executiveThanks, operator. On behalf of the whole team, I want to welcome everyone to the conference call covering our third quarter 2026 results. Jag Reddy, MEC's President and CEO, is here to lead today's call, along with Rachele Lehr, our Chief Financial Officer. This discussion includes forward-looking statements regarding future business and financial expectations. Because of various risks and uncertainties—among them the risks described in the periodic reports we file with the Securities and Exchange Commission—actual results could differ significantly from what today's forward-looking statements project. Other than as required by law, we assume no obligation to update those forward-looking statements. In addition, this call will cover certain non-GAAP financial measures. A reconciliation of these measures to the closest GAAP financial measure appears in our quarterly earnings press release, which you can find at mecinc.com. After our prepared remarks, we'll open the line for questions; with that, I'll hand the call over to Jag.
Jag Reddy
executiveThank you, Stefan, and good morning to all of you. Results for our third quarter came in as we had anticipated, showing robust demand and project volumes that are accelerating in our data center and critical power end market. Net sales rose roughly 18% compared with the prior year. That growth was aided by data center and critical power continuing to expand, commercial vehicle carrying on its recovery, and steady demand in construction and access. Within data center and critical power, more programs hit full production during the quarter, which lifted capacity utilization and produced a sequential gain of about 190 basis points in adjusted EBITDA margin. Meanwhile, we are still in the early phases of ramping the over $145 million in projects won in this end market during the last year. The speed and size of what customers require keep putting substantial pressure on our people, our equipment, and our organization. On October 1st, we completed the purchase of a manufacturing facility located in Thomson, Georgia, which carries out the capacity strategy we laid out after our second quarter equity offering. I will go into the facility and what we plan to do with it in greater detail shortly. Operational performance at our plants stayed uneven in the quarter for two separate reasons. To start, at the facilities that handle data center and critical power work, customer program schedules were moving very fast, which meant our teams had to rework production timelines and staffing resources to match. On top of that, we absorbed approximately $3 million in costs for data center and critical power project launches and outsourcing, along with premium labor expenses related to backing other customer programs. Next, the plants that lean more heavily toward agriculture and power sports are operating below efficient utilization levels, because customer volumes in those end markets remain weak. We're actively shifting programs across our footprint to even out workloads and better align our cost structure. That rebalancing requires time, and the resulting underutilization dragged on margins for the quarter. These costs landed in line with what we had anticipated. We remain of the same view we expressed last quarter: these are temporary. We anticipate gradual relief as demand continues to accelerate and new awards keep entering the launch cycle. We expect these ramp-related costs to decline through early 2027 as ordered equipment arrives, outsourced production returns in-house, and we continue filling open positions. Importantly, we are deliberately absorbing these near-term costs, because the programs now launching strengthen our long-term margin profile. Finally, today's demand reflects a multi-year investment cycle, and we believe MEC remains in the early stages of that opportunity. Our products typically get installed in the later stages of building a data center. What this means is that the infrastructure projects receiving funding from our current programs began construction roughly three years back. Given the money already dedicated throughout the industry, along with our penetration rate of under 5% among OEM customers, we feel confident about demand over the long term. Admittedly, short-term sentiment regarding data center construction could fluctuate, yet our assurance about the durability of this demand—and about the multi-year growth opportunity that lies ahead for MEC—remains unchanged. Turning now to several of our key end markets: commercial vehicle net sales increased by nearly 35% compared with the prior year, reflecting stronger customer demand and supported by greater North American Class 8 production. ACT continues to forecast Class 8 production growth of more than 8% in 2026. Even though ACT's 2027 forecast has been trimmed a bit, the company still anticipates output growth of around 9% that year. The present build rates, along with customer activity we're observing, leave us feeling positive. Net sales in construction and access climbed roughly 9% compared with a year earlier, helped by ongoing gains in non-residential construction demand. We anticipate that this end market will continue delivering steady contributions as non-residential activity further strengthens; meanwhile, power sports net sales dropped about 27% versus the prior year, the result of persistently weak customer demand while OEMs in that market adjusted their worldwide supply chains. This pattern is consistent with what we had expected and will probably carry on through 2027. On the military side, we're still up against continuing delays in program transitions. Agriculture is still in a cyclical trough, and we don't see a near-term inflection. Both of those are in line with the outlook we've shared before. In data center and critical power, net sales were up about 65%, which reflects accelerating demand from existing customers as well as new project launches. That end market made up roughly 22% of total net sales for the quarter. During the quarter, we booked approximately $45 million in new data center and critical power project awards, and our qualified opportunity pipeline now tops $200 million. With demand growing, we keep looking at ways for customers to reserve dedicated capacity, as well as arrangements in which customers fund certain capital investments needed to support their programs. Our approach to capacity and production priorities will stay focused on growth that is sustainable, diversified, and profitable over the long term. The awards we secured during the quarter reflect both new customer wins and continued expansion with existing major customers. These programs cover a range of power gen enclosures, switchgear, switchboard enclosures, and uninterruptible power supplies. We continue to expand our share with key commercial vehicle customers as they prepare for upcoming product launches tied to the 2027 EPA regulatory changes; these programs are expected to begin entering production in late 2026 and continue ramping into 2027. Outside commercial vehicle, we also gained new business linked to model launches with a power sports customer, and at the same time we grew our business with an agricultural customer. On capital allocation, we continue to concentrate on three priorities: putting money into organic growth, further bringing down leverage, and making selective acquisitions that are accretive. First, organic growth. Given the programs we have been awarded and our pipeline, we presently anticipate hitting full capacity over the coming 18 months; we are putting capital to work now to enlarge our footprint before we get there. On October 1st, we completed the acquisition of our Thomson, Georgia facility. Situated in the southeastern United States, nearer to major data center and critical power customers, this site gives us a growth platform in a region where our capacity has been tight. Along with planned equipment investment, we anticipate this facility will contribute roughly $50 million in annual revenue capacity by 2028. That will push our total revenue capacity past the approximately $850 million figure we shared earlier. Rachele will discuss the related capital spending and the return criteria we use for these investments. Second, deleveraging. We closed the quarter at a net leverage of 2.9 times, and 2.5 times remains our long-term target. With volumes increasing and profitability getting better, we anticipate that earnings growth and cash generation will fuel ongoing advancement toward that goal. Third, accretive M&A. We'll remain opportunistic about pursuing acquisitions that bolster our competitive standing, add capacity, and back long-term value creation. Going forward, we feel confident about the opportunity in front of us and about our capacity to produce profitable growth in 2027 and beyond. Before turning the call over to Rachele, I'd like to discuss how our margins will move as we go through this transitional stretch for MEC. In the past, we've pointed to an adjusted EBITDA margin of roughly 15% as the objective for our business. We still see a clear route to that level and possibly past it.
Jag Reddy
executiveThis trajectory depends on four factors, and all of them are already underway. The first is that ramp-related expenses should ease as equipment we've ordered arrives and gets installed, and as outsourced work comes back in-house. The second is better absorption and operating leverage as our data center and critical power programs keep ramping toward full production. With the demand we see ahead of us, we're deliberately bringing on people, equipment, and capacity ahead of where we are today. Once volumes catch up to that resource base, we anticipate operating leverage to improve considerably. Third is the ongoing expansion of our workforce. Labor availability is still tight at certain facilities. As hiring catches up, we expect to lessen our dependence on premium labor and overtime. And finally, demand normalizing in our agriculture and power sports end markets. Softer customer volumes in those markets are squeezing margins through underutilization, as I mentioned earlier. The footprint rebalancing that's already in progress should help offset that, and a recovery in those volumes would give margins additional support. Those four factors, together with the ongoing mix shift toward higher value data center and critical power programs as this end market approaches 25% of total revenue, give us confidence in that trajectory. We expect measurable margin improvement over the next 12 to 18 months, and I want to be clear about how that progress will take shape; these factors play out on different timelines. Ramp-related costs should ease first, starting in early 2027. Hiring and absorption improve as programs reach run rate over the course of the year, and when agriculture and power sports recover will be determined by demand in those end markets. Consequently, we expect 2027 to be a year of continued growth, with margins improving sequentially rather than in one step. The benefit of this work will be most visible as we exit the year and head into 2028; we will provide our formal outlook for 2027 on our fourth quarter call; we believe these actions position MEC to deliver attractive, sustainable returns on invested capital as we capitalize on a multi-year secular growth opportunity. With that, I'd like to hand the call over to Rachele.
Rachele Lehr
executiveThanks, Jag, and good morning, everyone. Third-quarter total sales rose 18.1% versus the prior year, reaching $170.4 million. Manufacturing margin came in at $18.8 million, equal to 11% of net sales, versus $15.9 million, also 11% of net sales, in the prior-year period. The year-over-year gain in manufacturing margin dollars stemmed mainly from better capacity utilization, which was driven by higher sales volumes in data center and critical power, along with growth in commercial vehicle and construction and access end markets. Partly offsetting that increase were $3 million of data center and critical power launch and outsourcing costs plus premium labor. Other SG&A expenses were $8.8 million, compared with $10.5 million in the prior-year period. That decrease is mostly due to reduced non-recurring acquisition-related costs and savings from the Accu-Fab acquisition. Interest expense came in at $3 million, compared with $3.4 million a year earlier, as a result of lower average borrowings under our revolving credit facility, partially offset by higher interest rates during the current period. Adjusted EBITDA reached $17 million, equal to 10% of net sales, versus $14.1 million, or 9.8% of net sales, in the prior-year period. The gain was driven mainly by greater sales volume and improved capacity utilization, partially offset by data center and critical power project launch and outsourcing costs along with premium labor; on a sequential basis, adjusted EBITDA margin improved by about 190 basis points. Turning now to cash flow and the balance sheet. During Q3 of 2026, free cash flow came in at negative $3.3 million, compared with negative $1.1 million a year earlier. The main reason for that decline was increased capital spending on equipment required to meet fast-growing demand in the data center and critical power end market, which was partially offset by stronger cash flow from operations. Net debt as of September 30 was $146.6 million. Under our existing credit agreement, the ratio of net debt to trailing 12-month adjusted EBITDA was 2.9 times. Turning now to our revised full-year 2026 guidance: for that year, net sales are projected at $630 million to $640 million, adjusted EBITDA at $48 million to $52 million, and free cash flow use of $6 million to $16 million. The outlook bakes in a complete year of Accu-Fab ownership, added cross-selling revenue, and further recovery in commercial vehicle as well as construction and access, partially offset by persistent weakness in our agriculture and power sports end markets. It also accounts for continued launch and outsourcing costs tied to data center and critical power programs, plus premium labor. Two factors shape this updated outlook. To start, as Jag mentioned, schedules for customer programs in data center and critical power keep shifting, and the timing of some project volumes has moved into early 2027. Next, the mix of products across our legacy end markets is squeezing margins. Commercial vehicle is growing strongly while agriculture and power sports remain weak, and with lower volumes in those areas, portions of our footprint are not fully utilized. As a result, we anticipate that adjusted EBITDA margin for the fourth quarter will land slightly under the third quarter's level. This quarter is a transitional one in our view, and it doesn't change the path Jag outlined — ramp-related costs begin to ease in early 2027, and margins improve sequentially from there. Our free cash flow guidance accounts for working capital investment as well as planned capital expenditures of $25 million to $35 million, which includes the initial investment in the Thomson, Georgia facility. As Jag noted, we closed the acquisition of our Thomson, Georgia facility on October 1. Counting the purchase price, facility improvements, and production equipment, we presently expect to put roughly $25 million into the location in total through 2028. Of that figure, we currently anticipate capital expenditures of approximately $10 million in 2027, with the rest invested in 2028. When it's fully in place, we expect this investment to back roughly $50 million in yearly revenue capacity. Spending timing will match equipment lead times, customer demand, and how awarded programs ramp; we will keep assessing every phase of the investment against our established return criteria, such as an internal rate of return of at least 15%. With this phased approach, we can add capacity as demand develops while maintaining discipline around capital deployment and cash flow; to sum up, our third quarter reflected the dynamics Jag described: strong volume growth and improving utilization in data center and critical power, partly offset by launch costs and weakness in a couple of our legacy end markets. As we look forward, the priority stays on turning larger volumes into better profitability and cash flow. We aren't offering 2027 guidance at this point, though we anticipate that improvement will accumulate gradually throughout the year. Costs tied to ramping should ease first, and the complete payoff from stronger fixed cost absorption, operating leverage, and footprint rebalancing should show up more fully in our results by late 2027 or early 2028. We'll drive that progress while keeping a disciplined stance on working capital and capital spending. Our attention remains on bringing leverage down toward the long-term target of 2.5 times, while financing organic growth opportunities that satisfy our return criteria. We'll stay selective as well when assessing further acquisition opportunities. With that, operator, we're ready to open the line for questions.
Mike Shlisky
analystYes. Hello, and good morning. Thanks for taking my question.
Jag Reddy
executiveGood morning, Mike.
Mike Shlisky
analystI just wanted a bit more color on the margin improvement you mentioned that's going to happen across 2027. What I'm trying to get at, I suppose, is what the base is, or the bottom of that margin progression. Is that what we've just seen? Even though I believe it rose quarter-over-quarter, is it what you'd expect to see, with the fourth quarter serving as the base you'll climb from? Will there be a rough first quarter and second quarter history leading up from there in the third and fourth quarters? I just want to see the precise trajectory, or the ups and downs, and where the absolute lowest point sits.
Rachele Lehr
executiveHi, Mike. Yes, so I think you've got it right. Q4, as you can see, is going to come in slightly below Q3; that mirrors seasonal softness plus some shifting of the customer timelines, and then we still have the DCP ramp costs. As we move into Q1, we expect to have the capital that we purchased about six months ago up and running, and that'll let us then cut back on our outsourcing, and then that will also let us begin reducing our premium labor. So, that will occur sequentially in the first part of the year, such that in the second part of the year, we will have the equipment up and running, we'll have the labor to support it, and then we'll improve sequentially as data center ramps throughout the rest of the year.
Mike Shlisky
analystAll right. We're looking at Q4 as the baseline, more or less. That was really the key thing I wanted to ask. Thanks for addressing it.
Rachele Lehr
executiveRight, Q4 is the baseline.
Mike Shlisky
analystYes. And then second, I mean, this is really breaking news, but I wanted to hear your thoughts on what went on in the elections last night. I suppose that's a question with two parts. First, are there any shifts within Wisconsin or your other big tax bases? Any shifts in party or within those states and jurisdictions that you're watching or considering? And then on a wider level, some of the candidates for different seats in Congress and governor offices made plenty of remarks about data centers and critical power not being something they want to see in their states, and things like that, wanting to cancel or revoke projects or slow things down, and so on. I'm just wondering whether the projects you've been involved with, the companies you've been working with, do they all still feel pretty confident about how the data center and critical power build-out will happen, aside from the very current near-term timeline changes? But more broadly, do people still feel confident when you consider the wider build-out here?
Jag Reddy
executiveYeah, great question, Mike. Since yesterday, this has been on my mind. As we approached the election, strong resistance to data center expansion existed in numerous states—red or blue, it made no difference. A groundswell of opposition to building out data centers had emerged. Yet if we pause and consider what that was really about, it centered on state governments granting tax breaks to data center operators, along with how electrical infrastructure investments were being financed, who was footing the bill, and how electricity costs would be shared—specifically whether local customers would end up bearing the brunt of those cost increases. That's basically why a lot of states began imposing moratoriums and so on. Again, I can't claim to be a futurist, but from where I sit, absorbing all of this, the base case at least is that over the long term, data centers will need to keep getting built out. Nobody disputes that. What it comes down to is: what will federal policy be? How will states react when it comes to sharing the costs of infrastructure investment and power generation, and also to sharing the actual cost of the electricity supplied to these data centers? And naturally, there's plenty of misinformation out there regarding water usage. A lot of these data centers in fact recycle their water. We're here by Lake Michigan, correct? In certain states it's not a problem whatsoever, but I believe data center operators will move past it, or at minimum supply the proper details regarding water consumption, right? Taking all of that into account, I'm extremely, extremely optimistic about ongoing spending on data center expansion for the foreseeable future. We had a laugh about this amongst ourselves. Hey, our prepared remarks mentioned we could run out of capacity in 18 months, and somebody joked that maybe it'd be 19 months instead of 18, right? That's essentially where things stand at the moment. Ultimately, with the debt markets being tight and considering the rationale—or rather the return on investment—for data center operators and the hyperscalers, that will determine whether the build-out pace will be what it is, rather than whether we need to construct data centers at all. Once more, I could not be more bullish about data center build-out; this election outcome changes nothing for us. Honestly, I'm feeling somewhat hopeful, though with caution, that once the election is over—whether at the state level or with the federal government—they'll come back to the table with certain guidelines and regulations. They'll look to make data center approvals more efficient, streamline tax abatements, or whatever other incentives they choose to provide in the communities, and establish some guardrails regarding who foots the bill for infrastructure investments, power usage, and electricity costs for these operators, correct? That being said, if you take a step back and really ask yourself—aside from putting up the physical building and the chips—where does the rest of that investment actually go? The demand lands squarely in grid, infrastructure, and equipment like switchgear—that’s exactly our lane. Every DCP product line we back and expand ties directly to electrical infrastructure. I’m very optimistic about how we’ve set up MEC to benefit from the build-out expected across the coming three to five years.
Mike Shlisky
analystGreat. The other part of what I asked was about what's happening, maybe in Wisconsin. Is there anyone, first, that we're sort of pushing for higher corporate tax rates, things like that? Or other states where you've got a very-
Jag Reddy
executiveYeah, look, I'll throw in one more, right? We don't appear until the third year of the build-out; so, a lot of the programs we're supporting right now, those projects started construction three-plus years ago; so, we're not worried about, right, what could happen over the next year or so. Things will calm down. Again, I don't want to talk politics, but, and I think Wisconsin's governor-elect is actually quite moderate when it comes to his position on data centers. But also, right, we're not only supplying into Wisconsin data centers, we're supplying all over the country. So, like I said earlier, right, we expect this noise to die down a bit, and then more cooler heads prevail because we do need these investments. We're also going to put these data centers in China, right? We need them, we're going to get them, and then there'll be a much more streamlined process going forward.
Mike Shlisky
analystSorry, Jag. What I really meant to ask was about the wider corporate tax rates that apply to all of your income in Wisconsin, and what effect that could have.
Rachele Lehr
executiveYeah.
Mike Shlisky
analystIf anything, well, you know.
Rachele Lehr
executiveWe really aren't expecting any meaningful shifts. Wisconsin came in blue, and it's still blue. On that front, we figure things will just keep going along the same way.
Mike Shlisky
analystAll right, that's great. I'll make sure it gets to the right people. Many thanks.
Jag Reddy
executiveThank you, Mike.
Andy Kaplowitz
analystGood morning, everyone.
Jag Reddy
executiveMorning, Andy.
Rachele Lehr
executiveGood morning.
Andy Kaplowitz
analystJag, your data center exposure keeps growing, as you're aware. How, if at all, could you better handle the variability of data center starts heading into 2027? Perhaps you can boost efficiency — and could you aggregate how much of the hit to your 2026 and Q4 EBITDA pressure stems from this timing inefficiency versus the other matter you mentioned, namely ag and power sports under-utilization?
Jag Reddy
executiveYeah. I'll let Rachele come in, but let me share this much. That's a really good question, Andy. As new entrants in this market, we're still learning how schedules keep shifting for some of our DCP customers. I'd put it at roughly $20 million of DCP revenues that moved out of the second half of 2026 into 2027. The reason — I'd say the primary reason, beyond mere seasonality, that we lowered our Q4 margins is precisely this highly profitable data center revenue shifting into the first half of next year, since our customers — and this involves more than one customer — keep grappling with their own supply chains and their difficulties in rapidly scaling to these high volumes. With that, I'll hand it to Rachele.
Rachele Lehr
executiveJag basically nailed the main driver there. When you’ve got $20 million at 20% adjusted EBITDA, that accounts for a big chunk of the shift. Add in some extra labor and launch cost—since we haven’t yet reached full run-rate production on that—and it pulls our midpoint from $56 million down to $50 million. So those are the elements behind it. As we keep progressing and actually achieve that DCP ramp, like we just discussed, we’ll see sequential gains as we go through 2027.
Andy Kaplowitz
analystThat's really useful. Jag, you said there's now a pipeline of opportunity worth more than $200 million for data centers. I believe you've said before that data centers might eventually make up 25%-30% of your mix, and could even go beyond that. Thinking about how to shield MEC from postponements — I know you'll say you're three years out from when these things begin, so with luck they won't be postponed. This whole notion of securing capacity with specific customers — are you getting nearer to that? Do you figure you might be able to lock in a big chunk of your added capacity across the coming 12 to 18 months?
Jag Reddy
executiveAndy, I remain optimistic about securing capacity with our customers. There's more than one customer we're actively talking with about locking capacity or arranging some form of capacity payment guarantees. So we're cautiously optimistic that it will come together. Meanwhile, the pipeline keeps expanding. My bigger worry is when we'll have to put up our hand and say, we can't take on any more new business. Because, as you can imagine, these programs differ from our industrial programs, which might take 18 to 24 months to appear as revenue — we can begin making production parts in three months, and within six months of award, we're at a full ramp for many of the DCP customers. That means, at minimum for the first three to six months, I must safeguard that capacity once we win a program, since I know the ramp is coming at that particular plant for that particular customer. We're working through all those mechanics, and then there's clearly a cost to holding that capacity — not just for that six months ahead of the full ramp arriving, but also for any additional program delays. As we learn to manage that better, the sales teams are getting smarter and more aggressive. We're going back to DCP customers — I'd say even in Q4 — and not merely talking with them, but actually charging them for delays, charging them for added headcount, charging them for working capital. We're improving at this. Heading into 2027, I feel really good about how we'll be able to manage, how we manage our costs. Look, we've been in business 81 years in the industrial market. We've been in DCP for a year, and it's a very fast-moving industry. There were certainly some lessons in 2026 that will carry over into 2027. I couldn't be more bullish about 2027. Given everything the teams have accomplished, what we've invested, the additional machine capacity that comes online in Q1, and where we stand in our hiring cycle, I feel very good about safeguarding our capacity, being able to charge for it, and potentially locking it in with a couple of customers.
Andy Kaplowitz
analystAppreciate all the color.
Jag Reddy
executiveThank you.
Sam Karlov
analystHey there, good morning. Sam Karlov here, sitting in for Ross. Appreciate you taking my questions. I'd like to spend a moment digging into the qualified pipeline. I mean, it went from $125 million last quarter up to $200 million. Could you shed some light on why the increase was so sharp, and what types of opportunities were added? Was it bigger opportunities, new customers, or mostly more opportunities from existing customers?
Jag Reddy
executiveWhat I'd say is that the bulk of that increase comes from new customers, ones we haven't done business with before. Of course, we won't discuss specific customers on these calls, Sam, but one customer has more than $50 million across three different programs. We also have another European switchgear customer with roughly another $50 million in new programs, and there's another U.S. customer with over $60 million across multiple programs. I'd say that over the last three months or so, we've been able to keep working with these customers, qualify them better, and many of the programs from the customers I just mentioned are very close to a decision. At this point we can say that not only is the customer very close to deciding, but our odds of winning those programs are greater than 50%, and that's when we feel really good about including that and actually raising the bar on our qualified pipeline.
Sam Karlov
analystGot it. Just as a brief follow-up on that, what are the primary considerations or factors that shape the way these customers choose where to allocate this volume?
Jag Reddy
executiveAbsolutely. Two things come into play. The first is location — and location is growing even more important, which dovetails well with what we're doing through our Thomson investment. The second is the ability to get a $50 million program up and running inside a three to six month window. Few fabricators in North America could pull that off, let alone pull it off well. That plays directly to our strength, because we don't just have the footprint — we've been putting capital in. And yes, we're absorbing that cost upfront. You've watched us contract out work and hire temporary staff so we could build those capabilities quickly. Waiting until 2027 to invest in these people and capacity was an option, but doing so would have cost us some of these opportunities. Yes, in the short run it weighs on the P&L — that's real — yet I'm very optimistic about the payoff, both in 2027 and in 2028, as we land these much bigger programs. Right after we closed the Accu-Fab deal, the programs we were winning ran $2, $3, $5 million. Today we're bidding on $20, $30, $40, $50 million programs. That's the shift. Only a handful of people on that Fab 40 list are able to step up and then say — not merely regarding one or two programs, but we are contending in easily 7 to 10 separate programs, each ranging in size from $20 million to $50 million. That speaks to MEC's experience, capabilities, footprint, and the investments we have made. I want to thank each of our investors for standing by us through our equity raise. Those equity raise funds are being put to good use in investments for the future.
Sam Karlov
analystGot it. No, that's good to hear. Just one quick thing about CV. I mean, I noticed you issued your preliminary expectations for 2027 — commercial vehicle up mid to high single digits. I mean, next year's ACT growth expectation is 9%, so could you maybe help us think through how your content per truck goes up with the 2027 model year and how that should carry through to revenue?
Jag Reddy
executiveYeah. You can see it too, hey, the third bullet, right? As we've mentioned before, we expect a number of strategic exits in the CV market—and across industrial markets broadly, to be precise about CV, ag, as well as construction and access. From many of our customers, we're pushing hard for higher pricing. Next year, we anticipate net exits worth $20 million to $30 million from our industrial customers. What that does is simply open the door for us to steer that capacity toward data centers. So while ACT projects 9% growth next year—roughly 300,000, about 300,000 Class 8 builds next year—we're in agreement with that. Simultaneously, though, some departures could benefit us over time by letting us shift our capacity toward data center business with better margins.
Sam Karlov
analystUnderstood — that's clear to me, and I'll share that with the team.
Jag Reddy
executiveThanks, Sam.
Jag Reddy
executiveMorning, Greg.
Greg Palm
analystYeah, good morning, and thanks for taking the questions. Perhaps to begin with, I was hoping you might unpack a bit more about some of the — call them the inefficiencies, the ramp costs, some of those schedule changes, all of that stuff that's kind of affecting timing. When we think about labor, or the lack of it, some of the availability challenges — does that change where you think you want to place a lot of this data center work compared with what you were thinking six or nine months ago?
Jag Reddy
executiveYeah. I'll kick things off, and Rachele will jump in. That's an excellent observation, Greg. The placement of certain programs today differs from our expectations six to nine months back. A number of our rural facilities are still having difficulty increasing output. Right now, throughout the company, roughly 230 to 250 positions sit unfilled at our plants. Since we keep securing additional business, that figure keeps rising. Clearly, that presents yet another difficulty. Yet even without growth, we would still be carrying more than 200 unfilled roles across the network. So the effect was that, as a near-term fix, we chose outsourcing, after which we began bringing on temporary workers at a lot of these sites. Everybody is aware that finding welders is currently the toughest trade to staff; at a few of our facilities we're presently paying $90 per hour plus per diem, while the entry-level rate at that same factory today sits slightly under $30, correct? The clients located across the street at that very plant are likewise paying $90 an hour. This is a well-known issue, right? So what steps are we taking? First, we've relaunched boot camps at several plants to develop our own welders, enabling us to promote from within and train people who may be in different roles that can make. Perhaps they were earning $18 an hour, and now they’re able to earn $30 an hour, correct? We’re handling a portion of that work. But even more significantly, at that specific plant, right, we chose to remove some of the work that involved weld content, since we can’t hire welders at that site. We began introducing data center work that actually doesn’t require welding, right? A lot of our data center projects don’t involve much welding, so we’re rebalancing the network based on where labor is available. Let’s put labor—sorry—programs that can be adapted to the available labor, and then shift programs around, right? A big chunk of that effort happened during the back half — sorry, especially in Q3 — and we'll keep at it through Q4. That's really what sets us up as we head toward 2027. Meanwhile, we know we're able to bring on plenty of staff in Hazel Park, Chicago, North Carolina, and now Georgia, correct? Our focus will land squarely on those 4 sites, because at each of them we can add lots of workers spanning a wide range of trades. So our attention is shifting toward those locations, and we're rearranging things. Where should weld content go? Where should assembly-type content go? Where should the various other programs go, right? Every bit of that work is underway. The team did exceptionally well in Q3, and as we head into 2027 we feel fairly confident about loosening some of these bottlenecks, right? Constraints tied to machines ought to loosen by Q1, since new machines are now being installed at several of our plants—equipment we paid for almost 2 quarters ago; after that, certain labor constraints will continue loosening as we progress through the first half of next year, exiting Q2. Lastly, outsourcing will come back once the machines are up and running, right? That's how we're addressing some of these challenges. But as you mentioned, right, yes, that altered what our outlook looked like 6, 9 months ago, and where these programs will end up as we slot these new programs and new wins in across the network.
Greg Palm
analystYeah. Okay. That makes sense. On that same topic, when it comes to your capacity to reprice both current contracts and certainly a few of the newer items, given whether it's simply higher costs from inflation, higher labor costs, and so on — what are you seeing?
Jag Reddy
executiveYeah; we're taking a firm stance when it comes to repricing. As I said in response to Sam Karlov's question earlier, we do anticipate some strategic exits — mutually agreeable exits, if you will. We're going to use price to accomplish that, since we do need some additional capacity at a number of these plants, and we are leveraging price to exit certain of our legacy programs and maybe bring in some new programs.
Greg Palm
analystOkay. Fair enough. Appreciate the call.
Jag Reddy
executiveThank you.
Jag Reddy
executiveMorning, Ted.
Rachele Lehr
executiveMorning, Ted.
Ted Jackson
analystHello, and good morning, everyone. I was somewhat worried they hadn't noticed my hand was raised — you know, I was waving it. Most of the questions I had have already been answered. I've got a couple left. I wanted to spend a little time on ag and power sports. I mean, power sports is kind of its own separate animal. But my sense on ag — I mean, when you look at it, Deere has been adding workers and discussing bringing production up along with ag components. If you listen to AGCO's call, North America was something of a bright spot. Most of these companies have been producing under retail demand in North America and expect retail not necessarily to grow, at least not by much, but they do expect volume improvements just because they'll be producing to demand rather than below it. And yet you're showing AGCO declining. On power sports, if you sort of work your way through it, it seems like the motorcycle side of things in the U.S. has kind of stabilized and is performing well. The side-by-side market, maybe it isn't doing fabulously, but if you sort of break it apart — and maybe I'm wrong here — but strip out the recreational side and look more at the utility side, and I assume all of that flows through that same line item for you, that's clearly a bright spot. I guess my point is this: the declines you're putting forward regarding your outlook for those markets — am I missing something, or is it more because you're walking away
Jag Reddy
executiveYeah
Ted Jackson
analystFrom a business standpoint, do you follow what I'm getting at here? Those two things don't square up very well. That's my initial
Jag Reddy
executiveYeah, yeah.
Ted Jackson
analystThat's the name I'm giving it.
Jag Reddy
executiveThat's a fair question. Yeah, Ted, that's a fair question. I'll take them one by one. Let me start with ag. From a macro standpoint, we need to see tariff relief, and we need to see diesel prices drop before the economics work for a farmer to be able to afford a brand new large HP tractor or a new combine, right? That's the challenge, and I don't see that happening. I don't know — maybe last night's results could change some of that next year. Maybe we're cautiously pessimistic on it, and we'll see how it plays out next year; but some of the hiring you mentioned at one of our customers — in fact, our business mix with that customer leans predominantly toward construction rather than ag. Ag keeps becoming a smaller and smaller portion of our overall sales, so we're not placing a lot of weight on an ag recovery in the short run. But whenever it returns, right, we'll be ready for it; on power sports, you're absolutely right. We're here in Milwaukee this morning, and some news talked about significant sales at our local customer. At the same time, that same customer insourced eight jobs to the U.S., and that pat on their back really means they're outsourcing more and more of the work, similar to every other power sports customer, to Asia; we're seeing significant movement in the supply chains where they're relocating to Asia. Given that, even though the market may be stabilizing in terms of retail sales, I think from a supplier perspective, right, we keep seeing declines in our business with these power sports customers. Hence our focus: we had two power sports-specific factories. We already converted one into a data center-focused factory, and then we keep looking for opportunities to put more data center work into the other power sports-centered factory as time progresses here; so I'm not very bullish on power sports coming back, at least for us, and we'll see what happens with ag.
Ted Jackson
analystAlright, and that was a really good answer. Moving on to a few things about outsourcing. In the release you mentioned a headwind of roughly $3 million in the third quarter, and if I remember correctly, that was about what you had anticipated for the entire second half of 2026. So it looks like maybe that came in a bit higher in the quarter than expected. I suppose what I'm getting at is, do I have that right? And then, regarding that headwind from some of the costs tied to outsourcing products, what should we expect for the fourth quarter? I know you aren't providing 2027 guidance, but perhaps how should we think about that headwind in the first quarter too, leading into my next question.
Rachele Lehr
executiveYes. As we said coming into this, we expected $1 million-$2 million. That's really launch and outsourcing. You almost need to view the two combined for what we reported. We had said earlier that each of those would be about half of that amount, and that's where the disconnect comes from. Our total amount on outsourcing hasn't changed. We had projected the second half for that at $2 million-$3 million. You're absolutely right, it's roughly half of that in each quarter. The aggregate of the two is the $3 million.
Ted Jackson
analystAll right, that's where I got mixed up — it's comparing apples to oranges, given what I was looking at.
Rachele Lehr
executiveYeah.
Ted Jackson
analystMy next question concerns the equipment you've ordered — it's all arriving and you're in the process of installing it. So the first thing I'd ask on that is: can you walk us through how the timing works? Do you expect this equipment to be installed by the close of this fiscal year, or to be installed at some point during the first quarter? And then, how long does it take to get it installed, commissioned, and actually producing output? That helps you on two fronts — first, the outsourcing revenue, and second, improved asset utilization rates. So a discussion about the timeline for that equipment, and then perhaps how you're thinking about CapEx for 2027.
Rachele Lehr
executiveRegarding the equipment, some of it has already come in or is coming in late during Q4. Actually getting it operational is going to occur sometime in Q1. Like you mentioned, once that happens, a few of our issues will be taken care of. Transitioning the outsourced work back in once it's up and commissioned is going to take time, though, but honestly we view Q1 as a major factor in getting the equipment up and being able to work through those costs; then as we look toward 2027, obviously some of this equipment will need to have a final — as it arrives — final payments and final pieces. As we noted in both our presentation and guidance, we expect $40 million to $50 million next year, with growth remaining our focus. That continues to be the primary area we're concentrated on as we keep expanding within data center and critical power.
Ted Jackson
analystAll right. If we look at the equipment you've got, everything will be installed by the fourth quarter. It'll be commissioned during the first quarter, but the benefit to margins from that progress likely won't show up until the second quarter of 2027.
Rachele Lehr
executiveYes, at some point in the second quarter.
Ted Jackson
analystSo that's part of the scale-up, then. What that means is, in the first quarter, the thing you're really counting on to push your margin up is that $20 million of revenue that slipped out of the fourth quarter.
Rachele Lehr
executiveYes — that's us improving the run rate on the DCP, and having that make up a bigger piece of our mix will definitely help our overall margins.
Ted Jackson
analystAlright then. Fine. Appreciate the response to what I asked.
Jag Reddy
executiveThanks, Ted.
Rachele Lehr
executiveThank you, Ted.
Jag Reddy
executiveBefore we wrap up, I'd like to express appreciation to our team for the commitment and effort they showed this quarter, and to our investors for the confidence they keep placing in MEC. Our confidence is strong in the direction we're taking and in what we can achieve — building a company that is stronger, growing faster, and more profitable in the years to come. We're eager to share our progress with you in future updates. Thanks for being with us today.
Operator
operatorThis concludes today's call. Thank you for attending. You may now disconnect.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Mayville Engineering Company, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Mayville Engineering Company, Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Mayville Engineering Company, Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.