We appreciate everyone holding. I'm the conference operator, and I'd like to welcome you to K92 Mining's Second Quarter Financial Results Conference Call and Webcast. Just a reminder that everyone joining is in listen-only mode and that this conference is being recorded. Following the presentation, you'll have a chance to ask questions. <<operator_script>> At this point I'll hand the conference over to David Medilek, Vice President, Business Development and Investor Relations. Please go ahead.

David Medilek

executive
#2

Thanks, operator, and I appreciate all of you joining K92 Mining's conference call for the second quarter of 2022. We hope things are going well for you and your families. Joining me on the line are John Lewins, our Chief Executive Officer and Director, along with Justin Blanchet, our Chief Financial Officer. I'd also like to remind everyone that a Q&A session will follow management's remarks. Since forward-looking statements will be made during this call, please see the cautionary notes and risk disclosure in our MD&A as well as slide 2 of the webcast presentation. Also, please keep in mind that unless otherwise noted, every dollar figure mentioned on this conference call is in United States dollars. With that, I'll hand things over to John for an overview.

John Lewins

executive
#3

Thanks, David, and hello everyone. We moved ahead again in the second quarter, hitting several records — a record cash balance, record mine production, and record mill throughput — while also posting solid all-in sustaining costs and cash costs. It was the first quarter in which our throughput came in well above the Stage 2 run rate: we averaged 1,196 tonnes per day versus the Stage 2 run rate of 1,100 tonnes per day. After the quarter closed, in July, the process plant set several new daily throughput records that were considerably higher than the Stage 2A expansion run rate of 1,370 tonnes per day. Importantly, we hit those record throughput levels without having installed the new flotation cells, which will double our refer capacity and were only scheduled for the fourth quarter. That really underscores the upside potential beyond even our Stage 2A design. Finally, we keep making substantial progress on organic growth through exploration, delivering a 10.8 million ounce gold equivalent inferred resource at Blue Lake at a discovery cost of under $1 an ounce. We had high-grade drill results at Kora and Judd, and I'm pleased to say there are now four surface diamond rigs running at Kora site and Judd site, with the fifth on the way.

John Lewins

executive
#4

On top of that, we've got six diamond rigs running underground. So exploration has us genuinely excited, and we think this is just the tip of the iceberg — both when it comes to the high-grade vein systems and with regard to the porphyry targets. Turning to safety, we had one lost time injury in the quarter. We're still proud to hold one of the best safety records anywhere in the Australasian region. Occupational health and safety is a strong focus for us, and so is continually improving our safety systems. On ESG, I'm happy to say we've recently wrapped up several community projects, among them refurbishment of the Kainantu police station and refurbishment of the Kainantu high school library. Other efforts — upgrading community roads, various agricultural projects, training and education initiatives — are still ongoing. During my trip to Papua New Guinea last month, K92 was recognized for our industrial training program. Among mining companies in PNG, K92 gives practical work experience to the largest number of mining engineering, metallurgy and geology university students, developing that workforce skill domestically is a major focus, and we point out that our workforce has one of the lowest percentages of expatriates of any mine in the country.

John Lewins

executive
#5

This initiative is just one among a wide range of community and social efforts, and I'd invite everyone to check out our sustainability report for further details. We expect to release our 2021 sustainability report very soon, and we take a lot of pride in the positive difference K92 has made in Papa New Guinea. Another major priority for K92 is greenhouse gas emissions and climate change, and I'm delighted to share that our 2021 greenhouse gas emissions inventory and TCFD gap analysis are now finished. Those findings, together with our greenhouse gas emissions forecast that is currently in progress, will serve as an important tool for K92's mission targeting and goal setting as we move forward. The 2021 greenhouse gas emissions inventory was carried out by WSP consultants and demonstrates that K92 achieves low carbon production with an emission intensity roughly 60% under the global gold sector average. The results further point to a near-term chance to dramatically cut our emissions, as illustrated in the emissions build-up pie chart presented here. Upgrading the grid for our direct power distribution from Yonki Dam along with enhancements to our distribution liability could potentially lower combined stope to location-based emissions by nearly two-thirds. And I'm happy to say we are collaborating with PNG Power on this upgrade, which is in fact already in progress.

John Lewins

executive
#6

We anticipate this will have a significantly beneficial effect on lowering the intensity of our emissions. And crucially, it is not far off in terms of timing. The opportunity to achieve this exists within the coming 12 to 24 months. Turning to how we performed operationally. Over the quarter, output totaled 26,085 ounces of gold equivalent, and 108,853 tonnes were processed at a grade of 8.2 grams per tonne. Measured against Q2 2021 mill throughput, throughput at our mill rose 44%, while production climbed 59%, respectively. One thing that remains a big plus is how well the mill is running. As mentioned, average mill throughput during the second quarter came to 1,196 tonnes per day, 9% higher than the Stage 2 run rate. During June, the plant set a record monthly average of 1,251 tonnes per day. Also in June, after our new TC-1000 crusher was installed, several daily records were set, among them 1,638 tonnes processed on July 6, 1,642 on the 14 and 1,609 on 12. As I noted earlier, what makes this even more impressive is the fact that the extra rougher flotation cells have not been installed yet, and those are a key component of the Stage 2A expansion. Regarding our key operational quarterly physicals, K92 posted record mill throughput and record mine material.

John Lewins

executive
#7

Development rose sharply as well—up 19% versus the prior quarter—and that marked the second-best quarterly rate of development advance we have recorded to date. COVID-19 definitely had an effect on development, and it stays a key near-term priority as we grow the mine and gain more flexibility in near-term operational stope sequencing. I'm happy to say that June saw development advance reach near-record levels. And since the new jumbo and loader have just arrived in country, we clearly expect that to keep going. We also have plans in motion to bring in additional equipment during the months ahead. Regarding 2022, I believe it's worth reminding investors that our guidance assumes a stronger second half than first half, mainly because of higher throughput rates and also because of higher grade—stope grades coming from stope sequencing. That leaves us now well placed to hit our production guidance of 115,000 to 140,000 ounces gold equivalent. I'll now hand the call to our Chief Financial Officer, Justin Blanchet, who will cover our financial results for the third quarter.

Justin Blanchet

executive
#8

Thanks, John, and good morning, everyone. For the second quarter, revenue came in at $37.4 million, which was up 5% versus the prior year. Our gold sales totaled 23,674 ounces at an average realized selling price of $1,783 per ounce, versus 18,939 ounces at an average realized selling price of $1,754 per ounce a year earlier. At June 30, 2022, gold in inventory — both concentrate and doré — stood at 3,012 ounces, which is 1,836 ounces lower than at March 31st because of the timing of sales. Cost of sales was $23.2 million versus $20.9 million in the prior year, or $18.5 million versus $15 million once non-cash items are excluded. The rise in cost of sales reflects more tonnes mined and processed in 2022 as well as inflationary pressure from the COVID-19 pandemic and the war in Ukraine. With the Stage 2 expansion ramping up successfully, the company has been able to realize improved economies of scale and reduced unit costs, as mining activity grew from 72,000 tonnes in Q2 of the prior year to 114,471 tonnes in Q2 2022. Cash flow from operating activities before changes in capital was $10.5 million in Q2 2022, compared with $15.2 million in the prior year.

Justin Blanchet

executive
#9

By the end of June 30th, 2022, our cash and cash equivalents stood at $81.7 million. During that quarter, we spent $10.7 million on expansion capital, and our working capital balance reached $94 million — the strongest we've had to date. After the quarter closed, the company finished a bought deal financing that brought in gross proceeds of CAD50 million. There is no debt on the balance sheet. As John mentioned, in the second quarter the Kainantu gold operations turned out 22,934 ounces of gold, 1,229,961 pounds of copper, and 25,224 ounces of silver — or 26,085 ounces gold equivalent. Our sales came to 23,674 ounces of gold, 1,349,816 pounds of copper, and 27,033 ounces of silver. Cash cost came in at $617, and all-in sustaining cost was $893 per ounce of gold, both well under the realized gold selling price of $1,783 per ounce. Compared with the prior year, cash costs fell from $736 per ounce. That drop was mainly thanks to the successful ramp-up of the 400,000 expansion, which let the company achieve better economies of scale along with a 25% rise in gold ounces sold. It's worth noting that once the Stage 2 plant expansion was commissioned in late third quarter 2021, we've observed a meaningful compression in our total unit cost per tonne processed.

Justin Blanchet

executive
#10

As operations ramp up, we keep seeing cost pressure easing through economies of scale. At this point I'll hand the call back to John, who will carry on with the remainder of the presentation.

John Lewins

executive
#11

Thank you, Justin. Now, turning to the exploration and growth portion of today's call, we'll start with the Kainantu production growth strategy. The Stage 2 expansion, taking capacity to 400,000 tonnes per annum, was completed in the late third quarter of 2021. Throughput rates in the second quarter have now clearly surpassed that level, and our Stage 2A expansion is well underway at present, lifting throughput by a further 25% to 500,000 tonnes per annum. We're also moving ahead with the Stage 3A expansion, which raises throughput to 1.2 million tonnes per annum by building a stand-alone new processing plant. The feasibility study also involves examining a PEA case in which, once the new 1.2 million tonnes per annum plant has been commissioned, we would bring the existing 2A plant back online and ramp production up to fill both plants. That study is well advanced, and we intend to announce the results over the coming weeks. Regarding Stage 2A, the capital cost, as I believe you recall, is low at $2.5 million, mainly for ancillary equipment for the processed plant. As for the underground mining rate, the increases come from accelerating the timing of some of the Stage 2A sustaining capital. At the plant, the filter press is operational, an additional TC-1000 has been installed and commissioned, and float tanks are slated for installation in the fourth quarter, with commissioning also in that fourth quarter.

John Lewins

executive
#12

Even so, given how well the plant has performed up to now, we can still raise mine and processing throughput rates before those float tanks arrive. And that has clearly been shown by what you've witnessed over the past couple of months. For Stage 2A, we anticipate a substantial increase in our free cash flow generation, which will clearly further bolster our capacity to self-fund our growth. Also in the second quarter, during April, we obtained our Doré Export license from the Bank of Papua New Guinea. The first Gold Doré sales took place in the quarter. Now that this export license has been granted, our gravity circuit will be ramped up, and we expect to see better overall payabilities and recoveries. So while I was on site in July, I inspected the new TC-1000 crusher, which had recently been installed and was being commissioned. Now the crusher had originally been intended to run in parallel with the existing TC-1000 crusher. However, because of the improved performance we've seen from the crusher over the last few months, we've actually installed it as a tertiary crusher that can also serve as a backup secondary crusher. Now the benefit of installing it as a tertiary crusher is that it means we can deliver a final product to the mill, and that has the potential to push overall plant throughput even higher.

John Lewins

executive
#13

Also, while we were at the site, we got to watch the underground tele remote system operating. That’s among the many instances of sophisticated technology we are putting money into at the K92 Gold mine. As the video shows, it is an advanced setup featuring LiDAR and drive mapping. Additional instances at the site involve the jumbos equipped with Auto drill, and we are currently working on installing our underground WiFi system, which will allow detailed real-time tracking of our mobile plant and personnel. At the twin incline, the farther incline had progressed 1.4 kilometers as of the end of July, and the development crew’s performance has been very strong throughout 2022, with twin incline advance running roughly 38% over budget. You might remember that the twin incline was built oversized, able to handle as much as and possibly more than 5 million tonnes per annum with conveyors, letting the infrastructure accommodate expansions far past Stage 3. Regarding exploration in the quarter, drilling was ongoing at Kora, Kora site, Judd and Judd site. During June, we reported high-grade underground drill results at Kora and Judd. At Kora, 54 holes were reported, with highlights such as 5.9 meters true thickness at 23.18 gram per tonne gold equivalent and 2.64 meters at 37.38 gram per tonne gold equivalent.

John Lewins

executive
#14

Judd is also turning in some solid numbers this quarter — 62 holes, among them 8.8 meters of true thickness grading 61.17, and 5.17 meters true thickness at 18.83 grams per tonne gold equivalent. Turning to Kora, the Kora site vein system, and this long section: we have three key exploration areas. Area one is drilling Kora site from surface. As the long section shows, previous drilling has been absolutely — you know — along roughly a kilometer of strike length; just one hole was reported today, and K92 drilled it in Q1. That hole recorded what may be the more significant exploration result since the discovery hallway back in 2017. The second area involves drilling Kora site from underground, which we expect to deliver information synergies with that surface program, letting us extend the resource at depth. Area three: in the second half of the year, we intend to drill what we call Kora Deeps plus the Northern strike extension of Kora from the twin incline; drilling of Kora's northern extension below Irumafimpa recently got underway on the twin incline. At Judd, the Judd site vein system exploration program really follows a similar plan, with the difference that exploration along the vein system trails Kora by about 3 years.

John Lewins

executive
#15

If you remember, high-grade at Judd was only found by us in Q4 2020, while Kora North was clearly May 2017. Surface drilling at the Judd site is now underway, and drilling at the Judd site from underground has also started recently, with a large share of our underground rigs focused on drilling the Judd Vein system. So again, on site in July, I visited our more southern underground drill rig — the rig that was initially drilling the Judd site but is also targeting the Kora site. As you may recall, our development underground sits between the Judd and Kora vein systems. So we're drilling off to the left here, which means that will be drilling into Judd. With the rig change and drilling to the right, that would then be drilling Kora. Once our initial drilling program here is finished, that rig will be pulled out, and we're going to develop this another 100 to 150 meters to the side, and again we'll begin more of our drilling of the Kora site from underground. I'm also pleased to report that our fourth surface drill rig is operating at the Kora site and the Judd site, as shown on the image to the layer. All drill rigs are delivering strong drill meters, and plans are underway to bring in a fifth rig.

John Lewins

executive
#16

So last week we shared news of a significant milestone. At Maiden Blue Lake, the inferred resource stands at 10.8 million ounces gold equivalent, which equals £4.7 billion copper equivalent. This resource is sizable, since a high-grade core remains open at depth, and it ranks as the fifth largest non-porphyry in Papua New Guinea. It was outlined using under 17 kilometers of drilling and at a cost below $1 per ounce gold equivalent. Now on the long section, you can observe that the resource contains a defined high-grade potassic core, with grade rising as you go deeper. The porphyry environment looks relatively well-preserved, with limited erosion and few signs of faulting, which you can see reflected in a fairly high degree of symmetry across the section. The porphyry is open at depth, and we think there is strong expansion potential via step-out drilling. Through our exploration at Blue Lake, we have gained a tremendous amount of knowledge and intend to apply it to other targets in that prospective Porphyry belt. You may remember that in late 2021 we flew the mobile MT advanced geophysics, and this confirmed several of the non-porphyry targets while also highlighting the potential for additional targets. And we note that in Papua New Guinea porphyry systems tend to cluster, and there are five targets to find near Blue Lake.

John Lewins

executive
#17

The work now clearly indicates that A1 ranks as our top porphyry target. It shows a very strong connectivity response and sits in a highly prospective geological setting as well. Basically, it is thought to be the primary resource for the high-grade Kora, Judd, Maniape, and Arakompa deposits. In addition, field mapping shows that Blue Lake, A1, and <<inaudible>> lie within the same large litho-cap, which points to the potential for further porphyries between them. We intend to start a comprehensive SAR program imminently, to be followed by a detailed drill program at A1. So with that, operator, we would like to begin the Q&A session. Thank you.

Ovais Habib

analyst
#18

Thanks, operator. Hi, John, and hello to the K92 team. John, it's really good to see mining rates rising consistently. So, on that point, according to guidance, output during the second half should be stronger, and with the 2022 year-to-date all-in sustaining cost sitting at roughly $838 per ounce, the guidance we've reaffirmed suggests an ASIC of about $942 an ounce for the second half in order to hit the low end of our guidance. So, John, are you simply taking a conservative stance when it comes to the cost guidance, or is there some kind of catch-up plan for the second half?

John Lewins

executive
#19

Alright, thanks, Ovais. Yeah, honestly, the one place where our performance has fallen short of our own expectations is development. As you're aware, we're aiming to grow into the two-way, and from there it moves straight into what we refer to as Stage 3. So the intention is definitely that development activity will rise considerably, and that won't necessarily show up in cash costs — it will show up in your all-in sustaining cost.

Ovais Habib

analyst
#20

Alright, that sounds good. And just shifting a bit to the elections at P&G — maybe you could give us some color on when you expect the mining lease renewal to happen as well?

John Lewins

executive
#21

Alright, regarding the election, the incumbent government led by Marape was essentially returned to power. So Prime Minister Marape's party, clearly, secured the largest number of seats in that election. As is always the case, there wasn't any single party that dominated. The new government remains a coalition — one that is led by PM James Marape's party. Also, as we typically observe in PNG, there was a substantial rate of turnover among NPs — not quite 50%, which is the usual figure, somewhat below the norm, but still a meaningful turnover of MPs. And that takes in our local member along with the mining minister. So certainly, quite a few changes have taken place. The new government's ministries haven't been announced as yet. We anticipate they'll be revealed over the coming weeks. I'm actually traveling into PNG this week, and that will involve four meetings with the local MP, the Governor of the state — pardon me, the province, Eastern Highlands province, as well as with the new ministers once they're appointed. And then, as the chamber, we have a day where the chamber of mining and oil and gas — we go in and provide a briefing in parliament to the new parliament regarding the industry and what we're doing, et cetera, et cetera.

John Lewins

executive
#22

That's going to take place next week. So I think it will be back to business, obviously, for the government, and certainly the client—oil and gas and mining are their key industries and truly the engine behind the economy's recovery after COVID. As for renewing our ML, we submitted the application to get that renewal done early. It isn't actually due until October 24. But we're hoping to have it renewed by the end of this year. And certainly, our expectation right now is that we should secure the renewal by year-end. I met with the MD of the MRA a couple of weeks ago, when I was in country. He certainly indicated that, from that standpoint, they're moving our renewal forward, and that this was a realistic expectation.

Ovais Habib

analyst
#23

Thanks. That's really helpful context, John. Appreciate it.

Operator

operator
#24

Moving on, we have a question from Don DeMarco at National Bank Financial. Go right ahead.

Don DeMarco

analyst
#25

Thanks, operator, and good morning to John and the team. So looking at year-to-date, H1, I can see you've delivered 42% of the midpoint of production guidance, and you've reiterated that guidance, which is great. Yes, the guidance range is somewhat — somewhat wide, at 115,000 to 140,000 ounces gold equivalent. Could you give us some indication of where you might expect to land within that broad range?

John Lewins

executive
#26

All right. Yes, thank you for that, Don. Look, the reason it was intentionally broad is essentially due to every uncertainty we faced entering the year, including all the effects of COVID we've observed, and a good number of those are still with us, as you'd be quite aware from other companies, and that covers supply chain problems — we've kept raising our on-site inventory month after month. Partly that's clearly because we're — we're considering our production expansion. But it's also because we're attempting to cushion against supply chain difficulties. And those can have an effect. And one area we've also highlighted concerns our mobile plant, where we've gotten extra mobile plant in <<inaudible>>. But every one of those arrived months later than — than the supplier had initially promised. And so all of that has affected our ramp-up, particularly in the development area. And that, in turn, has also meant we haven't enjoyed as much flexibility as we'd like, for example, with some of our store scheduling. So — these things can affect you not necessarily by lowering perhaps the tonnes you treat, and we're actually running slightly ahead of the tonnes we're going to treat, but certainly regarding where you can mine and so forth.

John Lewins

executive
#27

That mix of factors is really why we gave guidance that's fairly broad. I'd definitely say reaching the upper end of that range will be a challenge. So we'd certainly expect that landing in the middle is more probable for us than coming in above it.

Don DeMarco

analyst
#28

All right, that's excellent.

John Lewins

executive
#29

Which, I realize, is ours.

Don DeMarco

analyst
#30

Right, right. That’s — okay. Well, that’s good. I mean, it sounds like, directionally, it’s going to be higher than what you delivered in H1. In Q2, we saw grades just over 7 grams per tonne. You hit a lower grade sequence at the end of the year. Encouraging to see,you’ve got higher grade stopes in the back half, what does this mean? I mean, does it mean going back to 9 or 10 grams per tonne and we’ve seen that before in previous quarters?

John Lewins

executive
#31

Of course, according to the mine schedule we should be transitioning into grades that are higher than what we saw during the first half of the year. That is definitely what we expect.

Don DeMarco

analyst
#32

All right, all right. We can stop there. And then one last question. When we look at Blue Lake, you have just 26 holes in it, but you already have close to 11 million ounces — how many rigs are operating there? And at this stage, are you going after the high-grade potassic core? Are you drilling beneath the lithocaps, since it looks like there are quite a few targets? And with the maiden inferred resource, are you raising how much priority you give this target?

John Lewins

executive
#33

Right now, we don't have any rigs drilling at Blue Lake. We completed the program, and after that we carried out the modeling exercise — you've seen the result of that, which used an independent consultant. As things stand today, we have four rigs on surface. Every one of those four rigs is drilling in Kora and Judd South, the first 500 meters of strike length extending from the mining lease. And they are definitely planned to stay in that area for the rest of the year. One thing I'd highlight, though: that area may also take in some drilling at A1. So, as you'll have seen from the release we issued, effectively — the modeling indicates that Blue Lake, A1 and a number of the other porphyries are, in a sense, part of a swap. And certainly part of a lithocap, so it covers a good number of those. Our geological interpretation is that the A1 Porphyry would be our top target, and that is definitely where we plan, at this point, to put our next two holes. We continue to view Blue Lake as having really substantial potential at depth. And it is clearly open at depth, which the model has demonstrated.

John Lewins

executive
#34

We believe A1 could end up being more appealing. It certainly looks like the heat source for Maniape, Arakompa, Kora, and Judd, and although the whole system obviously holds a huge endowment where metal is concerned, we see that as possibly the core, so to speak.

Don DeMarco

analyst
#35

Okay, John, really appreciate the extra detail there. Thanks a lot. Best of luck in the second half. That's everything from my side.

John Lewins

executive
#36

Appreciate that, Don.

Operator

operator
#37

Our following question comes from Kulvir Gill at TD Securities. The line is yours.

Kulvir Gill

analyst
#38

Thanks, operator, and John and Justin. I’ve got a quick question about the feasibility of the NPA you brought up on today’s call. Could you remind me whether those two are being released separately or at the same time?

John Lewins

executive
#39

All right. So the DFS for the 1.2 million tonne per annum project includes within it a scenario in which we aim to grow output roughly two years after we first commission the 1.2 million tonne expansion. So for the 1.2 million tonne plant, we're targeting commissioning — I believe that's the third quarter of 2024 — and after that we intend to keep expanding our underground operations, with the goal of bringing the existing Stage 2a plant back online in 2026. So you have 1.2 million tonnes in 2024, and then you raise it to roughly 1.7 million tonnes in 2026, and all of that sits inside a single report. So everything will come out at the same time.

Kulvir Gill

analyst
#40

Alright, that's everything from my side. Thanks.

John Lewins

executive
#41

Much appreciated, Gill.

Operator

operator
#42

Our next question comes from Andrew Mikitchook at BMO Capital Markets. Go right ahead.

Andrew Mikitchook

analyst
#43

Yes. So I had myself on mute there. John, thanks for taking my question. There have already been all sorts of good questions asked. I just have one quick one to wrap up my thoughts. This Blue Lake resource, obviously, was a bit of a halo large resource, and you already stated that you're looking for the higher grid feeders. Can you give us some sense of what you think what kind of grades or maybe grades linked with tonnages become material or maybe even more simply interesting to you to pursue?

John Lewins

executive
#44

Okay, that's a difficult one. Look, the priority — well, what we've observed at Blue Lake is definitely intriguing enough to chase. And if there were truly nothing else available to us, we'd be going after it, with another drilling program starting soon. The fact is, we think Blue Lake presents — sorry, A1 presents a bigger potential opportunity, I'd say that's the right way to put it. From where we sit, the number of ounces demonstrated at Blue Lake is definitely enough for us when it comes to considering a Porphyry-style development. That said, on grade, in a perfect world, if we were examining something like — something at A1, which sits directly along strike from Kora and Judd, we'd be seeking, I think, roughly a gram plus in terms of gold equivalent grade. It's noteworthy. It's a 1:1 ratio. Wafi-Golpu, if you look at it, also carries a 1:1 ratio. Broadly speaking, porphyries and P&G usually have comparatively high gold. I suppose we're rather bullish on both the coal price and, in particular, the copper price looking ahead. And we'd definitely be eager to see some — to see that kind of ratio persisting in anything we examine.

John Lewins

executive
#45

But naturally, as you're aware, commercial viability is driven by a mix of grade and tonnage. And what we've done—what I think we've demonstrated—is that this is a truly large system, and it has already shown a very substantial endowment of metal. And we genuinely haven't yet drilled into what we'd regard as the heart, so to speak, of that entire system. So in terms of porphyry exploration, as we've said, these are really, really early days. At present we've drilled only 26 holes to date. And a number of those were simply shallow holes, just attempting to grasp the early geology. So it's genuinely early days. I actually think what our exploration team has already outlined is incredibly exciting, particularly when you consider that there have been 30 years of exploration around Kora, the Blue Lake area. Blue Lake was a greenfield discovery made by our own exploration staff, getting out on the ground. So—and yet it sits some three kilometers from the mining lease. So there's still enormous potential to be assessed. It's going to take us many years. So yes, we intend to be the biggest explorer in PNG for the foreseeable future, I think.

Andrew Mikitchook

analyst
#46

That's not really a fair question. Thanks, John.

John Lewins

executive
#47

Appreciate it, Andrew.

Operator

operator
#48

Moving on, we have a question from Chris Thompson of PI Financial. Go right ahead.

Chris Thompson

analyst
#49

Morning, John, and morning to everyone at K92 Mining. I appreciate you taking my questions. Many solid questions have already been raised — but just one quick thing for John: could you comment on how quickly assays are coming back? Any worries on that front? I mean, clearly, you've got a drilling workload on the books that's being planned.

John Lewins

executive
#50

All right, then — every one of our assays has been completed, and there's an on-site lab operated by Intertek. It's a contract lab, so to speak. That facility sits within a credit laboratory, yet it serves K92 exclusively. Next, regarding the expansion work we've carried out at the site over the past 2.5 to three years — something I believe a number of analysts will get a look at in October — that work has covered enlarging the lab, meaning the assay lab, where sample prep, fire assay and so forth are being scaled up. Broadly speaking, when it comes to certain exploration work, turnaround might take a week or two weeks, purely because 10 rigs are running at present. And I'm glad to report that the average meters we're producing each week have been trending upward. So that's, I suppose, our one talent. Still, yes, we've shifted to a double shift. And as I mentioned, the laboratory has been expanded, so that's something allowing us to hold our turnarounds down.

Chris Thompson

analyst
#51

Thanks, John. And so, for the last question, I suppose it relates to COVID. Perhaps you could just say a bit about how COVID stands in the country right now? Are there any worries looking ahead, or is it simply that severity is somewhat declining?

John Lewins

executive
#52

Oh yeah, COVID. Well, at present, in April, we ceased quarantining for nationals who arrive on-site. We had already ceased it for sets, but in April we also ceased it for nationals. And aside from a couple of cases — very limited cases — we've had no COVID on-site. No COVID on-site. And we're still testing when people arrive and all the rest of it, and we're seeing almost nobody presenting with COVID at this point in time. During my last visit to PNG, which was just a couple of weeks back, just prior to August — there's almost no COVID present anywhere in the country. The last serious wave was the original Omicron wave, which came through in February, March, and that significantly impacted part of the — parts of the industry. It did impact us in terms of absenteeism. I mean, it didn't really impact us in terms of COVID on-site, because we were still running quarantining at that point in time. So we were actually able to maintain, I called it free-site. Yeah, in terms of what does that mean going forward? Absolutely, no idea, I think we continue to monitor it. This, what do we call it BA.4, BA.5 hasn't really shown itself in PNG in any significant way whatsoever.

John Lewins

executive
#53

And naturally, with PNG, you don’t really face that kind of winter setting where the suggestion seems to be—certainly we saw it in Australia during winter, when we had an improvement in forwards in Australia. And I think the worry is that you will see it in the northern hemisphere this coming winter. In PNG we don’t truly have a winter as such, so we don’t face that extra kind of challenge. So at present, we’re in a fairly good position when it comes to COVID.

Chris Thompson

analyst
#54

Excellent. Thanks a lot, John, and congratulations — appreciate it.

John Lewins

executive
#55

Appreciate it, Chris.

Operator

operator
#56

That brings us to the end of the question-and-answer session. At this point, I'd like to hand the conference back to CEO and Director John Lewins so he can offer any closing remarks.

John Lewins

executive
#57

Thanks for that. Well, I appreciate everyone joining this and for the questions today. In many respects, the second quarter is the one we've felt best about from an operational standpoint. Why is that? Since, considering the physicals we managed to deliver on-site, we've in fact pushed this operation past our Stage 2 expansion. And we're already at the halfway mark toward our Stage 2A expansion, despite not having finished installing the plant required in the process plant. And we don't yet have all the mobile plant we intend to have in place to reach that Stage 2A. So from that angle, this quarter has been a genuinely, genuinely strong one for us. Alongside that, we've managed to ramp up exploration and, by quarter's end, had 10 rigs on site. And we're also turning out record meters when it comes to exploration. Add to that the continuing capital work underway on site — the new workshop at the portal area, with twin incline running more than 30% ahead of budget year-to-date. The expansion, as I noted, at the camp's assay lab is advancing strongly, along with the lifting of the tailings dam.

John Lewins

executive
#58

There's an enormous amount of activity taking place at site. Our workforce is growing. We've managed to bring in genuinely high-caliber individuals, from within the country and from abroad. And the results of that are becoming visible, and we're truly happy with where things stand. Yet we also know there's an awfully long road ahead, with significant expansion on the horizon touching numerous areas. So while we feel a great deal has been accomplished, we equally feel there's a very, very long way still to travel, and that's precisely what makes this so thrilling for us, in operations as well as on the exploration side. And we're eager to once again bring some analysts out to site and let people witness for themselves what has been delivered through the past two exceptionally, exceptionally difficult years. So I want to recognize our operations team and our exploration team for the extraordinary effort they've put in throughout COVID, but this most recent quarter, our operations team and our exploration team — I have to say I'm immensely pleased with their accomplishments, and we are definitely very proud of what those folks have done. Thank you to our team. Thank you to all of you for joining this call, and we look forward to the coming quarter, as they say.

John Lewins

executive
#59

Much appreciated. Goodbye for now.

Operator

operator
#60

That brings us to the end of today’s conference call. You can now hang up your lines. We appreciate your participation, and enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete K92 Mining Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to K92 Mining Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in K92 Mining Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.