Good morning, ladies and gentlemen. Karthikeyan here, the moderator for this conference call. Welcome to the Q2 FY '27 earnings conference call of NBCC India Limited. Joining us today are Shri K.P. Mahadevaswamy, Chairman cum Managing Director; Dr. Suman Kumar, Director, Commercial; Shri Anjeev Kumar Jain, Director, Finance; <<inaudible>> Shri Ashutosh Gautam, Director, Projects; and Mr. Sri M.D. Singhal, Executive Director, Finance. <<operator_script>> Kindly note that this conference is being recorded. I will now hand the floor over to Shri K.P. Mahadevaswamy. Thank you, and over to you, sir.

Kellambally Mahadevaswamy

executive
#2

Thank you, Mr. Karthikeyan. Good morning, everyone, and a hearty welcome to all of you. First of all, happy Dhanteras, and I wish you a happy Deepawali in advance. Before we begin the call, we welcome our new Director, Project, Shri Ashutosh Gautam. He has served for 34 years across multidisciplinary wings of infrastructure, which will help NDCC on multiple fronts. For quarter 2 operation and execution, we achieved revenue from operation of INR 2,890 crores standalone and INR 3,396 crores on consolidated, reflecting a 38% year-on-year increase on a standalone basis. On a stand-alone basis, EBITDA rose significantly by 154%, INR 219 crores from INR 89 crores -- INR 86 crores. And our standalone PAT grew by 31%, standing at INR 225 crores, marking a significant growth. For H1 operation and execution, we achieved revenue of operation INR 4,713 crores standalone and INR 5,655 crores on consolidated, reflecting a 26% year-on-year increase on a standalone basis. On a standalone basis, EBITDA rose significantly by 105%, INR 379 crores from INR 183 crores, and our standalone PAT stands at INR 376 crores, marking a significant 31% year-on-year growth. In terms of order book position, NBCC standalone order book stands at INR 1,12,000 crores and consolidated order book INR 1,26,000 crores.

Kellambally Mahadevaswamy

executive
#3

New business won during quarter 2 comes to INR 3,600 crores on a consolidated basis. The following are the key projects bagged in the last quarter. The RBI residential complex at Amravati, AP, New Andhra Pradesh, valued at INR 800 crores; a housing project in Seychelles at roughly INR 600 crores. Work given out to contractors. During quarter 2, we awarded INR 1,500 crores of fresh tenders at the consolidated level, bringing the first-half total in 2026-'27 to INR 3,200 crores. Over the coming 2 quarters, we expect new work worth INR 15,000 crores to INR 16,000 crores to be awarded. Tenders for every package of Supertech have been uploaded, worth INR 9,600 crores, and we will award them in quarter 3 itself, with turnover beginning in quarter 4. And many additional projects, including ones recently secured from the Government of Bihar, West Bengal, J&K, will be awarded over the upcoming quarters. Redevelopment projects. Continuing the resource mobilization sale under the VII GPRA project, NBCC successfully sold residential apartments covering 8.8 lakh square feet at Avenue Towers opposite Leela Hotel, Sarojini Nagar, New Delhi, via an open e-action, at a total sale value of INR 5,191 crores. All major packages within the redevelopment projects are at the running stage.

Kellambally Mahadevaswamy

executive
#4

Right now, the balance workload stands at INR 9,200 crores. For the Amrapali project, Phase 2 has begun across various packages, and at present it carries a balance workload of INR 8,000 crores. We're pleased to report that NBCC has finished 24 stalled Amrapali projects from Phase 1, and the ending-over work is now underway. Work on Amrapali Phase 2 is moving ahead on a fast track. At one of the packages, the building site has reached up to INR 26 crores. And as a last update on the HSCC merger, it's on a fast track so that we'd gain better synergy. Thank you. The floor is now open for questions and answers.

Operator

operator
#5

<<operator_script>> Our first question is from Pankaj Kumar with Kotak Neo.

Pankaj Kumar

analyst
#6

Congratulations on the strong numbers. Sir, regarding the guidance we provided earlier for FY '27 — roughly INR 13,000 crores to INR 14,000 crores in standalone revenue — and with H1, we've come in at about INR 4,700 crores. So where do we stand on hitting that guidance? And what does the path look like for FY '28 and '29?

Kellambally Mahadevaswamy

executive
#7

I want to reassure everyone that we will hit INR 13000 crores to INR 14,000 on a standalone basis. As usual, our first and second quarters tend to be slower in pace. It's only in the third and fourth quarters that we'll reach this figure, and that still holds true. We are going to achieve roughly INR 13,000 crores to INR 14,000 crores on a standalone basis.

Pankaj Kumar

analyst
#8

And what about 2028 and 2029?

Kellambally Mahadevaswamy

executive
#9

At 29, we've already committed roughly INR 21,000 crores on a consolidated basis, and on a standalone basis there will be 20%, 25% growth.

Pankaj Kumar

analyst
#10

This pertains to FY '28.

Kellambally Mahadevaswamy

executive
#11

For the following year, you're saying '28.

Pankaj Kumar

analyst
#12

And previously, we mentioned order inflows of roughly INR 50,000 crores to INR 60,000 crores, and one big project, V GPRA, is part of that. So where does that stand now? And what's the overall outlook for order inflows in the current financial year?

Kellambally Mahadevaswamy

executive
#13

We expect to secure orders worth INR 50,000 crores to INR 60,000 crores during this year — that guidance still stands. Just recently, we won roughly INR 2,500 crores of work from the Bihar government, and another INR 8,000 crores work order should arrive within this quarter itself. As for GPRA, it will definitely come either this quarter or the next one. It is in process. At the earliest, we are going to get around INR 30,000 crores to INR 35,000 crores from V GPRA.

Pankaj Kumar

analyst
#14

So with all these environmental-related issues, we're seeing construction restrictions. So how is progress going at the construction site?

Kellambally Mahadevaswamy

executive
#15

It’ll be in place. We’re complying with every standard we currently follow. Even so, any time AQ rises, construction will be halted, and that will impact solely our Delhi projects, not the others. Throughout India, we are certainly performing well. In this quarter, we are also going to award Supertech. Starting next quarter, turnover will come from Supertech as well as J&K. For the J&K III tender, we have already received the technical bid. It will be opened at the earliest. The price bid will proceed at the earliest, and we will move to award it during this very month, J&K.

Pankaj Kumar

analyst
#16

All right. So the fresh award of INR 15,000 crores to INR 16,000 crores contains about INR 9,600 crores coming from Supertech — that is what you mentioned.

Kellambally Mahadevaswamy

executive
#17

So from INR 50,000 crores to INR 60,000 crores, we're going to award somewhere around INR 15,000 crores to INR 16,000 crores during this year. We've already committed that — and that includes Supratech and J&K. And some — we may expect some work that we're going to award through the Bihar government and West Bengal as well. Recently, we signed MOUs with the Bihar and West Bengal governments.

Pankaj Kumar

analyst
#18

And what about the next financial year? What type of award are we looking at? And what would the total number be — what would the total value be of the projects running by the end of this financial year, and then by the next financial year?

Kellambally Mahadevaswamy

executive
#19

Next year — sorry, what business are we going to give?

Pankaj Kumar

analyst
#20

There aren't any projects currently running.

Kellambally Mahadevaswamy

executive
#21

Running projects?

Pankaj Kumar

analyst
#22

Yes.

Kellambally Mahadevaswamy

executive
#23

Right now, we're at about INR 33,000 crores. So next year, another INR 16,00 crores, INR 17,000 crores will get added, meaning it'll rise by another 10% to 20%.

Pankaj Kumar

analyst
#24

All right. And sir, finally, regarding MAHAPREIT, what’s the current status on that project?

Kellambally Mahadevaswamy

executive
#25

Regarding the MAHAPREIT project, it has been delayed for some reason. Still, I believe we will get MAHAPREIT underway this year as well.

Pankaj Kumar

analyst
#26

So, what exactly are the…

Kellambally Mahadevaswamy

executive
#27

Not long ago, my Director Project paid a visit and had discussions with them. Some initial — since this is a self-sustainable project, funds have to be arranged, and we need to secure the clearances, approvals and all of that. That is why it is being delayed. However, within this year, we are going to start MAHAPREIT as well. And for Naveen Nagpur too, we will begin the tendering in the last quarter.

Pankaj Kumar

analyst
#28

So has this HUDCO tie-up <<inaudible>> been finalized, or is it still pending?

Kellambally Mahadevaswamy

executive
#29

What about funding from HUDCO?

Pankaj Kumar

analyst
#30

Right, regarding MAHAPREIT, you brought up the funding from HUDCO.

Kellambally Mahadevaswamy

executive
#31

Nope. It's still happening. Still happening.

Operator

operator
#32

Mahesh Tolani from <<inaudible>> has the next question. It appears there's no answer. Our following question is from Vasudev Ganatra of Nuvama.

Vasudev Ganatra

analyst
#33

Congrats on those strong figures. Sir, both our EBITDA margins and revenue growth came in pretty solid this quarter. So did we do anything quite different? Or were there any one-offs at play? Could you shed some light on that for us?

Kellambally Mahadevaswamy

executive
#34

My finance director will respond.

Anjeev Jain

executive
#35

EBITDA this time around has basically risen to 8%. We previously described EBITDA as falling within a 5% to 6% range. But on this occasion, we have featured -- and in Q1 as well, we booked 9%. The main reason is the marketing fee we earn when selling a self-sustainable project on behalf of Ministry of Housing and Urban Affairs. So across the half year we booked roughly INR 100 crores in marketing fee, and that is what drives the increase. Beyond that, we have always said our cost structure stays fixed, so any rise in revenue will affect EBITDA. And since revenue went up both in this quarter and in the half year, that effect is now showing.

Vasudev Ganatra

analyst
#36

So, sir, what was it that drove that revenue increase this quarter?

Anjeev Jain

executive
#37

We saw a rise of roughly — in Q1, you mentioned INR 1,823 crores. In Q2, we posted INR 1,890 crores. And on a consolidated basis, there is — compared with INR 2,260 crores, we posted INR 3,400 crores. So that revenue on its own drove a solid lift in EBITDA.

Vasudev Ganatra

analyst
#38

Right, so all of that revenue growth came purely from the executions we carried out. There wasn't any one-off of that kind, correct?

Anjeev Jain

executive
#39

Nothing here is one-off — nothing at all. This is recurring income, and it will show up. Our position is such that we operate on a fixed cost base. Any time revenue rises, that flows through positively to EBITDA. So that is what you are seeing in the results.

Vasudev Ganatra

analyst
#40

Of course, sir. That's excellent. And sir, looking at H2 now as well as FY '28, what are our plans when it comes to monetization? Are there any bulk sales or anything of that kind that we're planning?

Anjeev Jain

executive
#41

During the Q1 conference call, I believe we mentioned that we were planning to sell some land parcels, and we had <<inaudible>> that effort. In Q3, we completed sales of 2 land parcels, and I think within this quarter we are going to record roughly INR 433 crores in revenue from those land parcel sales. Beyond that, RFP for 2 additional land parcels is in the pipeline, and those may also materialize this quarter. So our plan is, whatever land bank we hold, we want to monetize it and generate funds so that the money can be put toward future projects.

Vasudev Ganatra

analyst
#42

All right, got it. And could you tell us, on a consolidated basis, what revenue and margin guidance targets we're aiming for in FY '27 and FY '28?

Kellambally Mahadevaswamy

executive
#43

We're looking at roughly INR 15,000 crores to INR 16,000 crores on the top line, and somewhere in the range of INR 1,100 crores to INR 1,200 crores on PAT.

Anjeev Jain

executive
#44

We're keeping our guidance as it is. Whatever guidance we gave in Q1, we've maintained.

Kellambally Mahadevaswamy

executive
#45

We had already given that at the time. And we are definitely going to get there.

Vasudev Ganatra

analyst
#46

That's wonderful to hear, sir. And one final question, sir: when do we intend to launch the Ghitorni project along with the Sector 37D projects?

Kellambally Mahadevaswamy

executive
#47

For 37D, the work has already been awarded and the contractor is already mobilized. Piling activity has already begun. So the sale will get started — I think, hopefully, we're going to launch in January. After the 15th, we're going to start a sale. For Ghitorni, of course, the sale agreement has to be executed. Once that is over — meaning the consultant tender we have already received — so we have to appoint a consultant and we have to do the agreement with the Delhi government. Once it is over, I think next year onwards, Ghitorni also is going to start. It will going to take shape.

Vasudev Ganatra

analyst
#48

All right, thank you. And one final question, sir, regarding our operations in Dubai — where do things stand there at the moment?

Anjeev Jain

executive
#49

Regarding the Dubai operation, all of the approvals are in hand. Both our design and the <<inaudible>> groundbreaking have received approval. We will also secure a RERA registration, since Dubai likewise has a RERA registration requirement. And hopefully this month, or perhaps the first week of December, we will hold the groundbreaking ceremony. <<inaudible>><<inaudible>>

Vasudev Ganatra

analyst
#50

All right, and when should we expect sales to begin here?

Anjeev Jain

executive
#51

Yeah, we're planning to kick off a sale in phases. And I think the first phase will happen by the end of December, or possibly in January 2027. And that will just be the sale. Cash will come in, but revenue will only be recognized once that project is complete. Position.

Vasudev Ganatra

analyst
#52

Understood. Thank you. And if I could fit in one last question: within that consolidated order book, roughly how does it divide between PMC and redevelopment?

Kellambally Mahadevaswamy

executive
#53

Roughly 60%, so a 60-40 split. For redevelopment, also 60-40. And at the consolidated level, that figure comes to 53...

Operator

operator
#54

Komal Choudary from Ratnavali has the next question.

Komal Choudary

analyst
#55

You'd said the closing order book would reach INR 2 lakh crores by the end of the financial year. As things stand, we're sitting at roughly INR 125 crores to INR 130 crores. My assumption is that 2 large orders were anticipated. So where do those orders stand now?

Kellambally Mahadevaswamy

executive
#56

Those two large orders are still ahead of us. They’ll arrive. They’ll arrive—2 big orders. Meanwhile, in parallel, we recently secured some business from the Bihar government as well: INR 2,000 crores, INR 3,000 crores, we’ve got that, and another INR 8,000 crores we are going to obtain in Phase 2 during this very quarter. And West Bengal too—we’ve gotten—we’re working on it, discussions are continuing with another 2, 3 state governments.

Analyst

analyst
#57

And what would you say West Bengal's size is as well, sir?

Kellambally Mahadevaswamy

executive
#58

West Bengal should come in at roughly INR 10,000 crores, perhaps. We've signed close to 9 MOUs. So the value still needs to be assessed. So there will be about INR 10,000 crores a quarter from West Bengal, roughly.

Analyst

analyst
#59

Thanks a lot, sir. And sir, why is the execution — I mean, in quarter 1 and quarter 2, the awarded contracts are roughly equal in size. So where's the bottleneck? Why can't we award additional contracts? Because as of now, we're sitting at nearly 6 years of order book. If we keep going at this pace, then where is the bottleneck? Why aren't we — I saw I've been tracking a tendering site, you have ordered Supertech of INR 10,000 crores, et cetera. But apart from that, why aren't things moving forward?

Kellambally Mahadevaswamy

executive
#60

Mahar couldn't be taken up, and Jemmukashmir was also delayed. Jemmukashmir's tender is now on the website as well — the tender we received for roughly INR 2,000 crores during the quarter, and we'll issue it this month itself. As for Supertech, I think by month end or next month, we will definitely award about INR 10,000 crores. So somewhere between INR 15,000 crores and INR 16,000 crores in total will go into award this year. That's the minimum I'm telling you. If West Bengal and Bihar get added, it will be more than that. I think Mahar is also going to be converted from business into execution. Navin Nagpur is going to start as well. So redevelopment projects, and with the state government — actually, the state government, where it's on a self-sustainable mode. And a lot of approvals are required. So because of approvals and financial arrangement, it's getting delayed. That's all. Otherwise, it will definitely be converted.

Analyst

analyst
#61

Sure, and sir, just one last question from me. Since we’ve accomplished such solid work on the Delhi monetization, should we expect the government to hand us additional orders, given that we’ve really delivered on this land — the recent sale in Delhi and so on? Are they becoming more open to placing more orders? Because every day we see reports about a handful of buildings collapsing in Delhi and elsewhere. So the government will have to carry out a great deal of redevelopment in that area.

Kellambally Mahadevaswamy

executive
#62

Right, absolutely. We're in conversations with the state government as well — which is why I'm keeping that state government unnamed. We expect to secure 2 or 3 state governments with sizable orders. Naturally, Delhi needs substantial redevelopment — everything is old buildings in depleted condition, there's no proper road facility infrastructure, and even energy efficiency is absent. Through redevelopment, we're creating what amounts to net zero buildings. So solid waste, STP, energy-efficient building — we're delivering all of that at World Trade Center, and even at Sarajinagar and Neetajinagar. That gives us a major opportunity. Also, plenty of empty state government land exists. Talks are underway. My belief is we'll close 1 or 2 orders within this year itself.

Analyst

analyst
#63

And those 2 large orders — should we expect them in the calendar year?

Kellambally Mahadevaswamy

executive
#64

Yes, absolutely, absolutely. GPRA5GPRA is already going through the cabinet approval process, and we're also expecting movement on butter fencing.

Operator

operator
#65

Our following question is from S. — that request has been withdrawn. Now we move to the next question, which comes from the line of Sumeet Rohra with Smartsun Capital Private Limited.

Sumeet Rohra

analyst
#66

To start, I’d like to wish you and your whole team a very, very happy Diwali. And sir, congratulations on a fantastic set of results. Now sir, I have a few detailed questions. So sir, first, you signed 9 MOUs just a few days ago with West Bengal. So sir, could you kindly highlight what opportunity size you see there? And how soon do you think that can translate into business flow? That is my first question, sir. My second question, sir, sir, if I understand correctly, is that you said that your revenue guidance INR 14,000 crores is on a stand-alone. So on a consolidated basis, should about INR 6,500 crores to INR 1,000 crores, is my understanding correct, with PAT being about INR 1,100 crores to INR 1,200 crores as you highlighted. Sir, thirdly, my question is you mentioned just now that you’re expecting order inflows of nearly INR 5000 crores to INR 60,000 crores in terms of GPRA and the other orders. So that means you are still expecting that by March 31, we should close with a total order book after awarding could be to the tune of about INR 185,00 crores to INR 2 lakh crores sir.

Sumeet Rohra

analyst
#67

So, am I right in understanding that, sir?

Kellambally Mahadevaswamy

executive
#68

Yeah, yeah, absolutely, for sure. So INR 10,000 — perhaps INR 20,000 crores, that's what we'll move to award, INR 1,80,000 crores, and what's left for cloud is going to fall in the next year — the next financial year.

Sumeet Rohra

analyst
#69

And sir, I mean… and as for…

Kellambally Mahadevaswamy

executive
#70

In West Bengal, let me tell you, we've signed 9 MOUs with various departments. One is the sum department, another is urban development, Kolkata Municipal Corporation. We've done quite a few iconic projects in Kolkata. One is Dandania, and the other is Sania. They're aware of NBCC's quality and potential. Because of the change in government, they wanted to engage NBCC sooner — previously there was a restriction on PSUs. Only the state government could execute anything above INR 50 crores per order. That obstacle has now been removed. We successfully got 9 MOUs executed. I believe this is a first for West Bengal — 9 MOUs in one single day, executed with the PSU — and the Minister is also very keen, and she is quick to get work started right away. One such project is pink. They want to build pink throughout West Bengal. We're going to begin in the first quarter, next quarter — that is the fourth quarter — we will start. Besides that, Riverfriend and some construction, and also a library, Baar. Kolkata is an old city, and they want to carry out a great many development works there.

Kellambally Mahadevaswamy

executive
#71

And there’s the USP and redevelopment model. Right now, we received this work order via PMC — and naturally, they were looking to construct a new cabinet as well. So that, too, I believe will come to our team. So quite a few other jobs are in the pipeline. So I’d rather not go into specifics in detail, but we are going to receive a good order from West Bengal.

Sumeet Rohra

analyst
#72

Yes, and sir, if I caught that right, our Director of Finance also mentioned that we completed 2 land parcel sales during this quarter. So in effect, that means roughly INR 400 crores of revenue will come to us in Q3 from the land parcel, along with an addition of about INR 200 crores to the bottom line. I mean, is that also — did I hear that correctly...

Kellambally Mahadevaswamy

executive
#73

For Q4, we're going to receive it because it has to be recognized once we've already sold it — we'll get the cash in Q3. But in Q4, both the turnover and the profit will be booked in Q4.

Sumeet Rohra

analyst
#74

I hear you, I hear you. And sir, I can also say this with confidence: all of you have built a fantastic company, because in the public sector space today, you are among the only firms with a book-to-bill ratio of 1:10. That gives you an extremely high level of visibility. So sir, my one request is this — I've also noticed that on October 18, you appointed a director to the infrastructure development project. Given the kind of visibility you have, with nearly INR 1.5 lakh crores now moving to INR 2 lakh crore, you could easily be a 40%, 50% growth company — I mean on a year-on-year basis, right — because your order book is that strong. So if we could put a bit more focus on execution as well, it would really do us a world of good, sir. So I mean, if you could share a few thoughts on that too, it would be very helpful.

Kellambally Mahadevaswamy

executive
#75

Absolutely, Sumit — one point I wanted to share is what NBCC has done over the past 1 or 2 years, 3 years. The Amrapali projects had stalled, and thanks to the grace of God and the intervention of the Supreme Court — the Honorable Supreme Court — we've finished all 24 projects. It's running on a self-sustainable mode. When a PSU fails, what usually happens is private takeovers. Here the story is reversed: a private builder walked away from the project, and the PSU is finishing it. In the same way, there's a long waiting list for the officers. Officers used to commute 1 or 2 hours from Noida or Faridabad, Gurgaon — now they're getting their homes. We've already handed over our flats — almost 5,000 homes. Another 9,000 are now under construction. By this year-end, we're going to get some of that. But definitely, from next year onward, 7G PRA will complete all of it. By the end of next year — December or March — we're going to complete both Amrapali Phase 2 as well as 7G PRA. This will be a big order and big projects, and we're expecting 5G PRA also. And the state government is following as well. Gova already — we have awarded it and execution has started.

Kellambally Mahadevaswamy

executive
#76

J&K’ is going to begin a project, and a small project has already begun. So the other 3 tenders are in the pipeline. So there are a lot of opportunities and a lot of work that we already have to convert. Of course, conversion took some time, but definitely now turnover will come. And in addition, we’re going to get PAT as well — PAT, EBITDA, everything.

Sumeet Rohra

analyst
#77

So, at a basic level...

Kellambally Mahadevaswamy

executive
#78

There's one more point I wanted to mention here — we've also switched up the technology. Because of that, at Sa7jarmrapali we're now up to roughly 33 floors. We've done it in only 2 years. That's a major accomplishment. We're using my shuttering, and the pace is really quick while quality is maintained as well. So the technology at Sa7jiar has been changed, and we've brought in precast technology too. We've therefore upgraded the technology to get better quality and on-time execution. And naturally, energy savings and all the ESG aspects are being followed by us.

Sumeet Rohra

analyst
#79

Yeah, yeah. Sir, if I could just ask — so on a consolidated basis, you should essentially finish this year at roughly INR 17,000 crores, sir? Is that broadly right?

Kellambally Mahadevaswamy

executive
#80

No matter what the number turns out to be — 10 — in any case, we remain fully committed to it.

Sumeet Rohra

analyst
#81

Right, of course. Then moving into next year — the plain reality is that you're handing out close to INR 20,000 crores. So for next year, we should really be expecting something on the order of 25% growth or more. So are we talking roughly INR 2,000 crores, INR 2,000 crores...

Kellambally Mahadevaswamy

executive
#82

Yeah, '22.

Operator

operator
#83

Our following question is from Prem Lunia at Astute Investment Management.

Prem Luniya

analyst
#84

Sir, I just wanted to ask — this is an example I'm using — if we place an order, what's the typical timeline for it to turn into revenue for us? What has it been in that same case?

Kellambally Mahadevaswamy

executive
#85

With PMC projects, everything hinges on the structure type, the height of the structure, and the foundation. Typically, we can finish PMC work on a redevelopment project within 3 to 4 years; for volume, it's 4 to 5 years, depending on what the volume is. If it's self-generated, you need 6 months up front for the approval process and so on, and we have to generate the money, so that 6 months is required. As for execution, right now we're following just 24 months to 30 months.

Prem Luniya

analyst
#86

All right. So, sir, the question was framed around the fact that we had roughly 500 crores of revenue during the first half. And per our guidance, we need to hit at least INR 10,000 — INR 1,00 crores — while the awarded order book currently stands at just INR 33,000 crores. So...

Kellambally Mahadevaswamy

executive
#87

The work we've been awarded, we'll finish that in 2 years — 18 to 24 months at most, nothing beyond that. What I'm referring to is new projects, 3 to 4 years.

Prem Luniya

analyst
#88

Did not receive it.

Kellambally Mahadevaswamy

executive
#89

The award period is going to be no longer than 24 months.

Prem Luniya

analyst
#90

Okay, so you believe that INR 10,000 crores could actually be reached out of that INR 30,000 crores?

Kellambally Mahadevaswamy

executive
#91

Yes, absolutely, without a doubt.

Prem Luniya

analyst
#92

Yes, absolutely. Regarding the marketing fees — from what I understand, we've had a lot of sales across the last 2 quarters, which means we've earned quite a bit in marketing fees. So could you provide the precise figure for H1 and for Q2? What amount was earned in marketing fees?

Anjeev Jain

executive
#93

How much is the H1 marketing fee, roughly?

Kellambally Mahadevaswamy

executive
#94

10 crore rupees, 10 crore rupees...

Anjeev Jain

executive
#95

Roughly.

Prem Luniya

analyst
#96

Alright.

Anjeev Jain

executive
#97

We recorded INR 8 crores during Q1.

Prem Luniya

analyst
#98

All right, thank you. Regarding those land parcel sales of INR 400 crores, what kind of margins should we expect to record on them? Since this is legacy land, would its book value be on the lower side?

Anjeev Jain

executive
#99

Roughly 50%.

Kellambally Mahadevaswamy

executive
#100

We expect to earn a profit of roughly INR 20 crores.

Operator

operator
#101

Our next question comes from Vikas on the line.

Analyst

analyst
#102

I have two questions about the land sale parcel. On the books, is it carried as stock in trade or as an investment? What I was asking is whether we'll be paying 12.5% tax, or whether the highest marginal tax rate will apply on NBCC? That was my first question.

Anjeev Jain

executive
#103

It's sitting in our books of account as inventory.

Analyst

analyst
#104

Therefore, that would be the top marginal tax rate. And regarding what we anticipate in the second half — apologies, I didn't quite catch the details on land sale parcels for H2 as well as '27 and '28 — what sort of range could you provide, broadly speaking, for those land sales?

Anjeev Jain

executive
#105

Actually, our books show roughly 54 acres held as land parcels, with a value of INR 720 crores. So we intend to monetize these parcels. Following that monetization approach, we've begun with 2 parcels located in Jaipur, where we stated we expect a sale value of INR 433 crores against a book value of about INR 195 crores. Another 2 parcels are also at the auction stage, in the auction process — namely Meat and Ghaziabad. Beyond that, we're also planning, in the next year as well, to put some parcels up for sale. These are historical land parcels recorded in our books, appearing in inventory in our books.

Analyst

analyst
#106

What I asked was, roughly what would the market value of the land parcel we hold in inventory be as of now — is it around INR 1,000 crores, or INR 2,000 crores? Just a very broad range. I'm sure you've had a valuation done.

Anjeev Jain

executive
#107

Yeah — according to the IBB valuer report that we did at year-end, it comes to roughly INR 1,600-plus crores.

Analyst

analyst
#108

More than INR 600 crores.

Anjeev Jain

executive
#109

One thousand six hundred crores in Indian rupees.

Analyst

analyst
#110

INR 1,600 crores. That's -- and from that, we've only -- how much did we sell this quarter?

Anjeev Jain

executive
#111

In terms of market value, we've sold roughly INR 250 crores.

Analyst

analyst
#112

We have roughly INR 1,400 crores in the pipeline, give or take about 10%, 20%. My second question was about the commission on the Ministry flats that are to be sold. And also, on the private sector flats, if you have any, what sort of trajectory do you see this month — this half, the second half — and next year when it comes to sales commission, commission income?

Kellambally Mahadevaswamy

executive
#113

On the sale value, we're actually getting 1%. We recently closed one action at the Africa venue, and there the top sale price came to INR 89,000 per square feet. The reserve price stood at just INR 37,160. Whatever the selling price turns out to be, at 1% of it we're going to receive roughly INR 51 crores as a marketing fee in 7 GPRA. And naturally, we're selling Amrapali as well. In that case too, we're getting a 1% marketing fee. In Bihar, we signed an MOU not long ago under which we're going to get 1.25% as a marketing fee.

Analyst

analyst
#114

Sir, when I refer to half — H2 — what sort of marketing fees are we looking at, broadly speaking? I don't want to hold you to anything specific. And for next year, could you give me a broad range for H2 without getting into the details? I'd really appreciate that. For H2 and the next financial year, what level of marketing fees are we discussing?

Kellambally Mahadevaswamy

executive
#115

For H2, we're set to receive an additional INR 100 crores, and next year there should be roughly a 20% to 25% increase, with INR 250 crores coming to us via marketing.

Analyst

analyst
#116

That works out to somewhere between INR 200 crores and INR 250 crores.

Operator

operator
#117

Our following question comes from the line of Sub from...

Analyst

analyst
#118

Is this coming through okay, sir?

Anjeev Jain

executive
#119

Yes.

Analyst

analyst
#120

I've just got a single question about the order book. So as of March FY '26, our consolidated order book stood at INR 1,27,000 crores. Then H1 inflows came to INR 5,000 crores, and H1 revenue was also INR 5,000 crores. So how is it that the order book is INR 1,26,000 crores, which is INR 1,000 lower? Was there any cancellation in orders?

Kellambally Mahadevaswamy

executive
#121

No, no, no — nothing has been cancelled. So in October as well, and in September some work was carried out just on that INR 1,000 crores defense you're referring to. Nothing has been cancelled. Nothing has been cancelled. On the conversion side, it's taking a bit of time, that's all. Up to now, there is no cancellation.

Analyst

analyst
#122

And which projects do you expect to be running once FY '27 wraps up, sir?

Kellambally Mahadevaswamy

executive
#123

Right now it's already running at INR 32,000 crores. So we're going to get another INR 10,000 crores per quarter that we execute, and INR 1,000 crores to INR 16,000 crores will be awarded. So by the end of the year that will be around INR 40,000 crores — at the consolidated level, we'll have INR 40,000 crores of running projects.

Operator

operator
#124

Our next question is from Ravi Kumar Naredi with Naredi Investments. I believe he's on another line. We have a follow-up from Vasudev Ganatra at Nuvama.

Vasudev Ganatra

analyst
#125

Sir, regarding that Africa Avenue asset we divested — the revenue from it will land in Q3, correct? It hasn't been booked in Q3.

Kellambally Mahadevaswamy

executive
#126

Right, right, precisely, precisely. Q3 is on its way.

Vasudev Ganatra

analyst
#127

All right, so when do you expect the bulk sale of Kya Mark and Vinay Mark to take place?

Kellambally Mahadevaswamy

executive
#128

Most likely in the next quarter. In the last quarter, the two of them will arrive.

Vasudev Ganatra

analyst
#129

And what sale value would we typically be estimating from this?

Kellambally Mahadevaswamy

executive
#130

We're looking at a sale value in the range of INR 8,000 crores to INR 10,000 crores, and out of that, we'll receive 1% as the marketing fee.

Vasudev Ganatra

analyst
#131

All right. So taken together, those two come to roughly INR 8,000 crores to INR 10,000 crores in sale value. Okay. And finally, sir, where do we stand right now on Netaji Nagar?

Kellambally Mahadevaswamy

executive
#132

Netaji Nagar is progressing well. Every project has already been awarded. So the work is fully underway. Of course, because of graft, there is some earthwork and there are some restrictions on certain items, but we will see. It is going well. Roughly INR 9,900 crores is running, with Nitajinagar and Tarajinagar taken together.

Operator

operator
#133

Our next question is from Ravi Kumar Naredi of Naredi Investments.

Ravi Naredi

analyst
#134

Sir, what would our top line and bottom line be in financial year '28, rather than '27? -- top line and bottom line, roughly INR 2,000 to 1,000 crores for the top line, and INR 1,500 crores would be the PAT bottom line. That is very nice. Sir, regarding our 4 to 4.5 lakh square feet in Githori, has there been any development so far?

Kellambally Mahadevaswamy

executive
#135

The last MOU needs to put the shareholders agreement into effect, and that's underway. So I believe we'll sign the MOU by the end of this quarter. A consultant tender has already been issued. Evaluation is therefore in progress. After the shareholder agreement is done, we'll then begin planning and execution of the project. I think construction will start from next year onward.

Krish Beriwal

analyst
#136

So our hope is that the MOU gets signed by 31st December?

Kellambally Mahadevaswamy

executive
#137

Yeah, hold on a second — let me get to that first.

Analyst

analyst
#138

Alright. Sir, regarding the Rajasthan Mandpump order worth INR 4,000 crore, where do things stand? My understanding is that the debt figure later rose to INR 5,500 crores.

Kellambally Mahadevaswamy

executive
#139

Right, right. Actually, the election code of conduct kept it from getting underway. I believe the election wraps up on November 12. The local election is currently happening. In November, December, that tender — the Rajasthan Mandpump tender — will come up as well.

Analyst

analyst
#140

And Mumbai Fust, the INR 10,000 crore order — any progress on that, anything at all?

Kellambally Mahadevaswamy

executive
#141

We’ve already begun some smaller-scale work — roughly INR 100 crores in projects have been awarded so far. The remainder is still in the pipeline. At this point, they want to move to a redevelopment model. Previously, it was structured under a PMC model. Now, after witnessing the success story in Delhi — the 7 and all — even trusts everywhere, and even government departments, the income tax department and the GST department, everyone wants to pursue it under this model, so that the government doesn’t have to put in any money. Instead, they’ll receive surplus funds, and maintenance and everything else will be covered within it. That’s the model they want to follow. So...

Analyst

analyst
#142

We're going to take on this project as well.

Kellambally Mahadevaswamy

executive
#143

It's a redevelopment model, a self-sustainable model—trust too.

Analyst

analyst
#144

So NBCC is going to take on this project. Yes, yes. NBC will do...

Kellambally Mahadevaswamy

executive
#145

NBC will handle it. We’ll sell the buildup area. Rather than selling a land parcel, they will proceed to get...

Analyst

analyst
#146

Got it, sir. Now, regarding the Chhattisgarh project — the one worth INR 1 lakh crore — is there an opportunity for us there?

Kellambally Mahadevaswamy

executive
#147

At first, I said we would be adding 2 additional states. I’d rather not name Chhattisgarh or any specific place. So once it comes to us, I’ll let you know — I’ll disclose it to you. During this year, we are going to receive new work orders and redevelopment-model work in 2, 3 states...

Analyst

analyst
#148

BCP...

Kellambally Mahadevaswamy

executive
#149

We already have HPCL. And with ONGC as well, we recently signed — actually, we're about to sign an MOU with ONGC too, covering their redevelopment works and everything. HPCL is already signed, and we're going to begin the work at Bangalore — HPCL Bangalore.

Analyst

analyst
#150

That's a lot of responsibility resting on your shoulders, so it really comes down to how you carry it out.

Kellambally Mahadevaswamy

executive
#151

Absolutely, without a doubt — many PSUs hold sizable land parcels. Or rather, I should say parcels that aren't being utilized, and those end up subject to encroachment or similar issues. So our plan is to redevelop these valuable lands.

Analyst

analyst
#152

Over the coming 5 years, we have the ability to take on a project worth INR 5 lakh...

Operator

operator
#153

The next question is from Krish Beriwal at Millennium Capital. It looks like there's no response. Up next, we have a follow-up question from Vikas.

Analyst

analyst
#154

Nope, everything I asked about has been covered.

Operator

operator
#155

That brings us to the end of the question-and-answer portion. At this point, I'll turn the conference over to the Chairman, who will offer some closing remarks.

Kellambally Mahadevaswamy

executive
#156

NBCC has won several significant contracts from state governments, including West Bengal and Bihar, just last week. In West Bengal, there's various urban development work underway. And in Bihar, 4 redevelopment projects worth around INR 10,000 crores are expected to come through during this year itself. On the real estate side, NBCC successfully carried out the sale of 2 land parcels at D Jaipur via an open e-auction process, bringing in INR 250 crores and INR 180 crores, respectively. These transactions produced an aggregate profit of roughly INR 239 crores, which will be realized over the next 2 quarters. NBCC has also hit a significant milestone in its international growth with the formal inauguration of its branch office at NBCC Australia in Melbourne, Australia, on October 28, 2023. On resource mobilization, the 7 P project successfully sold Africa Avenue to a residential tower. A few more packages are in the pipeline for the sale auction. So — wishing all of you a happy and prosperous Deepavali, and have a safe Deepavali. Thank you.

Operator

operator
#157

Much appreciated, sir. To all of our investors: should you have any remaining questions or need more details, kindly contact Mr. Balakrishnan Singla in Investor Relations at NBCC. Ladies and gentlemen, that brings your conference to a close for today. We appreciate your participation and for using the call service. You can disconnect your lines at this point. Thank you, and enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete NBCC (India) Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to NBCC (India) Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in NBCC (India) Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.