Good day, everyone, and welcome to the J.K. Cement Q1 FY '23 call, which PhillipCapital India Private Limited is hosting. <<operator_script>> Kindly be aware that this conference is being recorded. At this point, I'll turn the conference over to Mr. Vaibhav Agarwal of PhillipCapital India Private Limited. Thank you, and the floor is yours, sir.

Vaibhav Agarwal

analyst
#2

Yes. Thank you, Inba. Good evening, everyone. PhillipCapital India Private Limited welcomes you to the Q1 FY '23 call for J.K. Cement Limited. Joining us on this call are Mr. Ajay Kumar Saraogi, Deputy Managing Director and CFO; Mr. Sumner Khandelwal, Deputy CFO; and Mr. Prashant Seth, President, Business Information and Investor Relations. On behalf of J.K. Cement Limited and the management, I would like to note that some statements we make or discuss during this conference call could be forward-looking, relating to future developments and current performance. Such statements carry a number of risks, uncertainties and other important factors that may cause actual developments and results to differ materially from what is stated. Neither J.K. Cement Limited nor the company's management is obliged to publicly alter or update these forward-looking statements, whether due to new information, returns or otherwise. I will now hand the floor to the manager of J.K. Cement for opening remarks, after which we will take the Q&A. Thank you, and over to you, Saraogi sir.

Ajay Saraogi

executive
#3

Thanks, Vaibhav, and good evening. On 13th of August, the Board of Directors convened to review how the company performed for the first quarter that ended 30th June, 2022. The key highlights were as follows: revenue from operations came in at INR 2,066 crores, compared with INR 2,269 crores in the prior quarters and in the last quarter of FY '22 — that's a decline of 5%. Other income fell 46% to INR 22 crores, versus INR 41 crores. Operating expenses were down 6%, at INR 1,766 crores compared with INR 1,886 crores. EBITDA for the quarter was INR 405 crores, up 2% from INR 397 crores. Depreciation rose 19% to INR 90 crores, versus INR 76 crores. On this depreciation, we reviewed the useful life of certain power plants, and additional depreciation has accordingly been provided for. Finance cost declined 10% to INR 62 crores, against INR 69 crores. Profit before tax was INR 271 crores, a decrease of 3% compared with INR 279 crores. Profit after tax stood at INR 271 crores versus INR 149 crores, an 81% increase, since impairment of Fujairah had been taken in the prior quarter.

Ajay Saraogi

executive
#4

Tax provisions came in at INR 90 crores versus INR 63 crores, while profit after tax stood at INR 181 crores compared with INR 86 crores. Earnings per share for the quarter were INR 23.44 against INR 11.16. The EBITDA margin during the quarter reached 19.08% versus 17.87%. Looking at it year-on-year, revenue from operations rose 33% to INR 2,166 crores from INR 1,634 crores. EBITDA was INR 405 crores compared with INR 402 crores — essentially flat, up just 1%. Depreciation was higher once again, at INR 90 crores versus INR 66 crores. Finance cost amounted to INR 62 crores against INR 56 crores, and profit before tax came to INR 271 crores compared with INR 305 crores last year, an 11% decline. Profit after tax was INR 181 crores versus INR 208 crores, down 13%. EPS: INR 23.44 against INR 26.95. The EBITDA margin was lower, at 19.08% versus 25.11%. Those are the key financial highlights. Turning to the project side, the greenfield expansion at Panna has reached an advanced stage. The company anticipates commissioning it during this year; efforts are underway, and there is a possibility the plant could go onstream as early as the third quarter.

Ajay Saraogi

executive
#5

To this point, roughly INR 2,072 crores has gone into the project. Turning to how the debt looks, gross debt stood at INR 2,785 crores as of 30th June, compared with INR 2,850 crores. Net debt came in at INR 1,727 crores versus INR 1,606 crores. Net debt to EBITDA works out to 1.12x, compared with 1.05x as on 31st March, while net debt to equity is 0.39 against 0.38. Those are the key points. Should you have any questions, we would be glad to take them. Thank you.

Operator

operator
#6

We’re going to start with the first question, which comes from Shravan Shah at Dolat Capital. <<operator_script>>

Shravan Shah

analyst
#7

To start, nice work on the somewhat stronger results, especially the quarter-over-quarter gain in EBITDA per tonne. Now, on to my questions. First, regarding pricing: after June, what price decrease have you seen in the north and central regions?

Ajay Saraogi

executive
#8

In the north, we're seeing roughly INR 10 to INR 12 per bag less. Central India isn't really our core market, so it's hard to pin down the actual decline there. The north, though, is where the big movement has been.

Shravan Shah

analyst
#9

And what about the south, sir? Specifically South and West Karnataka, plus Maharashtra?

Ajay Saraogi

executive
#10

South — and South hasn't shifted much, roughly INR 5 to INR 6.

Shravan Shah

analyst
#11

All right, so the next thing I want to ask about is power and fuel. What did our consumption cost come to in Q1 FY '23? And how are we looking at that cost now, especially for Q2? So are we beginning to see power and fuel costs come down starting in Q2, or will that only happen from Q3?

Ajay Saraogi

executive
#12

So actually, we continue to see the advantage from cheaper fuel during Q1. The complete effect of that expensive fuel we bought hasn't — what I mean is, the whole impact isn't in yet, and that should show up in Q2. So we expect fuel cost in the second quarter to come in above the first quarter. So there's no question of any decrease at this point, but Q2 would represent the highest fuel cost for many — for I think all periods ahead.

Shravan Shah

analyst
#13

And any rough figure — 10%, 15%, something like INR 100 or INR 150...

Ajay Saraogi

executive
#14

The range of INR 10 to INR 12 ought to be greater relative to what we see for power fuel, and that cost might be roughly INR 200 per tonne more.

Shravan Shah

analyst
#15

Alright, I understand. Regarding a few data points, then: for this quarter, what about OPC and PPC, the share figure, the railroad mix, and the lead distance of the fuel mix?

Prashant Seth

executive
#16

Yeah, so OPC and PPC — PPC came in at 64% this quarter. The rate ratio was 69%. Railroad was 70% to 83%, and lead distance was 475 kilometers.

Shravan Shah

analyst
#17

All right, the lead distance has gone up.

Prashant Seth

executive
#18

Yeah, that figure has gone up, and the reason is the new markets — we're supplying those new markets in Central India from the plants we already have. So the lead distance has gone up.

Shravan Shah

analyst
#19

What about the fuel mix?

Prashant Seth

executive
#20

Our fuel blend is roughly 50% petcoke, with the rest made up of imported coal and alternate fuel.

Shravan Shah

analyst
#21

All right, understood, understood. Sir, to make sure I have this right: you mentioned we reviewed how long the power plant will operate, and that's the reason depreciation came in higher by roughly INR 14 crores this quarter — so is this roughly INR 90 crores per quarter now the standard run rate we should expect?

Ajay Saraogi

executive
#22

Right. I believe that's the run rate we're talking about, since the effect shows up only in this quarter. So the yearly effect of reviewing the life of the different power plants comes to roughly INR 60 crores.

Shravan Shah

analyst
#23

All right. And finally, turning to capital expenditures and debt. So, as you noted, we'll most likely be kicking off Panna during this quarter. So that'll be both...

Ajay Saraogi

executive
#24

That's not for this quarter — I meant quarter 3.

Shravan Shah

analyst
#25

Sorry—by December.

Ajay Saraogi

executive
#26

We're working on it. Yes, at first the target was by FY '23, but we're pushing ahead on it, and our hope is that perhaps in quarter 3 we can get Panna started.

Shravan Shah

analyst
#27

So this is going to involve both even grinding and the full 4 MTPA.

Ajay Saraogi

executive
#28

Yes, yes, there could be a way, both during the quarter itself — this is what we feel, that barring anything unforeseen, we should be able to do. So, well, as we said, definitely, I mean, in all circumstances, the plant would be onstream during this fiscal year. So what our working is, that we are still — we are — our work is at a very advanced and satisfactory stage, and we are hopeful that maybe in the third quarter itself we commission it.

Shravan Shah

analyst
#29

All right. So looking at the whole year for CapEx, how much are we going to spend — including Panna, what remains to be spent? And besides that, even the paint and maintenance, so what would full-year CapEx be for this year and then for next year?

Ajay Saraogi

executive
#30

Right. As we've communicated, the yearly plan calls for INR 1,700 crores of CapEx. So overall, Panna will get roughly INR 1,150 crores of CapEx, the paint will take INR 150 crores, and then INR 325 crores goes to sustenance CapEx. The remainder is what we're planning — perhaps some spending on the future plan for the 2 split grinding units. It should land in the range of INR 1,700 crores.

Operator

operator
#31

<<operator_script>> Our next question comes from Rajesh Kumar Ravi, who is calling in from HDFC Securities.

Rajesh Ravi

analyst
#32

I've got a few things I'd like to ask. To start with, could you give us the product sales volume for the UAE, along with total sales coming from your facility?

Prashant Seth

executive
#33

Yes. Yes, the volume for UAE during this quarter came in at 1,25,000 tons.

Rajesh Ravi

analyst
#34

And you skipped the fuel cost per kilo — what was that figure for Q1, on a consumption basis?

Prashant Seth

executive
#35

On a consumption basis, the average mean fuel cost in Q1 came in at roughly INR 10,000 per tonne.

Ajay Saraogi

executive
#36

No, actually it's roughly the same — consumption comes in at around INR 2.30.

Rajesh Ravi

analyst
#37

And what was the difference from Q4, sir? And what's our position in Q2?

Ajay Saraogi

executive
#38

Therefore, for Q2, we’re looking at roughly INR 2.75.

Rajesh Ravi

analyst
#39

And for Q4, what was that figure, sir?

Ajay Saraogi

executive
#40

For Q4, it came in at INR 2.30, I believe — actually, it ranged somewhere between INR 2.20 and INR 2.30. Compared with Q1, the figure was pretty much in that same band; Q4 and Q1 were more or less alike.

Rajesh Ravi

analyst
#41

Okay, so this comes as a surprise. Even though we were up against inflation of 15% to 20%, you still managed to keep things roughly flat on a quarter-over-quarter basis.

Ajay Saraogi

executive
#42

That’s the benefit we’re seeing, but it won’t show up in the second quarter.

Rajesh Ravi

analyst
#43

Right, so everybody's definitely in the REIT during Q2. But from Q3 onward, do you see this INR 225 tapering down?

Ajay Saraogi

executive
#44

Look, fuel prices have dropped. We haven't fully seen that yet — partly, yes, it should show up in the third quarter, but even in Q3 there will be some effect from the high-cost inventory. So not for the entire quarter, because by then — once that cheaper fuel inventory gets to the plant — we have a blended situation. I think if the average could fall to something nearer to Q1 or thereabouts.

Rajesh Ravi

analyst
#45

So for Q3, are you expecting a bit of tapering back toward the Q1 numbers?

Ajay Saraogi

executive
#46

That's right.

Rajesh Ravi

analyst
#47

Sir, could you tell us what the total project cost is for the central expansion, Panna and Hamirpur?

Ajay Saraogi

executive
#48

So that's 2,070 crores of Indian rupees — 2,970 crores of Indian rupees.

Rajesh Ravi

analyst
#49

And what did you say the amount being spent on this is for fiscal year '23?

Ajay Saraogi

executive
#50

We expect INR 1,150 crores to land in this financial year.

Rajesh Ravi

analyst
#51

Alright, INR 1,150 crores, since — according to the presentation, right, at the close of Q4, you've got — it depends — you've already used...

Ajay Saraogi

executive
#52

As of now, we've spent INR 2,072 crores. Another INR 1,900 crores still has to go out. So there will be some spillover, because with payments and performance guarantees, some of it shifts, and the waste heat piece may shift as well — we're trying to keep it inside this fiscal, though part of it could land in the first quarter of next fiscal. That means roughly INR 300 crores to INR 400 crores of CapEx, the actual cash outflow, might fall into the coming FY — FY '24 — but the bulk of the spend, about INR 2,600 crores, should broadly be incurred this year.

Rajesh Ravi

analyst
#53

Alright, and one final question. Sir, where does the paint project stand? You mentioned how much CapEx is being spent this year — so what's the status regarding the planned finalization of the land and all of that?

Ajay Saraogi

executive
#54

So we've obtained — we've received the permission for land, and that land has been allotted to us. It's located at Matra in UP, so the land has already been identified. At this point we're in the process of securing the land acquisition and other approvals. And in the meantime, we're also collecting quotations for plant and equipment and other items. So we should be finalizing all of these things within the next 2, 3 months' time.

Rajesh Ravi

analyst
#55

And when would this plant be operational?

Ajay Saraogi

executive
#56

The timeline hasn’t changed — we should have the paint plant commissioned by March ’24.

Rajesh Ravi

analyst
#57

Right. And on CapEx for the first 2 years — that's total CapEx, not just your share, correct? That gets spent over the next 2 years?

Ajay Saraogi

executive
#58

Correct — that INR 600 crores gets spread across 5 years, just like we mentioned before.

Rajesh Ravi

analyst
#59

So with that spend over these 2 years — this year and next year — of roughly INR 250 crores, this plant will be up and running, and it should be operational?

Ajay Saraogi

executive
#60

No, no, no — so for next year: this year we're planning to spend INR 125 crores. The spending is higher. It's roughly — next year's expenditure would come to about INR 200 crores, since the plant will be commissioned. And then we spend on branding and other things. So the remaining INR 300 crores gets spread across the next 3 years.

Operator

operator
#61

<<operator_script>> The following question comes from Navin Sahadeo, who is calling in from Edelweiss Securities.

Navin Sahadeo

analyst
#62

I have a couple of questions. First, I'm looking at your presentation, and it shows CO2 emissions in per-kg terms — kg per tonne, that is — rose a bit in Q1 '23 compared with the '22 average. Is that due to some shift in the sales mix as such — meaning, did we make more — or was it the share of OPC or, say, unbranded...

Prashant Seth

executive
#63

No, Navin, that's not it. What this actually concerns is the emissions stemming from power and from the use of the alternate fuel. It's a small fluctuation that keeps recurring, so it isn't particularly significant either.

Navin Sahadeo

analyst
#64

No, it isn't significant. I was just a bit confused by the fact that...

Prashant Seth

executive
#65

That comes from solar power and emissions tied to alternative fuels, which are showing some fluctuation.

Ajay Saraogi

executive
#66

And Navin, I want to expand on what Mr. Prashant said. In certain months last year, we were running some thermal power plants. This year, though, we haven't run any thermal power plant. Unfortunately, thermal power plant generation isn't really counted for this calculation, and we purchased that much power from wholesale, which is essentially why it has risen. So really, it comes down to the mix of power sources.

Navin Sahadeo

analyst
#67

Yeah. Nope. My apologies — I was glancing at it and got a bit puzzled, since the green power mix sits just one line under that, and the exposure there has risen from 32% to 41%.

Prashant Seth

executive
#68

That's why, as Sumnesh ji points out, captive power—the coal-based captive power—doesn't count as green power. So we've now halted captive power, and instead we're sourcing solar power, which falls under green power. And when it comes to the solar power we're purchasing, carbon emissions do get counted. Whereas for the coal-based captive portion, those emissions aren't being counted under this system. So for that reason, the rise in green power has ended up producing an increase in emissions.

Navin Sahadeo

analyst
#69

Okay, and to follow up on that point briefly: after we begin operating at Panna, on a fully ramped-up basis, what sort of shift should we anticipate in the blending ratio, or the CT ratio itself, because my understanding is that Central India as a region is significantly more of a blended cement area compared with, say, the north, or even the west or south for that matter. So how large should that improvement be?

Ajay Saraogi

executive
#70

Well, that depends. Right now, every one of the new markets we're moving into is vendor cement. We'll have to watch, during the initial ramp-up, what institutional sales come in, and we'll have to see what happens with blended cement — that's going to hinge on institutional demand. Yes, when it comes to trade, it'll mostly be blended cement only.

Prashant Seth

executive
#71

And to build on what Saraogi ji said, essentially from Hamirpur, there will be a substantial rise in blended cement, since that unit will produce only PPC. But when it comes to Panna, since our priority will be to capture the market first, basically, initially there might be a somewhat higher quantity of OPC, but gradually it will keep coming down and blended cement will go up.

Navin Sahadeo

analyst
#72

Got it — just one more question, if I can squeeze it in, please. Staff costs went up sequentially by roughly 17.5%, 18%. So I just wanted to ask — is that due to things like salary increases, and is the whole effect coming through because of that — and then after Panna, is this set to — should it ideally get better still once Panna comes?

Ajay Saraogi

executive
#73

So look, for the staff, yes, the impact of the increment is there. Also, the extra marketing staff we've taken on for the new markets. So the additional manpower that's needed for the new market is also built into the staff cost. So there would be only the plant staff which is presently being capitalized, that should come in once the plant starts. So going forward, on the per tonne basis. Yes, the absolute amount would be higher, but we will get after the Panna production. The per tonne cost will come down.

Navin Sahadeo

analyst
#74

Sure, I’ll ask just one final question if that’s all right. Regarding the grinding units — you mentioned that some CapEx will be identified for at least 2 additional split grinding units in Central India — have you settled on where they’ll be located?

Ajay Saraogi

executive
#75

Yes. So one of them is located in MP, and the other one is in UP.

Navin Sahadeo

analyst
#76

All right. And if I could just ask — the eastern side or the western side? Any detail on that, or perhaps we can go over it when you join us next time...

Ajay Saraogi

executive
#77

In Eastern UP, and then westward toward Indore and Ujjain — that's the area nearer to it — we do have another choice, namely the MP site, and we're in the process of finalizing that one.

Operator

operator
#78

Thank you. We'll now take the next question, which comes from Sanjay Nandi, calling in on behalf of Ratnabali Investments.

Sanjay Nandi

analyst
#79

Sir, since we've already wrapped things up with the launch of the Panna plant, could you share the demand-supply situation that's currently at play in Madhya Pradesh — for instance, what sort of production are we looking at for the start-up at Panna plant?

Ajay Saraogi

executive
#80

On the production side, what we're anticipating is that during the next fiscal year, we should be running somewhere in the range of 50% to 60% of capacity. Capacity stands at 4 million tons. So that's the figure we're looking at for the first full year of operation.

Sanjay Nandi

analyst
#81

Looking ahead, we're going to be aligning ourselves with the norms and standards of the industry, correct?

Ajay Saraogi

executive
#82

Moving forward, yes, yes.

Operator

operator
#83

We move now to a question from Sumangal Nevatia, who is on the line from Kotak Securities.

Sumangal Nevatia

analyst
#84

For the first question, just to clarify on pricing. You mentioned a decline of roughly INR 8 to INR 10. Could you compare those prices against 1Q on an average basis?

Ajay Saraogi

executive
#85

So for Q1, that's on an average basis?

Sumangal Nevatia

analyst
#86

So, I guess the question is how do today's prices compare with the 1Q average?

Ajay Saraogi

executive
#87

On average, those current prices would come in roughly INR 15 to INR 18 per bag lower.

Sumangal Nevatia

analyst
#88

All right. And that's the gross price, correct — I mean, at the retail level?

Ajay Saraogi

executive
#89

At the retail level, if you look at pricing today, the distributed range varies — currently anywhere from INR 360 to INR 380 per bag.

Sumangal Nevatia

analyst
#90

All right. And this isn't — unless I'm wrong about this, when it comes to the south?

Ajay Saraogi

executive
#91

For the South, that figure would be roughly INR 20 less.

Sumangal Nevatia

analyst
#92

Got it, got it. Sir, moving to the next question: earlier you mentioned utilization of roughly 50% to 60% during the first year — since this involves a substantial ramp-up and growth, would there be any marketing, selling expense, and so on that gets front-loaded in year one?

Ajay Saraogi

executive
#93

That part didn’t come through clearly for me.

Sumangal Nevatia

analyst
#94

When you ask about the Panna expansion, our expectation is roughly 50% to 60% volumes and 50% to 60% utilization of that plant in FY '24. That's a pretty steep jump in overall volumes, and it's a new region. So is there any front-ended marketing or selling expense that we'll see, or will it be normalized — or spread out over a few years?

Ajay Saraogi

executive
#95

This will roll out gradually, and we've already begun. We've already started opening the new markets that we'll need to supply from Panna. So even right now, in those new markets themselves, we're selling somewhere around 40,000 to 50,000 tons a month. That means we're already supplying all those markets. And whenever we look at it, all of our branding spend and the other items are included in that. So there would be extra branding spend, but the additional volume will offset it.

Sumangal Nevatia

analyst
#96

Got it. One final question about the grinding units being split off going forward. How large a contribution would that be in total? And should we expect commissioning to happen at some point during FY '25?

Ajay Saraogi

executive
#97

Right, that predates FY '25. And it ought to be incremental to what we have planned, which the Board hasn't approved as yet. So we're at a point of adding further capacity, and that's also set out in our annual report — if you look there, we intend to add roughly 6 million tons. That would come about in one way: we're also exploring more options around revamping certain existing grinding capacities as well as putting in new grinding capacity.

Operator

operator
#98

Prateek Kumar from Jefferies has the next question on the line.

Prateek Kumar

analyst
#99

I'll start with the trade mix — it's stayed consistently up in the upper part of that 60% to 70% range. So once Panna operations have stabilized, do you see it settling around there? Or is the aim for the whole company to go beyond 70%?

Ajay Saraogi

executive
#100

Our end goal for the company is to hit 70%-plus in trade volume. And right now, even for Panna, we're supplying every market, and from the grinding station it should be largely trade volume. It'll be blended cement, and mostly serving the trade market. And from the integrated plant, because normally, if you look, the non-trade segment is more OPC than blended cement. So even with Panna, we expect to hold in the 65% to 70% range initially and then go up beyond 70% afterward. Also, one other key factor: this definitely depends on future demand — if all the incremental demand comes from institutional, where you need to grab market share, you have to sell more in the non-trade segment, then for sure there would be some adjustment to the trade, non-trade ratio, because in any case, on trade, we are increasing. We're working toward raising the trade numbers, but there's a limit to how much trade can grow if demand isn't rising in that segment.

Prateek Kumar

analyst
#101

Just one more question. Regarding operating costs once Panna is commissioned, how would the cost of operation at Panna compare with the company's overall grey cement operation cost?

Ajay Saraogi

executive
#102

Panna’s costs should be comparable. As a new facility, it will run more efficiently, though the first 3 to 6 months may serve as a stabilization period. After that—4, 6 months, say, starting in the third quarter of next fiscal—we should see some of the best costs come from Panna operations.

Prateek Kumar

analyst
#103

And finally, sir, regarding demand trends — I mean, right now we're probably in the latter part of the monsoon, so how do we see demand shaping up year on year, both going forward and after the monsoon as well?

Ajay Saraogi

executive
#104

We're anticipating solid volume growth for the monsoon season. In fact, we think that starting with September itself, there should be some improvement in the volume figures.

Operator

operator
#105

Tejas Pradhan from Citigroup has the next question on the line.

Tejas Pradhan

analyst
#106

Sir, I just wanted to verify something. In your annual report, you noted that toll operations for Wall Putty have begun. So could you give us some sense of the volumes that might be expected from this method?

Ajay Saraogi

executive
#107

It's not large volumes we're talking about — initially just a modest 1,000 to 1,500 tons per month out of each site, rising afterward to a ceiling of 2,000 to 2,500 tons. From there we move into additional locations, pursuing distributed manufacturing, which speeds up market development. What that means is you can serve the market more effectively, because in these areas — anything supplied from a Katni or from Gotan — the longer your lead distance, the more your service factor suffers. So ultimately, what we're doing is delivering better servicing, and in marketing today, servicing is the thing that counts. Beyond quality and the other parameters, which we're preserving regardless, service has turned into a really crucial factor.

Tejas Pradhan

analyst
#108

All right, all right. And would the expense for this be comparable to what you see at your own plants, or would it be…

Ajay Saraogi

executive
#109

So in the end, spreading out manufacturing ought to bring about savings and cost reductions as well, once enough time has passed.

Tejas Pradhan

analyst
#110

All right, all right. And then last, kind of building on what we talked about earlier too. You brought up a road map of 25 million tonnes of gray cement capacity by FY '25. So when it comes to this clinker, would it mostly be coming from operations you already have, or is any debottlenecking, et cetera, being planned for this?

Prashant Seth

executive
#111

Yes. So we are indeed observing some—once Panna has stabilized. So Panna would net out the—whatever balance of clinker is required, that will come from the additional production we expect to get from Panna. At present, everything of ours has been—we have set 8,000 TPD at Panna, but we see a clear potential for 10,000 TPD from the Panna kiln.

Tejas Pradhan

analyst
#112

Right. So Panna has the ability to go from 8,000 up to 10,000. And that on its own ought to be sufficient to cover the 25 million tons?

Ajay Saraogi

executive
#113

Yes.

Operator

operator
#114

<<operator_script>> Our next question comes as a follow-up from Shravan Shah at Dolat Capital.

Shravan Shah

analyst
#115

Sir, just to clarify on employee cost — you mentioned roughly INR 143 crores for the quarter on a stand-alone basis. So this run rate, as you said, also takes in the increment. From next quarter onward, that's the standard, and once Panna begins, perhaps we'll see another INR 5, 10 crore rise in it. Is that understanding correct?

Ajay Saraogi

executive
#116

Right now, the Panna cost won't show up, since J.K. Cement handles marketing for the products. What does appear is the employee cost for marketing. So unless Panna is merged with J.K. Cement — and we do have a merger plan — it won't be part of the stand-alone audited results. It will only be reflected in the consolidated results.

Shravan Shah

analyst
#117

All right, so let's suppose the merger goes through — in that case, that quarterly run rate would come after Panna begins, starting from Q1...

Ajay Saraogi

executive
#118

There will be some extra plant cost that comes on top of that. Some additional marketing expenses will also be there, since a few more depos are being opened so we can serve the whole market, because with this Panna, we shall be covering the entire state of MP and UP. So with Panna, that will be the ultimate market. With Panna, our market reach — we will be a whole, we will be covering the entire state of UP, we shall be covering the entire state of MP.

Shravan Shah

analyst
#119

Understood. Even so — regarding Q2, that INR 143 crores figure, this run rate is going to carry on — and...

Ajay Saraogi

executive
#120

Regarding Q2 and Q3, I don't believe there should be any significant change.

Shravan Shah

analyst
#121

All right. But after Panna is merged, by how much will that employee cost go up?

Ajay Saraogi

executive
#122

So what we're looking at, no matter how you slice it, is INR 143 crores. That means you could be looking at roughly another INR 10 crores — in other words, 10% on top of that figure.

Shravan Shah

analyst
#123

Understood, understood. And a second point of clarification. So right now, that's Panna clinker plus 4 MTPA of grinding. Of those 2 grinding units, one is integrated with MTP and 2 MTPA sits at Hamirpur, plus the additional 6 MTPA we're discussing. For this, we've identified one location, Indore, and the second is Eastern UP.

Ajay Saraogi

executive
#124

One facility is in MP, though not in Indore as of now. The Board has not finalized and approved that site again. So I won't specify the exact location. One is in MP and the other is in UP. I said near Indore — I didn't say Indore itself — it's around there, and the location hasn't been announced yet, so we'll let you know. There's one location, and one location is in Eastern UP.

Shravan Shah

analyst
#125

Alright. So on that point, generally speaking, nothing is final yet, but as for the extra branding, that would amount to 2 MTPA at sites down the road. So that gives 6 MTPA at perhaps the maximum, and we could be looking at 3 locations.

Ajay Saraogi

executive
#126

So we'll have those 2 sites — 2 additional sites — and on top of that, we're upgrading a portion of the grinding capacity at the grinding stations we already run, both at the integrated plant and at the grinding plant. So some grinding improvement will come from there. Taking all of that together, the total incremental amount would come to roughly 6 million.

Shravan Shah

analyst
#127

Okay. So would just that 2,000 TPD bump in clinker capacity at Panna be enough on its own for all the additional 6 million tonnes of grinding we're contemplating? And does that full 6 MTPA come online by FY '25, or does it kick off from FY '25?

Ajay Saraogi

executive
#128

That ought to get underway during FY '25.

Shravan Shah

analyst
#129

All right. So an additional 6 MTPA in total will be in place by FY '25. And would just the extra 2,000 TPD of clinker from Panna be enough for that?

Ajay Saraogi

executive
#130

Look, after the modification we completed at Nimbahera, we already have surplus clinker right now. We’ve got clinker, and we aren’t running the older kilns at present. So we have enough capacity and collaboration. Therefore, whenever — as you’re aware, we possess the grinding capacity, and once demand rises, we will be using all of our clinker facilities.

Shravan Shah

analyst
#131

And overall, just approximately, on a ballpark basis, for this 6 MTPA, what would the CapEx come to per MTPA — around INR 200-odd crores?

Ajay Saraogi

executive
#132

Is that INR 200 crore?

Shravan Shah

analyst
#133

That comes to INR 200 crores for each 1 million tonne grinding unit. So I'm just trying to get a handle on the capacity...

Ajay Saraogi

executive
#134

That ought to fit comfortably inside it. Yeah, yeah. I won't put any figures out there, since those figures haven't been—what we're doing is just talking about specific hypothetical figures, like the 200 crores per million you mentioned. You're referring to a ceiling of as much as 1,200 crores, and I'm saying yes, comfortably within that—that's our sense, that it ought to get done inside that.

Shravan Shah

analyst
#135

All right, all right, all right. So in that case, when we take that into account, what would the maximum peak debt come to? From this point forward, is it possible that peak debt could rise by another INR 700 crores, INR 800 crores, or INR 1,000 crores at most?

Ajay Saraogi

executive
#136

If we look at peak debt right now, standalone gross debt comes to 2,785, while net debt stands at 1,727. Roughly 800 crores remains undrawn from the bank and still needs to be drawn down, and there may be some extra borrowing as well. Yes, I'd say net peak debt ought to land at roughly 3,300 to 3,400 at the most.

Operator

operator
#137

Our following question comes from Girija Ray, who is calling in from Systematix Group.

Girija Ray

analyst
#138

Regarding that INR 2,970 crores of CAPEX on Panna, does that figure also take in WHRS?

Ajay Saraogi

executive
#139

Right, INR 2,072 crores on Panna — and that figure does include it. Then the project cost of INR 2,970 includes WHRS.

Girija Ray

analyst
#140

We're also setting up WHRS in Karnataka, is that right? And that's included in that as well, correct?

Prashant Seth

executive
#141

At Panna WHRS, the project cost includes a 22-megawatt WHRS, and installation of that unit is underway at the Panna site.

Girija Ray

analyst
#142

But in the annual report, you also mentioned that we're setting up in Muddapur, Karnataka as well?

Prashant Seth

executive
#143

That isn't included in this project's cost. It'll fall under our regular sustenance CapEx.

Girija Ray

analyst
#144

So that would land at roughly INR 250 to INR 350 crores within that subsidiary?

Ajay Saraogi

executive
#145

No. What the annual report discusses is, first, that this 22 megawatt forms part of the Panna project, and then we intend to install a WHRS at Muddapur, the southern plant in Karnataka, where no WHRS currently exists. So those details are still being worked out. That would require extra CAPEX of roughly INR 175-odd crores to INR 200 crores, which would be separate.

Girija Ray

analyst
#146

On solar and wind power, at 38.5 we're adding capacity — so where exactly are we adding it?

Ajay Saraogi

executive
#147

Solar and wind span every one of our sites, and it's handled more on a group power basis. It isn't tied to capital at this point, since we're only putting a marginal amount into the equity of the group power provider. Our investment is purely in the equity, and that's how we obtain the power. So it covers all the locations where we operate.

Operator

operator
#148

Our next question comes from Prateek Kumar at Jefferies.

Prateek Kumar

analyst
#149

That covers everything I wanted to ask.

Operator

operator
#150

Our next question comes as a follow-up from Rajesh Kumar Ravi at HDFC Securities.

Rajesh Ravi

analyst
#151

I've got 2 follow-ups. First, regarding the CapEx guidance for FY '24 across all projects on a consolidated basis?

Ajay Saraogi

executive
#152

That figure is going to come in at INR 1,100 crores.

Rajesh Ravi

analyst
#153

That would mostly go toward the Muddapur WHR, along with 6 million tons of grinding expenses.

Ajay Saraogi

executive
#154

Lower CapEx for Panna plus the standard CapEx, including the WHR, and then whatever applies to the grinding locations plus paint, all of it.

Rajesh Ravi

analyst
#155

All right, got it. And for FY '23, what's the guidance on volume?

Ajay Saraogi

executive
#156

For fiscal year '23, volume figures are up roughly 10%...

Rajesh Ravi

analyst
#157

Is that on grey cement, or consol, that you're looking at, sir?

Ajay Saraogi

executive
#158

This is consol.

Rajesh Ravi

analyst
#159

Alright, a 10% volume figure for consol. Now, regarding the Panna expansions, we're putting in 2.5 million tons of clinker, which clearly will rise to 3.3. That 22 million — does this WHR capacity serve this capacity, or does it include future expansions?

Prashant Seth

executive
#160

No. Look, the WHRS is tied to the kiln capacity — it's based on the current kiln capacity. Right now, there's just one kiln at Panna. Unless we add Line 2 at Panna, there wouldn't be any additional WHRS. Other than that, no extra WHRS.

Rajesh Ravi

analyst
#161

The reason I'm bringing this up is that, viewed from a kiln throughput standpoint, isn't that figure too high? At 2.5 or 3 million tons, we're getting 23 megawatts of WHR?

Ajay Saraogi

executive
#162

Not too high.

Rajesh Ravi

analyst
#163

Okay, and then what...

Ajay Saraogi

executive
#164

This has become the standard at this point.

Rajesh Ravi

analyst
#165

All right, that's helpful, thank you. And again on Muddapur, since the CapEx is INR 200 crores, what capacity are you expecting there in WHR terms? Would it be a similar figure — around 18 or 20 megawatts?

Ajay Saraogi

executive
#166

Yeah, just about 20 megawatts.

Rajesh Ravi

analyst
#167

Roughly 20 megawatts. One final thing on clinker capacity. You mentioned that the 6 million tons, together with debottlenecking of 0.7 million tons, would let you fund it. Since, when I look at your overall capacity — clinker capacity as of now, it's about — even once this Panna project is commissioned, 13-odd million tons of clinker capacity. If I apply a blending of 1.5 times for the cement-to-clinker ratio, then for 25 million tons you'd need roughly 16 million tons, so 3 million tons would still be needed. Are we considering debottlenecking opportunities at all 3 of those locations?

Ajay Saraogi

executive
#168

No, what I mentioned is that an incremental clinker line will come in from Panna at 2,000 TPD, so you'll get that, and then when we discuss 25 million tons of capacity, you never actually see 25 million — you don't hit your average capacity utilization unless that capacity exists. So you have to target 85% of capacity for production within the clinker. You can't assume peak production. That doesn't happen; the plant doesn't operate on that basis. Demand isn't there on that basis either.

Rajesh Ravi

analyst
#169

Got it, got it. Sir, so you're mainly looking at this from the distribution angle? Great, sir. I believe that covers everything on my side — all the best.

Operator

operator
#170

Our final question comes from Ram Chakravarthy, who is an individual investor.

Speaker

unknown
#171

Let me ask something straightforward: given how fuel and other input costs have gone up on a percentage basis, what effect do you expect that to have on EBITDA for Q2 compared with Q1?

Ajay Saraogi

executive
#172

EBITDA for Q1 came in at 19%. And when you factor in the cost increases along with some price declines, that ought to bring EBITDA down by roughly 6% to 7% on that basis.

Speaker

unknown
#173

So you're saying it goes from 19% down to 6% to 7%?

Ajay Saraogi

executive
#174

Yeah, the decline could be roughly 30%, and for EBITDA the drop would be 35%.

Speaker

unknown
#175

Alright, alright — 30 to 35 basis points.

Ajay Saraogi

executive
#176

Yeah, 35%, right. So the decline in EBITDA could come to roughly close to about INR 400 per tonne.

Speaker

unknown
#177

Alright, alright. And this is only going to be temporary. So once we get to Q3, things would improve, correct?

Ajay Saraogi

executive
#178

I certainly hope that’s the case.

Operator

operator
#179

Appreciate it. At this point, I'd like to return the discussion to Mr. Vaibhav Agarwal so he can offer some final remarks. The floor is yours, sir.

Vaibhav Agarwal

analyst
#180

Yes. I want to say thanks, on behalf of PhillipCapital India Private Limited, to the management team at J.K. Cement for holding this call, and many thanks as well to everyone who joined in. Thank you very much, sir. Inba, at this point you can go ahead and wrap up the call. Thank you.

Ajay Saraogi

executive
#181

Vaibhav, thanks, and thanks to all of you for being here.

Prashant Seth

executive
#182

Appreciate it.

Operator

operator
#183

Ladies and gentlemen, that brings this conference to a close on behalf of PhillipCapital India Private Limited. We appreciate your participation, and you're welcome to disconnect at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete J.K. Cement Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to J.K. Cement Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in J.K. Cement Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.