasp the local conditions. They are extremely eager to develop their own country. The esprit de corps among management and the workforce is astonishing, and empowering women in senior management roles fosters a corporate culture far superior to what was traditional at the major mining companies. That is simply a fact, and we encourage people to come and see it.
Robert Friedland
executiveThat sort of value doesn't show up in net present value models, and spreadsheets won't capture it either — it lives in flesh and blood, in corporate culture. That makes the management team critically and incalculably valuable. May it keep going, may it thrive, and may it last a long time, since this planet requires a great deal of conscious mining if we're to have any chance of changing how we've done things before. Here's hoping for peace and for peaceful use of the world's resources, and for leaving a better world to our kids and our grandkids. Thank you once more, everyone.
Matthew Keevil
executiveMuch appreciated, Robert. That's a fantastic way to finish up. I just want to mention that our call has now reached its conclusion. And thank you all for joining today's event. As the speakers described, there are plenty of exciting milestones ahead for Ivanhoe Mines as 2023 draws to a close and we head into 2024. Once again, should any question remain unanswered, please get in touch with our IR team once this call ends, and we'd be glad to address it. With that, I'll hand things back to the operator to close us out. Many thanks, operator.
Operator
operatorThanks. That brings us to the end of today's conference call. We appreciate everyone joining us. You're free to disconnect now, and we hope you have a pleasant day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Ivanhoe Mines Ltd. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Ivanhoe Mines Ltd. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ivanhoe Mines Ltd. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.