Good day, everyone, and welcome to the Neogen Chemicals Q2 FY '27 earnings conference call. <<operator_script>> Kindly be aware that this call is being recorded. I'll now pass the conference to Mr. Nishid Solanki of CDR India. Thank you, and you have the floor.

Nishid Solanki

unknown
#2

Thanks. Good evening, everyone, and a warm welcome to the Neogen Chemicals Q2 FY '27 Earnings Conference Call. With us today from the senior management team are Mr. Anurag Surana, Non-Executive Chairman; Dr. Harin Kanani, Managing Director; and Mr. Gopikrishnan Sarathy, Chief Financial Officer. We'll start the call with opening remarks from the management team, followed by an interactive question-and-answer session. Before we begin, a standard disclaimer. Certain statements made during today's call may be forward-looking in nature. Actual results may vary from these forward-looking statements, and a detailed disclaimer is available in our Q2 '27 earnings presentation, which has been uploaded on stock exchange website. With that, I would now like to invite Dr. Harin Kanani to share his opening remarks. Thank you, and over to you, sir.

Harin Kanani

executive
#3

Good evening, everyone, and thanks for joining us to go over our Q2 and H1 FY '27 financial results and business outlook. I hope you had an <<inaudible>> chance to review our investor presentation. I'll start with the key performance highlights and strategic developments from the quarter, as well as progress on our growth initiatives. After that, our CFO, Mr. Gopi Sarathy, will walk through the financial highlights. To begin, I'm happy to report that we turned in a robust, all-round performance this quarter, with consolidated revenue up 42% year-on-year to INR 296 crores and EBITDA up 51% year-on-year to INR 445 crores. Our stand-alone profitability is even better, and the consolidated performance reflects initial fixed cost absorption at Neogen Ionic, where revenue scale-up and capacity utilization keep ramping up.. Overall, the performance highlights the operational agility, inherent strength, and flexibility of our business model, and we simply pivoted toward applications with better demand visibility and higher volumes. This momentum was further reinforced by an accelerated ramp-up in our battery chemicals business, with Q2 FY '27 revenue reaching INR 37 crores compared to INR 5 crores in the same quarter in FY '26. This was in line with our business plan, and we expect substantial scale in Q3 and Q4 and beyond, supported by the upcoming ATC battery manufacturing ecosystem built in India, along with the rapid shift by U.S electrolyte manufacturer towards sourcing from non-<<inaudible>> suppliers in India.

Harin Kanani

executive
#4

What's important here is that these results were achieved despite a complicated macroeconomic backdrop. That backdrop included geopolitical conflicts in the Middle East, friction in supply chains, inflation in feedstock costs, and temporary overheads tied to EBIT at our Dahej facility. Now I'll turn to the main highlights and the progress we've made on our strategic growth initiative: expanding Organolithium capacity at Patancheru, which is anchored by continued volume gains and by the growing footprint of Organolithium in high-growth emerging applications. Our Board has approved an expansion of manufacturing subtilty at Patancheru, Telangana. Through this, our Organolithium capacity will double from 300 metric tons per annum to 600 metric tons per annum, with an estimated capital outlay of INR 45 crores. This strategic expansion should unlock additional revenue potential of INR 150 crores to INR 200 crores, depending on prevailing lithium prices, and it further strengthens our leadership position in specialized ration chemistries. I'd also like to discuss now the successful fund raise through our maiden QIP. A major strategic landmark during the quarter was the successful completion of our maiden Qualified Institutional Placement, QIP, which raised INR 600 crores and demonstrated strong institutional faith in our business. The QIP was oversubscribed 6.5x, with broad-based participation from leading global and domestic investors. That resounding vote of confidence significantly strengthens our capital structure.

Harin Kanani

executive
#5

We're putting these proceeds to work strategically to pay down debt on our balance sheet as we get ready to finance our next growth phase down the road. On the insurance claims status—regarding those insurance claims—cumulative recoveries to date stand at INR 154 crores, made up of INR 155 crores on account payment, and that includes the INR 15 crore tranch received in July 2026 plus INR 9 crores from <<inaudible>> realization. Also, on October 29, 2026, the company accepted an additional claim amount of INR 152 crores from the insurance, which will be released in due course. With that—with that, our total on account claims received and receivable now stands at INR 316 crores, inclusive of accepted claims and craft sales today. As a result, the majority of our recognized claim amount has now been secured, and discussions with the insurance company regarding the remaining balance are progressing constructively, and we expect further settlements as the final assessments conclude. On the operational plan, and these 2 update that trial runs of the rebuild distant are currently underway, and we expect full to commence commercial production shortly within this current financial year, so that next quarter we will have—we'll be able to fully utilize these facilities. We would also like to update on the credit rating.

Harin Kanani

executive
#6

We have upgraded our credit testing, which mirrors a stronger balance sheet and better financial flexibility. CRISIL fusel rating has changed the outlook on Neogen's long-term bank facility of CRISIL A- to stable from negative, while reaffirming the short-term rating at CRISIL A2 +. This favorable rating move highlights the improved capital structure that came from our successful fundraise, continued operational ramp-up and solid balance sheet discipline. Turning to battery chemicals. We are moving from capital investment into execution and scaling up sales. Our project mechanical completion time lines remain on track for both electrolyte and electrolyte sold. On electrolytes, mechanical assemblies complete trial runs and have begun alongside facility validation and active joint trials of recipes with multiple Giga factories. At the same time, for lithium electrolytes sales, we have secured provisional approvals at our Dahej facility from 5 major international customers, completed final site audits for 3 U.S.-based manufacturers and already commence commercial supply with 2 customers, 2 international customers. For Neogen Ionics Limited has executed a business offer agreement to consolidate the lithium and electrolyte salt in LiPF6, solid LiPG6, undertaking our -- undertaking under our sell-down subsidiary Neogen Morita New Materials Limited, NML for short, for a cash consideration of INR 245 crores on a going concern basis, which also includes INR 77 crores already infused by Morita through preference allotment recently.

Harin Kanani

executive
#7

Looking ahead, our stand-alone businesses along with the Battery Chemicals segment are strongly placed to enter an exciting growth phase—one that matches India's ambition of self-reliance in advanced energy storage and materials. With a robust balance sheet behind us and a disciplined approach to execution, we are entirely on schedule to deliver our consolidated annual guidance, while we keep building long-term value and sustainable growth for our stakeholders. That brings my opening comments to a close, and I'll now pass the call to our CFO, Mr. Gopikrishnan Sarathy, who will walk you through the key financial performance.

Gopikrishnan Sarathy

executive
#8

Thank you, Dr. Kanani. Good evening, everyone. I'll take you through the consolidated financial performance for Q2 FY '27 now. Unless otherwise specified, all comparisons are year-on-year. Revenue rose 42% to INR 296 crores, driven by consistent volume expansion across core segments. Strong growth in Organolithium and the rapid scaling of Neogen Ionics also contributed. We saw the revenue at Neogen Ionics at INR 37 crores versus INR 5 crores last quarter -- last year. And this equals the full year sales that we did in last year. Within our base vertical, organic chemicals brought in revenue of INR 238 crores, reflecting 29% growth, while the inorganic chemicals segment delivered 140% growth at INR 58 crores. Consolidated EBITDA grew 51% to INR 45 crores, while stand-alone EBITDA delivered strong 54% growth to INR 54 crores, with a margin of 18.6%. Consolidated EBITDA reflected the initial fixed cost absorption at Neogen Ionics, as the capacity is yet to ramp up, alongside temporary expenses related to the Dahej rebuild interim tolling arrangement and elevated input costs. As capacity utilization scales up at NIL, operating leverage will improve significantly. Consolidated PAT grew 144% to INR 8 crores, while stand-alone PAT surged 127% to INR 21 crores.

Gopikrishnan Sarathy

executive
#9

Performance at PAT shows solid operational momentum, even if it was temporarily affected by increased interest and depreciation charges related to ongoing CapEx initiatives. Looking forward, interest costs should trend lower, helped by reducing term debt with the QIP proceeds, cheaper borrowing after our credit rating upgrade, and the insurance claim disbursement that is coming in. As of September 30, 2026, we held a robust liquidity position of INR 465 crores in liquid investment on fixed deposits. This brings consolidated net debt to INR 195 crores, while stand-alone net debt was INR 378 crores. With an optimized capital structure, a better credit profile, and revenue-generating assets scaling quickly across both core specialty chemicals and battery materials, Neogen is well positioned for sustainable and profitable growth. That concludes my remarks. I will now ask the moderator to open the floor for the Q&A session.

Operator

operator
#10

<<operator_script>> Our first question comes from Nilesh Ghuge of HDFC Securities.

Nilesh Ghuge

analyst
#11

Can everyone hear me?

Operator

operator
#12

Nilesh, your volume is very low. Could you switch to your handset mode?

Nilesh Ghuge

analyst
#13

Can you hear me at this point?

Operator

operator
#14

Yes. Please, go ahead.

Nilesh Ghuge

analyst
#15

My first question relates to the Organolithium expansion. As Harin mentioned, there's an investment of INR 45 crores and anticipated revenue of INR 150 crores to INR 200 crores. Could you share the timeline for completing this project and for revenue reaching INR 150 crores to INR 200 crores?

Harin Kanani

executive
#16

Thanks, Nilesh. We're aiming to have the annual additional lithium capacity finished by next September, in H1. We did say it would take a full year, but our expectation is to wrap it up by the end of next H1. So next year it should add somewhere in the range of INR 50 crores to INR 75 crores. Then in the year after that, we ought to be able to bring in the full INR 150 crores to INR 200 crores of revenue from that added capacity.

Nilesh Ghuge

analyst
#17

Right, right. And your comment noted that this Organolithium is finding use in various end-use applications. Could you expand on that?

Harin Kanani

executive
#18

Yes, we've observed a really significant rise in approvals within the Pharma segment. But at this point we've also obtained international approvals in Pharma, plus we have certain applications in agro. So demand is coming in strong. And right now, the added capacity is operating at full tilt. So roughly a 300 tonnes run rate. So we would be complete -- we'll be doing 300 tonnes and perhaps, if we can manage some incremental capacity increase, even more than that by the end of this year. And on top of that, internationally, we've also identified applications in the semiconductor area. So we have -- and certain specialty polymers. So we've already secured permissions, meaning approvals, both for semiconductor materials and for the specialty polymers, where volume demand is also strong. So taking into account the growing Indian local pharma demand along with international pharma demand, and the demand that's going to arrive from the international market in semiconductor business, semiconductor and specialty polymer application business, we are carefully raising the capacity.

Nilesh Ghuge

analyst
#19

Alright. Alright. Then my next question concerns the balance sheet. As Gopi noted, you already hold liquid investments of more than INR 600 crores, and net debt stands at roughly INR 1,000. My understanding is that this insurance claim money has still to arrive — it's coming in Q3. So the Morita investment will come in as well. So how do you view the net debt level for FY '27, or to put it more precisely, FY '28?

Harin Kanani

executive
#20

All right, on the FY '28 net debt level I'll turn it over to Gopi, though let me first confirm that yes, we're still waiting on the final insured disbursement. The insurance amount we expect is INR 152 crores. All the procedure has been completed on our side. The confirmation has been given to the insurer. So we anticipate it within the next few weeks. That will arrive in Q3. And naturally, the Morita second installment will also be there — by, let's say, end of Q3 or early Q4, that's what we're expecting. But essentially, in the second half, the balance Morita investment should also come in. . I think for overall net debt, Gopi, for FY '28, if you could come in?

Gopikrishnan Sarathy

executive
#21

Nilesh, as for total debt, we're looking at roughly somewhere between 1,300 and 1,500, and that depends on lithium prices and the other prices during that period.

Nilesh Ghuge

analyst
#22

Are you talking about FY '27 or FY '28?

Gopikrishnan Sarathy

executive
#23

Let me start with the first question. Our total revenue came in at 136 million, which represents growth of 28%.

Nilesh Ghuge

analyst
#24

28, all right. Happy Diwali to you.

Operator

operator
#25

Moving on to the next question, which comes from Jason Soans at IDBI Capital.

Jason Soans

analyst
#26

I just wanted to ask about — I wanted to revisit the guidance on battery chemicals that you gave during the previous call, for '27 and '28. Is there any update on that? I mean, you had mentioned INR 300 crores for this year, and for '28, I believe, roughly INR 1,000 crores, INR 1,100 crores. So is there any update there? And just on that point, some commentary on how the EVcell plants are progressing on the ground, and on international demand for lithium salts as well.

Harin Kanani

executive
#27

Absolutely. Thanks, Jason. So on the solid demand side, for international salt demand, we're definitely seeing very strong interest there. Our Dahej facility, as we said, has already been approved by 3 out of 5. We expect the fourth one quite soon as well. And the fifth customer has already told us he'll approve the Pakhajan side directly. We've already gotten good POs in hand, where we can see Q3 should be even better than Q2. So as you may recall, Q1 was around 15, 17, around INR 17 crores, and in Q2 we were already at INR 37 crores, and we can see Q3 will be significantly better. And Q4 is a year when we'll have <<inaudible>> non-China requirement kind of start. So we're expecting an even stronger Q4. So you can keep seeing significant increases as we go from Q1 to Q2, Q3 to Q4. If you remember on the last call, we gave a breakdown that INR 200 crores we're expecting from the salt business and INR 100 crores from electrolyte. And in case we are short past electrolyte, because that depends on Indian.

Harin Kanani

executive
#28

So what we'll do is try to offset that as Pakhajan capacity comes online. For our salt operations at Pakhajan as well, trial production should begin by December, with meaningful volumes starting in February or March. We don't have a specific figure for that yet. It all hinges on how much Pakhajan contributes and on the two customized customers of ours, Ola and Exide. Where Ola is concerned, every approval is already in place. As for Exide, trials are currently underway. They've already reviewed some early data showing them the advantages of Indian electrolyte, and they're carrying out additional investigation. Should that prove successful — and they've also announced Q4 commercialization — then it depends on how their volumes shape up and, if they do come up short, by how much. We still expect something in the range of INR 250 crores to INR 300 crores for the current year. I mean, we're still aiming for INR 300 crores, but it really comes down to electrolyte volume and how much we can recover from Pakhajan given the approval timeline.

Harin Kanani

executive
#29

This applies to the present financial year. I think we'll see it rise next year. There's quite robust demand for salt, and we're also producing salt agitators and even solvent. Taken together, we foresee no difficulty reaching INR 1,000 crore plus in revenue. As we've mentioned, how much above that — whether INR 1,200 crores or INR 1,500 crores — is something we'll be able to state based on how the electrolyte business is progressing. So I think it's a bit too early for us, but the INR 1,000 crores plus figure still stands. And even for this year, we ought to be at INR 250 crores, INR 300 crores. Fortunately, the base business is performing quite strongly. So at a consol level, we should be holding at roughly close to around INR 1,350 crores, INR 1,400 crores of revenue, more or less in line with our earlier guidance or perhaps somewhat better. So I hope that addresses your question.

Jason Soans

analyst
#30

Sir, I just had a question about those 5,500 metric tons of lithium salt. From that quantity, I'd like to know how much we expect to use captively and how much is intended for external sales.

Harin Kanani

executive
#31

The way we see it right now is that, depending on the situation — there are very strong external sales. And as I mentioned, technically speaking, we could run at 80% or 90% utilization over the coming year, or at least roughly 80%, and most of that output can be sold externally. Now, depending on what happens locally — look, locally we have 2 options, and the customer's choice will determine which one. Many customers these days are asking us to make sure that even for electrolyte, locally produced salt is used. A year ago, they were saying you could import from Morita or someone in China and use this formula, since prices were lower. But as the gap between China and India narrows and shipments from China become uncertain, they are now telling us to allocate that salt for electrolyte. So we'll see. Whatever our customers request very firmly — that it be consumed internally — that portion will be allocated locally. My estimate is that the total gigawatt hour capacity coming online by, say, the end of this financial year or early next financial year is 60 giga. That works out to roughly 60,000 tonnes of electrolyte demand.

Harin Kanani

executive
#32

I'm putting next year at roughly 10% to 20%. At that 10% to 20% level, you're looking at about 600 — roughly 6,000 to 10,000 tonnes of electrolyte. And within that — at around 12% odd — somewhere in the range of 500 to 1,000 tonnes is what can be consumed locally. Naturally, that hinges on what the customer chooses. So that portion aside, whatever gets used locally — and naturally, when we use it locally, there will be electrolyte produced, which adds further value, correct? Since if we use x dollars of salt, the electrolyte comes to almost 2x, with that salt making up around 50%, right? So on the whole, that's the comparison — today we don't know whether it's 500 or 750 or 1,000, or whether the customer tells me to import from China or to use my own — but if we simply said, let's say, almost 80% of 5,000 tonnes gets consumed and sold internationally, then at today's prices, we should already be at somewhere around INR 800 crores to INR 1,000 crores of revenue. And whatever we then sell in electrolyte form will be additional value-add. So whether that value-add takes us to INR 1,200 or INR 1,500, we'll be able to let you know once we have more clarity from our customers, perhaps by Q4 or Q1.

Harin Kanani

executive
#33

On the salt side, though, something like INR 1,000 crores — close to roughly INR 1,000 crores in revenue for next year — seems really strong.

Jason Soans

analyst
#34

Absolutely, sir. As for the base business, sir, as you noted earlier, I think we'll likely stay with the initial guidance we provided previously — roughly INR 1,000 crores to INR 1,050 crores for the current year, and somewhere around INR 1,150 crores or so for the following year?

Harin Kanani

executive
#35

Regarding our base business guidance for last year—actually, the guidance we gave last quarter—we had said 950,000. Given how the second quarter has played out and looking at Q3 and Q4, we believe we'll come in INR 50 crores to INR 100 crores above what we guided earlier. But whatever shortfall arises from the battery business, the base business will make up that amount or even more than that. So overall, we should be in a stronger position. And for the next year as well, we can raise our guidance because we would also have the Organolithium capacity, which we just announced and which wasn't taken into consideration. So next year, we would look somewhere closer to around INR 1,200 crores. And this year, given where we are—we're already at INR 550 crores plus in the first 6 months. Typically, the second 6 months are like—is stronger. Also with our Pakhajan—sorry, our Dahej plant coming online during this quarter and then being available for next quarter. Many of my new CSM projects that were on hold will also start contributing once Dahej comes online. So together, we feel next year also should be stronger than our original idea.

Harin Kanani

executive
#36

So next year, I'd put us somewhere in the range of, let's say, INR 1,200 crores to INR 1,300 crores. And for this year, what I'm expecting is revenue of INR 1,100 crore plus, roughly.

Operator

operator
#37

Our next question comes from Abhijit Akella at Kotak Institutional Cities.

Abhijit Akella

analyst
#38

Starting with the battery revenue you recorded in 2Q and 1H, could you perhaps break that down between salts and electrolyte?

Harin Kanani

executive
#39

A lot of that is just salt — I mean, electrolytes make up no less than 5%, 10% of it.

Abhijit Akella

analyst
#40

Right, got it. And Harin bhai, just to make sure I caught what you said a moment ago — you brought up roughly 60 gigawatt hours of capacity arriving on the battery side around the start of next financial year. At this point, how much line of sight do we actually have? I mean, is it all essentially confirmed that this capacity is close to being finished? Or might there be some slippage in that timeline?

Harin Kanani

executive
#41

Honestly, from our side, we do get input from customers, though a fair amount of that can't be disclosed. So the bulk of what I'm able to pass along is what's already public, correct? What we've observed is that Ola remains on schedule to add capacity, while Exide's installed capacity stands at just 6 giga. Tata and Reliance have both set targets — I believe their capacity is meant to be online by Q4 of this financial year and Q1 of the next one — and Amara Raja has likewise given guidance, beginning in Q2, Q1, Q2 of next financial year. Waaree too, either Q4 — with Q4 bringing capacity online. The way I see it, getting these capacities up and running isn't a problem. So my sense is capacity arrives by Q4, Q1 — this year's Q4 or next year's Q1. The question is whether ramp-up and trial production stretch out for 1 year. As we've noted before, including historically, our view is that a battery plant typically needs 2 years to become fully stable. So our expectation is that by FY '29, even at a 50% utilization level overall — and say, in the third year, the 60 gigahertz running at 80%, 90% utilization.

Harin Kanani

executive
#42

So because of that, by FY '29 we believe there's a really good chance that our 30,000 metric ton capacity ends up completely utilized. And we're hoping that by FY '30 we'd already be coming up short of <<inaudible>>, which means we'll need to plan additional CapEx in FY '29. So I'd say most of these customers are on track. And as we've described, for nearly 5 of the customers we already have the recipe in hand, and we're at various stages — a customer is already convinced, for instance two of the customers have already used our electrolyte in their pilot line or commercial lines, and two of them are currently — sorry, three of them are currently testing our electrolytes, either in their R&D or at an external lab, comparing against the Chinese electrolyte. So those efforts are also underway. And we've also made solid progress with the fixed customer, whose international team came in and was very happy to see our Pakhajan site. So they were extremely pleased. They — this is our interaction scale. They offered very positive remarks. The only thing is that for their immediate requirement, we just need to work out how the recipe can be shared with us. But apart from that, all 6 of them are very eager to work with Neogen.

Harin Kanani

executive
#43

We therefore have quite a clear view here, and I think the sole uncertainty is how quickly stabilization occurs over the next 2 financial years. Will it take them 6 months, 1 year, or 2 years to stabilize and reach 50%, 80%? That is the one question that is hard to answer.

Abhijit Akella

analyst
#44

Understood. One point I want to clarify regarding those figures. This quarter, the gap between stand-alone and consolidated revenues comes to roughly INR 7 crores — INR 295 crores against INR 288 crores. Yes, we noted that the subsidiary brought in about INR 37 crores of revenues. So how exactly is that being accounted for? Why doesn't it appear in the consolidated numbers?

Harin Kanani

executive
#45

I'd say the primary factor is that a portion of the raw materials needed by the subsidiary actually comes into Neogen Chemicals, since that's where we purchase lithium and where we hold all the permissions. So as Neogen ramps up gradually, some raw materials could come straight into Neogen Ionics, but we have to buy them through Neogen Chemicals and then transfer them. That's why there are certain interunit transfers between Neogen and Neogen Ionics, and that's where this difference in the numbers comes from. And in fact, if you basically account for that, then Neogen Chemicals' gross margins should also be significantly better, because of some courses of about INR 18 crores, INR 20 crores worth of material. This is basically bought by Neogen Chemicals and transferred to Neogen Ionics.

Abhijit Akella

analyst
#46

Understood. The final thing I had concerned inventory. It appears to have risen fairly significantly during the first half. What is the precise reason for that? And how do you expect it to trend across the remainder of the year?

Harin Kanani

executive
#47

So here's the situation: our Dahej plant is coming online, but it hasn't fully come online yet. That means we still need to keep going with outsourcing, or with the older manufacturing setup. And on top of that, customer demand is rising quite a bit as well. So what we expect is that by the end of this current financial year — Q4, roughly — the Dahej site will have improved. So we'd be at somewhere around, let's say, 180 days, that's what we're targeting — roughly 180 days by the close of this financial year. And in the next financial year, when we'll have full utilization across all the sites, we're aiming to return to our historical best, which came in at roughly 140 to 160 days, in the next financial year, that is FY '28 and beyond. And that's only for the stand-alone. Beyond that, with some of the CSM business that's coming in and some large molecules that are coming in, we're able to execute those strategies. Also, Organolithium, as it contributes more there, the working capital cycle requirement is lower too. So then we can improve and reach a range of 110 to 140 days as we move forward in FY '29, FY '30.

Harin Kanani

executive
#48

That's what we're aiming for. And naturally, in the battery segment, we're looking at a working capital cycle of close to roughly 90 days, which we believe we can get to. So Dahej is just ramping up, beginning operations and still doing job work, and demand remains very strong as well. So it's really a mix of all those factors. But we're confident that by the close of this financial year, there will be at least 180 days of working — 180 days of inventory, and going forward, 140, 160 for the following year, and then 110 to 140 in FY '29, '30.

Abhijit Akella

analyst
#49

Okay, just one final item, if I can fit it in quickly. Regarding what the QIP proceeds will be used for — will they go toward deleveraging for now? Or might we also look at some expansion in the battery <<inaudible>>?

Harin Kanani

executive
#50

No. So depending on the end use, we're committed — the main priority will be to deleverage the balance sheet. So we've already — unfortunately, we had to issue certain notices to our term loan lenders as well as for bonds. And as you can see, we've completed the task. So we've already, like, moved faster to resolve and repay INR 200 crores of bond. So some of these will get repaid and we'll be deleveraging the balance sheet. For future investment, like we said, if there's no special — no requirement from Indian customers for us to contribute salt. So for our FY '28, salt and electrolytes, we have enough capacity. What we're watching is FY '29. So I think by Q4 of the current year, as we'll see the base business kind of — and the electrolyte salt business will kind of start stabilizing by, let's say, Q4 or Q1 next financial year, we're also expecting some government policy clarity and even Indian electrolyzed customer clarity about use of local salt or imported salt by Q4, Q1. So that is a time where, if at all, we have to take care of both India and the U.S., and if the demand of both is strong, then FY '29, we will be short.

Harin Kanani

executive
#51

At some point in FY '28, we'll have to bring additional pulp capacity on. That call will likely be made around the end of Q4 or in Q1. By then we will have accounted for developments in the U.S., how the U.S. business is progressing, how India electrolyte is progressing, and policy — so it will be the combination of all of those.

Abhijit Akella

analyst
#52

Got it. Best of luck to you.

Operator

operator
#53

Our next question comes from Archit Joshi at Nuvama.

Archit Joshi

analyst
#54

Let me start with a first question, more of a clarification on something that came up during the previous con call. Regarding the non-Chinese demand being generated for salts, that is a point I was not able to clearly grasp, since we had stated that in calendar year 2027, the salt usage that was already, let's say, part of electrolyte formulations and was coming in from China would now be displaced by non-Chinese sources. I really could not work out how that equation would function. And who are these players right now when it comes to exporting electrolytes or salts, in both separate ways? So if you could just clarify how that mechanism can help us in the next calendar year?

Harin Kanani

executive
#55

Sure. So within that single large bill that got passed, there's the tax credit, and it can be claimed by companies manufacturing things such as advanced chemistry cells and lithium-ion battery cells in the U.S.A. This is known as the 45x tax credit, and it reaches, I believe, as much as $35 per kilowatt hour. However, to qualify for it, you must lower your reliance on foreign entities of concern — FEOC, as they call it — non-FEOC supply. So based on that condition, in 2027, customers need to move away from FEOC toward non-FEOC supplies, and that essentially covers Neogen plus roughly 4 or 5 other salt producers globally. So that's the clarification on your first point, and that's why we've stated that our solid demand is rising quarter-on-quarter. And we're confident that next year our full capacity ought to be, say, fully utilized for the U.S. market, because first, we have a non-FEOC, or basically 45-compliant, supply, and second, we have Morita stable technology. So that mix makes us very strong. Right now, today, most of this is presently coming from China — so electrolyte is already being produced in the U.S.

Harin Kanani

executive
#56

The only components involved are the electrolyte salt and the additives, and right now those mostly come from China. There's 1 Japanese supplier and one Korean one, and now Neogen plus one more Indian company — 2 others are in the qualification process. So those 4 are going to be the main suppliers. And there's one additional Korean company attempting to come online, perhaps sometime next year. Those will be the primary suppliers for FEOC compliance.

Archit Joshi

analyst
#57

So then, let's say there could be Chinese firms that are exporting the full formulation as well, and since they're already backward integrated, for them the salt usage is captive. And that isn't salt usage that forms part of the electrolyte. Is that being traced by U.S. authorities, which could also open up an opportunity for the salt portion of what's captively consumed in China to come to Neogen too? Is that a possibility, or does the whole American ecosystem produce electrolyte formulation on its own and import no electrolyte formulation at all? So I just wanted to get an understanding of that aspect too.

Harin Kanani

executive
#58

Right. So the way things stand today, historically there was a small amount of electrolyte being imported, but those volumes have already dropped considerably. And most of the electrolysis is produced by 5 electrolyte producers in the U.S. So earlier in my call, I mentioned that there are 5 entities making limits in the U.S., and of those, 3 have already approved our Dahej site — as I explained, they've already completed audits as well. And with two, we've begun commercial supply. So all 5 of them impact us. And the fifth one, once Pakhajan happens, will come online too. So essentially, by June, we'd have access to the whole U.S. ecosystem.

Archit Joshi

analyst
#59

Understood, sir. Noted. Sir, is there anything new regarding the partnerships you’re building in energy storage here in the domestic market?

Harin Kanani

executive
#60

So in that earlier mention, I was referring to every cell maker, and I pointed out that firms such as Waaree Energy and Reliance are both largely focused on energy storage, and the same goes for Exide and Ola, which has entered, and that is essentially for energy storage. So the entire 60 gigawatt of capacity that's coming has both EV and energy storage in it. As a matter of fact, when it comes to energy storage, the capacity as it currently stands is actually larger than what the EV application even needs.

Archit Joshi

analyst
#61

Understood. Sir, one final point, returning to the broader <<inaudible>> U.S. narrative. I just wanted to get a handle on this: a couple of Chinese firms are likewise planning to establish their own manufacturing plants in the U.S., specifically for salt, and I don't really grasp how that would pan out for them, since incorporation-wise they will remain Chinese companies. What's your view on that, sir?

Harin Kanani

executive
#62

So I believe, as you quite rightly pointed out, they won't resemble this PAP or non-FEOC compliance, so because of that, perhaps they're hoping they might pick up some customers for whatever reason who can't meet the requirements of — or who don't — who aren't so firmly required. But if anyone wants a 45 credit, the waiting stand today, they cannot buy. So I think — some of these are announcements, but in reality very limited things are getting done on the ground, just in the hope of telling U.S. policymakers that this is also an option available that we are willing to invest in the U.S. So I think it's more posturing and more hope of a policy change, but the waiting stand today, very few customers would be interested in a facility, which is owned by Chinese or controlled by Chinese in the U.S.

Operator

operator
#63

Our next question comes from the line of Viraj Baraka with Kotak AMC.

Viraj Baraka

analyst
#64

Okay, just two quick questions. First, the money from the QIP that went toward working capital rose, but that's mostly tied to the U.S. salt shipments, right — the ones that were supposed to begin in November or December of this year. Is that a fair way to read it?

Harin Kanani

executive
#65

I think there's a bit of confusion there. I think the QIP proceeds are in many of the QIP proceedings because by the time we got them, we weren't able to fully — so most of them were sitting as cash as of 30th September. And basically, the QIP proceeds would be used the way we originally said, like for repayment of long-term loan, for some working capital reduction, like depend — working capital and dependency reduction. And the third would be for general profit book.

Analyst

analyst
#66

And then just one final question. Basically, the net debt guidance is INR 1,300 crores to INR 1,500 crore for FY '28, compared with the current INR 1,095 crores. So what I was just trying to see is that INR 45 crores is coming from Organolithium CapEx. And there is INR 150 crores, with roughly around INR 263 crores more coming from the battery CapEx — INR 1,800 million minus the INR 537 million, that's INR 263 crores. So INR 263 crores and INR 45 crores, which makes a total requirement of INR 308 crores — do you see any other investments through FY '28?

Harin Kanani

executive
#67

We do still have a bit of investment balance left before the project at Pakhajan and Dahej is finished, since a few capacities remain to be completed, correct? And on top of that, working capital will be needed, because in FY terms it will aim at INR 1,000 crore in revenue — rr 1,000 crores revenue — INR 1,000 crores plus revenue for the battery business.

Analyst

analyst
#68

Okay. And if you could also help with the cash movement. So net debt is fine, but the cash movement too — from this INR 1,095 crores, how much is the current cash, and in 1 — in FY '28, how would you early.

Harin Kanani

executive
#69

Honestly, covering everything in detail on this call at the moment would be really tough. There <<inaudible>> is present here. So my suggestion is that you simply work with the projections we already have. Then, should any questions come up afterward, it would be best to email our investors, and we will do our best to respond using whatever guidance is available to us.

Operator

operator
#70

<<operator_script>> Our following question comes from Tejas Arun Sonawane, who is calling in from Asian Market Securities.

Tejas Sonawane

analyst
#71

My first question concerned the qualification timelines for the electrolyte formulation plant. You said earlier that we already supply recipes to several domestic manufacturers from our Dahej plant. So once a newer technology sort of comes online, how do we view the timeline for electrolyte formulations that are produced from the new plant?

Harin Kanani

executive
#72

As we mentioned, during trial production at the 6 giga factories — or the 5 giga factories we already have — we've raised the recipe. So we'll produce these materials jointly for our customers. And with this material, they can carry out the qualification. For some of them, it will mean shifting sites. Those to whom we've given samples from Dahej — two of them have already approved and received, but it will be a kind of transfer from Dahej to Pakhajan, and that will be relatively shorter, 2 months, 3 months. Even shorter, again, either we've given them samples, as I explained, they're already testing samples from like <<inaudible>>, Chinese electrolyte. So they'll also just test this to see it delivers the same performance as our earlier samples from R&D. But overall, what we feel is that most of these customers are coming by Q4, Q1. So we feel we have enough time to make sure that by the time they start, they can complete all the approvals and, rather than first importing from China and then changing over, they should be ready to start buying from us from day one once they've generated sufficient data.

Harin Kanani

executive
#73

So with any luck, on the electrolyte side, approvals shouldn't be an issue — as it comes online, that process takes somewhere between, say, 2 months for someone and 6 months at most. So by March, it's essentially fully approved. After that, it simply comes down to what demand does, depending on how their cell production ramps up.

Tejas Sonawane

analyst
#74

Alright, understood — one more quick question. I joined the call a little late. Could you share what amount of revenue came from the Organolithium business in Q2, and what you expect at the time of the sale?

Harin Kanani

executive
#75

So since Organolithium is one molecule — as we mentioned before, a single molecule accounts for a major portion of that. For competitive reasons, we don't want to break down how much revenue came from this. But I can tell you our capacity of 300 tonnes, which is 300 tonnes of active, which was expanded earlier, which works out to roughly 25 tonnes per month. So we're on track to — we're already exceeding or very close to that 25 tonnes per month kind of utilization, or above it. So we're fully utilizing the facility. And as you know, demand is very strong.

Operator

operator
#76

Our next question comes from Rohit Nagraj with 360 ONE Capital.

Rohit Nagraj

analyst
#77

The first question looks past FY '29. You mentioned that if our plans unfold the way we expect, we'll need to prepare for the following phase of CapEx at some point near the close of FY '28 or in early '29. So when it comes to the optimal plant size for electro, something like salt, what figure are we considering? And regarding timelines or lead times, how long would it take to build an additional facility, given that most of the infrastructure is already in place and we'd just need to add more reactors to it?

Harin Kanani

executive
#78

Yeah, so I'd say the smallest amount needed for the salt is somewhere between 3,000 and 5,000 tonnes when we're talking about the liquid salt. As for any additive, it's roughly 1,000 tonnes. And the lead time in a setup that already exists — for instance, I'd need to put <<inaudible>> in place for 12 months. But if you want to be safe, ideally 18 months is a solid timeframe for the incremental CapEx. It isn't simply a matter of installing reactors. We've got a case like that with the additive where, for another, let's say, 500,000 tonnes, all we need to do is put in reactors. But for the — we would have to build a structure and then install the reactor. That said, the shared infrastructure such as utilities and all of that would already be in place. So ideally, I'd say 15 months to 18 months is a good timeframe for a salt or electrolyte plant.

Rohit Nagraj

analyst
#79

Let me just clarify one small point. Regarding the availability of cash flow, do we have varying amounts of cash flows available to fund the CapEx through a combination of debt and equity?

Harin Kanani

executive
#80

Yeah, our view is that if — suppose by FY '29 we're already bringing in something like INR 2,500 crores to INR 3,000 crores of revenue, right? Then at a 20% ROCE, which we mentioned before, we ought to be landing somewhere in the neighborhood of INR 500 crores, INR 600 crores of EBITDA. So with numbers of that kind, we think we can finance it from within.

Rohit Nagraj

analyst
#81

Great. Now for the second question...

Harin Kanani

executive
#82

And that's always the goal—because one thing we also need to keep in mind is, if I look at something like a 10-year picture, right—so if within 10 years, India gets to where China is today. So today, China sits at somewhere around 1,000, 1,200 a gigawatt—and let's say today, if you look at China's top 1 or 2 electrolyte makers, they're still able to command around 25%, 30% kind of market cap—market share. So if we think of India reaching—and India's own demand too, as per the <<inaudible>> report, is expected to be somewhere around 600,000 gigas internally with some exports—we can imagine India can be 900,000. So that new—and if, let's say, Neogen also has a 30% kind of our market share based on just looking at a China model, no other logic. That also requires a 300 kt kind of electrolyzed capacity at 380 kt capacity, approximately 10x of what we have today. So I think once India cell production is true, once India's ability and in the global supply chain, we've been accepted. In the next 7 or 8 years, we have to increase capacity 8, 9x of what we have today.

Harin Kanani

executive
#83

The Board will need to examine where things stand and make plans. But the soonest we'd see that next category of capacity added is roughly FY '29, though in a case like salt, a call might be required in FY '28. If both are needed, we require it for the India market and the U.S. market alike. And the U.S. market's move from China to non-China is proceeding without friction. -- and India electrolyte is ramping up too. So that's the caveat.

Rohit Nagraj

analyst
#84

That's great, thanks. Now for my second question on salt: with the 3 molecules we show as having import dependencies, how do those contracts typically work on pricing when volatility hits — do they reset each quarter, twice a year, or something along those lines?

Harin Kanani

executive
#85

Yes. So lithium essentially flows straight through to pricing, I'd say. Right now, our long-term customers — the ones holding long-term supply agreements with us — operate on a quarterly reset. Beyond that, these days we also sell to buyers who don't have long-term contracts. With those customers, we either move to a monthly reset model or lock in a price for a 6-month period, or similar, but with an advance payment or some arrangement that guarantees the price. On top of that, we more or less provide back-to-back lithium coverage. So back-to-back lithium coverage plus a fixed price across a 3-month, 6-month, or 9-month span with an advance-type setup, or a monthly reset — that's what we're discussing with new customers. As for the old customer, the existing long-term contracts we hold stay on track, and that's a quarterly reset.

Operator

operator
#86

The next question comes from Anukul Arora at SHagun Capital. Anukul, we can't hear you clearly. Could you switch to your handset mode, please?

Anukul Arora

analyst
#87

I think most of what I wanted to ask has already been covered. I just wanted to get a sense of — we're seeing solid demand from the U.S. for <<inaudible>>. So do we have — are there any plans on our side to add capacity as we move ahead?

Harin Kanani

executive
#88

So Anukul, yes, as we mentioned, we're simply waiting for this to play out — how things go in Q4 and in Q1 of the next financial year. And we're also hoping that come Q1 of next financial year, nearly all of the U.S. customers would already have given their approval — and beyond that, we're watching India's government policy too, how it backs localization, and how customers are approaching things both from a government-policy angle and from a security-of-supply angle. So on that basis, by Q4 of the current financial year and Q1 of next financial year, we'd like to make a call regarding additional capacity for the salt. In other words, that's when we'll have greater clarity on both the U.S. and India sides. And as we've talked about, at some point in FY '29, we would need to make another call about raising capacity for both the electrolyte and nation. So if all goes well over the coming 7 to 8 years, we'd need to multiply capacity 7 times over. So next — over roughly the next 8, 9 years, we'll be in a situation where there will be some pauses along the way, but even so we would be continuously carrying out CapEx.

Raghav Angra

analyst
#89

Alright. Understood. Sir, my next question concerns battery cell offtake within India—would you say the ramp-up remains on the slower side, or what's the situation?

Harin Kanani

executive
#90

No. Actually, I believe the battery requirement this year will go even higher. And I think if you look at the MHI — the Ministry of Heavy Industry — they've issued a report in which they stated that next year, battery demand will be nearly 95 to 100 gig. So demand is very strong. It's only production, and the first initial production, that's a struggle. As of today, let's say, for example, 60 gigawatt hour of capacity is coming online. And as we said, it may take 1 or 2 years for them to get fully utilized. So they are — like they'll be fully available, let's say, by FY '29 or FY '30. But the demand for what's once again produced in FY '29, FY '30 is already there in 28. In fact, by FY '30, the expected India demand is going to be 160 giga against the 60 gigahertz, which will be fully usable. So I think that demand is very strong. We don't have to worry about demand in India. Only the ramp-up of cell production is what we need to watch, capital.

Operator

operator
#91

The next question comes from Raghav Angra, who is with Manish Stories.

Akshay Satija

analyst
#92

Can everyone hear me?

Operator

operator
#93

Yes, go right ahead.

Darshil Zaveri

analyst
#94

Could you clarify what portion of the planned capacity for electrolyte and lithium salt has confirmed customer demand behind it, as opposed to customers who are still going through trials and approvals? Also, what commercial ramp-up timeline do you expect for each product — specifically, how long it takes to go from approval to regular commercial supply, and then ultimately to full utilization?

Harin Kanani

executive
#95

Regarding the electrolyte source, as mentioned previously, we anticipate full utilization by next year itself, since we're running at roughly 70% to 80% utilization. As for the electrolyte salt, our projection is that full utilization will be reached by FY '29. On the electrolyte salt side, we hold some long-term contracts, and we're also in discussions with customers who aren't under contract, and on that basis we're confident full utilization can be achieved next year. Naturally, those long-term contracts don't include take-or-pay provisions. That's why we're likewise talking with others to make sure — but demand is very strong, so in the salt we can hit 70%, 80% utilization levels next year. And when it comes to electrolyte, we don't have long-term contracts with an EV maker because, as discussed earlier, cell production is coming online. It needs to stabilize. Only after stabilization will they be clear on volumes. So we don't have those contracts, but we have held commercial discussions. We have had pricing models agreed upon — that this is how we would handle the pricing — and the customer has accepted that.

Harin Kanani

executive
#96

The sole factor that occasionally alters this is whether they make our additives on-site or bring them in, based on how the prices compare — customers will still settle that as volumes increase. Yet the utilization guidance for FY '29 rests on the fact that the total fixed plans coming online need 3,000 tonnes at 60 gigahertz. And right now, our installed capacity stands at 30,000 tonnes. Apart from meg capacity, there is very little capacity out there. So most of the demand ought to arrive at Neogen, and that guarantees full utilization, particularly since importing electrolyte is extremely difficult. That is why the bulk of customers will probably buy it locally.

Operator

operator
#97

<<operator_script>> Our following question comes from Akshay Satija at Alpha Invesco.

Analyst

analyst
#98

Nice work on those strong results. I'd like to get some clarity on the fact that Exide hasn't received approval yet. For a manufacturer like Balaji Mine, how difficult would it be to bring in IPF 6 from China, work with the DMC, and then supply it to companies such as Exide or others?

Harin Kanani

executive
#99

I mean, for anyone, this is a journey, right? First you’ve got to get it working in R&D, and after that you need to build something like a plant at scale. So as we see it today, hardly anyone in India even has the capability to produce electrolyte in a lab. And the reality is you’d first have to develop that capability, produce it. Even if you build a plant, that takes a minimum of 2 years, and on value it adds just 15%, 20%, correct? So you also need to secure efficient IPS. I’m not saying it’s impossible, but in my view it’s very hard for someone to, say, within the coming 2 years, put up a due facility, obtain all the approvals, gain the customer’s confidence, and offer a more competitive price than a proven technology that Neogen already has, being an established player already. And of course, something like that could perhaps occur over a 10-year period. And depending on how much of it does occur, we talked about that number earlier — that 30% market share as well — Neogen has to grow 10x.

Harin Kanani

executive
#100

So it really hinges on how well that remaining 70% goes — the question then becomes whether Neogen can grow 10x or more. That's dependent, and it's something we're working on. Also, the advantages you hold: first, there's the first-mover advantage in the approvals you already have. Then, once approval is in place, it's very rare for customers to switch. And the second advantage is that when we undertake the next round of 30,000-tonne CapEx, we'll essentially be making incremental CapEx at 60%, 70% of what someone building a first 30,000-tonne plant would spend. So I think those are the advantages on our side that we need to leverage over the coming 7, 8 years as we move past our existing <<inaudible>>.

Operator

operator
#101

<<operator_script>> Our following question comes from Darshil Zaveri at Crown Capital.

Analyst

analyst
#102

I'd just like to ask about margins, sir — for this year, what's the outlook on a consolidated basis, given that we saw a dip and you also carried a higher interest cost, correct? So if you could just help us with guidance on that.

Harin Kanani

executive
#103

Turning to the core Neogen chemical business, we're currently sitting at an EBITDA level of 18% or a bit above. As the edge plant starts up and some of those extra costs from working outside come down, we expect the margin to improve past Q4 and certainly into next year. We're deliberately aiming to tailor our product — working with a better product mix — so that our margins strengthen. So I'd keep guiding to user capital margins of 18% to 20%. Now, with Neogen Ionics, what sometimes happens quarter on quarter is that capacity comes online and expenses hit, but utilization only follows in the following quarter. That makes the exact margins a bit hard to predict, though we do expect that once significant volumes arrive from Q4 and Q1, at least — hopefully — we'll be EBITDA positive, and depending on how expenses land, PBT positive as well, quite soon, sometime in the next financial year. Overall, once everything is fully utilized — the contracts are in place right now — we can achieve a return on capital of 20% plus on the investment of roughly INR 1,800 crores to INR 2,000 crores, plus a 90-day working capital cycle.

Harin Kanani

executive
#104

So the overall investment will come to somewhere between about INR 2,500 crores and INR 3,000 crores, and at full utilization that ought to produce EBITDA of close to INR 500 crores plus, say by FY '29. That's the thing we're concentrated on and aiming at right now, and it's the foundation for the guidance you've been provided. I realize that this year and next year there will be some volatility in margins, but again, you can either fix your attention on that or fix it on the opportunity sitting in front of us over the next 10 years. So as the whole ecosystem and the business settle down, we ask our investors to show a bit more patience. And once full utilization is reached, we'll have greater clarity and margins that are more predictable, which we can plan around.

Operator

operator
#105

That's going to have to be our final question for today, ladies and gentlemen. At this point, I'll turn things back to management for some closing remarks. Sir, the floor is yours.

Harin Kanani

executive
#106

Appreciate everyone for the time, the thoughtful questions, and your continued support. Should anything else come up, please contact our Investor Relations team at CDR India. We’re looking forward to talking with all of you next quarter. Happy Diwali to each and every one of you — wishing you all the festival’s greetings. Have a great day ahead. Thank you.

Operator

operator
#107

Appreciate it, management team members. That brings us to the end of this conference on behalf of Neogen Chemicals. Thanks to everyone for being with us today. You can go ahead and disconnect your lines now.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Neogen Chemicals Limited transcript — plus 133,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Neogen Chemicals Limited earnings transcripts and 133,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Neogen Chemicals Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.