This is Liontown's call covering results for the first half of 2026, and we're glad to have you with us. Once the formal presentation wraps up, a Q&A session will be held for investors and analysts. During today's call, participants are able to submit questions either in text form or as live audio. If you'd like to send a text question, just click on the messaging icon. Put your question into the box near the top of the screen, then hit the Send button. For a live audio question, click the Request to speak button located at the top of the broadcast window. The audio question screen will then take the place of the broadcast. Please use the dial-in number and access PIN you've been given to pose your questions over the phone. On the other hand, if you're on a home or personal network, you can submit questions through the web by clicking Join Queue. Should a prompt appear, choose Allow in the pop-up so your microphone access is granted. In case you run into any trouble with the platform, dial-in details are also available on the homepage beneath Asking Audio Questions. Click the Documents icon to view today's files along with platform instructions. Pick a document to open it. While reading, you're still able to listen to the meeting. Text questions may be sent in at any point, and the audio queue is open as of now.

Operator

operator
#2

At this point, I'll pass things over to Liontown's MD and CEO, Tony Ottaviano.

Tony Ottaviano

executive
#3

Thank you, Michelle. Good morning, everyone, and thanks for being with us today. Joining me are Greg Jason, our Chief Financial Officer, Ryan Hair, Chief Operating Officer, and Grant Donald, our Chief Commercial Officer as well. Michelle, could we move to the first slide, please. The important information. I'd like to begin by putting into context where the company stands, since this half has genuinely marked a turning point for the business. First, Kathleen Valley is performing exactly as planned. We finished the switch to 100% underground mining in the first half and brought in more than AUD 208 million in revenue, over twice what we recorded in the prior corresponding period. The underground mine is ramping up, and Ryan will take you through some further detail on that. The plant is running well even though we are feeding it lower grade material from the OSP and wrapping up what remains of the open pit mine, and we are now shipping product to customers across the globe. The first half financial result is what you would expect from a company still in its ramp up period. The statutory loss came in at AUD 184 million. Greg will cover that in more detail, but let me unpack it by saying that this figure does not reflect how the business has operated.

Tony Ottaviano

executive
#4

Let me just split this into three components. First, there’s a derivative charge — a non-cash item tied directly to the convertible note — and Greg will address that a bit later on. Then there’s a depreciation charge of AUD 90 million, which relates to the open pit. The open pit is finished. It spans a three-year period, so we need to depreciate it across those three years. There are also some capitalized commissioning costs from when we declared commercial production at our plant. The main point is that the earnings profile is improving, and for the right reasons. We’re now putting higher grade ore into the plant and blending it with material from our open pit and OSP, and recoveries are going up. We’re getting higher prices. They kept strengthening in the second half, and all three of these factors drive us toward better margins. The market is lending a hand as well. We’re now seeing BEVs come forward as a second demand engine alongside EVs. If we look back to when we approved this project in 2023 or 2022, the market environment was different. Permitting, financing and construction each take years to complete. The near-term supply response is going to come from brownfields expansion and restarts.

Tony Ottaviano

executive
#5

That is encouraging for us, since we already have production in place. That leads me to the study examining a 4 million ton expansion at Kathleen Valley. This represents a brownfields growth opportunity stemming from an asset that is already operating. It stands as one of just a handful globally capable of delivering extra tons into the market at the speed this option allows. That is the context. I will now pass things to Greg and the team so they can walk through the specifics. Ryan, over to you.

Ryan Hair

executive
#6

Okay, thanks Tony. We’ll move on to the following slide. Thank you, Michelle. This next slide gives an operational snapshot, and the main takeaway is that we have now finished the shift to 100% underground mining. That marks a major milestone. Open pit operations produced 917,000 tons of ore in the half, and the last ore from that source was delivered in December. Underground ore mined came to 533,000 tons, which shows how quickly the ramp up has progressed. The plant processed slightly more than 1.2 million tons at an average grade of 1.3% lithium. Recoveries kept improving, averaging 61% during the half. Concentrate output reached 193,000 tons at a weighted average grade of 5%. All of the metrics are moving the right way. From this point, the turning point is clean ore and grade. As ore from underground becomes the main feed to the mill, we expect both recoveries and production to keep getting better. With that, I’ll pass it to Greg.

Greg Jason

executive
#7

Thank you, Ryan. Good morning, everyone. Could I get the next slide, please? Great. I'll go over a few financial highlights here, and later in the presentation I'll provide further detail. As both Tony and Ryan have mentioned, you can see production and sales are up. On a realized price basis, we show an 18% gain period over period. We've altered the calculation methodology so it aligns more closely with what our peers do. Previously, we reported realized prices simply as period revenue divided by tonnes shipped. What that meant was that you had certain mark to market or provisional to final pricing adjustments pertaining to prior periods, and to the extent that pricing data after the close of the reporting periods needs to be captured in quotation periods, that was being missed. What we do now is present the estimated realized price only for tonnes shipped during the period, and the result is $888. To help you translate from the Q1 and Q2 figures we reported before, we had said Q1 was $700, and under this method it's $691. We had stated Q2 as $900, and under this method it's $985.

Greg Jason

executive
#8

That approach will carry forward. On unit costs, the rise to $985 per tonne is visible. Mining costs accounted for nearly all of it. During the first half of FY 2025, the material we processed originated at the open pit — the big ore load in that large body, clean feed, and a lower unit cost. Blending OSP material happened in the first half of 2026, and that material carries greater contamination, which therefore affects recovery. There is also the premium expense tied to crushing and sorting OSP, which landed in that half rather than the earlier one. On top of that, we moved into underground operations, where mining unit costs run higher than they did with the earlier open pit material. What you see now is the net result. All-in sustaining costs are roughly $45 higher again, you can observe. Sustaining capital starting up explains that. A new plant had just been commissioned in the first half of 2025, and by the first half of 2026 sustaining capital programs are in progress, which produces that outcome. Turning to the P&L section: revenue grew by more than twofold, reflecting both the tonnes and the better price.

Greg Jason

executive
#9

We recorded an underlying EBITDA loss of AUD 8 million. The key thing to note here is that even with the better realized price, pricing remained weak during the period. And the prices you're seeing in the market right now really don't have much effect on us for the first half of 2026. A lot of our contracts carry backward-looking QPs, so we're fully exposed to pricing as it stood. Second, there's the ramp-up and the unit operating cost effect I mentioned earlier — the move from open pit to underground. We also capitalized production costs in the first half of 2025, since commercial production at the processing plant hadn't been reached yet. That was declared at the start of last calendar year, and so. That came to AUD 39 million. A big difference period-over-period. Then the D&A effects once you move to the next line, underlying net profit, -89. D&A is higher with the open pit winding down, amortized over a short period. We had interest capitalization for the same reason — having reached commercial production in the first half of 2025. Ultimately, that brings us to the 89. Moving to the statutory result headline, there's a significant impact from LG.

Greg Jason

executive
#10

That item was entirely about marking up the derivative carried on the balance sheet for their convertible option. No cash was involved, and the way to think about it is that as the share price rose, the accounting cost of settling that liability with equity also rose. We were required to book that in the half. The conversion took place on 4 February. You will see a gain of AUD 58 million flow through the books in the second half, and it reflects the gap between the total liability we carried at the end of December — the derivative plus the debt — and the market value of the shares issued on 4 February. 239 million shares at AUD 1.77, that being the closing price. You'll see 58 in the second half. We finished with AUD 390 million. That's news we published in January. A strong position as we came into the year. I'll say more about the balance sheet a little later in the presentation.

Tony Ottaviano

executive
#11

My apologies. Michelle, could we move on to the next slide?

Ryan Hair

executive
#12

Okay, thank you, Greg.

Tony Ottaviano

executive
#13

Ryan, over to you.

Ryan Hair

executive
#14

Thanks, Tony. Safety continues to be the main thing we focus on operationally, especially as we grow the underground. Our lost time injury frequency rate stayed at one for the half. The total recordable injury frequency rate rose to 11.55, which mirrors the pattern we mentioned in the previous quarterly presentation regarding manual handling injuries among our contractor work groups. The targeted steps involving field leadership and contractor oversight are ongoing. Safety observations at a little more than three per thousand hours demonstrate continued workforce involvement in proactive hazard identification. Our hybrid power station achieved 82% renewable penetration for the half, which shows our continued dedication to low carbon intensity production. AUD 11.7 million spent on Tjiwarl businesses during the period demonstrates the strengths of that partnership and our real commitment to meaningful local employment and value creation. Now moving to underground production on the next slide. Thanks, Michelle. The 37% quarter-on-quarter rise in ore mined to 308,000 tons in Q2 continues to track well against the planned ramp up. As we mentioned last quarter, the mine reached a 1 million ton per annum run rate in September. For the December quarter, the overall run rate was slightly below 1.25 million tons, which leaves us well positioned to hit the 1.5 million target by the end of this quarter.

Ryan Hair

executive
#15

Things on the development side are moving along nicely, with new work areas being opened up at several levels. We've seen solid reconciliation against both the resource and grade models. Stope performance and dilution are still tracking as expected, and the infrastructure keeps performing well. To sum it up, the infrastructure is in place and functioning properly. The ore body is still meeting our expectations, and we're ramping up according to plan. Turning now to the plant — next slide, please. The plant also kept performing as expected as we moved through the planned change in mill feed composition. As I noted, we processed just over 1.2 million tons for the half at 92% average availability, which is stable and reliable performance. Lithium recovery came in at 61% on average, still trending upwards, which reflects deliberate feed sequencing and ongoing circuit optimization. The feed mix is really the key point here. During H1, open pit ore still made up around 60% of the feed. In H2, that changes to roughly 75% underground, and by FY 2027 we're aiming for more than 90% underground feed. As clean, higher grade underground ore becomes the dominant source of plant feed, recoveries will keep improving. With that operational summary done, I'll hand it back to Greg now.

Greg Jason

executive
#16

Right. Let's move to the next slide, please. This chart presents the waterfall from first half 2025 EBITDA to first half 2026. We've discussed the revenue increase, which came largely from the tons. Then there's the higher cost of sales excluding D&A, the ramp-up in tons as well, plus the effect of elevated operating costs. I referenced the AUD 39 million difference that was capitalized in first half 2025, and that's the walk down to the -8. Please go to the following slide, which covers net loss after tax. Same idea here, from -15 in the first half of last year to -184. Naturally, we have the carryover of EBITDA from the previous slide. LGES is an AUD 148 million turnaround. We recorded a gain in the first half of 2025 on the derivative's fair value, but recorded a charge in first half 2026, hence the AUD 148 million. We also saw a turnaround on FX. The rate moved adversely in first half 2025, so you had lower Aussie dollar debt, and the opposite occurred in 2026. Additional D&A related to the tons, and the interest capitalization not occurring or being at a lower level in the first half of 2026.

Greg Jason

executive
#17

So that brings you to AUD 184 million. May I move on to the following slide? At the start of the period we had AUD 156 million. We ended at the 390, meaning AUD 178 million in receipts. Between that figure and revenue, a matching gap shows up as a rise in accounts receivable. It's purely a matter of timing. Production costs came to AUD 237 million, which have naturally climbed alongside the heavy activity level. On sustaining capital, there's AUD 16 million — I brought this up earlier — which we now treat as sustaining since commissioning of the surface infrastructure is behind us, along with a large portion of growth capital. Underground capital development led that spend, together with related underground infrastructure and finishing the paste plant. You can see the equity raising from earlier in the year, and from there we arrive at AUD 390 million. Would you mind advancing to the next slide? The LGES conversion has truly reset our balance sheet. Notice reached us in late January. Conversion took place on 4th of February and removed AUD 482 million in liabilities from the books. Our offtake agreement with LG remains in force. It runs for 15 years. The conversion and the shift in shareholding leave it unaffected.

Greg Jason

executive
#18

We’ve still got the LISP and Ford debt, and both are covenant light. Ford’s repayments got pushed out from last year to September of this year, and that comes to just over AUD 11 million each quarter. It starts in September. As for the AUD 15 million under LISP, we’ll pay that back in two equal portions across FY 2027 and FY 2028. Those are quarterly instalments too. You’re able to see how the Ford and LISP maturities are profiled. We enter the year at AUD 390 million. The LGES conversion, which reset the balance sheets, left us in a strong position. Begin the year, continue the ramp-up, examine the growth opportunities. Think about diversification. Back to Tony.

Tony Ottaviano

executive
#19

Thanks a lot, Greg. Michelle, could we move on to the following slide? That should set the stage for the next few slides I want to walk the listeners through. Let me step back for a moment — I think this slide matters because it shows how history has played out and what the future might bring. Let's discuss how this chart conveys a very particular story. As you can see, there were two earlier spodumene upcycles, lasting approximately 15 months and 18 months, respectively. You can also see where we stand now, with prices having risen off the bottom and the market getting tighter. The real question is: how do we respond when the market requires supply? The tagline captures it perfectly. The supply response will benefit incumbent producers. Greenfields will lag. If projects aren't shovel-ready at this point, bringing them online will take longer — a minimum of three years. New projects confront years of permitting, financing, and construction demands, so they're unlikely to deliver tons during this coming upswing. Brownfield projects hold an edge. Operations that already have infrastructure and approvals in place will respond much more quickly. As for how we view our own project, we'll debottleneck step by step and deliver incremental tons as the expansion progresses, which generates early cash flow and also helps us manage our capital profile.

Tony Ottaviano

executive
#20

I'll wrap up on this slide with that line at the bottom, which reads, "We are uniquely positioned as an existing producer with the infrastructure and optionality ready to respond decisively." Moving on to our specific project. Next slide, please. The 4 million tonne brownfields expansion. As we discussed during our quarterly review, that 4 million tonne figure is essentially a refresh of what we put forward as part of our DFS. Into this refresh we'll fold all the most current understanding and knowledge from our operations, so that the design criteria can be fine-tuned. We know which areas we need to target. Those were stress-tested once we began operating. After that, we'll examine what can be done to deliver that incremental debottlenecking and unlock those tonnes. An expansion should lower our unit costs through amortizing our fixed costs and through increasing scale. As I said earlier, Liontown holds a competitive advantage. We're a recent developer, and all our key approvals and supporting infrastructure are already in place, and we're expediting timelines. This will come to the board in the first quarter of FY 2027, and it remains subject to the board's approval and to how the market is unfolding at that time.

Tony Ottaviano

executive
#21

Moving to the next slide, please—just this last one. What I mean is, we are delivering that transition, and as I mentioned, earnings are getting better. On the right side of this slide, you can see the mine plan comparison. Oh, sorry—let's just go to this final part. I won't go over again what I covered at the beginning. Kathleen Valley is being delivered as designed. We've been through the ramp-up stage, and we've generated a set of financials that mirror that ramp-up. What matters more is that the earnings trajectory keeps improving as ramp-up advances, along with the market tailwinds we're benefiting from. We have a genuine live option with the 4 million ton expansion that we are refreshing, which will position us to take advantage of a market that's improving. Let's go to the final one, then, in closing. Before I take questions, I want to recognize the team at Kathleen Valley and what they've achieved during this transition—safely and on schedule. They did what we told you they would do, and to me and the board, that is what counts. I also want to recognize our shareholders who have stayed with us.

Tony Ottaviano

executive
#22

The narrative here is straightforward. The toughest stretch is behind us. That transition has now finished. Our balance sheet has been cleaned up. Expenses are declining. Pricing is rising. Growth options are available to us. Looking ahead, we sit in a very strong position. Thanks, and from this point I'll take questions.

Operator

operator
#23

Thank you, Tony. If you haven't yet sent in a text question or gotten into the live audio queue, please do that at this time. So that everyone gets a chance to ask something, kindly keep to two questions at the start. Feel free to rejoin the queue should you have additional questions. I'll give each caller's name before introducing them and then ask you to proceed. After that, a beep will sound to let you know your microphone is live. Hugo Nicolaci from Goldman Sachs has our first question. Hugo, go right ahead.

Hugo Nicolaci

analyst
#24

Good morning, Tony, and to the whole team. Congratulations on the ongoing strength and the ramp-up of the project. Now, first, regarding the debottlenecking component: it sounds as though restudying that is already going quite well. If you're set to take it to the board in the September quarter, I'm just curious whether you could offer a little commentary on how you're viewing the cost element there compared with earlier expectations. I believe historically we were talking about the low hundreds of millions AUD to debottleneck the plants, and roughly a similar magnitude to build the next mine that would support it. I was just asking, in terms of direction, how much those costs may have risen since the last time you examined them, please.

Tony Ottaviano

executive
#25

Sure thing, Hugo — appreciate the question. That's something we're actively reviewing at the moment, and we're keeping a close eye on where the market stands. By market conditions, I mean what's happening in construction and in equipment supply. The figures we previously shared with the market were AUD 100 million for the plant and AUD 150 million for the mine, correct? Our hope is that it stays within a similar range, though I'd rather not have you treat that as final until the study is complete.

Hugo Nicolaci

analyst
#26

Yes, that's clear. Perhaps just one question about the cost side. I appreciate that the underground mine is not yet commercial, and it remains targeted for the June quarter of this year. Could you give a bit of a breakdown of where your mining costs and processing costs sit right now, and then where you expect them to land as things keep ramping up?

Tony Ottaviano

executive
#27

All right. Ryan, would you like to field that one, or should I take it?

Ryan Hair

executive
#28

Okay, Tony. Hugo, I believe we've already provided some remarks regarding the underground mining expenses, which run roughly AUD 100 per ton on a fully delivered basis, and the costs are approximately at that level. Once you have those figures, you can likely deduce the processing cost, since we've been fairly transparent about the total unit operating cost. In terms of direction, during the quarterly presentation we mentioned that we will clearly provide additional guidance on FY 2027 as we work through that budgeting process. I think the theme we've discussed before — where, as we mine deeper into the lower sections of the mine at larger scopes, meaning the same expense to extract those tons is spread over a greater number of tons — will directionally bring down the unit cost of mining. Likewise, as we feed more clean ore, specifically clean underground ore, through the plant, recoveries will rise. Production will consequently increase, and the denominator — production — being larger will create some fixed cost dilution effect. Everything points in the direction we've previously described regarding the value of the larger scopes and improved recovery and production, all still pushing unit operating cost lower.

Ryan Hair

executive
#29

Like I mentioned, we'll share additional guidance as our internal budgeting work proceeds in the run-up to FY 2027.

Operator

operator
#30

Our following question comes from Levi Spry at UBS. Levi, the floor is yours.

Levi Spry

analyst
#31

Hello there, Tony and everyone. Appreciate you making the time. This one is probably really for Ryan, I suppose. We're now, you know, a fair way into the March quarter, so could you give us some updated color on the 500,000 tons and, I guess, that 70% recovery goal? How is the ramp-up on each of those progressing?

Ryan Hair

executive
#32

Sure, thanks Levi, I appreciate you asking. We have a lot of confidence in that 1.5 from the mine. Like you mentioned, we're now most of the way through the March quarter, and we remain quite comfortable with how the mine is performing, along with how equipment ramp up and the mine's continued development are providing additional work fronts and more opportunities to track on. My confidence there is still strong. Past that — past the 1.5 toward the 2.8 by the end of FY 2027 — once again, all of it remains on track. As I noted in my opening remarks, the mine keeps performing almost precisely as we planned. There's nothing we're worried about on the horizon there, aside from the fact that ramp up always involves a lot going on, but as I said, the team has it all in hand. On the plant side, we remain very confident in the plant's capacity to run for extended periods of time. Good availability, good throughput. On recovery, as we've mentioned I think a few times previously, 70% recovery is very achievable. We're on clean underground ore, and any time we run underground ore through the plant, we get circa that level of recovery.

Ryan Hair

executive
#33

Actually, just two days ago we achieved a +70% recovery from some material that was slightly contaminated underground. We blended it with a portion of that OSP material Tony mentioned. We have ample data supporting that underground can deliver that kind of recovery. Regarding Q3, we're processing a greater amount of open pit material than we had planned — or at least, you know, compared with when we first put the budget together 12 months ago. You may remember that at the close of the previous quarter, we noted we had taken more ore from the open pit. Because of that extra ore from the open pit, we ended up with bigger stockpiles, and we've been running that material through during this quarter. The main feed type will only be switching over to underground right at the end of the quarter. We expect to see more of that steady 70% recovery as we move into Q4. I hope that answers your question, Levi.

Levi Spry

analyst
#34

Yeah. Perfect. Thanks. Thanks for the additional detail. So then, going back to those 4 million ton expansion studies for FY 2027 — could you just sort of walk through the timeline on that, I suppose, compared with the ramp up to 2.8 within FY 2027? How are you thinking about ramping up to 4 from underground mining rather than from the plant?

Ryan Hair

executive
#35

Tony, I’ll handle this one. Is that all right?

Tony Ottaviano

executive
#36

Yeah, that's right.

Ryan Hair

executive
#37

So Levi, I think the simplest way to frame this is that the 2.8 case just keeps rolling forward, most likely. To reach that 4 million tonne scenario, we'll be running a couple of workstreams at the same time. First, if you flip back to the slide showing the 4 million tonne case — though I'm not certain you're able to navigate back there — there was a portion of the Mount Mann deposit that, during the November 2024 recalibration, we intentionally bypassed, and now we're able to return and begin pulling ore from those upper levels within the Mount Mann ore body. That's the first point, and it comes on top of, and in addition to, what's already baked into the 2.8 case. Second, the other decision we made back in November 2024 was to hold off on activity at the Northwest Flats deposit. What we'll now do is begin extracting ore from that deposit. The choice available to us today, which wasn't there at that point, is to come off the bottom of the open pit and pull that ore straight from the Northwest Flats deposit.

Ryan Hair

executive
#38

That’s going to occur in parallel as well. When you look at the 2.8 case, you’re adding some extra ore from Mount Mann plus additional ore from Northwest Flats, which is now simpler to access because it comes from the bottom of the open pit, and both of those should take place in parallel. With the 2.8 case, and taking all of that into account, we expect the underground mine ramp up will, generally speaking, line up with the de-bottlenecking Tony mentioned when he discussed the plant work we’ll carry out to incrementally unlock capacity from the plant. It’s approximately across the same period, and as Tony indicated, brownfields expansion is always going to be faster than greenfield. If you said a greenfield would take 3 years, then we’ll probably be more in the order of a couple of years rather than 3.

Operator

operator
#39

Up next, we have a question from Hugo Nicolaci at Goldman Sachs. Hugo, the floor is yours.

Hugo Nicolaci

analyst
#40

Hi again, everyone. Here so soon. First, just to follow up, Ryan. I wanted to make clear that 100 Australian dollars per ton mining cost. Is that the amount being expensed, or does it represent total cash cost, including sustaining development capital?

Ryan Hair

executive
#41

I might pass that over to Greg, but sure, Greg, why don't you begin, and then I can add some color.

Greg Jason

executive
#42

Sure. Oh, absolutely — please, go right ahead.

Ryan Hair

executive
#43

Cash in total.

Greg Jason

executive
#44

Yes, that’s the overall cash amount.

Hugo Nicolaci

analyst
#45

Great, thank you. Is that right? That figure doesn’t factor in the development spend, does it?

Greg Jason

executive
#46

Amortization isn't part of that figure. What you're seeing there is the mining operation's cash cost.

Hugo Nicolaci

analyst
#47

Understood.

Greg Jason

executive
#48

That figure leaves out the capital needed for sustaining operations. What we're talking about is the development cost.

Ryan Hair

executive
#49

Yeah. Well, perhaps the clearest way to shed light on that is this: if you take the actual cash cost for the day, plus what's a relatively small sustaining cost, then that's all wrapped up in the hundred. The development cost — and on that, you know, you might spend a considerable amount of time and money, obviously the work we've completed to date, getting to that zone of the ore body doesn't include that. It does include the minor sustains, so things like, you know, increased vent, some, you know, pasting costs and those kind of things. That is included, but not that development cost. Hugo, if that makes sense.

Operator

operator
#50

Our next question comes from Andrew Harrington at Petra Capital. Andrew, the floor is yours.

Andrew Harrington

analyst
#51

Thanks. Good morning, gentlemen. Could you give us more detail about Wagon Wheel, your customer? For instance, where does your quarterly shipping go — is that entirely China, or is half of it China? How do you expect that to develop going forward?

Tony Ottaviano

executive
#52

I’ll pass it along. Appreciate the question, Andrew. Grant Donald, our Chief Commercial Officer, will take that from here.

Grant Donald

executive
#53

Absolutely. So, as we've shown in earlier presentations, there's an offtake chart that illustrates where the volumes are headed — I'd point you back to that. At a high level, our primary offtakers are Ford, Tesla and LG. As we've mentioned before, the Ford tons during the first 18 months will be going to Chengxin, a Chinese refiner that operates a facility in China as well as one in Indonesia. Beginning in 2027 and 2028, those volumes will be directed to Canmax in China. Historically, both the LG volume and the Tesla volume have been shipped to China. It's obviously well known that Tesla constructed a refinery in the U.S., and once that facility is fully ramped up, the plan is for it to be the ultimate destination for that product.

Andrew Harrington

analyst
#54

All right, thanks. A wider question regarding the Middle East war: do you anticipate any shifts when it comes to your fuel costs, let's say, and I suppose, are customers telling you anything in a different way or with greater urgency? Or what do you think might change if this continues — you know, whether for better or worse on your end?

Tony Ottaviano

executive
#55

Yeah. Andrew, I might address part of that question, and then I'll have Grant wrap it up regarding customers. But when it comes to fuel and diesel in particular, I mean, we're at 80% renewable. That gives us a really significant advantage. The bulk of our power comes from renewable sources. On average, diesel accounts for roughly 4%-5% of our total cost base. It's not a major amount. We feel quite confident on that front. I'll pass it to Grant to speak with you about how customers are affected.

Grant Donald

executive
#56

Yeah. No, look, I mean, we've discussed a bit where the bulk of the volume is heading. Right now, we haven't heard anything from customers suggesting there's a problem with moving a ship from Australia to China. It's a fairly short trip, you know, under two weeks. I expect that trade to keep going. We have seen some disruption from Africa into China, and that has generated some interest from customers with exposure to Zimbabwe volume in securing more volume. You know, that's a separate matter.

Operator

operator
#57

Those are all the questions we have in the queue. At this point I'll turn things back over to Tony, who will offer some closing remarks.

Tony Ottaviano

executive
#58

Much appreciated, Michelle. Thanks to everyone listening in. Thanks to those who sent in such excellent questions. And thanks to my team for organizing today — Leanne, Jared, Ash, and Claire, along with the team, I really appreciate it. Yeah, here's to looking ahead to the second half.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Liontown Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Liontown Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Liontown Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.