Good day, everyone, and welcome to the NBCC (India) Limited Q2 and H1 FY 2026 earnings conference call, which ICICI Securities Limited is hosting. Please be aware that every participant line will stay in listen-only mode, and once the presentation wraps up, you will have a chance to pose questions. If you require help at any point during this call, please signal an operator by pressing star, then zero, on your touch-tone phone. Kindly note that this conference is being recorded. I will now turn the conference over to Mr. Mohit Kumar of ICICI Securities Limited. Thank you, and over to you, sir.

Sumeet Rohra

analyst
#2

Good afternoon, everyone. I'm speaking on behalf of ICICI Securities, and I'd like to welcome all of you to the Q2 FY 2026 earnings call for NBCC (India) Limited. Joining us today from the management team are Shri K.P. Mahadevaswamy, CMD; Shri Saleem Ahmad, Director of Projects; Dr. Suman Kumar, Director of Commercial; Shri Anjeev kumar Jain, Director of Finance; Shri M.B. Singhal, Executive Director of Finance; and Shri Balkishan Singla, Investor Relations. So, without further delay, I'll hand the call over to management for their opening remarks, and after that we'll move to Q&A. Thank you, and over to you, sir.

Kellambally Mahadevaswamy

executive
#3

Good afternoon, everyone, and a warm welcome to all of you on today's investor call for the second quarter. In quarter two, looking at standalone operations and execution, we posted total income of INR 2,225 crore, and INR 3,017 crore on a consolidated basis, which reflects a 20% year-on-year rise at the consolidated level. Our standalone PAT stands at INR 173 crore, delivering significant year-on-year growth of 40%. In addition, consolidated PAT stands at INR 157 crore, marking 25% year-on-year growth. EBITDA margin has declined gradually quarter to quarter owing to a lower contribution from our Real Estate projects and lower marketing fees from Amrapali Projects. That said, EBITDA margin has gone up H1 to H1, and we are very confident of improving EBITDA margin on a year-to-year basis. Order book: NBCC standalone order book stands at INR 1,012,000 crore, and the consolidated order book is INR 128,000 crore. Business secured: on a consolidated basis, NBCC secured INR 6,800 crore in quarter two, taking the total to INR 10,000 crore in the first half of 2025 to 2026, following major projects secured by NBCC during quarter two. Rajasthan State Industrial Development and Investment Corporation, that is RIICO, around INR 3,136 crore; development of Naveen Nagpur for NMRDA, around INR 3,000 crore; African Safari Plaza, Animal Hospital, quarantine facility, and other allied works, INR 355 crore; MOU with the Department of Post for Land Development across India.

Kellambally Mahadevaswamy

executive
#4

We also signed another MOU — a strategic one with an Australian real estate developer, which expands our global footprint. There's also a strategic MOU with Stanton LC Real Estate Development LLC covering a real estate project in the UAE. On the business award side for the contractor: during quarter two, new tenders worth INR 2,000 crore were awarded at the consolidated level, taking the total to INR 3,800 crore across the first half of 2025 to 2026. For the second half, we expect new work of INR 10,000 to 12,000 crore to be awarded. Turning to redevelopment projects: in H1 2026, the GPRA Redevelopment Project added INR 1,021 crore to the top line. The first phase of the Netaji Nagar project, valued at INR 1,450 crore, stands at roughly 93% completion. Two additional Netaji Nagar projects, worth INR 2,000 crore, have begun contributing, with a further INR 2,000 crore in the pipeline for award at Netaji Nagar. On Sarojini Nagar: this is a large project, and work has been proceeding on film packages valued at INR 8,000 crore; two projects there are finished, and another INR 5,000 crore is in the pipeline for award at Sarojini Nagar. Regarding the Amrapali project: for the half-yearly period, the Amrapali stalled project contributed INR 1,054 crore to the top line. For phase one of the Amrapali project, NBCC has finished close to 23 of 24 projects and completed 30,000 units, and the remaining Sahayak Yojana project will be finished by June 2026.

Kellambally Mahadevaswamy

executive
#5

That's the sole project we still have. In phase II, the Amrapali project has kicked off across various packages, comprising INR 17,000 crore in sales, and construction costs come to roughly INR 12,000 crore. Over the coming quarters, this project will make a significant contribution to both top line and bottom line. Thank you. The forum is now open for the question and answer session.

Operator

operator
#6

Thanks so much. At this point we'll open things up for questions and answers. If you'd like to pose a question, you can press star and one on your touch-tone phone. Should you want to take yourself out of the queue, just press star and two. We ask that participants use handsets when asking a question. Ladies and gentlemen, we'll pause briefly while the question queue is put together. Our first question comes from Ravi Kumar Naredi, of Naredi Investments LLP. Please go ahead.

Ravi Naredi

analyst
#7

Thanks a lot for the chance to speak. Sir, honestly, I’d call this a fantastic result. I’ve been overseeing NBCC for the past 10 years now. Sir, our order book stands at INR 128,000 crore, whereas execution for this year might land between INR 12,500 and 13,000 crore. If I take the Net Profit Rate from H1 — which is 7.65% — then our Net Profit works out to INR 1,000 crore in this Financial Year 2026. Is that possible?

Kellambally Mahadevaswamy

executive
#8

We're looking at INR 800 to 900 crore for this year. That's going to be our profit.

Ravi Naredi

analyst
#9

All right, sir — when we aren’t carrying out a project ourselves and instead bring in an outside agency, why is it that we can’t move faster on project work? Because if I take our project order at INR 128,000 crore and INR 12,500 crore is yearly execution, why are we falling short in project execution? Could you give the specific reason?

Kellambally Mahadevaswamy

executive
#10

So with this INR 125,000 crore from MAHAPREIT, that's a redevelopment project where we need to raise the funding for the Redevelopment Construction. Now, HUDCO recently sanctioned the loan for building three packages, so work will get going. This isn't a PMC project here, and it isn't a budgeted project where the money comes out of a budget. This is a self-sustainable mode project. In a similar way, on the Jammu & Kashmir INR 15,000 crore work, the approval is running late. That's a state government project where we also have to follow the redevelopment model. Raising the funds and securing approvals is taking a bit of time. Once both of these projects begin, that means together it comes to INR 40,000 crore per quarter across these two projects. RIICO as well, we got that recently. RIICO too — every project we're doing there is in self-sustainable mode, the Redevelopment Model. That's the reason it's taking some time. Once it starts, then for sure it will keep running, and we'll earn good revenue as well as profit too.

Ravi Naredi

analyst
#11

HUDCO, what amount of loan has been sanctioned to us?

Kellambally Mahadevaswamy

executive
#12

That's not us. They'll handle the sanctions. We aren't borrowing anything. In fact, it's MAHAPREIT that's borrowing. MAHAPREIT is the one taking the loan. NBCC is taking a loan too — meaning there's no problem, since the land is theirs, so the loan will be taken by them alone. We serve as their project management consultant.

Ravi Naredi

analyst
#13

Got it, sir. What I'm asking is this: in those cases where you say HUDCO has sanctioned loans for three projects, what does the loan amount come to? Could you give it to us straight?

Kellambally Mahadevaswamy

executive
#14

Naveen Nagpur — in the first phase, I believe they've sanctioned INR 11,000 crore. That figure covers land acquisition too, since they still have to buy the land. And at MAHAPREIT, I think INR 3,000 crore has already been sanctioned.

Ravi Naredi

analyst
#15

They've approved INR 14,000 crore, correct?

Kellambally Mahadevaswamy

executive
#16

Yeah, yeah — that applies to them, not to us, sir.

Ravi Naredi

analyst
#17

Ha, ha. Oh, right, right — that's for them, not for us. Not for us. Sir, of that INR 128,000 crore, how much of the book do we actually hold a clear mandate on to begin the project? Could you put it that way?

Kellambally Mahadevaswamy

executive
#18

We have nearly INR 34,000 crore in projects currently underway. As I just explained, there's INR 40,000 crore. Those are the two big projects. Naturally, under 7GP there is also roughly INR 6,700 crore that hasn't begun yet. We already hold INR 34,000 crore across the projects in execution. That's what's running.

Ravi Naredi

analyst
#19

There's a project underway worth INR 34,000 crore. Which we might complete within the next two years — or three years?

Kellambally Mahadevaswamy

executive
#20

Two years — two years. Yeah, yeah. For sure. Under two years. Certain projects take even 18 months, others 24 months. A few projects run to three years.

Ravi Naredi

analyst
#21

What's the status of our backlog for the Delhi Residential Colony? And what volume have we sold during this quarter?

Kellambally Mahadevaswamy

executive
#22

In Delhi, we haven't made any residential sales yet. That will happen down the road. In Sarojini Nagar, we've sold 100%. On the commercial side, there's no inventory left. Sarojini Nagar is 100% sold.

Ravi Naredi

analyst
#23

Sarojini Nagar is fully sold — 100% sold. And there isn't any other Residential Project in Delhi that still needs selling, right?

Anjeev Kumar Jain

executive
#24

It’s going to happen. It’s going to happen. The Commercial Project is in place. It’s valued at roughly INR 9,000 crore, and it will open next month. January. Next month.

Ravi Naredi

analyst
#25

The INR 9,000 crore figure — that will land in January.

Kellambally Mahadevaswamy

executive
#26

Right. Directly across from the World Trade Center, there’s a commercial space we’ll move into at the end of the first quarter — sorry, the fourth quarter. The fourth quarter. January.

Ravi Naredi

analyst
#27

January. All right. Thanks so much. Wishing you the best.

Kellambally Mahadevaswamy

executive
#28

I appreciate it. Thanks a lot. Many thanks.

Operator

operator
#29

Thanks. Our following question comes from Dixit Doshi at Whitestone Financial Advisors. The line is yours — go ahead.

Dixit Doshi

analyst
#30

Yeah, thanks for the chance to ask. My first question is this: could you split the order book for us, in terms of how much comes from a self-sustainable model and how much comes from the budget allocation?

Kellambally Mahadevaswamy

executive
#31

If it’s standalone only, it’s roughly 40% on PMC, and INR 67,000 crore under the redevelopment model. INR 67,000 crore. 60% redevelopment. 60%. 40, 60. You could put it as 40% PMC model and 60% redevelopment.

Dixit Doshi

analyst
#32

All right. So we can say this 40% PMC will be more or less executable over the next 3 years, and 60% of redevelopment may take 4 to 5 years.

Kellambally Mahadevaswamy

executive
#33

Yeah. Yeah. For sure.

Dixit Doshi

analyst
#34

Alright. Alright, so for my second question — earlier there was some discussion about the larger Colony Redevelopment in Delhi. Could you give us more detail, or is there any update on that? It's underway at the moment.

Kellambally Mahadevaswamy

executive
#35

I can tell you it's in process. The moment we receive the confirmation order, I'll let you know right away. Right now, it's under the process.

Dixit Doshi

analyst
#36

So you figure that could happen at some point this year, or might it take a bit longer than that?

Kellambally Mahadevaswamy

executive
#37

This year. For sure, it's going to happen this year.

Dixit Doshi

analyst
#38

That's going to happen this year. How large might it turn out to be?

Kellambally Mahadevaswamy

executive
#39

Right now, I’m not able to say. For sure, later on, I’ll pass that along to you, since it’s a price-sensitive matter. I’ll keep you informed. For sure, it is continuing.

Dixit Doshi

analyst
#40

Okay. Regarding the Ghitorni Land — what's the total area in square feet we have, and how many square feet are we able to build on it?

Kellambally Mahadevaswamy

executive
#41

We’ll move ahead on roughly 21 acres, and that will get sorted as soon as possible. Hopefully construction can begin by the end of this year or in next year’s first quarter, and we’ll also begin selling the commercial spaces. Okay. In 2024? That should produce approximately INR 8,000. It will end up generating roughly INR 8,000, something along those lines. Revenue of some INR 7,000 crore. INR 7,000 revenue. INR 7,300.

Dixit Doshi

analyst
#42

Across all 21 acres, we can expect top line of INR 7,000 crore.

Kellambally Mahadevaswamy

executive
#43

Right, right, got it. And there will be roughly INR 5,200 crore sitting there.

Dixit Doshi

analyst
#44

Alright. Alright. Alright.

Kellambally Mahadevaswamy

executive
#45

That number is a conservative one. A conservative figure.

Dixit Doshi

analyst
#46

Right. Yes, understood. Regarding our other income, looking at this quarter, it comes to roughly INR 106 to 107 crore. Across the half year, that figure stands at INR 181 crore. Does that come mainly from interest earned on the cash we hold, or was there some one-off element in there too?

Anjeev Kumar Jain

executive
#47

There are three components to it. I'm Anjeev Jain, Director of Finance. It has three main parts. First, we sold land — an industrial plot in Noida — which brought us INR 44 crore in earnings, or rather other income. Beyond that, it's INR 44 crore. INR 44 crore. INR 44 crore.

Dixit Doshi

analyst
#48

44 crore rupees. All right, all right.

Anjeev Kumar Jain

executive
#49

Roughly INR 42 crore of that comes from dividends — dividends paid by our subsidiaries.

Dixit Doshi

analyst
#50

Alright.

Anjeev Kumar Jain

executive
#51

The remainder of that comes from interest.

Dixit Doshi

analyst
#52

Right, but wouldn't the dividend coming from the subsidiary have been eliminated in the consolidated numbers?

Anjeev Kumar Jain

executive
#53

Right, I'm referring just to that standalone figure. Got it. Understood.

Operator

operator
#54

Thanks. Our following question comes from Vasudev at Nuvama. You have the floor.

Analyst

analyst
#55

Yeah, thanks for giving me the chance. Sir, the 40 to 60 split you mentioned applied to standalone. What would that split look like at the consol level?

Kellambally Mahadevaswamy

executive
#56

At the consolidated level, the split is 47 and 53 — 47% and 53%. INR 61,000 crore comes from PMC, while INR 67,000 crore comes from redevelopment. As for the subsidiary, no redevelopment work is being done there. Essentially, their business is purely PMC.

Analyst

analyst
#57

All right. Sir, regarding the awards on our projects, what amount did we award during Q2, and what’s the target we’ve set for the second half of this year?

Kellambally Mahadevaswamy

executive
#58

Up to now, we've handed out 3,752. Our hope is that we reach a full INR 10,000 to 11,000 crore over the course of this year. That's what we're aiming for — the minimum target.

Analyst

analyst
#59

So this happened in Q2 or the first half — 3,700?

Kellambally Mahadevaswamy

executive
#60

We're at 3,000 through the second quarter. That's six months.

Analyst

analyst
#61

All right. Sir, given that we’ve already secured roughly INR 10,000 crore during H1, how many additional new orders are we expecting for the second half?

Kellambally Mahadevaswamy

executive
#62

One more thing: the floor is 10,000 at minimum. That's the minimum goal we've set, though it will go beyond 10,000.

Analyst

analyst
#63

All right, so on the whole, we're going to come in above roughly INR 20,000 crore. Okay, that's excellent, sir. When it comes to FY 2026 and 2027, what sort of revenue growth should we expect, along with what EBITDA and PAT margins?

Anjeev Kumar Jain

executive
#64

20%. 20%. For the top line, we're looking at 20% growth. On the bottom line, our PAT margin and EBITDA will be around 7 to 8%, and EBITDA will be around 6 to 6.5%.

Analyst

analyst
#65

So for FY 2027, just to confirm, we're aiming for 20% growth in revenues?

Anjeev Kumar Jain

executive
#66

As a government company, we're bound by a target that the Advisory Ministry sets. Each year, the Advisory Ministry determines that we should deliver a minimum growth of 20%.

Analyst

analyst
#67

All right, certainly. That's excellent, sir.

Kellambally Mahadevaswamy

executive
#68

We’ve already sold 1. Once these 2 redevelopment projects get underway, that means we’ll move into achieving more than that — whatever the minimum set rate is here. That’s in line with the MOU. After this MAHAPREIT and J&K start, we’ll move into bringing in more revenue.

Analyst

analyst
#69

Alright. Yeah, yeah, absolutely. That's wonderful. Sir, regarding the seven GPRA societies work we have — for Sarojini Nagar and Netaji Nagar, what would the total pending order book be on this project?

Kellambally Mahadevaswamy

executive
#70

The amount still outstanding comes to roughly INR 7,000 crore.

Analyst

analyst
#71

Right. And regarding this Netaji Nagar phase — the one that's underway at the moment — which you?

Kellambally Mahadevaswamy

executive
#72

Of that INR 7,000 crore, a tender will be floated by us within this quarter itself. Somewhere in the range of INR 4,000 to 5,000 crore, we are going to float that tender. It's all set. At this point, we're about to call for the tender.

Analyst

analyst
#73

Alright, that’s pretty interesting, sir. So sir, regarding Netaji Nagar, what’s the value of the works that are currently ongoing? I missed that figure — you said it’s 93% completed. What’s the value of that?

Kellambally Mahadevaswamy

executive
#74

That comes to INR 1,450 crore.

Analyst

analyst
#75

All right. All right. Yes.

Kellambally Mahadevaswamy

executive
#76

Sorry, could you say that again?

Analyst

analyst
#77

Regarding the Amrapali Project, you mentioned that our margins declined due to lower Marketing Fees. Is that true for the project overall — meaning our Marketing Fees are low in general — or does it apply only to this quarter?

Kellambally Mahadevaswamy

executive
#78

This applies just to this quarter. During this quarter, we weren't able to sell the property. That's the reason we couldn't get the—it's only a quarter-to-quarter comparison. Apart from that, we're receiving a 1% marketing fee. There's no decrease in the marketing fee.

Analyst

analyst
#79

Right. Right. Right. That's down to weaker sales.

Kellambally Mahadevaswamy

executive
#80

The prior quarter. During this one.

Analyst

analyst
#81

Alright, understood, sir. Where do things stand right now with the Supertech projects?

Kellambally Mahadevaswamy

executive
#82

Supertech — on 8th December, I believe there's a Supreme Court hearing. We're waiting, hopefully, for that Supreme Court decision. It will come. It's just taking a bit of time, that's all. It will come to our KT.

Analyst

analyst
#83

Right, yeah, that's certain, sir. And sir, only a couple or three additional questions regarding the bookkeeping side. What's the value of Real Estate, the Real Estate that belongs to us, which we disposed of during the first half, and what amount are we aiming for across the full year?

Anjeev Kumar Jain

executive
#84

The total value of the Real Estate on our books comes to INR 958 crore. During the first half of this year — in the first half of this year — the turnover we generated from Real Estate amounted to INR 26 crore.

Analyst

analyst
#85

So that was the revenue, or the pre-sales, that we recorded — INR 26 crore?

Anjeev Kumar Jain

executive
#86

Real Estate revenue only gets recorded in the book accounts at the point of sale. That can be reward as we transfer.

Analyst

analyst
#87

So the revenue figure is just INR 26 crore, correct? And not the pre-sales?

Anjeev Kumar Jain

executive
#88

No, that's not the pre-sale. The pre-sale figure is 24%. I'm talking about revenue.

Analyst

analyst
#89

All right, so what would pre-sales be for the quarter, or for the first half, and what's our target for the full year?

Anjeev Kumar Jain

executive
#90

Actually, at this moment, no pre-sale exists. Any sale that was launched got completed solely for this half year. The sale figure, the revenue figure, is INR 24 crore. There is no pre-sale as such. Roughly INR 64 to 65 crore is our target for this year.

Analyst

analyst
#91

All right.

Anjeev Kumar Jain

executive
#92

That's the conservative number.

Analyst

analyst
#93

Yes. Sir, finally, what amount of seed capital do we have on our books right now?

Anjeev Kumar Jain

executive
#94

The seed money comes to INR 481 crore. Within that total, INR 465 crore goes to the Amrapali project, while INR 16.5 crore is allocated to the DTC project.

Analyst

analyst
#95

Alright. That's all I have, sir. Thanks, and best of luck.

Kellambally Mahadevaswamy

executive
#96

Right. Thanks very much.

Operator

operator
#97

Thanks. Our next question comes from Sumeet Rohra at Smartsun Capital Private Limited. Go right ahead.

Sumeet Rohra

analyst
#98

Good afternoon, sir, and to your whole team as well. First off, sir, congratulations on a solid set of numbers. Now, sir, my question relates more to the business overall. Because as things stand today, your order book sits at roughly INR 128,000 crore. My sense, sir, is that this order book will need to be executed across four to five years. Would it be fair to understand, sir, that revenue ought to now begin rising at a very rapid pace, since most of these orders you hold would need to be delivered over the coming three to four years? Second, sir, if you could shed some light on the order visibility you're seeing, because the focus we're clearly picking up is essentially development. You are a key instrumental player operating in this segment. Sir, could you shed some light on the order visibility you see? On the profitability front as well, if we take a three-year view, could you also shed a bit of light on how you expect profits to evolve, sir?

Kellambally Mahadevaswamy

executive
#99

Mr. Sumeet, sir, I already covered this: of the INR 112,000 crore, roughly INR 40,000 crore came out from J&K and MAHAPREIT Bombay. Those 2 projects, I believe, will get underway this year. Because of this self-sustainable approach and the redevelopment model, we require some seed money to kick off the projects. That's why we got stuck. Just recently — it debuted only yesterday — we acquired sanctions and a loan as well. Now MAHAPREIT will move into taking place. In the same way, J&K will also move into getting at the early years. Once those 2 projects begin, that definitely means our top line will go up. Once the top line goes up — since we have fixed expenditure, which is only our overhead salaries — after that, the bottom line also rises rapidly. As for new future business, we have a top rather finalization with redevelopment of other colonies in Delhi. DDA will go on to interest 2 more colonies to us for redevelopment. We are in talks with MCD, Municipal Corporation of Delhi, PWD. We have plenty of work in the pipeline. Likewise, we are talking with various state governments. Tribeca is also willing to hand us some works. HPCL, they wanted redevelopment in Bangalore. We are talking with various PSUs.

Kellambally Mahadevaswamy

executive
#100

The PSUs hold sizable land parcels, or they have older colonies and township colonies. Those we will redevelop. Our pipeline includes a very solid order book. As soon as we secure the order book, we will certainly inform you, since it is a price-sensitive matter. That is why I cannot directly tell you which orders those are or when they will arrive. Yes, certainly within this year — I am saying INR 10,000 crore is the bare minimum. We will obtain more work orders.

Sumeet Rohra

analyst
#101

Right. Sir, what I'm getting at is this: I realize that for this year, you'd be looking at revenue growth of roughly 20 to 25%. And sir, my understanding — please correct me if I'm wrong — is that starting with the next financial year, your revenue ought to accelerate, correct? Since you keep awarding more and more orders. Sorry, what was that?

Kellambally Mahadevaswamy

executive
#102

Yes, absolutely. I'm calling that a conservative figure, but it's going to rise. Without question, it will go up.

Sumeet Rohra

analyst
#103

All right. Sir, would you like to take it?

Kellambally Mahadevaswamy

executive
#104

That's a conservative figure.

Sumeet Rohra

analyst
#105

All right, and sir, if I caught that right, your EBITDA Margins are going to come in near 6.5%. Did I hear that correctly?

Kellambally Mahadevaswamy

executive
#106

Correct.

Sumeet Rohra

analyst
#107

All right, that's fantastic. Thank you very much, sir, and my best wishes to you. Best of luck to you, sir. Appreciate it.

Operator

operator
#108

Thanks. Our next question comes from Divyam Doshi at Pragya Securities Private Limited. Please go ahead.

Divyam Doshi

analyst
#109

Hi there, and congratulations on the strong results. I'd like to ask about something you mentioned on prior calls — that the state development projects in Rajasthan, Goa, Chhattisgarh, and the Kerala Housing Board were nearly ready, with DPRs at the final stage. In Q2, what we're seeing is only orders coming in, not actual work getting underway on the ground. So when do you expect genuine execution on this project to start? What is your internal timeline for getting the approvals all tied up?

Kellambally Mahadevaswamy

executive
#110

On the Rajasthan tender, the consultant appointment process is underway. We expect to make that appointment by this weekend or next week. For Goa, we've already issued a tender. Goa is at an advanced stage. We'll be appointing on these Goa tenders within this quarter only. As for Kerala Housing Board, we're waiting on some approval. Approval is what we're waiting for. Forest clearance is needed there. Once that comes through, we'll move to award as well. On MAHAPREIT and J&K, as already mentioned, we'll begin those projects by the year end.

Divyam Doshi

analyst
#111

Alright, thank you. Just one final question. Could you please tell us which projects can realistically be carried out during the coming financial year, FY 2027, and how much revenue each of those projects is capable of bringing in? Would you share which projects are actually feasible to execute in the next financial year and how much revenue those projects will contribute?

Kellambally Mahadevaswamy

executive
#112

Amrapali, we have seven GPRLs underway. We'll move into call four, five tenders, plus another four, five tenders, and that should bring in roughly INR 4,000 crore. Naturally, Goa is one we'll go into award. Without question, Rajasthan, Mandapuram, and RIICO — those too we'll go into award within this year. Come next year, every one of these projects will deliver solid revenue along with profit.

Divyam Doshi

analyst
#113

All right, all right. So are there any fresh projects that are slated to wrap up during this fiscal year?

Kellambally Mahadevaswamy

executive
#114

On the financial side, we're finishing up the projects. In phase one, Amrapali, we've actually completed close to 23 projects. There's just one left, Aadhar Seva Yojana, and it should be done by the second quarter of the first quarter of 2026. At 7GPRA, type II is finished, and type IV plus type V, roughly 1,000 units, we'll be completing those. Type VI is also at an advanced stage. Of course, at 7GPRA we're completing the project within the timeline.

Divyam Doshi

analyst
#115

Right, that’s all from me. Thanks very much. I’ll get back in the queue. Best wishes.

Kellambally Mahadevaswamy

executive
#116

Thanks. Thanks a lot.

Operator

operator
#117

Thanks. Our next question comes from Ankita Shah at Elara Capital. The line is yours — go ahead.

Ankita Shah

analyst
#118

Yeah. Hi sir. Congrats on the results and the strong performance. My first question concerns the Real Estate side. Now that we have completed properties that are ready for sale, when do we expect to see traction in Real Estate revenues? The first half appears to be relatively muted.

Anjeev Kumar Jain

executive
#119

Yeah. Ankita, good morning. Anjeev here — Anjeev on this side.

Ankita Shah

analyst
#120

Yes, sir.

Anjeev Kumar Jain

executive
#121

On the Real Estate side, we were expecting roughly INR 250 crore plus in revenue, but our strategy has shifted. As you know, there's a project in Bhubaneswar called Imperia. From that project we planned to bring in about INR 200 crore of revenue, but we've changed our approach and will use it only for lease revenue, since leasing in Bhubaneswar is a good business. That's why we were expecting INR 250 crore plus of revenue, but we've now moved our revenue guidance away from Real Estate to INR 65 crore or INR 67 crore.

Kellambally Mahadevaswamy

executive
#122

There's enormous income potential when it comes to IT people. At this point they're asking for lease. We'll move into getting good revenue. Rather than selling, the asset will stay with us alone. We're planning to — our strategy has been changed. We will move into giving it out on a lease basis. That's roughly INR 200 crore. We are not.

Ankita Shah

analyst
#123

So for this year, what amount of Real Estate revenue should we be anticipating?

Kellambally Mahadevaswamy

executive
#124

Roughly INR 65 crore. That figure is approximately INR 65 crore.

Ankita Shah

analyst
#125

So what are the margins going to be on this? What about segment margins?

Anjeev Kumar Jain

executive
#126

The margin is going to come in at INR 27 crore. So if we take INR 65 crore as the top line, that puts INR 27 crore on the bottom line.

Ankita Shah

analyst
#127

Alright.

Kellambally Mahadevaswamy

executive
#128

Somewhere around 30% to 40%. 40%.

Ankita Shah

analyst
#129

Understood, understood. Beyond that, sir, you described how margins fell as a result of the Amrapali Projects. Is this a temporary effect, or has the margin on the project come down overall?

Kellambally Mahadevaswamy

executive
#130

No, no — that's just temporary, only for this quarter. Especially just this quarter. Next quarter and two, we'll get that profit margin as well. EBITDA as well, we'll get there. PAT has already gone up. It's only EBITDA that we're discussing.

Ankita Shah

analyst
#131

Understood. Is the marketing fee still unchanged as well? The marketing fee expressed as a percentage?

Kellambally Mahadevaswamy

executive
#132

Yeah, yeah. We're receiving 8% PMC along with 1% marketing. With any luck, next quarter we'll receive the full marketing amount.

Ankita Shah

analyst
#133

Understood. Finally, sir, of that total INR 128,000 crore order book, how much is currently at various phases of execution and could bring in revenue during the year?

Kellambally Mahadevaswamy

executive
#134

We're already at 34,000 that I'm running. Another INR 10,000 will be awarded by us in the course of this year. So roughly INR 44,000 will be the projects we have running. Come next March — March — we'll move to award MAHAPREIT and J&K, and that gets added to our KT.

Ankita Shah

analyst
#135

All right. All right. Sounds good. Certainly, sir. That's all I had. Thanks, and best of luck.

Kellambally Mahadevaswamy

executive
#136

Much appreciated, and thanks again.

Operator

operator
#137

Thanks. Our following question comes from Dixit Doshi at Whitestone Financial Advisors. The line is yours — go right ahead.

Dixit Doshi

analyst
#138

Yeah, thanks again for the chance. So a few things. First, just to clarify: you're referring to a 6.5% EBITDA margin. That's excluding the other income, correct?

Kellambally Mahadevaswamy

executive
#139

Yeah. Yep.

Dixit Doshi

analyst
#140

Yes. All right. My second question — when I look at the P&L that you file with the exchanges, there's a line item among the expenses: write-offs. That has dropped quite a bit. Could you explain whether it will stay at these low levels or whether we might see it rise going forward? If I look at last year, for H1, it was INR 102 crore last year. For H1 this year, it's just INR 5 crore.

Anjeev Kumar Jain

executive
#141

The amount is going to hinge on how much of a write-off occurs each quarter. In fact, an ACL mechanism existed last year. After the ACL gets established, our decision has been to remove that financial asset entirely from the books. In the equivalent quarter or equivalent half year previously, we chose to fully write off the financial asset up to INR 100 crore. No such instance arose this time. That explains why no write-off appears.

Kellambally Mahadevaswamy

executive
#142

Even so, our PAT is going up. That’s what makes this so attractive. We’re raising it—compared with last year, whether you look year over year or quarter over quarter, we’re posting a solid PAT.

Dixit Doshi

analyst
#143

Alright. Alright. That number could rise, depending on the.

Kellambally Mahadevaswamy

executive
#144

Yes.

Dixit Doshi

analyst
#145

Alright.

Anjeev Kumar Jain

executive
#146

That hinges on how the outstanding balance is analyzed, along with the ACL that gets created in the books of accounts.

Dixit Doshi

analyst
#147

All right, got it. Thanks. That’s all from me.

Kellambally Mahadevaswamy

executive
#148

Thanks. Thanks.

Operator

operator
#149

Thanks. Before we move on to the next question, just a reminder for everyone: you can press star and one to ask a question. Our next question comes from Amanveej at Stout Investment Management. Please go ahead.

Analyst

analyst
#150

Good afternoon. I’d like to start with a question about Supertech. Is there any update on that project, and where do you see the hearing, say?

Kellambally Mahadevaswamy

executive
#151

Supertech. On December 8th, a hearing is scheduled. We are awaiting the Supreme Court's ruling. My belief is that it will arrive either at this hearing or the following one. The decision will reach us. With luck, it will reach us.

Analyst

analyst
#152

Yes, sir. The next question concerns the running order, sir.

Operator

operator
#153

My apologies for cutting in, Aman. The audio on your end is unclear.

Analyst

analyst
#154

Yes, that would work better. The second question is about the running order book, sir. You mentioned that by the end of this year we'll be at INR 44,000 crore, assuming an additional INR 1,000 crore by the close of this year. I'd like to see that figure for FY 2027 and FY 2028. Could this running order book be around INR 60,000 to 70,000 crore over the next one to two years?

Kellambally Mahadevaswamy

executive
#155

Possibly. Perhaps over the next 2 years. Since we began awarding this MAHAPREIT along with J&K, Rajasthan, and Goa, our order book will certainly link.

Analyst

analyst
#156

Okay, sir. The last question comes from the Real Estate side. You mentioned INR 64 to 65 crore of revenue recognition for this year. What figure applies to FY 2027 and FY 2028?

Kellambally Mahadevaswamy

executive
#157

Twenty-eight, for sure — we’ll move toward our 30:70. Ghitorni as well, we expect that in 2028. From our Real Estate, we may receive roughly INR 200 to 250 crore.

Anjeev Kumar Jain

executive
#158

That's the profit figure. Now regarding property, in FY 2028 we'll be in a position to have INR 800 crore plus, at roughly 30:70. One of the 30:70 projects, Bhubaneswar, will come up then.

Analyst

analyst
#159

So the entire INR 800 crore will be recognized in FY 2028 itself?

Kellambally Mahadevaswamy

executive
#160

Yeah. Yeah.

Analyst

analyst
#161

About fiscal 2020 — yes, sir, on that. And for fiscal 2027, roughly what top line are we targeting for Real Estate?

Kellambally Mahadevaswamy

executive
#162

Regarding the INR 100 crore figure — INR 100 crore in top line and roughly INR 20 to 30 crore on the bottom line. We've already divested our Kolkata and Bhubaneswar assets, which is where our approach shifted. Had we not done that, we might have realized INR 200 to 250 crore. As for Bhubaneswar, selling is off the table. Rather than that, we'll lease it out. That gives us some revenue — fixed revenue — since plenty of IT structures are relocating to Bhubaneswar these days. They're coming to us, and our plan is to lease it.

Analyst

analyst
#163

Yeah, approximately, how much does that rental income from Bhubaneswar by itself come to for the year, and it's recurring annually, right?

Anjeev Kumar Jain

executive
#164

It'll come in at roughly INR 20 crore to INR 23 crore, or about INR 24 crore.

Kellambally Mahadevaswamy

executive
#165

Within a year.

Anjeev Kumar Jain

executive
#166

Within a year.

Analyst

analyst
#167

Yes, sir. Are there any other areas where we might pursue a comparable model rather than an outright sale?

Kellambally Mahadevaswamy

executive
#168

At the World Trade Center, we've already handed over space — we purchased 3 floors there. Rent is coming in from that. It's been provided to CAG and GST. So each month we receive rent of INR 2.5 crore, which works out to roughly INR 30 crore. That INR 30 crore is what we're getting at the World Trade Center.

Analyst

analyst
#169

Yes, we're aware of that, sir. Going forward, are there any other projects you might consider converting to this rental model?

Anjeev Kumar Jain

executive
#170

That will hinge on how the market plays out. If leasing ends up generating solid revenue,

Kellambally Mahadevaswamy

executive
#171

We're also making plans in Ghitorni, naturally—we wanted to offer some spaces on a rental remodel basis. Rather than selling off the entire property, we're considering going that route.

Analyst

analyst
#172

What's the acreage you plan to sell it across?

Kellambally Mahadevaswamy

executive
#173

We haven't made a final decision on that yet. It all depends on how the market looks — if we can secure good rent, then we'll certainly look to offer up whatever excess space we have in mind.

Analyst

analyst
#174

Alright, sir. Thanks for taking the question.

Kellambally Mahadevaswamy

executive
#175

Thanks. Appreciate it.

Operator

operator
#176

Thanks. Divyam Doshi from Pragya Securities Private Limited has the next question on the line. Go ahead, please.

Divyam Doshi

analyst
#177

Sir, in the earlier calls you had given guidance of INR 14,000 to 15,000 crore for the Financial Year 2026, and I've seen that. So far, we've only completed roughly INR 5,300 crore. You need to target 1.5 of the current sales. How is that possible?

Kellambally Mahadevaswamy

executive
#178

Sure, it can be done. Look, if you measure each year by comparing one half to the next, or simply put one quarter up against another, we're already at 15%–16%. And on a standalone basis, naturally, we're reaching 20%. Without question, this is an achievable goal. Without question, we will reach 14,000 on a consolidated basis.

Divyam Doshi

analyst
#179

All right. Is there anything else?

Kellambally Mahadevaswamy

executive
#180

The working season—in the second year, the second, third, and fourth quarters will be the busy period for the civil industry. We expect solid revenue during this half year.

Divyam Doshi

analyst
#181

Alright. Are there any additional plans down the road for boosting the EBITDA Margin? At present, that figure sits at roughly 4 to 5%. Your goal has been set at 6%. Could it possibly reach double digits at some point later on?

Kellambally Mahadevaswamy

executive
#182

Double digits? At the moment, I believe I'll address that question on the next call, I think. Double digit, yes. For sure, that's what we want. We'll see.

Divyam Doshi

analyst
#183

I realize that's really tough, but yeah.

Kellambally Mahadevaswamy

executive
#184

As soon as we’re able to reach the double digit figure, as soon as our Ghitorni and our 30:70 begin delivering results, that will certainly be in double digit. Because Ghitorni alone will have around INR 5,000 crore in profit. And in 30:70, INR 800 crore. So from 2027 to 2028, certainly, I believe we are going to deliver a double digit figure, EBITDA.

Divyam Doshi

analyst
#185

Alright, thank you very much.

Kellambally Mahadevaswamy

executive
#186

I appreciate that.

Operator

operator
#187

Thanks. Our next question comes from Ravi Kumar Naredi at Naredi Investments LLP. The line is yours — go ahead.

Ravi Naredi

analyst
#188

Sir, I'd like to ask — could you share how many additional orders we might get in H2?

Kellambally Mahadevaswamy

executive
#189

H2? Minimum 10,000, as was said earlier, 10,000. The figure will land between 20,000 and 30,000, though 10,000 is the floor we're aiming for. We're going to achieve that.

Ravi Naredi

analyst
#190

Could you give us the target for the top line in the 2027 financial year?

Kellambally Mahadevaswamy

executive
#191

Eighteen thousand. I've already made that commitment — 18,000.

Ravi Naredi

analyst
#192

Alright. Thanks, sir.

Kellambally Mahadevaswamy

executive
#193

Thanks. Much appreciated.

Operator

operator
#194

Thanks. Our next question comes from Dixit Doshi at Whitestone Financial Advisors. You're up.

Dixit Doshi

analyst
#195

Yeah, just one question about that 30:70 Gurgaon Real Estate project. You said how much top line could come from it?

Kellambally Mahadevaswamy

executive
#196

We're looking at roughly INR 2,200 crore in top line.

Dixit Doshi

analyst
#197

Two thousand?

Kellambally Mahadevaswamy

executive
#198

And 2,200.

Dixit Doshi

analyst
#199

Alright.

Kellambally Mahadevaswamy

executive
#200

Approximately.

Dixit Doshi

analyst
#201

Alright.

Kellambally Mahadevaswamy

executive
#202

The PAT figure should come in at roughly INR 800 crore.

Dixit Doshi

analyst
#203

All right. So at this point, has construction gotten underway there?

Kellambally Mahadevaswamy

executive
#204

The tender’s already been called. I believe we’ll get started ahead of December or January.

Dixit Doshi

analyst
#205

Right. So you're anticipating the exit, given that revenue gets recorded at the point we hand over the property. Got it.

Kellambally Mahadevaswamy

executive
#206

That's all. That is the reason. If not, the cash will arrive right away starting in January or it won't, and we are going to receive the money. But VW can be booked. Turnover can be recorded only at the point when we hand it over. That is the reason we are planning for 2027 to 2028, when we will get that revenue.

Dixit Doshi

analyst
#207

What I'd like to ask is whether you anticipate that in 2 years, the building work will be finished and we'll be doing the handover as well?

Kellambally Mahadevaswamy

executive
#208

Absolutely.

Dixit Doshi

analyst
#209

So this tender we're giving out next month — it'll cover the full INR 2,200 crore?

Kellambally Mahadevaswamy

executive
#210

Yeah. Yeah.

Dixit Doshi

analyst
#211

All right. All right. Good. I have nothing further to add. Thanks.

Kellambally Mahadevaswamy

executive
#212

Appreciate it.

Operator

operator
#213

Thanks. Our next question comes from Dr. Akshay Patil, an Individual Investor, who is on the line. Please go ahead.

Analyst

analyst
#214

I want to congratulate the NBCC team on a solid set of results. I can see a substantial overall increase coming next. As a public sector company operating with that level of efficiency, I feel very proud of the entire team. My first question is — hello, can you hear me?

Kellambally Mahadevaswamy

executive
#215

Go ahead, please. Please continue. Dr. Sir, please go on.

Analyst

analyst
#216

Right, yeah. So my first question is this: on the last conference call, you mentioned that a financial arm would be established. Has anything moved forward on that front, so that margins could be improved?

Kellambally Mahadevaswamy

executive
#217

Since our financing comes from our sister company HUDCO, we aren't really looking to establish an NBFC at this time. We're receiving funds from HUDCO and carrying out the execution ourselves, and I think that's sufficient. There's one point I wanted to share with you here: whenever a PSU fails, a private player takes over — Air India, for instance. In our NBCC situation, it works the other way around — whenever the private sector fails, NBCC steps in and finishes the job. That's the reverse story. Amrapali is the example — one of the best examples: the private people failed at Amrapali, and we are completing that project. So we are proud to call ourselves a Navratna Construction Company.

Analyst

analyst
#218

No, sir. I’ve followed this company for a long time, yet over the past two years its results have been phenomenal. I want to congratulate the team on putting in such hard work and on creating value for the shareholders.

Kellambally Mahadevaswamy

executive
#219

Thanks. Appreciate it.

Analyst

analyst
#220

Yeah. My next question is this: in earlier earnings calls, you've mentioned a top line of INR 25,000 crore and a bottom line of INR 5,000 crore. Which financial year do you expect that to happen in?

Kellambally Mahadevaswamy

executive
#221

We already said it, right? 2,000. 2,000. PAT is going to be 2,000, and INR 25,000 crore on the top line.

Analyst

analyst
#222

Let's start with the headline number, for fiscal 2028. All right.

Kellambally Mahadevaswamy

executive
#223

Yeah, 28.

Analyst

analyst
#224

All right, thank you. That covers everything on my end.

Kellambally Mahadevaswamy

executive
#225

Thanks. Thanks.

Operator

operator
#226

Thanks. Our following question comes from HK Dash, an individual investor. Go right ahead.

Analyst

analyst
#227

That's a great figure, sir, and thank you for the chance to ask. I just wanted an update on the parcel of land situated very near Bombay Airport — the Hindustan Organics Limited plot. We hold an agreement covering that land, sir. What is its current status?

Kellambally Mahadevaswamy

executive
#228

Not precisely, though we are indeed observing certain PSU land parcels in Mumbai. National Bicycle Limited holds a plot close to Sea Link, and we intend to carry out redevelopment on that site. In a similar vein, it could be Balmer Lawrie, which possesses a substantial land parcel, and Richardson & Cruddas as well. We are even in discussions with the shipyard. With luck, starting next year and beyond, we will secure some business in Mumbai too.

Analyst

analyst
#229

Much appreciated. Thank you very much, sir.

Kellambally Mahadevaswamy

executive
#230

Thanks. Thanks.

Operator

operator
#231

Thank you. Ladies and gentlemen, if you'd like to ask a question, you can press star and one. Our next question comes from Sumeet Rohra of Smartsun Capital Private Limited. Please go ahead.

Sumeet Rohra

analyst
#232

Right, sir. You had just brought that up — actually, what I wanted to ask about was the potential opportunity with the PSUs. You said you're in talks with PSUs regarding land parcels. You also brought up HPCL. Sir, how large are some of the opportunities we have with the other PSUs?

Kellambally Mahadevaswamy

executive
#233

With HPCL, about INR 1,500 crore of that is located in Bangalore.

Sumeet Rohra

analyst
#234

All right. And you brought that up as well.

Kellambally Mahadevaswamy

executive
#235

Eighteen acres of land.

Sumeet Rohra

analyst
#236

My apologies, sir.

Kellambally Mahadevaswamy

executive
#237

There's 18 acres of land in Bangalore. That belongs to HPCL. Discussions are underway about redeveloping HMT. HMT is also located in Bangalore, and throughout India they hold land parcels. MTNL, I believe, will soon kick off its project in Delhi itself. MTNL and BSNL both possess enormous land parcels. We might secure additional parcels from these PSUs.

Sumeet Rohra

analyst
#238

All right, got it. Yeah, because, sir, I mean, the sheer scale of opportunity you have in front of you is truly enormous. I mean, it's clear you're in the leading position. Once again, I wish you good luck and all the best, sir.

Kellambally Mahadevaswamy

executive
#239

Thanks, Sumit. Appreciate it.

Operator

operator
#240

Thank you. Just a quick reminder for everyone: you can press star and one if you'd like to ask something. Ladies and gentlemen, since no one in the audience has a question, I'll now turn the conference back to management for their closing remarks.

Kellambally Mahadevaswamy

executive
#241

Thanks to solid financial results, NBCC's revenue and profit have both climbed considerably quarter over quarter. As you're aware, the fourth quarter is usually the biggest contributor, and we anticipate that pattern will further boost our overall results in the second half. On full-year guidance, we stay confident about hitting INR 14,000 to 15,000 crore in revenue, along with a stand alone PAT margin of 7 to 8% and an EBITDA Margin of 6 to 6.5% for the full year. On Real Estate contribution, we look for a meaningful contribution from our Real Estate projects in quarter three and quarter four, which will sustain our profitability momentum. On the Amrapali project sale, sales for the Amrapali projects have been launched, and we expect a strong response and positive outcomes over the coming quarters. On Ghitorni project status, the Ghitorni Real Estate project is in the final stage of resolution, and we would expect to begin position now to award the work either toward the end of this quarter or in next year's first quarter. Thank you. With that, thank you all once again.

Operator

operator
#242

Thank you, sir. Participants, please note, if you have any further questions, please contact Balkishan Singla from Investor Relations. Thank you. On behalf of ICICI Securities Limited, that concludes this conference. Thank you all for joining us, and you may now disconnect your line.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete NBCC (India) Limited transcript — plus 133,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to NBCC (India) Limited earnings transcripts and 133,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in NBCC (India) Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.