J.K. Cement Limited (532644) Earnings Call Transcript & Summary
January 23, 2024
Earnings Call Speaker Segments
Operator
operatorGood day, ladies and gentlemen, and welcome to the Q3 FY '24 earnings conference call for J.K. Cement, hosted by PhillipCapital India Private Limited. <<operator_script>> Please be aware that this conference is being recorded. I'll now turn the conference over to Mr. Vaibhav Agarwal of PhillipCapital India Private Limited. Thank you. Mr. Agarwal, the floor is yours.
Vaibhav Agarwal
analystYes, thank you, Michelle, and good evening to all of you. We at PhillipCapital India Private Limited are glad to welcome everyone to this Q3 FY '24 earnings call for J.K. Cement Limited. Joining us today are Mr. Ajay Kumar Saraogi, our Deputy Managing Director and CFO, along with Mr. Prashant Seth, President of Business Information and Investor Relations. I want to note, on behalf of J.K. Cement Limited and its management, that some of the remarks that may be given or talked about during this conference call could be forward-looking in nature, relating to developments yet to come and built on present-day expectations. Such statements carry a range of risks, uncertainties and other significant factors that could make actual developments and results turn out materially different from what has been stated. Neither J.K. Cement Limited nor the company's management takes on any duty to publicly change or refresh these forward-looking statements, whether because of fresh information, upcoming events or anything else. I'll now turn things over to the J.K. Cement management team for their opening remarks, after which we'll move to an interactive Q&A session. Thank you, and over to you, Saraogi sir.
Ajay Saraogi
executiveThank you, Vaibhav. Good afternoon, and welcome to the Q3 results. The Board of Directors convened on 20th January to go over how the company performed during the quarter that closed on 31st December, the third quarter of 2023. Among the key highlights: net sales for this quarter rose 9% versus Q2, reaching INR 2,690 crores compared with INR 2,476 crores, and measured against the prior year they were up 18%, at INR 2,281 crores versus INR 2,690 crores. EBITDA for the quarter came in at INR 608 crores, compared with INR 447 crores in the preceding quarter — a rise of 36% — and INR 246 crores a year earlier, which is an increase of 147%. EBITDA margins stood at 22.6% for the quarter, versus 18% in the prior quarter and 10.8% in the prior year. Profit before tax for this quarter was INR 415 crores, against INR 246 crores, up 69%, and INR 90 crores last year, a 363% increase over last year. EPS was INR 37.40, compared with INR 23.10, and INR 7.40 in the previous year. Also during this quarter, the company commissioned its 1.5 million ton grinding unit at Ujjain.
Ajay Saraogi
executiveAt the Prayagraj grinding unit, which has a capacity of 2 million tons, the work is at an advanced stage, and commissioning will likely happen by September — that is, in the July-September quarter. Also, in its meeting, the Board of Directors approved an expansion of 6 million tons in Central India, and the key features of this expansion are that 3.3 million tons would be the Clinker Line at Panna — this will be line #2 at Panna — along with a 6 million grinding unit. So the 6 million of grinding comes from 3 million of greenfield grinding in Bihar and 1 million of incremental grinding through modifications in the existing systems at Panna, Prayagraj, and Hamirpur. So that would make — so that would amount to 6 million tons of cement grinding. The total project cost is expected to be INR 2,852 crores — INR 2,850 crores — of which it is proposed to borrow a rupee term loan and some debentures from banks amounting to INR 1,850 crores, with the balance coming from internal accruals. Commissioning is around within 24 months, and work is expected to start sometime by March, April this year. So within FY '26, we expect to complete this expansion of 6 million tons.
Ajay Saraogi
executiveSo with this expansion, by FY '26 the company's total gray cement capacity — installed capacity — would reach 30 million. Capacity currently stands at 22 million. At Prayagraj, 2 million tons is under implementation, and 6 million tons of new capacity is proposed. So by the end of FY '26, the company's overall gray cement capacity would be 30 million tons. During the quarter, looking at capacity utilization for gray cement, it was around 75%. Gray cement volumes came in at 4.15 million tons. The blended ratio was 66%, the trade mix was 62%, and premium products accounted for 12% of trade volumes. Looking at gross debt as of 31st December, that was INR 4,585 crores, and net debt to EBITDA was 1.64% against 2.21% as of 31st March 2020 — as of 31st March 2023. So those are the main highlights and how things are working. If you have any questions, we'll be happy to address them. Thank you.
Operator
operator<<operator_script>> Our first question comes from Shravan Shah, who is calling in from Dolat Capital.
Shravan Shah
analystWell done, sir, on a really strong set of numbers.
Ajay Saraogi
executiveThanks.
Shravan Shah
analystSir, my first question is really just to confirm the timeline regarding this 3.3 clinker and 6 million. So the 3.3 clinker at Panna would be starting in Q4 FY '26, and the 6 MTPA grinding would start by Q1 FY '26 — is that the fair way to look at it?
Ajay Saraogi
executiveNo, no. Look, by the close of FY '26, all of this will be commissioned, since we expect the clinker line — as we did previously at Panna — so we're allowing for an outer limit, with certain approvals still pending. What I mean is, once we receive the consent and so on, if we begin work by March or April this year, we can certainly have it commissioned by December '25, all of it. The cement grinding could be finished sooner, but finishing it sooner makes no sense while the clinker won't be available to us.
Shravan Shah
analystAlright, understood. Now, given this CapEx of roughly INR 2,900 crores, how much have we spent on CapEx in 9 months, and what is the updated guidance for FY '24, '25, and '26?
Ajay Saraogi
executiveSo, to this point we've actually spent roughly INR 900 crores on CapEx. The earlier guidance stood at INR 1,400 crores, though with the spillover we expect to close at INR 200 crores. That puts CapEx for this year in the range of INR 1,200 crores. And next year, yes, versus the guidance of INR 800 crores — now we'll also have CapEx for this Line-2, Panna Line-2, and this 6 million grinding. So it lands in the range of INR 1,200 crores, plus INR 200 crores of spillover from the current year, which makes next year's CapEx INR 2,200 crores.
Shravan Shah
analystAll right, INR 2,200 crores. All right. So then what would that be in FY '26?
Ajay Saraogi
executiveFor FY '26, that would come to roughly INR 1,800 crores.
Shravan Shah
analystApologies, sir. INR 2,000 crores and — INR 2,200 crores in FY '25, and INR 1,800 crores in...
Ajay Saraogi
executiveFiscal year 2026.
Shravan Shah
analystFY '26. Okay. Okay, understood. Now, regarding volume, pricing, and profitability, just two or three points. On the gray volume side, we are certainly performing much better. Over 9 months, we achieved growth of 21.3%. So is it fair to say that for the full year we should definitely see 19% growth? And any broader sense of volume growth for next year? Because for the industry, I would say it will be slowing. So for us, how should one view gray volume growth for FY '25?
Ajay Saraogi
executiveSo, as you can see, we expect to close this year at roughly 16.5 million tons by March '24. And, as we mentioned earlier, you could say that incrementally, at a minimum, 2 million tons will come each year in FY '25 and FY '26 — that's incremental volume.
Operator
operator<<operator_script>> Our following question comes from Aman Agarwal with Equirus.
Aman Agarwal
analystAnd once again, many congratulations on another strong set of results. Sir, regarding gray cement — while I understand that the gray cement business has been performing very well, I just wanted more clarity on how the white business is doing. Last time, you mentioned there had been some realization cuts, particularly in the putty business, because of steep competition. I just wanted an update on that — how is the current scenario?
Ajay Saraogi
executiveSo in the white business, we've achieved — there's tough competition there, particularly in the putty segment. And even though we've been growing, if you look at the white business, it has also grown by about 5% over the 9-month period on a year-on-year basis. So from April-December '22 to April-December '23, that's a 5% growth. Yes, on profitability, I'd say white cement is more or less flat when you look at the business as a whole. So we're expecting EBITDA margins of anywhere between 15% and 18% in the white business.
Aman Agarwal
analystYes, sir. And sir, regarding the total cost per ton, on the previous call you pointed out that you were looking for something like INR 50 per ton of savings in 3Q as well as in 4Q. In 3Q, we've already reported a cost saving of more than INR 100 per ton. Would you anticipate additional cost savings in 4Q on a sequential basis?
Ajay Saraogi
executiveYeah, there could be. Look, Q3 was unusual for a couple of reasons — part of the cost per ton, once you look at it net of the stock adjustment, is also due to the trade adjustment being in there when you value inventory. But for sure, we could see another one — though the major savings have already been realized. We might pick up some marginal savings, somewhere in the range of INR 30 to INR 40 this quarter or thereabouts.
Aman Agarwal
analystGot it, sir. And sir, could you possibly break out how each region grew during this quarter, or perhaps across the 9 months of '24?
Ajay Saraogi
executiveNo, those figures aren’t something we’re sharing.
Operator
operator<<operator_script>> Our following question comes from Devesh Agarwal with IIFL Securities.
Devesh Agarwal
analystSir, to start with the expansion itself — you mentioned that by the end of FY '26 we're aiming for that...
Operator
operatorMy apologies for cutting in, but sir, we can't hear you clearly — the audio isn't coming through.
Devesh Agarwal
analystHas it improved at this point?
Operator
operatorAlright, go ahead, sir.
Devesh Agarwal
analystYes. So sir, regarding the expansion, I was hoping for a bit more clarity on whether land is available at all of the locations, apart from the greenfield. Is that — will that be the situation?
Ajay Saraogi
executiveRight. Aside from the grinding site in Bihar — there we've pinpointed a handful of spots, though those deals aren't closed yet — the rest, in a sense, amounts to brownfield expansions, so land isn't a problem.
Devesh Agarwal
analystOkay, and when it comes to ordering, sir, what targets should we expect?
Ajay Saraogi
executiveSorry, could you say that again?
Devesh Agarwal
analystRegarding ordering.
Ajay Saraogi
executiveWe've actually begun receiving the quotes already, and my expectation is that we can wrap up every order as well as the core plant and equipment in the coming 3 to 4 months.
Devesh Agarwal
analystGot it. So for Bihar, sir, the site hasn't been locked in yet, correct? It's still being worked out — specifically where the plant would go?
Ajay Saraogi
executiveSorry, could you say that again?
Devesh Agarwal
analystRegarding Bihar, the precise site for the facility is still being worked out. The location hasn't...
Ajay Saraogi
executiveWe had 2 or 3 options, so we're just figuring things out, and we'll lock that in within the next 2, 3, or 4 months. Again, once we've got the land and at the same time we've got the approval, environmental clearance and all of that, so the land acquisition plus environmental presence ought to take roughly anywhere from 6 to 9 months. And we believe we can commission the grinding unit in a span of 12 months.
Devesh Agarwal
analystGot it. And sir, if you notice that Central India's portion of that overall volume has been rising, I just wanted to get a sense of how the probability differs between North India and Central India.
Ajay Saraogi
executiveNow, looking at Central India again — yes, pricing there is somewhat below what we see in the northern region. But since that facility is a new plant, we capture plant efficiencies and also receive a subsidy benefit. So roughly speaking, profitability in Central and North comes out about the same, given that we get the subsidy advantage in that region.
Devesh Agarwal
analystGot it, sir. And last thing, sir, what's the latest on the paint business? What have revenue and EBITDA come in at? And what's the target for FY '25?
Ajay Saraogi
executiveAs we mentioned earlier, yes, work is underway on the paint business, and we've managed to ramp up volumes. Looking at it — I mean, we've already surpassed a turnover of INR 100 crores across the 9 months. And at this point we believe we ought to be able to end the year at roughly INR 150 crores plus in top line terms. So that was — this is — so we — after bringing out JK Maxx around the start of this year on a small scale and then ramping it into our core main markets, so we have — we're seeing good traction, and we believe it will certainly exceed INR 150 crores, because if we look at the paint top line, we did about INR 46 crores in quarter 3 alone. And so we expect, so roughly INR 150 crores plus. Yes, there would be, owing to the one-time asset, we need to build the brand with branding cost. An operational loss is expected, anywhere from INR 15 crores to — INR 20 crores was what we planned. What we estimated is it could be INR 20 crores, INR 25 crores might be our loss.
Ajay Saraogi
executiveSo across what amounts to a 9-month stretch, we've taken a loss of roughly INR 15 crores in the paint business, though there's nothing unusual about that. What I mean is, if you look at how we're tracking things, we're watching the business on a gross margin basis, and on that measure, we're right where we had planned to be.
Devesh Agarwal
analystAnd for fiscal year '25, sir, are there any figures you could share regarding profitability?
Ajay Saraogi
executiveFor FY '25, our top line ought to land somewhere in the range of INR 250 crores to INR 300 crores. On the profitability side, again, that will hinge on — I mean, whether we post a marginal profit or a loss, since we have to invest in building the brand. In effect, we turn EBITDA positive in FY '26, at which point we're nearer to an INR 500 crores top line — an INR 400 crores, INR 500 crores top line.
Operator
operator<<operator_script>> We'll take our next question from Pathanjali Srinivasan, who's calling in from Sundaram Mutual Fund.
Pathanjali Srinivasan
analystCan you hear me, sir?
Operator
operatorYes.
Pathanjali Srinivasan
analystYes. First off, congratulations on a strong set of numbers. I had a few questions. One concerns gross debt — so after our CapEx, what would gross debt levels reach at the peak over the next couple of years?
Ajay Saraogi
executiveSo look, right now our gross debt stands at roughly INR 4,600 crores. And afterwards — if we look at FY '26, it ought to come in near INR 5,500 crores of — you see, we're going to take on borrowing of about INR 1,850 crores. But across those 2 years, we'll wind up paying back roughly INR 800 crores, INR 900 crores of debt as well. So the incremental rise would be somewhere around INR 1,000 crores of debt, so we might say gross debt can peak at a maximum of INR 5,600 crores.
Pathanjali Srinivasan
analystAll right. Sir, regarding white cement, it looks like realization went up compared with the prior quarter — could you put a number on how much that increase was?
Ajay Saraogi
executiveNo. Look, when we talk about realization increases, total white cement is a mix of things — it comes down to product mix changes and other factors. So to be precise — on putty specifically, yes, quarter-on-quarter there's been some pricing pressure, but a shift in product mix is producing a marginally higher realization per ton.
Pathanjali Srinivasan
analystSo does that mean we’ve been selling more specialized products or something, and that’s why realizations have risen a little?
Ajay Saraogi
executiveIt’s really a mix of all those things. With Specialized, we produce ShieldMaxX, which is a premium putty, along with other items. And because this quarter was seasonal, that factor plays a role.
Pathanjali Srinivasan
analystAlright. Sir, and just one final question: what's our energy cost for each kcal?
Prashant Seth
executiveThat comes to INR 1.80.
Pathanjali Srinivasan
analystAnd how much of a decline are we expecting to see in the next quarter?
Ajay Saraogi
executiveOn the margin, if anything — since we already hold inventory at this rate, I don't believe there will be much of a difference this quarter, just a marginal one, nothing significant. Petcoke prices have come down, and we ought to see some reduction. However, that would only show up in the first quarter of next fiscal, because this depends on inventory levels — we rely more on imported fuels, so we carry 60, 75 days of inventory.
Pathanjali Srinivasan
analystAlright, sir, and if I can just fit in one final question here. For '25 and '26, what are the targets we have for WHRS and renewables?
Ajay Saraogi
executiveRegarding WHRS, then: first, a new WHRS plant at Muddapur is at an advanced stage. Trial runs are in fact underway, so it will be commissioned and will contribute. Thus the benefit will begin to show next quarter — partly during this quarter, and in full during the first quarter of next fiscal, we shall see it. So our current...
Prashant Seth
executiveRight now, WHRS capacity stands at 64 megawatts, so it will rise by, let's say, an additional 18 megawatts at Muddapur. And then we'll also have WHRS at the new clinker Line-2 in Panna. So we will be doing...
Ajay Saraogi
executiveWith solar and wind, we're pursuing the usual partnerships, and we expect to grow that by roughly, let's say, 50 megawatts -- 50, 60 megawatts annually.
Pathanjali Srinivasan
analystOn that same point, I noticed a reference in our presentation to a 22 megawatts agreement running until 31st March '24. Sir, what does that actually mean?
Prashant Seth
executiveSo that agreement <<foreign_lang>> that tie up will expire by that period.
Pathanjali Srinivasan
analystSo, will we renew it? Or how does that work — is that something we get to choose?
Prashant Seth
executiveWe also formed some new partnerships.
Ajay Saraogi
executiveWe did have some short-term arrangements in place. Now we're moving into a long-term PPA agreement. So in the interim, we also had a short-term tie-up, and that was included in that figure.
Pathanjali Srinivasan
analystYeah, I was just hoping to get a figure on what we're aiming for in '25 and '26 when it comes to renewable.
Ajay Saraogi
executiveLooking at it, for '25 and '26 on the renewal side, we should definitely be able to take on roughly 50 additional megawatts, that's for sure. Out of that, 25 megawatts would come from waste heat by FY '26, since Line-2 is going to have that waste heat, plus another 25 from incremental solar power, so we could see an extra 50 megawatts coming online across FY '25 and '26.
Pathanjali Srinivasan
analystSo this is an addition to our 18-megawatt Muddapur facility, correct?
Ajay Saraogi
executiveYeah, yeah — this is on top of Muddapur, right.
Prashant Seth
executiveCorrect.
Operator
operatorOur next question comes from Amit Murarka with Axis Capital.
Amit Murarka
analystRegarding the subsidies in Central India, what amount was recorded during this quarter?
Ajay Saraogi
executiveSo on a quarterly basis for the company, the total subsidy comes to roughly INR 26 crores to INR 27 crores each month. That's approximately INR 80 crores a quarter — somewhere between INR 75 crores and INR 80 crores per quarter.
Amit Murarka
analystRight. Right. And how much, in total, are the fiscal incentives that are available here?
Ajay Saraogi
executiveSo for total quantum, we expect that it varies — in Panna, the total comes to roughly INR 300 crores, which we will receive. And then there are fiscal incentives that are available for the grinding locations. So on a year-on-year basis, we should get approximately INR 300 crores over the next few years.
Amit Murarka
analystRight. And Panna phase 2 is going to come with incentives again as well, correct?
Ajay Saraogi
executiveYes, so we plan to submit an application, and with any luck, we ought to receive it.
Amit Murarka
analystOkay, understood. And regarding peak net debt, I believe you mentioned gross debt of INR 5,600 crores, correct?
Ajay Saraogi
executiveRight, so that's currently at INR 4,600 crores — which is why I mentioned there should be an incremental INR 1,000 crores, or at least that's the figure we view as peak debt.
Amit Murarka
analystGot it. And on the paint revenue side too — I think you also recorded some revenue in the stand-alone business. What would that amount be for Q3, the 9 months?
Ajay Saraogi
executiveSo that comes to roughly INR 25 crores — INR 26 crores, to be precise.
Amit Murarka
analystAnd that gets grouped into the white cement putty revenue, right?
Ajay Saraogi
executiveYeah, absolutely, definitely.
Amit Murarka
analystOkay. Okay. And does this also carry some EBITDA? Or should we treat it as EBITDA-neutral?
Ajay Saraogi
executiveNo — think of it in terms of paint. Looking at the stand-alone figures, you might see a bit of marginal EBITDA, though it could just as easily come in at zero. On a balanced basis, that advertising spend sits within the MaxX business — inside the paint business itself.
Amit Murarka
analystOkay, and finally, regarding the Toshali acquisition, is there anything new to share?
Ajay Saraogi
executiveRegarding the Toshali agreement, dialogue is still ongoing with both the state government and the owner about transferring the mining lease. The state government had concerns too about handing Toshali over based on our confirmation that we would buy Toshali out, so we are actively working on that. And because — one, at the same time we are working out an arrangement for a long-term tie-up for the limestone, pending allocation of the mining lease. So the government is also considering that, in the event the mining lease transfer takes some time, they can assure a long-term supply of limestone, and whether the company would be in a position to consider that as an alternate option for the interim period until the limestone — until the mines are transferred.
Amit Murarka
analystSure. And on the final question about employee cost — it appears there was some increase this quarter, with some incentives and some employee bonus having been...
Ajay Saraogi
executiveThe rise in employee costs in that area comes from a variable pay program, and it included a piece tied to a — because the targeted profit is being hit, there’s an added provision for that variable pay, which has to be paid out.
Amit Murarka
analystAll right. All right. And for the fourth quarter, should we expect a similar figure?
Ajay Saraogi
executiveThe figure for the fourth quarter might come in slightly lower, since there's an effect carried over from the prior period — and that extra impact shows up in this quarter.
Operator
operatorWe'll now take the next question, coming from Jyoti Gupta at Nirmal Bang.
Jyoti Gupta
analystSolid numbers. With the split in capacity between gray and white cement, is it fair for me to assume EBITDA of 1,200 came from gray cement, with white cement contributing roughly 2,400?
Ajay Saraogi
executiveSorry, we aren’t actually breaking out EBITDA figures for the two businesses individually. You can work them out using whatever method you’re using for your calculation.
Jyoti Gupta
analystAll right, so from what I’ve worked out, I think that’s roughly where the figure ought to land. Then, regarding the expansion side: my gross figures are pretty near, but when it comes to where you expect volume growth to come from going forward across India’s cement growth as a whole, given that every company is adding capacity—do you believe demand ahead will match both the capacity that exists now and the capacity still to come?
Ajay Saraogi
executiveSo look, demand is rising as well. If you consider that the base has gone, the extra effective capacity added is no greater than the demand. So we genuinely see that whatever additional capacity comes online will be absorbed.
Jyoti Gupta
analystAlright. So what rate of growth are you expecting when it comes to demand — demand across all of India? Or perhaps in the specific markets where you're actually running operations?
Ajay Saraogi
executiveWe're seeing demand growth somewhere in the range of 7% to 9%.
Jyoti Gupta
analystAnd that 7% to 9% figure specifically in the market where Shree and UltraTech are also extremely active, and where capacity additions are going to be significant—there will be substantial new capacity coming in. You're assuming, you believe, that it's self-consuming, that the market will absorb all of that upcoming capacity—which means it is...
Ajay Saraogi
executiveUp to now, that has taken place, and our sense is that, yes, it would be.
Jyoti Gupta
analystAlright. Sir, regarding your fuel side, I'd like to get a sense of — I mean, given that your fuel costs have fallen quite a bit, I'd also like to know whether this will stay steady. If that's the case, then maybe I can look for a 1,200 EBITDA in the fourth quarter, at roughly those levels. I mean, not the same at 1,300, but perhaps near 1,200 levels is what I'm anticipating for the fourth quarter. So is — will there be any shifts in your fuel?
Ajay Saraogi
executiveLook, once more, you brought up both fuel and EBITDA. EBITDA isn't tied to where fuel prices sit — it's a blend of factors. Sure, there will be some effect. As I mentioned before, we feel we already hold inventory valued in line with the Q3 average fuel cost, so we don't anticipate a significant decline on that front. Beyond that, EBITDA reflects other costs as well as — and the biggest piece is realization. So right now, this month's realization is slightly below where the third quarter ended. That means we would definitely — we are definitely — I mean, it's not that — we do expect some price increase to come through, but should that not materialize, then commenting on EBITDA per ton would be difficult.
Jyoti Gupta
analystRight. Okay. And one more thing I'd like to get a handle on regarding the WHRS — you're going to bring on another 50 megawatts over the coming 2 years, that being by FY '26.
Ajay Saraogi
executiveRegarding WHRS, we will actually be adding an incremental 43 megawatts. At Muddapur, 18 megawatts is being added and is already undergoing trial runs. And 25 megawatts of WHRS is proposed alongside the new expansion at Panna.
Operator
operator<<operator_script>> We'll now take a question from Navin Sahadeo, who is calling in from ICICI Securities.
Navin Sahadeo
analystWarmest congratulations, sir, on such a strong set of numbers. By my estimates, you could definitely be ahead of the industry leader, UltraTech Cement, for the quarter. My question was that I understand pricing is dynamic. And on the cost side, we have wasted recovery as the benefit coming in the next quarter. Beyond that, are there any additional levers — from a cost rationalization or a revenue optimization standpoint — that will ensure we keep up this lead over the industry?
Ajay Saraogi
executiveSo look, WHRS is in place, but the benefit won't be visible yet. It won't be at full strength during this quarter. We expect to see WHRS delivering its full benefit starting in Q1 of FY '25, since it's still under commissioning, and it will take some time before it stabilizes and everything else falls into line. On other costs, yes, there could be some on fuel — as I mentioned, we're trying, though there could be incremental savings of roughly INR 30 to INR 40 a ton from fuel and other costs. Beyond that, we don't foresee any savings right away this quarter. On pricing, yes, we're trying to work out the other mix, but at the same time we also need to look at our new markets in Eastern UP, which need to be developed, and at the Prayagraj expansion, which should come around by the end of the second quarter of FY '25.
Navin Sahadeo
analystGot it, that's helpful. So my other question had to do with the overseas operations — we were basically taking the gap between consolidated EBITDA and stand-alone EBITDA. You also mentioned that paint accounted for a loss of roughly INR 5 crores for the quarter, as you said. Yet the difference comes to a decent INR 16.5 crores, or nearly INR 17 crores. So what I'd like to understand is whether there's anything like what happened in the previous quarter — where there was a one-off chance to export clinker to Australia — or whether this is a more sustainable kind of recovery, or margins, in the UAE?
Ajay Saraogi
executiveRegarding Fujairah operations, as we mentioned previously, we've been attempting to figure out our turnaround plan for those operations. Those operations are also negatively impacted by extremely elevated fuel costs and due to elevated logistics costs. So conditions over there are returning to normal. There's been a decrease in fuel cost. We're also working on the other value-added products, which have also now been delivering some positive revenue for us. So during this quarter, at Fujairah as well, we have earned -- there is an EBITDA comparable to -- somewhat comparable to Q2. In Q2, the EBITDA for Fujairah stood at roughly INR 25 crores. And in this one, it is INR 21 crores.
Navin Sahadeo
analystAnd sir, my broader question is just how sustainable this is, because historically, as you mentioned, I mean, multiple...
Ajay Saraogi
executiveAnd so once more, we did have some decent — I mean, there were also a few one-off volumes in there. But I think, as we're looking at Fujairah, on an annual basis we ought to be able to — although we're currently trying to figure out a plan in Africa, and that could take a while. But there are additional restrictions, or other increases in cost along with restrictions, that are being put in place in the UAE, yet if things stay normal on a consistent basis, we do believe that we could — not at this pace, but certainly averaging somewhere around — anywhere from INR 30 crores to INR 40 crores a year could be sustained at Fujairah.
Navin Sahadeo
analystAll right, that sets up a much improved situation compared with how things were before. And just a final item from me: freight cost per ton went up on a sequential basis — naturally, I figure, because of a peak season and a rail surcharge, that's my assumption. But is there anything beyond that, in the sense that, since we're likely aiming to build out that eastern UP market, as you mentioned, or perhaps Bihar, because, I mean, we will ultimately establish operations there — so does the lead distance go up? And is that figure then...
Ajay Saraogi
executiveYes, so lead distance has gone up as well, and one factor is busy freight. Lead distance is rising. It rises because we're serving new markets. There's a shift — a mix shift. In the south, where lead distance remains shorter, volume was slightly lower, so all of those factors played a part. Those are the two main factors. And another point is that inventory has gone up somewhat, which is — again, an incremental adjustment, where on a given day some freight appears as an expense and forms part of stock valuation. So — but if you look at the two biggest comps, one is the busy period. I mean, because of railway freight, and there's also an increase in lead distance.
Operator
operator<<operator_script>> Our following question comes from Sumangal Nevatia with Kotak Securities.
Sumangal Nevatia
analystSir, for my first question, could you provide a breakdown of that INR 2,800 crores — how it splits across grinding, clinker, WHRS, that kind of detail, if you're able to share it?
Ajay Saraogi
executiveSo look, on the INR 2,800 crores breakdown: if you consider the grinding stations over in Bihar plus the expansions we still need to carry out, that comes to roughly INR 600 crores to INR 650 crores, and the figure of INR 2,200 crores would be what gets spent at Panna, WHRS included.
Sumangal Nevatia
analystGot it. And sir, now that we're moving into Bihar, what kind of strategy is there regarding new catchment areas versus deepening our penetration in existing ones? Will Bihar be serving the whole new market?
Ajay Saraogi
executiveBihar, then, would represent a fresh market for us. Right now we aren't selling anything there. When we established Panna, it served as a new catchment area, and in a comparable way there were new markets in MP and UP that we have been — that we are capturing. So we'll follow a similar approach to move into Bihar, and when it comes to the new markets, our plan would be to consolidate on them.
Sumangal Nevatia
analystAll right. And sir, this news had been expected for some time now. I mean, can we take it, then, that going forward you'll pursue expansion out to Panna, and that any future growth will happen either at another site or through a greenfield plant?
Ajay Saraogi
executiveAs I mentioned before, look, there are two or three possibilities, and based on how the market looks, one possibility involves expanding in the North at Jaisalmer, and another involves expanding in the South, where capacity utilization is already running at a very high level. There's also the possibility of Line-3 at Panna, and if something materializes for Toshali, that's a possibility too. So those are the four possibilities we have. And I think by the time we get to — we're at an advanced stage of completing Panna Line-2, we should — we would have a clear plan for where we need to go next.
Sumangal Nevatia
analystGot it, and just to clarify one final point, sir. You mentioned gray volumes of roughly 16.5 million tons for this year. Of that total, how much would have come from Panna? I'm just trying to get a sense of what utilization would look like in a typical year overall.
Ajay Saraogi
executiveSo Panna would already be running at 75%, 80% capacity utilization — 75%. So at Panna, capacity utilization would definitely be 75%.
Operator
operator<<operator_script>> Our following question comes from Rajesh Kumar Ravi at HDFC Securities.
Rajesh Ravi
analystCan everyone hear me?
Ajay Saraogi
executiveYes.
Rajesh Ravi
analystCongratulations, sir, on a strong set of results. I have a few questions. First, regarding the expansions — these grinding expansions you're carrying out in brownfield — so are they actually adding some balancing equipment? Or will it be a separate grinding mill that's getting ready?
Ajay Saraogi
executiveNo, there isn't a separate grinding unit. It's within the existing unit itself — some upgrading. What I mean is, we had room in the design, and we went ahead and added an additional packing system and...
Rajesh Ravi
analystRight. And on the CapEx figure you cited for FY '25 — if I caught that correctly, INR 2,200 crores — and then the following year it would come in at roughly INR 1,500 crores?
Ajay Saraogi
executiveRight, right. So the INR 2,200 crores that was earmarked for FY '25 did cover the capital expenditure for the Prayagraj expansion. That means it took in the Prayagraj grinding unit, which is due to be commissioned in FY '25. It also took in part of the spillover CapEx — INR 200 crores of it — coming from the current year. The plan for the current year stood at INR 1,400 crores, and we're doing — we should wrap up near INR 1,200 crores. Some routine CapEx, plus roughly INR 1,200 crores, INR 1,300 crores of spending on the new expansion.
Rajesh Ravi
analystTurning to the operating metrics, the results you've reported are solid, though a couple of items stand out to me. Your nontrade mix has gotten better — the trade mix declined from 69% to 64% versus the prior quarter. Also, what our panels indicate is the central market, which I take to be roughly flat past that point as well. And then there's a sizable inventory — a negative inventory adjustment — negative inventory figures, the way that adjustment works, so could you walk us through what that was? Where do you — in what way will you gain on realization even with the loss on nontrade sales and this big inventory number?
Ajay Saraogi
executiveFirst, we want to stress that we've managed to hold onto our market share and trade across every market. In terms of trade sale, we haven't lost market share. In fact, in the new markets — actually, in those new markets, we've even further improved our trade share. If — yes, the nontrade volumes percentage has risen, because if the incremental demand and the opportunity are coming from nontrade, then to capture that incremental volume, you'll have to sell in the nontrade segment.
Rajesh Ravi
analystRight. So what was going on there — if you're moving more volume through nontrade, you were definitely picking up on volumes, but the...
Operator
operatorApologies for cutting in, sir, but your audio isn’t coming through clearly at the moment.
Ajay Saraogi
executiveNo, actually, Rajesh, pricing during this quarter came in stronger than it did in the prior one. That is the reason we saw an improvement in realization.
Rajesh Ravi
analystAnd sir, on that inventory adjustment figure, could you walk us through it?
Ajay Saraogi
executiveThe reason is that inventory levels—well, look, during the prior quarter, with maintenance running at typical levels since Q2 is when we usually do maintenance, clinker stock had gone down. At this point we've returned to the optimum level again this quarter.
Rajesh Ravi
analystSo there was nothing in there that was one-time in nature?
Ajay Saraogi
executiveYeah, yeah, there’s nothing one-time about it.
Rajesh Ravi
analystFinal question on WHRS — you're executing for 3.3 million tons, and you referenced roughly 25 million tons of WHRS. Is there surplus there, since typically we figured about 3 million tons odd would be enough for at most 15 megawatts of WHRS?
Ajay Saraogi
executiveNo, no, that's not the situation. At Panna, Line-1 already has 22 megawatts of WHRS in place.
Rajesh Ravi
analystThat's right. Even so, optimal utilization can be achieved with…
Ajay Saraogi
executiveActually, your audio isn't coming through clearly.
Rajesh Ravi
analystSorry. I'm asking this: given 3.3 million tons, was that the best call you could make, and is all of this 25-megawatt feasible?
Ajay Saraogi
executiveYeah, that's definitely possible.
Operator
operator<<operator_script>> We'll now take our following question from Prateek with Jefferies.
Prateek Kumar
analystI think that covers most of what I asked. Sir, my first question is about the green energy mix—I just want a number. You mentioned megawatt installations in both solar and WHR, so the 50% of FY '24 YTD, what number is that expected to reach, say by FY '26? Some peers I've spoken with mention a 60% figure by FY '26.
Ajay Saraogi
executiveWhen you look at green power right now, we're sitting at 50%. By FY '26, my expectation is that we'll be nearer to roughly 60%.
Prateek Kumar
analystAnd one of your earlier presentations mentions 75% as, like, probably more of a...
Prashant Seth
executiveThat's the goal for 2030.
Ajay Saraogi
executiveThat is the goal we have set for 2030.
Prateek Kumar
analystOkay, regarding realizations — that INR 26 crores booked in the stand-alone paint business, was it a comparable figure in the prior quarter as well? Because on your total for 9 months, you mentioned 100...
Prashant Seth
executiveThe prior quarter came in at INR 19 crores.
Prateek Kumar
analystINR 19 crores. So paint does give a bit of a lift to reported blended realizations in white cement as well, though it isn't all that material?
Ajay Saraogi
executiveOkay.
Prashant Seth
executiveYes.
Prateek Kumar
analystOkay, and sir, regarding — this is the final question. About freight, you mentioned there’s some rise in lead distance since you’re essentially developing new markets. So that figure of 1,290, is it expected to more or less hold steady, or is there something one-off, especially in this quarter?
Ajay Saraogi
executiveI'd say on a quarter-over-quarter basis it ought to hold steady, because first, the railways surcharge will stay the same, more or less, so there won't be any effect from that. As for lead distance, I don't think there should be much of an increase there either. So my view is that quarter-over-quarter, it should be roughly flat.
Prateek Kumar
analystIt would stay elevated. In the prior year, we were at 1,220 on an annualized basis. Looking ahead, it will likely hold near 1,300.
Ajay Saraogi
executiveThat's exactly what I'm saying — just like this quarter.
Operator
operatorWe’ll take our next question from Ritesh Shah at Investec.
Ritesh Shah
analystI have a couple of questions. First, sir, regarding the cement clinker ratio — how should we think about it from now through FY '26, given the capacity? I believe you mentioned a figure of 66% for the quarter.
Ajay Saraogi
executiveYeah, so anything in the range of 0.62 to 0.64 is what we could see.
Ritesh Shah
analystAll right. And sir, what’s behind our confidence on this? Are tie-ups or flash-lag already in place? Or is it that the deals are already close, and that’s what gives us this confidence?
Ajay Saraogi
executiveRight, right. So look, that already locks in arrangements for every one of the grinding sites that exist today, and those will also take in the brownfield expansions at Hamirpur and Prayagraj. So the only remaining piece is the long-term tie-up that's still being negotiated, and that one needs to be completed once the site for the Bihar unit is settled.
Ritesh Shah
analystAll right, that’s useful. Sir, are we considering LC3? Several companies have said they’re prepared for commercialization. Do you have any views on calcined clay as a product?
Ajay Saraogi
executiveYes, yes. So we’ve also — actually, we’ve already completed a trial production run. And we are certainly examining how that could become a commercial option, so we’re already working on it.
Ritesh Shah
analystSir, do you have any timelines?
Ajay Saraogi
executiveNo, the timeline — look, one, you could do it again, but we had to wait and see, unless a proper commercial model is in place. So that needs to be looked at on the demand-supply side, and the time lines will hinge on that.
Ritesh Shah
analystAlright. But suppose the product were available to us — just speaking hypothetically...
Ajay Saraogi
executiveYeah, the product is pretty much ready on our end. The testing has been completed.
Ritesh Shah
analystThat's useful. And sir, one final question: is there a particular reason for choosing Bihar? Why not some other state?
Ajay Saraogi
executiveThat's organic growth. Once we move from the East, that becomes a natural market for us. From Panna, we have no other alternatives to turn to. That's the natural growth market area.
Operator
operatorLadies and gentlemen, because of time constraints, this will be the final question for today, and it comes from Sonal Bansal of Eureka Stock and Sharebroking Services Limited.
Analyst
analystCongrats, sir, on the fab results.
Ajay Saraogi
executiveI appreciate that.
Analyst
analystI'd like to get your view on how pricing will move in the North and Central region over the next 2 quarters.
Ajay Saraogi
executiveSo we do expect some price increase to happen this quarter. If it does happen this quarter, that would be good. If not, the first quarter could be tough, given the elections and other factors.
Operator
operatorSince that was the final question, I'll now pass the conference over to Mr. Vaibhav Agarwal for his closing remarks. Over to you, sir.
Vaibhav Agarwal
analystYes. On behalf of PhillipCapital India Private Limited, I want to express thanks to J.K. Cement's management for this call, and many thanks as well to everyone participating. Thank you very much, sir. You can go ahead and wrap up the call now. Thank you.
Ajay Saraogi
executiveThanks, everybody, for being here. Appreciate it. And should anything else come up, well, you’re welcome to reach out to us directly.
Operator
operatorMuch appreciated, sir. Thanks to the management team as well. Everyone, that brings this call to a close on behalf of PhillipCapital India Private Limited. We're grateful you could be with us, and you're free to hang up your lines at this point. Thank you.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete J.K. Cement Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to J.K. Cement Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in J.K. Cement Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.