Keyera Corp. (KEY) Earnings Call Transcript & Summary

November 10, 2026

Toronto Stock Exchange CA Energy Oil, Gas and Consumable Fuels earnings 51 min

Earnings Call Speaker Segments

Dan Cuthbertson

executive
#1

Thank you, and good morning. With me on today's call are Dean Setoguchi, our President and CEO; Eileen Marikar, Senior Vice President and CFO; Jamie Urquhart, Senior Vice President of the Liquids Business Unit; and Brad Slessor, Senior Vice President of the G&P and NGL Pipelines Business Unit. Dean and Eileen will start us off with some prepared remarks, and after that we'll open the line for questions. I want to remind everyone listening that certain comments and answers we provide today concern future events; these forward-looking statements are made as of today's date and reflect events or outcomes that management currently expects; we will also reference certain non-GAAP financial measures. For more information on non-GAAP measures and forward-looking statements, please see Keyera's public filings, which are available on SEDAR and on our website; with that, I'll hand the call to Dean.

C. Setoguchi

executive
#2

Thanks, Dan, and good morning, everyone. We turned in a strong quarter across our expanded platform, and the acquired Plains assets keep performing better than we had anticipated. We remain on track to hit our near-term synergy targets. And as we bring these businesses together, we're finding further opportunities to create value beyond what we initially expected. On top of that, every one of our major growth projects is still on schedule and tracking at or under budget. That progress strengthens our confidence in the strategy we've been carrying out and in the opportunities that lie ahead of us. We see a generational opportunity for Canada to reinforce its standing as a global energy supplier. Growing need for energy that is secure and dependable, together with tighter coordination between governments and industry, is creating a more favorable environment for investment and expansion. Our strategy has centered on developing the infrastructure and connections that enable Canadian producers to expand and access higher-value markets efficiently; thanks to our larger platform, we are now better placed than ever to back that growth while generating meaningful opportunities for Keyera and its shareholders. Moving on to how our operations performed; we delivered solid results in both fee-based segments. Within Gathering and Processing, strong customer demand drove further growth in the North region, as Wapiti and Simonette both approach full operating capacity. Liquids Infrastructure had another quarter with record realized margin. The main drivers were the first full quarter of contributions from the Plains assets we acquired, plus our extra 50% interest in CAS, and strong throughput across our asset base. Now for the condensate demand outlook: planned pipeline projects should support more oil sands production growth, and that will increase demand for condensate. We're positioning the business to support that growth, including a capital-efficient debottleneck of our Fort Saskatchewan condensate system that will add roughly 15% capacity. That extra capacity should enter service early next year. Moving to AEF: reliability at AEF has been below what we expected. The heat exchanger that was repaired has deteriorated more quickly than expected, so we now anticipate an interim outage of roughly 4 weeks in early January to finish the repairs. The permanent replacement equipment is scheduled to be installed in May 2027, and we expect to be back at full production by the close of that month. We have completed a thorough review of the facility and are modifying how we operate and maintain it. Restoring sustained, reliable performance is our top priority, and we are determined to get this right; we remain confident in the strong underlying fundamentals of our iso-octane business and its long-term contribution to Keyera. Going forward, the opportunities across our expanded platform encourage us. Demand from customers is still robust. Our attention is on carrying out the strategy and meeting the growth targets we've committed to. I'll now hand things to Eileen, who will review the financial results and outlook.

Eileen Marikar

executive
#3

Thanks, Dean, and good morning, everyone. If we set aside transaction and integration costs tied to the Plains acquisition, adjusted EBITDA came in at $466 million, and DCF was $247 million, or $0.84 per share. For the quarter, we reported a net loss of $68 million. Our fee-based segments turned in another quarter of strong financial performance. Gathering and Processing realized margin was $125 million; in Liquids Infrastructure, we posted record realized margin of $272 million, which reflects the strong performance of our legacy asset base along with full quarter contributions from the Plains and KAPS acquisitions. Moving to the Marketing segment. Marketing realized margin for the quarter was $95 million. Performance was affected by the previously announced interruption involving Enbridge's Line 5 system, along with reduced utilization at AEF in the quarter. Those negative effects were partially offset by improved iso-octane pricing and butane sales. Turning to our financial position: we ended the quarter with net debt to adjusted EBITDA at approximately 3.6x. While leverage remains above our long-term target range, we continue to prioritize deleveraging and anticipate returning to that range in 2028. This morning, we revised our 2026 guidance. We are increasing our 2026 marketing realized margin guidance range to $400 million to $430 million. Our updated forecast is driven by better-than-expected margin contributions from iso-octane and butane, plus roughly $50 million in added benefits stemming from revaluation of inventory and related hedges tied to the Plains acquisition. Our growth capital guidance has not changed. We now expect maintenance capital expenditures to rise by $20 million, putting the range at $260 million to $280 million. Cash taxes should land somewhere between $55 million and $75 million. Moving to our 2027 guidance, we remain on track to hit our targeted fee-based adjusted EBITDA per share CAGR of 16% to 18% from 2025 through 2027, and 7% to 8% between 2027 and 2029. As is our practice, guidance on realized margins for the Marketing segment will come in May, when we release first quarter financial results. We expect growth capital to fall in the range of $630 million to $670 million, made up mainly of projects already in progress. Maintenance capital expenditures should land between $250 million and $280 million, and that includes roughly $20 million for planned equipment replacement and related work at AES, plus $20 million for one-time IT integration projects across the facilities we acquired. Cash taxes are projected at $130 million to $150 million; with that, I'll hand things back to Dean for his closing remarks.

C. Setoguchi

executive
#4

Thanks, Eileen. Keyera is carrying out a clear plan to reinforce and lengthen the integrated value chain we've built, while also making sure the business is positioned to gain from what we believe will be a once-in-a-generation opportunity within the Canadian energy sector. Looking forward, we stay focused on disciplined integration, dependable operations, progress on our growth projects, and creating long-term value for both our customers and our shareholders. On behalf of the Board and the management team, I'd like to express our appreciation to our employees, customers, shareholders, indigenous rights holders, and other stakeholders for their ongoing support. With that, we'll open up the line for questions. Operator, please go ahead.

Robert Hope

analyst
#5

So regarding AEF, could you give a bit more incremental detail on what you expect to accomplish during the January outage, how you'll operate the facility between now and May, and also, is there any flexibility to collaborate with suppliers to speed up equipment availability so that the May outage might potentially be moved up?

C. Setoguchi

executive
#6

Rob, those are all very good questions. I'm going to hand it over to Jamie, who can give you more color on AEF.

K. Urquhart

executive
#7

Yes, Rob, and thanks for asking. What we're planning for January is actually very much along the lines of what we did back when the first failure happened in January of 2026, to be candid. We have a pretty solid understanding of what the main cause of that failure was that took place in January. When we completed the repair that ended up bringing us back up around late May of 2026, we knew at the time that this would only serve as a temporary fix. We had taken the design that existed, which was in fact a heat exchanger that had been redesigned and put in during 2022, and that exchanger didn't perform as we had anticipated, and it ultimately led to the failure we saw in January. So in our minds we have a very clear picture of what is going on inside that exchanger. What we'll do, then, is go in and carry out some repairs on the exchanger tubes and ultimately bring that facility — bring that exchanger — back into service. Once that's done, we anticipate getting near to, or possibly reaching, the facility's full capacity. But after that, we're going to encounter the same phenomenon we've observed across the last 4 or 5 months, which is a gradual decline in how effective it is. Then we'll address the issue once and for all using the permanent exchanger, which we plan to install in May. On your final question: yes, we've been coordinating with all the various providers involved with that manufacturer. That covers sourcing the materials, the actual manufacturing of components, and then ultimately putting those components together. And then, of course, there's the final step of delivering that equipment to our site. So we're working across 4 separate workstreams. The team recognizes how urgent this is, and we feel confident that May represents the outside date — we're very confident. We'll likely do somewhat better than that, though that would be a matter of weeks better, not months better.

Robert Hope

analyst
#8

All right. That color's helpful. Maybe we can shift focus to the Plains transaction now. In the prepared remarks, you again point out that it's running ahead of expectations. Could you give us a bit more incremental detail on where that outperformance is showing up — qualitative or quantitative — and also what you see as the next wave of opportunities from the Plains assets?

C. Setoguchi

executive
#9

Yes. Thanks for the question, Rob. Let me restate that we're extremely happy with this acquisition. We've clearly issued guidance on our synergy target covering the first 12 months after close, which takes us to May of 2027. That guidance range is $120 million to $140 million. I'll have Brad go into that in more depth. But when I consider the transaction overall, I view it in terms of how much value we see beyond the deal thesis that we brought to our Board and that they approved. There are a few different buckets tied to that. First, the business is broadly performing better than we modeled. Volumes are higher, liquids yields at Empress are higher, and Empress is also higher. So the base business is beating expectations, which is great to see; we've also found opportunities that are more one-time in nature where we've avoided capital. Again, that translates into dollars and savings, which is great for us to see; now that we've spent several months operating these assets — these new assets — we've identified a number of new capital opportunities that are highly capital-efficient, and we'll keep evaluating them and likely invest in them over the coming years. So that's another opportunity where we believe we can add value from this business that, again, wasn't part of our deal thesis and isn't classified as a synergy. The fourth bucket is the synergies. With that, I'll hand it to Brad. Brad is our senior executive overseeing our integration and synergy management team; so Brad, perhaps you can add more color on the synergies.

Bradley Slessor

executive
#10

Yes. Thanks, Dean. And Rob, thanks for asking. As Dean said, by the end of September, we had already achieved $115 million in run rate synergies. That compares against our target of $120 million to $140 million, which we're going to deliver within 12 months; so we clearly feel quite good about what we've achieved up to now. The other point I really want to highlight is this — everything we're doing with the new assets is also making us a better service provider for our customers. It's giving them, with this expanded platform across the country, greater flexibility, better market access and more options for managing through operational disruptions. So we feel quite good about the services we can offer our customers. And beyond that, we keep seeing meaningful opportunities as we integrate our new teammates, get their thoughts, understand what we could work on together, and as we integrate systems and optimize our operations, we keep seeing many opportunities ahead of us that we'll be excited to talk about in the coming quarters.

Aaron MacNeil

analyst
#11

Could you give us a little more detail about the 2027 capital program? I suppose what I'm really asking is whether any of the timing around spending has shifted at all. Is there anything new or different when it comes to scope? And given the projects you have in hand today, what kind of trajectory does capital look like beyond 2027?

C. Setoguchi

executive
#12

Yes, thanks for the question. Broadly speaking, I just want to make sure we get across the message that we're very pleased with how we're executing our capital projects, and they're all moving along on or ahead of schedule, and on budget or below budget. So with that, I'll just hand it over to Eileen, and she can give you more color.

Eileen Marikar

executive
#13

Sure. Thank you, Aaron, and thank you, Deane. Yes, I simply want to restate the same point: our projects — everything that is well underway — remain on schedule and are trending at or below budget. So that pleases us a great deal. A portion of the spending you are seeing in '27 is probably tied to the ACE terminal, where most of the outlay will happen in 2027 rather than 2028. So that may account for the difference there; so as we look ahead, the bulk of our capital spend on these major projects we have announced will be finished by the end of '27. And then, once we move into 2028, that really falls away, and that is what genuinely helps us deleverage the balance sheet, and we begin to capture the EBITDA from all of these projects. So that is how we expect the balance sheet to come back into line.

Aaron MacNeil

analyst
#14

That makes sense. Then perhaps shifting topics somewhat to the condensate system debottlenecking and that 15% additional capacity: how much of that customer demand is already present, or do you expect it to be present by the time the capacity is in place? And how much further could that system be pushed before a more capital-intensive expansion becomes necessary?

C. Setoguchi

executive
#15

Yes, great question. Clearly, we have a very strong condensate system. We deliver a valuable service to oil sands producers; and we're certainly very excited about the potential to add 1 million to 2 million barrels of additional oil egress capacity. So because of that, condensate demand will be much greater. And with even Trans Mountain having come into service over the last several years, we've seen a lot of demand for our services, and that's what has also driven our — helped to drive our record liquids infrastructure margins; but with that, I'll turn it over to Jamie and perhaps you can talk a little bit more about our condensate system.

K. Urquhart

executive
#16

Absolutely, and thanks for asking, Aaron. Regarding the debottleneck we announced yesterday, that project is essentially contracted — the capital investment is a response to contracts we've managed to secure over the last 3 to 6 months. I can also share that we're holding further discussions with the major oil sands players about the next expansion phase on our system. And as Dean says, we're very excited about the part we play in supporting that growth within the basin.

C. Setoguchi

executive
#17

Yes. And one more thing I’d like to highlight: if you look at our condensate system, we actually have additional capacity on the KAPS condensate line, which of course we now own 100% of. Jamie mentioned our system in Edmonton, Fort Saskatchewan, where we also offer condensate storage services. And we hold a 30% interest in the Norldited pipeline, which with Enbridge also has a couple of hundred thousand barrels of capacity; so again, we have the right infrastructure to help support growth for the oil sands players.

Maurice Choy

analyst
#18

Perhaps staying with the contraction theme. As Jamie said, the debottleneck project is basically contracted in a way similar to the capacity that already exists. But if I could pull back a bit and speak about this more philosophically, sanctioning liquids infrastructure projects and locking in customer contracts have usually moved in tandem. And I wonder whether you think that will still hold today given the competitive landscape you're seeing now as well as over the next few years.

C. Setoguchi

executive
#19

I understood the question completely, Jamie.

K. Urquhart

executive
#20

Right, so, Maurice, perhaps you could say a bit more about what you mean when you talk about contracting in lockstep.

Maurice Choy

analyst
#21

Traditionally speaking, I suppose, when you went ahead with a liquids infrastructure project, the contracts would already be locked in on that very day. We could argue somewhat about how quickly those contracts take effect, but at sanction you would have them secured. Would that hold true as you proceed with sanctionings down the road?

K. Urquhart

executive
#22

Yes. So yes, look, I mean, that has always been the way we think about making sure contracts are in place to justify and give us confidence that we will make sound investments yielding the rate of return we want. One great thing about operating an existing system, though, is that you can extend from it in increments that are highly capital efficient and, in the end, timely enough to satisfy customer needs as their growth comes to fruition too.

C. Setoguchi

executive
#23

Yes, and I want to add something to that, Brace — it wouldn't apply only to our liquids infrastructure segment. On the gas gathering and processing side too, that same approach to investment definitely holds. We'll seek out contracts to support the capital we put in.

Maurice Choy

analyst
#24

Got it, and let me wrap up with one question about AEF. Over the past 2 years you've been through several thorough reviews of that facility, and expectations have been reset more than once — covering outages, utilization rates and the margin impact. With all of that in mind, what have you done to build greater confidence that the solution you intend to install in May 2027 will truly fix the problems you're facing today?

C. Setoguchi

executive
#25

That's an excellent question. First off, we're treating this with real seriousness, since reliability sits within our control. I'm confident our team will get it right, and Jamie will address that shortly; but I do want to stress that the iso-octane business — its fundamentals remain very strong, and once we have these heat exchangers fully up and running it will contribute strongly to our business; and we firmly believe in the long-term fundamentals of that business. So with that, I'll hand it over to Jamie.

K. Urquhart

executive
#26

Yes. So Maurice, thank you for that question. And to expand a bit on what I told Rob, which was really focused more on the near term — let's take a step back, as you suggested, and look hard at the lasting solution to the problem we're dealing with now, and also at the steps we've taken that give us confidence the facility will run dependably over the long haul, well past this immediate issue, right? So what I mentioned when I answered Rob is that essentially, at this moment, we're running with a repaired heat exchanger that went in back in 2022, and the redesign we did on it didn't perform as we had anticipated, and that ultimately led to the failure we had in January. So we carried out a root cause analysis and pinpointed precisely what brought about that failure. And the decision we've reached is that we're essentially going to swap it out for a design we had previously installed at the facility, one that had delivered that service very successfully and reliably for more than 25 years. So we're returning to the original design, but we also had to spend time earlier this year working out which design we should go with. That's why we went ahead with repairing the exchanger in place. That was always viewed as a temporary fix. The other thing we've done, though, as you pointed out, particularly over the last 12 months, is really question how we run the facility across the whole site. So following that review, we've moved away from maximizing short-term production and toward operating within very clearly defined reliability parameters, backed by more frequent planned maintenance. And we believe that once those things are combined, we'll be applying those learnings. We're confident that once the permanent exchangers are back in place in May, AEF will operate reliably going forward.

C. Setoguchi

executive
#27

Yes. And Jamie, the maintenance you're referring to — the more frequent maintenance — would basically be a 4-year cycle, with 2-year pit stops, so to speak...

K. Urquhart

executive
#28

Yeah, so previously we were aiming for a 4-year turnaround, which is more typical in other areas of our business, and that reflected how unique AEF is. We're — we're planning to have a significantly shorter outage instead. It won't be a complete turnaround every 2 years. What we're doing with the May outage is essentially pulling forward the work we had proposed for 2028 and doing it in 2027, so that we can then avoid another outage in '28.

Maurice Choy

analyst
#29

So perhaps as a brief follow-up, and this will be my last question. If the new heat exchanger doesn't reach full production until the end of May, how would you plan to give us adequately solid marketing guidance for 2027 at your Q1 results, which come out in early May?

K. Urquhart

executive
#30

I might hand that to Eileen, but what I can stress to you is how confident we are in that equipment's schedule and the fact that this is a design we're highly confident has been implemented; we're very confident in our capacity to operate at full production following that outage. And to address Rob's question, we understand very well what the current heat exchanger will be able to deliver once we complete the repairs we identified in January.

Eileen Marikar

executive
#31

Yes. To expand a bit on what Jamie mentioned, we're quite confident about providing guidance for 2027 in May, since by then the heat exchanger repair will be well underway and our supply season will be finished. And that guidance always rests on certain assumptions. And of course, the key assumption is that AEF will keep operating as we anticipate for the rest of the year.

Robert Catellier

analyst
#32

I'd like to return to the synergies from the Plains acquisition. Where would you say — I mean, it really does sound like things are going well. Where do you think the surprises are coming from? Is it commercial? Or is it on the capital or OpEx side?

C. Setoguchi

executive
#33

Yes. Thanks for the question, Rob. You know, we definitely see plenty of opportunities. And again, we really didn't get a chance to look under the hood until we closed on May 12. And generally, what we've seen is that these assets haven't been — they've been underinvested. And again, that's because Plains is more of a crude oil company and they're based in the United States; so we just see a lot of low-hanging fruit and opportunities based on what we've seen so far; and I think it's also important that we've been prioritizing. So we can't get everything all at once; so Brad has done a good job prioritizing. But Brad, I'll turn it over to you and maybe you can speak to the buckets of what you see.

Bradley Slessor

executive
#34

Yes. Thank you, Dean, and thank you, Robert. Like Dean mentioned, we have actually pinpointed hundreds of chances to boost margin through cost reductions or other actions, and we have ranked and stacked those according to what we can carry out fast and what delivers the biggest impact for us. So we are moving through that list very diligently, checking them off one at a time, which you can see reflected in the $115 million of synergies we have already delivered. And as I said earlier, as that list grows and we keep prioritizing and executing on the opportunities that, honestly, the team we inherited were — most of them they already knew about. They simply weren't in a position to pursue them, as Dean said. And so now we are empowering them to pursue that. And so we stay very confident about hitting the target and going far beyond it.

Robert Catellier

analyst
#35

All right, and then a similar kind of question regarding the capital project side. It appears Zone 4 now sits $40 million below your initial budget, and the ACE terminal is tracking well too. So I'm wondering whether something systemic is at play there. It might simply be that — you had sufficient contingencies and then you end up under that. But is there anything systemic such as productivity, or are you now leveraging procurement given that you have more scale? Have you spotted any trend in how your capital projects are performing?

C. Setoguchi

executive
#36

Rob, that's an excellent question regarding our capital projects; and as an infrastructure company, it matters greatly to show that we can execute on projects very well; and I do want to restate that I'm very pleased with the way our projects have been progressing, both from a cost and a schedule perspective. I'll hand this over to Jamie to give you more color, but I'd say, I mean, we've built a number of larger projects, not all of which went super well. But I think what matters most is that we applied our learnings. We put the foundation in place so that we could execute better and more consistently. And we're seeing the fruits of those efforts now. But with that, Jamie, you can add more color on that.

K. Urquhart

executive
#37

Yes. So thank you, Dean, and thank you for that question, Rob. To build on what Dean mentioned, we definitely gained a great deal of knowledge, particularly across Zones 1 through 3, but we also formed ties and alliances with service providers. And that has truly benefited us as we shaped our approach regarding whom we would engage to secure the work and how we would collaborate. So certainly, in Zone 4, we selected the strongest of the service providers we had partnered with across zones 1 through 3 and gave them the opportunity to take on those projects, and I believe we are now enjoying the rewards of that. Beyond that, we find ourselves in a situation — those projects received sanction at a point when we were able to secure the finest crews from those service providers too. The market is shifting as we move ahead. Activity is picking up in our basin, yet we are confident that through those alliances, we will manage to keep them in place. And ideally, that will set us apart in terms of our capacity to deliver and carry out projects in the future.

Robert Catellier

analyst
#38

All right. That's my final question, and it concerns the Northern region. What factors are limiting you, and what's the timeline for your ability to increase capacity in that area?

Bradley Slessor

executive
#39

Yes. Thank you, Robert. Brad speaking. So regarding the Northern gathering and processing region, we keep observing really strong gas flows through Pipestone Gas Plant, the Wapiti Gas Plant, Simonette, and honestly, throughout the whole business, as we mentioned previously, our approach is always to put in serious effort on contracting before considering expansion of capacity. So throughout that network, we're nearing full capacity. As discussed in earlier quarters, we're examining debottlenecking at both the Wapiti gas plant and the Simonette gas plant. We're working — those projects are progressing really nicely, and we're putting in hard work with customers to get there, and we anticipate being able to share a bit more on that next year. Broadly speaking, though, we keep seeing outstanding wells drilled all around our facilities. We're seeing record wells drilled, and they're arriving with, honestly, somewhat more gas than perhaps we had anticipated. And so that is fueling demand for additional gas processing even while these producers are targeting formations that are very liquids-rich.

C. Setoguchi

executive
#40

Yes, and I want to build on what Brad said, Rob. When you consider how much additional natural gas supply will be needed to serve LNG Canada Phase 2 and possibly other LNG projects, that will call for greater gas gathering and processing capacity. We sit right in the best part of the Montney, where liquids yields are very high, condensate included. So we anticipate considerably more activity in our core area up in the North.

Sam Verbil

analyst
#41

I'd like to hear how confident you are now that Norlight will be expanded within a reasonable timeframe. From what you said in your prepared remarks, it certainly sounds as though demand exists and is on its way; but do any obstacles remain, whether on your balance sheet or in your partners' willingness to move forward on that project?

C. Setoguchi

executive
#42

Sam, excellent question; and what's great about Norlight is that at the time we sanctioned that project together with Enbridge, we actually increased the pipe's size. And Brad, you handled the bridge deal; we upsized to 24-inch, 24-inch pipe. That leaves us with a couple of hundred thousand barrels of capacity still available on the pipe as it stands. So for us and our entire condensate system, that represents a tremendous opportunity. Jamie, is there anything else you'd like to add?

K. Urquhart

executive
#43

Yes. I think the one point I would tack onto what you asked regarding our partner is that we are extremely well aligned with them. And as Dean mentioned, Brad and his crew had the vision to install a bigger-diameter line. That lets us subsequently grow capacity in a capital-efficient manner by adding pump stations at intervals along the route; so — and we have discussed this previously, the timeline required to accomplish that compared with constructing fresh pipeline is highly favorable whenever we are in talks with producers, since it moves in lockstep with the schedule of their plants too. So we are very, very strongly situated on the pipeline, and also with our partner.

Analyst

analyst
#44

Okay. Great. And then perhaps a question about the '26 growth CapEx guidance — same range, but toward the higher end. I noticed you mentioned that all the major projects are trending at or under budget. So does that high end reflect the modest amount of CapEx for the FSCS debottleneck, or any other odds and ends that will hit the budget in '26?

Eileen Marikar

executive
#45

Thanks for the question, Sam. I'd say most of it is — there could be a little capital even tied to some of the new assets, but the bulk of this would be, again, timing of spend; going back to the key message, every one of the projects is going really well, but much of it is simply timing; and so we'll be through most of our major capital spend by the end of next year, and then 2028 really, really comes off.

Ben Pham

analyst
#46

I'd like to revisit AF for 2027. If we set aside that $85 million headwind you've disclosed, how would you describe the marketing setup for 2027? And thinking specifically about some of your remarks regarding possible tailwinds on the frac spread side, you've hedged 75% of propane and the market has been quite strong as well. You also have extra flexibility from the Plains assets, and you've been opportunistically selling butane too.

C. Setoguchi

executive
#47

Ben, thanks for the question. That's a very good question. Perhaps I'll hand it over to Jamie to talk more about our marketing business. Again, I want to reiterate, because I think it's kicking me here, that we won't be providing guidance until May of next year, but maybe Jamie can offer some general color.

K. Urquhart

executive
#48

I believe that served as a reminder for me too, in addition to answering your question, Ben — you covered all the key points, correct? As we've discussed, there are the realities at AEF and the plan we have that we're quite confident about for returning to dependable operations. Yet the underlying fundamentals for our basin, and for our marketing business as well, are extremely strong. So we mentioned iso-octane. — fundamentals A reminder to everyone: iso-octane gets priced off crude and the RBOB crack, and ultimately an octane premium. And so, given that we've seen strong commodity pricing for both crude and RBOB cracks, we've seized the chance to apply, as we have previously, our risk management policy to lock in favorable prices into '27 and are beginning to do that into '28 as well. You brought up propane. We're quite bullish on propane. Brad alluded to this: as we come to understand our Plains assets better and the value proposition of sending propane down to the Eastern markets, we're extremely excited about it; so that's one of the tailwinds we think about from that Plains acquisition; and then similarly, on the butane side, we've been very successful at selling on a spot basis the butane we haven't consumed at AEF at very favorable prices, taking advantage of the current market that really, frankly, is driven off of what's happening internationally. But we also view the Eastern markets for butane as very attractive as well, along with our ability to get those barrels down to the East, whether that's via rail and/or through Line 1, Line 5 that ultimately is available to us to transport mix that ultimately gets cracked in Sarnia. So all the things you asked about in your question are positives for our business. Once again, I'll also reiterate that, based on the pricing we've seen and the forward pricing that's been at above historic levels, we've taken that opportunity to lock in those values for '27.

C. Setoguchi

executive
#49

Yes. And Ben, beyond what Jamie said, I’d like to stress that the combined operation—the Plains assets and business plus Care’s legacy business—is doing very well. So regarding the third quarter results we’ve just posted, keep in mind that we have just been through 3 turnarounds. One took place at Brazeau River. There we converted the facility from sour to sweet, which will make us more competitive on a cost basis. That makes us very happy. But there were also some large turnarounds at KAPS North and at Empress, specifically Empress 6, where we have not only the straddle plant—the large straddle plant—but a fractionator as well; and during that outage, we also had to contend with the Line 5 disruption, which cost our quarter another $35 million. So in spite of all that noise, our business performed very well. And so as we move toward more normal quarters, we are still coping with the AF reliability issues, which we’ve discussed extensively this morning. But we’re beginning to return to something like normal operations. And Brad covered many of our synergies. We will keep adding value from those synergies. Taking all of that together, we are very optimistic about our future in 2027 and beyond.

Ben Pham

analyst
#50

Okay, understood. So it sounds to me like the AF situation is trending below what you were expecting. There are plenty of other levers that could potentially offset part of that. Could you — on the net debt to EBITDA, I understand some of the near-term headwinds affecting leverage, and you still expect 2028 to be the target timeline. Could you discuss the cadence of deleveraging from here? And do you expect this to be the peak of your leverage? And is there some flexibility for additional CapEx that you've initiated for 2027?

Eileen Marikar

executive
#51

Thanks, Ben. Yes, regarding the balance sheet, you're correct that it will truly peak at the end of the year, and we expected that; it was contemplated; we knew our balance sheet would be affected given that we just — we took on the 2 acquisitions; and it will return in line into our range by 2028. There is potential to deleverage more quickly as we see some of the things we just discussed within the marketing business as well as the base business, which, again, is performing extraordinarily well; so that opportunity exists to deleverage faster than that. But really, stepping back, our leverage targets, even though we are a much bigger entity now, we never changed those targets, and they remain conservative; and so we feel it still gives us the flexibility when we see opportunities; and that's the key — as we move through our major projects next year and obviously get through that, we really do bring that balance sheet back in line, and there are so many opportunities to be had given the macro environment that supports it.

Patrick Kenny

analyst
#52

Coming back to the marketing guidance for a moment. I realize you've been pretty busy with hedging on the frac spread; I just want to check whether that range's low end — the $400 million for '26 — would represent, say, a worst-case situation for propane demand this winter, given the El Nino trends we're seeing? And could you also perhaps comment on how you might be protected, or potentially exposed, when it comes to weather and physical propane sales volumes through Q1?

C. Setoguchi

executive
#53

Yes, so perhaps Jamie can address the propane markets, and then Eileen can address our guidance range. Go ahead, Jamie.

K. Urquhart

executive
#54

Yes. So, Patrick, that's a great question. Yes. So, one thing we found when we completed the Plains acquisition is that we gain exposure to a larger market, correct? Having maximum flexibility for our customers and our marketing team around egress is truly a core element of our strategy. And so, regarding how we run our business, particularly with the Plains barrels heading east, we essentially pair them back to back. So, the barrels being produced, which are ultimately accounted for and essentially committed for pickup during the winter. When we consider the barrels in Western Canada, we likewise secure spreads, and in the end, we have such a wide range of choices regarding where those barrels are directed that we feel confident our propane business will do well through the winter.

Eileen Marikar

executive
#55

Regarding the guidance range itself, the one point I'd tack on — especially about the low end — is that we always bake a bit of conservatism into that lower bound. And naturally, it presumes AEF performs according to our plan. Beyond that, we have a lot of confidence in that range.

Patrick Kenny

analyst
#56

All right, great. And then perhaps regarding the rail side of things, there's been a bit of chatter lately about wider heavy dips and pipes filling up, mainly around crude by rail making a return to the market, at least for the time being until some of the bigger egress projects come online. But also, certain oil sands proponents looking to use rail out to the West Coast. I'm just wondering how your rail assets could be positioned to capitalize on both the near-term opportunities and any longer-term projects that may reach the West Coast.

C. Setoguchi

executive
#57

That's an excellent question, Pat. And we do have some truly amazing rail assets with a great deal of flexibility. And rail remains a very effective means of particularly leveraging ARPS, and we're able to accomplish that a lot with our infrastructure; but specifically when it comes to crude, Jim, perhaps just talk to some of that right now.

K. Urquhart

executive
#58

Yes. Great question, Patrick. And actually — just to rewind a bit, our ADT facility used to be ACT, or ADT ACT, standing for Alberta crude terminal; so we do have the capability to help move crude out of ADT. We'll keep referring to it simply as ADT so nobody gets confused; and I can tell you that we recently closed a deal and are, right now, moving crude out of that terminal. I think the second piece of your question is very relevant too: when you consider ACE and how we develop it, and how our existing KJT facility — where we're currently working to add flexibility so we can move both butane and propane out of it — fits in, since we have a very strong rail facility at KFS North and rail facilities across the network, west to east, in Plains' business. We see the opportunity, particularly with ACE, to expand that facility in response to demand for hydrocarbons — hydrocarbons coming out of Western Canada; so rail, as was mentioned earlier, is truly a core element of our strategy; and when we think about it, it certainly is a core element of our strategy, and hopefully we can contract enough to eventually, per cash, step out into a larger opportunity like T.

C. Setoguchi

executive
#59

Yes, and to add to what Jamie said, our terminals — particularly the ACE terminal — that land is really well connected. A lot of pipe runs straight through the 1,300-acre parcel we have there. So if we end up moving products besides propane and butane, the lines are already in place, so hookups would be very short tie-ins.

Dan Cuthbertson

executive
#60

Thanks again, everyone, for being with us today. If anything else comes up, don't hesitate to contact our Investor Relations team. Have a wonderful day, all.

Operator

operator
#61

Thanks. That brings us to the end of today's conference call, everyone. We appreciate all of you for joining. You're free to disconnect at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Keyera Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Keyera Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Keyera Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.