Lumentum Holdings Inc. (LITE) Earnings Call Transcript & Summary

November 7, 2024

NASDAQ US Information Technology Communications Equipment earnings 63 min

Earnings Call Speaker Segments

Kathy Ta

executive
#1

Thanks for joining us, and welcome to the earnings call for Lumentum's fiscal first quarter of 2025. I'm Kathy Ta, and I serve as Vice President of Investor Relations here at Lumentum. With me on the call today are Alan Lowe, our President and Chief Executive Officer, Wajid Ali, our Executive Vice President and Chief Financial Officer, and Chris Coldren, our Senior Vice President and Chief Strategy and Corporate Development Officer. During today's call, we'll be making forward-looking statements. Those include statements about our strategies, trends, and expectations for our products and technologies — covering demand, our customers, our end markets, and market opportunities — as well as our expectations and beliefs regarding recent acquisitions, including Cloud Light, macroeconomic trends, and our expected financial and operating performance, including our guidance. They also include statements about our future revenues, financial model, and margin targets. Such statements carry risks and uncertainties that might cause actual results to differ materially from what we currently expect, especially the risk factors laid out in our SEC filings. We encourage you to review our most recent filings with the SEC, particularly the risk factors described in our most recent 10-K and in our 10-Q that will be filed soon. Any forward-looking statements made during this call reflect Lumentum's reasonable beliefs and expectations as of today. Except as required by applicable law, Lumentum assumes no obligation to update these statements. Please also note that unless otherwise stated, all financial results and projections discussed in this call are non-GAAP. Non-GAAP financials should not be considered as a substitute for or superior to financials prepared in accordance with GAAP. Lumentum's press release with the fiscal first quarter results and accompanying supplemental slides are available on our website at www.lumentum.com under the Investors section. With that, I'll turn the call over to Alan.

Alan Lowe

executive
#2

Thanks, Kathy, and good afternoon to all of you. During Q1, we came in above the top end of the guidance we had given for revenue as well as for earnings per share. We achieved a fresh record in orders for datacom laser chips, 200 gig EML chips among them, which shows robust demand from several customers, one of them an AI infrastructure customer. Given growing cloud demand and better trends across the wider networking market, we anticipate double-digit sequential revenue growth for the second quarter. In Q1, we moved forward on our strategy to broaden and diversify our cloud and AI opportunities. We landed one more hyperscale transceiver customer through a new qualification along with initial volume orders. That comes on top of the new award we discussed last quarter. We anticipate beginning volume production shipments tied to these new customer awards during the first half of calendar 2025, with ramping across the year, in line with the revenue targets we previously provided. Across the last several quarters, I described a three-pronged strategy for growing our cloud data center business. To recap, prong one is broadening our cloud and AI customer opportunities at both the component and transceiver levels as customers move to higher speeds. Prong two is scaling substantial production capacity for components and transceivers located outside China. Prong three is pushing forward our differentiated technology roadmaps, which let customers scale future generations of cloud and AI data center architectures toward higher compute capacities in a way that is more cost-effective and more power-efficient. I'd like to give more detail on recent progress across each of these areas. On broadening our customer opportunities, as the industry moves to higher speeds, our differentiated technology grows more valuable, particularly for market and technology-leading customers. For instance, over the coming year, the shift to 200G lane speeds will fuel growth and raise the importance of single-mode optics along with indium phosphide laser transmitters. This shift fits well with our market and technology leadership. Our indium phosphide EML transmitters have built a strong reputation for high performance, high quality, and reliability. As evidence, our 100G EMLs are presently shipping in large volumes to a broad set of optical transceiver suppliers for use in leading-edge single-mode 400G and, even more importantly, 800G optical transceivers. Those customers are now designing our 200G EMLs into their next generation of transceivers, which positions us well for the coming transition to 200G per lane. We've also made meaningful progress broadening our opportunities on the high-speed datacom transceiver side of our business. As we forecasted earlier, our datacom transceiver shipments should rise sequentially in this December quarter, and we expect our transceiver production to keep growing through calendar year 2025, fueled by demand from several hyperscale cloud and AI customers. Like I said before, we've booked a first batch of orders from new hyperscale clients, and we anticipate beginning shipments of production transceivers to those clients during the first half of calendar 2025. Beyond that, we're working hard to lock in further awards across several other opportunities. Growing manufacturing capacity at existing Lumentum sites located outside China forms the second element of our cloud and AI data center plan. That growth matters because it guarantees a safe, dependable supply chain for our cloud and AI customers. Indium phosphide laser chips play a vital role in data center infrastructure. During our previous earnings call, we explained that to satisfy rising demand, we remain on track to boost EML production capacity by 40% in Q4 of fiscal 2025 relative to what we had in Q4 of fiscal 2024. This build-out will ease the shortage of indium phosphide capacity felt across the industry. Even so, we anticipate remaining on allocation for all of calendar year 2025. Expanding datacom transceiver capacity at our Thailand campus continues according to plan. The initial production line is running now, and we expect to finish further phases of expansion within the next 18 months so we can satisfy the large volume of demand coming from our customers. That work includes finishing construction of the new three-story cleanroom facility on that same campus, which is still on schedule. The third element of our cloud and AI strategy centers on supplying innovative technologies that tackle the mounting difficulties of scaling data center compute capacity. We're partnering with leading-edge customers to create breakthrough solutions that enable higher data link capacities alongside improved energy efficiency, which will underpin their multi-year cloud and AI infrastructure roadmaps. Within the data center, optical switching should prove critical for cloud and AI network architectures of future generations. Lumentum's optical switches — power-efficient, high-bandwidth, and low-latency — are well-positioned to satisfy what these evolving networks require. We've already delivered evaluation units to customers, and their feedback on our performance has been overwhelmingly positive. Although we're starting to ramp our 200G laser chips, we're already closely aligned with customers on technologies for future generations of even faster optical links, such as 400G per lane, plus new architectures like co-packaged optics, which will demand distinctive ultra-high power lasers. Our sophisticated indium phosphide and photonic integrated circuit capabilities are vital for satisfying these forthcoming demands. Deployment of these technologies isn't expected to begin until our fiscal 2026, yet we're actively collaborating with customers to shape what comes next in optical technology. Carrying out our three-pronged strategy will produce substantial revenue growth, powered by fresh opportunities in AI and cloud data centers. That growth, together with a network business that is recovering, puts us in position to get back to a double-digit operating margin as capacity utilization rises and we keep strict cost discipline. During last spring's OFC conference, we laid out a goal of achieving a 17%-20% operating margin when quarterly revenue exceeds $600 million; I'll now turn to other fiscal first quarter revenue and product developments. Cloud networking segment revenue for the first quarter rose 11% quarter over quarter and 23% year over year, helped along partly by robust in-market demand from cloud hyperscale customers investing both within and outside of AI data centers. We're likewise encouraged by ongoing shipment growth for our latest networking products. That, paired with improving inventory positions for our products at networking customers, gives us encouragement about what lies ahead. Demand rose sequentially for our narrow linewidth tunable lasers serving high-speed long-haul applications, plus 400ZR and faster solutions for DCI applications. Given the design wins we already hold here, we expect to keep a leading market share in laser components for ZR and ZR+ applications through this fiscal year and beyond. Interest from customers in our advanced coherent transmission and next-generation transport offerings keeps climbing. In leading-edge coherent transmission, demand is strong for 130 and 200 gigabaud coherent products. That demand stems from requirements for more capacity and spectral efficiency amid ongoing bandwidth growth. Our differentiated technology, manufacturing capabilities, and solid design wins leave Lumentum positioned to sustain leadership in these critical products too. Alongside rising demand for our coherent transmission components, we're witnessing greater demand for integrated C+L band transport solutions, high port count ROADMs, and newly emerging demand for multi-rail ROADMs and amplifiers.

Alan Lowe

executive
#3

Multi-rail represents the following phase when it comes to scaling the optical transport layer efficiently and providing greater flexibility within high-capacity line systems. For fiscal Q2, we expect robust sequential expansion in cloud and networking revenue, driven by fast growth in our offerings that serve cloud and AI applications, along with widespread demand improvement throughout our product portfolio. Let me now shift to our industrial tech segment. Our industrial tech segment revenue rose 2% quarter over quarter, as anticipated, while falling 38% versus the same quarter a year ago. As is true for others in this area, demand remains under pressure because of the soft industrial end market. Within industrial tech, our emphasis is on creating innovative industrial laser products that address customer requirements for greater precision with as little heat damage as possible. This opens up possibilities for our ultrafast laser products in heat-sensitive uses such as semiconductors, displays, and advanced packaging. We are collaborating closely with top semiconductor equipment makers on interposer and advanced semiconductor packaging applications. We just delivered high and low-power FemtoBlade demo units for advanced display applications, and customer feedback has been positive. Turning to fiscal Q2, we anticipate industrial tech will be roughly flat on a sequential basis, as an uptick in industrial lasers, driven by our ultrafast lasers, is offset by a quarter-over-quarter drop in 3D sensing revenue. In summary, we have achieved meaningful progress carrying out our strategy to expand our cloud business. We established a new record for datacom chip orders and are working hard to meet this demand across the next several quarters. We also achieved excellent advances with multiple high-speed optical transceiver customer engagements, among them securing significant transceiver orders from a third hyperscale customer. In addition, we are working actively to win additional awards from additional new customers. Our strong pipeline of cloud customer engagements, together with improving trends in the traditional networking market, strengthens our confidence in hitting our previously stated target of growing quarterly revenue to $500 million per quarter by the end of calendar year 2025. We expect continued substantial growth into 2026 and 2027 as we take advantage of new cloud and AI opportunities, positioning our cloud business for a multi-billion dollar annual run rate in the years ahead. Before handing the call to Wajid, I want to convey my heartfelt thanks to our employees for their steadfast focus and commitment and to our customers around the world for their partnership and collaboration. With that, Wajid.

Wajid Ali

executive
#4

Thanks, Alan. Before I walk through the Q1 financials, I want to remind everyone that, as we discussed last quarter, we've revised how we present things to fold in certain charges that used to be left out — mainly ones tied to abnormal excess capacity — in our non-GAAP figures beginning in the first quarter of fiscal 2025. Historical periods that are comparable have been restated so they line up with this approach and stay consistent. First quarter revenue came in at $336.9 million, and non-GAAP EPS was $0.18, both above the top end of the ranges we had guided to. On a GAAP basis, gross margin for Q1 was 23.1%, operating loss was 24.5%, and net loss per share was $1.21. Now for our non-GAAP numbers: first quarter non-GAAP gross margin reached 32.8%, rising from the prior quarter and holding steady versus a year ago on the strength of higher revenue. Looking ahead to coming quarters, we expect company gross margins to climb sequentially as manufacturing utilization gets better, thanks to an improving telecom outlook plus more datacom laser shipments. Non-GAAP operating margin in Q1 was 3%, improving both from the previous quarter and from a year earlier. First quarter non-GAAP operating profit was $10 million, while adjusted EBITDA came to $37 million. Non-GAAP operating expenses for Q1 added up to $100.4 million, or 29.8% of revenue — that's $1 million less than the fourth quarter and $1.9 million below the year-ago quarter. Even with more investment going into our growing cloud opportunities, Q1 operating expenses were lower thanks to restructuring actions taken during fiscal 2024, along with tight cost discipline throughout the company. Q1 non-GAAP SG&A expense was $37.7 million, non-GAAP R&D expense was $62.7 million, and interest and other income on a non-GAAP basis was $4.6 million, helped by interest earned on our cash and investments. First quarter non-GAAP net income was $12.2 million, and non-GAAP diluted net income per share was $0.18. Our fully diluted share count for Q1 was 69.1 million shares on a non-GAAP basis. During the first quarter, cash and short-term investments grew by $29 million, reaching $916 million. Working capital came in as we expected, with inventory rising from the prior quarter to support anticipated revenue growth in our cloud modules business; in Q1, we put $74 million into CapEx, largely for high-speed transceiver capacity additions at our Thailand manufacturing site and indium phosphide wafer production capacity. Now for segment details: first quarter cloud and networking segment revenue was $282.3 million, up 11% from the prior quarter and 23% from a year ago. Cloud and networking segment profit was 13%, up both sequentially and year on year. Our first quarter industrial tech segment revenue was $54.6 million, up 2% sequentially but down 38% year on year. First quarter industrial tech segment profit was 4%, up from the previous quarter and down from a year earlier. Turning now to what we're projecting for the second quarter of fiscal 25, that's on a non-GAAP basis, reflecting the assumptions we hold as of today; for that quarter we anticipate net revenue landing somewhere between $380 million and $400 million. Several assumptions sit behind this Q2 revenue outlook: cloud and networking should rise on a sequential basis, driven by robust growth in products that serve cloud applications along with strengthening demand from networking customers, while industrial tech comes in roughly level quarter over quarter, as greater shipments of industrial lasers are offset by a drop in 3D sensing. From that, we forecast non-GAAP operating margin for the second quarter landing in a range of 5.5% to 7.5%, with diluted net income per share between $0.30 and $0.40. Underlying our non-GAAP EPS outlook for the second quarter is a non-GAAP annual effective tax rate of 16.5%; those projections further assume a share count of roughly 69.6 million shares; having said that, I'll hand the call back to Kathy so we can begin the Q&A session. Kathy.

Kathy Ta

executive
#5

Thanks, Wajid. So that everyone gets a chance to ask something, we ask that you limit yourselves to a single question plus one follow-up. With that, we're ready to start the Q&A.

Samik Chatterjee

analyst
#6

Hey there. Appreciate you fielding my questions, and nice work on that impressive outlook. Let me start with the guidance — I believe the sequential bump you're implying for cloud and networking lands somewhere around $50 million to $60 million quarter over quarter. Could you break that down for us a bit, in terms of what portion reflects telecom getting better as opposed to datacom chips or datacom modules? If you could give us a rough sense of where the bulk of that gain is coming from, and then I have one more question. Thanks.

Alan Lowe

executive
#7

Absolutely. Thanks, Samik. Alan here. What I'd tell you is that it's a combination of every piece you mentioned. Datacom chip growth won't be significant until a few quarters from now, since capacity arrives in steps and large blocks; therefore, like I mentioned in the script, Q4 will see a step up, though chip increases this quarter will be limited. Telecom is only slight, and beyond items heading into DCI applications, I wouldn't count on that being robust growth — however, datacom modules are seeing a big jump, and per what we said in the script, we anticipate that carrying on through calendar 2025.

Samik Chatterjee

analyst
#8

Understood. Understood. Now for my follow-up, you made an announcement about yet another new customer when at this point you have — I mean, if I were to take the two new customers you've announced over recent quarters and add them together, how should we think about how big the opportunity might be after both of them fully ramp compared to what the original customer was for Cloud Light? When we combine those two new customers, how should we think about the size of that relative to the first original customer there? Thank you.

Alan Lowe

executive
#9

Yeah. I think answering that is difficult because ultimately it comes down to how well we execute and whether we can provide the quality, the delivery, and the capacity that the customers require. So as I mentioned earlier, the new customers will begin ramping during the first half of next year, and earning the growth of their business in the second half will be up to us; and I think we're putting ourselves in a very good position. As I said, we're having the capacity ready, with clean rooms as well as equipment. So we're planning for success, but we still have to earn that. That said, all of these are very, very large customers that consume a lot of transceivers. And so getting in the door is step one, and earning a bigger share is really what we're striving to do now.

Samik Chatterjee

analyst
#10

Understood, understood. Excellent, I appreciate you fielding my question.

Simon Leopold

analyst
#11

Excellent, many thanks. I was hoping to explore in greater detail the situation surrounding the Cloud Light business. Looking back at the time you shared results for your third fiscal quarter a year ago, you mentioned the general rhythm of that operation, noting we would encounter somewhat of a lull during June and September, which I believe we then observed followed by the rebound in December; therefore, what I am attempting to gauge is essentially what has shifted regarding that December projection compared with your thinking from a number of quarters back. Does it sit higher, lower, and what differs when it comes to shaping that expectation for Cloud Light? Thank you.

Alan Lowe

executive
#12

Appreciate that, Simon. Yep. Honestly, not much is different. What we're seeing lines up with what we anticipated, which is the shift involving our new products, something we've discussed. Those new offerings are being scaled up at this point, so everything has fallen into place just as we foresaw and just as we described during the last 2 earnings calls, meaning I don't see anything surprising.

Simon Leopold

analyst
#13

Then, to build on that, I'm curious to hear your view on where the market for 1.6 terabit devices is heading, and what role you'd expect to play in it — really from the standpoint of timing and how big it gets. Thank you.

Alan Lowe

executive
#14

Sure, that one's more difficult because there's a lot of interest from a lot of customers in 1.6T, and really, 1.6T is one variant of the next generation of products. There's also 800 gig with 200 gig lanes. So at the component level, as I mentioned in the script, we're going to take part with our 200 gig EMLs, and that ramps more toward next summer. But right now we're in the qualification stages and have gotten volume orders as our capacity is quite constrained. So mostly we'll play at the component level with EMLs, and then at the transceiver level we'll play. We've sampled transceivers to customers and the feedback is very, very positive, as we discussed on the last call. So we're in the hunt. We're in the game, and we just need to keep working on the qualifications. And then the timing is really up to the customers too. So some are ready sooner than others, but I'd say that by the end of next calendar year, 1.6T should be ramping significantly.

Simon Leopold

analyst
#15

Thank you. Great.

Kathy Ta

executive
#16

Thanks, Simon.

Chandra Shekhar

analyst
#17

Thanks. Chandra Shekhar here, filling in for Meta. I'll keep this brief, and congratulations on the quarter. I wanted to ask, has anything shifted in your schedule for vertical integration with Cloud Light? My understanding is you said there would be essentially no shipments before the close of fiscal 2025, but is there any newer timeline you can share regarding that vertical integration?

Alan Lowe

executive
#18

There isn't much that has changed, really. What I'm getting at is that we're working on products that combine our lasers with EMLs and VCSELs, and those still need to go through qualification. But to be honest, the timeline is the same as before—the products that were already in development before we made the acquisition are now making their way to the market, and by and large, those didn't change. I'd put it this way: during calendar 2025, we clearly have opportunities to bring more product into the field, and that should help margins late in the calendar year and as we move into calendar 2026. Separately, our non-GAAP R&D expense came in at $52.7 million.

Chandra Shekhar

executive
#19

All right, that's useful. So a fast follow-up about telecom. Do you basically anticipate quarter-over-quarter expansion mostly coming from fresh offerings, or items that hadn't seen stockpiling before? I believe you brought that up during the prior quarter. And how should we think about conventional telecom items performing quarter to quarter through the year? Thanks.

Alan Lowe

executive
#20

Yes. I'd say we're witnessing significant momentum in everything related to ZR, in anything that links data centers together as those facilities get constructed, and that might come in the form of ZR modules. However, considering our portion of tunable lasers that are used in ZRs, that's where a substantial acceleration will occur on the telecom side. So I'd say hyperscale expansion is quite robust beyond the data center, and that encompasses transport or open line systems. I'd say carrier expenditures remain subdued, and inventory still has to be worked off in that area, yet there are indications of hope. So new products are shipping out, as we discussed, and I believe we're a quarter or two from getting back to more typical inventory levels, but we're definitely observing encouraging signals of inventory decreases of our product at our customers.

Kathy Ta

executive
#21

Thanks for asking.

Chandra Shekhar

executive
#22

Thank you.

Ananda Baruah

analyst
#23

Hi there. Yes, everyone. Afternoon to you. Appreciate you letting me ask; Alan, we'd really like to hear your perspective on how one should approach tariff positioning and tariff risk, which are pretty hot subjects right now. So just give us your view on that, particularly when it comes to diversifying away from China, and then I've got a quick follow-up too. Thank you.

Alan Lowe

executive
#24

Yes. Who ends up occupying the White House doesn't factor into any change to our strategy, in my view. Our approach has been to operate as a company headquartered in the U.S. that manufactures beyond China, and that won't shift because tariffs might rise, so I'd argue it leaves us positioned extremely well, given that we've got an established manufacturing site in Thailand that we're expanding at a dramatic pace, and our laser chips are produced in the U.S. along with the U.K. and Japan, so seen that way, I believe we're about as tariff-free as it's possible to be regarding what lies ahead. So no strategic change is taking place, I'd say, though that idea definitely strikes a chord with plenty of our customers seeking supply chain resilience, and we deliver that to them through vertical integration and also a small footprint in China plus an expanding footprint beyond China.

Ananda Baruah

analyst
#25

That background is really useful. Thank you. Then my brief second question concerns EML lasers — with this tight supply situation, do you folks possess any pricing leverage, or are you actually exercising any, that could be tapped here? Thanks; that's all from me.

Alan Lowe

executive
#26

My view is that we approach pricing across the whole portfolio, and when supply is tight, prices either decline more gradually or climb more quickly; thus, in this constrained climate, as we plan ahead and as we stand here right now, a great deal of capital being poured into expanding capacity has to be funded by us. So I believe we are on solid ground in pursuing price optimization for EMLs as a single area under review, and we have already put in place certain strategic pricing measures for those products.

Kathy Ta

executive
#27

Thank you, Ananda.

Ananda Baruah

analyst
#28

Thanks, everyone. I appreciate that, Alan.

Alan Lowe

executive
#29

Operator.

Michael Genovese

analyst
#30

Oh, excellent. Many thanks. I suppose could I simply request additional detail regarding the telecom market? And whenever you offer remarks about 2026 and 2027 and that sort of visibility, does that pertain entirely to the datacom side, or to what extent does telecom visibility reach?

Alan Lowe

executive
#31

I mean, I think with traditional telecom, or carrier telecom, visibility isn't great, though I'd say deployments have run beneath the pace of bandwidth demand growth, so there will need to be extra spending and deployments on new networks, and we're witnessing that right now in China as new networks get rolled out. As for visibility into telecom carrier network spending in 2026 and 2027, I'd be lying to you if I claimed I had good visibility there. I think instead the data center and data center interconnect markets, we believe, will be very strong going forward, and honestly, we hold a fairly small footprint and small share of datacom transceivers, and given our U.S. headquarters and manufacturing outside of China, I think there's a compelling reason for customers to come our way. So we expect not only to grow our datacom module business and EML chip business, but to gain significant share through the next coming years.

Michael Genovese

analyst
#32

Great, that's really useful. Then last thing, I suppose, could you share additional detail regarding the optical switch offering for the data center? What role will it play inside the data center? Also, is this essentially an entirely new capability, or is it more like the next step? Will it take the place of something, or substitute for a portion of something? I'm particularly wondering about Ethernet switches, and whether that's relevant at all.

Chris Coldren

executive
#33

Yeah. Mike, it's Chris here. Let me give that a try; it does, clearly, what the name says — optical switching. As you're aware, inside a data center there's tiering, numerous tiers of optical switches, needed to achieve the massive scale required for connectivity throughout a very large data center. So the capacity to build high radix, meaning roughly 300 by 300 level switches. I suppose one could make the case it substitutes for a certain tier of electronic switches. My view leans a bit more toward it being an addition, since it lets the data center grow more efficiently, meaning the power draw found in current switches, or the switches you'd deploy if you had scaled present-day architectures, could then serve additional GPUs plus additional networking, optics, and so on, to link AI accelerators together; that's genuinely the point here — delivering far greater energy efficiency when we're discussing big pipes spanning a very large data center. Another benefit, to be clear, is that when you stack more tiers of switches, those switches introduce extra latency, whereas optical switching carries very minimal latency. So that's another significant plus as data centers get bigger. Sorry, Mike, were you speaking?

Michael Genovese

analyst
#34

All right. Thanks, Mike. Oh, actually, I was simply about to mention, so essentially it seems that when GPU clusters grow bigger and bigger, you require bigger optical switches, basically, just to put it briefly. Broadly speaking, that's right. Many thanks.

Wajid Ali

executive
#35

I believe there could be additional applications, and perhaps a few points worth noting as well: from our perspective, this represents a logical outgrowth that builds on the technologies we've led the way in developing within the ROADM area across the last several decades. And thus it's truly a matter of tailoring the technologies we've possessed to a fresh data center possibility.

Michael Genovese

analyst
#36

Great, thank you very much.

Tom O'Malley

analyst
#37

Hi, everyone. Strong results, and I appreciate you fielding this question. I'd like to get a handle on how qualification works over on the transceiver side. You've just landed one more award, and on the prior quarter's call you mentioned something like qualification during the Q1 window with that initial customer. Could you bring us up to speed? With these 2 new customers, have both of them qualified as of yet, and once qualification is done, at what point do you typically start to get a sense of the volumes you'll receive? Clearly, qualifying and the quantity you ultimately ship aren't the same thing, but you're feeling quite confident about next year, so please remind us: when will these 2 customers become qualified, and after that, when will you get a sense of the volume forecasts for those 2 customers?

Alan Lowe

executive
#38

Yes. I'd say we remain on track relative to what we communicated previously concerning that initial new customer we discussed during the prior earnings call, with qualification taking place during the first calendar quarter. As for the additional customer brought on during this quarter, I'd say they are qualified at this point, and we've now booked orders that will start ramping during the first half of next year. So the timing differs somewhat, yet we're pleased with both. And as I mentioned earlier, plenty of other qualifications are underway that we'll hopefully discuss on the upcoming earnings call. Very useful. Then, turning to the various pieces that get you to that $500 million per quarter, you've conveyed greater confidence around that figure, maybe even a touch higher.

Tom O'Malley

analyst
#39

At present, you're sitting at roughly the low $300 million per quarter. You mentioned EML hitting a record. From what I recall, that used to be around $80 million a quarter or so. Let's simply suppose it's a bit higher than that; but you said capacity gets exceeded for 2025, so essentially you're fully sold out there; so looking at where you head next, from the low $300 million up to that $500 million range, does more of that added amount come from EML lasers, or does more of it come from qualifying these new transceiver customers and their ramp-up? Any clue on that would be super useful. Thank you.

Alan Lowe

executive
#40

Sure. Sure, Tom. If I begin with the midpoint of our guidance for fiscal Q2, the quarter we just guided, we're guiding to $390 million at the midpoint. And I'd say there's a mix of what we anticipate winning and expanding from now until the close of next calendar year. As I mentioned in the script, boosting EML capacity by 40% from the June quarter of last year to the June quarter of this year, this upcoming fiscal year, plays a role in that growth, but I'd say transceivers are expanding. Anything tied to data center interconnect will expand, and we aren't relying heavily on a rebound in the traditional telecom business with carrier spending. And should that occur, then we'll arrive there faster. But I'd say that's roughly the three big prongs, which is growth in the chips beginning truly in the summertime, growth in transceivers that we've discussed really beginning in the December quarter, and then data center interconnect are really the three big drivers for moving us from $390 million at the midpoint to the $500 million.

Kathy Ta

executive
#41

Thanks, Tom.

Karl Ackerman

analyst
#42

Yes, thank you. I wanted to dig deeper into that hyperscale win, plus the design win that came up during the prior quarter. To be specific, are these transceiver chances coming about because hyperscalers or big customers are linking up their own AI processors, or because you've landed a spot on reference designs for possibly new GPU platforms? And while you answer that, do these first transceivers already incorporate your EMLs? If they don't, does that delay the timeline for these customers or hyperscalers to ramp your optical products in 2025? Thank you.

Alan Lowe

executive
#43

Yeah. Thanks, alot . I believe we typically don't discuss customer architectures and what they're deploying, though we can definitely speak to our transceivers. So these, by and large, are transceivers that won't include our EMLs at initial launch, so to speak, since these have been in development and designed across the last year or so. Obviously, these accounts have other opportunities, to Alan's point, as we succeed and execute with them. Not only will there be more share, but there will be more SKUs and other types of transceivers where we can introduce more of our own content.

Karl Ackerman

analyst
#44

Karl, thanks for that.

Kathy Ta

executive
#45

Kathy here — did you have something else you wanted to ask?

Karl Ackerman

analyst
#46

Yeah, building on that, could you talk about whether the recent business you're winning comes from data center clients shifting their purchases of those optical transceivers over to American-based vendors such as your company? If you could address that; and also, can you put a number on the growing TAM you anticipate as AI clusters gain the ability to break apart certain elements of scale-up architectures? Do you view that as another new avenue? Thank you.

Alan Lowe

executive
#47

Yeah. Let me clarify that these represent fresh opportunities, so this isn't a shift of allocation. What I'd say is customers definitely appreciate our U.S. headquarters and manufacturing outside of China, plus a lengthy roadmap along those lines. So I believe that positions us better to capture these new opportunities. Right now, these are clearly scale-out. Bringing optics into a greater portion of scale-up is likely around 1 year to 1.5 years away in terms of timing. I mean, some companies are certainly advancing in that direction, but what we have here are conventional pluggable transceivers for scale-out hyperscale use cases as more AI equipment gets deployed, so to speak. If you remember, looking back 12 months, only 2 players were really constructing AI gear, and I expect that number to grow. I think you touched on the idea, to some degree, of partially disaggregated architectures as we move ahead into calendar 2025 and 2026.

Kathy Ta

executive
#48

Appreciate it, Karl.

Alan Lowe

executive
#49

The 4Q25 outlook — right, we discussed calendar 2025 and reaching $500 million. My view is there are plenty of opportunities for us, regardless of whether this particular one or that one was baked into our number. Winning every single one we pursue isn't necessary; so it's tough for me to claim, yes, we're exactly on track with the two we had planned for. That makes it a difficult question to answer; they definitely factor into us getting there, and we're extremely pleased with how far we've come with these customers, plus others we anticipate discussing on upcoming calls. Understood. That helps. Then for my follow-up, during qualification you noted that additional volume has to be earned. Does that imply you're a secondary supplier in these arrangements? If that's the case, what share would make sense in your estimation? Well, in every one of our businesses, trust and share must be earned, and that happens via quality execution, a resilient supply chain, and following through on commitments. Share moves around across all our businesses based on whether performance is good or bad; that's the meaning I was trying to convey with that point. Hyperscaler demand is enormous, and nobody depends on a single supplier. As they bring two or three suppliers up to speed, whoever executes best will capture greater share over time. That's precisely what we're focused on — ensuring we build that trust and supply resilience, so customers feel they can depend on us for more of the product they require. That's the effort we're putting in.

Kathy Ta

executive
#50

Thanks, Brian. Yeah. Thanks fore the color .

Alan Lowe

executive
#51

Of course.

Ryan Koontz

analyst
#52

Excellent, I appreciate you taking it. I'd like to revisit what you said regarding DCI, and get a handle on how much you're exposed there when it comes to tunables. Could you perhaps discuss the possibilities you have in that module segment? Do you have a presence? Have you landed any design wins for ZR modules in ZR as of now? And in what way should the investment community view that chance for your company?

Alan Lowe

executive
#53

Yes. Regarding DCI exposure, the largest revenue exposure on our side, as I mentioned earlier, comes from tunable lasers and, to a smaller extent, additional components that go into ZR and ZR Plus modules made by others. We also have exposure through our own ZR module, and our progress on the 800 gig ZR and ZR Plus is quite good, in the U.S. and also abroad. So that progress leaves us positively encouraged. As for the 400 gig module, honestly, we arrived at the market late. Our share is small, and we're working hard to try to build that share. Yet honestly, the market is extremely strong, and we're quite pleased to expand our tunable laser business in it and to back our customers who are capturing a major share in a market expanding extremely quickly as data centers get situated farther apart.

Ryan Koontz

analyst
#54

Yeah, that's logical. The market there is more developed. Then a fast one for Wajid regarding gross margins, given all the various pluses and minuses happening right now. As the fiscal year progresses, what's the right way to frame gross margins? Yeah.

Wajid Ali

executive
#55

Thanks, Ryan. As we mentioned in the script, we anticipate sequential improvement in gross margins. We're already observing it during Q2. Our operating margin profile looks markedly different from what we delivered in Q1. Therefore, we expect that gross margin gain to carry into Q3 and Q4, plus as additional supply for EMLs becomes available. That said, we plan to raise our R&D spending in Q2 and on through Q3 and Q4. Alan's remarks probably make clear that customer pull is very strong, and the opportunities are very strong too. So for that reason, from an R&D perspective, we'll likely spend ahead of revenue. And we've already discussed certain capacity investments we are undertaking. So yes, gross margins will tick up sequentially across the fiscal year, though it will be somewhat muted from an operating margin perspective due to the greater R&D investment we're making, simply because of how much customer pull we have.

Ryan Koontz

analyst
#56

That sounds excellent. And would the capacity you mentioned adding bring some overhead consequences? There's also a slight drag until it gets fully used.

Wajid Ali

executive
#57

Yes, it does. Yeah. Thank you. Yeah. Thank you. No, there is indeed a bit of an overhead effect, since we're expanding at our Thailand facility as we shift a greater share of our transceiver production there. So while we increase and ramp that output, a couple of quarters will carry overhead expenses tied to it. That's already factored into the sequential margin increases. Then, once volume climbs during the middle portion of the next calendar year, we'll start seeing the payoff as it works through the quarters. We'll share more detail on that when those quarters arrive, but thank you for bringing it up.

Ryan Koontz

analyst
#58

For sure. That helps a lot. Thanks so much, everybody.

Christopher Rolland

analyst
#59

Hey, everyone. Appreciate you taking my question. Alan, I wanted to go a bit deeper on your earlier comments about bringing laser production in-house, particularly with Cloud Light. You said it mostly remained unchanged. What I'd like to understand is what was actually different in that case. You also brought up the back half of 2025 as when those margin improvements would show up. My read is that this gives us a sense of the integration schedule. Maybe I had it wrong, but my prior assumption was that you'd be doing much more integration during the first half. So I'd really like to know: is this a qualification issue? Is it not a delay? Or was it just my understanding that was off? Is what's happening here tied to EML limitations? And does that timeline look like it's being pushed back a bit when it comes to vertical integration, and what's behind that?

Alan Lowe

executive
#60

Yeah. That's a solid question, Christopher. A couple of points I'd bring up — first, our customers don't want product that's already in flight to be changed. That's point one. Second, we're limited on laser capacity. So we've got to weigh make-versus-buy calls regarding what's largely the product moving through the transceiver business right now, which is silicon photonics-based. That means we rely heavily on CW lasers — EML lasers aren't yet part of what we're shipping and releasing today. We have two options for those CW lasers: purchase them from outside suppliers, or leverage our highly valuable EML capacity to incorporate them into what we build. We ran the numbers. Plenty of solid CW laser vendors exist. For us, the better call is to source those CW lasers externally and keep that EML capacity available for customer shipments, rather than repurposing it toward CW laser production. That's among the reasons why bringing CW lasers into our products is being deferred to the back half of the year. So, our current focus includes developing designs built on EML technology, and those should hit the market during the back half of the calendar year. Qualification work still lies ahead for us. Right now, though, the bulk of what we manufacture relies on silicon photonics, and for that we draw on continuous-wave lasers supplied by our strategic partners. Doing so lets us preserve EML capacity for the customers who need it.

Wajid Ali

executive
#61

Yes, and I would also mention that the genuine benefit in terms of performance from EML begins to appear when we discuss 1.6T and later iterations with greater capability at 1.6T, so the roadmap we naturally follow also fits with relying more on vertical integration in situations where, at those rates, the relevant technologies are far more distinct.

Christopher Rolland

analyst
#62

Thanks a lot, guys. I mean, that really tidies things up for me—at minimum, it clarifies quite a bit. It likely also leads into my next question, which is about gaining a better grasp of EMLs. I mean, it appears as though the entire market is shifting in that direction. AI requirements are driving unit growth. From what I've been able to identify, at least, there's another significant EML participant out there. It appears that when you've got this EML capacity on hand, it actually generates pull-through for your transceiver units, your pipeline, your market share, your customers, new customers, and so on. So why is 40% the figure we're discussing? Why aren't we discussing 100%, or perhaps even beyond that? What makes 40% the correct figure in this case? And how much capital does this require? If you chose to, how quickly could you bring new lines online? And given how important this component seems to be in this new cycle, would you err on the side of overbuilding rather than underbuilding? Thanks.

Alan Lowe

executive
#63

Christopher, you sound quite a bit like my board of directors, so that's an excellent question; adding capacity does require time. One thing we did while we were focused on integrating and capturing synergies—we had two wafer fabs over in Japan. We intended to shut one down and fold it into the other; we halted that a number of quarters back and said, "That additional wafer fab capacity is something we need," and we're now ramping it up. If you look back 18 months, we had unused capacity in our wafer fab. Adding capacity takes 18 months, so that's roughly the situation. We're adding more. We're shifting to bigger wafer sizes. That requires time, and we're putting in epi reactors. That also requires time, so it's a very good question. If I could add 100% between now and June, I'd do it. But the lead time for capital equipment, plus bringing up and qualifying new tools, is simply painful. The good news, though, is that market has barriers to entry. So we're going to expand it as quickly as we possibly can; and simultaneously, we're going to launch new products; so the 200 gig per lane is a new product. We're in the process of getting qualified. That requires time and resources and typically begins at a lower yield; and we have to work through that learning curve and that yield. So I believe we'll perform well in the second half of the calendar year on that. But we are certainly adding capacity past the 40% following the June quarter. We're definitely not sitting idle.

Christopher Rolland

analyst
#64

Maybe I could squeeze in a single additional question. How come you don't rely on your?

Kathy Ta

executive
#65

Oh, of course.

Christopher Rolland

analyst
#66

All right. Thank you, Kathy. Oh, right. I was about to ask, what's stopping you from putting that constrained EML capacity toward onboarding new Cloud Light clients? Seems like you'd solve two problems at once.

Alan Lowe

executive
#67

Yes. Fair point. Silicon photonics is something we have. Multi-mode VCSEL-based transceivers, those are in our lineup too, along with EML-based transceivers. Every one of those gets designed with a particular use case in mind. Certain use cases perform better with single-mode silicon photonics. With EMLs, some carry a more favorable cost structure. And like Chris mentioned, much of the incoming next generation of 1.6T favors EMLs, particularly once you move into multi-wavelengths, where EMLs are positioned to be really important. So yes, that's definitely something we'll pursue. It likely lines up better with the back half of the calendar year, once we're further along with these more advanced 1.6T products. Beyond that, we've got next-generation 200 gig EMLs coming, and those should truly set us apart from rivals. I believe that hands us the means to generate added differentiation at the transceiver level and push gross margins upward.

Christopher Rolland

analyst
#68

Appreciate it, everyone. My apologies for this being the third question.

Kathy Ta

executive
#69

Thank you, Chris. Sierra, let's fit in one additional question, I believe.

Richard Shannon

analyst
#70

Happy to squeeze this in before we wrap up. Appreciate you guys fielding my questions. I might build on what was asked about optical circuit switching. There were a few questions and remarks earlier. Perhaps you could lay out the schedule for qualification and the volume ramp, just so we have a sense of it. And your close competitor that just reported has clearly mentioned a product that's needed. Could you talk about how you're differentiated, or different, or complementary relative to their efforts?

Alan Lowe

executive
#71

Sure. What we're up to, I can share. What they're up to, I really can't say. Their technology is surely distinctive and fascinating, I'm sure. Our approach and our technology, I'd say, are not the same. Ours relies on MEMS; and as Chris said before, we bring years of know-how with MEMS designs and MEMS inside our WSSs. Actually, our most sophisticated WSSs incorporate several technologies such as LCOS and MEMS; so as we mentioned, feedback from our customers has been favorable. Some customers are further along and more prepared to deploy optical circuit switches in their data centers; others need to re-architect or develop software to make this optical circuit switching possible; so it truly comes down to which customers are ready and when. That said, I'd call a deployment in calendar 2025 realistic. And the growth that matters more will likely come in calendar 2026.

Richard Shannon

analyst
#72

All right, that's really helpful information. I appreciate it, Alan. Now for my next question.

Alan Lowe

executive
#73

Excuse me — one more point I wanted to mention, Richard. The product has already been moved over to our Thailand operation, which means qualification units and beta units are being built in Thailand as we speak. So the moment customers give the word, we'll be set.

Richard Shannon

analyst
#74

All right, that's helpful, Alan. For my follow-up, I want to revisit something we haven't discussed in some time: 3D sensing. Are there any developments—whether in the markets you've served previously or in newer ones—that could signal growth and better results in the near future?

Chris Coldren

executive
#75

Hi, Richard, Chris here. My answer would be partly affirmative and partly negative. Clearly, the high-volume use cases we've supported for multiple years have reached maturity, and within that particular application there isn't a clear trigger unless the Android ecosystem starts embracing it broadly. There's no indication of that happening in the near or medium term, though it remains a possibility. Turning to other areas—metaverse, augmented and virtual reality, and similar opportunities—those are contributing somewhat, along with automotive. However, adoption in both has moved more slowly than any of us would have liked. Even so, companies are still investing heavily there. As a technology leader, we keep working alongside those leaders, but we'll stay restrained about our outlook until a genuinely new application emerges.

Kathy Ta

executive
#76

Appreciate that, Richard.

Richard Shannon

analyst
#77

All right, thanks, everyone.

Kathy Ta

executive
#78

Thank you, Sierra. Yes, appreciate it. Sierra, I believe we’ll hand things back to Alan so he can wrap up.

Alan Lowe

executive
#79

Alright. Thanks. As we close out the call, I want to share a few final points. Our growth outlook has us very optimistic. The broad photonics lineup we've built — grounded in proprietary internal technology and demonstrated production strengths — tackles essential problems such as connectivity constraints and energy usage; given solid momentum across our three-part approach, we have strong conviction that by the close of calendar 2025 we will hit $500 million in quarterly revenue, and over the longer horizon, grow our cloud operation into a multi-billion dollar yearly run rate. We appreciate your participation on today's call. We hope to see you at investor conferences and other meetings later this quarter. Have a great day.

Operator

operator
#80

This brings today's conference call to a close. We appreciate everyone for joining us. At this point, you may disconnect your line.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Lumentum Holdings Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Lumentum Holdings Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Lumentum Holdings Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.