NANO Nuclear Energy Inc. (NNE) Earnings Call Transcript & Summary
August 12, 2026
Earnings Call Speaker Segments
Matthew Barry
executiveThanks, and hello everyone this afternoon. With me today are Jay Yu, who founded NANO Nuclear and serves as Chairman and President, along with our CEO James Walker and our CFO Jaisun Garcha. Just a note that the press release issued today and the slide deck that goes with this webcast can be found on our website. Before we get into things, let me take a moment to cover the forward-looking statements on this call. Slide two lays this out in greater detail, but today's presentation includes forward-looking statements regarding NANO's future, and those are made under the safe harbor protections of the relevant federal securities laws; we want to caution you that actual results — including, without limitation, outcomes of NANO's microreactor development work, our vertical integration plans, customer acquisition, and other strategies and plans, timelines for hitting goals, and other matters tied to our future operations — could differ materially and adversely from what those forward-looking statements express or imply. The significant risks and other factors that might cause actual results to diverge from what our forward-looking statements describe are laid out in our SEC filings, among them our annual report on Form 10-K that we filed this past December, and we encourage you to review it. The forward-looking information shared today is accurate only as of today, and except where the law requires it, NANO takes on no obligation to update anything provided. With that said, I'll hand things over to Jay Yu, NANO's founder, chairman, and president.
Jay Yu
executiveThanks, Matt, and I appreciate everyone who's on the call today. To kick things off, I want to walk investors through what sets NANO Nuclear apart and why we think we're positioned strongly to create value within the advanced nuclear sector. Our strategy was deliberately structured around six elements that, in our view, will decide who wins commercially at scale. The first one is our technology. Kronos rests on high-temperature gas-cooled reactor technology, which has proven itself through deployments around the world spanning many decades. On top of that, the TRISO fuel Kronos relies on has gone through a great deal of qualification effort under the U.S. DOE's AGR program, which adds to our confidence that we're building on a mature advanced reactor foundation. Meanwhile, Kronos' improved safety characteristics — using helium as the coolant along with TRISO fuel — make it a strong fit for use cases that call for sitting close to customers, such as AI data centers, industrial applications, military installations, and remote mining operations. The second element is design maturity along with fuel flexibility. Kronos's high TRL is supported by significant historical investment across 10 years of development. Our confidence in how mature Kronos's design is comes from the NRC formally accepting the University of Illinois's Construction Permit Application for review, which makes NANO Nuclear the first commercially ready microreactor developer constructing a full-scale unit and one of just a small number of Generation IV reactor developers to get to this point. The design of our reactor also allows it to run on LEU plus fuel, which you can buy commercially right now, while keeping the option to use HALEU down the road with no redesign needed once HALEU becomes available and makes economic sense. Scalability comes next. In our view, success will come down to whether a standardized design can be manufactured both economically and at scale. Kronos's small modular architecture is meant to enable standardized manufacturing along with repeatable deployment. We anticipate this approach will offer one of the most obvious routes to gain from new accelerated licensing channels, such as Part 53 and the proposed Part 57, shorter deployment timelines, and economies of scale. Commercialization is fourth. Our initial full-scale prototype development at the University of Illinois is moving through formal NRC licensing, with a defined path to first power near 2030. Our commercial pipeline keeps expanding as well. Not long ago, we finished a feasibility study looking at the potential to deploy as much as 1 GW of power with BaRupOn. Simultaneously, we're pushing forward with talks involving a possible strategic collaborator and customer developing planned gigawatt-scale data centers both in the U.S. and abroad. Those talks keep moving ahead, and we foresee the possibility of reaching an initial framework soon that would name NANO Nuclear as their preferred nuclear technology provider. Alongside that, we're looking into strategic alignment mechanisms, which might involve milestone-based investments tied to specific commercial and project development milestones — something we think would create meaningful value for shareholders; the proposed structure is meant to align long-term interests and incentivize our shared success. On a separate track, we're continuing talks with a nuclear power project developer and an AI infrastructure company to jointly assess multiple projects. Finally, we're also seeing considerable interest from earlier-stage conversations with potential defense, mining, and industrial customers. We think these opportunities give us line of sight to several gigawatts' worth of possible commercial build-outs. Then there's vertical integration. In our view, one of the biggest hurdles the advanced nuclear sector will face across the next 10 years is delivering on a wider nuclear fuel cycle, and that's why we've made expanding our capabilities there a strategic priority. With our recently announced purchase of Secured Transportation Services, or STS, we've sped up that progress, since it gives us the means to move nuclear fuel as well as spent fuel. Already, our team has spotted ways to use STS's specialized know-how to reduce the risk around Kronos' development and our growth throughout the fuel cycle. Just as important, STS has shown a track record of profitability. Our team is eager about a number of meaningful chances to expand the business organically, and through one more M&A possibility that we are currently assessing; beyond that, we keep pushing forward on M&A and partnership talks aimed at fuel facility assets so as to further de-risk the nuclear fuel cycle. Finally, getting things done takes both capital and the right people. We closed the quarter with roughly $580 million of liquidity, which we believe gives us one of the strongest balance sheets anywhere among advanced reactor developers. That solid financial footing gives us the flexibility to move our first deployment ahead, while at the same time chasing strategic acquisitions and partnerships throughout the nuclear fuel cycle. Just as important, we've put together a seasoned team drawn from the DOE, the NRC, U.S. National Labs, the U.S. military, and advanced reactor developers. Our team has expanded a great deal over the last year, with our headcount rising to 85 employees and contractors as of the close of our third quarter, up from 31 a year earlier, and we expect substantial growth ahead. In our view, this mix of technology, financial strength, and industry experience has laid one of the strongest foundations in the industry for creating long-term value. Our team is looking forward to further progress and stays excited about both near-term and long-term chances to create additional value for shareholders; with that, I'll hand the call over to our CEO, James Walker, who will share more details on our progress and recent developments.
James Walker
executiveThank you, Jay. Within the advanced nuclear sector, NANO Nuclear has built a solid base, and throughout the third quarter we kept turning that base into concrete results. May brought formal acceptance by the NRC of our Construction Permit Application for putting the Kronos MMR into service at the University of Illinois Urbana-Champaign, which kicked off the official review. After that, the NRC stated it anticipates finishing its environmental assessment during Q1 2027, along with its safety evaluation during Q3 2027. Those anticipated milestones line up with what we expect: a review process wrapping up in 2027, which opens the door to starting initial construction work in the second half of 2027; meanwhile, multiple crucial engineering work streams are moving forward. We announced not long ago that we are working with Fortil, a consulting and engineering company known internationally, on an engineering collaboration aimed at advancing Kronos' fuel handling and storage system. For both our first deployment and the wider commercialization of the platform, that system plays a vital role. Additionally, we are moving ahead on an engineering collaboration with a different engineering firm recognized around the world, focused on Kronos' primary helium circulator. That firm brings decades of experience backing gas-cooled nuclear reactor programs, and this collaboration has now moved into the detailed design phase. Taken together, these steps show momentum across multiple critical path work streams. They help us mature key reactor subsystems, lower first-of-a-kind execution risk, and create repeatable designs for standardized commercial deployments down the road. A further notable area of progress this quarter was the ongoing build-out of our vertically integrated nuclear platform. As Jay pointed out, we closed the acquisition of STS in May. STS operates globally in nuclear logistics, transportation, and services, and it has a profitable track record. Boasting over 20 years of experience facilitating the movement of radioactive and nuclear materials, STS serves commercial nuclear customers as well as critical missions for the U.S. DOE and NNSA. By internalizing these capabilities, we can lessen dependence on third-party providers, speed up our expansion across multiple parts of the fuel cycle, and speed up future reactor deployments. Simultaneously, we have achieved solid progress moving forward on a number of synergistic acquisition and partnership opportunities spanning the nuclear fuel cycle. Among them are an additional fuel transportation business plus nuclear fuel facility assets. We anticipate the potential for more than one announcement in the months ahead, contingent on further diligence and closing conditions, with one position adding revenue at close, and another carrying more substantial revenue potential in or around the 2030 timeframe. The third major area of progress involved growing Kronos' commercial pipeline. This quarter, we kept moving our deployment opportunity with BaRupOn forward by finishing the previously announced feasibility study, which assessed a phased deployment of as much as 1 GW of Kronos MMR capacity. We consider this a key milestone, and we are pushing discussions toward launching the NRC licensing process. At the same time, we are advancing talks toward an initial framework with a possible strategic collaborator and customer to back their planned multi-gigawatt pipeline of data center projects. Assuming everything gets signed off, this framework might put NANO Nuclear in position as the go-to provider of nuclear technology. The specifics are still being negotiated, but in our view this framework — along with future collaboration — might considerably reinforce the route we're taking to commercialization, since it would link NANO Nuclear with a seasoned infrastructure developer whose record is strong when it comes to developing, financing, and carrying out large-scale projects. We're additionally looking at ways to bring interests into alignment via prospective investment into NANO Nuclear Energy, contingent on set commercial milestones that we think might generate considerable shareholder value. On top of that, we think this collaboration might serve as a significant endorsement of both our technology and the strategy we're pursuing to commercialize it, while giving us visibility into a deployment pipeline measured in multiple gigawatts, which might assist in speeding up Kronos' commercialization; we also entered an MOU alongside Supermicro to assess combining Kronos with Supermicro's platforms for AI servers and data center infrastructure, plus possible joint go-to-market possibilities and off-grid deployments aimed at next generation AI infrastructure. Getting involved this early lets us jointly examine how nuclear-powered data centers of the future might be engineered as integrated systems, instead of handling the power source and the computing infrastructure as two separate development choices. What's more, we keep pushing forward several opportunities both inside and beyond the data center market, which further shows how broad and how large the market opportunity is for Kronos. Along those lines, AFWERX — the innovation arm of the Department of the Air Force — recently chose us for an SBIR Phase I award, aimed at advancing the Kronos MMR for the U.S. Air Force. This newest award widens even further the set of opportunities we have with the Department of the Air Force, coming after the direct Phase II SBIR award for Joint Base Anacostia-Bolling that the company announced earlier, which remains on track as it moves forward. We turned in our fourth contract line item deliverable not long ago, and the four remaining deliverables should wrap up across the coming 12 to 18 months. Finally, we strengthened our already solid balance sheet further by bringing in roughly $26 million in net proceeds through our at-the-market, or ATM, facility. When the quarter closed, we were holding about $580 million in liquidity. All in all, the quarter brought substantial movement on every one of our main strategic priorities. Now I'd like to give some extra detail on our recent acquisitions of STS, the headway we've achieved since closing that transaction, and the opportunities we see for building long-term shareholder value. What we acquired with STS amounts to more than just a fuel transportation business. Past its existing operating business, its regulatory clearances, its skilled workforce, and its long-standing ties with customers, STS offers a strategic platform for broadening our capabilities throughout the nuclear fuel cycle, which helps further de-risk Kronos's deployments. Ever since it became part of NANO Nuclear, STS has kept proving how strong its platform is by backing a number of important DOE and NNSA missions, among them the successful shipment of HALEU from Japan to the United States, the removal of highly enriched uranium from Venezuela, and further domestic transportation campaigns in support of the U.S. nuclear industry. In our view, these missions speak both to how highly specialized STS's capabilities are and to the trust that key government agencies have placed in the organization. Turning to what lies ahead, we think STS is in a remarkably strong spot to gain from the nuclear sector's ongoing expansion. As more reactors get deployed, that should push up need for moving fuel and for services tied to the fuel cycle, and within this niche market STS stands among the recognized frontrunners. Already, beneath the NANO Nuclear banner, STS is pushing forward with efforts meant to widen what it can do, preparing for that anticipated expansion. Beyond hauling and logistics, STS adds strength to NANO Nuclear as well. Among the team are people who bring decades of know-how in backing this industry. In our view, that depth of expertise can help with running reactors down the road, while also deepening ties with important government bodies. Feedback from potential clients has likewise been heartening, with a number of them seeing our capacity to deliver a more unified offering as a real point of distinction next to competing reactor builders. From STS comes a thriving standalone operating company that we anticipate will keep producing a dependable revenue foundation, even as it opens up several paths toward substantial organic expansion. Simultaneously, we are right now assessing a bolt-on acquisition that in our view might considerably grow STS's skills, its geographic reach, and the revenue it generates. We're eager to provide updates on how things develop over the next several quarters. On that note, I'll pass the call along to our CFO, Jaisun, who will walk through the financial highlights.
Jaisun Garcha
executiveThanks, James. I'll give you a quick rundown now of how we did financially in Q3 and for the year-to-date period. With STS now part of NANO Nuclear, we've brought in a fuel transportation business that generates revenue and has shown a proven track record of profitability. During the first six months of calendar year 2026, STS brought in roughly $3.9 million of unaudited revenue, and that figure includes $200,000 from the May 22nd closing of the transaction through June 30th. Operating expenses came to $15.9 million, pushed up by greater G&A and R&D spending as we keep moving Kronos development forward, steer Kronos through the formal NRC licensing process, push ahead with work at the University of Illinois, and broaden our capabilities throughout the nuclear fuel cycle. As we anticipated, operating expenses rose compared with the prior year period as we scale up our engineering, regulatory, commercial, and fuel cycle workstreams. Our Q3 net loss came in at $10.1 million, versus $7.6 million in the prior year quarter. That increase comes from higher OpEx, partly offset by greater interest income thanks to our larger liquidity position. Year-to-date net loss came to $25.8 million, better than the $32 million in the prior year period, helped by substantially greater interest income and reduced equity-based compensation. Year-to-date net cash used in operating activities was $18.7 million, mainly a reflection of the year-to-date net loss, partly offset by non-cash equity-based compensation. Year-to-date net cash used in investing activities was $297.6 million, driven by our purchase of short-term investments of approximately $281 million, additions of plant, property, and equipment of approximately $10 million, and roughly $6 million tied to the STS acquisition. At the close of the quarter, we held $580 million in liquidity, up roughly $11 million from the prior quarter. That increase reflects approximately $26 million in net proceeds from our ATM program, partly offset by capital deployed to advance Kronos development, NRC licensing activities, and broader fuel cycle initiatives. We believe our balance sheet ranks among the strongest in the advanced nuclear energy sector, giving us a clear competitive advantage as we move toward our first-of-kind deployment. Several non-dilutive funding opportunities for the University of Illinois project could strengthen our already strong financial position further, and we believe those could meaningfully cut the capital required. All told, this liquidity profile not only puts us in a good spot to advance our first-of-kind prototype, but also gives us the flexibility to pursue value-accretive acquisitions across the fuel cycle while we keep advancing Kronos towards commercialization. We'll keep deploying capital strategically to de-risk Kronos development and commercialization, and prudently, consistent with prior successful value-accretive investments such as the acquisition of the Kronos MMR assets and STS. Overall, we remain confident that our financial strength puts us in an exceptionally good position to execute on our growth strategy. With that, I'll hand the call over to the operator for Q&A.
Sameer Joshi
analystHi there, good afternoon, James, Jay, Jaisun, and Matt. Nice work on the progress. Getting the CPA accepted was a genuine milestone, and the STS acquisition is a good fit for your strategy too. My first question: as the regulatory process moves along with the safety evaluation and environmental assessment, on the other hand, you mentioned you're working with Fortil and another engineering firm. Might there be any long lead items you'd need to order at this point so construction can begin in the second half of 2027?
James Walker
executiveLuckily, the early construction is centered more on items such as putting in the citadel. Picture a large underground concrete structure that the reactor will sit inside — technically, right when the construction period begins, we don't require any components related to the reactor. That isn't to say we haven't begun sourcing those items, and we're in vendor negotiations over pricing and delivery timelines and all of that. But the early construction isn't held up by those. As soon as we receive the approval and the turnaround from the NRC, the federal regulator, we'll move forward immediately with excavating the ground, then pouring concrete and installing steel for the portion of the project that will house the nuclear reactor. The remaining parts of the actual system, the Kronos system as a whole, include the thermal energy storage system, which is the solar salt. That serves like a battery, plus the adjacent plant, which turns that thermal output into electric. None of that involves nuclear at all. Many of those components are quite standard. Think turbine systems, solar salt — those don't even have to wait for NRC approval. We can start building those right away, and they're more off-the-shelf components. There's plenty we can do even before we procure components; but we do want to, by the time the approval comes next year, be in a position where we know where everything is coming from, what everything costs, and we have everything lined out in terms of the pathway to the full build-out of the reactor system.
Sameer Joshi
analystThat's good to hear and reassuring. Now, turning to the acquisitions you mentioned. STS is obviously completed. You talked about an adjacent acquisition, and perhaps one more. Have you set aside any budget, a specific figure, a dollar amount you plan to spend in 2026? Or would you rather stay opportunistic and strategic about it?
James Walker
executiveThere isn't a cap on how much we might spend on acquisitions, but we are extremely capital conscious. That matters, I think, since we don't want to pursue large acquisitions running into the hundreds of millions of dollars, even if those were to bring big revenue-generating businesses into NANO Nuclear Energy. Our focus has largely always been on acquisitions that give us in-house capability, which will help us roll out our reactor systems. Often, that simply means buying small companies; with STS, for example, I believe the initial payments in that deal came to roughly $7 million, plus some future payments for retention allowances. That's fairly typical of the other acquisitions we're currently evaluating. They're small in scale. The purpose is bringing in-house capabilities to us. The one possible exception could be a fuel facility we're examining. Yet again, with that fuel facility, there's no real acquisition cost. Our equity stake there would be earned by investing in the completion of that facility. So it all has to be very strategic. Every one of these acquisitions is, naturally, meant to support the mass rollout of the reactor systems. Still, we don't want to spend large sums on acquisitions. Revenue is clearly helpful, and it does reduce the company's risk somewhat, but it's about in-house capabilities. It's partly also about seizing the hugely expanding nuclear market. With that STS acquisition, we're already seeing all kinds of contracts far beyond what STS could ever solicit previously, because it required more capital backing, which we can now provide. So these small entities have expansion potential; but to answer your question concisely, no, we aren't seeking big outlays for big acquisitions.
Matthew Barry
executiveSameer-
James Walker
executiveThank you.
Matthew Barry
executiveI would-
James Walker
executiveGo ahead.
Matthew Barry
executiveOne more thing I'd mention: should we pursue acquisitions requiring a larger expenditure than what we've spent on deals completed to this point, we're quite mindful of that — as James pointed out — regarding the money going out the door. We're also, ideally, looking at a number of financing options to bring that down, be it government initiatives or alternative avenues for lowering that outlay. And beyond that, if bigger kinds of acquisitions came along, you could reasonably expect that spending to be spread across multiple years instead of being paid entirely at the start.
Sameer Joshi
analystGot it. Appreciate the context, and thank you. I'll rejoin the queue now.
Craig Irwin
analystEvening, and thanks for fielding my questions. I'd like to ask about how the project pipeline looks. From your prepared remarks, it's quite evident that the UIUC project remains on schedule, with construction kicking off before next year ends. You've disclosed a notably intriguing tie-up with Ameresco that, in my view, the market isn't fully valuing. Ameresco holds 8 enhanced use leases from the Navy, and right now they're pursuing leases from the Army, which hands them land plus access to straightforward permitting—or far quicker permitting than you'd get on commercial or non-military land—for power projects backing data centers serving both hyperscalers and the military itself. Publicly, they've discussed a near-term pipeline worth $10 billion. Of the $1.5 billion in bookings from the prior quarter, a very sizable portion genuinely originated from data center. As I understand it, the actual figure sits in the mid-20s over the medium term. They're eyeing a $20 billion medium-term power opportunity. Since they can execute faster and likely enjoy access to DOE and Department of Defense licensing routes for nuclear power, they might be among the most compelling customers out there. Could you perhaps elaborate on your ties with Ameresco? Have you held talks with them regarding possibly leveraging these alternative routes for construction approval, for plan approval, since these would be Department of Defense projects? They've mentioned 70% funded via third-party debt, and I believe there are major names lined up and vying for those slots. Is there anything you can share regarding your discussions with that company that would help people grasp the true value there?
James Walker
executiveSure. Glad to provide some background and color on that. What's difficult for NANO is that we're a technology company. We've got an excellent reactor system. Once we begin commercial deployment of the reactors, we'll be looking at dozens of sites and numerous reactors being deployed across many locations. That means plenty of components sourced from many suppliers and arriving at a single location; it's going to demand substantial EPC work. The earliest conversations with Ameresco centered on that engineering procurement and construction effort, and coordinating it, since it's a major undertaking in its own right, particularly given the potential scale of some of these operations we're considering. Ameresco, in my view, they're clean energy projects. When they look at things such as DoD, it's nearly comparable to how we're handling the Air Force and our Air Force contracts. The DoD is likewise pressing ahead, aiming to bring these systems into operation so that they can achieve energy sovereignty. That said, even for the DoD, these are fresh undertakings. They are quite familiar with naval reactor systems and aircraft carrier reactor systems, yet even this represents somewhat uncharted ground for them. So whether it comes by way of Ameresco's projects or by way of the Air Force, we still must complete that feasibility study analysis, much like what we are doing with the Air Force. I wouldn't claim that Ameresco's projects could speed things up for us enormously, simply because of what we already know about what must be done right now when it comes to supplying the information the military requires to feel at ease about installing reactors at their locations. On certain matters they do have to defer to the NRC, since these are new reactor systems. My sense is that even with Ameresco's projects, where they'll be examining putting nuclear reactors onto their sites, it remains — however you look at it — a fresh undertaking for the DoD, one where they'll need NRC assistance and partial support; they do gain from projects such as the UIUC project, the University of Illinois construction project, since they're able to watch it being built, they're able to watch the NRC work through the process, and that delivers added reassurance. They're currently at that stage where they're attempting to assess who the genuine players are here, because there are truly only a small handful on that kind of commercial path. They're narrowing that down as they become more expert at grasping this sort of advanced reactor industry as a whole. Not to make the answer convoluted, but essentially it really comes down to a factor of-
Jay Yu
executiveRight.
James Walker
executivethe standard licensing structures that have to be navigated to provide confidence, and there isn't much capacity to speed those up.
Jay Yu
executiveYes.
Craig Irwin
analystGot it.
Jay Yu
executiveOne more thing I’d like to mention — when it comes to Ameresco, conversations between us are ongoing right now. They’ve got a pretty strong nuclear-focused team over there, so we’re engaged with them on an active basis, and we’re evaluating a range of approaches together with them. To underscore your point, they’re exploring various segments, and nuclear is among those segments, plus there are synergies in that space, exactly as you pointed out; discussions with them about these opportunities continue.
Craig Irwin
analystThanks for that. My next question concerns Dioxitek, correct? Reports have circulated publicly that NANO Nuclear put forward a $230 million investment, arranged across two phases. It seems pretty clear that this didn't originate from you, yet it's sitting there in the public domain, so perhaps that widens the room — or the chance — for you to talk about this possible investment. I realize it was a proposal, that talks are underway, and that you aren't necessarily — I mean, other parties could end up winning the bid in this process. Could you perhaps offer us a bit of color, from where you sit, on the current state of things, and on how this might be a strategic fit for NANO over the coming couple of years?
James Walker
executiveSure; so yeah, that-
Jay Yu
executiveSure, I can give you a quick response on that. At the moment, our proposal is being reviewed, and we expect to share an update within the next few months, though we are not in a position to discuss it at this point. Obviously, our aim is to be vertically integrated. That would represent a significant accomplishment for us. As things stand, however, the review is still ongoing, so there is not much we can say about it.
Craig Irwin
analystGot it. I fully understand. Let me ask one final question, if that's alright. Finding individuals who possess nuclear know-how isn't simple, correct? The team at NANO Nuclear Energy has accomplished something impressive by attracting seasoned leaders, officials, and technical specialists from this field — individuals who bring many decades of experience, and there are lots of them. Could you discuss what your recruitment strategy looks like for the coming year? Should we anticipate that headcount growth will keep pace at a comparable rate to what has been showing up throughout the past year? To achieve the capabilities you anticipate and are preparing for regarding NANO Nuclear Energy's wider capacity and ability to execute, is it necessary for us to witness the workforce size doubling over the medium to longer horizon?
James Walker
executiveThat's actually a solid question, since NANO Nuclear Energy clearly has evolved from being a smaller enterprise into one of medium size. Along with that shift came a significant restructuring of the way we truly operate and bring our departments together. Our technical group definitely requires additional growth, and essentially we must achieve that so we possess the internal framework needed to move a reactor initiative ahead from sophisticated design right through to a genuine, physically functioning reactor system. As it happens, I'm speaking today from the University of Illinois. Even today's discussions with the chancellors and deans entail a considerable volume of staffing and engineering effort being needed. Within just the coming few months, a substantial increase in technical personnel will likely become apparent as additional individuals join us. Across the following couple of years, that growth will extend much further. Such growth is absolutely essential, and it pertains solely to the reactor system. Further acquisitions are going to add more staff across other sectors of the nuclear field too, transportation included. Regarding the other domains we've already mentioned, such as the fuel supply chain, we are likewise pursuing further hiring in those places. NANO is growing at a very rapid pace. Still, I believe the crucial thing is to remain highly judicious throughout the recruitment effort, since hiring too many people without having the organization structured properly — with the right reporting lines — can rather swiftly lead to staff being misallocated and lacking clearly defined responsibilities tied specifically to NANO's mission; we're attempting to handle this as cautiously as possible, yet there's pressure on us to scale up as fast as we're able.
Nate Pendleton
analystGood afternoon, and thank you for allowing me to ask a few things. During the remarks you prepared, you mentioned moving talks forward on a framework alongside a strategic collaborator and customer tied to a multi-gigawatt pipeline. Could you shed some light on how a structure of that type might be arranged, what it might open up on the commercialization side for your company, and perhaps what drew that customer toward NANO in particular?
James Walker
executiveCertainly. So far we have not made a large amount of detail public, though I can talk at a fairly general level about the general framework that has been established — or rather, that is currently being established — with this major partner. They build many data center campuses, and over time they want to incorporate NANO systems into those campuses. On their side they would bring items such as campus financing and power infrastructure, while NANO would bring items such as the reactors, the fuel, licensing assistance, and operational know-how. Our approach to structuring this involved examining the way other firms have put together PPA agreements. A large number of those fall short because they do not demand any investment from the prospective customer they intend to serve. That leaves a certain amount of fragility, since any non-binding arrangement essentially says: if you construct a reactor system and power costs this amount, then fine, we will purchase it. Should that requirement not be satisfied, we carry no obligation. In my view, that model is inadequate for the way reactor companies will need to successfully market and deploy their reactor systems. Under the structure we are putting together, the partner in question would be able to obtain equity grants and warrants in NANO Nuclear Energy, and would also gain the ability to put tens of millions — possibly even $100 million — into NANO Nuclear Energy as development and reactor purchase milestones get reached. That makes for a highly motivating arrangement in which, for example, even NANO Nuclear Energy itself might invest in the nuclear data center project. That would let us hold equity in that position. Once nuclear construction truly gets underway, it could produce additional revenue for the company. In this manner, we become more tightly tied to the technology partner, and that shared level of investment lowers risk on both sides while giving each of us a path to double-dip, in a sense, into the ability to generate revenue on both sides. That kind of synergistic partnership is basically the goal behind this new framework we are rolling out for Kronos together with the data center partner.
Matthew Barry
executiveAnd I want to jump in here and provide a bit more context too. The possible partner we're discussing is a worldwide infrastructure investment and development company that has a track record of constructing, holding, and running major infrastructure ventures across the globe, and they anticipate that expertise will carry over effectively to their bold intentions regarding gigawatt-scale AI industrial campuses both in America and abroad. So, as James pointed out, we're nearing completion of an initial framework in which NANO Nuclear Energy might serve as their favored supplier of nuclear technology; this would have a defined structure. Naturally, James mentioned observing certain difficulties with various kinds of contracts, be it power purchase agreements or otherwise; this one could be set up somewhat differently since this firm would aim to buy NANO Nuclear Energy's reactor. Because of their background with these sizable infrastructure endeavors, their skill at finding sites, securing power, and essentially carrying these out, they are highly capable, and they're also skilled at obtaining financing for them. They excel at every aspect of that, which would dovetail nicely with what we offer, and so in our vision they would acquire our reactors. Yet, as James pointed out, there could be room for mechanisms such as options allowing a possible equity stake in that nuclear entity that would be vending the electricity, which is genuinely compelling. Finally, as James pointed out, I believe the possibility of an arrangement involving some degree of investment into NANO not only indicates possible extra funds down the road, but also indicates a certain seriousness about this, along with a degree of, I'd say, faith and assurance regarding NANO Nuclear and how advantageously placed we are as the inaugural microreactor developer constructing a complete prototype to seek formal NRC licensing, and clearly capable of obtaining fuel that is available on the market right now, plus possessing a design that has drawn considerable investment. I think it likewise indicates assurance in NANO as an enterprise. Another key point is that, considering the possible intended pipeline and the potential multi-gigawatt chance for NANO, I think it could truly speed up our path to commercialization too, and clearly the fact that it involves a trustworthy partner, I think, renders it quite significant as well. I hope all of that is somewhat useful.
Nate Pendleton
analystFor sure. That sounds quite thrilling. I'll keep watching for the details. So perhaps as my second question, returning to what you said earlier about the supply chain, fuel availability is often one of those essential path items that many people have their eyes on at this point. Could you give us an update on where things stand in your talks with commercial enrichment suppliers and TRISO manufacturers? How does that availability shape up given your commercialization schedules at UIUC and past that?
James Walker
executiveI believe this is a genuinely vital question for all reactor companies right now. See, discussions with enrichers and fabricators are quite distinct from one another. Regarding enrichment, I think our major edge over nearly all of our rivals comes from the fact that we're able to use low enriched uranium, meaning fuel that is actually producible at present. Firms such as Urenco — we've already begun talks with them regarding their ability to supply the enrichment we'd require for a mass rollout of systems; that's clearly separate from the University of Illinois project, where we're evidently obtaining the fuel needed for that first of a kind initial reactor system. There are several fabricators on that side whom I'll get into shortly, but the enrichment piece fortunately works in our favor; so, once HALEU becomes available, there are multiple companies we're already in discussions with, organizations such as Centrus, that do plan to produce HALEU fuel; we'll take that fuel, and we'll be capable of refueling our reactors with no modification; using that HALEU fuel, that will permit longer stretches between refueling. The benefit is we want to reach the market soon. We want to reach the market sooner, and being able to actually use enrichment companies that require no site amendment, no license amendment to produce our fuel is a significant one. Those discussions, thankfully, have been quite positive. The capacity is there to do that, and the other reactor companies are looking at using HALEU. They aren't having those discussions with existing enrichment companies since they wouldn't be able to source their kind of fuel from them. So, regarding the fabrication side, the intriguing aspect here is that there are new entrants in this market. Everyone's likely acquainted with BWXT. They've been producing TRISO for many years already. They're now seeking a commercial arm of that venture in which they'd set up a Category II site, mainly because their Category I site generates far too much overhead to create a competitive product; then there are organizations like Standard Nuclear partnered with Framatome and even TRISO-X with the subsidiary of X-energy. The good part is that as more and more participants enter this space, we're in a favorable position to negotiate and secure the best prices. At this moment, we're in discussions with every single party I named, and our aim is to secure agreements that will last for the long term. When it comes to producing the fuel required by the first-of-a-kind reactor system, that manufacturing capability is already in place. Meeting our schedule for getting that fabrication completed doesn't concern us, since both the capacity and the know-how exist today. Looking ahead, though, our longer-term approach may shift somewhat, particularly when we consider larger bulk loads and the growing volume of reactors produced as time goes on. It's possible that some NANO component would still need to be brought online down the road so we could produce particular fuel elements, such as the SCM our fuel requires; perhaps we'd prefer deeper involvement there, setting up joint ventures in that area as a way to reduce long-term risk. What matters is that these are future considerations, in my view, as we seek to de-risk the large-scale deployment of reactor systems. For the first of a kind, things are fine on both the enrichment side and the fabrication side. Our attention, I believe, has already moved toward 2030 and the years after, where we want to reach a point of hitting that deadline and being able to mass-produce reactors along with fuel made at mass scale.
Craig Shere
analystThanks, and good afternoon. I appreciate you taking my questions. On an earnings call devoted solely to the SMR industry, one participant made the case that most deployment opportunities involving both electricity generation and heat applications could just as readily rely on 400 to 450 degree fast reactor designs as on high temperature gas cooled reactors, and that HTGRs are truly the best fit only in perhaps a handful of specialized niches. Our own approach has been to stress HTGR differentiation more forcefully, citing X-energy's furthest-along deployments with Dow, and noting that NANO Nuclear Energy in particular has a large number of prospects — spanning Korea, the Middle East, and those distant Canadian off-grid markets in cold climates, whether they be communities or mining sites. Can you speak to how meaningful that elevated temperature operating level actually is, particularly when you put it next to fast reactors using metallic fuel?
James Walker
executiveAbsolutely. To give a bit of technical background — and luckily my training in nuclear engineering allows me to tackle this to some degree. What we should understand about what was said concerning high temperature gas reactors is that these have seen deployment previously. Quite a few have been put into service around the globe, and the way they operate is something people know well. The only genuine knock against them concerns low capacity factors, because bringing power up and taking it back down could take a considerable amount of time; in industrial settings where demand may swing, that might not fit well. With advanced reactors like the ones we build, you use a solar salt loop for storing energy. The reactor itself is able to keep producing at a steady rate, while the thermal energy storage side is what lets you ramp things up or down and handle huge swings in demand. That design came directly out of the operating record, which is where we got that insight. But when you put fast reactors side by side with ours, the problem is that no one has ever managed to deploy them on a commercial basis. If I were to try, just speaking off the cuff, to actually get a fast reactor running, you would require a highly enriched fuel core at the center, and that would mean either HALEU-type fuel or some mixture involving plutonium. The issue with each of those options is this: first, HALEU simply isn't obtainable, and it could remain unobtainable for quite a while. Beyond that, letting a business in the commercial sector manage any plutonium isn't permitted either, and doing so would additionally call for modifications to the law. Were you forced to pick one or the other, right now you'd pick a high-temperature gas reactor rather than a fast reactor every single time, particularly considering that it has no track record in operation and no commercial rollout. There's another advantage for high-temperature gas reactors in industrial settings, especially when you pair them with thermal energy storage: they generate a large amount of heat, which makes them a great fit for foundries, and they don't need fuel that simply can't be obtained — it's obtainable today. On the fast reactor side, bigger is better. Why? Because you have a significant neutron flux and you're not moderating it. The term "fast reactor" refers to fast fission taking place as a result of the fission event. You increase core density by using things like uranium-238, which isn't very fissile, but if you have enough neutron flux, you can still drive that fission reaction. On a small scale, though, that's hard, so a large reactor system is required. If you're building a huge reactor system to serve the efficiencies of a fast reactor, you're already constraining how flexibly you can deploy it, since you can't make those units as small, as mobile, as portable, and as modular as a high-temperature gas reactor allows. The strategies are quite different. My view is that if you placed me in a fast reactor company right now, first, I would need to examine the fuel immediately and attempt to devise a solution. Second, I would be aiming bigger, scaling up almost right away. If you claimed fast reactors hold an edge over high-temperature gas reactors regarding thermal output for industry, I think you would be cherry-picking your information. That argument is very hard to sustain unless you're being extremely selective.
Craig Shere
analystThat's quite useful. For my follow-up, a portion of this was already addressed during your replies regarding a possible strategic developer partner arrangement and the choice between fee-based income and keeping some equity stake. What interests me, though, is the push-and-pull between those options throughout all your business opportunities; on one side we have the Oklo ownership PPA structure, and then there are several others — X-energy, Newcleo, Terrestrial Energy — leaning toward a fee-based or fuel sales approach. I understand you're amenable to either, and that in the end the fee-based route could account for the vast majority of deployments. Yet is there a geographical split where, say, you'd be more inclined to deliver services rather than hold ownership abroad?
James Walker
executiveThat's a really intriguing thing to ask. In fact, amusingly, it connects back to your earlier question, since we're seeing considerable interest from nations such as South Korea, and much of what they want centers on industrial heat for manufacturing, given that they lack the same availability of gas, coal, or oil that America has or that other nations have. To de-risk their own heavy industry over the long haul, they view nuclear as the answer. Since they see nuclear as the answer, I believe there's greater appetite there for being able to deploy these reactor systems at scale. Within that there's somewhat of a blend between those who want to own the systems — meaning you wouldn't need to stress over long-term reactor payments, only covering servicing, maintenance, and refueling. Even so, I'd maintain that's a minority, even when measured against simply paying an agreed monthly or quarterly contractual price for power, because many of these industries, despite being heavy industries seeking to de-risk their long-term security, remain less keen on owning and operating a reactor and bearing responsibility for it. They're still glad to make capital investments in these projects, but in the end they want the responsibility to rest with someone else, while they simply receive that long-term de-risking power.
Jake Sekelsky
analystHey everyone. Appreciate you fielding my questions. Coming back to STS and that roughly $7 million of revenue from last year, could you give us some sense of how we ought to frame that as we look toward 2027? I'm curious whether you intend to grow that business in the near term, or whether it makes more sense to see it as a supporting operation that locks in fuel transportation?
James Walker
executiveIt's both, actually. From the very beginning, this company has always kept a sharp commercial focus. Even at inception, we were asking ourselves how we actually get reactors deployed out there. It quickly became obvious that this is a highly specialized industry. Moving yellowcake to a conversion facility, uranium hexafluoride to enrichment, enriched uranium hexafluoride to deconversion, deconverted fuel to fabricators, fuel to a reactor — each and every one of those steps demands some degree of transportation capability. Once we saw how few participants existed in that space, and that as advanced reactors moved closer to deploying their reactor systems, capacity there would be squeezed considerably, we understood we needed to pursue a transportation capability and keep that ability in-house, so we wouldn't find ourselves stranded at that juncture. The upside now is that since this will be a major growth area, we can expand that business enormously. STS is an incredibly expert company, though their experience leans more toward the back end of the fuel cycle. We're evaluating acquisitions on the front end of the fuel cycle to complement what they do and give us a more holistic business capable of doing everything in the nuclear industry. First, for us internally, but second, it also unlocks that ability to grow that business enormously this decade, even before the reactors are actually out there. That said, yes, it did start as a de-risking operation for the deployment of reactor systems, but we see the massive potential for business to be generated through the growth of that industry.
Jake Sekelsky
analystAll right, that's useful. Now, as a follow-up regarding M&A possibilities — obviously you're not able to get into details, but could you perhaps sketch out, in general terms, which portions of the supply chain you're focusing on, and where you see the greatest potential when it comes to vertical integration?
James Walker
executiveYeah, definitely. Jay and I, while we were growing this business, recognized quite early on that fuel supply would be a huge problem, purely due to underinvestment across the prior decades in strengthening it. As additional reactors come online, the pressure on that only grows tighter. So for that reason, we've pursued highly strategic investments in areas such as — Sayless Technologies, to give one example, which is a related transaction company — and it focuses specifically on enrichment. This was formerly Cameco Tech, which delivered fairly solid results during the 1990s, and was likewise shut down simply because inexpensive Russian material could be obtained. Holding that partnership amounts to a strong call option, should they succeed in their efforts on the enrichment side alone. On either side of that, we're currently evaluating both conversion and deconversion projects. One of them came up earlier during today's call, but we're eager to lock that down, finalize those contracts, and build the in-house capacity to govern particular segments of the fuel supply chain. This isn't only about de-risking our reactors — it will also be an enormous growth area for our own company in the years ahead. Everybody will require fuel. Regardless of which type of reactor gets built, that fuel supply will be needed by all. Be it a fast reactor, a molten salt design, or a high temperature gas reactor, having some degree of control over the fuel supply chain is going to prove essential if you want to manufacture reactors at mass scale. Many of the acquisitions and investments we're currently making revolve around those specific areas, in order to de-risk. I'd say mining isn't so much the focus, though the yellowcake industry does exist to an extent we feel at ease with — we're able to source material whenever needed — but past that point, heavy industry and heavy infrastructure will be required.
Jeff Grampp
analystYeah. During the prepared remarks, you brought up a few possible non-dilutive funding opportunities that might assist with financing the University of Illinois deployment. I was just hoping you could provide a bit more detail on what sorts of opportunities those are, and whether there are any kinds of ranges for the quantum of capital that might be available to help fund this. Thanks.
James Walker
executiveSure.
Matthew Barry
executiveHey, Jeff.
James Walker
executiveOh, go ahead.
Matthew Barry
executiveRight, absolutely. Jeff, let me jump in on that quickly. We're looking at a few different possibilities, I'd say. For instance, investment tax credits. The project at the University of Illinois stands out as fairly distinctive, since our initial unit is being constructed adjacent to the Abbott Power Plant at that location. For that particular project, there could be a base 30% ITC, and on top of that, possibly an additional 10%. We're also assessing energy community bonuses — that would be the first one. Beyond that, we're clearly looking at DOE programs that might cover part of the fuel costs, plus other avenues, whether through our collaborator on this effort, the University of Illinois, or the State of Illinois, to potentially provide backing. And of course, because this is a research reactor, we avoid the NRC licensing fee. That's something we've taken a lot of pride in — being very deliberate when it comes to capital allocation. But yes, we're quite enthusiastic about these additional funding possibilities too, which could meaningfully bring down the capital cost of the project.
Jeff Grampp
analystUnderstood. I appreciate that. Turning to my next question about BaRupOn, could you provide a little more detail on that project? I realize you're not able to comment in too much detail on their behalf, but a possible licensing application came up in what you said. Do you have any early guesses as to when that might happen, and what are the biggest factors that determine when this project moves a bit closer to maturity?
Matthew Barry
executiveHi, apologies, Jeff. Would you mind saying that again? My apologies. A piece of it got cut off.
Jeff Grampp
analystYeah, sure. That was about BaRupOn and the possible licensing application you mentioned. I'm just curious whether you have any early estimates for when that project might be ready to file a licensing application, and which factors determine that possible timing.
Matthew Barry
executiveSure. James actually just got cut off, so I can answer this quickly. Obviously, we finished the feasibility study there; we're excited about the chance with BaRupOn and to keep engaging in discussions with them. Like we said in the prepared remarks, we're evaluating the start of the licensing process, evaluating project timelines, and working toward early-stage product development activities. Right now, we don't want to give a definitive timeline for any of this, since discussions are ongoing, but we are clearly talking about initiating the licensing process. I think, obviously, given where we stand with the University of Illinois project, we still have a few years and time is on our side. But obviously, we would aim to move as quickly as possible. Hopefully in the coming quarters, we'll have more updates there.
Adam Kelsey
analystFantastic. Thanks. A lot has already been covered, so I'll keep it to a pair of brief questions. I realize the NRC process came up earlier, yet clearly it's a significant short-term catalyst for the share price. What I'd like to know is whether there are any near-term markers or checkpoints that can be seen between the big milestones, which would show that the NRC process—or that process—is still tracking to plan.
Matthew Barry
executiveHi, Adam. Right. A few separate milestones, I'd say, are what we're assessing. Per what the NRC released publicly, an environmental assessment lands in, I believe, February 2027, according to the timeline they published, and then a safety analysis is of course scheduled for September 2027. Of course, those aren't the sole two major milestones. Looking at this review, it's iterative in nature. Audit questions are being worked through right now—we get questions from them, we send back answers—to tackle the areas where the NRC wants greater completeness and improved understanding. The two major milestones I just mentioned are among the biggest ones; though as I said, this is an iterative effort, and we'll of course continue our engagement with them. In the end, as we said during our prepared remarks, the schedule the NRC released matches what we expect for starting construction in this year's second half. As has been observed with certain other Construction Permit Applications involving other public peers or private peers, there may hopefully be a chance to even shorten that licensing schedule relative to what the NRC has publicly set out.
Adam Kelsey
analystGreat. Thanks. Is there anything more you can tell us about how much capacity their people have, or what they're putting first?
Matthew Barry
executiveFrom what our NRC licensing team has told us in our internal discussions, nothing about staffing has come up as a problem. My sense is that we keep talking with them fairly often. So far, I don't believe we've run into a single case where staffing got in the way of continued engagement with them; as I said before, we've been working with them quite actively since June, responding to some of their audit questions and that sort of thing. In fact, we've been holding weekly meetings with them on an ongoing basis, and adding other interactions when needed to resolve whatever gaps come to light. So, yes, the dialogue with them has been quite constructive up to this point.
Sherif Elmaghrabi
analystHi, thank you, and good afternoon. I'll start with my first question. STS fits quite well alongside certain efforts you're already involved in on the fuel side, and you've mentioned how you may seek to expand your fuel presence. Regarding M&A and Kronos, what's your thinking on strategic possibilities that could assist in getting Kronos constructed and brought to market?
Matthew Barry
executiveOf course. Sherif, clearly, as we consider bringing Kronos to commercialization, that involves numerous dimensions. I'd say the purchase of STS, in my view, truly adds a few essential elements. The team brings many decades of expertise backing the industry. They actually employ individuals with backgrounds running reactors. As we consider possessing such skills internally and even consider certain projects we currently have, and we intend to construct smaller-scale mock-ups of Kronos at our Oak Brook demonstration facility and are in fact moving those plans forward. Retaining this know-how inside the company can aid us in a number of these efforts, whether it's clearly their operational background, but also some of these other efforts. And then clearly, fuel is essential for bringing future commercial units online, but clearly even our first-of-a-kind unit and clearly assessing DOE programs. I'd say STS holds strong ties not just with national labs, but also with the DOE and the NNSA. We believe certain of those ties too might ultimately prove advantageous to us. Finally, clearly STS possesses know-how not just in managing spent fuel, but also in moving fuel throughout the cycle. I believe all of this know-how can not just assist us with upcoming commercial rollouts, but even simply pushing forward Kronos's development, having this extra know-how inside the company can empower us across each of these domains, to assist us across each of these domains.
Sherif Elmaghrabi
analystThank you, Matt. Now I have a process-related question that I think would help me grasp things better, and it may actually be one for James. Suppose I get a Kronos reactor up and running using conventional fuel, and afterward I move it over to HALEU — does that require any reworking of the power plant, or is it simply a case of putting in the different fuel?
Matthew Barry
executiveSadly, James was removed from the call, but what we understand, drawing on discussions we've had with the technical team, is that we truly could just plug and play, taking out the LEU plus fuel and swapping in HALEU fuel.
Sherif Elmaghrabi
analystAlright. That's really useful. Thank you, Matt.
Matthew Barry
executiveA redesign wouldn't be necessary, in my view — that applies to the Kronos MMR design, I'd say. What matters a great deal there, I believe, is our ability to accomplish this absent any redesign, and it genuinely gives us the adaptability to utilize fuel that is commercially obtainable at present, and then, at the point when HALEU becomes obtainable and makes economic sense to deploy, we'd essentially be able to plug and play.
Sherif Elmaghrabi
analystYeah, that's nice to hear. Thanks once more.
Chris Souther
analystHey, everyone. Appreciate you fielding my questions. It's great to hear about some of those advanced talks with the project developer and the AI infrastructure company. Do you think we could get more clarity on that during this year? I'm just trying to get a baseline, I suppose, on how intense those conversations are, and how we see them developing from here over the near term.
Matthew Barry
executiveYeah. Thanks for that, Chris. I believe there are two pieces here. Clearly, there's the opportunity involving the possible strategic partner and data center developer for the multi-gigawatt pipeline they have planned. I'd say we're enthusiastic about the possibility, and we've been moving those discussions forward. I'd say in the near term, what to watch for would be — and clearly there's no way to promise timelines on any of it — but I'd say a possible framework agreement soon that lays out the possible relationship we talked about. That would clearly cover possible items such as milestone investment opportunities tied to key value-creating commercial milestones. So at first I'd watch for a framework agreement, and then clearly after that we'd aim to clearly make far more headway on more definitive agreements, whether that's items such as joint development agreements for particular sites. I think there's a number of ways we've envisioned this at this point in time. There's a number of development milestones, but before possible milestones tied to actual firm commercial purchase orders. So I think there are potentially a number of development milestones, whether it's, as I said, joint development agreements, securing a site, kicking off the NRC licensing process, doing items such as site characterization and drilling that can clearly show a strong partnership and progress being made before firm purchase commitments and more definitive agreements. So I think that's how to view that one. Separately, as we pointed out in our prepared remarks, we're assessing possible opportunities with an AI infrastructure company plus another nuclear project developer. This could potentially be us assessing joint opportunities among the three parties, which I think, given that these two companies are quite credible and each brings their own unique experience in the space, is something pretty exciting. So I'd say watch in the near term potentially for items such as an LOI or things like that there, assuming we can keep advancing discussions.
Chris Souther
analystUnderstood. That's really useful. Perhaps just how should we view you folks getting into the NRC process, plus the construction coming up, as catalysts for customers who want evidence of execution and reduced risk for future commercial builds. Are you noticing more inbound interest or credibility on your side about being able to join that process with an actual project here that you'll begin building essentially 12 months from now?
Matthew Barry
executiveYes, Chris, I can say the answer is definitely. We've received direct feedback once we filed the Construction Permit Application and it was accepted for review; we've received direct feedback from a number of potential customers for a number of opportunities we're pursuing, that they see NANO as highly credible, simply because we truly are the first, as we mentioned before, microreactor developer constructing a full-scale commercial unit. Well, technically it's a research reactor, but it will be a full-scale 15-MW electric unit. Simply from that alone, considering where we stand in the licensing process, it's seen very favorably. We've received that feedback. In addition to that, we've also received direct feedback about the acquisition of STS and having the internal capabilities not just to move the fuel, but also to have a clear plan for spent fuel and to have personnel in-house who possess those capabilities too. So yes, it's something we're quite excited about. We've already observed, I'd say, rising interest, whether from mining companies or even military-related opportunities. There's been specific mention of the fact that we're in formal NRC licensing, and there seems to be clearly a direct path to a commercial license related to that a commercial license will be very easily achievable once the University of Illinois project, we get that operating license. So, yes, I think we're quite excited about our progress and some of these opportunities.
Jay Yu
executiveOnce more, I'd like to express my appreciation to all of you for being with us on this call today. Your ongoing backing means a great deal to us, and our enthusiasm regarding what lies ahead for NANO Nuclear has never been stronger. We're eager to share further developments and news across the next few quarters. Enjoy your evening.
Operator
operatorThanks, everyone, for joining in. That brings today’s teleconference to a close. You can now hang up, and I hope the rest of your day goes wonderfully.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete NANO Nuclear Energy Inc. transcript — plus 133,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to NANO Nuclear Energy Inc. earnings transcripts and 133,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in NANO Nuclear Energy Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.