Liontown Limited (LTR) Earnings Call Transcript & Summary

January 21, 2025

Australian Securities Exchange AU Materials Metals and Mining earnings 60 min

Earnings Call Speaker Segments

Tony Ottaviano

executive
#1

Getting a plant that has only operated for five months into shape. In December we hit 92%, which sits very near where we want to be. Notably, lithia recovery came in at 55% for the quarter and 59% for December. I believe everyone here knows that recovery is the holy grail for producers in lithium hard rock. Recovery, grade, and flowsheet design are closely linked in delivering that result. That's our ambition. That's where our attention will sit over the months ahead so we can reach the target we've set, and we have a slide covering this. I've discussed production: 88,000 tons for the quarter. That, to me, is a superb effort once more, given a plant that has run for five months. Grant and his team are performing excellently on the sales side, and he'll cover that briefly shortly. Then lastly, operating cash flow. Once again, during ramp-up, we've managed to produce positive operating cash flow from operating activities. Next slide, please. I mentioned the mining side in my highlights, but the specifics are here. At the open pit, ROM stockpiles are accumulating.

Tony Ottaviano

executive
#2

We'll cover the ROM stockpiles a bit when Jon reaches his part. During the quarter, 2.6 million tons were moved. From my perspective, the ore coming out of the lens we've exposed — and we remain within that lens — is a real achievement. It is precisely where we anticipated it would be. The grade and chemistry match exactly what we expected. So the team has done excellent work in grasping what we're mining. As part of the cost optimization effort we carried out earlier — or later — in the year last year, we've demobilized an excavator and truck fleet. On the underground side, I'll keep it brief by saying we're advancing development meters. The trend is visible there. That is progressing well. And the ground conditions are what we anticipated. I was underground shortly before Christmas alongside the Byrnecut leadership team, and what we saw down there was exceptional. Production stoping activities remain on schedule for quarter four FY 2025. Productivity from the jumbos — the key metric everyone watches — continues to sit well above 300 meters per jumbo per month. And we're bringing on the third jumbo early in 2026, consistent again with the revised mine plan we released in November.

Tony Ottaviano

executive
#3

Moving to the next slide, please. At this point I'll pass things over to Grant, and he'll walk you through how the plant performed.

Grant Donald

executive
#4

Appreciate that, Tony. Across plant availability, our ramp-up keeps hitting or beating what we expected. Milled tons and recoveries are still climbing, which shows the steady gains we're making. SAG mill availability is still elevated, as the chart in the top right makes clear, and that supports robust mill throughput — more than 600,000 tons were processed in the quarter, which works out to an annualized run rate, as Tony noted, of 2.4 million tons, a touch above the 2.3 run rate we guided to back in November. Recoveries keep improving progressively, averaging 55% in the quarter — that's 10 percentage points above the prior quarter, or 23% better. The chart at bottom left illustrates the month-by-month progressive gains, with December averaging 59%, which already beats some of our peers after just five months of operation. There's still more ground to cover on this journey, and we have identified actions plus a program of work in place to keep moving toward our 70% target by Q3 2026, which is the March quarter. Throughput and recoveries together delivered production of 88,700 dry metric tonnes in the quarter at a weighted average grade of 5.2% lithium oxide. Let's move to the next slide.

Grant Donald

executive
#5

Robust output let us increase the total tonnes sold to customers from when production began to beyond 100,000 wet metric tonnes. Those tonnes were distributed between our offtake partners and spot buyers. December was especially strong, with 36,400 dry metric tonnes produced, and that made possible shipments totaling 81,300 dry metric tonnes in the quarter. We completed four customer shipments in the quarter, among them our first cargo to LG Energy Solution aboard the biggest vessel we have loaded to date at 33,000 wet metric tonnes — a company record — and we aim to surpass it this month. In this quarter we also began producing and shipping tantalum, which we expect to become a steady stream of output and customer deliveries during this quarter. As another Liontown milestone, we declared commercial production under our offtake agreement with Tesla, effective from the beginning of this calendar year. We keep receiving strong inbound interest from customers seeking to set up routine spodumene purchases from well-known names that have an established track record, and many of these the callers would recognize. Demand for spodumene, even amid a comparatively soft backdrop for chemicals, is still robust, which shows the built-in optionality of purchasing spodumene when faced with uncertainty and the ongoing evolution of battery chemistries.

Grant Donald

executive
#6

Since our forward offtake is anticipated to kick off in July 2025, demand looking ahead for Liontown product is still robust, which means we anticipate a tight forward sales book through the rest of FY 2025 and past that point. With that said, I'll pass things over to Jon Latto.

Jon Latto

executive
#7

If you could turn to the following page, please. Thank you. Thanks, Grant. Tony and Grant have already addressed the production and sales figures shown in the upper section of this slide. I'll now address the financial metrics that are presented before you. First, as indicated by the title of the page, net cash flow from operating activities came to AUD 16.7 million for the quarter, as Tony noted, and that figure appears in the 5B quarterly cash flow statement we released today as well. At this stage, it's worth bearing in mind that we remain in ramp-up, we are applying the accounting standards, and we are capitalizing our commissioning costs at the Kathleen Valley Processing Plant, which gives us a new margin when we look at revenue less our operating costs. This approach will stay in place until we declare commercial production at the Kathleen Valley Processing Plant, which is expected to happen during the current half-year period. Had commercial production been declared, those capitalised commissioning costs would flow through to the profit and loss statement in the usual way. We incurred AUD 5.3 million of cash commissioning costs during the quarter, so if commercial production had been declared at the processing plant, we would have recognised those costs as cash outflows from operating activities and delivered an adjusted positive cash flow from operating activities of AUD 11.5 million for the quarter.

Jon Latto

executive
#8

That's a solid outcome for the first complete quarter in which we've been operating, particularly given that the company remains in ramp-up. As Grant noted, we recorded quarterly revenue of AUD 89.8 million, generated from sales of 81,341 tonnes of spodumene concentrate across four shipments made during the period. As you can see, we reported a unit operating cost for the December quarter of AUD 1,000 per tonne on an SC6 basis, along with an all-in sustaining cost of AUD 1,170 per tonne, likewise on an SC6 basis. I'd like to highlight a couple of things here. First, on an SC6 basis this works out to $652 a tonne for unit operating cost and $763 per tonne for all-in sustaining cost. It's encouraging that our average USD realized price per tonne on an SC6 basis came in at $806 a tonne for the quarter, exceeding both our unit operating cost and our all-in sustaining cost. My last point here is that capitalised commissioning costs have been incorporated into both the unit operating cost and the all-in sustaining cost figures, so you can gain a genuine picture of how we're performing. Lastly, regarding our cash position, we finished the December quarter with a robust cash balance of AUD 193 million.

Jon Latto

executive
#9

A few points I want to flag here. Beyond that AUD 193 million cash balance, we received payment in January 2025 for an additional AUD 12 million of product shipped before year-end. On hand as well were 25,000 dry metric tonnes of saleable concentrate. We've also built and fully paid for mining substantial ore stockpiles as planned, and by quarter-end those stockpiles totaled 1.3 million tonnes. Beyond that, AUD 25 million sits on deposit with Export Finance Australia, tied to a guarantee required under the Zenith power purchase agreement. Those funds have been cash-backed for a while now, and we're working with the relevant parties to get that money back and substitute another form of security. If you'd turn to page 10, please. I'll now walk through our cash flows in a bit more detail using the cash flow waterfall in front of you, going left to right across it. First, as you'd expect, we begin with opening cash of AUD 263.1 million at the start of the quarter.

Jon Latto

executive
#10

After that, we received cash inflow of AUD 91.2 million from spodumene concentrate sales during the quarter. The following bar in the waterfall displays operating costs for the quarter, roughly AUD 79 million — essentially our open pit costs, covering both contractor and owner costs, along with processing and maintenance, site administration, and corporate costs. In the next bar, you can see interest receipts of AUD 4.8 million. Those figures produce positive cash flow from operating activities of AUD 16.7 million, and as the call-out box in the waterfall then shows, you can see how that adjusts to AUD 11.5 million positive cash flow if adjusted for the cash commissioning costs I mentioned earlier. Those cash commissioning costs, as you can see, appear in the next bar, which covers cash flows from investing activities — so I'll move on now to the following bar, which is project costs. Project costs for the quarter came to AUD 45 million, and they are essentially payments made during the quarter for construction of the Kathleen Valley operation.

Jon Latto

executive
#11

And those were payments. This AUD 45 million covered things like paste plants, final payments to Monadelphous — our structural and mechanical piping contractor — Mod Squad payments, and payments for spares and similar items. I'll pause there and offer a couple of comments. So last quarter, we stated that we had roughly AUD 65 million in project costs to pay, and that this would be finished up in the December quarter. What we're seeing now is that this figure is actually about AUD 10 million lower, since some project provisions we held turned out to be higher than we needed, and that's combined with our continued strong contract management. But the project tail will take longer to pay out as we finalize items such as final insurance premiums, commissioning of the paste plant, finalization of the Construction Training Fund Levy, and release of project retentions. But what this essentially means is that we have a lower project spend, and it stays with us for longer. It's a good outcome. The next component of the waterfall is other capital of AUD 28 million for the quarter, and the majority of this spend is underground development costs, with the balance being general sustaining capital.

Jon Latto

executive
#12

We're now in a phase of the underground that requires heavy development spending, and my expectation is that quarterly costs for capitalized underground spend in FY 2026 and FY 2027 won't reach the level we saw this quarter. The explanation is that during FY 2025 we increased the capital requirement in order to open up access to the top of the ore body — the vent rise, the decline, and so on — ahead of stoping, which is set to begin around April 2025. Then, on the final bar of the waterfall, we have lease and hire purchase costs, which take in the lease payments on our right-of-use assets, the biggest of which are the payments for the power station. That takes us back to the strong cash position we see at quarter end of AUD 192 million. With that said, I'll hand back to Tony.

Tony Ottaviano

executive
#13

Thanks, Jon, and thanks, Grant. Let's move to the following slide, please. I want to finish up before we begin the Q&A. With that said, for those listening, safety remains a priority, and ESG stays at the forefront. As I noted in my opening remarks, this is a lasting and ongoing focus for the company and for all mining companies, for that matter. Spodumene production and shipment for the quarter of 81,341 — sorry, our shipping for the quarter of 81,000 tonnes on a dry metric tonne basis was strong, and tantalite sales have begun. Revenue of roughly AUD 90 million, with positive net cash flow of AUD 16.7 million — again, a great result for the first full quarter of production. And importantly, we hold AUD 193 million in cash. Jon went into detail on some of the other funding amounts coming in, particularly the receivable from what we shipped in December but haven't received the funding for in January. On the ramp-up side, that remains a focus and a strong outcome. It is meeting and exceeding plan. I want to tell those listening that, as I somewhat hinted at, recovery is our main focus here, and we keep pushing this and pushing it hard.

Tony Ottaviano

executive
#14

We are continuously refining and testing as we proceed. In fact, during late December and throughout January, we ran some transition material from the mining operation through the plant. That transition material carries elevated contamination levels yet still holds quite a strong grade. Normally, this product would have gone through our ore sorters, which we subsequently halted as part of the optimization effort. And we are evaluating whether we can blend it with either the high grade or the clean ore, or alternatively run it as a discrete product. So during January we conducted some test work to understand how this product performs through the plant. The key operating metrics, once again, represent a solid result: our all-in sustaining costs along with our unit operating costs, our productivity per jumbo of 317 meters, and our plant performance — both mill availability, which after five months is now pretty well on target with what we expect during normal operation, and our recovery of 59% in December. And we are carrying on in January, notwithstanding the trials we have conducted with the transition material. Finally, to wrap up this presentation, we are maintaining the guidance we gave the market in November, while also noting that we have deferred AUD 5 million of capital from H1 into H2.

Tony Ottaviano

executive
#15

To sum up, we delivered strongly, we're in a solid financial position, and we have a robust foundation for creating value going forward. That's where we stand right now. Thanks. With that, I'll open it up for questions.

Operator

operator
#16

Thanks, Tony. If you haven’t sent in your text question yet or gotten into the live audio queue, please do that now. I’ll give each caller’s name and then ask you to proceed. After that, a beep will sound to let you know your mic is live. We’ll start with Levi Spry of UBS. Levi, once the beep sounds, please go ahead.

Levi Spry

analyst
#17

Morning, Tony and everyone — and a happy New Year to you all.

Tony Ottaviano

executive
#18

Appreciate that, Levi.

Levi Spry

analyst
#19

I have a couple of questions. Maybe we can begin with the market—a few days ago there was a story circulating about, I believe it was SQM, possibly achieving a price around $900. Could you share some insight into what you're hearing from customers since we've returned from Christmas, as I'd imagine, and also remind us when your next shipment is scheduled to depart?

Tony Ottaviano

executive
#20

Well, look, Grant put together a piece on the market outlook. Just to go over that again, we're definitely seeing a lot of strong inbound interest in spodumene. I won't say anything about that specific auction SQM ran, but we also heard about one that Albemarle did. There was some press about it yesterday. I mean, that's really encouraging, and as Grant said, there's a deficit in spodumene in the market, regardless of where chemical prices sit, and we showed a graph from Wood Mackenzie at our AGM that indicated a continuing deficit in spodumene going forward, so our next shipment is this month. I think it lands in Geraldton either today or tomorrow, and it will be our biggest shipment to date, so again, we're seeing very strong demand.

Levi Spry

analyst
#21

Okay, great. Yeah, thanks. And on this notion of optimizing the business, the asset, the ore body for concentrate grade, could you walk me through that? So 5.2% now, but every metric you're reporting sits on a 6% basis, so production and costs. Is there any? Why wouldn't this simply be a 5.2% mine, assuming you get the delta in the additional volume, but a reduced realized price, and it evens itself out? Could you sort of walk us through that and how you're thinking about how you're optimizing for that, I guess?

Tony Ottaviano

executive
#22

That's a fair question. Look, I think we addressed it somewhat in the November update, and also during this conversation. We're testing the transition material to see how it affects recovery. Now, on our side, we keep optimizing the circuit to figure out the grade — we understand how grade, mine grade, and recovery relate. Higher grade means better recovery. And at times we see some competitors raising their mine grade to achieve improved recovery. So with all those trade-offs — we've only been operating five months — we're trying to pin down the optimal range for con grade. Is it 5.2? Is it somewhere between 5.2 and 5.5? Right? We have produced 6% con, but I think we're arriving at the understanding that somewhere between 5.2 and 5.5 could be optimal, though we're still working through that.

Grant Donald

executive
#23

Levi, this is Grant speaking.

Levi Spry

analyst
#24

Alright, sure.

Grant Donald

executive
#25

I mean, we apply a 6% basis simply since that's the industry standard, not because it's necessarily the target.

Tony Ottaviano

executive
#26

Absolutely.

Levi Spry

analyst
#27

Right, understood. Thanks. Thank you. And perhaps I can slip in just one more. So I'm thinking that you've provided cost guidance for the second half, but clearly you're still ramping up, and the recovery is the critical element there. And the underground hasn't come in as yet. So at what point will you be able to update us on, I suppose, a more steady-state kind of cost base, along with that underground mining cost component, once you're fully ramped up and operating solely on underground ore from part of FY 2027, I believe that's the guidance?

Tony Ottaviano

executive
#28

In November, we gave guidance covering the balance of the half. Guidance for FY 2026 will come in July. So until then, I'd say the guidance we've already handed you is your best target, correct? After that, as part of our FY 2026 release, we'll show the market what the underground will look like. As we said, stoping begins in quarter four of this financial year. So we'll realize that quickly, and based on what we've seen up to now, we have a reasonably solid handle on our underground operating costs.

Operator

operator
#29

We’ll take our next question from Hugo Nicolaci at Goldman Sachs. Hugo, once you hear the beep, please go ahead.

Hugo Nicolaci

analyst
#30

Oh, hi Tony. Jon, Grant, happy New Year, and thanks for the update. Congrats on the ongoing ramp-up performance improvements you've obviously seen so far. First question — I appreciate that you're still in ramp-up and looking to optimize some costs going forward, but given the run rates you've been able to achieve this quarter, could you give us a bit more of a go-forward breakdown of where you're seeing things like processing costs and costs at the open pit?

Tony Ottaviano

executive
#31

Yeah, I think — and I'll let Jon jump in here. For me, on the open pit mining side, we'll wrap up the open pit by the end of this year, early next year. So we're at peak production right now, roughly. So nothing unusual there. And on processing costs, as I said, our tonnes through the mill are pretty well at guidance level now. We've gone 2.3 million, and we're doing just over 2.4 million. So we're basically there now, and we'll declare commercial production, as Jon mentioned, at some point in this half. So look, I think, Hugo, to answer your question, we're not that far from what we'd regard as steady state on the processing side.

Hugo Nicolaci

analyst
#32

Understood — thank you. Right, many thanks, Tony; I appreciate that. Clearly, an earlier question already addressed the potential upside relating to spot pricing right now. I suppose what I'm after is an update on where things stand in your discussions with either the banks or LG regarding the optionality attached to that additional AUD 100 million of indebtedness capacity. And I'm not saying you would necessarily draw on it, but if you did, what kind of timing would apply for you to access possible additional funding there?

Tony Ottaviano

executive
#33

Yeah, look, Hugo, I think optionality is the word to note. And there is a fair bit of optionality that we could pull if we felt the need. But right now, the focus has been very much on delivering what we've got, and which we're doing. So there's a facility there that we could exploit if we have to. But at the moment, we're not focused on it.

Operator

operator
#34

Thanks. We now have a question from Reg Spencer at Canaccord. Reg, once you hear the beep, please go ahead.

Reg Spencer

analyst
#35

Thanks, Tony and team. Congrats on a pretty good quarter from a production standstill. I just had a quick question about capital. Could I just clarify that you still have AUD 11 million of construction CapEx to spend across, say, the coming six months, whatever that period might be. Can you tell me what your sustaining CapEx budget is for the next six months and then what you expect that to be once you achieve steady state in the underground?

Jon Latto

executive
#36

Tony, should I handle that question?

Tony Ottaviano

executive
#37

Sure, Jon, go ahead.

Jon Latto

executive
#38

Yes, Reg, that's correct. What's left in terms of cash going out for the project is AUD 11 million in cash payments. That's accurate. If you mean our CapEx spend, i.e., what we put into underground development, then as you can see, I believe in this quarter specifically it came to around AUD 28 million, and you can extrapolate from that however you like. But generally speaking, this is the year with heavy capital intensity, and we do anticipate a fairly solid reduction in capitalized underground development spend as we move toward FY 2026 and 2027. I definitely don't expect it to stay at the levels we're seeing now.

Reg Spencer

analyst
#39

Right, okay. Yes, understood. So that underground figure — the AUD 28 million of underground capital you brought up — that relates to developing the underground rather than being operating capital once you're actually in the underground?

Jon Latto

executive
#40

Right, so that's what the underground development costs. Yep, that's right. That's the portion we capitalize. So basically it's building out the underground asset. Beyond that, we clearly also carry some sustaining CapEx.

Tony Ottaviano

executive
#41

Yes. And will the operating development show up in operating cost, given that it gets spent over a year?

Reg Spencer

analyst
#42

Yes, understood. Thank you, Tony. And my apologies for going on about that. And regarding that specific sustaining capital figure, can you offer any guidance on what you anticipate it will be once you reach steady state?

Tony Ottaviano

executive
#43

I believe we gave you some guidance in our November update, Reg, where we split the sustaining capital into what we see as ongoing PPE, sustaining capital, plant and equipment, and then the sustaining capital for the mine itself, correct? And I think using that number should serve as a good proxy.

Operator

operator
#44

Thank you. The next person to ask a question is Stuart Howe of Bell Potter Securities. Stuart, once you hear the beep, go right ahead.

Stuart Howe

analyst
#45

Alright, Tony — congratulations on such a strong quarter. Just two questions from me. First, regarding the ramp-up phase: you mentioned the clean product and the ore-sorted product. Could you remind us how that ore-sorted product actually works? Has it already been sorted? Is it ready for processing? And how do the two products differ in terms of how you treat them and their grades?

Tony Ottaviano

executive
#46

Right, so the ore-sorted material has already been extracted and sits in stockpiles. That gives us clean ore along with OSP material, correct? So the cash is already spent, and it's ready for use. The rationale for setting it aside, as I noted during my presentation, Stu, relates to grade and contamination, correct? In other words, how much host rock has diluted that clean ore? Dilution can fall anywhere from 15% to 30%, right? Our original thinking was that we'd ore-sort that material, then produce a cleaner product, reduce the contamination until it meets clean ore spec, and then run it through the plant and blend it in without any problem. But we've now also asked ourselves, well, why not simply run it through the plant as is, right, treating it as a discrete product and processing it in batches, right? That's part of the test work we carried out in late December and early January, to see what effect that has on product grade and recoveries. So optimization efforts are still ongoing, but that's the plan. We can either bleed it in gradually as we go, since it doesn't materially affect the plant, or we can batch treat it.

Tony Ottaviano

executive
#47

That's the thing we're focused on optimizing right now.

Stuart Howe

analyst
#48

Right, I just want to make sure that it wasn't already fully handled and still requires additional processing or, as you put it, blending in. And then second, for me, regarding the recent FX weakness or Aussie dollar weakness, I just want to ask — can you capture the full benefit of that under your existing off-take contract?

Grant Donald

executive
#49

Absolutely.

Tony Ottaviano

executive
#50

Grant, the floor is yours.

Grant Donald

executive
#51

Yeah, Tony, apologies — I was only going to add that selling in U.S. dollars is the industry standard, which means we capture the full advantage from that. Of course, U.S. dollar strength and commodity prices are related, though right now that has clearly worked either against us or in our favor.

Tony Ottaviano

executive
#52

I think one thing worth stressing, Stu, is that the conversions we showed you in our presentations relied on the quarterly average for FX — that $0.65 figure, correct? We're aware that the spot price today sits below that level, and it has for a few weeks now. That only adds further upside.

Stuart Howe

analyst
#53

And one last quick item, if I can. Underground mining is clearly progressing very well. For that initial stoping planned for mid-2025, what would you say are the main milestones needed to reach it? Your development rate now stands at roughly 7.3 kilometers. Do you simply need to keep doing what you're doing, or is there anything else we should watch for?

Tony Ottaviano

executive
#54

So there are two things I'd describe as enablers, really. The first is our ventilation work, which is needed to support stoping — and that ventilation work is progressing right on schedule. If you look at our quarterly report, you'll find some photos of the raise boring that has been going on. So that is on track to be completed before stoping begins. The second enabler is the paste fill. And although we won't require a first stoping for some time yet, the paste fill plant is finished. It's constructed. We'll simply commission it once we're ready to begin stoping. So those, in my view, are the two major enablers for steady state production stoping.

Grant Donald

executive
#55

I think, Tony — Grant here, just to add — we've already done the work to open up various headings, right? And the decision we made around the new mine plan to defer the stoping until April was really driven by making sure that when the gear arrives on site, it's 100% productive from day one and there's not gaps in between. So we could have stopped stoping in November, but that's not the most efficient way of doing it. So we're making sure we've got enough headings open so that equipment is fully utilized on site from day one.

Tony Ottaviano

executive
#56

Sure.

Operator

operator
#57

Glyn Lawcock with Barrenjoey has the next question — go ahead once you hear the beep.

Glyn Lawcock

analyst
#58

Hello, Tony — Glyn here. Wishing you a happy New Year, and welcome back from France.

Tony Ottaviano

executive
#59

I haven't returned to that point so far.

Glyn Lawcock

analyst
#60

I just want to check one thing quickly. Oh, you're still there. Okay. Well, enjoy the rest of it, then. Only to clarify something: that realized price you mentioned — the 806 for the December quarter — is that quoted on a CIF basis or an FOB basis?

Jon Latto

executive
#61

That price is on a CIF basis.

Glyn Lawcock

analyst
#62

All right, so the 763 all-in sustaining cost leaves freight out. You said sea freight isn't part of that. What is sea freight going for right now?

Grant Donald

executive
#63

Sure, that's a fair question, Glyn. I'll offer two points — one you didn't specifically raise, but I'll take the chance to underline it. Within the 806 there's also the 30,000 tonnes of provisionally priced product. Sadly, 31 December 2024 was likely the weakest pricing moment the market has seen to date. That has come through as a mark-to-market adjustment, which we don't anticipate realising. As for your actual question about freight — well, it hinges on vessel size, but as some of the narrative we've shared shows, our emphasis is on trying to parcel our own shipments to customers onto larger vessels. That lets us bring freight down from roughly AUD 29 to AUD 30 a tonne to as little as AUD 19 a tonne. So efficiency is very much the focus.

Glyn Lawcock

analyst
#64

All right, so the comparison you actually want to make is between roughly 783 to 793 and the 806. On top of that, the 806 also includes a provisional pricing hit.

Grant Donald

executive
#65

Yeah, that’s a fair point.

Glyn Lawcock

analyst
#66

Yes. And to make it clear once more, every bit of your offtake is tied to chemical indices too. So it appears that, based on which chemical indices you apply for the December quarter, you end up with roughly 8.5%, more or less, as the linkage. I'm aware there's also a provisional pricing adjustment in there. Is that correct? Is that how we should look at it?

Grant Donald

executive
#67

Sure, it really comes down to the math, so that's a fair point. Clearly, the mix in this quarter differed from what you'd anticipate moving ahead. Spot activity was heavier during this quarter than it will be later on. That said, you're correct that every one of the long-term off-takes is currently tied to a chemical. That being said, as Tony mentioned, inbound demand is robust, and my sense is the market is moving away from that right now, and we'll watch how it develops.

Glyn Lawcock

analyst
#68

So is it possible for you to follow Pilbara's approach and shift everything over to linkage with the spodumene indices? Can that be done given the limitations in your contracts?

Grant Donald

executive
#69

Right. I mean, you know, a deal is binding unless you renegotiate it. But at this stage, the emphasis here is on ensuring we push our expenses lower and operate efficiently—naturally, though, we leave no stone unturned.

Operator

operator
#70

Hayden Bairstow from Argonaut has the next question. After the beep, Hayden, go right ahead.

Hayden Bairstow

analyst
#71

Yeah, thanks. Well, a solid quarter, guys. I’ve just got a couple of questions for me. Just regarding products versus recoveries, I mean, are you under any pressure at all to push that product grade higher, or are the current customers you’re selling to relaxed about it? And then the follow-on from that is, are Tesla and Ford more restrictive on what the minimum sort of product grades are likely to be, or do you think over through this process of getting to target recoveries, you can worry about the product grade later?

Grant Donald

executive
#72

Yeah, thanks, Hayden. Look, basically, that specification is part of the contract, so there's no problem there. It matches what a lot of our peers do. I mean, other companies make very similar products. In fact, some produce it below this level and sell it successfully. So it's not an issue for us. And right now, the industry applies a linear price adjustment, so there's no penalty for doing that. So if you can boost overall lithium recoveries and make more product, that's positive for the P&L.

Hayden Bairstow

analyst
#73

All right, that's good. I'll stop at that point. Thank you.

Operator

operator
#74

The following question comes to us from Melanie Burton of Reuters. Once you hear the beep, please proceed.

Melanie Burton

analyst
#75

Hello.

Tony Ottaviano

executive
#76

Hello, everyone.

Melanie Burton

analyst
#77

I'm hoping my audio comes through clearly for everyone.

Tony Ottaviano

executive
#78

Absolutely, that’s something we’re able to do.

Melanie Burton

analyst
#79

Here's my question. Yes, thanks. This morning at the inauguration, we saw the U.S. administration confirm that they intend to roll back the EV subsidies from the Biden era. I'm wondering whether you foresee any effect on your customer base, or on the market more broadly?

Tony Ottaviano

executive
#80

I spent a lot of time last night, my time, listening to the speech, and the focus was on getting rid of the subsidy, but I believe the president said he wants consumers to have choice, so essentially that comes down to making sure EV suppliers can offer a product that's competitive on price, and also competitive on performance, and we're confident they can do that, based on what we're seeing come out of China and other places, so over the longer term, I simply don't think demand will be a problem.

Melanie Burton

analyst
#81

Appreciate it.

Grant Donald

executive
#82

Grant speaking. I believe it's also crucial that we keep in mind how the markets compare in relative size, correct? China, then, expanded 40% year-on-year last year. Of 17 million EV sales, it made up 11 million. That works out to roughly 65% of the market. For North America, a comparable figure is 1.8 million, and that's growing at roughly 9%. One key point is that demand in China keeps being driven by that shift toward EVs. And what Chinese manufacturers have spotted quite shrewdly is that the rest of the world currently stands at about 1.3 million units, and it's expanding at roughly 27% year-on-year. Within two years, that will place them above North America as a market. And that's the target they're pursuing right now, having been shut out of the North American market.

Melanie Burton

analyst
#83

Yeah, that's helpful — appreciate you filling in those extra details.

Operator

operator
#84

Sam Catalano of Wilsons Advisory is up next with a question. Sam, once the beep sounds, go right ahead.

Sam Catalano

analyst
#85

Good afternoon, Tony, Grant, and Jon. I hope this comes across as a reasonably straightforward question at a high level. Clearly, there have been quite a few detailed questions today, but you provided a rather thorough operational update and guidance back in November. So my simple question is this: aside from the AUD 5 million of project spend that slipped into next year, has anything occurred on the operational side since the end of November that would make you — you have obviously maintained the guidance — but that would make you think there could be a few changes compared with what we said in November?

Tony Ottaviano

executive
#86

No, our guidance stays exactly as it is. Apart from that AUD 5 million deferral—shifted out of the first half into the second half—everything is on target. Sam?

Sam Catalano

analyst
#87

Yes. Excellent. That matches what I anticipated. I appreciate it.

Operator

operator
#88

Adrian Rauso has sent in a text question for our next one. He asks whether that AUD 16.7 million net operational cash number takes in things such as freight and royalties. If it does, then you're turning a profit at a spot price well below what the market had expected. So why does he believe LTR is performing so much better than most people forecast?

Tony Ottaviano

executive
#89

Thanks, Adrian. Jon, would you like to take the first portion of that question?

Jon Latto

executive
#90

Absolutely, Tony. So yes, every one of the operating expenses shows up within cash flow from operating activities. That's a reasonable point. And I'll turn things over to you for the second part.

Tony Ottaviano

executive
#91

So, well, why is it that we're performing better than others or than expected? I think, look, from our standpoint, we've consistently said that we've invested a great deal of effort in the plant's design. We've invested a great deal of effort in how we plan and how we execute. And I think those efforts are beginning to pay off. And I mean, it's a tough gig starting up an operation and a development company. And we're now beyond that. We're now into production, well and truly. And we'll see further benefits come through as the good team that we've got continues to optimize and improve.

Operator

operator
#92

The next question comes to us in writing, from Brenton Saunders of Pendal Group.

Brenton Saunders

analyst
#93

Which phases make up the path to better recoveries? And which parts of the recovery process pose the greatest difficulty?

Tony Ottaviano

executive
#94

Thanks, Brenton. That's quite a multi-part question. What we've learned over the five months of operation is that the process really begins at the mine. So the grade you send into the plant matters enormously. As I said earlier, higher grade means better recovery. Contamination, or hygiene, is absolutely vital as well. So the product we make needs to carry low contamination—under 5% in our case. Then, once you get into the plant, what we're discovering is that grind size is the second opportunity area. What size do we grind the product to in order to maximize flotation? We now have a designed grind size that we've achieved, and we're beginning to see recovery improvements. The third element is keeping slimes production to a minimum. That means not grinding so fine that you can't recover it. Right? We have to minimize the slimes we lose, and with them the lithia we lose. Then finally, there's the entire science of flotation. On mass pull, we're aiming for roughly 15%–18%. And an overall flotation recovery of 90%, but an overall plant recovery, as we've said, targeting above 70%. There are several other elements. Within the whole flotation area, I could get into reagent selection, froth heights, and all the rest of it.

Tony Ottaviano

executive
#95

To put it plainly, those are the key areas we're concentrating on, all the way from the mine through to the plant.

Operator

operator
#96

Our following question comes in as a text submission from Daniel Marinescu. At what point will you begin repaying the debt and the interest?

Tony Ottaviano

executive
#97

Now, I can respond to this, but I'll let Jon do that.

Jon Latto

executive
#98

Yes, absolutely — that's a fair question. As I believe everyone knows, we currently have two debt structures: one involving Ford and another with LG. Taking LG first, interest on that facility gets capitalized during the initial two years, and there's effectively no repayment of principal required under it. LG has the option to convert; should they choose not to, the whole amount falls due as a single bullet payment when the tenor ends, that is, at the close of its five-year term. That covers the LG debt. Turning to the Ford debt, we're capitalizing interest on that one right now. As for repayments, though, they begin once the quarter ends that follows the declaration of supply commencement under the offtake — and Grant, I think we've indicated to the market that this most likely arrives in the September quarter of this year, at the earliest.

Operator

operator
#99

Paul Krasnoff is up next with a question. On the topic of dividends, Tony and Tim, what are the odds, the timing, and the size?

Tony Ottaviano

executive
#100

Oh, thanks for asking that. That last name is pretty well known, isn't it? Dividends. Honestly, my chairman brings up dividends with me on a daily basis. Let's step back for a moment. We've put together a capital allocation strategy, and the board has approved it now. The emphasis is squarely on paying down debt, on where we're able to, and on growth. So right now, it's premature to say anything about the dividend part. But trust me, in terms of how we're thinking about it, that's not far off at all, since our chairman cares about it a great deal.

Operator

operator
#101

We have a text question coming in from Mark Heenan for our next one. Tantalite concentrate output came to 246 tonnes. Do you have any offtake customers secured at this point? Could you give us a sense of pricing?

Tony Ottaviano

executive
#102

Grant is the right person to take that question.

Grant Donald

executive
#103

Right, we do. We've shipped product under an offtake agreement, so yes, we have customers who are taking the product. On the pricing side, there's an index for tantalum that Argus publishes, and it's a fairly helpful reference for overall price realization. That index covers a different quality of product, so some upgrading and processing is needed, which means we wouldn't realize all of it. Still, as far as the top-line figure goes, that's essentially what the industry relies on for payments.

Operator

operator
#104

Alan Peace sent in a text question, and it's the next one we'll take. He asks when our shareholders will finally be rid of the shorters in this great company of ours. Or, he wonders, is waiting required on our part until those shorters are done manipulating the SP?

Tony Ottaviano

executive
#105

Alan, thanks for asking. Honestly, my view is that short selling is simply a feature of the market, and I doubt we'll ever be completely rid of it. That said, the strongest response to shorting is to actually achieve the results we've promised, and that is exactly where our attention sits. If investors choose to short the stock, that's a call they must make on their own, grounded in how the company performs. So we'll keep delivering, and we'll keep doing what we said we would, while shorting follows whatever course it follows.

Operator

operator
#106

We have a text question coming in from Scott Gick. He's asking whether Liontown is aiming to build out downstream lithium processing. And if so, what's the timeline for that?

Tony Ottaviano

executive
#107

Grant is the one who should field that.

Grant Donald

executive
#108

Right. So, as Tony mentioned on the opening slide, the strategy slide, we are still doing work with both LG and Sumitomo on a downstream project — one centered on Japan and the other in a different place, likely Southeast Asia. That work has its own schedule. But right now, both projects are at what you might call the pre-feasibility stage. I'm trying to pull together some preliminary figures so we can make an investment decision on whether to keep them going or not. Obviously, what's going to come out of that is that today's pricing levels probably aren't enough to justify investment. So we'll need to see better price expectations for refining before anything gets built and funded.

Operator

operator
#109

Thanks. That’s all the questions we have.

Tony Ottaviano

executive
#110

Once more, we appreciate all of you joining us on the call. To wrap up, I’d simply say that we’ll keep running things as well as we’re able and make good on our commitments. Thanks, everyone. And thanks to Jon and Grant too.

Operator

operator
#111

That wraps up our call for today. Thanks for being with us. You're free to disconnect at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Liontown Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Liontown Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Liontown Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.