J.K. Cement Limited (532644) Earnings Call Transcript & Summary
August 16, 2023
Earnings Call Speaker Segments
Operator
operatorGood day, ladies and gentlemen, and welcome to J.K. Cement's Q1 FY '24 Conference Call, brought to you by PhillipCapital India Private Limited. <<operator_script>> Kindly be aware that this conference is being recorded. I'll now turn the conference over to Mr. Vaibhav Agarwal of PhillipCapital India Private Limited. Thank you. Mr. Agarwal, the floor is yours.
Vaibhav Agarwal
analystYes. Thanks, Michel. Good evening, everyone. On behalf of PhillipCapital India Private Limited, we’re glad to welcome you to J.K. Cement Limited’s Q1 FY ’24 call. Joining us on this call are Mr. Ajay Kumar Saraogi, Deputy Managing Director and CFO; Mr. Sumnesh Khandelwal, Deputy CFO; and Mr. Prashant Seth, President, Business Information and Investor Relations. I’d like to note, for J.K. Cement Limited and its management, that some statements we make or discuss during this conference call may be forward-looking statements about future developments and based on current performance. Such statements carry a number of risks, uncertainties and other important factors, which could cause actual developments and results to differ materially from what is stated. J.K. Cement Limited and the company’s manager assume no obligation to publicly alter or update these forward-looking statements, whether due to new information or future events or otherwise. I’ll now hand the floor to our global management of J.K. Cement for their opening remarks, which will be followed by track Q&A. Thank you, and over to you, Saraogi sir.
Ajay Saraogi
executiveThank you, Vaibhav. Good evening, and welcome to our Q1 results. On 12th of August, the Board of Directors convened to go over how we performed in the first quarter — that's the quarter that closed on 30th June. The key highlights for this quarter: net sales came in at INR 2,541 crores versus INR 2,613 crores in the quarter before, roughly a 3% decline, although that figure stood 20% higher than the same quarter a year ago. Revenue from operations fell 2%, reaching INR 264 crores, compared with INR 265 crores and INR 213 crores in the prior year. EBITDA for this quarter totaled INR 402 crores, versus INR 364 crores in the preceding quarter — a rise of 11%, yet 1% lower on a marginal basis when set against 4.97% a year earlier. EBITDA margins stood at 15.8% this quarter, compared with 13.9% in the prior quarter and 19.2% in the first quarter of last year. Profit before tax for this quarter was INR 193 crores, against INR 190 crores — an increase of roughly 2%, versus INR 270 crores in the previous year. In this quarter, this year, we have Jaykaycem Panna, which has been running as a subsidiary.
Ajay Saraogi
executiveThe subsidiary has been merged, so this quarter’s figures were regrouped, including Panna’s working. I’d also like to say that Panna’s working has been quite satisfactory. We commissioned Panna sometime in November, December last year, and in a short span of time, today the plant is already operating at about 75%. Work on the Ujjain project, where we are putting up a grinding unit of 1.5 million tonnes, is at an advanced stage, and hopefully this will get commissioned in the fourth quarter of the current fiscal. As regards the grinding unit at Prayagraj, we have now received the environment clearance and have already placed the orders for main plant and equipment. And immediately after the monsoon, work would start at Prayagraj, and we are hopeful that we should be able to commission in quarter 3 in FY '25. These are the major highlights for this quarter. If you have any questions, we’ll be pleased to answer the same. Thank you.
Operator
operatorThank you very much, sir. We will now begin the Question-and-Answer Session. <<operator_script>> The first question is from the line of Shravan Shah from Dolat Capital, Please go ahead.
Shravan Shah
analystHello, and congratulations on the strong results. First question: previously you mentioned volume growth of 15%. This quarter, Crew has already achieved 29% volume growth. So for the full year in grey cement for sale, could we potentially see 20% or 25% volume growth this year?
Ajay Saraogi
executiveNo, I believe we mentioned roughly 15%. So our efforts would certainly be focused there. Demand is healthy. Yet looking at this quarter, July was hit by rain, which pushed volumes down, and factoring in the other maintenance schedule and all, we're confident we ought to deliver growth of at least 15%; we'll try to see whether the demand momentum, which is likely to carry on, lets us grow nearer to 20% — but not beyond that.
Shravan Shah
analystRight. So for this quarter — last quarter, we posted EBITDA of INR 2 crore. This quarter, then, the EBITDA would broadly be. So I'm trying to get a sense of whether there's further improvement in profitability?
Ajay Saraogi
executivePanna is operating better now. As we mentioned, that 75% capacity utilization is already in place. And even when you look at EBITDA, it's close to the company average. Then in this quarter, we commissioned the base recovery plant. Going forward, we'll gradually begin using more AFR. So the benefit from all of that should also show up in the quarters ahead.
Shravan Shah
analystAll right. Sir, at a high level, I still need more data points, but before that, broadly we’re trying to understand this in terms of profitability. So over the last 2 quarters, we’re seeing that the white segment has a similar EBITDA margin or gross even 15%, 17%. So is it fair to say, if I take like say, 15%, 17%? So this quarter, in terms of the grade broadly, I understand we aren’t discussing details. But broadly, the EBITDA for timing grades <<inaudible>> is still INR 800. So can one see this number, with the volume increased, at an INR 900-plus number?
Ajay Saraogi
executiveYes, absolutely, we're confident that EBITDA will get better as we move ahead. So once we start seeing some benefit, we'll get it over the course in the form of reduced fuel cost. We did see that benefit this quarter. As we mentioned earlier, for this year we expect overall fuel cost savings of roughly INR 250 to INR 300 a tonne. So of that, the first quarter actually was quite good on fuel cost compared with the prior quarter. But that's because we had some window to secure even cheaper fuel. Still, that said, even on a sequential basis, looking ahead, we should see a saving of INR 60 to INR 75 per tonne in fuel cost itself. Over the next 2 quarters, we have to watch whether we get those savings after that, from the fourth quarter onward, or not, since petcoke prices have begun firming up. So we have to watch how prices hold up going forward. It had fallen to around $115, and then it rose again to roughly $130, $135.
Shravan Shah
analystAll right, so let me give you a couple of data points now. What about the power and fuel cost? Last quarter it stood at INR 12,000. And where KPL is concerned, we say 2.4%. So what did that come to this quarter?
Ajay Saraogi
executiveMy view is that the prior quarter really stood on its own. The reason is that following the merger of the Central India operations, that quarter came in at INR 2.50. For this quarter, the combined figure is INR 2.20.
Shravan Shah
analystAlright, INR 2.20. And regarding <<inaudible>>, for the last quarter it came to INR 12,000 — how much was that, and what about this quarter?
Ajay Saraogi
executiveBasically, that comes to roughly INR 1,000 less for each tonne.
Shravan Shah
analystAll right. What about the railroad mix — late distance for this quarter? And the fuel mix for...
Ajay Saraogi
executiveRail came in at 14%. The <<inaudible>> figure stood at 426 kilometers.
Shravan Shah
analystAll right, that's excellent, sir. And what about the fuel mix for this quarter?
Ajay Saraogi
executiveOn a heat basis, the fuel mix comes in at roughly 60% petcoke, with the remaining 40% split between other fuel and AFR.
Shravan Shah
analystOkay, so on CapEx — for this year we're looking at somewhere between INR 12 crores and INR 1,400 crores. So how much have we done in Q1? And does the number stay the same?
Ajay Saraogi
executiveThe figure stays unchanged. And the bulk of our CapEx — roughly INR 150 crores — was completed during the first quarter.
Shravan Shah
analystAnd for FY '25, is it also roughly INR 700 crores to INR 800 crores of CapEx?
Ajay Saraogi
executiveHello?
Shravan Shah
analystRight. For FY '25, would it be roughly INR 700 crores to INR 800 crores of CapEx?
Ajay Saraogi
executiveYes, INR 800 crores. So as far as the CapEx guidance we've provided goes, it stays unchanged for now, since our plans haven't changed.
Shravan Shah
analystAll right, understood. And just to be clear, on working capital loans generally, that would come to INR 400 crores, which is what it stood at in March, correct?
Ajay Saraogi
executiveYeah, it's roughly INR 400 crores.
Shravan Shah
analystAll right. Then when it comes to pricing after June, what's the situation with prices? Has there been a slight decline?
Ajay Saraogi
executiveRegarding pricing, we have seen an increase—prices in the Northern region showed some improvement during July, although the southern region is still unchanged or under pressure. In the north, though, there has been a bit of an uptick in prices. The centers have been more or less the same.
Operator
operatorPardon me, Mr. Shah, could we ask you to please get back in line, since other participants are also waiting for their turn?
Shravan Shah
analystYou’re the ones posing every question <<inaudible>>.
Operator
operatorThanks. <<operator_script>> Next up, we have a question from Navin Sahadeo at ICICI Securities. Please go ahead.
Navin Sahadeo
analystGood evening, sir, and thanks for the chance to ask. I have 3 questions. First, sir, regarding other operating income — basically, the net sales shown in the presentation, and the difference is what — and the difference in the net sales shown in the P&L account. That has come to — I think for the quarter it has shot up to INR 83 crores versus an average run rate of INR 50 crores, as I see in the past. So what would you attribute this to — this jump of roughly INR 30 crores?
Ajay Saraogi
executiveThat's the amount by which the subsidy goes up. Navin, for the year the subsidy should come to roughly INR 250 crores. So we could say it's approximately INR 60 crores, INR 65 crores per quarter. Apart from that, one more income relates to certain AFR and other scrap sales and other items, some of which could be one-time. But if you speak of the subsidy by itself, that would be in the vicinity of about INR 60 crores, INR 65 crores, since we now have a subsidy in the case of Panna, we have a subsidy in the case of Hamirpur, Aligarh and Nimbahera.
Navin Sahadeo
analystGot it. So at a minimum, let's say a run rate of INR 70 crore to INR 75 crore can keep going each quarter over the next couple of years. Would that be a fair assumption?
Ajay Saraogi
executiveThe subsidy would come to INR 60 crores, INR 65 crores, but there's typically another INR 10 crores, INR 12 crores of other income there.
Navin Sahadeo
analystRight, that's the case. So on average, a sale could come to INR 75 crores.
Ajay Saraogi
executiveDefinitely.
Navin Sahadeo
analystAlright. Sir, my second question, then, concerns that waste heat recovery plant you mentioned had been commissioned during the prior quarter at 22 megawatts. So did that commissioning happen near the very tail end of the quarter? Or am I just trying to get a clearer picture...
Ajay Saraogi
executiveThat’s the tail end of the <<inaudible>>.
Navin Sahadeo
analystSo that offers no benefits at all.
Ajay Saraogi
executiveThis quarter won't be normal for us. I think utilization this quarter might be around 50%, partly because of <<inaudible>> — and again, the monsoon is a really tough month, since rain also disrupts how the kilns run. When kiln operations aren't very stable, that has an effect on waste power generation. So this quarter, we'll see at least 50% of the benefit coming from waste heat at Panna, and starting in the third quarter, yes, we'd have optimal generation from captive power.
Navin Sahadeo
analystSo on a normalized basis, let's say from the third quarter, when compared with Q1, we ought to be able to see a saving — annualized savings of roughly INR 60 crores, INR 70 crores each year from <<inaudible>> AFR.
Ajay Saraogi
executiveYeah, INR 50 and INR 60, those would be in there.
Navin Sahadeo
analystGot it. And sir, this is my final question. Looking at the debt, I believe on a sequential basis it has risen by a bit more than INR 100 crore — I mean net debt. And you mentioned that we have incurred CapEx of only INR 150 crores.
Ajay Saraogi
executiveRight, Navin, and the key thing is that this figure leaves out CapEx — the balance of CapEx spillover tied to finishing the Central India expansion. So a substantial sum went out on that, for the waste recovery commissioning and all of it. That comes on top of INR 150 crores. In other words, the INR 150 crores of CapEx does not include what was spent at Panna. The spillover CapEx at Panna stood at roughly INR 300 crores as of the start of the year. Then over the quarter, a further INR 175 crores to INR 200 crores went toward the remaining work at Panna. So when you look at the other piece — the CapEx was really INR 300 crores plus during the quarter.
Navin Sahadeo
analystSo that's still going to be included within the INR 1,400 crore guidance you're providing for this year.
Ajay Saraogi
executiveThat falls within the INR 1,400 guidance. As for the rise in debt, we have drawn down — some drawing took place even in the month of July, at the close. So whatever this debt balance is, it had to be drawn for the Panna expansion, and it has been drawn.
Navin Sahadeo
analystRight, got it. So, just to wrap things up.
Ajay Saraogi
executiveAlso, we’ve secured some extra volume for the Ujjain project.
Navin Sahadeo
analystGot it. Just to wrap up, on net debt, can we safely assume it's close to peaking? We've mostly reached the top.
Ajay Saraogi
executiveWe're getting close to the peak. In fact, I'd say it has now peaked, because during the first quarter, repayments weren't happening either. So once we're back to a normal repayment schedule — or not — the net debt has already filled up.
Navin Sahadeo
analystOkay, that helps. I’ve got 1 or 2 more questions, but I’ll return to the queue. Thanks very much.
Operator
operatorThanks. <<operator_script>> Our next question comes from Ritesh Shah at Investec India. Please go ahead.
Ritesh Shah
analystHello, and thank you for the opportunity. I have a couple of questions. First, regarding Toshali: is there any update on the transfer of the limestone lease? Do you have any timelines for the growth optionality and the incremental things we plan to do there?
Ajay Saraogi
executiveNo. Right now there isn't one, and we're still waiting on the government's approval. And unless and until the government approves the grant of the mining, we won't move forward with the transaction <<inaudible>> precedent in the agreement.
Ritesh Shah
analystAlright. So, sir, has anything been removed from our balance sheet? Have we provided the...
Ajay Saraogi
executiveNothing has been spent on our side.
Ritesh Shah
analystAll right, that’s great, thanks. Sir, the second one is a broader question. Sir, could you lay out how big the putty and white cement market in India is? And what market share would stand at present? And on the earlier call, you had said profitability has kept coming under pressure. Sir, how are we to interpret and read that, sir?
Ajay Saraogi
executiveI'd say the putty market should be close to around 4 million. So that would be the present market for putty, which we don't have. And when it comes to white cement, in India we have capacity of close to 1.4 million, 1.5 million tonnes. And the balance is some imports coming into India, mainly from UAE, which is <<inaudible>> and Jaykaycem Fujairah. So those are the 2 countries from which major imports are coming into India from UAE. So that is the position. As you said, yes, because the putty market has become very, very competitive due to the entry of the paint manufacturers, because one, they find this a very lucrative value-added item, or it is part of the paint. This is why we entered the paint business, because we were told that we are already there in the paint, because our customers, influencers, everybody is common. So for the paint manufacturers now, putty again, and for them, yes, they have an advantage that they don't have to do much publicity. It is part of the existing additional product in the bouquet of products which they have.
Ajay Saraogi
executiveSo, as we observe, the paint industry is running at margins between 12% and 18%. Therefore, I believe that moving forward, the white business should likewise be operating at that identical EBITDA margin level.
Ritesh Shah
analystOkay, and sir, regarding market share, what would that figure be for putty and for white cement?
Ajay Saraogi
executiveSo putty should land somewhere in the 22% to 20% range. We don't have all the exact figures on hand, but we do have a range of 20% to 25%. From what I recall of the L1 analysis, our market share came in at roughly 22%, 23%. As for white cement, it's largely a 50-50 split — perhaps 48% to 52% between UltraTech and us. So when it comes to white cement market share, we're more or less on equal footing.
Ritesh Shah
analystAbsolutely. That’s quite useful. I’ll return to the queue now. Thanks very much.
Operator
operatorThe next question will come from Sanjay Nandi at VT Capital, on the line.
Sanjay Nandi
analystCongrats on the strong numbers. Just to note, we did implement some price increases in the northern part of our constrained area during Q2. So could you quantify that for us — what kind of 5x did you get?
Ajay Saraogi
executiveRegarding the price increase, it's been an effective hike of roughly INR 7 to INR 10 per bag.
Analyst
analystAll right. And that’s been continuing. Do you have a cut in the investor?
Ajay Saraogi
executiveSorry, could you say that again?
Analyst
analystWe haven't reduced the investor, correct?
Operator
operator<<inaudible>>.
Analyst
analystSir, just to check — we've raised the price by INR 7 to INR 20 per bag, right? So is that finalized, or have we made any further rollback of the price?
Ajay Saraogi
executiveNo. Right now, that's the price hike that's in effect, and it's already been passed through in the market. We really need to see how long it holds up and whether there's any room for the price to go up further.
Analyst
analystAnd sir, how much utilization have we seen in these first 1.5 months of Q2? Has there been any utilization at all?
Ajay Saraogi
executiveFor us, the utilization level during Q1 came in at roughly 80%.
Analyst
analystWhat's the run rate looking like across roughly 1.5 months into the following quarter?
Ajay Saraogi
executiveSorry, could you repeat that?
Analyst
analystSo how much utilization has there been in this roughly 1.5 for the upcoming quarter, sir — Q2?
Ajay Saraogi
executiveUtilization in Q2 came in a bit lower, and that's because sales were weak owing to the heavy rains and flat conditions. So what's the result? Q2 is always a soft period during the monsoon. Demand drops off, and moving material becomes an issue. On top of that, we had some — I mean, most of our planned maintenance was scheduled in this quarter.
Analyst
analystSir, for the final question, could you shed some light on the paint business and tell us what kind of stock we're targeting for that?
Ajay Saraogi
executiveYes. So regarding the paint business, we've already begun opening additional areas, and all our current dealers who expressed interest — we've now started shipping material out to them. So step by step, across our network, the business has gotten underway, and so far we're seeing a solid response. If things go as we see them, we aim for incremental growth of roughly INR 70 crores or INR 200 crores during this fiscal year. Yes, Q1 was low, but we expect volumes now, since we've already begun the dispatches — dispatches have started. Volume should pick up. And with the festival coming up, we ought to reach a reasonable number.
Analyst
analystDo you feel confident that the business can keep up its top line growth as far as the industry likely is, starting from next year onward — like '25 onward?
Ajay Saraogi
executiveThat's not clear.
Analyst
analystSir, how confident are we that we can keep up that top-line growth relative to the peers in that same segment?
Ajay Saraogi
executiveNo. So, based on what we've planned, we believe we can get there, similar to what happened last year with Acro, where the top line came in at roughly INR 80 crores to INR 90 crores. This year we had targeted somewhere between INR 150 crores and INR 200 crores, and then INR 300 crores in the next FY '25. As things stand right now, we feel this should be achievable.
Operator
operatorThanks. <<operator_script>> Next, we have a question from Dipika Kakwani, who is an individual investor.
Speaker
unknownCould you give us some guidance on what realization we should expect for this quarter, sir?
Ajay Saraogi
executiveSo overall realization, the way things look right now, we should expect maybe an improvement of somewhere between roughly INR 50 and INR 70 per tonne on average versus the prior quarter.
Speaker
unknownAnd could you share with us what the realizations were for Q1 FY '24?
Ajay Saraogi
executiveFor Q1, net sales realization came in at roughly INR 5,000 per tonne.
Operator
operator<<operator_script>> Our following question comes from Shravan Shah with Dolat Capital.
Shravan Shah
analystThanks, sir. Sir, starting with Karnataka — the WHRS 16 megawatt, when will that get underway?
Ajay Saraogi
executiveSo the work on that has already begun, and I believe it should be commissioned by the end of December.
Shravan Shah
analystAll right, that sounds good. Next, the debottlenecking of Panna clinker, taking it from 8,000 TPA up to 10,000 TPA — so by Q3, will that one be finished as well?
Ajay Saraogi
executiveCorrect.
Shravan Shah
analystAll right. So regarding that paint segment you brought up — on the revenue side, for the full year we're talking INR 150 crores to INR 200 crores — but when you look at it on an accounting basis, should we expect some EBITDA figure, some EBITDA loss?
Ajay Saraogi
executiveYes. We’ve already said that the EBITDA loss comes to roughly INR 20 crores.
Shravan Shah
analystAnd is there anything new on the next phase — the expansion we’re considering for the second line at Panna — and, of course, we’re also wondering about the Joselito ; any update on when work is likely to begin, or when you’ll announce Panna’s second expansion phase?
Ajay Saraogi
executiveWe haven’t been given a date yet. So I believe the Board will look at the situation at some point—perhaps early next year or near the end of the current financial year. At that stage, we’ll review the whole status and then make a decision.
Shravan Shah
analystBut would we prefer to pursue expansion at Panna first?
Ajay Saraogi
executiveThat ought to be the case. There's nothing I can say about that. That will let us see what the decision turns out to be.
Shravan Shah
analystAll right, that covers what I had to say. Thanks.
Operator
operatorThanks. <<operator_script>> Our next question comes from Prateek Kumar at Jefferies. Please go ahead.
Prateek Kumar
analystMy first question concerns fuel cost. You said we were, I believe, looking at INR <<inaudible>> per tonne in fuel cost savings, and INR 60 to INR 75 of spending across the next 2 quarters. So does that mean more than INR 200 was realized in the first quarter of what?
Ajay Saraogi
executiveRoughly INR 150 has already been achieved. As I said as well, this quarter was unusually strong since we had a chance where we obtained some domestic fuel at a very — at the lowest price. And that was when the international rate was at its minimum, so we secured it at that level. That, too, shows up in the earnings for this quarter. But that said <<inaudible>>, we anticipate a further 60 to 75 gain in the second quarter on top of the first quarter. So we still expect that we ought to have saved around INR 300 per tonne by the end of December.
Prateek Kumar
analystYou asked about INR 150 being realized this quarter, or was it INR 300 that got revised this quarter?
Ajay Saraogi
executiveYes, 150 Indian rupees.
Prateek Kumar
analystOkay, INR 150. And when it comes to petcoke—whatever figure we're considering for the savings—what's the kilocalorie cost compared with the 2.2% we recorded this quarter?
Ajay Saraogi
executiveSo we expect roughly a 20% reduction. That should show up in the next quarter, and possibly another 20. That's the sequential path we anticipate for prices coming down.
Prateek Kumar
analystAll right, I'll take that one, since a few of the other companies have pointed to 1.7 or 1.8 as roughly the top end of what they expect to realize in savings. So...
Ajay Saraogi
executiveAs I mentioned, we ought to reach 1.8 by the close of this third quarter.
Prateek Kumar
analystAll right, so 1.8 is the minimum cost that we could potentially be considering.
Ajay Saraogi
executiveI’m not sure what the presence of stands will be — we’ll have to see that.
Prateek Kumar
analystAlright. Regarding profitability for the Panna unit, you mentioned it aligns with the company. So does that mean it matches the gray operations, or does it match the overall stand-alone operation?
Ajay Saraogi
executiveI should agree with operations.
Prateek Kumar
analystAgreed, let's proceed. All right, so for stand-alone operations we reported roughly 900 per tonne. So it would obviously be lower than <<inaudible>> includes with...
Ajay Saraogi
executiveNot a major impact. A significant difference.
Prateek Kumar
analystThat's a meaningful gap, alright. Okay. Appreciate it. Thanks for the chance to respond.
Operator
operatorThanks. <<operator_script>> Our next question comes from Aman Agarwal, who is on the line from Equirus Securities.
Aman Agarwal
analystThanks for taking the questions. Sir, I just wanted to get some clarity on the savings we expect from the green power capacity that's being added — not just the depletion, but the renewable capacity as well. We have a target of 80 megawatts of WHRS for '24. And I believe 94 megawatts of renewable power.
Ajay Saraogi
executiveRight now, our renewable capacity sits at roughly 46 megawatts, and we intend to grow that to 100 megawatts, possibly by the close of the next fiscal year.
Aman Agarwal
analystSir, I just wanted to get a clearer picture of the savings you expect to come out of these.
Ajay Saraogi
executiveBecause we aren't running a capital model across most of these operations, this is group captive power. As a result, we're anticipating power savings in the range of 30% to 40% relative to the growth rate.
Aman Agarwal
analystOkay. And regarding that Toshali acquisition sale, the Northeast market looks fairly small to us, and we've already observed a number of capacity additions from a <<inaudible>> player active in the Eastern region. So I just wanted to get your perspective on how you see the regional dynamics unfolding.
Ajay Saraogi
executiveNo. Again, Toshali, as I mentioned, is a natural extension of the market we're already serving, just like what we're doing with the next expansion at Panna. So in addition to strengthening our position in the existing Central India markets, we'll also be moving into the Eastern market. As I said, that will become our natural market, and with Toshali as an opportunity, we see getting a limestone deposit in an area where, within a vicinity of 400 to 500 kilometers, there is no plant. That gives us a very good opportunity, and we're planning — if all goes well and we secure all the mining leases and everything — that 2.5 million to 3 million tonnes of capacity can be added, in a region where there is no direct competition. So 500 radios or when you get a plant where no competition is available, direct competition material can come from any other regions. So you'll have a lot of local advantage in catering to those markets.
Aman Agarwal
analystGot it, sir. And sir, one final point on the midterm goal we've set of getting to 30 million tonnes of capacity — would the further additions mostly be brownfield or greenfield in nature? Or does the company still have some debottlenecking scope left?
Ajay Saraogi
executiveThere aren't any significant debottlenecking opportunities remaining, since all the modernization work at our existing plants has already been completed. As a result, we see future expansion coming only through brownfield and greenfield projects.
Operator
operatorOur following question comes from Navin Sahadeo at ICICI Securities.
Navin Sahadeo
analystThanks for having me again. So, regarding Acro Paints and the guidance we're looking at of INR 120 crores to INR 150 crores in revenues, how did Q1 go, in terms of both revenue and EBITDA?
Ajay Saraogi
executiveRegarding paint, we posted roughly INR 25 crores during Q1. And for the quarter overall, EBITDA came in at a loss of roughly INR 2 crores.
Navin Sahadeo
analystAlright. About INR 2 crores in losses, since Acro Paints was, as such...
Ajay Saraogi
executiveAcro Paint is included, and whatever new areas we're getting into through Acro Paint — the new markets we're entering — those are in there too. So that's part of the INR 25 crores top line as well as the loss.
Navin Sahadeo
analystGot it. The second question concerns the clinker factor — I was just reviewing the annual report. So compared with a year earlier, there's a slight decline in the clinker factor, I believe from 65.6% to 65% or thereabouts for the quarter. So with the Ujjain and Prayagraj grinding units coming on stream, how much more can this clinker factor be reduced?
Ajay Saraogi
executiveSo with the grinding unit, it would certainly assist in bringing down the clinker factor, and improving the — so that will certainly be of help, since all of the output from that grinding unit is blended cement. That said, I think we need to look at whether we achieve incremental production of roughly — so the saving comes to around 10% more with the blending unit, in terms of — on average, when you consider the clinker factor.
Madhavkrishna Singhania
executiveSo Navin, to build on what Saraogi said, it's going to affect the overall ratio — like, once Prayagraj and Ujjain are in, it might have an impact of <<inaudible>>...
Ajay Saraogi
executiveIt really hinges on that weighted average, and there's another factor here: a good deal of the incremental demand is arriving from the non-trade sector, as one comment noted. So to expand in line with the industry, or beyond it, we'll need to move into non-trade as well. If we don't, we won't see overall volume growth, even though the trade segment has been growing for us. But for total volume to rise in absolute terms, growth has to happen in both the trade and the non-trade segments.
Navin Sahadeo
analystYes, got it.
Ajay Saraogi
executiveSo with that said, if I see improvement in the trade segment, but an equal improvement in the non-trade segment, then the clinker factor won't change.
Navin Sahadeo
analystSure.
Madhavkrishna Singhania
executiveAnd logically, at the grinding unit, we don’t supply UPC from that facility. So as we keep adding grinding units, that definitely has an effect on the ratio.
Navin Sahadeo
analystGot it. So at least in terms of direction, we're able to see a degree of improvement. There's room for another 200 to 300 basis points of reduction in the clinker factor. Is that a fair assumption to make, right?
Madhavkrishna Singhania
executiveSo those facilities begin to flash, as an example, whenever they're operating at 70% to 80% of capacity, and at that point, for sure, that ought to.
Ajay Saraogi
executiveYes, that could happen. But as I mentioned before, much will hinge on how demand and supply shift between trade and nontrade going forward.
Navin Sahadeo
analystGot it. And regarding the fuel cost, you mentioned we achieved about INR 150 per tonne this quarter, along with a saving of roughly INR 75 to INR 50 per tonne.
Ajay Saraogi
executiveYes, that 150 over the next 2 quarters. So as we indicated, a saving of roughly INR 300 a tonne over Q4, which should be there.
Navin Sahadeo
analystRight. So the sole difference is that I'm referring to petcoke, and that has dropped to a level as low as $105. As you noted at the start, it has reached around $130-odd, and we hold inventory covering roughly 2 to 3 months. So here we are in August. Will this rise hit within Q3 itself, or will it show up more toward Q4?
Ajay Saraogi
executiveDepending on what the indication turns out to be, again, certain shipments are going to arrive with a cheaper cost, and others would carry a higher one. So whatever indication comes with the fuel planning that we currently have. So we've provided an indication of INR 0.20 per 100 GCB of savings in each of the upcoming 2 quarters. So let's treat that as an indication. Our fuel cost stood at roughly INR 2.20 in Q1. It ought to be approximately INR 2 in Q2 and INR 1.83 in Q3.
Navin Sahadeo
analystStill, as a general direction, you can safely figure that Q3 is where the savings on fuel costs hit their low point.
Ajay Saraogi
executiveWe're seeing additional softening when it comes to petcoke pricing.
Navin Sahadeo
analystYeah. But right now, we're seeing a $20 to $25 bump. So from there...
Ajay Saraogi
executiveRight. Honestly, 105 was really — I mean, that was a pretty brief stretch.
Navin Sahadeo
analystGot it.
Ajay Saraogi
executiveWhat I mean is that it hadn't dropped 2 tiers of 105 — it stayed in the 115 to 122 range, and 123 or 125 was a very narrow window. Anyone, whatever their capability, whatever it was, only very few plants managed to secure major shipments within that price band.
Navin Sahadeo
analystGot it. Sir, this is my final question: are there any additional revenues? Operationally, I recognize that further cost reduction is possible through waste, and there is clinker reduction. On the fixed cost side, is there room to become somewhat leaner now, especially when I look at consultancy charges or similar items — are there any areas where we could achieve some cost reduction on the fixed cost front?
Madhavkrishna Singhania
executiveYes, absolutely — we're actively working on that. Perhaps not right away, but fixed cost is certainly something we're focused on. And then, as a next step — because once again, it isn't just variable cost. Fixed cost matters just as much. We're looking into whether fixed cost can be brought down, which we see as a good thing when we — yes, compared with a year earlier, there is an increase, with the rises driven by inflationary trends, added manpower, and other expenses stemming from more business. But we're still evaluating revenues in consultancy and other expenses. So wherever we see a net business gain, we'll pursue it, and it's certainly part of our plan. Not at this moment. Down the road, it will always be a question of seeing how we can bring fixed cost down.
Navin Sahadeo
analystThat's useful. Is there anything you'd suggest we...
Madhavkrishna Singhania
executiveNo. Actually, on that guidance point — if you're talking about the absolute number, no. What we have is guidance tied to our internal budget, which we'd prepared for the year. We're trying to see how we can first cut back on that budget, because when it comes to incremental items, any increase over the absolute figures is extremely, extremely hard. The main reason is that it's largely beyond our control once you've got expansion and other things already under way.
Navin Sahadeo
analystThat’s a fair point. Thanks very much, and all the best.
Operator
operatorThanks. We'll take the next question from Raghav Maheshwari, who's on the line from Asian Market Securities.
Raghav Maheshwari
analystSir, my main question is about the Ujjain grinding unit. Do we have enough clinker from the existing supply at Nimbahera or Magrol, or do we need to upgrade or modernize Line 1 at Nimbahera <<inaudible>>, given that Nimbahera Line 1 isn't running because its operating parameters are very old?
Madhavkrishna Singhania
executiveWe do have enough clinker on hand. In fact, even looking back at the prior fiscal year, lines 1 and 2 at Nimbahera ran for just about 2 months out of the entire year. And as things stand right now, we have adequate clinker available for the Ujjain project, sourced from Nimbahera and Magrol.
Raghav Maheshwari
analystSir, right now, essentially regarding the Nimbahera line and lines 1 and 2, what would the cost gap be between the most recent operating parameter and the deadline difference in terms of clinker costing manufacturing?
Madhavkrishna Singhania
executiveYes. Absolutely — when you compare the operating cost of kiln #1 and #2 with that of the remaining kilns, it comes out higher, and that gap ranges from INR 300 to INR 450 per tonne. That said, this is making use of spare capacity. No investment is required from us. That line already carries certain fixed expenses, since derating the capacity isn't an option for us. So there are plenty of upsides. We do take on some additional variable costs. Overall, there's a saving in the risk cost of roughly INR 100 a tonne. And beyond that — well, if you look only at operating profit, the picture is different. But on an overall net cost basis, interest and depreciation included, there's no interest or depreciation cost attached to running these lands.
Raghav Maheshwari
analystUnderstood, sir. One final question from me. Beyond the Prayagraj and Ujjain expansions, once those are finished, is there any room to grow only cement capacity while using the additional clinker we have? What I'm trying to get at is whether we can add cement capacity without any clinker expansion at all. Is that feasible?
Madhavkrishna Singhania
executiveNo — what we're looking at is this: once Prayagraj comes online, our grinding capacity will reach 24 million to 25 million tonnes. And at that point, I mean, the clinker capacity we have today would be just enough for all of that capacity. So there won't be any extra clinker on hand to support additional grinding capacity.
Raghav Maheshwari
analystFor whatever reason, correct?
Madhavkrishna Singhania
executiveYeah, yeah. On the whole, that's right — maybe to some degree. We still move a bit of clinker out of the southern plant; even though capacity there now stands at 3.5 million tonnes, we continue selling on average roughly 1.5 lakh tonnes of clinker annually, and that's the whole of it. Beyond that, we have no clinker to spare.
Raghav Maheshwari
analystAll right. But if we later want to run line 1 and line 2, and demand picks up somewhere in the north or in Central India, could we expand cement capacity by relying on Nimbahera line 1 and 2?
Madhavkrishna Singhania
executiveNo, that's not it. What I mean is that the 24 million tonnes being ground at present already takes in the clinker coming from lines 1 and 2.
Operator
operatorOur final question comes from Ritesh Shah, who is on the line from Investec India.
Ritesh Shah
analystSir, my first question is this: we’ve introduced a number of new products over time, and those include WhitemaxX, GypsoMaxX, TileMaxX, and Wood Amore. Sir, what are the revenue and the EBITDA run rate for these? Could you please help with that? That’s my first question.
Madhavkrishna Singhania
executiveSo WhitemaxX isn't a new product, to be clear. It's a component — all of our white cement products belong to the MAxX family. This falls under the branding effort. When you say WhitemaxX, that's the white cement.
Ritesh Shah
analystWhite cement, indeed.
Madhavkrishna Singhania
executiveIt's not a new product, then. GypsoMaxX is a gypsum plaster that we brought out roughly 4, 5 years ago, and to keep up with what all our dealers and retailers need these days, you have to offer a bouquet of products — just the one item isn't enough, because when a customer walks in, he wants to pick up every product from a single counter. If that counter carries only the single product available, we run into a challenge from demand arriving from the market — that's the difficulty the dealers are facing. So when we began this journey of launching value-added apps throughout the company — we kicked that journey off around 5 years back. And so we've seen that with the introduction, we've managed to build a fresh profit pool, a new bucket for us, even though it isn't very substantial. But we'd say, from the raps yourself, roughly 15% — 12% to 15% of the total wide EBITDA comes from the MaxX.
Ritesh Shah
analystYes, sir. Sir, could you put a number on what that figure came to for the full year last year?
Madhavkrishna Singhania
executiveNo, we don't disclose figures for MaxX — we aren't sharing numbers on the main products either — and what you're requesting is a breakdown of MaxX, which again falls under our business confidentiality data, so we are not sharing MaxX data on a separate basis.
Ritesh Shah
analystRight, got it — thanks for that. My second question, sir: how should we think about the options we have at <<inaudible>>? So when you consider it, do you look at <<inaudible>> Nimbahera yield expiries, or do you look at <<inaudible>> versus the Panna brownfield opsonities? I'm just trying to get a sense of how you're thinking about it.
Madhavkrishna Singhania
executive<<inaudible>> amounts to a long-term strategy. We'll see — in Rajasthan right now, no new sites are available to you. And looking ahead, as demand rises, one and <<inaudible>> holds solid limestone deposits; it has faced — it has logistical challenges regarding both bringing material in and getting it out to market. So there, we're attempting to figure out what incentives the state government could provide to partly offset that drawback. But apart from that, with quality limestone, we can achieve solid clinker output there, and combined with the grinding units, that makes for a solid business model. So going forward, I mean, if we must receive — we must satisfy the higher demand. So that has to be — I mean, the old north market mainly relies on cement arriving from the state of Rajasthan. So Rajasthan won't gain additional limestone deposits, so we then must move to regions where limestone is available.
Ritesh Shah
analystSir, this isn’t a fallback for the Nimbahera lease expirations. What you’re looking at is...
Madhavkrishna Singhania
executiveThat isn't back to the Nimbahera lease expiry. On that front, we already have — during the last year, we picked up an extra lease through the auction near Nimbahera. And regardless, I would — I mean, this isn't the right forum for that discussion, but my view is that mining leases are approaching expiry, though certainly a provision exists, and there would be considerably more clarity nearer the date from the government regarding whether the write-off diffused will fall into the current year. Otherwise, it isn't a workable option.
Ritesh Shah
analystAnd one last follow-up on Nimbahera. Sir, how do you view water as a commodity in this case? My understanding is that previously the government wasn't granting approvals because water was an issue there. So has this been addressed by putting in pipelines, or are we still depending on growing on that?
Madhavkrishna Singhania
executiveWhen it comes to water, I don't have any issue.
Ritesh Shah
analyst<<inaudible>>
Madhavkrishna Singhania
executiveSo yes, <<inaudible>> have secured the government's approval for water.
Ritesh Shah
analystAll right, however...
Madhavkrishna Singhania
executiveWe've gotten the necessary approvals — from the government, for the water we required.
Ritesh Shah
analystAll right, but does that mean we’re depending on groundwater, sir?
Madhavkrishna Singhania
executiveNo, no. What we also put forward was acquiring the pipeline, which forms part of that project.
Ritesh Shah
analystAlright, that’s really useful, sir. Thanks a lot, sir.
Operator
operatorThanks. That brings us to the end of the questions for today, ladies and gentlemen. At this point I'll pass the conference to Mr. Vaibhav Agarwal, who will offer closing remarks. Vaibhav, the floor is yours.
Vaibhav Agarwal
analystThank you. On behalf of PhillipCapital India Private Limited, we want to thank the management team at J.K. Cement for this call, and many thanks to pardon joining the call. Thank you very much, <<inaudible>> now come the call. Thank you.
Madhavkrishna Singhania
executiveThanks, Vaibhav. And thanks to all of you for being on this call.
Operator
operatorThanks, management team members. Everyone, PhillipCapital India Private Limited has now wrapped up this conference call. We appreciate your participation, and at this point you're free to hang up. Thank you.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete J.K. Cement Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to J.K. Cement Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in J.K. Cement Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.