Good morning, everyone, and thanks for joining the September quarterly webcast for Liontown Resources. Here with me this morning to present the company's results are Tony Ottaviano, Managing Director and CEO; Adam Smits, Chief Operating Officer; and Jon Latto, Chief Financial Officer. After the formal presentation, we'll hold a Q&A session for investors and analysts. During today's call, participants can ask questions both by text and live audio. <<operator_script>> Should you run into any trouble submitting a question through the web, a backup phone line is available. You'll find dial-in details on the Request to Speak page or on the Home tab under Asking Audio Questions. To view documents relevant to today's meetings, select the Documents icon. A list of all available documents will appear. Once selected, the document will open within the platform. You'll still be able to listen to the meeting while viewing the documents. Text questions can be submitted at any time, and the audio queue is now open. I'll now hand over to Tony Ottaviano.

Antonino Ottaviano

executive
#2

Thanks, Josh, and welcome aboard, everyone, to this call. We take enormous pride in delivering our inaugural quarterly today, and it comes with a full suite of production results. Getting here has been a source of great pride for us — we've gone from explorer to developer and now to producer. So as of today, we've taken our place among the world's lithium producers. This quarterly report makes it very clear that we keep delivering on what we say we will, and we're now progressing with a ramp-up that we have strong confidence in and that matches our expectations. So let's move to the first slide, please, Josh — the important information. Next one, please. Okay. I want to begin with ESG, and the first bucket is safety. We're a company that has emerged from construction and is now entering a new phase as an operator. Because of that, the risks show up in a different form. The management team, led by Adam Smits, is very aware of this, and our attention stays relentless on safety. Any injury is one injury too many. And while these results are steady, we keep looking to eliminate all injuries from the workplace as best we can.

Antonino Ottaviano

executive
#3

On one of our social metrics — we track many, but this one concerns female workforce participation — and again, from a company that began with nothing, we now have well over 320 employees, and we've reached the industry standard for female participation. That isn't the finish line. It's only the start. While the big end of town can put forward various value propositions to attract female employees, we'd like to urge women to consider companies like ours too, where we can provide a differentiated value proposition. On the environmental side, there's a great photo that illustrates this. A company of our size made a bold commitment to secure at least 60% renewable power and to build Australia's largest hybrid power station, and we've achieved that. Beyond achieving it, we've surpassed our 60% target, with 86% renewable penetration at first production. And finally, again, as with injuries, we want no material reportable incidents, and we've performed well there, and we remain vigilant. Next slide, please, Josh. Turning to production highlights, I might hand over to Adam to give us that overall view of production.

Adam Smits

executive
#4

Good morning, everyone. I'd say the key metrics here are fairly typical for a company like ours. Mining came in at 4.1 million tonnes for the quarter. We began mining quite early on. Open pit mining has now been underway for almost 20 months. Underground has been operating since last October, so nearly 12 months. And that's proven itself in a way that's, I suppose, steadily pushing through and delivering the tonnes when we need them. So we're not living hand to mouth. We've got decent stockpiles on the ROM at grade. Processing was 280,000 tonnes for the quarter, based on 2 months. For context, we've already processed nearly 200,000 this month. So you can see the progression since we started. Plant availability, I think, reflects how much effort, design and work we put into building the plant — 87% for the quarter. For context, 99% for the last week, 98% for the last month. So this is, I suppose, a real positive for what we've built and lets the team then optimize the plan. And that's where people should gain some confidence. Production was 28,000 dry metric tonnes for the quarter. That's in excess of 52,000 tonnes as we sit today, with sort of 65,000 tonnes forecast to be shipped.

Adam Smits

executive
#5

That should give you a sense of how confident we are in the production. Sales, 10,000 — that was our first shipment. Last Friday our second shipment went out, another 22,000. So you can see we're not just producing it, we're also getting it out the door. And lithia recovery at 51% — there's a chart a bit further along in the slide deck that shows how that has progressed and keeps progressing, I think that's the best way to put it with lithia recovery.

Antonino Ottaviano

executive
#6

Thanks, Adam. Now, if we could move to the following slide, please. Mining performance. There's a series of slides we'll walk through now covering how we've done overall. This is something I'll be sharing with Adam. I'll just touch on a few highlights. As Adam said, we've been operating in the open pit for over 20 months, and we've been advancing through the underground for nearly 12 months. And looking at a few of those photos, in the open pit we've now got the entire ore body flowing as we forecast in our mine scheduling. So at this point we're producing 100% ore, with very little waste. In the underground, as that photo shows, the progress has been tremendous. Jumbo productivity is running above 311 meters per jumbo per month. And during the recent month, September, we averaged more than 320 meters per jumbo per month, which is an outstanding effort. And you can see the ground conditions underground. They're exactly as we expected. It's dry and very good from a geotech standpoint. Adam, would you like to add any of the specifics on that?

Adam Smits

executive
#7

No. Honestly, I'd say the underground work has come along extremely well. <<inaudible>> has been outstanding in the partner role. At this point we've got more than 5,000 meters of development, covering both capital and operating development as well as level development. With the open pit, the schedule for it mattered a great deal. Our aim was to genuinely be in ore at the moment the plant kicked off. So we didn't just want ore sitting on the ROM pad — we wanted to be generating additional ore. By year-end, our forecast is to have in excess of 1 million tonnes of ore either on the ROM pad or in the stockpile beside the plant, which gives you a sense of how nicely that pit is performing and, I suppose, of the foresight involved in getting that open pit team going early. As Tony mentioned, there have been no major problems where hydrology is concerned. As a matter of fact, no water has shown up underground. And in the same way, the pit has stayed dry. Crucially, when it comes to weather events, a great deal of work has gone into putting both the underground and the open pit to the test over roughly the past year, demonstrating that rain events won't cause interruptions to our ore supply.

Antonino Ottaviano

executive
#8

Thanks, Adam. Josh, could we move to the next slide? On this one—and the few that follow—I'll pass things over to Adam. Still, speaking as CEO, these results make me extremely proud. We have just 8 weeks of data, yet the trends are already visible. I also want to credit our designers, Lycopodium among them, along with every partner who helped us reach the point where the plant is commissioned and delivering this kind of performance after merely 8 weeks.

Adam Smits

executive
#9

Yes. Like I mentioned before, one of the main things we concentrated on during the design stage with Lycopodium was making sure the plant would be highly operable and maintainable. A great deal of time and effort went into choosing the correct materials, drawing on lessons from past projects or others we've done. How would you describe it — troubles caused by choosing poor materials. To this point, we certainly haven't run into those problems. As I said before, we're tracking at 98% availability for this month and 99% for the last week. And that availability trend is visible there. The only real dip came from a shutdown we had at the start of this month. On recovery, there's been a consistent improvement from where we began in week 1 to roughly where we stand now. Last week's average was 55%. This week, we're in the 60s. So there's clear progress, which is what we anticipated. We have — though I think for context, we have a brand-new team operating a brand-new plant, and these curves reflect not only, I suppose, the ramp-up phase, but also that the plant is being commissioned. So we're commissioning and ramping up at the same time, and that's what those figures show.

Adam Smits

executive
#10

I'd say it's quite impressive that we're already close to where some of our competitors are, especially when you look at how we've recovered after only about 2 months of running. Another thing worth mentioning is that tantalum started up in October — this month — and we're already above 70 tonnes of tantalum. For the company's income, that's really just icing on the cake, and it has worked right from the start with lots of room to improve. So there's additional upside there too.

Antonino Ottaviano

executive
#11

One last thing I want to say about the plant: we have constructed, and by now commissioned and brought into operation, the most modern lithium plant anywhere in the world, and we kept maintenance and operability at the forefront of the design, which carries through into operating costs. So let's go to the next slide, please, Josh. Here's another confirmation of how the plant is performing, and I'll have Adam walk you through this as well.

Adam Smits

executive
#12

Yeah. So, if you look at weekly production — and I mean not just throughput but actual output as well — you'll notice milling tonnage has been climbing consistently. At this point we're processing somewhere around 7,000 to 8,000 tonnes per day, and it keeps getting better. That's simply part of the ramp-up, and it's all according to plan. In the same way, concentrate output over the past couple of weeks shows where we're headed — above 1,000 tonnes of concentrate per day. What matters is that starting on day 3, I believe that was, the concentrate has met spec. That means more than 5% lithium and comfortably below 1.5% iron. So...

Antonino Ottaviano

executive
#13

And at points, we've generated more than 6.

Adam Smits

executive
#14

And over the past 3 or 4 days, it has come in above 6. Just so everyone has a sense of it — above 6, meaning a 6% recovery. So these are genuine, genuine metrics; genuine, genuine progress, once again showing the capital, the hours, the work, and the upfront design effort that went into it. This was never about just putting up a shiny plant. It is producing results. The crushing circuit sits idle. It operates somewhere between 6 and 10 hours per shift purely because there is that surplus capacity at the sleeve.

Antonino Ottaviano

executive
#15

And last, on plant design—as Adam mentioned earlier—we now have a complete flow sheet, and that gives us a steady foundation so we can improve step by step and reach the efficiencies we're aiming for. There are still meaningful optimization levers open to us. We've barely begun, so we know what those levers are, and we're actively tracking them down. Next slide, please, Josh. On shipping, as noted in our opening slides, we've gotten off to a solid start with shipments and offtakes. Our inaugural shipment left Geraldton on September 27. We've also kicked off our spot sales strategy—as we've said consistently over the last 2.5 years, we will always set aside a share of production for the spot market to create the transparency that's needed. We've followed through on that, and we're delivering on it. Revenue from sales this quarter will be recognized in the December quarterly. Regarding our strategic offtake agreements, we intend to deliver into them gradually as production ramps up, and announcements on that will come in due course. Another notable point: we've held negotiations with Ford and reached a win-win outcome, balancing our offtake book by pricing some of our product off a carbonate index rather than hydroxide only.

Antonino Ottaviano

executive
#16

And Ford gets their product in return at the time they need it. Josh, could we have the next slide? Moving to the cash flow waterfall, I'll hand things over now to Jon, my CFO. Jon, over to you to take us through it.

Jon Latto

executive
#17

Absolutely. Thank you, Tony. I'll simply move through the cash flow statement from left to right. We began the period with $123 million in cash on hand. As we told the market, we subsequently arranged USD 250 million in convertible notes with LGES, our foundational offtake partner, which translated into AUD 372 million. That's the large green bar visible there. Continuing across, we incurred certain financing costs, mainly leasing costs we paid. In addition, there were, of course, some adviser fees and legal fees connected with establishing the convertible note. Further along, you can see a $1 million deposit tied to a 20,000 tonne sale completed in September. That's a modest deposit related to that sale. Naturally, we expect to receive those funds, or we will receive them, or have already received them, in October. Then you'll notice the $52 million outflow linked to our operating activities. That consists of our mining costs at the open pit for July, August and September. Our processing cost for August and September, since we commenced production on the 31st of July, plus, of course, our site administration costs, our maintenance costs and also our corporate costs.

Jon Latto

executive
#18

After that, there's a modest $2 million bar for net interest receipts plus some minor fees, but essentially that represents an inflow. Next we come to a $29 million bar, which basically corresponds to capital expenditure at our mining operations. So we have deferred waste at our open pit, along with the expense of advancing the underground as we work to bring it online. Taking all of that into consideration, we would have finished with a cash balance of $413 million before any capital spend tied to the Kathleen Valley project. Subsequently, over the quarter, we outlaid $81 million -- an $81 million outflow linked to the costs needed to reach first output at Kathleen Valley. That covers items such as the EPCM contractor, structural mechanical piping, mud square, first field, first spares, and similar things. We also incurred capital spend of $69 million, and that mainly concerns additional capital expenditure that wasn't needed for first production. It consists primarily of spending on the paste plant, which the underground requires, as well as capitalized commissioning costs as we ramp -- as we keep bringing the processing plant up to full capacity.

Jon Latto

executive
#19

So that puts us in a very solid cash position as we closed out the quarter, at $263 million. With that said, I'll turn things back over to Tony.

Antonino Ottaviano

executive
#20

Thanks, Jon. Could we advance to the following slide, Josh? On business optimization, our goal is to stay robust throughout the cycle. In our recent announcements, we've noted that we've started a business optimization effort — examining our costs, examining our mine plan, and determining the best way to optimize. Yet above all, it begins with productivity. As already stated, the plant is producing as we expected, but we aim to become more productive, and we have several operational levers that will get us there. The second element, which we've emphasized for a while, is optimization of our mine plan. Kathleen Valley holds a world-class ore body. We designed that ore body for exploitation at a time when the market was exceptionally strong, and we were reaching 3 million tonnes as fast as we could and then rapidly ramping to 4. The world has changed, and we need to grasp how that performs in this context, and we hold some robust options on that front. We're reviewing all our input costs, from existing contracts through to new contracts. Every consumable cost is under review, and we're making tremendous progress.

Antonino Ottaviano

executive
#21

What we have here is a systematic, well-structured emphasis on every major factor behind the company's operating costs. And then, as with all things, there ought to be a capital element, and that's something we're examining. We have completed — we are reviewing our entire capital expenditure from top to bottom. We're asking whether that capital outlay can be optimized, pushed out, or eliminated altogether, right, keeping in mind that we won't just cut it and then add it back into operating costs, since that's another area of focus too. We're focused on savings that recur. We will also put in place a capital allocation approach and process, and that will be rolled out, and it will give us additional insight into how capital will compete inside the organization. And lastly, we keep working with our mining engineers and our mine planners, who continuously examine the best way to deploy sustaining capital underground so that development costs are optimized. We will be giving the market an update. We had stated that we would deliver it during the first quarter of next calendar year. We have moved that up to before the end of this year, and the reason was that we're seeing strong performance in the plant, and the work is getting done.

Antonino Ottaviano

executive
#22

That means we can provide you with more detail on it over the next few weeks. Let's move to the next slide, please. To wrap up, then, safety remains our top priority. And we have shown that we are transitioning from construction into operations. We're keenly aware that this brings a different set of risks — a different suite of risks — and we are examining those and managing them. We have now joined the ranks of global lithium producers, we are in our ramp-up, we have delivered our first shipment, and we have a clear line of sight to steady state. Our mining activity keeps advancing according to plan, with the underground reaching almost 1,900 meters of development during the quarter at a jumbo productivity above 300. As I mentioned, in the last month we have been north of 320. On mining activities, when we make the announcement on the mine plan, we will produce a suite of options. And we will select the option that we believe will best optimize the business through this current cycle and into the foreseeable future. Just to be clear, it won't include care and maintenance. We have a strong balance sheet, with $263 million worth of cash in the bank.

Antonino Ottaviano

executive
#23

We keep working alongside our customers. The rationale behind this customer-led finance approach is that our interests line up. Our customers are after our product, and we’re after Tier 1 customers, and we keep working together on that while we navigate a very difficult market. And we are — and we’ve kicked off our spot strategy. Ultimately, everything begins at the resource. We have a high-grade, large resource at Kathleen Valley. That delivers optionality across a whole range of things. We have a plant that gives us that optionality, and we have an ore body that gives us that optionality. And we’ll be able to give guidance to the market on how we navigate this market through that with this ore body and the plant we’ve designed. And we’ll provide that business update, as I said, by the end of this year, maybe earlier. So that concludes our presentation. I’ll now, Josh, hand over to Q&A.

Operator

operator
#24

<<operator_script>> Today's initial question will be taken from Kate McCutcheon of Citi.

Kate McCutcheon

analyst
#25

Tony and Adam, congratulations on the ramp-up and the physicals. You just mentioned that the mine plan update is coming in the next 2 months. What should we expect from that? I believe you just referenced options. Will there be a recut operating cost for the 3 million tonne case? I think the last market disclosures were based on the 4 million tonne case. And would it be fair to expect lower concentrate grades in response to what customers want?

Antonino Ottaviano

executive
#26

Kate, everything you asked for will be included in that update. The detailed costs, the mine plan we’ve chosen to carry us forward, where we stand on concentrate grade — all of that will be released over the coming weeks. I won’t get ahead of it today. What I can tell you, Kate, is that our costs will be published in line with the World Gold standard. You’ll get cash costs and all-in sustaining costs from us. We won’t be playing games with items that are in and out and not included. How we produce it will be very transparent, and I’d recommend the industry do the same.

Kate McCutcheon

analyst
#27

Alright, that works for me. Now, regarding CapEx, I believe you mentioned roughly $70 million that wasn’t needed for commissioning. So does that mean this amount wasn’t part of the $120 million you said remained to be spent on CapEx at Kathleen Valley at the time the convertible was announced? Or is it spending brought forward? I simply don’t remember seeing any growth CapEx in your study once commissioning is done. Also, could you remind me when you expect to declare commercial production, and how we should think about the remaining construction CapEx as such?

Antonino Ottaviano

executive
#28

Let me address a few things on that. The $120 million — or rather the $122 million we announced as remaining funds needed for the project at the time of the convertible note was meant to take the project through to first production. Take the paste fill plant — that isn't needed, wasn't needed, for first production. As a matter of fact, it will be needed somewhat later on. So that capital got spent and was counted within our working capital. That's what shows up in the $69 million, correct? Regarding commercial production, we have room to maneuver under our offtake agreements, and I already said during our presentation that commercial production can be called on a customer-by-customer basis, correct? So a series of announcements about commercial production will be made by us in the foreseeable future, and we'll speak to that point. But nothing specific requires it, correct? It comes down to our election, at the moment we feel ready and confident about supplying into those contracts.

Operator

operator
#29

The next question we have today is from Hugo Nicolaci at Goldman Sachs.

Hugo Nicolaci

analyst
#30

Congrats on reaching some milestones. I just wanted to explore a few things mentioned earlier. Adam, you said you've already run 280,000 tonnes of material during October. I realize we're likely getting ahead of the outlook you plan to give in a couple of weeks, but do you have any indications about how you expect that ramp-up to go over the next couple of months, from here into next year?

Adam Smits

executive
#31

Yeah. Look, I think our target for tonnes was roughly 8 months from start-up to nameplate. And I believe we had around 15 — somewhere between 12 and 15 months on the recovery.

Antonino Ottaviano

executive
#32

Somewhere between 15 and 18.

Adam Smits

executive
#33

Yes, so in a notional sense, we're absolutely within those throughput ranges already. Right now we're running at roughly 325 tonnes per hour, against a throughput rate of around 380. What's driving that is the plant as a whole — the thing we're prioritizing there is recovery and grind rather than simply pushing nameplate tonnes through, while still holding grades above 5% and keeping that iron level low. So that's what's behind the throughput figure. So it will be brought up progressively in a manner that keeps us meeting the con grade. On recovery, anybody who has worked with lithium understands that chasing those recoveries is not the simplest thing. After 2 months of operation, we're already not far off our peers. We're solidly in the mid-50s, and we're already having days above 60 in a plant that is essentially brand new. It has taken some of our peers 14, 18 months to reach the point where we are today, and we know that from having examined other data. So I think we're going really well. We have a brand-new team. We have a brand-new plant. And I think we're solidly within that kind of banding of those kinds of trajectories, so to speak, on both recovery and throughput that we set out.

Adam Smits

executive
#34

If there's a way to reach that point sooner, believe me, we'll take it — the team can confirm that over the weekend, when I was pushing them hard in a frenzy to get more out the door, that's exactly what we'll do. That said, it has to be done in a safe manner, and it has to be done in a way that lasts. Being a one-day wonder gets us nowhere. We need to understand what we're doing, which levers we're pulling, and what results come from them. So much like what we've carried out across the entire process — from PFS through scoping and DFS — a very measured approach, done in a way that keeps it sustainable.

Hugo Nicolaci

analyst
#35

Great, that gives us useful detail — thank you. The second item is really about when the cash moves. Could you share a little more on the expected timing of payments for your shipments? Clearly, a deposit has come in for the most recent shipment. Once it reaches port, do you anticipate cash arriving then, or does the money come in over a longer horizon? And then, any further thoughts you can offer on, I suppose, cash going out — working capital and other movements right now — plus completion of items such as the paste plant that you have coming up soon.

Antonino Ottaviano

executive
#36

I'll answer that with Jon's help, sort of. But on revenue: the first shipment's money is already in the bank — we have it. Those contracts run through a letter of credit. So normally with a letter of credit, once we give the customer the quality certification, which gets done within 3 or 4 days after the ship departs the port, we can then draw on that letter of credit. So roughly 10 to 15 days is the timing we're seeing, okay? So we shipped just recently, as Adam mentioned, on Friday. Was it Friday? Yes — the 22,000 tonne shipment. And again, we'll draw down on the letter of credit quite soon, as soon as the quality certification comes through. So that's the kind of payment rhythm, right, that we have. As for capital cost going forward and payments, we have — or maybe I'll hand it to you, Jon.

Jon Latto

executive
#37

Yeah. No. Thank you, Tony. What matters most to point out here is this: first off, our project has no overspend. We're delivering it at the price we committed to. On the timing side, we do — there's a bit of that spending. Some of those funds are still needed for first production and we haven't paid them yet, but it's simply the project's tail end stretching out longer when you look at it from a cash outflow perspective. Still, I'll repeat: cost has not gone up. We're doing exactly what we told you we would do.

Antonino Ottaviano

executive
#38

We're still wrapping up invoices and that kind of thing, and we're settling the final contract figures with the contractors.

Jon Latto

executive
#39

Right. And regarding timing, I’d tell you that the rest of the cash outflow tied to building the Kathleen Valley project will essentially be finished by the close of the December quarter.

Operator

operator
#40

Levi Spry is the source of our next question today.

Levi Spry

analyst
#41

Just to double-check that final figure — the cash outflow for the remaining capital during this quarter, is that right?

Jon Latto

executive
#42

Absolutely, Levi. So the situation is that roughly $65 million is still outstanding, and that splits into 2 pieces. Essentially, about $50 million in cash payments remain to be made, and those relate to the cash payments that get us to first production. Then, as Tony mentioned, we are carrying on with the paste plant, which isn't needed for first production, and there's circa $13 million to $15 million left on that. From a cash flow perspective, we expect those to have flowed through and to be essentially taken care of by the close of the December quarter.

Levi Spry

analyst
#43

Yes. Understood. Okay. And returning to that question about the optimized mine plan: when should we expect to see it? And aside from simply ramping up to 3 million tonnes rather than 4 million tonnes, which parts are being optimized?

Antonino Ottaviano

executive
#44

Levi, we're concentrating on roughly 5 distinct levers. So at the mine, we're examining ultimate production. The second lever involves how we reach the working stoping fronts more cheaply — that means optimizing development costs. The third lever concerns which grades we mine. So what's profitable, and what do we leave for the market rebound. The fourth item is the optimal mill size, to match the production coming out of the plant. And then finally, as we've discussed, what concentrate grade we produce, given our customers produce around 5.3 to 5.5, and some of them produce 4.5. So that gives us a huge benefit as well. So those are broadly the levers we're looking at. There are others, too. Capital, as I've explained. We've got that slide that sort of breaks it down for you.

Adam Smits

executive
#45

To build on what Tony said, our big differentiator is this: with an underground operation, we can actually choose exactly where we go, which isn't the case with an open pit. In an open pit you have to start at the top and work downward, moving a lot of waste, and you really don't have many choices beyond, say, dropping down and taking a bit of cheeky ore — yet you still have to come back and haul the waste down before you can reach it. With underground, though, we're able to take a very targeted approach in chasing both grade and tonnes per vertical meter, and that's a key driver for the underground team and, I guess, a key advantage of our mine plan, particularly from an underground perspective.

Antonino Ottaviano

executive
#46

The tonnes per vertical meter matter a great deal, I'd say. Keeping those jumbos at full utilization — 100% — is what we're after. So everything in our mine plan going forward centers on squeezing the most out of equipment utilization, maxing it out. That's point one. Point two: by pushing as hard as we have at both the open pit and the underground to reach 3 million as fast as we can and then ultimately 4 million, we put a tremendous amount of infrastructure in place upfront. Our paste fill plant, at $4 million, is built. Commissioning is underway. It's finished. On our ventilation system, there's been a lot of thought about the path forward. It's being installed today. So the main vent draft is going in, and the decline drafts are already done, giving us ventilation down past 100 meters. A lot of things were done upfront that we can now lean on to optimize the plan should we decide to pivot in a new direction.

Operator

operator
#47

Today's following question is from Reg Spencer at Canaccord.

Reg Spencer

analyst
#48

I only wanted to add a bit to what Levi asked. I assume your answer will be that I simply have to be patient and wait until your optimization work produces results. But regarding those other production scenarios you are weighing as part of that optimization, my guess is they could involve something like a smaller, higher-grade approach, or an open pit only with the underground slowed down. I was just wondering how those alternatives would compare with where your fixed costs sit.

Antonino Ottaviano

executive
#49

Reg, that question covers a lot of ground. You’ll have to be patient, but I can offer some perspective. Again, I’ve been involved in this industry for a very long time. It’s easy to fall into the trap of thinking more tonnes are better because they spread your fixed costs, right? So usually, simply adding more tonnes can’t always dig you out of a cost position. There may be an optimal throughput that balances your fixed costs, but also your overall costs. We’re managing for cash. So we’re looking at the sweet spot that gives us the best cash outcome. So that’s why we don’t want to rush into this. There are many levers we need to pull if we -- to give us the ideal go-forward case.

Reg Spencer

analyst
#50

Understood. If I may squeeze in one final question. Tony, you said concentrate grade is among the levers available to pull. What I'd like to understand is the trade-off involved — the extra cost and the effect on your throughput from pursuing a higher con grade and improved pricing, set against throughput tonnes and what look like new industry benchmarks of, say, 5.3%, 5.4%. Then again, maybe I'll just have to wait for that optimization study of yours.

Adam Smits

executive
#51

Yes, that's a fair question, Reg. I suppose it's common knowledge that a lower concentrate grade generally gives you improved recovery, and you can usually feed more tonnes through. So obviously, what we've been focused on is actually producing concentrate, shipping it out the door, and bringing in some income. That's our top priority. But producing it on grade — meaning anything above 5% — and aiming for some low iron. What we're beginning to do now is optimize around the grade we produce and the recovery benefits we do and don't achieve. The circuit is so new, and the team is so new, that frankly we don't yet have a baseline for what the levers do when we pull them. For example, over the last few days, we've been achieving very good recoveries while also producing grades of around 6%. A month ago we couldn't do that. So we're trying to build up that data book, so to speak, or that library that tells us: right, if we want to produce a 5 con, what recovery uplift do we get? And then what does that mean for throughput, and what does that mean in terms of going all the way back to what we take off the ROM pad.

Adam Smits

executive
#52

To address what you asked, a recovery improvement is certainly there. Lowering the grade clearly delivers a con production gain as well, and that's something everybody knows. What we're working out right now is the precise size of it and whether the payoff justifies the effort.

Antonino Ottaviano

executive
#53

Reg, one last thing, though: should that approach fail to produce additional lithium units, there would be no logic to it.

Adam Smits

executive
#54

That is right.

Antonino Ottaviano

executive
#55

Right? So that's the direction I think you're going in. So we'll take a look at it. If it gives us additional lithium units, then we'll go ahead with it.

Adam Smits

executive
#56

Right. Right. This isn’t something we’re doing merely for rehearsal.

Operator

operator
#57

Adam Baker of Macquarie has our next question.

Adam Baker

analyst
#58

Tony and team, thanks for that update on the remaining cash outflow at start of the December quarter. I assume that the $65 million, does that exclude the costs associated with open pit mining as well as the underground development? And if it does, what do you expect those costs to be in the December quarter?

Jon Latto

executive
#59

Adam, is that the $52 million bar on the waterfall you mean? Since open pit costs are indeed part of that figure.

Adam Baker

analyst
#60

No, no — that applies starting with the December quarter.

Antonino Ottaviano

executive
#61

Yes. So going forward, Adam, it hinges on the kind of mining optimization work that we'll be presenting. What we're attempting to do with that waterfall, though, is show the market which operating costs will recur going forward and which project CapEx is nonrecurring and will stop by December, by the end of December. So with the $52 million sitting there, I think there's an additional $29 million, right, which is development for the underground, which sort of gives you a rough picture of what should typically carry forward. But we've noted on the slide that once those project CapEx are removed, we'll arrive at what we consider the more normalized operating and cash cost profile. But again, we'll — all of this could change once our revised plans are finalized.

Adam Baker

analyst
#62

Understood. Yes. So if underground development rates rise somewhat, it should be close to that $29 million, perhaps a bit higher going forward, and that will hinge, clearly, on how much development you're advancing. So that's clear. And maybe just regarding the ore milled grades. Is that something you'll be considering reporting in the future? And perhaps how has that been reconciling to the block model?

Adam Smits

executive
#63

Yes. Right now, I'd say we're at roughly 80% when it comes to reconciliation against the block model — that's a rough rule of thumb. It's gotten much better as the pit has moved through what you'd call the stringy zones, and now it's well north of 80%. And at this point we're in the flat lying zones, which is what we always anticipated. In certain months, I believe we've even seen a positive reconciliation, just to give you a sense of the direction. So it moves around a fair bit, but it's tracked, and we're achieving good reconciliation, I guess, on both tonnes and grade. Milled feed grade has fluctuated, and we're adjusting that quite a bit in terms of how we set it up. I think we currently have about 12 fingers on the ROM pad, and blending plus grasping the effect of the host rock, or the Gabro as we refer to it, has been a key focus over the last month.

Antonino Ottaviano

executive
#64

But I think there are a few things worth adding there, Adam. First, it's well understood that feeding better-grade material into the plant yields stronger performance and recovery — and that's what we've observed. Second, we're now 8 to 9 weeks into production. It's still fair to say, I think, that we're finding our footing when it comes to operating discipline. So managing that ROM pad, and getting operators to grasp how to cook the recipe for feeding the ROM, remains work in progress that we keep improving. So we need a bit more time. We don't enjoy the advantage that many of our competitors have, who've been running for years. We're doing this at warp speed. And lastly, when it comes to ongoing reporting of grade — mine grade and ROM grade — we want transparency toward the market. And as I said, we will be with our cost. But do our competitors report their mine grades on a quarterly basis?

Adam Baker

analyst
#65

Yes. Many of them do, simply on the mill grades that pass through the mill, but yes, we can revisit that.

Antonino Ottaviano

executive
#66

That’s something I’ll need to check.

Operator

operator
#67

Sam Catalano of Wilsons Advisory is up next with a question.

Sam Catalano

analyst
#68

I'd say the first 8 or 9 weeks have gone very well. What comes through clearly from this morning's questions is that we, as an analyst community, are likely drawing way too many conclusions from 8 or 9 weeks of operations that appear to have gone well. But I'll probably add to that theme. And just sort of push you a little more on the question Adam asked earlier. So if we assume for the next quarter that $81 million plus $69 million in your waterfall chart effectively becomes 65-ish. If you double output in the fourth quarter to, say, 50,000, 55,000 tonnes of con, would the $52 million and the $29 million double? Or would you think they'd be closer to where they are now?

Jon Latto

executive
#69

That's a good question. I mean, clearly, a big part of what we spend is fixed. So no, I wouldn't expect it to double. I mean, there could be — I probably need to take that question somewhat under advisement, but I definitely wouldn't expect it to double, since our cost base is largely fixed in nature. Of course, there might be a small increase, but we certainly wouldn't expect it to double. No.

Antonino Ottaviano

executive
#70

Also, Sam, there's another thing: revenue is coming in. So that part of the equation is something you'll be looking at as well.

Sam Catalano

analyst
#71

Yes, absolutely.

Operator

operator
#72

Today's next question comes in as a text submission. Regarding the Rio takeover situation, has Liontown specifically drawn any M&A interest?

Adam Smits

executive
#73

I’ll hand this one over to you to respond.

Antonino Ottaviano

executive
#74

So, regarding the Rio transaction in the sector, our take on Liontown is that it's a positive. When a multinational as large as Rio comes in and provides what I see as — in the bankers' words — a thematic reinforcement, that's going to be beneficial. Having a player of Rio's scale involved as a supplier will also kind of help even out the leverage between suppliers and OEMs and battery producers that are much bigger than the current group of suppliers. And lastly, when it comes to Liontown, no.

Operator

operator
#75

There's one more question that came in as a text submission. For tantalum sales, what approaches is management putting into place?

Antonino Ottaviano

executive
#76

Yes. We’ve got an agreement in place with a large tantalum consumer, and we’re selling to them on a spot basis. That’s our approach with tantalum right now. But the end goal is to establish long-term contracts — we’ve already had a first round of talks with several players, and those conversations are ongoing. For the time being, though, current output goes to one of those players on a spot basis.

Operator

operator
#77

And that brings us to our last question for today. How many long-term share — sorry, let me begin that again. To wrap things up, LTR has a lot of long-term shareholders who've stayed with the company throughout its journey. Even though market conditions right now appear challenging, can you offer us confidence that our Tier 1 quality will carry us through to the other side?

Antonino Ottaviano

executive
#78

Okay, first off, I’m hoping that a handful of them happen to be on the call. The management team, the Board, and I — and the Chair is very much in this as well — really do appreciate the backing and the belief that retail investors have shown in Liontown. I’ve personally talked with several of them, and honestly, when it comes to loyalty, you couldn’t ask for a better group of shareholders than them — especially compared with some of the investment funds. So our aim is to do the absolute best we can, and we’re working around the clock, 24/7, to make sure their investment is solid and stays that way. We have a world-class ore body. The support around that is beyond question. And on top of that, we’ve constructed a world-class plant. Adam and the team have done an outstanding job. So we’re confident. Thank you for your support.

Operator

operator
#79

Much appreciated. Today's call is now finished. Thanks for spending time with us, and enjoy the rest of your day. Should anything else come to mind, feel free to get in touch with the Liontown team.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Liontown Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Liontown Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Liontown Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.