Corvex, Inc. (MOVE) Earnings Call Transcript & Summary
November 12, 2026
Earnings Call Speaker Segments
Chance Moreland
executiveGood morning, everyone, and welcome to the third-quarter 2026 earnings conference call for Corvex. I am Chance Moreland, and I serve as Chief Financial Officer. With me on the call today are Jay Crystal, Co-Founder and Co-Chief Executive Officer, and Seth Demsey, Co-Founder and Co-Chief Executive Officer. I want to note before we start that forward-looking statements are part of what we say today. It is possible for actual results to differ materially from those statements. You can find the factors that might cause such a difference in today's earnings press release as well as in our quarterly report on Form 10-Q covering the quarter that ended September 30, 2026, and we expect to file that report with the SEC later today. The assumptions behind our forward-looking statements are those in effect as of today, and we do not undertake to update them. Both GAAP and non-GAAP financial measures come up on this call. Adjusted EBITDA is one measure we use, and we also refer to contracted annualized recurring revenue on live compute, an operating metric rather than a financial measure. Today's press release and our Form 10-Q include a reconciliation of Adjusted EBITDA to net loss. Adjusted EBITDA should not be treated as a substitute for GAAP results. Similar measures are calculated differently by other companies. You can find the press release and a replay of this call on our investor relations site at investors.corvex.ai. There are two framing points I want to make. First, Corvex completed its merger with Corvex Legacy Holdings on March 19, 2026, which means prior-year periods contain only the legacy healthcare business, so comparisons between years are not meaningful. Our first quarter with a clean sequential comparison to a full quarter of the AI cloud computing business is the third quarter, and that is the comparison I will use. Second, new this quarter, we will open the call to questions from our analysts once the prepared remarks are done; we expect to keep this format for subsequent earnings calls. I will now hand the call over to Jay.
Jay Crystal
executiveThanks, Chance. Good morning, and I appreciate everyone being here. Ninety days back, I laid out for you what our company does, the reason it succeeds, and the way you ought to gauge us. Now, on our second earnings call since becoming Corvex, I want to cover those identical three areas once more, with the emphasis this time on how we have executed and grown. I will begin with the three metrics I requested you track us against, and after that go through what we promised to accomplish versus what we actually accomplished, the reasons customers pick us, and where our attention goes next. Following that, Seth will provide a closer examination of the technology, which includes Corvex Token Factory, and then Chance will guide everyone through the financial results. When August came around, I requested that you evaluate us based on three criteria: contracted power, contracted annualized recurring revenue from live compute, and the capacity we place into service. Below is where each one stands. Regarding contracted power, all of the 7.7 MW of critical IT capacity contained in the plan we laid out in August is now under contract. Of that, 1.5 MW is operational, while the remaining 6.2 MW — spanning Midwest 1 and the Mid-Atlantic 1 expansion — stays on track to enter service in the fourth quarter of 2026. Additionally in August, Garrett Brams joined us from Cushman & Wakefield to lead sourcing and development for data centers. Finding power at the scale and on the timelines that match customer demand is his mandate, and he's off to a terrific start. As of September 30th, contracted annualized revenue on live compute stands at $21.6 million, and as of today it's $21.7 million — consistent with the roughly $22 million we shared on our August 14th call. A quick reminder: live ARR is backward-looking. Growth in this business starts with our power funnel. We pair power with customer demand, finance the project, and then deliver it. Regarding capacity we placed into operation, 128 NVIDIA Blackwell GPUs became active during the quarter at our Mid-Atlantic data center; those GPUs, which arrived in late July, constituted the last portion of the multi-year offtake for the NVIDIA Blackwell cluster that we announced on August 4th. Each quarter, we'll report these figures using the same methodology. Turning now to what we committed to last quarter: on August 31st, we laid out a detailed plan. During the call, we noted that critical IT capacity was expected to increase from roughly 1.5 MW to roughly 8 MW by the close of 2026, and that we hold a right of first refusal on another 12.5 MW at our Midwest 1 location, which could take total Corvex capacity past 20 MW in 2027; we also noted that both expansions are located within existing enterprise data centers that have live utility power. We further stressed that we were pursuing two categories of customers for that capacity. The first was a growing AI-native company showing qualified interest in offtake of at least three years, and our aim was to treat the deployment as a chance to build what might turn into a highly scalable relationship. The next item involved a counterparty that had both the creditworthiness and the desire to lease the entire data center, rather than just the initial stage of our Midwest 1 facility. We likewise noted that Corvex Token Factory would leave closed alpha sometime in the third quarter, and we said that we would keep underwriting every deployment before signing and would finance growth in a way that minimizes dilution. Let's now turn to what we have accomplished since the previous call; we have made clear, measurable headway in locking in offtake with the customer profiles and terms we described three months ago. On Mid-Atlantic 1, we're in the final stages of talks with an AI-native company that's expanding quickly — one we believe we can grow together with — to take over 1,000 NVIDIA Blackwells for a three-year period, on terms that meet our hurdle rate. On Midwest 1, we're encouraged by how the offtake conversations are progressing against the three criteria we established for that site: credit quality, signing the entire data center under an upside scenario, and the growth potential of the partnership as a whole. We look forward to sharing news once those agreements are finalized. As for capacity, Midwest 1 is still on schedule to be ready for service in Q4 of 2026. I'd like to define this term clearly, since we'll be referring to it each quarter. "Ready for service" indicates that a facility has power, cooling, and everything else needed for us to start running the computing cluster. It does not refer to the point at which customer compute becomes live and revenue starts—that happens later, following hardware delivery, installation, and commissioning after the site has reached ready for service. For most companies in this industry, the biggest hurdles are obtaining live power, securing particular electrical and cooling equipment for the data center, and getting permits. At Midwest 1, those are mostly resolved now. We anticipate delivering from construction start to ready for service in less than two quarters. We've also essentially finished the Mid-Atlantic buildout — all that's left is the last of the equipment install and commissioning. That site should be serving customers in Q4, right on schedule. As for Token Factory, we committed to Q3 and we shipped it publicly within that window. Developers and enterprises can sign up for free, obtain an API key, and run open-weight models, with zero data retention as the default. I'm looking forward to Seth sharing more shortly on why this matters and why offering open-weight inference on our platform has us excited. Let's now get into the reasons customers pick Corvex. Customers choose us because they trust three things: our technical and operational know-how, our capacity to supply power at the scale and on the schedule they need, and our skill at structuring and financing complicated projects. To start with, our engineers at every layer of the stack carry decades of experience building and operating large-scale distributed systems. That depth is what enables us to help customers succeed, even when the problem lies outside our platform. Consider one customer whose workload was running 30% slower than expected: we looked into it, profiled and optimized it, and two days later returned it running six times faster. On power, we're fortunate to work with excellent partners, and we're developing strong talent in-house. Working alongside our partners, the team is enabling Corvex to secure appealing data centers, and we're still on schedule to deliver that capacity to the market fast. Our power pipeline continues to grow. Regarding economics, our view is unchanged, so I'll be brief. AI factory revenue is contracted on a fixed-term, take-or-pay basis. Customers pay for reserved capacity regardless of whether they use it. Before we sign, every project has to meet a return threshold. The model incorporates power cost, hardware cost, financing cost, contract term, and residual value, as well as the counterparty credit profile. Every project gets its own financing structure: first come customer prepayments, then asset-level debt backed by the contract and equipment, and equity shows up only where it proves worthwhile. In August I noted that we would rather disclose a contracted figure that is smaller than one that is larger but fails to recover its cost of capital. How effectively we develop deals with appealing customers, economics, and financing terms continues to encourage me greatly. Now, three priorities for the coming 90 days. First, get Midwest 1 and the Mid-Atlantic expansion to ready for service on schedule while finishing offtake for those sites. Second, convert more of the power we can access into contracted capacity and keep expanding our footprint. Third, we need to generate demand for the Corvex Token Factory by working through partners and channel relationships. With that said, I'll hand things over to Seth, who will walk you through the technology in more detail. Seth?
Seth Demsey
executiveThanks, Jay, and good morning everyone. Over the next few minutes I want to address three things: what Corvex Token Factory is and why we decided to build it, the work we're doing on security, and what our engineering team delivered this quarter. I'll start with Token Factory, which came out on September 30th. The simplest way to describe it is this: instead of buying GPU capacity, you buy intelligence by the token. Whenever a developer or an enterprise submits a request to the standard API, we handle it with an open-weight hosted model that runs on our own infrastructure, and the customer pays for the tokens they use. You don't have to set up any cluster or deal with hardware, and as a default we keep nothing — not the prompt, not the response. This came out of a change we noticed in the way AI is being used in production. Closed-weight frontier models are impressive, but they cost a lot, and not every use case requires one; for a big and fast-expanding portion of actual production work, open-weight models now produce results good enough to drive real-world workflows and actions. In fact, that's how we run our own engineering. Planning and the toughest challenges get routed to frontier models for a minority of requests, while open-weight models served via Corvex Token Factory handle the bulk of everyday requests. Any workload making that move requires a place to execute. That demand is exactly what we're preparing for. On Corvex's side, this shifts how our infrastructure's economics work. When demand exists, capacity sold per token can bring in more per GPU hour than that same GPU would under a bare metal contract. The model itself dictates the pricing. Our open-weight models run on infrastructure we own, and we set prices well below what the frontier labs charge. Even so, there's a healthy margin over what serving costs us—we aren't selling premium access to some closed model. Moving over is made intentionally simple. Token Factory works with the API conventions of both OpenAI and Anthropic, so all a developer has to do is swap an endpoint, a key, and a model name, and the code and tools they already use—Claude Code, Codex, Aider—continue to function. We're only weeks past launch, so it's early days, and our first customers are explaining what makes it work for them. First, the head of an engineering company said Token Factory's speed and uptime made it dependable enough to serve as an execution layer within their workflows, and he added that a guarantee their code would not be used for training was a must. In the coming two quarters we will concentrate on demand, bringing partners and channels on board first, followed by direct enterprise sales, while we keep delivering on the roadmap. We are not yet discussing Token Factory revenue, and we anticipate a significant contribution starting in 2027. Moving on to security and our Assured AI offering. The uncomfortable truth about AI is that, at best, data gets encrypted while at rest and in transit, then decrypted before processing happens inside the CPU, the GPU, and before it lands in memory. In those moments, model weights, fine-tuning data, and prompts all sit exposed. Each provider wants you to place trust in their policies and their people. With Assured AI, we're making it so customers don't have to. Through trusted execution environments, Assured AI cryptographically proves that nobody, Corvex included, can reach a protected model or the data it processed. In March, we were one of the first to finish a verified production rollout of confidential computing on NVIDIA HGX B200 systems. That deployment includes attestation for the CPU and the GPU through Intel Trust Authority and NVIDIA NRAS, along with encrypted NVLink traffic between GPUs. We have been running protected workloads for some customers for more than a year. Inside Token Factory, we have brought Assured AI in, so that cheaper inference and provable privacy come together on a single platform. Today's standard Token Factory endpoints run with zero data retention, and it is the confidential computing layer that makes operator access not just a policy violation but something that simply cannot happen. The customers who matter most—regulated enterprises, financial firms, and public sector organizations—are also the ones with the strongest and most durable relationships once you're in; we expect proof points to share over the coming quarters. Now to the three items the engineering team delivered this quarter. First, Blackwell: we finished delivery of a multi-year cluster announced on August 4th, which includes the liquid-cooled HGX B200 capacity; since July 29th that cluster has been fully in production. Second, Midwest 1: our real estate team under Garrett Brams is turning an existing enterprise data center into a liquid-cooled, AI-ready facility, on track for service readiness in the fourth quarter of 2026. Third, platform software: back in August, we told you the next release of our cloud management software had shifted from planning into execution. It remains in execution and is on schedule. The first end-to-end stack is being deployed in our lab right now. Going forward, it will serve as the basis for every deployment we make, and as the foundation for continued development of our Assured AI security offerings for both cloud and inference customers. Finally, in Q3 we got notices of allowance for two patents covering Corvex's technology. That takes our portfolio to two allowed patents and 10 pending applications. With that, I'll pass it to Chance. Chance?
Chance Moreland
executiveThanks, Seth. As I mentioned at the start, the meaningful comparison for this quarter is sequential, so throughout I'll be comparing the third quarter against the second quarter. Third-quarter total revenue came in at $5 million, versus $3.8 million during the second quarter. The entire amount was generated by AI platform and services. Over the nine months, total revenue reached $9.3 million. This sequential gain reflects a full quarter of the capacity that went live in the second quarter, plus a partial-quarter contribution from the last tranche of the Blackwell cluster, which came online in late July. That timing is also the reason third-quarter revenue comes in below a quarter of the $22 million contracted annualized revenue figure we gave in August. A portion of that capacity was operational for just part of the quarter. Revenue was in line with what we shared in August. Contracted annualized recurring revenue, or contracted ARR, for live compute was $21.6 million as of September 30, and as of today it stands at $21.7 million. The definition remains the same. It represents the annualized value of fixed contractual fees for capacity that has been delivered, accepted by the customer, and is producing revenue as of the date stated. It excludes contracted capacity that is not yet live. This metric reflects how things stood at a specific moment—it isn't a projection or a GAAP figure, and in any quarter where capacity goes live partway through, it won't match annualized GAAP revenue. From here on, we'll share two numbers: the quarter-end value and the value as of today. Turning to expenses: cost of revenue for AI platform and services, leaving out depreciation and amortization, totaled $2.5 million, compared with $2.1 million in the second quarter. Depreciation and amortization was $2.9 million, compared with $2.7 million the quarter before. Technology and infrastructure expense came in at $1.3 million, compared with $1.4 million. Sales and marketing was $0.8 million, compared with $0.7 million. General and administrative reached $14.8 million, compared with $12.1 million. G&A, as I mentioned during the prior quarter's call, is mostly driven by non-cash stock-based compensation tied to the replacement equity awards granted at the merger. Stock-based compensation came to $11.3 million for the quarter overall, with $9.3 million of that recorded in G&A. Those awards carried roughly $143.6 million of remaining expense as of the merger, and that amount gets recognized through 2030 — so expect a sizable, fairly predictable non-cash charge quarter after quarter. Note 12 of the 10-Q lays out the awards in detail, and to grasp their economic impact I'd suggest looking at the share count instead of the income statement. Operating loss for the period was $17.4 million. We recorded $0.3 million of interest expense, a new item this quarter tied to the equipment financing I'll cover shortly, and it includes amortization of financing costs. For the third quarter, net loss came to $17.5 million, versus $12.8 million in the second quarter. Net loss attributable to common stockholders was $17.5 million. Adjusted EBITDA for the quarter was — $3.2 million, unchanged from the second quarter. We haven't altered that definition; the reconciliation is available in the press release and will also be included in the 10-Q. Moving on to the balance sheet and cash flow: at quarter end we held $42 million in cash and cash equivalents, versus $21.7 million as of June 30, along with $0.7 million of restricted cash. That increase comes from roughly $31 million in net proceeds from the private placement we closed in early September, plus $6.9 million in net proceeds from equipment financing, partly offset by $9.8 million in capital expenditures and $7 million of operating cash use. Net property and equipment stood at $39.1 million, up from $31.4 million. Debt at quarter end was $6.9 million versus none on June 30. That debt is the equipment financing tied to the Blackwell expansion we announced on August 4th; it sits at the project level, is secured by the equipment and the related customer contract, and carries no recourse to Corvex Inc. Finance lease liabilities came to $8.5 million, while operating lease liabilities were $4.9 million. Deferred revenue totaled $3.2 million, split between $1.9 million current and $1.3 million non-current, compared with $3.7 million on June 30. The decline reflects recognition of customer prepayments received earlier, as capacity under those agreements begins generating revenue. Operating activities used $7 million of cash this quarter, versus $5.3 million in the second quarter. Within that number you'll find roughly $1.8 million paid out to wind down the legacy connected devices business, about $2.5 million in prepaid rent, plus $1.2 million for prepaid software — partially offset by a $2.8 million vendor refund that came in during July. CapEx came to $9.8 million, including $0.2 million of capitalized software. Turning now to the capital plan: in August I mentioned that growing this business would require more capital, and that what we need in funding depends on the pace and structure of our expansion. We apply the same rule we set out in August: ahead of signing, each project gets underwritten to ensure it covers its cost of capital, and we finance it as much as possible with customer prepayments and asset-level debt before resorting to equity. Turning to our capital structure: on November 10th, 2026, common stock outstanding stood at about 39.1 million shares, alongside roughly 21,800 shares of Series D preferred outstanding, convertible into approximately 21.8 million common shares — about 60.9 million shares on an as-converted basis. That's versus approximately 56.6 million as-converted on July 8th, with the gap reflecting the September private placement of about 4.3 million as-converted shares at $7.75 per share. Regarding the at-the-market facility we announced on October 14th, we have made no use of it so far. We established it to give us fast, opportunistic equity access in measured amounts, mainly to fund the equity portion of specific deployments with attractive returns rather than for general operating needs. We will stay disciplined about when we use it and how much. On internal controls, the material weakness disclosed in our 2025 Form 10-K is still unremediated as of this quarter's filing. Back in August, I laid out the plan to you: bring on an advisory firm, finish the risk assessment and scoping work in the third quarter, then move on to designing and documenting controls, followed by testing. That risk assessment and scoping was finished during the third quarter. Right now we are designing and documenting controls spanning entity-level, business process, and IT general controls, beginning with order-to-cash, and we are building those controls into our new procure-to-pay and ERP systems as those systems go live. Testing of operating effectiveness should get underway in the first half of 2027. Remediation won't be finished until the controls have run for a sufficient period and been tested. Each quarter we will keep updating you until this is closed; with that, I will hand it back to Jay.
Jay Crystal
executiveThanks, Chance. I’ll wrap up the same way I did in August, since the core point remains unchanged even as the evidence has accumulated. What limits AI infrastructure is not demand, and it is not chips. It is whether a completed, powered data center can be brought together in one location and at one time with hardware, software, and a creditworthy customer, and whether that combination can be delivered dependably and within the customer’s schedule; in August, that described the task. Now it describes the quarter. 6.1 MW of critical IT capacity is slated to enter service, we are in advanced discussions with partners to take that capacity, a product was launched on schedule, and funding was structured around prepayments and asset-level debt ahead of equity. What remains ahead of us also has not changed. Our capacity must increase by multiples. Our revenue is still concentrated among a small number of customers. Token Factory has launched, and our focus is on scaling that product. Our controls work is in progress, but it is not complete. None of this is concealed, and none of it is new to us. Still, we are eager to address these challenges and, in doing so, increase shareholder value; with that, operator, we are ready for questions.
Bill Papanastasiou
analystHello, and good morning. Thank you for taking my questions. To begin with, I was hoping you could provide some detail on the financing environment and on whether any notable shifts have appeared since the prior quarter. Also, I am not certain — I did not catch it. Could you tell us what the cost of capital was on the USD.AI loan, and do you expect to use USD.AI going forward for future equipment financing? Thank you.
Chance Moreland
executiveCertainly, Bill. Yes, it is — Chance. Thanks for the question. Regarding your first question on the overall funding environment, I'd say we're still in active conversations with our financing partners, and we feel quite encouraged by the ongoing trends we've been sharing. Interest on their end, I'd note, is just as robust as what we observed earlier in the summer. All of us are watching the interest rate environment and adjusting as wider trends work their way through the industry. Even so, confidence in the space, interest in the asset class, and frankly confidence in Corvex remain as strong as they've been in quite a while. Regarding that dollar-denominated credit facility we announced back in August, I can confirm the rate on it sits at 10%; the USD team has proven to be an excellent partner, and we look forward to carrying on our relationship with them down the road.
Bill Papanastasiou
analystGreat. And as a quick follow-up on that, regarding the economics of some of those offtakes you're signing for GPU capacity, are you noticing any improvement when it comes to prepayment, or in the appetite to raise prepayments, and just GPU pricing in general? Hoping for a bit more color there. Thanks.
Jay Crystal
executiveSure, Bill. It's Jay here. On prepayments, yes, we're seeing customers compete more aggressively for capacity, partly because data center capacity is becoming scarcer, and that's an area where certain parts of the financing market are appearing. It's lifting the tenant credit quality needed to get into sites. Corvex has so far managed to navigate around that successfully and secure power in certain cases where others couldn't. So on customer prepayments, yes, we're seeing the percentages push higher compared with where they've been historically. On pricing, SemiAnalysis remains a fairly good guide for industry benchmarks. As capacity gets scarcer and demand density builds for clusters when they come online, that lets us position the cluster to effectively hit or surpass our hurdle rates as we bring these forward. So we're still encouraged about our ability to bring financed transactions to market that exceed our hurdle rate.
Bill Papanastasiou
analystThank you. This will be my final question. Jay, you mentioned a moment ago that data center capacity is becoming more difficult to secure. I was hoping you might go into a bit more detail from a boots-on-the-ground perspective. Are you seeing additional competition arise because regulatory headwinds are affecting players who pursue large-scale capacity and who need to essentially scale it back to subscale or smaller-scale data center deployments? I would be curious to hear how you see it. Thanks.
Jay Crystal
executiveYes. This market has always been competitive, but a few recent developments, particularly those involving Texas, have definitely caused demand increases to appear in other locations across the country for U.S.-focused offtake. From Corvex's viewpoint, we have stayed ahead of these trends regarding where we have selected to grow and have obtained rights to expand, for instance, at our Midwest 1 site. We feel encouraged about our capacity to navigate some of this, since there are really, in a sense, two trends taking place. Although demand pressure is rising, at the same time, particularly over the past few weeks, landlords are seeking improvements and enhancements in tenant credit quality with respect to the offtake we bring. As a company, we have always been strongly focused on tenant credit quality and offtake through the partnerships we establish and the customers we decide to bring in. That is turning out to be an asset for us as we navigate this environment, both regarding financing for clusters and then the financing that enables landlords who decide to partner with us. Seen through that lens, we are not discouraged by the environment, and in some ways, it is becoming a competitive advantage for us. Yes, to answer your question, we are seeing higher levels of demand. It simply needs to be filtered through the lens of tenant credit quality in order to compete and win that incremental power.
Bill Papanastasiou
analystThat's great. Thanks for taking my questions, and I wish you the best of luck in Q4.
Jay Crystal
executiveYeah. I appreciate that, Bill.
Kingsley Crane
analystThanks — appreciate you taking my questions. Hearing that Token Factory has launched is genuinely encouraging. What I'm wondering is how you see that offering evolving across the next year, and maybe what portion of overall consumption something like Token Factory might represent compared with a GPU hour or a take-or-pay deal, looking perhaps one or two years out. Thanks.
Jay Crystal
executiveYes, thanks for asking, Kingsley. As for Token Factory and how we see it developing over the next 12 months, particularly regarding, yeah, the percentage of capacity we might fill with it, for the clusters and larger footprints that we're bringing online, those are generally destined for long-term committed take-or-pay relationships with third-party customers. When it comes to how we intend to grow Token Factory, we've set aside part of our H200s along with our current GPU fleet for that purpose, and we're using those to get the effort started. Beyond that, we've locked in capacity from a third party on an asset-light basis, which allows us to expand in a cost-effective way and to align the length of the compute obligations we'd take on more closely with how long demand lasts that we're seeing through Token Factory. Basically, we're aiming to grow while keeping assets and liabilities matched in a controlled manner, and so far, as we've scaled that platform, we've managed to pair capacity with demand. Looking ahead a year or two, once our base workloads are steady, we have contracted guaranteed throughput, and we gain other kinds of forward-looking visibility, that should give us the confidence to start moving some of that capacity in-house. At that point, there may be selective chances to use compute—when we do these bigger deployments—to direct a portion of it toward the Token Factory, although for the larger-scale GPU clusters, only a minority percentage of the cluster would be allocated to the Token Factory.
Kingsley Crane
analystAll right, that's useful. It leads nicely into my second question: I'm just curious what you think about trends in spot pricing and committed pricing across the different GPU tiers, whether H100, Blackwell, or Vera Rubin, and then how you see your business model potentially gaining from spot increases. Maybe that ties more to Token Factory, if you intend to sign additional committed arrangements covering the bulk of capacity. Thanks.
Jay Crystal
executiveYes. Excellent question. What you're seeing with spot prices rising, we're seeing too, though committed financing has risen as well. Up to now, to make sure we secure certainty of offtake alongside the liabilities involved in deploying these clusters at scale, we've chosen to steer that capacity toward longer-term offtake so as to de-risk outcomes for investors while still achieving very attractive rates of return above our hurdle rate. Regarding spot, we tried it previously, and although it produced attractive yields, the market shifted over time in the share of capacity we assigned to spot. In other instances, a customer who had been using spot capacity for training departs, and then that customer has to be replaced; it meant a great deal of energy going toward keeping utilization high on the spot capacity so that, when we consider effective revenue per token, the effective revenue per GPU hour viewed through utilization, at that time it demanded too much effort compared with growing the business more scalably via long-term committed offtake. But to return to your question, it's certainly something we monitor. We might decide to try it going forward. We're observing upward price movement for committed as well as spot, and that could flow through to our business as longer-term offtake, including six-month and one-year deals, when some of our legacy servers come up for renewal. There are chances to raise average pricing there. For the new deals we're taking to market, we're quite happy with the economics coming through.
Kingsley Crane
analystAll right, that's genuinely useful. Thanks for making the time. Much appreciated.
Jay Crystal
executiveHappy to. Thank you.
Fedor Shabalin
analystThanks so much, operator, and good morning to all of you. I'd like to start with a question about unit economics and that possible security premium. More precisely, how do those unit economics stack up when you compare a plain bare-metal GPU lease against the complete Corvex deployment with, say, storage-managed services and Assured AI included? Could you maybe lay it out as revenue per GPU hour per megawatt and the incremental gross margin that comes as a premium for the security? Thank you.
Jay Crystal
executiveYes. Thanks for asking. Yeah, that's a great question. When we think about, I suppose, the relative pricing gaps among bare metal, managed Kubernetes, and then Assured AI, along with some of the more advanced offerings, a premium does come with it. Regarding our upcoming deployments, part of the difficulty, I suppose, is that when you run that premium through the power footprint, the rack density of the servers we're choosing to deploy; for example, with our upcoming NVIDIA Blackwell cluster, we're pretty encouraged about where that agreement is going to land in terms of revenue per watt or per megawatt. As we look at other offerings, even ones that would take our managed Kubernetes offering, where we do get a price premium on a per GPU per hour basis, and our Assured AI offerings, when you run that through the power efficiency of the compute, even if we're seeing an increased premium in the GPU hourly rate that we contract for, if the density differs on the machines, that can affect how that flows through and gets measured in terms of revenue per watt. Yeah, we do see stratification and the opportunities to clearly distinguish pricing between bare metal, managed Kubernetes, and more of the software-driven offerings, all the way up to the revenue per watt that we anticipate being able to achieve over time on Token Factory. But we also run it through the lens of the computing efficiency, the power efficiency of the machines that we're operating it on.
Fedor Shabalin
analystThanks so much for that. I've got a follow-up about CapEx for building out the capacity we've already secured. Forgive me if this was covered, but out of the approximately 6.3 MW that comes online this quarter, what portion of the GPU networking and fit-out CapEx has already been committed, and what portion remains uncommitted and under agreements? If you could size the remaining spend for each site, that would really help. Thank you.
Jay Crystal
executiveYeah, good question. Much of it, in terms of the timing of our commitments, is driven by when customer offtake happens. Some items we may commit to ahead of time, simply because of lead times. For example, we've spoken publicly about committing to power early so we can deliver facilities on schedule and meet the needs of customers we had strong confidence would come through the funnel; in other cases, similar long lead items get procured ahead of time. But the vast majority of capital ends up committed and packaged and brought to market at the same time as when we memorialize the offtake agreements.
Fedor Shabalin
analystAppreciate it. I'm grateful you took my question, and all the best going forward. Thanks a lot.
Jay Crystal
executiveThanks.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Corvex, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Corvex, Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research