Good morning, everyone, and welcome to National Grid's half year results presentation. I'm Angela Broad, Head of Investor Relations, and it's wonderful to see so many of you joining the call today. First of all, may I please point you toward the cautionary statement at the front of the pack. As always, John and Andy will take part in a Q&A following the presentation. <<operator_script>> All of today's materials can be found on our website. And of course, if you have any further queries after the call, please get in touch with me or one of the IR team. So with that, I'd now like to hand you over to our CEO, John Pettigrew. John?

John Pettigrew

executive
#2

Thanks very much, Angela, and good morning to all of you. We appreciate you being with us today. As usual, Andy Agg is here alongside me. And after we've each gone through our presentations, we'll naturally be glad to take your questions. As you're aware, back in May we refreshed our strategy and set out the steps we would take to establish National Grid as the leading pure-play networks business. That represented the start of a thrilling new period of expansion, with unparalleled visibility on roughly GBP 60 billion of capital investment across our networks during the coming 5 years, plus clarity on financing stretching well past that horizon. During the past 6 months, the speed of transformation in our sector has carried on, and so has the thrilling momentum inside National Grid. We wrapped up the GBP 7 billion rights issue successfully, putting our balance sheet in position to pursue this growth rapidly. We're making good progress on our key capital projects, lifting investment to a record GBP 4.6 billion during the first half. Within the U.K., building work has already begun on 5 of our ASTI projects. Meanwhile in the U.S., regulated CapEx rose 20% versus the prior year as we've carried on with our $4 billion Upstate Upgrade program. And our policy priorities have kept advancing too.

John Pettigrew

executive
#3

We're encouraged by how the new U.K. government has started out on its energy priorities. As you'll have seen, the National Energy System Operator, or NESO, came into being on the 1st of October, after we sold the Electricity System Operator for GBP 630 million. They've also set up Mission Control to help speed up progress on the energy projects that are needed for 2030. And at the end of this year, they'll finalize their action plan for reaching that goal, factoring in the advice NESO laid out this week. NESO's report is a welcome milestone on the road to clarity about the steps required to deliver against this goal, and we'll keep playing our part alongside the government, the regulator and the industry. The government has also asked NESO to develop a Strategic Spatial Energy Plan, setting out where energy assets need to be built and when, in order to meet the country's 2050 net zero goals. We're pleased that the King's speech in July included the expected legislation to reform the planning system. That will help speed up delivery of critical infrastructure, something we've long been advocating for. In the U.S., policymakers in Massachusetts and New York are continuing to advance plans to align economic growth and system reliability needs with their clean energy and climate goals.

John Pettigrew

executive
#4

Both states see the value in holistic, long-term energy planning, and it's encouraging that work on that has now begun. On the regulatory side, we've settled new rates for our Downstate New York gas business as well as our Massachusetts Electric business, which gives us still more visibility into our investment plans. Then in the U.K., Ofgem's release of the sector-specific methodology decision represented the next stage of the RIIO-T3 regulatory process. We also hit another key strategic milestone in September, when we closed the sale of our remaining 20% stake in our UK Gas Transmission business for GBP 686 million. So, as I said, there's exciting momentum and progress over the last 6 months, and that supports our compelling investor proposition: low-risk, high-quality asset growth, strong earnings growth, and an inflation-protected dividend. Now I'll turn to financial performance for the first 6 months. On an underlying basis — meaning we exclude the impact of timing and exceptional items — operating profit from continuing operations came in at GBP 2 billion, 15% higher than the prior year at constant currency. That reflects good performance across all of our regulated businesses, which drove an 8% increase in underlying earnings per share, to 28.1p. Our business delivered a record GBP 4.6 billion of investment, up 19% year-on-year at constant currency.

John Pettigrew

executive
#5

Also consistent with our policy, the Board declared an interim dividend of 15.84p per share. Now moving to reliability and safety. Despite severe weather across most jurisdictions, reliability stayed strong on our U.K. and U.S. networks. Our teams restored outages quickly and well within regulatory requirements — including in our New York region, where, during the worst storms, the average time to restore 95% of customers came to just 12 hours. Looking forward, NESO has just published its winter outlook report for the U.K., forecasting an electricity capacity margin of 8.8%, a touch above last year's and broadly in line with recent winters. All told, we're confident we'll deliver our customary high standard of reliability across our networks over the months ahead, and we remain vigilant as we go through the winter in both the U.K. and the U.S. Safety, as ever, stays a critical focus throughout the business. Over the first 6 months, our lost time injury frequency rate stood at 0.1, in line with our group target. Given the substantial increase in capital delivery, we're bringing on new contractors working for National Grid for the first time, and so we've strengthened our protocols to make sure our high safety standards are upheld.

John Pettigrew

executive
#6

Turning now to how the group performed operationally, beginning with UK Electricity Distribution. Our capital investment rose 6%, reaching GBP 647 million, with the growth coming from more customer connections, greater asset health workload and network reinforcements. We've also continued to make progress on customer service, including the May launch of ClearViewConnect. That online tool gives visibility of grid supply point capacity, and it includes a view of the generation connections pipeline, which helps prospective developers pinpoint the quickest and cheapest places to connect. We've made solid strides as well in reforming the connections process. Through a leading role in the industry's Technical Limits initiative, we've managed to bring forward the connection offer date on more than 280 megawatts of distribution generation. And as we mentioned at our Connections investor event in January, by reviewing projects that aren't progressing, we've removed 3.7 gigawatts of capacity from the contracted connections queue. Looking forward, although more than 3 years still remain in ED2, we're already giving thought to the next regulatory cycle. Ofgem issued its framework consultation yesterday, and it contains wide-ranging questions designed to help shape the ED3 price control; we'll respond early in the new year. Moving on to UK Electricity Transmission, CapEx there increased 43% to GBP 1.3 billion, driven by growth in customer connections, with 2.3 gigawatts of new customer connections in the first half.

John Pettigrew

executive
#7

And we're making solid progress on London Power Tunnels, our GBP 1 billion project, where a 2.5-kilometer circuit linking Hurst substation and Crayford was energized successfully. Looking further out, transmission-scale connection requests from data centers are rising, and that's fueling substantial investment in new and upgraded substations across the Southeast. Turning to regulatory matters, Ofgem issued its decision in July on the sector-specific methodology, which is the next step in the RIIO-T3 regulatory process and will carry through to the final determination at the end of 2025. We were glad the document reflected our commitment to streamlining the overall framework so decisions on which projects proceed can be made faster. It also contains proposals for an advanced procurement mechanism, letting us lock in supply chain capacity early, plus a mechanism akin to the ASTI approach so funding can flow to projects sooner than has historically been the case. As you'd expect, we're engaging constructively with Ofgem and wider stakeholders to settle the right regulatory frameworks that deliver a net zero energy system and a fair return. And while Ofgem's inclusion of a cost of equity range of 4.6% to 6.4% is encouraging, the allowed return needs to sit at the top end of that range to keep attracting sufficient capital to the sector.

John Pettigrew

executive
#8

Ofgem has also wrapped up its inflation consultation, bringing in a nominal return on fixed rate debt—something that will improve how allowances line up with real debt costs and speed up cash recovery. Where policy is concerned, we've made headway on connections reform, and I'm glad to say we now share a consensus with government, Ofgem and NESO regarding the steps that need to be taken. During the second half of 2025, NESO is anticipated to roll out reforms under which projects have to pass through a 2-stage process built on a mix of project readiness and alignment with the Clean Power Plan. Moving on to our strategic infrastructure business, set up last year to deliver the 17 ASTI projects. We're handling these projects across distinct waves. Wave 1 is made up of the 6 most advanced projects, while Wave 2 covers the remaining 11, which sit at earlier stages of development. We've made good progress securing the consents required for the first wave of projects, and we anticipate having all the key equipment and material contracts finalized by early next year. As I noted earlier, construction is underway on 5 of the first wave, among them the offshore EGL -- Eastern Green Links 1 and 2, Yorkshire Green, North London Reinforcement and Bramford to Twinstead.

John Pettigrew

executive
#9

Construction is set to begin shortly on the Grain to Tilbury project, so by the close of this fiscal year we will have started work on all 6 Wave 1 projects. Moving on to our Wave 2 projects, several public consultations took place over the summer. With more consultations scheduled for 2025, we are moving along nicely through the consenting process. Procurement is coming along well, we are far along in locking in the supply chain, and we are filing an early construction funding request with Ofgem for Eastern Green Links 3 and 4 and the Sea Link project so these can advance quickly. Turning to the U.S., beginning with New York. CapEx remained strong, rising 29% to GBP 1.6 billion in the first half. That reflects solid progress on our $4 billion Upstate Upgrade, including our Smart Path Connect project, which is now halfway through construction and well ahead of schedule. It also reflects the work approved under the Climate Leadership and Community Protection Act, where construction on Phase 1 of the project is moving along well, and we have just issued the procurement tenders for Phase 2. We have also boosted investment in our gas network, replacing another 161 miles of leak-prone pipe as we keep working to cut our methane emissions.

John Pettigrew

executive
#10

Now regarding regulation: back in August, the commission gave the green light to the 3-year rate case settlement covering our KEDNY and KEDLI gas distribution companies. Across the coming 3 years, we anticipate putting $5 billion to work, with ROE improving to 9.35%. We also submitted a request for new rates at Niagara Mohawk, our Upstate New York business. That filing calls for transmission spending to bring renewables onto the grid, upgrades to lines and substations, and additional funding for the program that replaces leak-prone pipe. At September's end, PSC staff, as they typically do, put forward rebuttal testimony — it included a 9.5% cost of equity versus the 9% return we're currently allowed, plus smaller increases to the capital investment we proposed. Settlement negotiations now lie ahead as the filing moves forward, and we have confidence that a constructive result can be achieved by spring. Shifting to policy: in July, a draft report issued by the New York PSC recognized, for the first time, that New York State will probably fall short of its goal of 70% renewable generation by 2030. Reacting to that report, Governor Hochul's administration has acted on several fronts — among them, reconvening the State Energy Planning Board so it can draft a road map for building a clean energy system in New York, with resource adequacy and affordability factored in.

John Pettigrew

executive
#11

Because of that, a more practical conversation has begun. And, as you might expect, we are involved in backing that process, which gives us a chance to help shape a better-balanced path for the energy transition. In New England, capital investment rose 7%, reaching GBP 814 million. That mostly mirrors the ongoing, stable expansion we have delivered via spending on grid modernization and asset health programs as well as work replacing leak-prone pipes. On the regulatory side, in September the DPU released its rate case order for our Massachusetts Electric business, clearing a 5-year plan featuring a revenue increase of roughly $100 million. That order contains a fresh regulatory recovery mechanism that delivers prompt funding for rising capital investment, plus a revised performance-based rate mechanism that offers inflation protection for operating and maintenance costs and larger allowances to address the higher expense of storms. All together, these improved recovery mechanisms will let us earn nearer to the allowed return of 9.35%. The DPU has likewise given the green light to our Electric Sector Modernization Plan as a strategic road map backing decarbonization investments. As part of that, we requested $2 billion of investment, covering upgraded power lines, transformers, substations and technology platforms across the coming 5 years.

John Pettigrew

executive
#12

We anticipate that the proposed costs and recovery mechanisms will be settled before the program begins next summer. And during the past summer, Governor Healey's administration has been working to get comprehensive energy and climate legislation passed. The proposed bill tackles critical issues we've been advocating for, including laying out an accelerated time line for siting and permitting of clean energy infrastructure projects, and we're hopeful it will move forward before the end of the year. And finally, in National Grid Ventures, capital investment was 11% lower at GBP 279 million following completion of the Viking Link to Denmark last year, partially offset by increased investment in National Renewables in the Isle of Grain. We've made good progress on the Propel transmission project through our New York Transco joint venture, which will help to deliver offshore wind power from Long Island to the Bronx in New York City and Westchester County. We've made further progress in the fourth phase of the expansion of our Isle of Grain LNG facility, which remains on track for completion next summer. And we've also commenced the sale process for National Grid Renewables. So as I said at the start, we've achieved significant progress across all areas of the business in the first half as we continue to support and invest in the energy transition.

John Pettigrew

executive
#13

I’ll pause at that point and pass things over to Andy, who will take you through the figures, and then I’ll return to discuss what matters most for the second half. Andy?

Andrew Agg

executive
#14

Thank you, John, and good morning to everyone. I want to point out that, as we normally do, we're showing underlying results that exclude timing, U.K. deferred tax and exceptional items, and unless otherwise stated, every result is given at constant exchange rates. Our remaining 20% holding in National Gas is reported as a discontinued operation through 26th of September, the date it was sold. Because of that, all earnings from this business have been left out of the continuing group's underlying earnings. So let me begin with how we performed overall in the first half. We posted strong results, with underlying operating profit from continuing operations of GBP 2 billion, which is a 15% rise versus the prior year, mainly driven by higher revenues across our U.K. and U.S. regulated businesses and by the non-repeat of a prior year environmental charge in our New York business, partly offset by lower profit in National Grid Ventures. Underlying earnings per share came in at 28.1p, 8% above the prior year restated figure. That reflects better performance across our regulated businesses and a slight decline in finance costs, which more than offset the higher share count after the rights issue. As John mentioned, our capital program has progressed very well, with investment from continuing operations of GBP 4.6 billion, another record level and a 19% increase year-over-year.

Andrew Agg

executive
#15

The factors behind this include additional connections within our Electricity Transmission business, faster completion of our ASTI projects, more pipe replacement work throughout our U.S. gas businesses, and a significant increase in activity on our Smart Path Connect and CLCPA transmission projects located in Upstate New York. Consistent with our policy, the Board has announced an interim dividend of 15.84p per share, which equals 35% of last year's rebased full year dividend. Moving on to our business segments now, beginning with UK Electricity Distribution. Underlying operating profit came in at GBP 573 million, an increase of GBP 10 million compared with the prior year. Higher revenues were partly offset by increased controllable costs, which rose by GBP 21 million as we directed resources toward activities designed to strengthen the business for the rest of RIIO-ED2. That included spending on field, customer and asset management teams, along with costs associated with implementing new distribution system operator functionality. For the full year, we anticipate controllable cost performance will be broadly consistent with the prior year. We also remain on track to achieve our goal of GBP 100 million in synergy benefits by FY '26, and have delivered GBP 58 million so far by capitalizing on our greater purchasing power and operating more efficiently at the 48 joint transmission and distribution sites throughout the U.K.

Andrew Agg

executive
#16

Plus we're generating savings by merging support functions. For the half year, capital investment came to GBP 647 million, which is GBP 39 million more than the prior period, mainly because of greater spending on reinforcement work and asset replacement. In our UK Electricity Transmission business, Underlying operating profit reached GBP 724 million, an increase of GBP 68 million versus the prior period. A strong first half performance came from higher allowed revenues and lower controllable costs as we continue to deliver further cost efficiencies. Capital investment stood at GBP 1.3 billion, 43% higher than the prior period. That reflects work on our RIIO-T2 projects, including customer connections, plus the step-up in investments on our ASTI projects, notably Eastern Green Link 1, Yorkshire Green and our North London reinforcement projects. Lastly, in the U.K., the Electricity System Operator posted an underlying operating profit of GBP 115 million. Turning now to the U.S., where underlying operating profit for New York was GBP 288 million, GBP 173 million higher than the prior year, reflecting higher net revenue driven by an increase in rates and the nonrepeat of an environmental charge in the prior period. That was partially offset by an increase in depreciation, reflecting the new rate case in our downstate gas businesses, KEDNY and KEDLI.

Andrew Agg

executive
#17

Capital expenditure came to GBP 1.6 billion. That figure was GBP 352 million above the previous year, supported by another increase in spending on the Smart Path Connect and CLCPA transmission projects in Upstate New York, along with greater investment in our gas distribution networks, which reflects the extra workload that was approved in our downstate gas rate case. In New England, underlying operating profit reached GBP 237 million, which is GBP 26 million above the prior period. That reflects higher rates in our Massachusetts Electric and Gas businesses, driven by the annual performance-based rate mechanism and by higher rates from the capital tracker in the Gas business, partially offset by higher depreciation and controllable costs. Capital investment totaled GBP 814 million, GBP 50 million above the previous year. That was driven by more asset condition work in our electricity distribution business and by higher gas spend, including leak-prone pipe replacement. Turning to National Grid Ventures, where the underlying contribution was GBP 207 million, including joint ventures. The GBP 70 million decrease relative to the prior year was mainly due to the one-off post construction review adjustment on the North Sea Link interconnector in the prior period, as well as lower profitability across the U.S. Ventures businesses.

Andrew Agg

executive
#18

Capital investments across National Grid Ventures came to GBP 279 million, which is GBP 33 million below the prior period, mainly reflecting completion of the Viking interconnector and partly offset by increased investment at our Grain LNG facility as we get closer to finishing the fourth phase of capacity expansion. After the announced intention to sell Grain LNG and National Grid Renewables, those assets will be treated as held for sale for accounting purposes starting the 30th of September. Our other activities posted an operating loss of GBP 38 million, GBP 25 million above the prior period. That was mainly driven by movements in the value of National Grid Partners' investments, which are carried at fair value, partly offset by a larger number of property sales in the first half than in the prior period. Moving on to financing costs and tax. Net finance costs stood at GBP 670 million, a decrease of 4% versus the prior year. The benefits of lower average net debt following the rights issue and reduced inflation on index-linked debt were partly offset by the effect of higher refinancing costs, with GBP 1.8 billion issued during the first half. The underlying effective tax rate before joint ventures was 11.9%, 180 basis points above the prior year, chiefly because of a shift in profit mix reflecting the one-off charges affecting the U.S.

Andrew Agg

executive
#19

Turning to business performance last year. Underlying earnings came in at GBP 1.27 billion, with EPS of 28.1p. Moving to cash flow. Cash generated from continuing operations reached GBP 2.7 billion, a 12% decline versus the prior year. That drop stems from timing, as we went back to the prior year balancing charge over recoveries in the system operator. Strip out timing, and cash flow from operations sits GBP 570 million higher, thanks to better cash generation across the U.K. and U.S. regulated businesses. Overall, net debt fell by GBP 5.1 billion to GBP 38.5 billion against the prior year-end, which reflects a net cash inflow from continuing operations of GBP 3.5 billion, including receipt of the rights issue proceeds, favorable exchange rate movements and other noncash movements of GBP 1.4 billion, plus receipt of GBP 686 million from the final 20% sale of National Gas. For the full year, we anticipate net debt dropping by roughly GBP 1.5 billion from the March level, assuming a USD 1.3 exchange rate. On forward guidance, we've laid out detailed full-year guidance in our results statement, as we always do. Compared with our May guidance, we now expect slightly stronger operating profit for the full year, driven by the high ESO contribution before the sale and higher net revenues in our New York business, partly offset by a weaker U.S.

Andrew Agg

executive
#20

Turning to the dollar outlook. So we still anticipate robust operational results and operating profit growth year on year of roughly 10%, along with lower financing costs thanks to a reduced average net debt. We expect that better performance to be mostly offset by the higher share count. Before handing things back to John, I'd like to revisit the 5-year framework we laid out in May, in which we expect investment of roughly GBP 60 billion to generate group asset growth of about 10% per annum across the next 5 years, plus a strong underlying EPS CAGR of 6% to 8% measured from an FY '25 baseline. That framework rests on a supportive regulatory and policy backdrop, growing certainty around our multiyear investment program, and a proven record of delivery on both the operational and financial fronts. In addition, we outlined a comprehensive financing plan that backs our investment program and lets us keep our strong investment-grade credit rating. And going forward, with an anticipated asset base of roughly GBP 100 billion by FY '29, funding clarity, strong earnings growth and an inflation-protected dividend, we have further strengthened what I see as a compelling investor proposition: creating value through both higher asset growth and an attractive dividend yield.

Andrew Agg

executive
#21

With that said, I'll turn things back over to John.

John Pettigrew

executive
#22

Thanks very much, Andy. Ahead of moving into Q&A, I'd like to use these last few minutes to lay out what our priorities are for the rest of this year, while we keep our focus on delivering our investment program efficiently. Let's begin with the U.S., where close to half of the GBP 60 billion investment is going to be spent from now through 2029. After the outcome of this week's U.S. presidential election, National Grid is eager to engage with the incoming administration. Just to remind everyone, the overwhelming share of what we invest gets decided at the state level, so we will keep concentrating as well on collaborating closely with state regulators and policymakers so that the infrastructure required across both our Gas and Electricity businesses gets delivered. From a regulatory standpoint, 3 key priorities stand out for us for the rest of this year. First, now that we have filed the new rates at our Niagara Mohawk business and gotten the staff rebuttal back in September, we are aiming to secure a settlement next spring. Second, given that the new rate plan and enhanced recovery mechanisms are now in place at our Massachusetts Electric business, the priority there is to work toward earning closer to the allowed return. And third, we are concentrating on getting agreement on the costs and recovery mechanisms for the Electricity Sector Modernization Plan in Massachusetts, which was approved recently.

John Pettigrew

executive
#23

Now on policy. As we said before, New York's governor is putting together a fresh state energy plan, and our expectation is that it will build on the CLCPA scoping plan and tackle key matters like resource adequacy and affordability. We're collaborating intensively with stakeholders to make sure it amounts to a thorough road map toward a clean, resilient and affordable feature for our customers. In parallel, the New York PSC is currently at work pinpointing both urgent and longer-term infrastructure projects that will underpin transportation and building electrification, prior to rolling out integrated gas and electricity planning processes. This proactive approach is one we've pushed for, and we anticipate filing our response at the end of the month that identifies the near-term infrastructure needs. Lastly, Massachusetts will submit our climate compliance plan next spring. That plan will lay out the investments our Massachusetts Gas network requires over the coming 5 years and beyond, so we align with state decarbonization goals while keeping service safe, reliable and cost-effective for our customers. Shifting to the U.K., where our priorities are squarely focused on delivery of our suite of major projects. As mentioned earlier, we expect to have construction underway on the first wave of ASTI projects by the end of this year.

John Pettigrew

executive
#24

For the second wave, what matters most is getting supply chain contracts signed. We've made substantial headway on that front, and I'm confident that come early next year, Tier 1 supply chain contracts will be locked in for every one of the 17 ASTI projects. That covers awarding the HVDC and converter station contracts for Eastern Green Links 3 and 4 as well as Sea Link. We also anticipate closing our GBP 59 billion HVDC framework, giving us a route to market for procuring materials for offshore projects in the 2030s and beyond. Beyond the ASTI portfolio, good progress continues on the Hinkley connection. The majority of works should wrap up by the middle of next year. As for our London Power Tunnels project, the Littlebrook to Crayford section gets commissioned over the winter. And lastly, we remain on track to connect 4.5 gigawatts of clean energy in total this year, including the Sofia Offshore Wind Farm and the Green Link interconnector. Turning to regulation, developing our RIIO-T3 business plan will be a key priority, and we'll submit it in December. Our totex submission will have 2 elements: a baseline with a high degree of cost certainty, including the first wave of our ASTI projects; and a more extensive pipeline, covering the second wave of ASTI projects plus further projects aligned to the holistic net zero pathway in the NESO's future energy scenarios.

John Pettigrew

executive
#25

As we submit this plan, we anticipate that the government's Clean Power Plan outputs, along with changes stemming from connection reform, will have some effect on our totex submission. That said, we don't expect much movement in the GBP 23 billion we foresee investing in electricity transmission through 2029, since we have a high level of clarity regarding the first few years of RIIO-T3. A second priority is to keep engaging with Ofgem so that it acknowledges how fierce international competition for capital is — by presenting evidence that backs the need for an appealing financial framework, with returns sitting at the top of Ofgem's range, suitable cash characteristics, and additional incentive opportunities that will deliver value for consumers at National Grid. On policy, our focus is to keep working closely with DESNZ and the newly created Mission Control as they put together their plan for clean power by 2030 and beyond. We will keep advocating for a fast-track consenting route for electricity transmission projects to be given priority as part of a wider set of reforms to the planning regime, for a community benefits framework for electricity transmission to be brought forward with urgency, and for a clean energy skills pipeline to be developed, including reforms to apprenticeship funding.

John Pettigrew

executive
#26

To sum up, a new and exciting period of expansion is now solidly in motion at National Grid. After laying out our plan for the coming 5 years, we have begun executing a GBP 60 billion network investment across both sides of the Atlantic. Significant capital projects in the U.K. and U.S. are progressing well, and the company is structured and focused so that this momentum carries forward. That momentum, together with unmatched clarity on our investment program, supports what we offer investors: low-risk, high-quality asset growth, strong earnings growth and a dividend shielded from inflation. This is an enormous and thrilling moment for our industry that will create -- that will keep creating meaningful opportunities for National Grid now and for many decades ahead, a foundation from which we will generate long-term value and returns for our shareholders. So I will pause here and open things up for you to put questions to me and Andy.

John Pettigrew

executive
#27

All right, so let's look at the list of people who've asked questions. Should we begin with Pavan at JPMorgan?

Pavan Mahbubani

analyst
#28

Two from me, please. First, could you remind us of the date when your business plan for the RIIO-ET3 period will be submitted? And can you offer any early indication of what we ought to expect, particularly regarding the CapEx mix, how you are approaching baseline versus uncertainty, and how that connects with your 5-year frame? My second question, then, concerns any remarks you might have about the result of the U.S. elections. And do you anticipate that this will alter your plans for U.S. investment through to 2029?

John Pettigrew

executive
#29

Yes. Thank you, Pavan. So as far as the business plan goes, the schedule is that we file it this December — right at the end of December — and after that we anticipate a draft determination coming from Ofgem over the summer, most likely in June of next year, with the final determination following in December 2025. On the character of it, as I mentioned in my remarks, the plan in effect splits into 2 halves. The first half is a baseline covering every project we feel confident will go ahead — or fully confident it will go ahead — along with cost certainty, so for instance the ASTI Wave 1 projects. The second part is a pipeline containing all the projects that line up with NESO's future energy scenarios, and the reason we're structuring it that way is that Ofgem asked for the business plan to be submitted in this form. As I said in my remarks, I believe this differs from earlier business plans we've had at this point, since a portion of the CapEx will be affected by connections reform — where substations are located, for example — and also by how far the government takes the Clean Power Plan after NESO's advice this week.

John Pettigrew

executive
#30

A portion of that pipeline is going to shift. Our view is that the GBP 23 billion we’ve laid out — part of the GBP 60 billion that carries CapEx through to 2029 — won’t be affected. Even so, come the early months of next year, we’ll see some movement there once the connections reform outcome is clear. So it’s a bit different from the usual pattern, but at a high level it breaks into 2 levels: a baseline, plus a pipeline that gives us confidence we can deliver what’s needed all the way to the end of RIIO-T3. On the U.S. elections: first, I’d say we look forward to working with the new administration. As you know, energy in the U.S. matters at both the federal level and the state level. The new administration has made clear how important it is to keep energy prices low and how important security of supply is. From where we sit, the vast majority of our capital investment program is decided at the state level, with state policymakers and state regulators. So our expectation is that it won’t have a significant impact on the GBP 60 billion we set out in May, to be delivered between now and 2029.

John Pettigrew

executive
#31

All right. Can we move on to Deepa from Bernstein for a deeper round of questions?

Deepa Venkateswaran

analyst
#32

I've got 3 questions. A couple of them concern ED3, and then one is about ED. So on ED3, you said you'd like the ROE to sit at the top end of the range. Do you have any view on how much operational incentive the package has to deliver? The reason I ask is that, obviously, with ASTI you were looking to cap your downside. So presumably the upside on totex could be smaller. So if you could just describe how you see it beyond the allowed return — where else might you be able to capture some additional return? The second one concerns the nominal debt allowance in ED3, which clearly is a help from a cash flow standpoint. How is National Grid thinking about fast money versus slow money within the business plan? Any early indications on that would be useful. And the final one is a clarification on ED. I think you've typically spoken about 100 to 125 bps of operational outperformance in that business. But in your most recent regulatory financial performance reporting, you forecasted 70 bps for ED2. So I was just wondering what accounts for the divergence, presumably since you're seeing the synergies, et cetera, are on track?

John Pettigrew

executive
#33

Alright, thank you, Deepa. I'll handle the first one, and then Andy can take the other two. So first, on ROE — like we mentioned back in May, it was encouraging to see Ofgem acknowledge, through the sector-specific methodology decision document, how much it matters that the regulatory framework draws investors in. To use their own language from that document, the range they laid out — 4.6% to 6.4% — they noted there are grounds for it potentially landing at the top end of that range. And clearly, one thing we'll be focused on going forward is engaging in that conversation and dialogue with Ofgem about why that matters so much. Beyond the rate of return, on incentives — we believe, and I keep talking with Ofgem about this, that there are quite a few incentives, Deepa, that would benefit consumers and, obviously, if we deliver well, would benefit National Grid shareholders too — things like getting projects delivered early. So obviously, given how large and extensive our capital program is, clearly, having an incentive to deliver those projects as early as possible makes a great deal of sense and will create value for customers.

John Pettigrew

executive
#34

Then second, items such as managing constraints. As you've observed during the past few years, the expense of balancing the system has gone up. There are possibly steps we could take as a builder and maintainer of the assets that might lower those constrained costs. So we believe an opportunity exists for incentives in those areas too. Those are the kinds of matters we are talking over with Ofgem right now. Andy?

Andrew Agg

executive
#35

Yes. Thank you. Now, regarding the ED3 — or the ED2 question, concerning that 100 to 125. Right, I think we'd always expect there to be some gaps between our total forecast across the 5 years of the rate case, or the price control, and what gets reported annually within the RRP. A few things drive that. There are some differences in how RORE itself is calculated. But also, when we think about our efficiency plans and how we aim to deliver them over the life, we'd expect those improvements to show up in the reported return as we crystallize those efficiencies in the outer year. So not all of it will land in the early years of the RRP. And as I said, it will be reported as we move through the outer years.

John Pettigrew

executive
#36

Would you like to touch on the nominal debt...

Deepa Venkateswaran

analyst
#37

Was the forecast for the full ED3 period in your RRP not the last year?

Andrew Agg

executive
#38

And on the nominal debt question — sorry about that. Yes. So, as you mentioned, Ofgem was quite explicit through the SSMD that this is the approach they've picked for the cost of debt allowance going forward. On your wider question about fast versus slow, stepping back, we've consistently said our focus is on both the return — the allowed return — that comes out in T3, and the overall cash characteristics. Nominal debt, I'd say, is a solid move in the right direction since it will speed up cash. That said, we'll keep working with Ofgem to make the case that — whether through adjustments to asset lives or the fast/slow mix — these are all distinct elements. As you're aware, in T2 we were at roughly 15%. So a natural rate could be a bit below that, but it's always something we'd want included in the overall package we work through with Ofgem.

John Pettigrew

executive
#39

Thanks, Deepa. Dominic will be next, and after Dominic, Jenny from Citi. So Dominic from Barclays.

Dominic Nash

analyst
#40

I’ve got a couple of questions, and they kind of build on what was asked earlier. First, regarding your 6% to 8% earnings expectation in the business plan—obviously, you’re relying on the exchange rate and CPIH, which may or may not be looking a bit on the high side. But going back to the ED3 review, how much flexibility do you actually have to manage your own earnings from here, given a nominal return on debt and your capitalization ratios shifting away from the natural rates? And how are you thinking about putting that through so you can manage earnings? Then, following on from that, do you expect ED3 will also include a nominal cost of debt? My second question is about the U.S. election. Could you remind me again what share of your capital spend in the U.S. comes from imported goods? And what impact and what mitigation strategies could you use if there were a material increase in import tariffs?

John Pettigrew

executive
#41

Alright. Why don't I have Andy handle the first one, and I'll cover the second. Actually, Andy, let me start with the second. Regarding our U.S. CapEx, honestly Dominic, most of it comes from domestic sources. Looking back historically, only a fairly small share has been brought in from abroad — items such as steel. But the bulk of the equipment is supplied by American equipment makers, GE being one example. So any modifications to trade tariffs don't hit us very hard. Andy?

Andrew Agg

executive
#42

Yes. Thanks, Dominic, for those questions. I think regarding how T3 affects earnings overall, if you look back at what we outlined in May when we introduced the 6% to 8%, I think we were clear that we've made assumptions over the 5 years that we believe are sensible and prudent. And obviously, that would have factored in what we anticipated regarding some of the first steps that we were seeing through the SSMC, the consultation at that time. So the question specifically about nominal debt doesn't -- you shouldn't automatically assume that, that will be additive. I think, as always, what will matter with the T3 plan, going back to the points John made about the scale of CapEx in there, is that we will be seeking an overall outcome that delivers what Ofgem has said about being both financeable, and importantly, investable and that will, of course, include the right cash characteristics whether that comes through the normal debt impact or other things like fast/slow or capitalization rate. So we will keep working on that, but as much from a ensuring it's the right framework as in terms of the impact on earnings.

Andrew Agg

executive
#43

Second, regarding your question about whether nominal debt will carry over into ED3 — actually, I believe Ofgem has now put that approach in place for the whole sector. So I don't see any reason it wouldn't apply in ED3 as well.

John Pettigrew

executive
#44

All right, thanks, Dominic. I’ll hand it over to Jenny next. Then once Jenny is done, we’ll go to Mark Freshney at UBS. So, Jenny.

Jenny Ping

analyst
#45

I have a couple of questions, please. First, for John, could you translate that Tier 1 supply chain into figures — specifically, what does it represent in terms of total CapEx covered across the 17 ASTI projects? Then second, for Andy, two questions on the U.S. If I recall correctly, your earnings guidance assumes a pre-deferred tax for the U.K., but not for the U.S. Could you speak a bit about what you think a change — a reduction in the U.S. tax rate would do to the deferred tax line, and therefore to your earnings line on a hypothetical basis? If I recall correctly, we had this conversation at Trump 1.0, but if you could just remind us of the direction of travel there. And then second, just on the ESO. Obviously, a lot of cash is already recognized because of timing. So can you give us a sense of the actual cash you're going to receive at the closing of the ESO, just so that we can get our net debt numbers right?

John Pettigrew

executive
#46

Okay. Thanks, Jenny. So I'll take the first one, and then leave the second and third for Andy. Let me try to offer a wider view of where things stand with the supply chain, since I know that's a key concern. I think, hopefully, people know that across roughly the past 18 months, we've carried out a fundamental review of how we engage, contract and procure with the supply chain. So progress has been really good. We've spoken before about how we make sure we have the contractors we need for the work resource. And I was really pleased that we established what we call the Great Grid Partnership with 7 of our supply chain — a GBP 9 billion contract that gives them visibility of the work we want them to do and gives us access to that work, and gives us confidence that we'll have the contractors we need. We've also been moving forward the HVDC and converter station framework agreement, which, as I mentioned in my speech, is a GBP 59 billion contract. And actually, I've been really pleased with the response we've had — all the major cable manufacturers and converter station manufacturers have responded to that framework agreement, and we're hopeful it will be in place very, very soon.

John Pettigrew

executive
#47

Now, if you look at each project individually, we've split ASTI into a first wave of 6 projects. For 5 of those, contracts are already signed and construction is underway. As for the sixth — the Grain to Tilbury project — planning will be secured by the end of the calendar year, and contracts will be signed by the end of the fiscal year. So for that first wave, we're quite confident we have the contractors and equipment required. From there, we move to the second wave — projects such as EGL 3 and 4, Norwich to Tilbury, and similar ones. Once again, we're going through procurement, and we're exploring ways to standardize equipment so we can get better access to the supply chain. In fact, we're lengthening the contracts we hold. Across the group, more than 50% of all the supergrid transformers we require have already been procured out to 2030, which leaves us in a very strong position. We'll also have an agreement with Ofgem allowing us to make upfront payments to the supply chain in order to lock in the manufacturing capacity we need.

John Pettigrew

executive
#48

And once more, looking at all of it together, for the Tier 1 contractors we're confident that everything required will be ready early next year across all 17 ASTI projects. So, Andy?

Andrew Agg

executive
#49

Yes. Thank you, Jenny. First, regarding the U.S. and possible tax changes. Obviously, it's quite early and plenty of things have been discussed or floated that could come to pass. Naturally, we'll need to wait and see exactly what does or doesn't take place in the new year. But just as a quick reminder, as you mentioned, when the rate was altered a few years back, as a reminder, it's effectively economically neutral for us, since the way U.S. regulation operates is effectively tax — the net tax charge gets included with the amounts we're permitted to collect from customers. And so, a change in the rate will effectively flow through into rates as well. So net-net, there's no underlying earnings impact. And of course, regarding cash impacts, that will need to be worked through based on what we see if any rules do change and then how that's reflected in regulation. But we wouldn't expect any significant earnings impact from that. And regarding the System Operator sale, the actual cash received was very close to the GBP 630 million. If you look back in the depths of the results statement this morning, we're very clear that the provision for the remaining return of the over-collected recoveries from the previous year is included in the held-for-sale business as is the cash that was associated with giving that money back.

Andrew Agg

executive
#50

That had already been removed from our figures. So we ended up getting very near to GBP 630 million, and that is the amount you ought to factor into your net debt projections.

John Pettigrew

executive
#51

Alright, thanks, Andy. Let's move on to Mark Freshney. Then following Mark, we'll take Robert from Morgan Stanley. So Mark, could you give us your question, please?

Mark Freshney

analyst
#52

So listening to how you answered the earlier questions—the possible shift in how Ofgem remunerates debt costs to a nominal cost basis, and the potentially lower deferred tax charge in the U.S., less the netting of that against the asset base, which came up in response to the last question—it seems to me that adding all of these together within the 5-year frame, there's clearly quite a bit of upward pressure on earnings. So my question to you is, would you agree with that? And then second, you mentioned being in a strong position on transformers, which I think is one major, major crunch point. But if I really had to pin you down, John, I mean, we know that one customer has essentially taken up all of one supplier's transformers for 2 years and has caused a lot of panic among some of your competitors in the U.S. In one word, are you confident of getting all the transformers you expect to get through to 2030?

John Pettigrew

executive
#53

Thanks, Mark. I’ll handle the second one, and then I’ll have Andy address the first. The straightforward response, Mark, is that it’s been clear to us—or known to us for a couple of years now—that lead times for supergrid transformers were going to stretch out. You may have seen some articles this week where people mentioned 3 to 4 years. But we’ve been making adjustments for that for quite some time already, so we are confident that we can secure access to the supergrid transformers we need, in both the U.K. and the U.S., across that period. As I mentioned, we’ve been lengthening the time frames we give to equipment manufacturers so they have visibility into what’s required. And when we’ve gone through procurement, we’ve found that we’ve actually been able to gain access to and procure those supergrid transformers. Just to add a bit more color: one thing we’ve done over the last 12 months is strengthen our relationships with equipment manufacturers outside the usual contracting process and, quite often, separate equipment procurement from EPC contracts.

John Pettigrew

executive
#54

And here in the U.S., we’ve also been broadening our supplier base for...

Andrew Agg

executive
#55

Yes. Thanks, Mark. I mean, attempting to kind of bring together the different parts of what you asked. I think, once more, go back to when we laid out that 6% to 8% guidance for our 5-year earnings CAGR back in May. Of course, that was purposely built to hold up across a variety of possible outcomes. And nothing we have witnessed since that point has pushed us beyond that range. So it stays our very clear guidance as of today. As I mentioned when responding to one of the earlier questions, of course, we made reasonable assumptions about regulatory outcomes grounded in what we knew at that time. And so you shouldn't assume that items such as nominal debt are automatically additive. And as I said, when answering the earlier question on U.S. tax, over time, we would expect that broadly to be neutral from an underlying earnings perspective, albeit with sort of one-off changes in deferred tax flowing through sooner. So no, I think we're very clear that the 6% to 8% remains our guidance today. And we will, of course -- if it does change, we will update that further down the line, but that's very clear in terms of where we stand today.

John Pettigrew

executive
#56

All right, thank you, Andy. Next we’ll hear from Rob at Morgan Stanley, and following Rob, we’ll go to Ahmed at Jefferies. So, Rob, would you like to ask your question?

Robert Pulleyn

analyst
#57

I have just one question, and it follows on from the supply chain theme. Going back to the full year results, when we were sitting around the table, you mentioned a GBP 59 billion framework agreement for supply chain, with HVDC being the hot topic at that time. If I'm mistaken, please correct me, but I believe there hasn't been any update on that. Is it still anticipated to be finalized, in terms of signing, before the end of calendar 2024? Also, since you've already addressed the transformers, could you offer some commentary on the HVDC side?

John Pettigrew

executive
#58

Yes. Thank you, Rob. So I did touch on this in my remarks, but let me add a little more color. We kicked off the procurement process for that framework agreement early this year. As I mentioned, it was a significant framework agreement covering not only the CapEx we require and the HVDC cable supply through 2029, but it will actually carry us well into the '30s too. We've been very pleased with the response from all the major cable manufacturers globally. And we're hopeful that framework agreement will be finalized either by the end of the calendar year, but definitely by the end of the fiscal year. So progress has been really good, the response has been very strong, and we feel very confident about it. In terms of, again, just drilling down a level. So regarding the first wave of ASTI projects, contracts are in place for EGL 1 and 2, which are the major HVDC contracts we needed as part of Wave 1. So again, we're in good shape on that front. Those contracts have already been awarded. As I said earlier, we're already in the construction phase on those.

John Pettigrew

executive
#59

All right, then I'll hand it over to Ahmed at Jefferies, and after that, Marcin at Bank of America.

Ahmed Farman

analyst
#60

Yeah, may I just go back to ET3 for a moment? You've obviously gone into quite a bit of detail and given us plenty of color regarding your confidence and the visibility you have, and you've spoken at length about supply chain and procurement. Could you also share some perspective on the consenting and planning visibility you have for ET3, and put some numbers around it? Is there something like a Phase 1? Is it all already consented, and do you have every approval in place to deliver it? That would be helpful. And perhaps you could tie that into the Spatial Energy Plan — how critical is it to delivering the plan? What do you need to see, and what's the timing on that? That would be super helpful. And then just lastly, I'd be interested in your perspective on the 2030 Clean Power Plan. Is there anything particularly notable in it? And how does that compare with the CapEx plan you laid out to us earlier in the year?

John Pettigrew

executive
#61

Alright, quite a lot there, Ahmed. Let me go through it with you. So on planning, I mean, first off, as you’re aware, we’ve been pushing for reform in this area for a while now. And we’ve seen the new labor government take up that issue. Our expectation is that legislation on planning reform will come next year. National Grid has been arguing for several things within that. One is streamlining the process, really in line with what the Networks Commissioner, Nick Winser, recommended about a year ago. We’ve also been recommending an accelerated planning process for strategically important infrastructure like transmission, and we’ve been advocating for that. But also talking with the government about the need to resource planning authorities, because with such a massive increase in the number of planning applications, resourcing matters too. But we’re hopeful that we’ll see positive progress on that through legislation next year. As for where we are on our specific projects — as I said, we’ve made excellent progress on the Phase 1 project at ASTI, all in line with the time scales we need to deliver these projects.

John Pettigrew

executive
#62

We've received DCO approvals from the Secretary of State for Bramford to Twinstead and Yorkshire Green. And planning consents have come through for filing for every one of the remaining Phase 1 projects apart from Grain to Tilbury, which is expected to get its planning consent at the close of this calendar year. So that's solid progress. During the summer, I believe we ran 8 separate consultations as preparation for Phase 2. Again, each one sits at a different stage. A number of them are in the pre-statutory consultation phase. On Norwich to Tilbury, one of the big projects within Phase 2, we have just finished the statutory consultation. So once more, all of them are working their way through the process. These projects span multiple years, so we only approach the planning authorities at the proper moment. And we carry out an enormous amount of consultation with local communities to ensure they grasp the options during what we term the pre-statutory consultation phase, so that we understand the community's concerns and can try to reflect them in the recommendations we make to the Secretary of State as well. Regarding the Spatial Energy Plan, it's probably helpful just to connect the 3 -- the various elements together.

John Pettigrew

executive
#63

So clearly, the foundational block has been what was announced this week by the National Energy System Operator — the Clean Power Plan for 2030. That advice will now, of course, feed into government, who are proposing that they'll come forward with their action plan at the end of this year. You may have seen a couple of weeks ago that the government also commissioned NESO to do the Spatial Energy Plan, and that is due to be complete by the end of 2026. And on the back of that, we'll then see the Centralised Strategic Network Plan in 2027. So all of these things sort of interconnect, but the foundation block, I guess, is the Clean Power Plan and what comes back from government at the end of this calendar year. From our perspective, obviously, we're working through the detail of it. As NESO said, it's a hugely ambitious plan. I think the words they used is "at the limits of what is feasible," and it will require everybody to play their part and for everybody to play their part in executing it and doing it flawlessly. From our perspective, looking at the networks, reassuringly, what the plan says is the projects that were identified previously, the 17 ASTI projects, are the ones that are going to be required for Clean Power 2030.

John Pettigrew

executive
#64

That report includes a recommendation concerning 2 of the projects — Norwich to Tilbury and Sea Link — with a request asking whether those could be moved up by 1 year, from 2031 to 2030. Clearly, we'll now take some time working with our supply chain as well as with the government regulator, NESO, on what would be needed and whether it's feasible. And obviously, that will ultimately feed into the action plan the government issues at the end of this calendar year. Okay. Next I'll go to Marcin, and after that to Ingo at Kepler. So, Marcin?

Marcin Wojtal

analyst
#65

I have two questions. First, regarding the Massachusetts Electric rate case, how pleased are you with the 9.35% result? My understanding is that you had actually sought a figure nearer 10%. And how confident are you that you'll in fact earn a return very close to the allowed return in that business? My second question concerns possible divestments of U.S. renewables and LNG Grain. I believe both have now been reclassified as held for sale. From an accounting standpoint, does that suggest you're confident that both of these assets will be sold within the next 12 months?

John Pettigrew

executive
#66

All right, I'll take the first one, and then I'll have Andy handle the second. Regarding the Massachusetts rate case — in my view it was a landmark case, because the crucial pieces worth concentrating on are these: we secured an agreement from the Massachusetts regulator that revenue can be adjusted when capital investment rises. As you're aware, our Massachusetts business carries substantial capital investment, and the regulator in effect accepted that our revenues may go up year over year as our CapEx grows. They also, at the same time, affirmed the performance-based mechanism that indexes revenues for operations and maintenance costs. So taken together, Massachusetts now, as a rate case, looks considerably more like what we have in New York. And while in the past Massachusetts has consistently had allowed returns higher than New York's, it has always been built on a historical cost base. That made earning those allowed returns harder. I believe the new framework now in place brings it much closer to the frameworks we know well in New York.

John Pettigrew

executive
#67

So because of that, we feel far more confident about getting much nearer to the permitted return. And as you're aware, in our U.S. businesses the goal is always to target no less than 95% of allowed returns. So compared with the prior regime, we have considerably more confidence on that front. Andy?

Andrew Agg

executive
#68

Yeah, and thank you. So regarding the divestments, I think, as John mentioned earlier, the first is the National Grid Renewables business in the U.S., where that process is already underway. And yes, we expect it to move forward into the beginning, or the early part, of next year. Then, as we've said before, on the Grain LNG sale, we'd expect that process to get started once we've finished construction of the current Phase 4, the new tank, which is expected around the end of the first quarter of next year. So yes, to your specific question about the accounting, our judgment is that we would expect both to be complete within 12 months from the 30th of September.

John Pettigrew

executive
#69

Thanks, Andy. Ingo, I believe this is the final question. So please go ahead with your question.

Ingo Becker

analyst
#70

I trust you haven't responded to those questions yet — I ran into a short connectivity problem. To start, I'd like to ask about the data center point mentioned in your slides. You note that in the U.K. Southeast, there's a transmission-scale data center connection request — could you say how many terawatt-hours that represents, and whether, in your assessment, it has any meaningful effect on the local system balance? My second question concerns the broader affordability of the expanding network cycle, perhaps both in the U.K. and the U.S. In some markets we've heard about supplier equipment prices going up, which probably isn't a surprise given growing demand from network companies that regulators are now noticing. I'm just wondering whether you can share similar experiences here? And finally, perhaps related: the German conservative party in the current situation has been discussing actually cutting grid fees quite substantially. It's not yet entirely clear what they mean. We suspect it involves shifting some of the network cost onto government budgets, but we don't really expect them to target the returns. And maybe if you're hearing anything as well, just from an overall affordability standpoint, what that cycle will do to builds?

John Pettigrew

executive
#71

Okay, thank you for that question. Let me try to give you a picture regarding data centers. This is something that's changing as we speak, so it's an area we're devoting a good deal of attention to right now. Looking at the big picture, over the coming 10 years, we will definitely see more load growth on the networks, in both the U.S. and the U.K. We've anticipated this because of transport electrification and heat electrification. But the actual amounts of electricity consumed for generative AI and AI add another factor on top of that, and we're still working to understand how that will play out. What we're seeing today, using the U.K. as an illustration, is that roughly 5 terawatt-hours of load in the U.K. comes from data centers. That works out to roughly 1.8% of total U.K. load. If you look at what has happened over the past 3 years, historically U.K. data centers have been somewhat clustered around the M25 and the M4 corridor. We have solid telecom networks there. We had about 1.5 gigawatts there 3 years ago, and we've since seen roughly 3 gigawatts of connection applications added on top of that.

John Pettigrew

executive
#72

What we've witnessed in that region amounts to data centers tripling in size. And the overwhelming majority of them are located there. Consequently, we keep putting money into expanding existing substations and building new ones in that area. Lately, we're noticing greater interest from the hyperscaler segment — meaning considerably bigger data centers — in other regions of the country, the Northwest included. If you examine the connections queue, roughly 10 gigawatts of data center demand is indicating a potential desire to hook up to the grid across the coming 15 years or so. Naturally, as we all know, that doesn't necessarily come to pass, yet it does signal the kind of scale we're encountering. Some of these data centers are becoming extremely large — around the 200 megawatts type size. To put that into context, 200 megawatts exceeds the household load of every city in the country, with the exceptions of Manchester, Birmingham and London. So when such data centers seek a connection, the load increase is significant. And probably the last point I'd make is that when you look at the business plan we're filing with Ofgem under RIIO-T3, you'll actually see that the biggest driver, in terms of additional supergrid transformers across the 5 years of RIIO-T3, is in fact data center demand in the U.K. as well.

John Pettigrew

executive
#73

Looking at the U.S., the situation is a bit different, since roughly 90% of data centers right now aren't located in the Northeast. On the whole, land and energy costs there run below Northeast levels, though interest in New York is beginning to pick up. We see approximately 1.5 gigawatts of potential data center demand, and about 1/3 of that sits within our territory. Massachusetts is somewhat smaller. At present, I believe we have 3 live connections, and the biggest among them is a request for a 200-megawatt data center. So the picture keeps shifting, and it's something we're heavily focused on right now. And as I mentioned, in T3 you'll notice some of the load growth, and part of the transformer investment we're making has been prompted by that. On affordability, it's always useful to remind people that, beginning with the U.K., the transmission portion of the bill is a fairly modest piece. That isn't to say we don't concentrate on delivering efficiency for our customers. But as things stand, transmission accounts for roughly GBP 20 out of the total yearly bill consumers pay, which comes to around GBP 1,700 annually. So even with our GBP 60 billion capital investment program, which will add a few pounds to infrastructure costs, in the end, if you accept that it will help bring down the commodity component of the bill, then affordability for customers ought to remain manageable.

John Pettigrew

executive
#74

NESO has just released its Clean Power Plan for 2030, and it contains fairly detailed analysis of what the costs could look like. We are taking a look at that at the moment too. In the U.S. it is a bit different, since we serve as the supplier in addition to being the network provider. When we file rates, we coordinate very closely with our regulators. In the more recent rate cases, you will have noticed that we have substantial increases in capital investment. One method we use to soften affordability concerns is to propose programs that assist vulnerable customers. And our regulators genuinely value that from National Grid as we work through various programs aimed at lowering costs for vulnerable customers during stretches when affordability is a concern. Okay. That being the case, I will note that I don't see any further questions. So I will thank everyone for being with us this morning. And I believe my main points are solid performance throughout our regulated businesses in the first 6 months, solid progress on the strategic priorities we laid out in May, and a robust beginning to carrying out our GBP 60 billion capital program, which we also laid out in May.

John Pettigrew

executive
#75

Thanks for being with us, and I'll be seeing all of you very soon.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete National Grid plc transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to National Grid plc earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in National Grid plc or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.