Mineral Resources Limited (MIN) Earnings Call Transcript & Summary
August 28, 2025
Earnings Call Speaker Segments
Operator
operatorWe appreciate everyone joining us, and we're glad to have you at the Mineral Resources FY '25 Full Year Results Briefing. Chris Ellison, Managing Director, and Mark Wilson, Chief Financial Officer, are the speakers you'll hear from today. Just a few housekeeping notes before we begin. This session is for the sell side, and analysts can submit questions by text as well as ask them live over audio. <<operator_script>> A recording of this call is being made, and a written transcript will be posted to the MinRes website later today. I'll now turn things over to the MinRes team.
Christopher Ellison
executiveMorning, everyone, and thank you for being here for the MinRes full year results. I'm Chris Ellison, Managing Director. With me today are our Chair, Mal Bundey, and CFO, Mark Wilson. Once I'm finished, Mark will take you through the financials. Let me begin by acknowledging that this has been a difficult year. We've been on board for 3 months. And as chair for 2 months in this short time, we've made extraordinary progress on the governance front, and I'm confident the changes we made sets MinRes up for an incredibly strong future. Our focus is on strengthening Board improving transparency and reviewing our governance framework while prioritizing and strengthening our balance sheet. I want to thank our workforce, more than 6,800 people. Their focus and commitment never waived thanks to our partners for their support and to our clients over the past 12 months. Operationally, it has been a remarkable year. Delivering Onslow Iron stood out as the biggest accomplishment in this company's history. We went from a final investment decision 3 years ago to first ore on ship in May of '24, with more than 100 vessels loaded with our transshippers and over 19 million tonnes have been shipped.
Christopher Ellison
executiveDuring our investor site visit in May, we showed how much has been accomplished within a brief span. We built a private haul road stretching 150 kilometers to support road trains with a 300-tonne payload. That stands as a global industry first — nothing like it has been done anywhere else in the world. We set up a fully complete Port Marine operation, encompassing truck or load storage reclaim and transship, and we laid out, designed, built, and commissioned 5 transshippers, with 2 additional units expected to arrive in mid '26. At our workforce, we developed resort-style accommodation and facilities. Our aim is to create a safe setting for our female workforce and to tackle the significant mental health issues that have been present in the mining industry for decades. Like any new project of this scale, we encountered challenges during commissioning, most notably with the Haul Road. The team responded swiftly, making the right investment decisions to future proof and enhance the haul road, and I'm pleased to confirm the operators are on track for full completion in mid-September. Despite disruption from Roadworks, the entire supply chain has performed outstandingly over recent months. Onslow iron ran at an annualized run rate of 35 million tonnes during the 4 weeks to the 26th of August. This strong performance aligns with guidance of achieving nameplate capacity in quarter 1 FY '26.
Christopher Ellison
executiveAlthough our near-term priority is hitting the FY '26 volume guidance of 30 million to 33 million tonnes on a 100% basis, we now see a clear route to running above nameplate with only minimal additional CapEx. Our sixth transship arrives before this financial year closes. At that point we'll be positioned to push past 35 million tonnes per annum. Our Mining Services business, which deserves credit for what's been achieved at Onslow Iron, is still the heartbeat of MinRes. I tend to think of it as more of an infrastructure business. It's anchored by fixed assets such as the crushing plants, port facilities and the Haul Road. On top of that, over 85% of our order book comes from life of mine contracts extending beyond 15 years. Mining Services earnings climbed more than 30% last year, and volumes are set to rise over 10% this year. That extends a track record of robust growth across the last 20 years. As a reminder, at our IPO in July of 2006, mining services contributed a little over $20 million EBITDA; once Onslow is at a 35 million tonne run rate, this entire business will deliver over $800 million in EBITDA for our share. That works out to a 19% compound annual growth rate since IPO. During the year the business picked up 3 new contract wins and 6 contract renewals.
Christopher Ellison
executiveOur retention rate is outstanding, and that reflects the constant effort we put into giving clients value. Over the last 10 years, just 2 contracts have gone to competitors, and we ended up winning both of them back. Such contracts provide stability across cycles. They support our earnings, and they let us pursue big projects such as Onslow Iron. Now on lithium. Looking back across the last 2 years, I admit we misjudged pricing — I have spent more than 16 years in the lithium business, and I never thought I would see prices return to roughly $600 a tonne during my lifetime. Back in '23, consensus and allies alike were projecting FY '25 SC6 spot prices near $1,500 a tonne. This year our focus is on cutting costs and raising performance so we are protected through the cycle. Progress has been good, and we anticipate lower costs in FY '26. Since coming out of care and maintenance 3.5 years ago, Wodgina has never done better. The market is still volatile, yet the long-term reality is unchanged. A global energy transition is impossible without more lithium supply. And thanks to the backing of our excellent JV partners, we have kept the flexibility to scale up fast once the market turns.
Christopher Ellison
executiveRegarding iron ore, we have made the decision to shut down the Yilgarn hub and put the mines up for sale. That brought to an end a lengthy and fruitful chapter for the region. Over at the Pilbara Hub, our planning to deliver the next satellite deposit is quite far along — Lamb Creek is going to enter production. We anticipate receiving approval soon, with the first store coming in the second half of FY '26. Investing in Lamb Creek is set to add a minimum of 5 years to the Pilbara Hub's life. As we look forward, the priorities right in front of us are obvious. We will keep raising governance standards, finish the ramp-up of on low iron, reinforce the balance sheet, keep expanding our mining services business, and apply discipline throughout the lithium to get the most out of returns. All of this amid some tough conditions. We ended the year carrying a good deal of positive momentum, especially at Onslow in, and that momentum has carried over into the beginning of FY '26. Onslow Iron demonstrates that we can deliver large, ambitious projects fast and to a standard that generates enduring value for our shareholders. That's roughly everything on that. I'll now pass it over to Mark, who will walk through the financials.
Mark Wilson
executiveThanks, Chris, and good morning, everyone. I'm glad to walk you through how MinRes performed financially in FY '25. As Chris mentioned, this was yet another year of transformation for MinRes, with the highlight being Onslow iron's delivery and record earnings in mining services. Our standing as a leader in mining services has only grown stronger; we've kept investing in world-class assets, and we extract considerable value from our core operations and infrastructure. All of this came about even with commodity prices falling sharply, especially for lithium and iron ore, which inevitably weighed on our results. Even so, the financial outcome we posted was robust, with revenue of $4.5 billion and underlying EBITDA of $900 million. That result speaks to how strong our diversified business model is, to discipline on cost and capital, and to the repositioning of our portfolio toward higher-quality assets and growing recurring Mining Services earnings. Mining Services posted record underlying EBITDA of $737 million. Record production volumes and the strong ramp-up at Onslow Iron drove this, with the first earnings recognized from the Onslow Iron Road Trust. In iron ore, underlying EBITDA came to $252 million in a year of transition. As Chris noted, we moved the Yilgarn hub into Karen maintenance from December 24, but growth at Onslow Iron more than offset that change, confirming our focus on longer life, lower-cost assets.
Mark Wilson
executiveIn lithium, tough market conditions meant prices dropped to lows not seen in years, but the division still posted underlying EBITDA of $23 million on the positive side. We concentrated mainly on operational gains and keeping costs firmly in check, and Bald Hill went into care and maintenance so value would be preserved until conditions improve. Cost and capital management, done with discipline, keep supporting the business. And during this year, we cut corporate outflows by way of efficiency measures, workforce optimization, IT savings and off-hiring of surplus equipment. In light of our financial position and the investment commitments we have ongoing, the Board made the prudent call not to declare a final dividend for FY '25. As of 30 June, liquidity was more than $1.1 billion, with no near-term maturity pressure. The first U.S. bond maturity comes due in May 2027, nearly 3 years from now. And the refinancing rate potentially available today is around 7.5%. Over the year, we freed up significant liquidity via strategic transactions. A minority interest in the Onslow Iron Private Haul Road was sold to Morgan Stanley Infrastructure Partners, which validated the quality and longevity of that asset. We also finished a substantial gas and oil transaction with Hancock Prospecting, speeding up cash realization. Capital expenditure came to $1.9 billion across the year, mostly directed towards finishing Onslow Iron.
Mark Wilson
executiveCapital spending came in at $200 million under what we had guided, although $100 million of that reflects a timing shift that will carry over into FY '26. Looking at FY '26, we anticipate that capital expenditure will drop to roughly $1.1 billion, and about half of that will be sustaining capital. The remainder goes toward finishing and expanding Onslow Iron, running the Pilbara Hub, and focused exploration. As the chair mentioned in a shareholder letter, since Onslow is now producing rising cash flows, and given our solid liquidity, falling CapEx, and the capacity to speed up deleveraging inorganically, there is no need for us to raise equity in order to fund our growth pipeline. We have also taken a proactive step and started putting on some iron ore hedging for the near term, while we finish construction at Onslow and spend most of our FY '26 growth CapEx. With the iron ore price sitting at or a bit above USD 100 a tonne in recent months, and as I noted at the June quarterly, we have prudently hedged a portion of what remains of our calendar year 2025 production, using a mix of collars with floors at USD 100 and ceilings near USD 107, plus fixed prices averaging roughly USD 103 million. As of today, approximately 1/4 of our remaining output for the next 6 months is hedged.
Mark Wilson
executiveTo wrap up, FY '25 showed that we can run the business well even when conditions are tough, while moving forward the important projects that matter most to what lies ahead for us. We have built the foundation for a stronger balance sheet, better cash generation, and a shift toward long-life, low-cost assets that will keep earnings going for decades ahead. We stay dedicated to disciplined capital allocation, careful financial management, and creating lasting value for shareholders. As we look forward, we are examining our capital allocation framework so that future investment choices are sound, shareholder returns are maximized, and balance sheet resilience is strengthened. Thank you. We are now glad to take your questions.
Operator
operator<<operator_script>> The initial question will be from Lachlan Shaw of UBS.
Lachlan Shaw
analystI have just 2 questions. First, congratulations on reaching that 35 million tonnes per annum run rate. I am curious, though, whether you could give us a brief update on the most recent jumbo truck rollover — I mean the cause, what remediation steps might be taken, and any effect on production?
Christopher Ellison
executiveYes. Lachlan, that was somewhat disappointing, honestly. A truck did end up on its side on Saturday night. But fundamentally, it came down purely to driver error. When it comes to operating on these highways, we're not immune to the same issues the rest of the world faces. The driver believed he was approaching a restage and was roughly 180 meetings away from it when he took the vehicle off the roadside. And when he realized his location. He hit the brakes, and the front prime mover along with the 2 trailers simply ended up on their side. We got in touch with the regulator right away. I believe the regulator recognizes that on these highways we deal with the same challenges as everyone else globally. In fact, since our last accent we've covered close to 13 million kilometers without an accident, and we have around 600 drivers working in that operation up there. So look, naturally we'd like to have zero accidents, but incidents like this will occur occasionally.
Lachlan Shaw
analystGreat. Alright, so is there any production impact worth mentioning?
Christopher Ellison
executiveNo. No, Lachlan, we had a shutdown lasting a couple of hours. We halted all operations so we could go back through things and talk with every driver. Fortunately, there was zero injury to the driver in the truck. He's been stood down while the investigation proceeds, and we still need him back at work. As for downtime, there was no effect — just a couple of hours last time — and the transhippers are operating with ample stock at the port. Our focus was this: had we believed another problem existed out there, we would have stopped the operation, since safety comes first. But no, time returns are unaffected.
Operator
operatorWe'll take the next question from Bennett Lyons at Jarden Securities.
Ben Lyons
analystChris, regarding what was said throughout the shareholder letter—less about there being no current requirement to raise equity, and more about your actively looking at chances to speed up deleveraging by way of an inorganic route. Clearly, that route means bringing some cash in. So it sounds closer to asset refiling. Thus my first question, I suppose, is this: could you please expand on whatever potential opportunities you are weighing to accelerate that inorganic deleveraging?
Christopher Ellison
executiveYes, Ben. Look, we are constantly examining opportunities. And if you look at the past 10 years in particular, we have managed to pursue a variety of different opportunities while recycling capital. We have been able to acquire assets at very low cost, develop them with our own in-house resources, and then go out and sell them at a fairly reasonable price. At the same time, through doing that, we have gathered some incredibly high-class Tier 1 joint vendor partners around the world. So I mean that partnership has grown out of us bringing capital onto our balance sheet, and that has really transformed the business into something fairly successful. But we are watching for opportunities out there that do come along from time to time. And look, certainly, if we are going to do something, once we have something binding in hand, we will let the market know.
Ben Lyons
analystAlright. Perhaps just a single follow-up on that point. I believe in the past we've discussed the possibility of a U.S. listing, maybe for a part of the lithium business, for instance, and that it's essentially under consideration — I'm just curious whether you've looked into whether you're actually in a position to issue a prospectus or equity in the U.S. under SEC jurisdiction while the company is still being investigated by the SEC here?
Christopher Ellison
executiveYeah. Ben, look, our timing on that was somewhat off. Had we begun 6 months sooner, we likely would have wrapped it up. That said, our timing was right. And I believe I mentioned some time ago that this is no longer a possibility. We aren't pursuing that route. As you're aware, lithium is in a pretty considerable downturn, and hopefully it's recovering. So that hasn't been a possibility for a couple of years.
Operator
operatorRob Stein of Macquarie has the next question for us.
Rob Stein
analystJust a quick question about those ongoing investments in the Utah hub. Could you speak to any kind of return protection strategies you're putting in place around that, given the CapEx investment in an asset that might be vulnerable to losses if iron ore prices were to drop? And I have a follow-up.
Christopher Ellison
executiveRob, we’ve been working in that central Pilbara area—I mean, I began all the way back at the start of 2,000 on manganese. And through plenty of commodity downturns, I mean, we’ve always kept that hub performing very well. I mean it contributes both in mining services and, obviously, in iron ore value. And at $100 a tonne, that operation, combined with services and iron ore, brings in roughly between 100 and 130 million EBITDA each year. So—and we also—we also need Lamb Creek to be able to support Iron Valley. We need to be able to handle that land. So look, we simply see that the hub up there has been valuable to us for a long time, and it has contributed for a long time, and we can manage it. Look, I remember a few years ago, we got—we went below USD 40 a tonne for iron ore, and we managed to keep that operation limping along. So I don’t think I could do it again at $38 a tonne, but I don’t expect iron ore over the next 5 years to fall anywhere near those levels.
Rob Stein
analystTurning to the lithium part of the business, and noting the CapEx, it wasn't light, but what I mean is that the CapEx didn't cover any major development at Mt Marion, such as a float plant or anything of that kind. Could you update us on how you're viewing development options at Mt Marion and Wodgina should lithium prices keep recovering, and against whatever sustaining needs arise over the next few years?
Christopher Ellison
executiveYes. So again, with lithium prices falling under $1,500, we essentially removed all the capital we had cut from the business. We simply took every dollar we could out of operations and capital spending. And until we see sustainable pricing around $1,500 per tonne or above, there are no real plans to do anything. Once our balance sheet is repaired, I think the priority would be Mt Marion. I'm getting a float plant in there. It's a relatively small capital outlay, and it looks like roughly an 18-month payback there. And the other thing it does at Mt Marion is take us from 2 products up to 5 products. So it makes common sense to do it, but we need to see 2 things. We need a better balance sheet, and we need to see long-term price sustainability.
Operator
operatorKaan Peker of RBC has the next question.
Kaan Peker
analystDuring Q4, I believe Mark noted that certain hedges were rolling forward, and that seems to have persisted. My sense is that in Q4, volumes sit at roughly 1 million to 1.5 million tonnes. How large is that figure going to become? And are those volumes primarily tied to the Pilbara Hub? I'll come back with my second question.
Mark Wilson
executiveRight now it's just shy of 3 million tonnes, and that reflects a mix of forward sales near 103 plus zero-cost collars with a ceiling at 107 and a floor at 100. We haven't specified where those tonnes would be sourced from.
Kaan Peker
analystSure. And more recently, a competitor of yours completed a low-cost facility for debt denominated in RMB. I'm just curious whether MIN has explored that possibility?
Mark Wilson
executiveYes. I know the deal you mean. The headline figure appears excellent. It really does. Once you convert it back into the corresponding currency, though, the price gap isn't especially wide compared with what it costs to do business in the U.S. market. So, stepping back from that specific question, we are always looking at various capital sources for this business. And I believe the debt market has a solid understanding of us, given that we've been in the U.S. since 2019. So we have several options open to us. We'll keep reviewing them as we proceed.
Operator
operatorMatthew Frydman of MST Financial has our next question.
Matthew Frydman
analystLet me start with my first question. Could you perhaps elaborate on precisely what falls under that capital allocation review you mentioned? I suppose what I'm asking is, what's included in the scope of what you're working toward there? Are you referring to setting guardrails or targets for the leverage ratios in the business, and so forth? And if that's the case, how do you view the leverage the business is able to sustain when you weigh the commodity exposures throughout the business against, perhaps, the more — the cyclical yet arguably more repeatable services earnings?
Mark Wilson
executiveI’ll take that question. Capital allocation is a major board priority, and we discuss it on a regular basis. Our intention is to return to the market with an update over the next few months. Broadly, though, that update will cover a review of the group’s financial policies and how we think about deploying free cash across the group.
Matthew Frydman
analystAlright, Mark, got it. And second, picking up again on what you said about the run rate Onslow managed in August and the fact that you're targeting completion of all remediation work on the haul rate in September. Just referring, I suppose, to that $200 million of deferred consideration — is there a window in which it could be achieved, say between August and November, before cycling season really ramps up? Is that what the business is aiming for? Or how are you thinking about, I guess, the windows for getting to that deferred consideration?
Christopher Ellison
executiveYes. Look, at Onslow our main aim is really—sure, we want that $200 million, there's no question. But honestly, what we're truly concentrated on out there is simply achieving sustainable operation. That's the work we've been doing since May of '24, when our goal was to bring in early cash flow. At this point every part of the project is running. The Haul Road will be handed over from that in mid-September, as we've stated. But August has really been a progression toward where we've been heading, with everything being commissioned starting at the mine site all the way through to the transhippers. Any of these major projects presents a challenge. And look, if you examine the past 15 or 20 years for large commodities that have come online, well, this one's ramp rate—in terms of build time and how fast we were able to turn it on—has been remarkably quick. But look, I anticipate the run rate we're achieving in August will continue into September and October, and it will be continuous operation apart from any weather events out there or factors beyond our control—whether, well, those are the things we keep an eye on.
Christopher Ellison
executiveAnd look, for many years in the Pilbara we didn't have any cycling at all. So the chance for us to capture that $200 million is — I mean, it's genuine throughout. I mean, I don't anticipate anything very out of the ordinary for the November and December cycle. So yes, we have another month to accomplish that, and then March, April, May, June after that. So look, I expect we'll get there, but the emphasis is simply on steady operation, goods, steady and safe operation.
Operator
operatorGlyn Lawcock of Barrenjoey has our next question.
Glyn Lawcock
analystChris, could I speak with you briefly about Wodgina and then about your guidance overall? I mean, Wodgina has 3 trains operational, with 2 of the 3 always running, and I was always thinking $250,000 per train, and then of course you can swap. Is the guidance simply conservative across the board? It just feels that way. Any comments you could offer?
Christopher Ellison
executiveNo, Glyn, I mean, look, given the situation we're in. I mean, we're both — and what you said is quite right. At any given time, 2 out of 3 trains are running, and we alternate them. But look, we aren't really going flat out trying to push a lot of product into the market. We're trying to make sure we're conservative on the product we sell when we're not making a lot out of it. And at the same time, we want to make sure that the budgets we put out in the market are achievable. I wouldn't say that I would — the budgets we got out there about what we're going to achieve. There may be a bit of upside with them, but we're operating with a commodity, and we're operating in the Northwest of WA. So I mean, we used our experience up there to be able to make sure we've got a budget that's pretty much on the money the Same with Mt Marion.
Glyn Lawcock
analystAll right, and staying with Wodgina for a moment. Pilbara, I believe, mentioned last week that it might secure floor pricing in order to restart — luggage, sorry — I mean, is there an opening here, since as I understand it Wodgina remains entirely uncontracted, so everything is being sold on spot? Have you considered the notion of floor pricing for Wagner, for pricing, as a way to perhaps bring Bought Hill back up, given that you've already hedged a portion of your iron ore? Is that something worth considering, or is it not even on your radar?
Christopher Ellison
executiveNo, Glyn, this is something we’ve been at for a very long time. If you go and set floor pricing, then what you’re really doing is giving a discount on your product in exchange for surety of sale. We’ve never required that. We have some very good lines out there. And I’ve always kept the entire lithium business floating. Look, some of the prices you’ve seen have been spiking for lithium over the last month. We’ve been right up there and achieving that. and say no, look, we simply don’t get any value from putting a long-term contract away with some clients. The only thing I want to talk about is discount.
Operator
operatorThe next person to ask a question is Kate McCutcheon with Citi.
Kate McCutcheon
analystJust on that—when exactly does that $200 million contingent payment land? Does it come on the first of November, assuming you stay above 35 million tonnes for another 2 months? Or does it arrive a month after that? And second, regarding the Northern Gateway Trust sale, is that still going ahead? Any thoughts on the size we might expect, and on timing?
Christopher Ellison
executiveMark, would you like to take that one?
Mark Wilson
executiveRegarding that $200 million, Kate, the criterion is a $35 million run rate across 3 straight months. Assuming that trigger is achieved, the payment will come within roughly a month afterward. On the Northern Gateway update, the process has moved along well. The trustee is handling it. Conditional contracts are in place covering a couple of the assets, and I'm confident our book value will be met or exceeded.
Kate McCutcheon
analystAll right, and I'd like to ask a follow-up question about Wodgina. Train 3 has been constructed and is being turned periodically. As you mentioned, is there a lithium price level that the JV would need to observe before considering use of that third train? And what would the ramp-up timeline be? Because my assumption is that you'd have to ramp up the tonnes you're mining from the pit. Is this a decision you can make, with more times potentially coming in 6 months? Or how should I think about that?
Christopher Ellison
executiveNo. Look, essentially, we’re operating 2 out of every 3 trains. So every train is functional. So turning on a train is immediate. We simply don’t want to add more tonnes into the market. We’re giving away the future on the business. And we want to be able to conserve those. And we’re also running the mine at what we regard as the optimum. So the lowest operating costs and trying to maximize the best bottom line we can out of Wodgina. And you probably noticed from the beginning of this calendar year, a lot of changes were made in the plant. We’ve optimized, and we’ve made some pretty good changes where we’ve increased the recoveries quite significantly. So that’s really been our focus. But keeping it at optimal operating cost is sort of where we’re sitting at the moment.
Operator
operatorThe next person to ask a question is Lachlan Shaw of UBS.
Lachlan Shaw
analystYes. Thanks for the follow-up. I wanted to revisit lithium once more. Chris, your remark about targeting $1,500 on a sustainable basis is really useful. I wanted to build on that: what do you think would be realistic when it comes to mobilization time? Clearly, the wage side would likely need more equipment moved in to raise the feed rate going to the plants up to 3 trains. And then Bald Hill is potentially a full remobilization. So how should we think about the timing of when they could return?
Christopher Ellison
executiveAlright, then. So where Wodgina is concerned, on the timing side, I mean, the bulk of the equipment is already there at the site. It's simply sitting idle. So realistically, at Wodgina it takes 6 to 8 weeks to get the proper mine planning in place, and after that 2 to 3. And that's roughly all that would be needed. At Bald Hill, once again, we have most of the machinery on site, and it's under care and maintenance. But if you were thinking about Bald Hill, 3 to 4 months to be able to remobilize down there, and then gradually start up 2 more must be on that to have everything running well.
Lachlan Shaw
analystYes. Okay. Great. I may just jump in once more with an additional one as well. So regarding Mining Services margins, a solid showing this year. I wanted to ask about looking ahead to '26 and perhaps further out, what's your thinking on that — sorry, how ought we to think about your Mining Services margins over the coming sort of year 2, 3 years out?
Mark Wilson
executiveI’ll take that one. I think the cleanest way to frame it is that for a good while now we’ve consistently described $2 a tonne as a sensible guide to performance. Clearly, there was some variability this year, given the ramp-up rates Mining Services managed to achieve through Onslow and also the effect of extra haulage costs, especially in the second half. As we enter this first quarter—and I believe I may have mentioned a bit of this in the quarterly—we have some haulage carrying over into that first quarter, but we also have some higher rates in the schedule for the first quarter. So as a general rule, I’d stay with $2 a tonne, thereabouts.
Operator
operator<<operator_script>> Our following question comes from Ben Lyons at Jarden Securities.
Ben Lyons
analystStarting with RDG and the Lucky Bay Ghana project, perhaps. My understanding is that the process is not yet finalized. However, assuming you succeed with the secured debt facilities and you take ownership of that project along with the related manganese assets, what would the strategy be — do you plan to put any extra capital into the project to make it more economic? And if not, what holding cost might apply if you shift toward a care and maintenance type of management?
Malcolm Bundey
executiveBen, this is Mal. Look, we have to work through the process first. Administrators are in place, and we're following that process. Obviously, it's been reported and it's in the administrator's reports. We've submitted a bid through docker, and we'll see how that turns out. Our plans will take shape as we learn the outcomes of that process. Really. And so we haven't fully turned our attention to it, because we haven't been in an operating position with any of those assets or the company. So we hadn't turned our mind to what that looks like yet. We have people beginning to formulate that.
Ben Lyons
analystAlright, and perhaps this one is for Mark. I see the indicative guidance regarding the proceeds on the carry line that ought to come through at a minimum over the coming 12 months? I haven't yet had the opportunity to review every account in detail. But maybe just a quick steer on the right direction, where we might see that showing up in both the P&L and the cash flow statement, please? And does that amount also feed into EBITDA for the iron ore segment?
Mark Wilson
executiveBen, the short answer is no—it has no impact on EBITDA. What it represents is the JV partner’s portion of the free cash generated by the mine’s operations, and then 80% of that free cash flow has to be paid out. When we modeled it, roughly $350 million is shown as current. We assumed about 95% for the year and production at a touch over 30%, just to give you a broad sense of how it is constructed or how we have assumed it. On the financials side, effectively it comes in as a—right now, it is a receivable, and it simply comes in as a contract against the receivable. It does not flow through the P&L.
Operator
operatorRob Stein of Macquarie is up next with a question.
Rob Stein
analystOn the services volumes guidance — sorry, the $315 million midpoint — if I strip out the Ono contribution, what should we expect from the rest of the business? Is it simply about 4x the employed tonnes to net that off, or are there some advanced movements in different parts of the mine plan that we should factor in for the year ahead?
Mark Wilson
executiveRob, I’ll take that one. For Onslow, it’s really just the 4 tonnes of activity. As you consider the guidance, what feeds into it is that we have some external wins and opportunities that we’ll begin and expect to convert. But we also have tonnes coming off from the prior year. For instance, at Mt Marion, we’ll do fewer tonnes. We’ve clearly placed Yilgarn and Bald Hill on care and maintenance. So all of those feed into that guidance number. I hope that answers the question.
Rob Stein
analystYes, it does. And my apologies — let me return to the Utah hub for a moment. It's quite helpful that the Onslow breakevens appear in the deck. I was simply wondering whether you could discuss the Utah Hub breakeven that you see on an all-in sustaining basis?
Christopher Ellison
executiveFor the central Pilbara, I believe we've indicated a figure of roughly $75 to $80 per tonne, and that's typically where it lands.
Operator
operatorThe following question is from John Campbell, representing the Australian Shareholders Association.
Analyst
analystChris, I’d like to get a sense of the maintenance timetable for the transhippers, since my understanding is that they have to travel to Singapore for that work. And I assume getting there and then returning eats up a fair amount of time. How often are they required to make that trip? Also, will #6 and 7 be delivered before the first one of them has to go?
Christopher Ellison
executiveYeah, John, every 5 years they’ve got to go in and draw the dock. So look, we have plenty of time for that. And we’ll probably — we’ll just take them one at a time. They get up there with the tag, and we’ll have 6 operating at any time, and the seventh transhipper is arriving around August next year, and that’s to handle any redundancy.
Analyst
analystHowever, regarding what took place over the course of the year involving those 3 nonexecutive directors who stepped down from the ethics committee, could you explain to us why they resigned?
Executive
executiveJohn, this is Mal. Look, I won't be speaking for the rest of the directors. I believe Justin Langer stepped down from the Board not long ago, and he provided his reasons for doing so. We are still moving ahead with refreshing the Board, which is what I intended when I joined, and I think you've seen 2 very strong candidates, and we're carrying that effort forward.
Operator
operatorThank you. We have no more questions. That brings today’s call to an end. I appreciate your time, and enjoy the rest of your day. If anything else comes up, please contact the MinRes team. You’re welcome to disconnect now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Mineral Resources Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Mineral Resources Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Mineral Resources Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.