executiveErica: Welcome everyone to MasTec's conference call covering results for the second quarter of 2024, which was first aired on Friday, August 2nd, 2024. I want to remind everyone that a recording is being made of today's session. Right now, I'll hand things over to Marc Lewis, our Vice President of Investor Relations at MasTec. Mark.
Marc Lewis
executiveThank you, Erica, and good morning to all of you. Welcome to MasTec's Q2 call. The statement that follows falls under the safe harbor protections for forward-looking statements set out in the Private Securities Litigation Reform Act of 1995; during these communications, we will make some forward-looking statements, including statements about MasTec's future results, plans, and anticipated trends in the industries in which we operate. Such forward-looking statements reflect the company's expectations as of the day this conference call was initially broadcast, and the company does not commit to updating those expectations in light of later events or knowledge. A range of risks, uncertainties, and assumptions are described in detail in our press releases and our SEC filings. If one or more of these risks or uncertainties comes to pass, or if any of our underlying assumptions turn out to be wrong, actual results could differ materially from the results expressed or implied during today's call; in management's remarks today, we will cover adjusted financial metrics, which are reconciled in yesterday's press release and the supporting schedules. Also, we may reference certain non-GAAP financial measures during today's call. Reconciliations of any non-GAAP financial measures not reconciled in these comments to the most comparable GAAP financial measure appear in our earnings press release. Please be aware that two additional documents accompany today's webcast, and those, together with the earnings press release, are available on the investors' events and presentations page of our website at mastec.com. A companion presentation provides information and analytics on the quarter just ended plus a guidance summary for Q3 and the rest of the year. That should assist you with your models. Both PDF files can be downloaded. Joining us today are José Mas, our Chief Executive Officer, and Paul DiMarco, our EVP and Chief Financial Officer. The call's format will be opening remarks and analysis from José, then a financial review from Paul. After those discussions comes a Q&A period, and we expect the call to run roughly 60 minutes. We had a strong quarter and there's a lot of important material to cover today, so I'll hand the call to José at this point. José?
José R. Mas
executiveThanks, Mark. Good morning, everyone, and welcome to MasTec's 2024 second quarter call. I'll walk you through how we performed in the second quarter and then give my view of the markets we serve. To start, a few highlights from the quarter. We brought in $3 billion in revenue for the quarter. Adjusted EBITDA reached $268 million. Adjusted earnings per share came to $0.96. Backlog finished the quarter at $13.3 billion, which is a sequential increase of $500 million; all told, it was another solid, clean quarter for us. Revenues landed a bit under expectations, but margins beat expectations by about 65 basis points. Communication and pipeline delivered strong margins, and clean energy showed meaningful gains, though these were partly counterbalanced by strain in power delivery. Results for the second quarter, together with guidance for the full year that is essentially unchanged, reflect the progress made across the business over the past twelve months as well as our confidence looking ahead. On the February call covering 2023 year-end, we discussed at length the indications of softness emerging in electrical distribution spending. Some of that pressure persists, but our diversification strategy and strength in other markets have enabled us to exceed expectations, which pleases us. Even with the near-term strain in power delivery, the outlook further out keeps improving markedly. Anticipated growth in U.S. energy load is set to affect our business considerably, since our customers will seize that growth chance, producing sizable boosts in spending on generation as well as grid expansion. Our position to capitalize on this chance is exceptionally strong. Such chances, together with greater federal funding that touches our communications and infrastructure segments, and a rising belief that natural gas will take on a bigger part in power generation down the road, present unmatched possibilities throughout our whole portfolio. I want to go over several encouraging things happening that I think will meaningfully affect how well we can expand both revenue and earnings. To begin with, our power delivery segment. In the second quarter, MasTec won a high-voltage transmission and substation project spanning 700 miles. Work on it should begin in early 2025 and wrap up in 2028, and we expect annual revenues in the range of $3-$500 million. This is among the biggest projects in the United States, and it marks a major victory for MasTec, since going after large transmission projects has formed a key element of our strategy. We've invested considerably over recent years so that we're better positioned to compete for and win large projects, and this award represents a strong beginning. Although several sizable transmission opportunities remain in the near term, the reality is that transmission spending will need to rise meaningfully to satisfy load growth expectations. The development cycle timeline for transmission projects has been a major challenge, but we're encouraged by recent proposed legislation in Washington. This Wednesday, the Senate Energy and Natural Resources Committee passed the Energy Permitting Reform Act of 2024 in a bipartisan 15-to-4 vote. This legislation aims to accelerate the buildout and modernization of the American power grid. It hasn't yet passed through Congress, and obstacles are likely given that it's an election year, yet the measure demonstrates that both parties acknowledge the significance of this matter. We regard that as a very positive indicator; within our communications segment, margins exceeded what we had anticipated, and we believe that pattern will persist. The growth we expect for the second half remains largely on course, and the strides we're making across wireless and wireline both give us encouragement. Our share gains with AT&T, along with the Nokia Ericsson swap-out, are progressing in line with our second-half projections, and we keep identifying robust expansion prospects within our wireline operation. For the latter half of 2024, we anticipate organic revenue growth of close to 20% versus the prior year. As we look forward, BEAD funding is coming into sharper focus regarding both its magnitude and its schedule, and we expect that it will affect our business in 2025. A number of new customers have entered the market. Lots of them have private equity backing and show considerable interest in our end-to-end solutions approach, which we think affords them a competitive advantage and therefore creates a strong opportunity for us; in our oil and gas pipeline segment, revenue came in a bit below expectations because certain projects moved into the second half, yet margins beat expectations. Although backlog has declined, demand remains robust. We anticipate this segment returning to a more book-and-burn rhythm, since it won't depend as heavily on bigger projects. We feel good about the visibility we have here over the coming few years, and we now think gas-fired generation is going to matter considerably more when it comes to serving load growth. Solid visibility across a multi-year horizon is quite a different situation from where we've sat during the past few years, and that leaves us quite confident in our business. Last, in clean energy and infrastructure, revenue rose 25% quarter over quarter, and margins came in as expected. For this segment, backlog reflected a book-to-bill ratio of roughly 1.2 times, and even more importantly, our forward visibility is excellent. Project activity looks very healthy, and although a substantial ramp is planned for the back half of the year, we have confidence in our capacity to deliver it. We also anticipate that backlog will keep growing over the remainder of the year and past that point. Demand remains genuinely robust across both renewables and infrastructure projects, and given the wins we expect in bookings, we believe we are well positioned to demonstrate very strong growth in 2025. On the infrastructure side, the imperative for our country and our states to address postponed infrastructure investment has never been more pressing. Spending from the infrastructure bill on highways, bridges, seaports, airports, and rail — together with sizable jumps in private outlays tied to site development, manufacturing, and data centers — is handing MasTec's infrastructure business some genuinely exciting chances to grow. Bid activity is extremely strong, and on a lot of those opportunities, few competitors are in the mix. Turning to renewables, we booked a solid quarter, and we anticipate that pattern will carry on. On NextEra's latest earnings call, they said renewable demand should triple during the coming seven years compared with the seven before. Let me say that again: triple during the coming seven years. While I think we have to embrace every form of electricity generation to satisfy the rising needs of both manufacturing and artificial intelligence, nothing can be stood up faster than renewables paired with storage. Over the past quarter, essentially every one of our renewable customers — utilities and independent developers alike — has moved to capture the rising load growth demand by deploying renewables. We firmly believe that no matter the election or the political winds, renewables will take a leading role in satisfying our nation's energy needs down the road. At MasTec, we are exceptionally well-positioned to gain from that for many years ahead. To sum up, we turned in another solid quarter and are off to a strong start this year. Our latest transmission project award is a major milestone and, we hope, the first of many future wins; that award, combined with the industry's obligation to satisfy load growth demands, sets our power delivery segment up to outperform for the foreseeable future. Our clean energy and infrastructure segment stands to benefit greatly as well from the stepped-up investments in power generation. Add to that the demand in telecom and the steadiness in our oil and gas pipeline segment, and I believe MasTec has never been better positioned. I want to use this chance to thank the men and women of MasTec. Taking charge of this outstanding team is both an honor and a privilege for me. MasTec's men and women commit themselves to safety, environmental stewardship, integrity, honesty, and delivering excellent quality projects at the best value for our customers. These qualities have not gone unnoticed by our clients, and the excellent work of our people is what has allowed us to position the company for ongoing growth and success. At this point I'll turn the call over to Paul for the financial review. Paul?
Paul DiMarco
executiveThanks, José, and good morning, everyone. I'll start with a few second-quarter highlights: we delivered adjusted EBITDA of $268 million, which came in $8 million above guidance, and margins were 65 basis points better than expected. That was achieved even though revenue landed roughly 4% under guidance. Our pipeline segment posted a very strong quarter, and the other segments matched our margin expectations. Adjusted earnings per share came to $0.96, $0.08 above guidance, mainly because of the adjusted EBITDA beat; we produced roughly $265 million in cash flow from operations during the quarter, even with 10% sequential revenue growth. The key factors behind that strong cash flow were our improving margin profile and lower DSOs. So because of that, we reduced net debt by roughly $200 million, and net leverage is now under 2.5 times. Our Q2 18-month backlog was $13.3 billion, which is $500 million higher than Q1. That shows record levels in every segment other than pipeline, and pipeline is still moving toward more book-and-burn work with less reliance on bigger projects. The main drivers behind the total backlog gain were the big power delivery award we mentioned earlier and strong bookings at CE&I. In our communications segment, we're also getting steadily clearer visibility into higher volume next year. Now I'd like to walk through segment performance and expectations. Pipeline segment revenue in the second quarter was $572 million, with adjusted EBITDA of $135 million, or 23.6%. Sales came in a bit below what we had projected, and that was due to how project burn timing played out, yet results stayed solid throughout our wide range of service offerings. MVP has launched, and all that remains is right-of-way restoration. This segment's demand continues to strengthen, and we now anticipate 2024 pipeline segment revenue of $2.1 billion, which is $100 million above our earlier guidance. We now expect full-year adjusted EBITDA margins in the high teens, a gain of 300 to 400 basis points compared with 2023; for the third quarter, revenue should be roughly $540 million, with adjusted EBITDA margins likewise in the high teens. Communications revenue for the second quarter totaled $825 million at an adjusted EBITDA margin of 9.9%, which beat our guidance. Now that we can see the second half of 2024 more clearly, we are reducing our full-year segment revenue guidance by $50 million, bringing it to $3.45 billion, and we are leaving our adjusted EBITDA forecast as it was, with margins in the high single digits. For the third quarter, we expect revenue of roughly $950 million, which is up 15% year-over-year, and adjusted EBITDA margins in the low double digits. Demand for both wireless and wireline services is still strong, and we expect it to continue ramping during the second half of 2024 and to be fully ramped in 2025. Communications segment backlog of $5.9 billion has set a new record once again. Second-quarter power delivery segment revenue came in at $637 million, and the adjusted EBITDA margin was 8.1%. Revenue came in a bit below what we had expected, since distribution services continued to be soft with certain customers. We're pleased to report that we've signed the significant transmission and substation contract, which gives us excellent visibility and resource utilization over the next few years. The 18-month backlog for power delivery stands at roughly $3 billion, which is a record for this segment as well. Keep in mind that our backlog captures only a portion of the new transmission award. For the entire year, we are updating our guidance to account for a more gradual rebound in demand for distribution services, since some customers continue to postpone near-term spending. We now anticipate segment revenue of $2.5 billion, with adjusted EBITDA margins in the high single digits—roughly 100 basis points below 2023. Our 2024 forecast excludes any meaningful contribution from emergency restoration services or the large transmission award referenced earlier. Although we view this temporary slowdown as a chance to review our overall cost structure, we remain highly confident that these deferrals will ease, so we are taking a prudent approach to preserving capacity. For the third quarter, we're projecting revenue of $650 million, and adjusted EBITDA margins should match our full-year projection. In the second quarter, the clean energy and infrastructure segment brought in $942 million in revenue, which came in roughly $80 million under guidance; the shortfall stemmed from the timing of project starts, mainly within our civil infrastructure group. We anticipate recovering that revenue during the latter half of 2024. For the quarter, adjusted EBITDA margin came to 5%, consistent with what we had forecast. Backlog rose $160 million, reaching roughly $3.7 billion, which shows robust bookings for clean energy projects during the quarter; beyond those awards, we continue to operate under limited notices to proceed on contracts worth more than $2 billion in total, and the great majority of that work will be carried out in 2025. Guidance for our clean energy segment for the full year is unchanged: $4.4 billion in revenue, with adjusted EBITDA margins in the mid-single digits. For the third quarter, segment revenue is projected at $1.3 billion, a 20% increase year over year, with Adjusted EBITDA margins in the mid-single digits, roughly 100 basis points better than Q2. Looking at the business as a whole, we now expect revenue for the full year to come in at $12.4 billion, while Adjusted EBITDA stays where we previously guided it, at $975 million. For the second half on a consolidated basis, our outlook is essentially the same as before: $6.75 billion in revenue and Adjusted EBITDA margins of roughly 8%. For the third quarter, we're projecting revenue of $3.45 billion and Adjusted EBITDA of $295 million, which works out to 8.6%. On top of that, we're lifting our Adjusted EPS estimates to $3.03 for the full year and $1.24 for Q3. Cash flow in Q2 was very strong — we brought in $265 million of cash flow from operations even with revenue up 10% sequentially. The main things driving that were better earnings and solid working capital management, with DSOs sitting at 69 days. We've got $1.8 billion in liquidity, and net leverage sits below 2.5 times. The extra revenue growth we're expecting in the back half is going to call for more investment in working capital, particularly in the third quarter. For the second half, our outlook assumes DSO in the mid-70s, an increase from the 69 days we delivered in the second quarter. Full-year cash flow from operations is now expected in the low $600 million range, which is above the $550 million we previously forecast. Now on our capital structure: during Q2, we closed a $550 million inaugural investment-grade notes offering, and those proceeds refinanced our term loan maturing in 2025 along with certain bonds we took on through the IEA acquisition. The financing got a strong reception from investors, and at its peak the order book was seven times oversubscribed. Interest rates on the new notes come in roughly 80 basis points lower than on the debt being refinanced. Finally, just a reminder that you can find a guidance summary in the investor relations section of our website, which lays out our outlook and offers extra data points to use in modeling. At this point I'll turn the call over to the operator for Q&A.
Sangita Jain
analystMorning, and congratulations on a solid quarter — especially given all the noise coming from some of your competitors. José, first off, well done on that big transmission win. Could you walk us through what the competitive landscape looked like for that project, how comfortable you are with the risk, and should we think of that margin as sitting above the segment level? My assumption is there's probably somewhat more risk baked in. And then, what else is out there in 2024 that you might be able to book, which would lock in your visibility for 2025? Second question: the cash flow guidance is really strong this quarter. You'll be under 2x levered. There are plenty of growth opportunities, José, and historically you're always the first to capitalize on that. I'm just curious about your appetite for M&A and where it would be focused. Would it be data center? Any interest in power gen? Is that market possibly coming back? Just trying to get a sense of your thinking, since you're usually, again, the first to go to market and get in front of people. Thank you.
José R. Mas
executiveYeah, good morning, Jamie, and thanks for asking. A few things: we've clearly been discussing our pursuit of large transmission projects for quite a while. We feel great about this project. We're extremely excited. There's a limit to what we can say. We obviously haven't disclosed the project's name, and we'll make a joint announcement with the customer in the months ahead as they finalize the actual start date. So we're really excited. We think we've pursued a number of these. We're very comfortable with the risk profile we've taken on. We believe we understand the project very well. It's been a lengthy pursuit for us, and one we're excited to have behind us. And I think it bodes extremely well for us in the market, right? Obviously this is the biggest transmission project we've ever won, and our ability to execute on it is really going to open a lot of doors for us. Again, we're super excited. On leverage, we're in great shape. We've talked about paying down debt over the last year. I think we've made great progress. Quite frankly, I think we're positioned to do anything we want when it comes to M&A; that said, our real focus is organic growth. The organic opportunities in front of us are unbelievable, and I think that's our main focus. We'll look at M&A perhaps more for tuck-ins, for opportunities to open markets where maybe we don't have a presence, but I don't think you should expect anything major from us on the M&A side.
Sangita Jain
analystJust as a quick follow-up on that transmission project—are there other things out there you could book for 2024, or do we have to get through this project first, if you know what I mean, before we start seeing incremental bookings on large transmission? Thanks.
José R. Mas
executiveNo, well, there are quite a few projects currently out there that we're pursuing. Obviously, this one will be built from 2025 through 2028, so on its own it's going to provide our group some really nice growth opportunities—but we're not out of the market. There are a number of projects; we're still competing. We're hoping to win more projects, and we hope this is just the beginning of what we've kind of been building toward. I mean, we made a number of acquisitions in 2022 to really position us to be in the space in a more meaningful way. And I think this really is the culmination and the beginning of starting that—of getting a first big win and really positioning ourselves in the marketplace as somebody that can and will do these on an ongoing basis.
Sangita Jain
analystThank you and congrats.
José R. Mas
executiveThanks, Jamie.
Sangita Jain
analystYeah, morning, José and team. Nice work on the solid quarter. My first question, though, was really about how the communication segment is looking ahead. 2025 is going to matter a lot for that business. So I'm just wondering about the different factors at play as we compare 2025 with 2024, and then whether you can say anything about the longer-term view for that segment.
José R. Mas
executiveYeah, morning, Neil. We feel really good about it, I'd say. We've discussed double-digit growth for that business in 2025 given where we're coming from in 2024, based simply on what's gone on in the business during the past year with the awards we received at the end of 2023. We remain comfortable with that. Clearly, we're very excited about what BEAD funding will bring to the market. Without a doubt, federal funding sometimes comes with delays. So we never anticipated BEAD would truly affect our business in 2024. We believe it affects our business in 2025, though that won't be the peak year, correct? We believe we start seeing it in 2025. During our prepared remarks, we touched a bit on which kinds of customers are coming into the market. We have plenty of private equity-backed customers beginning to overbuild and construct their own fiber-to-the-home systems. We believe we're extremely well-positioned to provide them services that others cannot. So we're very bullish about the business. We believe 2025 will be a terrific year, far better than 2024, from both a revenue and a margin standpoint. And we believe that only grows in 2026 and beyond.
Sangita Jain
analystAll right, that's useful. Then my follow-up: you brought up some deferral of spending on the distribution side, and we've noticed that among some of your peers too. It's simply hard to square with the reality that we have to invest so heavily to keep our grid in solid condition given the coming rise in power demand. So what's behind that? Is it a result of regulatory outcomes or timing, and what's your view on how this plays out as we head into 2025?
José R. Mas
executiveYeah, look, I'd say a great deal of it revolves around rate cases, and many rate cases either began this year or will begin next year. Utilities over the past two years or so have taken a double hit from inflation and rising supply chain costs, and they're now looking to recover those. There's a real coordinated effort around transmission and generation right now. So my honest view is that we'll see very large increases on both of those fronts on the utility side. And when it comes to distribution, I think everything eventually catches up, correct? As these rate cases ultimately get resolved, I believe they'll secure what they require, and we'll see things come back to the levels we had been anticipating. In the interim, we haven't yet had a severe storm season. A particularly intense storm season is what's expected. My view is that the difficulties involved in bringing those systems back will place considerable strain on the utilities, particularly if they start underinvesting in distribution. I see this as a temporary problem that we'll work through. It defies logic when you consider the broader picture — the rising load demands that lie ahead. Utilities, in my view, will feel that strain and in time will be compelled not just to put money into distribution, but even more crucially, to put money into generation and transmission alike.
Neil Mehta
analystYeah, common sense ought to win out. Appreciate it, José.
José R. Mas
executiveThank you, Neil.
Sangita Jain
analystMorning, and thanks for taking my questions. José, if I could follow up on the transmission project, do you believe you've got every state and federal permit you need in order to begin construction in early 2025, or are some still in the process of being obtained?
José R. Mas
executiveWell, with all of these projects, construction tends to begin once the permits are fully in place. A handful of permits are still being secured. Our expectation is that they'll be secured by the end of the year, with the project getting underway at the start of the year. As we move forward on that, I think that's the point when you'll see a joint announcement made with our customer.
Sangita Jain
analystGreat. Regarding clean energy, I simply wanted to get a sense of how you're set up for the remainder of the year, considering all the policy headwinds. Do you feel as though you need to book additional work to hit your guidance, or are you at ease with what sits in backlog to reach your guidance for the rest of the year?
José R. Mas
executiveThat's an excellent question. Clearly, we have a substantial ramp in the second half compared with the first half. At this point, we believe we possess every project required to achieve that ramp; we don't believe we must book any new work or unidentified work in order to hit our projections for 2024. Naturally, we remain extremely bullish, and I think Paul alluded to what we're seeing in the bidding market there. We anticipate backlog will keep growing, which will put us in an incredibly strong position for 2025. I realize there's plenty of noise out there. I realize there are plenty of concerns, but frankly, we don't see it. We believe demand is off the charts; we believe tremendous opportunities exist out there; we're really bullish, not only for the balance of 2024, but frankly, heading into 2025, given what we're seeing in that market.
Sangita Jain
analystThank you so much.
José R. Mas
executiveThank you.
Sangita Jain
analystThanks. Morning to you, José. Solid quarter.
José R. Mas
executiveMorning, Alex.
Alex Rygiel
analystHey, when you look at the communication segment, there's a somewhat mixed shift as we head into 2025, moving away from traditional tower construction and mature telco and cable company wireline work toward equipment changeout and BEAD projects involving plenty of new entrants. So if that's how it plays out, how should we think about the margin profile in communications across the next couple of years?
José R. Mas
executiveThe margins we achieved in Q2 came in a bit above what had been expected, and that makes us genuinely proud. When you look back, we have frequently discussed the period when our comms margins sat at 12%-13%. Our view is that level can be reached once more. Clearly, we are in a growth cycle at the moment, so reaching a steady state will require some time, yet I believe that kind of margin profile is within reach. I also believe that throughout the industry—not only at MasTec—you will witness telecom margins continuing to improve.
Alex Rygiel
analystCongrats on that power delivery project. It's really exciting to see it getting underway in 2025. Historically, margins in power delivery have sat in the high single digits. Looking ahead to 2025 and beyond, do you think the volume of work you're able to capture now could let you lift your margin profile to that double-digit level over the longer term?
José R. Mas
executiveYeah, so the quick answer is yes, definitely. When you look at what's happened with our power delivery segment, it started out through several acquisitions made a few years back. We were quite open about the margins those acquisitions carried, and we believe we've done a strong job of lifting them. Still, when it comes down to it, scale is what matters, correct? And we're reaching the stage where the scale we're building is what's needed to hit double-digit margins, something we see as pretty unique across the peer group. We believe we'll get there, and we believe we're nearly there. Heading into 2024, we had expected margins to perform better than they ultimately did. Clearly, difficulties in the distribution market have weighed on our margins this year, yet we remain quite optimistic about our standing in the market and about our capacity to keep enhancing those margins over the coming couple of years.
Alex Rygiel
analystThank you.
José R. Mas
executiveThanks, Alex.
Sangita Jain
analystGood morning, everyone.
José R. Mas
executiveMorning, Andy.
Paul DiMarco
executiveGood morning, Andy.
Andy Kaplowitz
analystJosé, you lifted your forecast for oil and gas revenue and margin in 2024, and we're aware you have several premium projects able to advance across the coming quarters. Clearly, attention is on natural gas, as you mentioned. The election is looming. Perhaps it shifts the landscape. But could you truly keep your 2024 revenue level going forward, even absent an MVP-type project? And are you able to hold margins at these elevated levels you're now achieving as you move ahead?
José R. Mas
executiveSure. So look, we see this as a very active market. On the previous call, we mentioned our view that we're able to sustain that $2 billion level for the foreseeable future with no truly large projects. That view hasn't changed. So we expect 2025 to be a very stable year. We also believe there are certain factors that could potentially make that better, right? Some larger-type projects are being discussed. We have certain alternative-type projects, such as some CO2 and hydrogen projects, that we believe could meaningfully move that industry as well. So we're quite bullish — far more bullish than we've been regarding the future of that business. I'm not sure much of that lands in 2025. I think 2025 is a stable year. But I do believe past 2025, there are some really good opportunities to significantly expand that market.
Sangita Jain
analystAppreciate that, José. We're roughly 10 questions in at this point, and oddly enough, nobody has asked about data centers yet. Let's shift to state of the market. Could you bring us up to speed on what's happening on your end there? I believe on last quarter's call, you mentioned finishing $150 million of work. There are roughly $1 billion of RFPs floating around out there. How has the market shaped up from your perspective? Is this a 2025 opportunity in your view? How should we be thinking about it for you folks?
José R. Mas
executiveI'd say it's unfolding the way we anticipated, correct? For 2024, we still expect to hit $200 million on data center work; hopefully that figure rises considerably in 2025. The opportunities exist. Right now we're in the midst of what we consider a fairly substantial bid cycle. So we'll have a clearer picture over the next few months. But honestly, I realize we never said the words data center, yet the truth is that data centers are fueling so many parts of our business, correct? What we've picked up so far, and I believe it keeps developing, is that power is the whole story, correct? Everything comes down to whether you can power these data centers; ultimately, how quickly this advances will hinge entirely on power. That has a major effect on our business, correct, spanning everything from generation through power delivery; on both ends of that, we believe we're extremely well-positioned; we believe it will bring enormous growth opportunities across our customer base, which in turn compels them to commit far more capital to the kinds of projects we handle. It feels like a great deal of what we do daily really revolves around holding those conversations, engaging people on both sides, whether that's the data center or hyperscaler side versus the utility side, grasping how each is approaching it, and then working to place ourselves in the strongest position to win. I feel terrific. I believe there will be considerably more opportunities than we've discussed so far. We truly need to put ourselves in position to capitalize on that; but I believe it will be an enormous opportunity for companies in our space.
Andy Kaplowitz
analystAppreciate it, José.
José R. Mas
executiveThanks, Andy.
Sangita Jain
analystGreat. Yeah. No, I just wanted to follow up with a couple more questions about the transmission project too, since that one's new. I mean, it's something you guys have said you wanted to be involved in for a while. I was just wondering, is that entirely sole sourced by you, or is some of it being subcontracted out? And I guess if it is, I mean, just how much visibility do you have into that, and even just the labor capacity you have to handle some of that work, since it's a bit different on the high voltage side compared with maybe some of the work you guys have typically done in that segment.
José R. Mas
executiveWell, I want to clear up a couple of things. First, we've performed a great deal of high voltage transmission work. It's been a key part of our business for many years. We've just wrapped up a handful of really successful projects over the last couple of years that I think gave our customers confidence in our ability to perform and deliver these kinds of projects; we believe we're extremely qualified for this, and we've done a lot of it. I don't want anyone to think this is something new or something different from what we've done. Obviously, the size and scale is different, but we think we're really good at this type of business, and we've proven that time and time again. This project is a sole source project. And again, it's one that we believe we've got the labor and the equipment to perform. So again, we're super excited. We think we're super ready and can't wait to execute on the project and show what we can do.
Sangita Jain
analystOkay, great. Yeah, I'm looking forward to seeing that get started and finding out a bit more about what it actually is. I guess the second one, staying on this general topic, but regarding the regulatory challenges in distribution, is that still really just limited to Illinois for you, or are you seeing it in other regions and customers, beyond what you mentioned earlier? And then just one last little addendum to that, I guess. But on the storm work, did you guys do any storm restoration for Hurricane Beryl last month? Thanks.
José R. Mas
executiveYeah. So a few things. If you look at rate cases across the country, they're not only in Illinois, right? Rate cases are everywhere. I think the challenges have been more widespread than Illinois. I think we've got a number of peers that have announced earnings in the last two weeks that have, I think, discussed that ad nauseam. So there are weaknesses elsewhere outside of Illinois for different reasons. And in some places, we haven't seen as much weakness. So it is geographical, but I do think it's — and I think there are three big issues, right? It's rate cases. It's inflation. It's been the cost creep of the supply chain over time; and ultimately, how are utilities going to be reimbursed for that within their state? So everybody's working on that a little bit differently.
Justin Hauke
analystOnce more, my view is that everything gets worked out, and we will witness another meaningful jump in spending, though that is basically the reality we are in at present; and what about the second portion of the question?
José R. Mas
executiveRegarding the hurricane, in the southern Texas region — the place where it truly hit hard on the CenterPoint side — we did not really do a lot with CenterPoint. So we were not particularly active on that storm, no.
Justin Hauke
analystAll right, that's wonderful. Thanks so much.
José R. Mas
executiveThank you, Justin.
Steven Fisher
analystHi there, thanks, and good morning. I'd like to build on the question of what the outlook looks like for clean energy bookings, especially in renewables. I'm curious how far into the future your solar backlog currently stretches, since I believe part of the visibility you previously had into 2025 may have been feeding into your double-digit growth expectation for that area. Also, do you anticipate booking anything significant in clean energy during this year's second half?
José R. Mas
executiveCertainly; let me make a few points. Different from many equipment suppliers, right, once we book something, it sits much nearer to when construction actually begins. That means there's a substantial gap between what goes into backlog and the visibility we enjoy as a company; so we have several customers with whom we've discussed multi-year outlooks, and we have genuinely strong visibility into what we believe we'll build for them, not just in 2025, but in fact in 2026 and beyond. The truth is that none of that appears in backlog. So much of the commentary and the confidence we hold in our business has nothing to do with backlog figures; it relates to the conversations we're holding with key customers regarding multi-year outlooks. Sadly, that simply doesn't appear in backlog. It appears in backlog only at the moment a project is about to start. So our backlog as of today doesn't truly contain any work extending past 2025. First, since it covers only 18 months, so in fact, it won't contain anything; but second, we wouldn't classify many of these projects as backlog. So what sits in backlog is short-term. We do expect to secure a considerable amount of work in this year's second half that will firm up our 2025 pipeline and, I think, give really good color into how 2025 will look for us. So again, we don't truly need to win a lot or anything to finish out our 2024 year. That we've kind of booked; we've got it in backlog. We're working off that. Now everything is about building for 2025. I think we'll be able to demonstrate that across the next couple of quarters. Again, just regarding the dialogue we're having with our customers, it's why we're so confident for a much longer period than merely the 18-month backlog.
Steven Fisher
analystThat's excellent. My follow-up question: it's encouraging to see you approaching the point where you'll truly begin delivering these clean energy projects in the back half of this year. As you head into that, what measures are you putting in place to make sure delivery goes as planned? And how should we view the supply chain and your teams' readiness to deliver as expected?
José R. Mas
executiveSteve, excellent question. It's one we've clearly been concentrating on from the moment we acquired IEA. That's what this has all been about; we believe we've been positioned to perform at this level for quite a while. Sadly, a year ago, we lacked the work to make good on it. Now, we have both the backlog and the work to deliver. Our teams are prepared. We're focused on operations. That's where all our attention goes today. We have strong confidence in our capacity to execute. We're eager to show it across the coming six months, and that's what our business centers on today. On the front end—business development and bookings—we believe we're in a far different position than twelve months ago; we retained the right resources to carry out the work, and that's where we stand today. Once more, we're extremely excited to get there compared with where we stood last year.
Steven Fisher
analystGreat. Thanks, José.
José R. Mas
executiveThanks, Steve.
José R. Mas
executiveGood morning, Adam.
Adam Thalhimer
analystJosé, you brought up infrastructure work where there isn't much competition. I'd like to know what you're seeing in that area, and how large a project you'd feel comfortable taking on?
José R. Mas
executiveWell, Adam, at this point our infrastructure segment is closing in on $2 billion. That figure combines the infrastructure operation we've had for years at MasTec with the one we gained through IEA. Honestly, the way this business has performed since we bought it has caught us off guard. Since that acquisition, it has actually beaten segment margins. The range of opportunities out there, and how quickly it keeps growing, has really taken us by surprise. On big projects in a variety of different regions, we're running into quite limited competition. And our confidence in how well we can execute has grown considerably; so it's doing better than I had expected. We're becoming much more confident about our capacity to put capital into this business and expand it; and I believe it will end up being a far larger piece of MasTec's future than we perhaps first thought. So my sense is it's still early days. My hope is that in the quarters ahead we can dig further into what you just raised, meaning the kinds of projects we're prepared to pursue and how big they are. There's genuinely a great deal happening on that front, but we'd prefer to discuss it once we believe we've notched some wins and feel comfortable speaking about it publicly.
Adam Thalhimer
analystAll right. Regarding that $2 billion of limited notice to proceed in clean energy — has it held steady? Are those projects running behind, or are they simply progressing as usual and heading toward construction?
José R. Mas
executiveYes. The $2 billion we have now is quite different from the $2 billion we had six months ago, correct? So the projects are converting into backlog. They begin with a limited notice to proceed. Eventually it gets booked into backlog, and then new projects are entering limited notice to proceed; so the $2 billion we have now is actually entirely different from the $2 billion we had six months ago. I don't recall specifically all of those projects from a quarter ago, but it's a constantly transitioning list; so it's really the list that it reaches before it reaches backlog. And I think it's been very active, very healthy, and we keep seeing that trend.
Adam Thalhimer
analystGood. Thanks, José.
José R. Mas
executiveThanks, Adam.
Brian Brophy
analystThanks. Morning, everyone. I appreciate you taking the question. I suppose, just so we're clear on this large transmission project, could you remind us what margins you've historically had on these big transmission projects? And is there any reason to think this one will be materially different?
José R. Mas
executiveYeah; so our belief is that all of the large transmission projects — the ones we've completed to date and the ones we're either contracted to do or hopefully will do — all have the ability to hit double-digit margins. At different points in time, a project may not meet its objectives, but for the most part, we think they're very healthy projects. They have very healthy margin potential, and it's all about our ability to execute it. So our expectation on that project would be that when it's all said and done, we've delivered hopefully at or above double-digit margins.
Brian Brophy
analystAll right, that helps. You also mentioned that a few civil project starts slipped somewhat in the second quarter. Is there anything particular worth flagging there? And I'm assuming those projects kick off here in the second half. What's the right way for us to think about them? Thanks.
José R. Mas
executiveYes. A portion of that is government work. We took on a sizable civil business that includes some highway work and related projects and such. It's simply the usual delays. So these are just projects that got going a bit later than planned. We've stated that we'll catch up during the second half, so construction-wise those projects will simply speed up somewhat; so it's really just fine-tuning, nothing significant.
Brian Brophy
analystAppreciate it. Thank you.
José R. Mas
executiveThanks, Brian.
José R. Mas
executiveWe simply want to express our appreciation to everyone for paying attention to MasTec, and we are eager to bring you our results update during the following quarterly call. Thank you.
Operator
operatorThis concludes today's call. Thank you for your participation. You may now disconnect.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete MasTec, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to MasTec, Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in MasTec, Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.