Liberty Energy Inc. (LBRT) Earnings Call Transcript & Summary
October 22, 2026
Earnings Call Speaker Segments
Anjali Voria
executiveThank you, Nick. Good morning, everyone, and welcome to Liberty Energy's Third Quarter 2026 Earnings Conference Call. Ron Gusek, our Chief Executive Officer, and Michael Stock, our Chief Financial Officer, are with us on the call. Before we get started, I want to remind everyone listening that certain comments we make today may contain forward-looking statements reflecting how the company views future prospects, revenues, expenses, or profits. Such matters carry risks and uncertainties that might cause actual results to differ materially from those forward-looking statements. These statements represent the company's beliefs, grounded in current conditions, which are subject to certain risks and uncertainties described in detail in our earnings release and other public filings. The remarks today will also reference certain non-GAAP financial and operational metrics. Those non-GAAP figures — EBITDA, adjusted EBITDA, adjusted net income, adjusted net income per diluted share, adjusted pre-tax return on capital employed, and cash return on capital invested — should not be viewed as replacements for GAAP measures, and they might not line up with similarly titled metrics reported by other companies. You can find a reconciliation of net income to EBITDA and adjusted EBITDA, of net income to adjusted net income and adjusted net income per diluted share, plus the computations of adjusted pre-tax return on capital employed and cash return on capital invested covered during the call, on our investor relations website.
Ron Gusek
executiveHello everyone, and thank you for joining us for our third-quarter earnings call. The number of Liberty's completions has risen considerably compared with the cyclical troughs experienced at the start of the year. Third-quarter revenue totaled $1.2 billion, while adjusted EBITDA stood at $142 million, reflecting solid operational execution and slight price gains, partially counterbalanced by drilling-related delays and inflationary cost pressures. During the quarter, we passed substantially reduced fuel expenses on to our customers. Natural gas substitution hit a record level, exceeding 60% of the total fuel our fleets used, delivering annualized fuel savings worth more than $1 billion to our customers. That result comes from ongoing spending on natural gas-powered machinery, along with a deliberate emphasis on the digital intelligence layer, which delivers substantial operational optimization of equipment and stretches the performance gap between frac fleets in the industry. On the power side, we're pleased to report that earlier this week LPI signed a strategic development agreement with a leading frontier AI lab and a dedicated infrastructure platform covering 1.2 GW of integrated power services at data center campuses. Under the deal, there's a sizable prepayment of capacity fees and a goal to execute the first energy service agreement contract for roughly 500 MW by December 2026. This deal sets out a staged schedule for bringing power online, running from the fourth quarter of 2027 through the first quarter of 2029, and it locks in the key business terms for the extra long-term ESAs. Getting to this point took months of joint engineering and design effort by both teams, and the result pins down an integrated power architecture built around the generation, power quality, reliability, and dynamic AI load needs. We're broadening this partnership and already collaborating on further projects at other sites — gas supply, interconnection, permitting, and construction planning among them — while we keep pushing the capabilities of our integrated power platform to serve ever more sophisticated on-site power systems. Dependable power on this scale takes more than generation by itself. It takes seamless coordination among generation, controls, customer load, and the wider electric grid. Building on the extensive modeling, Hardware-in-the-Loop, and integrated system validation done inside our own facilities, we recently finished advanced grid integration testing with the National Laboratory of the Rockies' Controllable Grid Interface, linking LPI's physical generation assets and Tempo controls to a synthetic grid modeled on a particular real-world electric system in the Southern U.S., replicating its relevant characteristics and operating behaviors. Whereas conventional grid analyses may depend on simulated versions of the grid and generating equipment, this particular test proceeded further: it combined a representative grid model with LPI's real generation hardware and controls, which let us assess how our physical system reacts under realistic grid conditions. Grid operability was shown by the testing, along with anticipated changes across the lifetime of a project that moves from islanded operation to grid participation. The testing additionally confirmed our control methodology and compliance with applicable IEEE standards, while establishing the performance characteristics of our generation assets to further inform system modeling and optimization. Taken together, these results strengthen our capacity to reliably coordinate on-site generation with the wider grid, encompassing capabilities such as peak shaving. This piece of work extends the trusted partnership we have with NLR and marks yet another key move in converting our integrated power architecture into the flexible, dependable solutions needed to handle customer loads that are ever more complex and large-scale. Across completions and power, we're assembling a lasting portfolio grounded in the principles that have defined Liberty for a long time — an unwavering customer focus, ongoing technology innovation, and disciplined execution. In completions, those strengths have enabled customers to achieve better performance and economics each year, and in power we're taking the very same approach as we create distinctive solutions that address the progressively complex goals of technology customers. These twin investments are reinforcing our competitive edge and widening our market opportunities, which puts us in position to deliver robust returns across cycles. At the start of this week, we reported an 11% raise to our quarterly cash dividend, a signal of confidence in our strategy and of our enduring dedication to returning long-term value to shareholders. During the third quarter, crude and refined product prices around the world firmed up as the continuing wars in the Middle East and Ukraine keep affecting markets. Although flows through the Strait of Hormuz have partly bounced back, Gulf exports are still exposed to operational interruptions, which keeps a risk premium in place for crude. Fresh strikes on energy infrastructure have worsened shortages of refined products, and low diesel stockpiles have become a critical bottleneck. Higher maritime freight costs plus longer trade routes have added further to these strains, pushing up the cost of delivered crude and products. Anticipation of a drawn-out supply disruption, along with an eventual rebuilding of strategic petroleum reserves, has kept the oil risk premium alive and pushed forward prices higher. North American natural gas fundamentals are still more balanced, since record output and plentiful inventories outstripped strong summer power demand. Qatari gas supply interruptions have likewise raised dependence on U.S. LNG, including replacement cargoes needed to satisfy existing customer commitments. Over the longer term, LNG exports and rising power consumption tied to AI and data center projects should fuel substantial demand growth. With this as the backdrop, producer well economics have improved considerably thanks to a more favorable forward curve, opening up appealing 2027 oil hedging opportunities and giving E&P operators better revenue visibility. These strengthening fundamentals further bolster frac market dynamics that are already tight, where somewhat greater completions activity has soaked up a large share of the industry's available capacity. Continued fleet attrition, equipment cannibalization, and insufficient industry investment have held supply back, especially for next-generation equipment with attractive gas arbitrage economics. Rising completion intensity and complexity also benefit scaled providers offering integrated services and advanced digital technologies. All of this, combined, supports frac markets that hold up better over time as well as continued improvement in service pricing. With AI accelerating the need for compute capacity, infrastructure builders increasingly favor integrated power solutions sited alongside data center campuses and other big load locations, so they can respond to growing community worries regarding power expenses, reliability, and similar matters. Beyond compressing timelines for energization and enabling customized energy setups, co-location can relieve strain on today's grid and cut down on the requirement for costly transmission spending, which eases effects on local ratepayers and communities. The partnerships Liberty has formed expand what we can deliver on these projects, pairing our power services with complementary technologies and infrastructure solutions — among them hybrid power systems, advanced energy management, and waste heat recovery. As time goes on, this integrated approach opens doors to tackling overall energy efficiency while giving customers more flexibility to respond to environmental and community priorities unique to each site. The announcement we made today with the frontier AI lab highlights how strong our integrated power platform is and how it can help advance our customers' wider strategic objectives. Trust, collaboration, and a shared commitment to scaling AI infrastructure underpin this relationship. Across the past year, we have established a solid foundation covering power design and architecture, power quality and load management, testing and validation, plus the long-term operations required to support this project and others like it; we are excited to serve a growing base of customers who want reliable, high-performance power infrastructure for data centers and other industrial applications. With global energy consumers putting more weight on secure, reliable North American energy supplies, our disciplined investment through cycles in leading-edge digital and equipment technologies widens our competitive advantage and grows our market opportunities in the years to come. We're seeing solid customer involvement and improving market basics, which let us take a more positive view as we wrap up this year and set our sights on 2027. Going forward, we anticipate that weather patterns and holiday effects in Q4 will be partially balanced out by ongoing demand momentum, including business pushed back from Q3. The Liberty team's dedication to ingenuity, innovation, and execution makes us proud, and we're in a good spot right now to meet demand for energy services in the coming years. At this point I'll pass the call to Michael, who will cover our financial results and outlook.
Michael Stock
executiveGood morning, everyone. The third quarter was marked by outstanding operational performance, and that produced strong financial results. Third-quarter 2026 revenue reached $1.2 billion, essentially level with the previous quarter. The results reflected robust utilization along with a slight increase in pricing, partially offset by drilling-related delays as crews work to rebuild customer well inventory following faster completions in the second quarter. The third quarter posted a net loss of $39 million, compared with net income of $43 million in the prior quarter. Adjusted net income was $10 million, versus $14 million in the previous quarter, and it excludes $49 million of tax-affected unrealized investment losses as well as transaction and other costs. For Q3, fully diluted net loss came to $0.24 per share, compared with net income of $0.26 per share the quarter before. Adjusted net income per diluted share was $0.06, down from $0.09 in the prior quarter. Adjusted EBITDA in Q3 reached $142 million. G&A expenses were $69 million for the third quarter, up from $67 million in the previous quarter, and that figure included $5 million of non-cash stock-based compensation. Once stock-based compensation is excluded, G&A increased by $3 million, driven primarily by higher compensation and other corporate overhead. For the quarter, other expense items came to $69 million. That figure includes $63 million in unrealized fair value losses on non-core equity investments, along with interest expense of roughly $6 million. Within that interest expense was $2 million of non-cash amortization of costs related to our convertible bond issuances earlier in the year. The third quarter brought a tax benefit of $10 million. Looking ahead, we expect the tax expense rate for the rest of 2026 to be about 24% of pre-tax income, and we don't anticipate paying material cash taxes this year. We closed the quarter with a cash balance of $119 million and net debt of $1.2 billion, which mainly consists of senior convertible notes issued in the first quarter. Aside from $30 million in letters of credit that remain outstanding, nothing is drawn on our revolving credit facility. Including what we can access under that facility, total liquidity stood at $669 million when the quarter closed. Cash went out during the third quarter for capital expenditures and cash dividends. Net capital expenditures and long-term deposits came to $622 million, a figure that included roughly $450 million for power generation deposits and other investments in power generation, digiFleets, capitalized maintenance spending and other projects; in addition, we returned about $15 million to shareholders through cash dividends. The board earlier this week declared an 11% increase in the quarterly cash dividend, bringing it to $0.10 per share. Our newly announced partnership with the frontier AI lab marks a significant move ahead for Liberty's power strategy. The sizable prepayment of capacity fees covering 1.2 GW cements the customer's dedication to the development effort. Such an arrangement creates stronger commercial alignment and enables faster execution so that power can be delivered at scale. I want to go back over how we are financing the major growth opportunities that lie before us. Our strategy rests on three pillars, designed to preserve financial flexibility for us while securing the long lead items that customers require to meet their strategic goals and to deploy power infrastructure at scale. First, strong free cash flow comes out of our core business, and that gives us a key source of capital to fund growth. Second, we went opportunistically to the convertible market earlier this year and raised roughly $1.3 billion in gross proceeds at a 0% coupon. Strong investor demand meant both offerings were upsized, and the capped call structures lifted the effective conversion prices to about $65 and $72 per share, respectively. That capital let us invest early in long lead equipment and put us in position to hit the deployment timelines our customers require. Third, we're moving forward with a non-recourse project level financing strategy meant to recycle capital as projects progress. We continue to see robust interest in our pipeline from a wide range of capital sources—project finance banks, infrastructure funds that focus specifically on this space, and private credit markets. As projects move forward, we anticipate project-level financing kicking off in early 2027; we're excited about the customer partnership we discussed today and about how much the Liberty team and our power partners have accomplished so far. We're eager to see what we can do together going forward. At this point I'll return the call to the operator for Q&A, and afterward Ron will offer a few closing remarks before we wrap up.
Arun Jayaram
analystMorning, everyone. Ron, on the competitive side, it's obvious there are a number of companies out there—Liberty among them—offering behind-the-meter solutions; the deal you laid out in the press release appears to span the whole molecule to megawatt lifecycle. I'd really like to hear you discuss what sets Liberty apart and helps you land what seems like a landmark agreement for LPI.
Ron Gusek
executiveMorning, Arun. I'd say you captured that extremely well. I'd borrow our customer's own words when they gave us notice that we would be moving forward with this landmark agreement—words that reflected how much trust they've placed in Liberty throughout the period we've worked together; that trust rests on, I believe, a very solid foundation. It really comes down to all the capabilities we offer. The hyperscalers and other parties seeking to build this generation for co-located power are, naturally, also newcomers here. Historically, they've depended on the grid for power, and now they find themselves in a somewhat different situation, and they want strong partners who can make that shift as smooth as possible for them. Making it as easy as possible to stand up a data center—we saw that early and have therefore been extremely focused on constructing a solid foundation that covers every component needed to succeed here. That covers everything from, as you mentioned, the gas molecule and the interconnection required there, perhaps the contracting work with the gas through design, construction, and operation of not only a power plant but also a complex balance of plant incorporating power quality systems built to handle the highly volatile load requirements that data centers bring. Ultimately, as we said on today's call, this lets us integrate with the grid later on. Handling not just what our hyperscale customer and their data center load require, but also the stringent requirements that come with a grid connection. Being able to synchronize with it and satisfy the voltage and frequency constraints needed to keep our grid operating. And on top of that, the commercial complexities involved, the ability to engage with the grid commercially, to take advantage of the attributes that provides. When you consider all those capabilities and then add a strong supply chain and packaging capabilities that guarantee deliverability, what you see in Liberty is an organization I'd argue has no equal in this space. So because of that, I believe customers are showing a lot of trust and genuine confidence in us, and that ultimately is what brought about a deal of this size.
Arun Jayaram
analystGreat. For my follow-up, Ron, it seems we'll need to wait until December before we can understand perhaps more specifics regarding the first ESA. I was hoping you might share some general thoughts about how long this award could potentially last, maybe address the credit quality of the frontier AI lab, and speak to whether this award can unlock project financing opportunities for Liberty, which Michael talked about in his prepared remarks.
Ron Gusek
executiveYes. Starting with your question about the counterparty. Naturally, we've stated quite clearly that we will only conduct business with high-quality counterparties possessing a strong financial position that enables us to obtain the financing needed to expand this power business at scale. You can be confident that the counterparty is one that gives us access to the financing we've been discussing and our path forward for project-level dollars to proceed and execute on this. Regarding the term, it appears no different from what we've indicated previously. This is a 15-year, would contemplate a 15-year term for the ESA, with a renewal opportunity in addition to that. As you mentioned, certainly once we reach the point where we've executed on this, we'll be able to provide further details.
Arun Jayaram
analystAll right, thanks. I’ll hand it back over.
Ron Gusek
executiveThank you, Arun.
Stephen Gengaro
analystThanks. Good morning, everybody.
Ron Gusek
executiveGood morning, Stephen.
Stephen Gengaro
analystAppreciate you fielding that. So, two things — the first one, and this might build on what Arun was asking about. Could you elaborate a bit on the capacity prepayment, what exactly its nature is, and how we ought to be thinking about it across the next several months and quarters?
Michael Stock
executiveStephen, that prepayment is significant. And when we say significant, we mean it in terms of hundreds of millions of dollars. It's a prepayment of capacity fees, and it will be amortized over, in all likelihood, the first five years of the contract — so it will serve as a source of cash during that stretch of time, and it will certainly be executed before the final ESA gets paid.
Stephen Gengaro
analystAll right, thank you, Michael. Moving to the legacy pressure pumping business, could you speak a bit about the pricing dynamics there? You brought up the huge sums of money customers are saving — how does that factor into the pricing you're able to push for? Or is it really just a question of supply and demand, with price stepping up as the market tightens? How should we think about you getting compensated for the enormous savings you're delivering?
Ron Gusek
executiveI'd say a few things come to mind on that. To begin with, it guarantees, or effectively guarantees, that a given fleet stays utilized. When you consider the opportunities you have while going through a very difficult environment such as the one we faced over the last couple of years, you have this idea of last fleet standing. Throughout that whole stretch, Liberty's utilization stayed very strong across all of our fleets, and that came down to a couple of factors. First, the service quality we deliver, but definitely second, the level of technology we bring. Fleets of that kind stay in high demand through ups and downs. That underpinning demand is always present. From a pricing perspective, those fleets tend to be more resilient. Even in an environment like the one we went through over the last two years, the pricing we get for the digi assets tends to hold up better than what you might see for a diesel fleet, where there might be somewhat more competition in the space and, consequently, somewhat more price competitiveness and a bit more of a dynamic environment. The dual-fuel assets tend to land somewhere in between. What's nice about an asset like that, and the arbitrage opportunity on the fuel side, is that it gives us a chance to have a conversation with a customer about a pricing change without materially altering the economics of their wells. Put differently, if we can shift them from a diesel fuel fleet to a natural gas fuel fleet, enabling perhaps $50 million a year in annualized savings given the arbitrage as it stands today, we can ask for the price needed to earn us a return on that invested capital. We've always said we want a cash-on-cash payback of less than three years. And they can get fuel savings, we can get a price increase, and it's a win-win for both teams. In an environment like this, where there are, of course, very strong savings opportunities for them, it's a chance for us to go back to them and have a conversation about price. There are, of course, still limits to that. The market is the market, and we live inside of that market. I do think we consistently command a premium relative to a lot of competitors in this space, but there's still a ceiling past which we can't go. Given how strong the market is, we'll keep pushing pricing higher over the quarters ahead, and definitely with particular attention on those fleets that are delivering those savings for our customers.
Stephen Gengaro
analystAll right. Appreciate the thorough rundown, Ron.
Scott Gruber
analystMorning to you, Ron and Michael.
Ron Gusek
executiveMorning.
Michael Stock
executiveGood morning.
Scott Gruber
analystCongratulations on the transaction. It seems quite logical that landing the first ESA within a broader development agreement would clearly make the road to later ESAs smoother. How should we think about the schedule for those remaining ESAs needed to reach 1.2 GW deployed by 2029? Since there has been resistance at some data center locations, how do you approach collaborating with this hyperscaler and its range of projects, along with your capacity to shift things around when pushback arises at particular sites, while still locking in those ESAs promptly enough to support the proposed energization timeline?
Ron Gusek
executiveScott, there's a lot in there to unpack, but I'll do my best to cover all of it. If I leave anything out, please come back to me on it.
Scott Gruber
analystYes, sir, I appreciate that.
Ron Gusek
executiveLet me begin with the first part of your question, the additional ESAs. We've discussed how we have several projects moving forward simultaneously, and that our top eight projects amounted to substantially more than the 3 GW of generation we had on hand. Those discussions keep moving quickly. We're still enthusiastic about those opportunities, and of course we'll keep the market informed as we achieve meaningful progress on them and have something worth sharing through a press release or similar. We remain excited about those opportunities and definitely keep seeing them move forward. I largely share your view that announcing roughly 1.2 GW now committed, on top of the reservations we already had, perhaps provides a bit more motivation to push ahead, given that our capacity is limited. Regarding possible worries about whether certain sites can proceed, we've discussed how we can build some insurance—for want of a better phrase—into our business, and that involves a couple of things. First, we favor having multiple legs on the stool when it comes to customers. We've sought to be in discussions and ultimately move potential projects forward with a number of end customers, a number of hyperscalers. We recognize that at any given moment, someone's sentiment could shift, and we want to ensure that wouldn't meaningfully affect our business. At the same time, we've also worked to secure access to a range of sites across a range of states and a range of counties within those states, so that no single decision in a given state or locale could affect our business; so, for instance, even in this discussion, the deal we announced today has a front-running series of sites for it in a particular locale, but we've identified a couple of backup opportunities we could pivot to. They sit in different states and would let us—perhaps with a slight delay—still move the project ahead. We've worked hard to build that into our approach so that no matter how things unfold over the coming weeks and months, we can advance this business with confidence.
Scott Gruber
analystThanks for all those details. Just one quick question. A permit was filed recently for a Wyoming project named Buffalo Run. Does that count among the separate projects with a separate customer that you mentioned? Its ultimate capacity seems bigger, but it looks separate — or is it included in this agreement? Anything you can share about that project, given the permit came through recently.
Michael Stock
executiveScott, I can address that a bit. As you know, we've been at work on this. It's well known that this Wyoming site has been in our efforts for some time, and we've just filed the large load permit. That permitting process typically takes roughly a 16 to 18 month span. This fits squarely into our strategy of building a pipeline of projects and potential plants extending all the way into the 2030s, correct? The soonest that project would likely begin execution is late 2028 into 2029 and into 2030. While we move through permitting, the data center partner involved will refine its marketing with the hyperscalers. We'll team up with a final hyperscaler and then potentially proceed on that front. But this is part of what we're doing today — building a pipeline for the coming decade, for a multi-gigawatt IPP not tied to a specific geography; we're pursuing near-term projects, as you've seen with the 1.2 GW, with very fast and early determinations and advancing to ESAs, toward these bigger, longer-term projects that position us into the 2030s.
Scott Gruber
analystOh, nice color. I appreciate that. Ron and Michael, I'll hand it back to you.
Michael Stock
executiveThank you, Scott.
Josh Silverstein
analystYeah. Morning, everyone. I was hoping you could help us line up the capacity that's coming in against the deployment timeline for the 400 MW Vantage deal and the 1.2 GW here. At this point, are you looking toward 2029 for the rest of that capacity deployment, or is there still some room in 2027 and 2028?
Ron Gusek
executiveLook, there's still room on our end for deployment in 2027 and 2028. We began taking delivery of generation early, so we've positioned ourselves well to serve some folks who want power standing up as soon as the back half of next year. On the ramp side, we do still have inbound supply chain capacity in our plan to allocate for the latter portion of 2027 and ramping through 2028. We're certainly in conversations to put that to work at this point in time.
Michael Stock
executiveRight. Most of what we're focused on, including that earlier-stage piece, really centers on late 2028 and into 2029 — that final gigawatt or so, just a bit over a gigawatt, which will come online in 2029. Yes, those discussions are progressing further and further at this point. The talks about late 2027 and early 2028 are quite far along.
Josh Silverstein
analystUnderstood. Regarding this 1.2 GW announcement, after the first 500 is signed, how do you anticipate the other 700 will be handled? Will that arrive as a single ESA? Or does it involve several contracts? What's the reason for several agreements rather than one large one covering the 1.2 GW? Thanks.
Ron Gusek
executiveIt really comes down to how they typically construct data centers. Our observation is that these projects usually follow a highly phased approach, so although you hear those very large figures cited for sites, whether that's the 1.9 GW in Wyoming or these locations that are all gigawatt plus in scale, the buildings usually come as blocks of perhaps 3 MW, 4 MW, 500 MW of IT load at a time. In this instance, the ESA is tied directly to one building. So what you'll see is that when our customer brings up later phases of this, the following building, an ESA will be linked to it, and we'll assign the suitable megawatts there. So you'll observe this unfolding across a few phases, one building after another, one site after another.
Michael Stock
executiveYeah, just a bit of color on that. It enables efficiency when it comes to permitting and efficiency when it comes to financing.
Josh Silverstein
analystUnderstood. Thank you.
Marc Bianchi
analystHi, thanks. I wanted to revisit one point and make sure it's clear. Ron, I believe when that question came up regarding the prepayments, you said hundreds of millions of dollars, and that relates to the 1.2 GW. So my first question is just to confirm whether that's right; and my second is, when do you expect that prepayment to take place? Does it happen in the near term, or does it come in ratably as these ESAs reach completion?
Ron Gusek
executiveNo, your characterization is accurate. That figure is hundreds of millions of dollars tied to the 1.2 GW. As Michael mentioned, it will be applied ratably against the capacity payments across the first five years of the contract, and we would anticipate receiving it in the near term. It does not depend on the ESA being executed.
Marc Bianchi
analystUnderstood. Thanks, Ron. So let me shift over to the frac side of things. I think an earlier question touched on this — you've got pricing that beats the market in your current fleet, thanks to service quality and the ability to run cheaper fuel. How should we on the outside think about leading-edge pricing climbing higher, and how that eventually turns into a meaningful lift in your EBITDA? Do market prices need to rise 10% or 20% before that shows up in EBITDA around the middle of 2027? Or could you walk us through how that progression plays out?
Ron Gusek
executiveYes. The market has definitely moved to a stronger place — from where I sit, looking ahead to 2027, we feel confident the market will be supportive of pricing on an upward path. In my remarks I noted how strong the forward curve is right now. Much of this year we dealt with a situation where front-month oil was quite strong, yet the forward curve dropped off fairly quickly, so there just wasn't a way to lock in solid economics through 2027 and even into 2028. Over the past few weeks, though, the forward curve has genuinely strengthened. For 2027, I believe we're now above $85 through the end of the year, and above 70 — perhaps even above 75 — through 2028. That assists us by giving us confidence in our E&P customers' outlook and in their confidence regarding their financial returns for next year's activity. Consequently, I think it puts us in a better position to go out and keep pursuing price increases quarter by quarter. Naturally, we don't adjust pricing across all our fleets at the same pace. Sometimes that happens as often as quarterly; other times it's more of a semiannual or annual event. We'll handle those case-by-case, customer-by-customer. But yes, sitting here today, I'd say we feel more confident in our ability to secure some additional price as we move into 2027. I'd also say we expect to keep facing inflationary headwinds, especially where labor is concerned. Input costs have risen this year because of the tariff situation and also the cost of items like fluids. Obviously, we consume a lot of oil and lubricants and similar products. Those have climbed quite significantly. But labor will be a big one in the years ahead. Trucking is another area where we're feeling it. So we'll work to pass that through and, beyond that, look to add some extra margin to our bottom line.
Marc Bianchi
analystThanks for those remarks — I'll turn it back over now.
Alexa Breno
analystGood morning, everyone. Thanks for taking our question. Yesterday's update struck me as encouraging on the power side. Could you walk us through what has to occur between yesterday's announcement and actually signing the final contract? Which milestones still lie ahead? And how much of that sits with you versus the customers or other parties?
Michael Stock
executiveSure, Alexa, I can address part of that. Every major commercial term has been settled. We're currently finishing up the legal drafting of the ESAs, and we're moving into the site-specific sections that impact the contract. Those are the items that need to be finalized right now, and they take some time. We've reached the stage where we have the trust. I'd say we have enough of the key terms for a standard ESA covering the entire 1.2 GW, which essentially becomes a repeatable process. Once this first ESA is finalized, the effort required for the second, third, or fourth with this client will be comparatively small and will only involve site-specific matters after that.
Alexa Breno
analystAll right, that's quite useful. So then, an update on the financing side. You mentioned the discussions a bit. Once you get closer to signing a contract on the power projects, what amount of upfront capital do you figure we should expect to be committed? Will financing updates come alongside the contract, or is there any color on how we ought to think about that?
Michael Stock
executiveYes. What we're up to there, I'd say, is that we're clearly hammering out these ESAs alongside our financial advisors, and as we move forward now, even before the ESA, we're speeding up the financing talks with our financial advisors and the capital sources so we can try to get that financing moving as fast as we can once the ESA is signed. Now, it does still take some time; that could range anywhere from eight weeks to three to four months, depending on what kind of financing it is, owner's engineer's reports, and other bits and pieces. But I think by doing the pre-work we're speeding that up, and I think we can get that financing in place fairly quickly after the ESA is signed.
Alexa Breno
analystThank you, Michael. We’ll hand it over now.
Keith MacKey
analystGood morning, and I appreciate you taking my question. Michael, you said the core business is producing strong free cash flow. Could you help us break down the quarter a bit more on that front? Specifically, how much of the EBITDA came from the frac business versus CapEx, and how should we think about that going forward somewhat further as well?
Michael Stock
executiveYes. When we look at things across the year, Keith, capital clearly shifts from quarter to quarter. EBITDA shifts too, and it’s on a solid upswing right now; we will generate fairly strong free cash flow as we have moved through this year, even as we reinvest in the base business for digiPrime. The base business gave us positive free cash flow this quarter. We have had that in every other quarter. The same holds as we go into next year, when I believe we will see good, solid free cash flow from the completions business, even as we reinvest in our digiFleet.
Keith MacKey
analystGot it, understood. When we look ahead to Q4, it seems a seasonal dip is something we should factor in. Could you share any context on how large we should expect that Q4 decline to be when it comes to EBITDA?
Michael Stock
executiveAs we've sort of hinted at before, what you'll notice is the holiday lull that always happens. Again, when a pad is being wrapped up right before Christmas, folks prefer to give their crews time off during the Christmas holidays, and so on. You also get winter weather setting in. That's balanced out by strong commodity prices and the fact that this year we aren't seeing any budget exhaustion or anything along those lines. My sense is our customers will push through to year-end with their completion programs. You'd anticipate a seasonal drop for Q4 that's slightly smaller than usual.
Keith MacKey
analystAll right, thank you so much.
Saurabh Pant
analystHello.
Ron Gusek
executiveHello there, Saurabh.
Saurabh Pant
analystGood morning, Ron and Mike.
Ron Gusek
executiveGood morning.
Saurabh Pant
analystRon, Mike, sorry if I overlooked this, but did you give an update on the CapEx figure for this year? I believe it was $1.5 billion last quarter, if that's still the same number. Just set me straight if I'm mistaken — the way I'm thinking about financing is, you'd receive this prepayment fairly soon, I'm assuming before the end of the year, by the time the ESA is announced or not announced, right? That's imminent. Should we think of that as sufficient bridge financing, and then once the ESA comes, you'll fold it into a project finance, and financing is no longer a concern, right? Is that the correct way to think about it?
Michael Stock
executiveI'll break that down a bit. Yes, our CapEx guidance for the year remains intact. We're not altering that. Yes, we will be getting a sizable prepayment of capacity fees that gets booked onto the balance sheet as deferred revenue, and that will be a meaningful source of cash for the fourth quarter. Yeah, we don't expect to need to access additional financing in the fourth quarter.
Saurabh Pant
analystAll right, great. No, Mike, that's crystal clear. Just on the 1.2 GW deal specifically, how should we be thinking about profitability? Are we still assuming high teens unlevered IRR, 1.7, 1.75, on CapEx? Is this in a similar vein?
Ron Gusek
executiveYes. There's no change on that front; we're still targeting those high teens returns on invested capital. The final capital deployed on any particular project will simply depend on how complex the balance of plant is. There's the base generation that forms part of every project we undertake, and then on the very simple end — say a basic commercial or industrial project — you'll see a far lower multiple on the cost of generation to arrive at total deployed capital. At the other end of the spectrum, for a highly complex inference data center with a volatile load profile, you'll see us move up toward those higher figures, approaching two times the cost of generation for full deployment of the facility. So as we begin announcing ESAs and some specifics around individual projects, we can give you some color on that case by case.
Michael Stock
executiveThe CapEx figure doesn't water down earnings. I'll say that again two or three times today. The high teens applies across all the capital we deploy. We're still aiming at roughly that — somewhere near a 5x cash-on-cash payback on that capital. So sometimes, when a contract runs longer, say a 20-year contract, the payback might stretch toward the six-year mark. On the 15-year, we're at that five. So again, to repeat, when we take on extended scope for a client because we're the good partner we are to them, our capital returns don't get diluted.
Saurabh Pant
analystNo, that's completely clear, Mike. Risk, return, and how much capital you need all move together. So I appreciate it. Thanks for clearing that up. I'll hand it back.
Derek Podhaizer
analystHey, good morning. I'd like to build on what Saurabh asked, specifically regarding how the financing actually works. From what I gather, the large prepayment will provide the cash you need to get this first 500 MW underway. How should we think through the mechanics and the sequence for later placing the project into an SPV-level project financing once you sign that ESA — in terms of possibly refinancing some of the financing, or simply working through the mechanics, and how we should think about that after the ESA and the SPV are in place.
Michael Stock
executiveRight. Let me clarify one thing. That $300 million isn't tied to this particular project. It represents a kind of commitment from the client covering the entire 1.2 GW, and yes, it gives the corporation a source of cash for the quarter. The corporation carries out spending on long lead time items that was originally funded through convertible bonds in the first quarter of this year. Once we sign the ESAs, those assets — or rather the purchase contracts — get dropped down into a dedicated SPV, and at that level the SPV arranges project financing and subsequently reimburses the corporation for the money spent up to that point. We'll hold a significant equity stake in those SPVs. Our target is roughly 20% equity and about 80% debt at the SPV level. So you'll see that cash come back to the corporation and be reinvested into long lead time items so that more projects can be generated going forward.
Derek Podhaizer
analystGreat, thanks a lot. That was really clear, and I appreciate it. I suppose moving to frac, I'm just curious about the discussions as we head toward 2027, in terms of activity and pricing. Many of your customers have stayed fairly quiet regarding what they anticipate for next year. Strip is at 85, and I'd imagine some hedges are already in place. You mentioned in your opening remarks the improvement in E&P revenue visibility. Earlier this week, a major peer of yours predicted North America would be flat, with no recovery in U.S. fracs. I'd just love to hear your thoughts on how we ought to begin thinking about 2027 and perhaps the various moving pieces and levers — whether we could contemplate a genuine frac recovery or whether it's simply too early to say from where we sit right now.
Ron Gusek
executiveLook, what I'd say is I'm not going to claim we're heading back to mid-cycle economics or anything like that next year. That would be going a step too far. That said, the rise in rig count has in the end driven higher demand for frac equipment, probably on the order of 15 to 18 additional frac crews, and that has produced a frac market that's relatively tight. There's no capacity sitting idle waiting for work to complete. Our calendar is full. I think you'll hear from our peers probably over the coming weeks that their calendars are full and utilization remains strong. That leaves us in a position to pursue modest pricing increases quarter-on-quarter. A quarter ago, I'd have told you I wasn't sure the fundamentals were there or that clarity around 2027 existed yet. Now, as we've noted, we've seen the forward curve strengthen; that hedge opportunity is there. I think we have confidence in our customers' economics for the year ahead, and I think that gives us a backstop for continuing to seek some modest additional price increases over and above the inflationary impacts I expect we'll keep feeling as we work through the tail end of this year and into 2027. Many of those conversations are happening right now. We're in RFP season; we've gotten through many of those, but they aren't complete at this point in time. Still a little more work to do before we have the complete picture for 2027. We'll be able to give you that outlook on the next call.
Derek Podhaizer
analystGreat, got it. We're looking forward to that. Ron and Michael, thanks for all of your comments. I'll hand it back over.
Ron Gusek
executiveThank you, Derek.
Eddie Kim
analystHello, and good morning. Congrats on the deal you announced yesterday. I'm just wondering whether there's any worry that the timing of that ESA could slip into early 2027, given that data centers are now a political headwind — or is your confidence that the ESA lands by December fairly solid at this stage?
Ron Gusek
executiveWell, what I'd say is that we can't foresee what's going to happen over the next weeks and months, but as things stand right now, we feel confident in our ability to get there. At this moment, there doesn't seem to be a problem with completing it before year-end. As we've mentioned, even in that scenario, we've ensured contingency options exist should something occur with the primary sites, so that we could shift to a different site. That could bring a modest delay were we forced to do so, but those contingencies have been built in so that we can handle whatever potential headwinds may come our way.
Eddie Kim
analystGot it. Moving on to pressure pumping — you brought up drilling-related delays during the third quarter. I was hoping you could give us a bit more detail there. Is it simply that drilling has been proceeding more slowly, or is it more about your completions operations running so efficiently that you're now running into the rigs? And do you think this pattern will persist over the coming quarters, or was it truly confined to 3Q?
Ron Gusek
executiveI'd characterize it as a fairly unique combination of events. Coming out of Q1 and moving into Q2, utilization rose quite substantially throughout the wider industry. That added activity came from uncompleted inventory; we had a large group of wells sitting out there awaiting a frac crew to arrive and get to work on them. Because of that, we could ramp activity up quite rapidly and had a substantial runway ahead of us. Yet given how efficient our world is nowadays, that inventory got worked through quite fast. Rig count did climb, but in the end that left us chasing rigs. In a few specific instances, we actually did catch up to the rig, which meant there was some space on our calendar we hadn't expected; it pushed a little work into the following quarter. I don't see that as something that happens regularly. Normally, we find ourselves with a little breathing room between us and the rig, or we have another option for relocating the fleet. This time, we got caught without either, so the quarter took a bit of a hit; but I'd describe it as a bit of a singularity rather than something we should expect to continue.
Eddie Kim
analystUnderstood. Appreciate that context. I'll hand it back over.
Jeff Le Blanc
analystMorning, Ron and everyone. Thanks for fielding my question.
Ron Gusek
executiveMorning.
Jeff Le Blanc
analystI'd like to check whether we can go back over how you're coming along on locking in the entire 3 GW by 2029, and whether any additional capacity has emerged since the Caterpillar announcement that came out in the 10-Q.
Ron Gusek
executiveNo; we're quite confident that the 3 GW is available to us so we can execute and have it energized by the end of 2029. We have not added or announced any further capacity on that front. Obviously, we keep working on the supply chain and keep working with our data center partners, who in some respects are seeking earlier generation. We're looking into partnerships and possible ways to meet their rising need for power. But nothing beyond that has been announced or committed to.
Jeff Le Blanc
analystAll right, thank you so much. I'll turn the call back over to the operator.
Dan Kutz
analystHi, thanks. Good morning. I'd like to revisit the outlook for the fourth quarter. I believe Keith raised a question about that. I just want to dig into it a bit further. Historically speaking — and I think you folks have mentioned this — fourth quarter top-line seasonality is usually around a mid to high single-digit decline. Given the dynamics you described, do you think a low single-digit decline might be a better target for this fourth quarter? Or would that be too optimistic? How are you thinking about the corresponding decremental margins for the quarter? Obviously there are various factors you guys have pointed to, some cost pressure, but then any incremental pricing traction that helps new decremental margins. Do you think low single-digit revenue decline is too optimistic? How would you describe incremental margins or decremental margins compared with normal levels for this quarter? Thanks.
Ron Gusek
executiveLook, I'd say we're not ready to provide a specific figure; it won't be quite as meaningful as what we'd typically see in a normal year, given some of the activity that has been pushed, given the strength of demand from the privates. We've certainly got some tailwinds in that regard, but we won't commit to a specific number there.
Dan Kutz
analystYeah, that's fair. So Michael, maybe you mentioned that the intention is to keep putting money into additional digiPrime assets, at minimum to maintain the replacement level. But how are you thinking about that over the nearer term — how do you weigh allocating capital to digiPrime investments against the rather sizable capital needs for expanding the power business?
Michael Stock
executiveWe're extremely optimistic about both parts of our business. Returns in our completions business are very strong, and we'll keep growing it across the next decade. Same thing on the power side, where at this point we don't see ourselves as constrained by capital. There are many forms of capital available to us for building that business, and in the power sector we're going to build a business that lasts for decades. Once again, we're very focused on building long-term businesses that we can grow over time, so we aren't chasing perhaps the fastest win or the fastest payback. Through the cycle we'll keep investing in both power and completions, and we'll grow the business over the next 20 years.
Ron Gusek
executiveAs you can imagine, Dan, in this specific environment, a great many people are raising their hands for next-generation equipment, simply because of the arbitrage between diesel and natural gas. As Michael mentioned, I believe we have always been clear that this is a both/and situation, not an either/or. For 15 years, we have built an immense amount of trust and strong relationships with our customers on that side, and we will keep supporting them with leading-edge technology and the service quality for which we are well-known; that will mean we will continue to invest in next-generation technology at a cadence that is reasonable and appropriate for the market. Right now there's substantial interest in that offering, so we'll aim to strike a balance between what the market is asking for and how quickly we're ready to keep manufacturing that hardware.
Dan Kutz
analystGreat. That's all genuinely useful. Thank you to both of you. I'll hand it back.
John Daniel
analystHey, guys. Thanks for having me. Ron, just to pick up where Derek's questions left off, but on the core business and recognizing you're in the normal RFP season, how would you describe that customer urgency to secure fleets for next year? And really just trying to get a handle on what has happened the last two to three weeks with respect to inbound calls versus maybe what you were seeing in Q3.
Ron Gusek
executiveLook, I’d say that although it didn’t progress as early as it has during certain prior years, we’ve encountered cases where, in my view, our RFP season for the following year took place over the summer; we’ve completed a substantial number of those discussions; for 2027, we already know where most of our fleets will be housed. In certain instances, I’d note, no RFP was held at all. Because of the trust and strength inherent in the relationship, our customers have simply decided to continue with us as we move into next year, acknowledging that a price conversation probably lies ahead; apart from that, they are committed to keeping Liberty involved; we still have a few such items left to finalize, but at this moment I believe we are largely through that process.
John Daniel
analystAll right. You may not have those figures handy for this question, but if you had to estimate — and I want to stress the word estimate — what is the smallest price increase range that you believe would be required just to cover inflationary costs? A rough approximation is fine. I'm only trying to get a sense of the scale.
Ron Gusek
executiveOh, gosh, I’m not sure I have that answer right at the top of my head.
John Daniel
analystOkay, that's fair enough. Well, I've said everything I have. Appreciate having us on. Unless you have—
Ron Gusek
executiveJohn, perhaps I could add one point there. What I'd say is that by this stage we've likely counterbalanced a good deal of it. When you consider a number of the rises that were behind that
John Daniel
analystRight.
Ron Gusek
executiveTariffs would be one of those, I'd say; take fluids — lubricants and similar items — we've seen those go up. That area has largely settled at this point. We saw a fairly sharp rise during the middle of this year, and we've leveled off there; labor inflation is something we'll be contending with, as I mentioned, but I believe we have a view on it and are acting somewhat ahead of the curve. Much of that, I think, is already addressed. Then, on top of it, there's some capacity to counterbalance those pressures, largely via technology and innovation. Consider how digiPrime has been deployed and what we've observed on component longevity from putting that asset to work, plus using AI as a software monitoring tool alongside it — we can soften some of those effects to a degree, reducing what a more conventional fleet might have experienced down the road. Taken altogether, we're likely in a reasonably decent position as we head into next year. We'll keep watching it closely. Labor and trucking in particular, I think, are the two where we'll feel things directly in the field, driven by the entire data center build.
John Daniel
analystFair enough. Okay. Thanks for having me.
Ron Gusek
executiveAmerica is at a turning point. This country, which led the globe through the Industrial Revolution, the Digital Revolution, and the Shale Revolution, is now moving into a new period of energy demand unlike anything we've seen. Artificial intelligence, advanced manufacturing, data centers, reshoring of industry, and ongoing economic growth are all driving up the need for affordable, reliable energy and modern infrastructure. The challenge in front of us is clear. If we intend to stay the world's leading economy, we have to make sure we can produce and deliver the energy that powers it; this ought not to be a partisan matter. Americans will keep debating climate policy, environmental priorities, and what our future energy mix should look like. Those discussions matter and they are necessary. Just as important are the concerns local communities raise about how energy infrastructure gets developed and how it affects the places they call home. Those concerns deserve serious attention. Successful projects rest not only on engineering and capital, but on trust, transparency, and meaningful engagement. Still, recognizing those concerns cannot turn into a reason for doing nothing. The fact is that the U.S. requires more energy infrastructure. We require new generation capacity. We require transmission. We require pipelines; we require storage. We require the infrastructure needed to support both traditional and emerging energy resources. To put it plainly, we need to build. Too frequently, however, the discussion gets reduced to a binary: unlimited development versus outright resistance. Neither option offers a lasting path ahead. Adopting a moratorium approach could postpone tough calls, yet it will not address the core problem. Affordable electricity will remain a necessity for Americans. Reliable power will still be needed by businesses. Economic opportunities that energy development can generate will continue to be something communities rely on. Whether demand will exist is not the issue. The real issue is whether we address it responsibly and proactively, or instead respond afterward to shortages, higher costs, and weakened competitiveness. What America requires today is not reduced scrutiny but greater certainty. We need decision-making processes that are transparent, rigorous, and efficient. Our policies should promote investment and still honor what communities care about. Above all, we need leaders who will concentrate on fixing problems instead of getting stuck in deadlock. Looking back across our country's past, America has thrived whenever we met hard problems with self-assurance instead of pulling back. Whether it was railroads or highways, bringing electricity to rural areas or building the internet, every generation put money into the infrastructure that allowed later prosperity. For our generation, energy is that infrastructure test. Whatever our politics, we ought to find common ground on one basic idea. A country that keeps growing needs an energy system that keeps growing too. Getting there means people will have to give a little, find new ways of doing things, and work together—yet the starting point has to be a common pledge to put in place the infrastructure we need to protect America's economic future, bolster its energy security, and better the daily lives of those who rely on it. Disagreement isn't the biggest danger. The biggest danger is letting that disagreement stand in the way of moving forward. We really appreciate your being with us on today's call. Have a good rest of your day.
Operator
operatorThat wraps up this conference. We appreciate your joining today's presentation. You're welcome to disconnect at this time.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Liberty Energy Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Liberty Energy Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Liberty Energy Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.