Kinross Gold Corporation (K) Earnings Call Transcript & Summary

October 29, 2026

Toronto Stock Exchange CA Materials Metals and Mining earnings 65 min

Earnings Call Speaker Segments

Operator

operator
#1

Thanks for holding. I'm Carly, and I'll be running today's conference for you. Right now, I'd like to welcome all of you to the Kinross Gold conference call covering third quarter 2026 results. Every line has been muted so that background noise doesn't come through. Once the speakers finish their remarks, we'll open things up for questions and answers. If you'd like to pose a question at that point, just press star and then the number 1 on your phone's keypad. Should you wish to take your question back, press star 1 once more. Thank you. At this point I'll hand things over to David Shaver, Executive Vice President. Please go ahead.

David Shaver

executive
#2

Thanks, and good morning to everyone. Joining us on today’s call are Paul Rollinson, our CEO, and from the Kinross senior leadership team, Andrea Freeborough, Bernard Wessels, Will Dunford, and Geoff Gold. If you’d like a full discussion of the risks and uncertainties that could cause actual results to differ from the estimates included in our forward-looking information, please see page 3 of this presentation, our news release dated October 28th, 2026, the MD&A covering the period ended September 30th, 2026, and our most recently filed AIF — all of which can be found on our website. I’ll now hand the call over to Paul.

Paul Rollinson

executive
#3

Thank you, David, and I appreciate everyone being here today. This morning I'll go over the results for our third quarter, share some high-level updates from throughout our portfolio, talk about what we've achieved on sustainability, and reaffirm our outlook. After that, I'll turn things over to the team so they can give you more detail. Before we get into the quarter, though, and consistent with what comes first for us, I want to speak to a matter of real importance concerning safety. It is with deep sadness that we acknowledge the tragic deaths of two employees of business partners at our Bald Mountain operations in Nevada. Our sincere condolences go out to their families, friends, and colleagues. Nothing matters more to us than the safety of every person at our sites, and we are determined to learn from these incidents and to strengthen our safety controls throughout our operations. Now to our results. After a strong H1, our portfolio met the updated commitments we set for the third quarter. Tasiast and Paracatu, our two top-tier, low-cost assets, both made major contributions and combined represented over half of our output at appealing operating costs. La Coipa and Round Mountain, the two smaller assets behind the near-term guidance update, came in according to our revised expectations.

Paul Rollinson

executive
#4

On the cost side, we're still keeping total operating costs in check and posted robust operating margins. That all fed through to more than $1.8 billion in free cash flow across the first nine months, and we closed the quarter in a position of considerable financial strength, with $2.6 billion in cash. That let us lift shareholder returns from 40% to 50% of our free cash flow, and year-to-date we've now given back more than $950 million to shareholders. I'm happy to say that across the last six quarters, we've bought back roughly 5% of our outstanding shares. Now to our growth projects. Our pipeline is moving forward, with solid progress continuing across our mine-life extensions and growth opportunities. In the US, the team keeps pushing ahead on our three high-quality projects: Phase X, Red Bird, and Curlew. At Great Bear, the advanced exploration work and the main project are both coming along well. On AEX, we're continuing to make good headway on the north and south exploration declines, with a combined total of more than 500 meters of underground development completed to date. As for the main project, detailed engineering and permitting are both progressing nicely, and we remain on track for first production in late 2029.

Paul Rollinson

executive
#5

On permitting, we keep collaborating closely with the authorities and have made substantial progress through the federal and provincial permitting processes. At the same time, we're actively engaging local communities and Indigenous partners via regular community meetings, continuous collaboration, and transparent communication, and Geoff will speak to that later. Shifting to growth in Chile: during the last quarter we gave an updated view of Lobo-Marte, emphasizing its strong production profile, low cost structure, and attractive economics. In Q3, we keep advancing permitting, detailed engineering, and execution planning toward targeted first production in the early 2030s. Now a few remarks on sustainability. In Q3, we continued making a meaningful impact across our regions. Three highlights: our work with Trout Unlimited on the Cripple Creek Restoration Project in Alaska, which focused on restoring waterways and fish habitat impacted by non-Kinross historic mining; our support for recovery efforts following the Tok wildfire in Alaska, including emergency assistance for families whose homes were rendered uninhabitable; and in Chile, we were proud to receive the Mining Foundation of Chile's award for commitment to territories and education, recognizing our support for education, training, and opportunities in the Atacama region. Now turning to our outlook.

Paul Rollinson

executive
#6

Our wider portfolio is still delivering strong results. Things have settled down at La Coipa and Round Mountain, and we are squarely on course to hit the revised production guidance of 1.84 to 1.86 million ounces. Going forward, our attention stays on these priorities: running operations safely, managing costs through productivity efforts, executing our grade enhancement strategy, preserving our solid financial standing, allocating capital with discipline, and moving forward our high-quality resource base along with our project pipeline. On that note, I will hand things over to Andrea now.

Andrea Freeborough

executive
#7

Thanks, Paul. I'll walk through the financial highlights for the quarter, give an overview of our balance sheet and return of capital, and then comment on our outlook. We delivered Q3 in line with our updated plan, with production and costs on track and a substantial amount of capital returned to shareholders via our dividend and an upsized share buyback plan. We produced 425,000 ounces and sold 410,000 ounces, with that gap driven by the timing of ounces sold. Cost of sales came in at $1,485 per ounce, and all-in sustaining cost was $1,947 per ounce. Across the first nine months, our production cost of sales was $1,396 per ounce, and all-in sustaining cost was $1,827 per ounce, both tracking well toward our updated full-year guidance. Q3 margins were strong at roughly $2,750 per ounce. Adjusted earnings were 50 cents per share in the quarter, and adjusted operating cash flow was $831 million in the quarter and more than $3 billion through the first nine months. Attributable adjusted free cash flow was $391 million when excluding the impact of working capital outflows. Those working capital outflows mainly reflected an increase in short-term stockpile balances at Manh Choh, along with lower payables and higher prepays, all of which come down to timing.

Andrea Freeborough

executive
#8

Cash flow on a free basis also took a hit from when ounces were sold, because of the September 30th bank holiday. Those ounces that hadn't been sold when the quarter closed were sold in early October. Moving on to the balance sheet and how we're returning capital. We closed the quarter holding $2.6 billion in cash, with $1.9 billion of that being net cash. S&P raised our credit rating during the quarter to BBB flat with a stable outlook, which lines up with where both Moody's and Fitch have us rated. On the capital return front, in September we lifted our commitment to 50% of full-year free cash flow, up from 40%, through dividends as well as share repurchases. Given our valuation has become even more attractive along with our free cash flow yield, we think our shares still offer a strong return on invested capital. In Q3 we stepped up the pace of our buyback program, repurchasing 8.6 million shares in total for $230 million. We also kept paying our quarterly dividend, which comes to roughly $50 million. Taken together, capital returned over the first nine months came to about 46% of our attributable free cash flow, up from 37% during the first half of the year. After the quarter ended, we bought back another $100 million in shares, and we're still on track to hit our 50% commitment by the close of this year.

Andrea Freeborough

executive
#9

Starting with the share buyback program we resumed in April 2025, we have bought back more than $1.4 billion worth of shares, which works out to roughly 5% of the shares we had outstanding. When you add in the dividend, we have returned more than $950 million so far in 2026, and more than $1.7 billion since the beginning of 2025. What these numbers show is how strong our cash flow generation is, along with our continued commitment to giving shareholders meaningful returns, even as we keep investing in the business and further reinforcing the balance sheet. Moving on to guidance now. We are still on track to hit the updated guidance we gave for production, cost of sales, and all-in sustaining cost. For the fourth quarter, production should come in between 430,000 and 450,000 ounces, which would bring us to 1.84 to 1.86 million ounces for the full year. We remain on track to achieve our updated cost of sales guidance of $1,420 to $1,460 per ounce, as well as all-in sustaining cost guidance of $1,850 to $1,900 per ounce. Our original capital guidance range of $1.5 billion, plus or minus 5%, is also on track. As we look toward 2027, and as we noted in our September update, we expect production to land in the range of 1.84 to 1.86 million ounces as well. On 2027 capital, as mentioned previously, our $1.5 billion guidance range is still subject to inflation and to incremental project additions that would support production in the 2030s.

Andrea Freeborough

executive
#10

We are actively assessing incremental investment opportunities that can unlock value from the significant resource inventory we hold. That covers the Fort Knox Phase 11 extension as well as other targeted opportunities throughout the portfolio that would add ounces and extend mine life. Will is going to go into these later on the call. Our annual budgeting process is currently underway, and we will give detailed 2027 production, cost, and capital guidance alongside our year-end results. Turning to 2028, our grade enhancement strategy should drive higher production compared with 2027 and provide an organic offset to inflation through the addition of higher-grade ounces from Phase X, Curlew, and Tasiast. With that, I will now hand the call over to Bernard.

Bernard Wessels

executive
#11

Thank you, Andrea. First, I want to acknowledge the heartbreaking deaths of two employees of a business partner at our Bald Mountain site in Nevada. These incidents have left us profoundly grieved, and our thoughts stay with their families, friends, and coworkers. As Paul mentioned, protecting everyone at our operations is our top priority. After these events, we conducted safety stand-downs across the company to reflect, reinforce, and share lessons throughout the business. Moving forward, we will keep up our unwavering emphasis on preventing fatalities and strengthen our risk management programs. We remain dedicated to visible leadership, disciplined execution, and actively managing everyone who works for Kinross. Now to our operations. Beginning with Paracatu, the mine again performed exceptionally well, as higher ore tonnes mined and stronger throughput drove substantial free cash flow. Output of 146,000 ounces at a cost of sales of $1,202 per ounce was in line with plan. Paracatu is still on track to achieve its guidance of 600,000 ounces at a target cost of sales of $1,240 per ounce. Tasiast, our lowest-cost operation, posted another outstanding quarter with strong throughput and mining performance. Production of 120,000 ounces at a cost of sales of $1,072 per ounce was on plan.

Bernard Wessels

executive
#12

Tasiast is still on course to hit its guidance of 505,000 ounces, with a target cost of sales of $1,050 per ounce. Over at La Coipa, output came in at 29,000 ounces, at a cost of sales of $2,194 per ounce. As we pointed out in the September update, La Coipa was one of two assets affecting our near-term production in 2026 and 2027. Production declined quarter-over-quarter, mainly because of unprecedented winter weather that limited access to the ore required to keep our targeted mill feed blend. That cut mining rates and, in the end, hurt mill throughput. At the same time, we ran into copper grades in certain sections of the sulfide ore that were higher than expected, which made blending more complex. Operations have since bounced back from the weather disruptions, and both mining and milling have settled down. To handle the elevated copper grades and boost recoveries, we are rebuilding ore stockpiles while tightening our ore control so the mill receives the right blend. Through our continuous improvement program, we have raised oxygen and lead nitrate usage and are pushing ahead with mill optimization. These steps are beginning to pay off, with mill throughput settling. Even more important, the effect is near term, since La Coipa bridges us to Lobo-Marte, which remains the key long-term value driver for us in Chile.

Bernard Wessels

executive
#13

Now let's look at the US side of the business. Taken together, our American operations produced 129,000 ounces, with cost of sales at $1,996 per ounce. Fort Knox turned out 72,000 ounces at a cost of sales of $1,938 per ounce. That output mirrored additional maintenance work and deliberately lower grades over the quarter, partly offset by better recoveries at the mill. Bald Mountain produced 29,000 ounces at a cost of sales of $1,616 per ounce. Its production reflected greater tonnage placed on the heap leach pads, partly offset by lower grades stemming from planned mine sequencing. I'm happy to say we poured first gold from Red Bird 1 in early October, and together with Red Bird 2, that carries the mine life into the early 2030s. At Round Mountain, higher mill grades and gradual recovery gains came through as planned, lifting output versus the prior quarter. Production of 27,000 ounces came in higher, while cost of sales of $2,557 per ounce declined. Even with that increase, output fell short of what we originally expected, and Round Mountain was the second of two smaller assets weighing on our near-term production profile. The cause was mill grades and recoveries below plan, along with slower mining rates due to more selective mining.

Bernard Wessels

executive
#14

Things have begun to settle down at Round Mountain as we keep rolling out efforts aimed at boosting results there. We're seeing better numbers in mill reconciliation and recovery — 60% recovery during the third quarter versus 44% in the quarter before. Before handing things to Will, I'd like to mention a few other items. On the weather front, we're watching El Niño's possible effects closely and getting ready for varying conditions at our South American assets. In Chile, the priority is handling heavier snowfall and keeping safe access to the site, while at Paracatu we're bracing for both intense rain and the possibility of drought. Detailed plans are already in place across our teams to keep operations safe and dependable. As for productivity gains, our continuous improvement programs centered on productivity and cost discipline keep delivering strong results. Building on that, we've kicked off our Critical Success Factors initiative, which zeroes in each operation on the handful of priorities that matter most for hitting plan: clear ownership, measurable targets, and disciplined execution. With that, I'll hand the call to Will.

Will Dunford

executive
#15

Thanks, Bernard. Now, regarding how deep our resource base goes: we hold over 27 million ounces in M&I plus another 17 million ounces inferred, so our inventory remains robust for future development throughout the portfolio. On top of that depth, our technical groups are pushing studies forward on a number of opportunities to extend mine life. Much like the three US growth projects we announced earlier this year, these internal projects give us considerable optionality to put more capital into the business at assets we already own, reinforce our production profile, carry mine lives into the 2030s, and build value for shareholders. Our focus is on finishing solid technical work on these projects so capital allocation decisions are well supported, and we will keep evaluating margins, risk, and returns as those investment choices get made. Moving now to the three US growth projects: they mark an important next phase for the portfolio, bringing in higher grades and lower-cost production, lengthening mine lives substantially, and adding shareholder value through reinvestment in the operating footprint and resource base we already have. We are glad to say execution is tracking well at all three projects, with development, engineering, and construction work moving ahead considerably during the last quarter.

Will Dunford

executive
#16

Beginning with Curlew, our project in Washington, we're seeing substantial headway on two fronts: the mill refurbishment and the tailings dewatering plant build. Over at the tailings dewatering plant, outdoor work on the tanks and thickener is close to wrapping up before winter arrives, and indoors things are moving along nicely as structural steel and mechanical equipment go in. The contractor handling the mill refurbishment increased activity considerably during this quarter, demolition is coming along well, and the new CIL tanks are now being installed. Mine-site work is likewise advancing nicely — underground development is running ahead of schedule, the first reaming pass on the main ventilation raise has finished, and the new dry and admin facility is essentially done. Taken together, all of this keeps us on schedule for first production at Curlew during 2028. Turning to Red Bird at Bald Mountain, we achieved first production from Red Bird 1 earlier this month, and pre-stripping plus construction at Red Bird 2 are going well. Engineering and procurement work for the South Plant has moved forward too, with detailed engineering at 30% complete and early purchasing of long-lead items now in motion. In addition, we finished permitting this quarter for the Red Bird 2 satellite pits, which keeps us on plan to start mining those pits in 2027.

Will Dunford

executive
#17

Regarding the Phase X project at Round Mountain, underground development is running roughly 8% ahead of schedule, and we have now finished more than 9,600 meters to date, which further de-risks our path toward first production in 2028. At the same time, engineering, procurement, and early works across both surface and underground infrastructure are continuing to advance on plan. We keep ramping up operations readiness, positioning the team for a smooth transition into operations as we move toward initial production. Infill drilling has likewise advanced for the early stoping horizons at Phase X, and the results we have seen are positive, indicating higher tonnes and ounces contained in our first stopes than what was modeled in our resource. The driver here is improved continuity of mineralization as we drill on tighter spacing, which lets us take a bulkier stope and more ounces than planned. You can see here some impressive intercepts, including 80 meters at 10 grams per tonne, which show potential to increase both the grade and tonnes delivered from this stope versus the resource model, which showed around 40,000 tonnes at 4 grams per tonne for this particular stope. While it is still early, these results are encouraging, adding confidence to initial mining inventory and supporting the planned production ramp-up.

Will Dunford

executive
#18

We kept up extensional drilling during Q2 as well, and we hit a really strong mineralized zone — 11.7 grams per tonne across 27 meters, roughly 300 meters down dip from our initial resource at Phase X. That fits right in line with what we believe about this deposit, and the drilling keeps demonstrating that mineralization may persist further down dip, which would grow the resource base and extend mine life. You can see a few highlights here of additional potential investment opportunities for the next phase of projects within our resource base. To begin, at Fort Knox we're carrying on with work to advance the next possible open-pit layback, Phase 11. That layback at the existing pit holds approximately 2 million ounces and could substantially extend our long-standing presence in Alaska. We see this as a lower-risk project, since most of the capital would go toward routine works for our Fort Knox team, such as waste stripping and heap leach pad expansion. Study work is coming along nicely, and we expect to put out a project update in H1 2027, with pre-stripping possibly beginning as early as next year. Over at Tasiast, studies keep moving forward on both the open-pit and underground extensions at West Branch, where the deposit's high-grade core persists at depth.

Will Dunford

executive
#19

We're also still looking into and assessing the optionality around satellite pits as a way to add more ounces to the profile through opportunities like Fennec, which came in last year. Over at Bald Mountain, the work goes on to unlock the resource base across our extensive land holdings. Right now we're focused on the Top area, where we're studying both the bigger Top open-pit pushback and the smaller Top Condor satellite pit. Potentially, these opportunities could push mine life past Red Bird and into the 2030s. Finally, at Lobo-Marte, we're happy with how permitting has gone so far, and it remains on track following acceptance of our EIA for review by Chile's environmental authority in early Q2 2026. We're beginning to advance detailed engineering and are working through project execution planning with a target of first production in the early 2030s. Along with Great Bear, Lobo-Marte is a strategic priority for us and an essential component of our grade enhancement strategy, given the strong potential production profile and margins that come from the high grade and low strip ratio of this heap leach asset. La Coipa is another place where we hold considerable optionality, both within our resource base and across our exploration projects. The initial phase of that optionality consists of the oxide extensions contained in our resource, which are presently in permitting and under study.

Will Dunford

executive
#20

These are laybacks of existing pits, and they could begin contributing in 2028 once we finish mining the current pits, Puren 2 and Phase 7, in 2027. Bernard mentioned some copper grades at La Coipa this quarter that came in higher than expected. While that hurt near-term production, these high-grade sulfides at the bottom of the existing oxide pits are our second phase of optionality. On that front, we are doing exploration to define an inventory and a PFS to explore potential for a flotation plant added on to the existing circuit to process high-grade sulfides. This is early stage, with potential for the mid-'30s post-oxide extensions. The third phase of optionality at La Coipa is the potential for a large copper porphyry deposit deeper on the property that is feeding the large number of surface deposits we have mined historically. This is longer-term optionality and would be a different scale of operations at La Coipa and is only in the early exploration stage right now, with deep drilling underway to try to find a copper porphyry. Turning now to Great Bear. We continue to advance the AEX program in parallel with permitting, detailed engineering, and procurement for the main project.

Will Dunford

executive
#21

Surface construction is basically finished at this point, and every bit of infrastructure needed for underground work is in place. On a combined basis, the two declines have moved ahead nicely, with more than 500 meters finished so far. At the main project, we're building several long-lead equipment packages, among them the mill motors, the transformers, and the power plant generators. The construction contract for the administration and camp facilities has been awarded as well. Detailed engineering continues to go well and has reached more than 55% completion. We anticipate bringing detailed engineering largely to completion during the first half of next year, and we'll follow that with a CapEx update. Capital will, we do expect, come in above the PEA, since it will capture roughly three years of inflation, a competitive market for contractors and skilled labor, plus scope changes and enhancements made along the way in detailed engineering. Still, with the high grade, the significant production scale, and the low anticipated costs at Great Bear, we expect a high return and a quick payback on that capital. Our focus is on constructing a robust, reliable, top-tier mine, given the quality of the resource base and the multi-decade production potential. With AEX now advancing underground, we're excited to see the future of Great Bear taking shape.

Will Dunford

executive
#22

I'll pass things along to Geoff now so he can bring us up to speed on permitting at Great Bear.

Geoff Gold

executive
#23

Thanks, Will. As Paul mentioned, the permitting schedule for our main project is still where we expected it to be. We keep working in close coordination with the regulators, and we're quite far along on the federal and provincial permits for the main project, which I'll touch on a bit more. On the federal side, the impact assessment is moving forward, and we have officially replied to all the information requests we've gotten so far. As we said before, a final ruling on our impact statement has to come by late spring of 2027 so that the early works and construction permits from federal and provincial authorities can be in place to start building the mine in summer 2027. On the provincial side, the integrated One Project, One Process — also called 1P1P — permitting is still moving ahead in line with our overall project permitting schedule. We've filed the majority of our key early works permit applications, and we expect to get our final Indigenous consultation plan soon, which is one more milestone in the provincial permitting process. In our view, signing an impact benefits agreement, or IBA, with Lac Seul and Wabauskang First Nations will help the permitting process overall and matters for keeping our project permitting timeline on track. On that front, we're still making solid headway on our IBA agreement.

Geoff Gold

executive
#24

As we disclosed earlier, a memorandum of understanding has been signed that sets out the main financial terms and the First Nations accommodations for the IBA, and right now we are working on moving forward the non-financial parts of that agreement, which includes the findings from our independent impact assessment work with First Nations. And finally, as mentioned before, a collective benefits agreement with the Northwestern Ontario Métis Community is already signed. All in all, we've achieved meaningful progress together with our Indigenous communities. With that, I'll hand the call over to Paul now for closing remarks.

Paul Rollinson

executive
#25

Thanks, Geoff. In closing, Q3 showed how resilient our portfolio is, and we're still on course to meet the updated guidance we gave for 2026. As we look ahead, our future has us excited. Our production base is resilient, and we have a clear route to higher-grade output beginning in 2028. Our cost position is competitive on a relative basis. Our balance sheet is excellent. Our return of capital is attractive. Our pipeline of exploration and development opportunities is an exciting one. We take great pride in our dedication to responsible mining, which keeps us a leader in sustainability. To wrap up, when we consider the strength of our portfolio, the strong free cash flow we generate, and our financial position set against our valuation today, we think our shares present an investment opportunity that is even more exceptional. With that, operator, I'd like to open the line for questions.

Operator

operator
#26

Thank you. Before we begin, a quick reminder for anyone who wants to ask something: on your phone keypad, hit star and then 1. We'll take a brief pause while the Q&A roster is put together. Our first question comes from Matt Murphy at BMO Capital Markets.

Matthew Murphy

analyst
#27

Good morning. I appreciate all the updates, and it's great hearing that projects are progressing well. My first question is about the CapEx trajectory. Given how things have gone so far, would it be reasonable to say you'll land near the top of this year's CapEx guidance? And can you comment at all on the pace for 2027? I realize there's the $1.5 billion figure, though that remains contingent on inflation and how projects advance. Do you have any thoughts on whether we should keep treating the $440 rate as roughly the quarterly cadence, or might it come in higher?

Andrea Freeborough

executive
#28

Hi Matt, this is Andrea. I'll go ahead and begin with that, regardless. For this year — for Q4 — likely somewhat of a rise in Q4 across both sustaining and growth. Where sustaining is concerned, I believe the first half will turn out to be roughly on par with the second half. It's sort of gone up and down quarter by quarter. On the growth side, we've observed that stepping up somewhat over the course of the year, right as the growth projects are ramping. That likely lands us somewhere between the midpoint and upper end of guidance as we finish out this year, though still inside that guidance range. Looking ahead to next year, we again have that $1.5 billion range out there, but as we've consistently noted, that depends on inflation and continuing project approvals. We're right in the middle of the budget process at the moment, and we'll see where that lands, but a few examples of items we're reviewing that remain under assessment are Fort Knox Phase 11. Should we approve it, we'd begin spending on it next year, and then there are some additional potential opportunities we keep evaluating that are really aimed at addressing production in the 2030s.

Matthew Murphy

analyst
#29

All right, thank you. I’m eager to hear the update after budgeting. Is there anything you can tell us about working capital—it was somewhat of a drag in Q3—and will that turn around in Q4?

Andrea Freeborough

executive
#30

I would describe that as temporary. I think a portion of it probably unwinds in Q4. It will likely move in the opposite direction during Q4 — that's fairly typical in our case. Short-term stockpiles were one of the major components in Q3, and that was at Manh Choh, and some of that will be drawn down in Q4, though we may see that pattern persisting simply because we halt mining before we halt processing; we've mined through the end of next year and there will be some stockpiles across that span as we keep processing past it. Items such as the payables and prepays will reverse as we move through Q4.

Matthew Murphy

analyst
#31

Much appreciated. In that case, I suppose

Andrea Freeborough

executive
#32

Finally, we ended the quarter with a somewhat higher level of finished goods, which reflected sales trailing production, and all of that inventory was sold during the first part of October.

Operator

operator
#33

Fahad Tariq from Jefferies has the next question.

Fahad Tariq

analyst
#34

Hello, and thank you for the opportunity to ask. Regarding Round Mountain, performance appeared significantly stronger than in the second quarter. Mill grades came in at 0.73 grams per tonne, recovery reached 60%, and I believe throughput hit a five-quarter high. I am attempting to square that with the September update, and my guess is that the answer lies in it being lower compared with the mine plan. Perhaps you could briefly address what the anticipated operating metrics were under the original mine plan — that would be quite useful. Thank you.

Bernard Wessels

executive
#35

Thanks. This is Bernard. As we noted in the press release, we have indeed observed those gains. We are beginning to see better results both in the grades coming through from Phase S and in certain recoveries driven by our improvement programs. Ultimately, I believe we recorded quarter-on-quarter gains, as shown there, yet we still must return to roughly 80% recovery, and we are firmly on track to reach that. As I stated lately, we are clearly seeing the revised enhancements take effect, and the grade recovery should be nearer to 80% during the latter half of the year.

Fahad Tariq

analyst
#36

Thanks. Now, pivoting to Great Bear on the AEX, could you speak a bit about what risks might exist — say, any pushback from First Nations or issues around permitting — and whether that would have any effect on the main project? Thanks.

Geoff Gold

executive
#37

Sure, I can take that question. Some context matters here. I'd say we actually have two distinct permitting tracks — one for AEX and another for the main project. AEX isn't essential to the main project, and I'd add that AEX doesn't fall under 1P1P, whereas the main project does, and that has made a substantial difference for us in terms of what we're seeing. On overall timing, permitting for the main project is still on schedule as of today according to our project schedule, which we've provided to both the provincial and federal authorities. Then regarding AEX, as those permits have been appealed by Grassy Narrows First Nation — they're seeking leave to appeal — we wouldn't anticipate a decision until later next year, possibly in the first half. In the interim, it's been full steam ahead. We've managed to significantly complete our AEX activity, and we certainly aren't expecting any delays at this point to permitting for our main project, since these are two separate processes, and we'd expect the provincial authorities to evaluate those main project permits on their own merits.

Geoff Gold

executive
#38

On that point, I’d add that we coordinate quite closely with the authorities so that the issues raised by Grassy Narrows are dealt with in those permits. Finally — and there has been a great deal of media coverage concerning Grassy — I’d note that the more significant voice in this matter belongs to our traditional territory rights holders, Lac Seul and Wabauskang, whose territory is where our project sits. They have given AEX strong backing and have also been very supportive of the project as a whole. We have advanced considerably in negotiating our IBA agreement. We view that progress — and, once those talks are finished, the completion itself — as a major catalyst for securing the remaining permits the project needs. Regarding the IBA, as we said before, we have essentially settled the key financial metrics and the compensatory elements for the nations, and at this stage we are concentrating on some of the softer matters, meaning the non-financial provisions. Progress on that front is excellent. We would anticipate signing that agreement prior to obtaining the final IAAC permit, and we likewise regard it as a possible facilitator for the rest of the project’s permitting.

Fahad Tariq

analyst
#39

Excellent, that’s very clear. Thanks so much.

Operator

operator
#40

Daniel Major from UBS has the next question.

Daniel Major

analyst
#41

Hello. Am I coming through clearly?

Geoff Gold

executive
#42

Yeah.

Paul Rollinson

executive
#43

That's right.

Daniel Major

analyst
#44

Hello there? Wonderful. Hey, and thank you for those questions. So I suppose, first of all, when we consider how unit costs will trend as we head toward 2027 — with output basically level and, of course, outside factors such as energy and so on appearing as though they'll keep applying steady cost pressure — would it be reasonable to think those unit costs are heading upward somewhere in the neighborhood of $50 to $100 per ounce, given where external variables stand at present?

Andrea Freeborough

executive
#45

Andrea here — I'll handle that question. Our practice is generally to give cost guidance only about a year ahead. Making that call is quite hard, especially when it comes to inflation beyond that horizon. One structural point may be worth noting: production in 2027 is comparable to 2026. Slightly more output will come from the US, with some offsets in other regions, though I don't believe that will materially affect overall costs in '27 relative to '26. We're right in the middle of the budget process at the moment, but we expect inflation likely to land close to this year's level, which was roughly a 5% factor applied to our costs. One caveat: we keep watching where diesel prices are heading, along with oil price and the crack spreads. At present we don't think that has much of an impact this year, but we'll keep monitoring it as the budget process moves along.

Paul Rollinson

executive
#46

I’ll add to that and say I fully back everything Andrea just mentioned, though we’re also looking ahead through the windshield a bit. One of the efforts we’re working on and executing is what we refer to as our grade enhancement strategy. As we look past ’27 toward ’28 and ’29, that’s the point when the grade enhancement strategy begins to take effect. We expect to start seeing the benefit from underground grades at Phase X, the benefit from Curlew, where we have higher grades underground, and naturally, our mine plan has us getting close to the bottom of the pit at Tasiast, where we return to the high grades. As Andrea said, from an operational standpoint, ’27 is very similar to ’26. We’ll continue pursuing efficiencies and doing everything we can to manage that inflation, but looking ahead through the windshield, we should have an organic offset.

Andrea Freeborough

executive
#47

I might just add as well, coming back to 2027, that we also have hedges in place for the oil cost component of the diesel price in 2027. We're roughly 50% hedged there for '27.

Daniel Major

analyst
#48

So you're hedged at 50%, and how does that sit relative to where diesel costs have been trending this year?

Andrea Freeborough

executive
#49

At roughly $60 per barrel or a bit below,

Daniel Major

analyst
#50

We posted revenue of $60 million.

Andrea Freeborough

executive
#51

up to 65 dollars per barrel.

Daniel Major

analyst
#52

All right, that is quite useful, thanks. Moving to the second item, and perhaps building on what Matt asked regarding CapEx: I believe you steered toward $260 million at Great Bear for this year. If the FID lands consistent with the schedule you expect, what run rate for CapEx ought we to anticipate going into next year? A comparable question for Lobo-Marte — will that project be carrying some form of pre-approval spending during 2027?

Will Dunford

executive
#53

When you go back to what was made public around the PEA, there is something of a profile in it. Clearly, in '27, once our federal permits come through, we move into substantial construction, and we do anticipate a meaningful ramp-up. In that initial PEA, it sat in the $500 million range. Of course, that is a few years old at this point when it comes to the value date on some of those quotes, and we expect it will be higher once inflation is factored in, but next year begins to be a meaningful spending year at Great Bear, assuming permitting goes well.

Daniel Major

analyst
#54

Understood. All right. From a timing perspective, that $500 million still holds, and then an inflation factor ought to be applied to it. Is that the correct way to think about it?

Will Dunford

executive
#55

That's the way we're looking at it at the moment. So Lobo-Marte won't be in full construction next year. That's still more of the early spending. We're continuing our budgeting work, but next year that won't be at the same scale. We'll really move into full construction later, in '28 into '29 — it sits a bit staggered behind Great Bear.

Daniel Major

analyst
#56

All right, thank you. And then one last question: yes, regarding that increase in the free cash flow payout as far as cash returns go, I definitely view it as, yes, a supportive factor, but under that policy you're still building up 50% of the free cash flow on the balance sheet. We've observed a bit of a drop in asset values across the sector more widely. What's your read on the M&A landscape? Are there any opportunities in the pipeline that appear more appealing now that some equity values in the sector are declining?

Paul Rollinson

executive
#57

Well, again, our usual approach to that question is that we keep an eye on what's out there. We believe we're sitting in a fairly strong spot thanks to the organic optionality we have internally. We hold more than 40 million ounces of resource. As you'll remember, one thing we did last year was bring a number of our US brownfield projects out of that resource category by doing more drilling and more study, and we essentially shifted those ounces from resource into reserve. There's plenty of depth in the portfolio for us to keep advancing things internally. Yes, we certainly do stay aware of and watch what's out there. Again, we have a fabulous balance sheet, very strong cash flow, and great internal resource optionality, so we don't feel under pressure. Particularly if there's a process or something happening, we'll take a look at it. If you glance in the rearview mirror, we've been quite disciplined about when we choose to move forward with M&A, and that will continue. We're in a good position where we don't need to do anything, but we can look.

Paul Rollinson

executive
#58

Whenever opportunities for creating value came to our attention, we would take a somewhat closer look.

Daniel Major

analyst
#59

Excellent, I appreciate that.

Paul Rollinson

executive
#60

Sure.

Operator

operator
#61

Our following question comes from Carey MacRury at Canaccord Genuity.

Carey MacRury

analyst
#62

Hello, and good morning. I have one question regarding La Coipa. I was just wondering about the mine plan — how long do you anticipate mining will continue in that area with the high copper grades?

Will Dunford

executive
#63

And maybe, more broadly, how much of the mine plan actually holds that kind of ore? Those very high copper sulfides sit at the bottom of Phase 7, which we plan to complete next year—those are the pits we currently have permitted. We do have resource out there for the future, and given the grades we're seeing, as we said in September, we're really examining optionality for the '30s. That material would come in after Lobo-Marte, on the back of a flotation circuit or something similar, for those resources and the high-copper-grade sulfides beneath the pit—but the currently planned pit only runs through '27. That's why the impact on us has been limited.

Carey MacRury

analyst
#64

So I suppose that explains why the 2028 guidance remains at roughly 2 million ounces?

Will Dunford

executive
#65

Apologies, Carey — we couldn’t catch that. What was the reason for that?

Carey MacRury

analyst
#66

So the 2028 guidance you gave still comes in at 2 million ounces. I take it, then, that you don't see much of an effect in 2028 coming from Round Mountain or from La Coipa?

Will Dunford

executive
#67

Neither Phase 7 nor sulfides will affect 2028, since our plan is to have that pit finished by next year regardless.

Carey MacRury

analyst
#68

All right. Moving over to Great Bear, I was just wondering — the decline is coming along, so when do you expect to be drilling from underground there?

Will Dunford

executive
#69

Our expectation is that this happens in early 2025. Should all remain on schedule as of now, we'll begin to see a few initial chances near the top of the ore body to drill out in a couple of areas. We are on schedule to do so in early 2025.

Carey MacRury

analyst
#70

Perfect. That covers everything from my side. Thank you.

Operator

operator
#71

Tanya Jakusconek from Scotiabank has the next question.

Tanya Jakusconek

analyst
#72

Morning, everyone. I believe I'm up. Appreciate you taking my question. I'd like to revisit the cost side, if possible. When you consider your 2027 guidance and look at input costs — and Paul, I think you brought up a tight labor market — could you share what you're observing regarding labor inflation and turnover? As I recall, it was roughly 10% for the company. I'm simply trying to get a sense of how that piece is trending and how consumable inflation is shaping up as well.

Andrea Freeborough

executive
#73

Tanya, I'll begin. Regarding labor specifically, again, everything here comes with the caveat that we're right in the middle of the budget process at the moment. The average labor inflation we're anticipating is roughly 5% to 6%, though it doesn't apply uniformly across the board. As usual, it tends to run higher in the US and in Nevada, but we're generally looking at approximately that 5% to 6% range on average, and as I mentioned, overall inflation of about 5%.

Paul Rollinson

executive
#74

Just to add to that, as we've noted repeatedly and on an ongoing basis, Nevada usually ranks as our hottest market. You've got competition on all fronts—for staff, for parts. The thing is, there's no currency advantage there like we enjoy elsewhere in the world. And as it happens for us, again, because of the region, our turnover tends to run somewhat higher in Nevada, and all of that, I'd say, keeps that market hot compared with several others we operate in globally.

Andrea Freeborough

executive
#75

For the assets we hold beyond the United States, labor agreements have now been signed.

Paul Rollinson

executive
#76

Sure.

Tanya Jakusconek

analyst
#77

And as for

Paul Rollinson

executive
#78

And what about the consumables side?

Tanya Jakusconek

analyst
#79

Please continue.

Paul Rollinson

executive
#80

To put it another way, we separate this into the individual pieces that make it up. You can kind of choose your own rough guideline, but if you consider energy, labor, and consumables — we've already discussed energy, our hedging approach, and what we've been doing on that front; it has worked quite well, and it's ongoing. On consumables, again, there's some slight ups and downs, but at the moment we aren't seeing anything especially dramatic that worries us.

Tanya Jakusconek

analyst
#81

All right. I can adjust the oil price assumptions, but on the consumables front, there isn't anything we need to concentrate on. Perhaps just on the capital side, then. You brought up again regarding Great Bear that we'll get an update on capital reflecting inflation along with the tightness in the labor market. At a high level, should I be thinking about what we've historically seen for CapEx increases, which have reached as much as 20%, 30% above prior figures? Would that be something that would put me off from your $1.4 billion that you disclosed for 2024?

Paul Rollinson

executive
#82

I'll begin, and Will, feel free to jump in. Clearly, the largest piece of all this would simply be the inflation true-up. You can roughly work out the numbers from the starting point back in 2023. Moving past inflation, the following category would be what I'd call discretionary shifts in scope or approach. By discretionary, I generally mean we're doing it for a sound reason. We see an opportunity to create value, we see an efficiency, we see a longer-term benefit. So inflation, discretionary, and then I suppose the final bucket I'd describe as more at today's market, and it's certainly a hotter market when it comes to attracting labor right now. We're expecting that. Some of it moves back and forth. For instance, one thing we're considering as we look ahead at Red Lake is our housing strategy. When it comes to drawing the best people to a new project, part of the equation will be what our plan is, what our housing strategy is, what we'll offer in terms of — and those things can affect your scope change. In Red Lake's case, we're examining a balance of a residential community within Red Lake along with keeping a camp to attract people who would still rather have that rotation.

Paul Rollinson

executive
#83

There are all sorts of elements involved in that, when it comes to fine-tuning and making adjustments. It's going to rise. I won't gloss over that, but I believe that matters, and we will always watch it closely, but at the same time, I also want to point out that when you consider production, margin, and cash flow, the payback period on this project has consistently been quite remarkable in terms of months, truly. Even with some extra capital, I wouldn't describe this as a project that's especially sensitive to capital, given production margins and cash flow.

Will Dunford

executive
#84

No — considering the long-term upside that site holds, our real emphasis is getting this built properly right from the outset and completing everything Paul mentioned so we have the right people in place to deliver it. The figures are out there already, but this is a 500,000-ounce-a-year producer, and the cash flow it generates with the AEX is substantial, which means a very robust payback for us. We can’t give a definitive number at this point since detailed engineering is only 55% complete. Procurement for our major contractors is just beginning now. We’ll be in a far better position to answer that question precisely in H1 of next year, but once again, our attention is on finishing the detailed engineering and ensuring we build a resilient asset, in light of the multi-decade potential we see there.

Tanya Jakusconek

analyst
#85

No, it was more about getting a feel for things — like, I want to avoid waking up to capital having doubled, compared with something that’s been more typical in the industry at that 20%,

Will Dunford

executive
#86

30%. At the time of the PEA, we stood at 1.4 plus 400 on the AEX; a complete doubling of that isn't what we anticipate, though it's early in the process, and we truly need to reach next year before we can offer you a clearer picture of it.

Tanya Jakusconek

analyst
#87

All right, so my last question is this: as we move nearer to the end of the year and you're reviewing your mine plans—the life-of-mine plans for 2027—how are you approaching the pricing for your reserves and resources, along with your cutoff grade? Thanks.

Paul Rollinson

executive
#88

Sure. Will, do you want to handle that one, or should I?

Will Dunford

executive
#89

The process is underway at the moment, and nothing has been finalized so far. For our part, we tend to focus heavily on the trailing three-year figure. We consider that a fairly pertinent data point that we like to monitor and follow, and clearly it has risen. At this point we're looking at a relative ratio of sorts for lifting our reserve and resource price. No final figure has been selected as yet, though we do anticipate it ought to come up enough to be realistic given this environment and the gold prices we have witnessed.

Paul Rollinson

executive
#90

To reiterate, for context, even that 3-year average remains well under the spot level.

Will Dunford

executive
#91

Sure.

Paul Rollinson

executive
#92

I think, as you've seen, the pattern has been a gradual drag upward over time, with a significant discount to where we sit at spot. I wouldn't anticipate any material changes from there. The bigger point, though — and it's really important that we stress this — concerns cutoff grades. As we've said many times, we have no intention of dropping our cutoff grades. We're examining cutoff grades in long-term stockpiles for something we might put in at the end of the mine life, mill life, that kind of thing. Generally speaking, our mills are full, we've got all the grade we need, and we have no requirement, or no need, if you will, to drop cutoff grades in order to keep our mills full. You'll see a kind of lagging revenue line adjustment tied to reserve and resource pricing, which, I would say, is in line with the trend of the last few years. As Will says, think along the lines of a three-year rolling average. Don't expect us to do anything dramatic with cutoff grades.

Tanya Jakusconek

analyst
#93

All right. The thing is, that three-year rolling average sits above $3,000, so going from 2,000 to three would be quite a jump. Okay.

Will Dunford

executive
#94

We aren’t targeting the three-year trailing figure directly. Consistency is what matters. Last year, with our reserve price, we stood at a historic discount to the three-year trailing. This year we’ll likely remain at a historic discount to that three-year trailing as well, but the aim is to try to move up gradually in a ratio comparable to what the gold price is doing. That doesn’t mean we go straight to it.

Tanya Jakusconek

analyst
#95

Got it — thanks for the questions.

Paul Rollinson

executive
#96

Thank you.

Operator

operator
#97

Moving on, our following question comes from Lawson Winder at Bank of America.

Lawson Winder

analyst
#98

Thanks a lot, operator. Morning, Paul and team. Thanks for squeezing me in. I know we're running slightly past schedule here, so I'll stick to just two, maybe two questions. First one is simply about the cost sensitivity to the Chilean peso. Is there anything we should read into that shift? It now sits at $60 per ounce for a 10% FX move. That's a little surprising given lower production out of Chile this year. Then I'd just have a follow-up on capital return.

Paul Rollinson

executive
#99

My sense is that what we're really seeing there is simply the effect on the denominator, since the cost mix is comparable. That's essentially what drove that.

Lawson Winder

analyst
#100

All right, that's reasonable. There's nothing specific you should read into it.

Paul Rollinson

executive
#101

Regarding that point.

Lawson Winder

analyst
#102

Turning to the dividend — a year ago around now, and again this February, it was raised fairly substantially. Would you view additional dividend hikes as a reasonable route for returning capital, or is the buyback perhaps now the favored mechanism for capital return? Thank you.

Paul Rollinson

executive
#103

Honestly, I don't believe our story has shifted when it comes to that philosophy of returning capital, as it applies to buybacks versus dividends. You're absolutely right. Our view is that the dividend ought to be a forever commitment, so to speak. As you noted, we've raised it two times. Since last year, I think we're probably up more than 30%, though we remain cautious. When we raise the dividend, we expect it to remain at that level. With the buyback, we see greater opportunity to lean in and out and to execute larger amounts. If you look at our pattern, we've maintained a baseline dividend and have raised that baseline dividend, but the real advantage we've captured is leaning into the buyback by expanding it. We believe that's the correct policy and the right philosophy for us at present. We think that's what our shareholders favor today. I'd encourage you to expect that we'll keep thinking about it along those lines going forward.

Lawson Winder

analyst
#104

I appreciate that.

Operator

operator
#105

Once more, should you wish to pose a question, please hit star 1 on your phone's keypad. At this point, we have no more questions. I will hand the call back to Paul Rollinson now for any closing remarks.

Paul Rollinson

executive
#106

Thank you, operator. I appreciate all of you being here. We’re eager to meet with you face to face over the next few weeks. Many thanks.

Operator

operator
#107

Everyone, that brings us to the end of today's conference call. We appreciate your participation. You can go ahead and disconnect at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Kinross Gold Corporation transcript — plus 130,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Kinross Gold Corporation earnings transcripts and 130,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Kinross Gold Corporation or any ticker on your watchlist.