NexGen Energy Ltd. (NXE) Earnings Call Transcript & Summary
May 20, 2025
Earnings Call Speaker Segments
Operator
operatorThank you for holding. I'm the conference operator, and I'd like to welcome everyone to the NexGen Energy First Quarter 2025 Results Conference Call. Please note that all participants are in listen-only mode and that this conference is being recorded. Following the speaker's remarks, we will hold a Q&A session. If you'd like to join the question queue, please press star then one on your telephone keypad. If you need assistance at any point during the call, you can signal an operator by pressing star then zero. At this time, I'd like to hand the conference over to Mr. Leigh Curyer, Chief Executive Officer and Director with NexGen Energy Limited. Please go ahead, sir.
Leigh Curyer
executiveMuch appreciated, Kaitlyn. Thanks to everyone for being with us on this call covering NexGen's Q1 2025 Financial Results. I'm Leigh Curyer, Chief Executive Officer of NexGen Energy, and with me today are my colleagues Travis McPherson, Chief Commercial Officer, and Benjamin Salter, Chief Financial Officer. During today's call, I'll give a short update on the worldwide uranium market picture, where we continue to see demand at historically unprecedented levels alongside supply that remains fragile. In addition, liquidity came back into the spot market during the latter part of the quarter, lifting spot 11%. I'll also walk through the highlights of what we achieved in the first quarter of 2025. That covers our ongoing progress through the regulatory process for the Rook I project as we get ready for the Canadian Nuclear Safety Commission hearings coming up later this year. I'll also update you on our exciting 2025 drilling program at Patterson Corridor East. The early results from that drilling program are simply excellent, including what is now recognized as the best-ever discovery phase intercept in RK-25 to 232 on our land package, as reported on March 24, 2025. Taken together, NexGen's Rook I project stands on the cusp of final federal permitting and, once complete, will move immediately into construction, then production at a time when the uranium market is going to be intense for low-risk, stable production sources from sound jurisdictions.
Leigh Curyer
executiveNexGen's Rook I project is going to put Canada back at the forefront of global uranium production, and it will embed the very best environmental, social, and governance practices. At the same time, through all of this, additional drilling at PCE is defining mineralization, and that mineralization is showing every one of the well-known and distinctive high-grade, solid technical setting characteristics found at its neighbor, Arrow, 3.5 km to the west. Once this presentation wraps up, we'll shift to the Q&A portion of the call, which gives you the chance to put any questions you'd like to Travis, Ben, and me. Over the course of today's call, we will be making forward-looking statements. I'd encourage you to go to our website for all the relevant disclaimers. To start, it's important to recognize the pivotal inflection point we're at. The uranium investment thesis has gone from promise to reality, with the key focus shifting to execution and scarcity. What we've seen in uranium equities since the start of the year is a genuine disconnect from the fundamentals. It's fair to say that the noise around tariffs had pulled attention away from key uranium market fundamentals that are materializing. With over 30 countries committed to tripling their nuclear energy capacity by 2050 and more than 60 reactors currently under construction globally, the robustness and the sustainability of demand is at unprecedented levels for nuclear power.
Leigh Curyer
executiveCanada has an important part to play here, especially since its neighbor to the south, the U.S., is coming to understand that securing supply of this key fuel demands major investment, and the projects needed must come online right now. According to the International Atomic Energy Agency's high-case scenario, cumulative uranium requirements will reach roughly GBP 7 billion through 2025. Most of those requirements remain undiscovered and unknown at present. A project such as NexGen's Rook I is unprecedented when it comes to volume, capability, and technical, environmental, social, and economic performance. Even so, our industry would need at least 10 of them over the next 25 years to satisfy demand. The sheer scale of the structural deficit highlights how critical the supply challenges facing the world are, and how scarce and strategic NexGen's role is. This quarter brought a telling market signal. Several producers have said current pricing levels are not sufficient and have therefore deferred contracting decisions, while others have pushed back final investment decisions on development projects. It is encouraging to see the new generation of uranium developers and to-be producers joining NexGen and working collectively, through discipline and patience, to ensure the sustainability of our industry. That will bring about higher uranium prices sustained over the long term, incorporating the real costs of delivering ethically sourced uranium so that supply remains reliable and sustained.
Leigh Curyer
executiveFor production to grow worldwide—which is necessary to satisfy both present and future demand—pricing has to firm up considerably as an incentive. Demand is holding up well, and as new technology companies come into this space, our industry is set up for stronger results than we've seen before, and that benefits everyone involved in supplying energy to people. Spot prices are right now around $71 a pound, after climbing quickly out of the low 60s amid fairly limited activity tied to an emerging carry trade opportunity, which shows how inherently sensitive the market is to even minor shifts in liquidity. At the same time, the term price has stayed solid, holding close to $80 a pound. That steadiness in longer-dated pricing is a powerful signal and has historically worked as a leading indicator. The underlying demand picture remains unusually strong even with near-term volatility. For NexGen, what's happening reflects and confirms the approach we've taken. Our first sales contracts reflect the basic supply-demand imbalance in the uranium market and, importantly, lock in the economics of a rising price environment for our shareholders while giving our utility partners unmatched security and diversification of supply. NexGen is staying extremely busy working on term deals with the industry, and neither elections, global trade tensions, nor the illiquidity in the spot market have affected that.
Leigh Curyer
executiveThe fact that NexGen is seen as playing a part in this market before long comes through clearly, and these contract talks now under way bear that out. On the policy side, things keep moving in a direction that favors nuclear power and supply chains that are secure. One thing stands out in particular: the executive order expected from the U.S. that would speed up nuclear project development via the Department of Defense and the Department of Energy. That effort acknowledges that national security and energy security have converged in the same way in today's electrified world. Baseload Power draws business investment, underpins industrial growth, and makes possible advanced technological development in critical fields such as artificial intelligence. In a similar vein, Europe recently announced plans to legislate a phase-out of Russian nuclear supply from its energy ecosystem starting in 2027. This decisive move away from Russian dependency creates substantial opportunities for Western suppliers and reinforces the premium placed on ethical, environmentally responsible production from politically stable jurisdictions. Also, just yesterday, Germany signaled a major positive shift back toward nuclear energy. That decision carries major positive implications for EU energy policy, along with Belgium repealing nuclear phase-out laws, which opens the door to new nuclear investment, and there are many more additional positive major macro news items involving nuclear. It simply mirrors the reality of how important power is — not only supplying power but supplying it reliably and from environmentally sensible sources.
Leigh Curyer
executiveFor populations and economies to be supported, Rook I from NexGen — boasting an environmental profile that leads the industry, technical simplicity, a lengthy mine life, and its Saskatchewan, Canada location — stands to gain enormously from this global supply chain recalibration. Significant company milestones have occurred in Q1 2025. Our two-part public hearing days for the Rook I project are being scheduled by the Canadian Nuclear Safety Commission, fixed for November 19, 2025, and February 9 to 13, 2026. Canada's largest uranium development project is something we are ready today to present to the world. Project approval is to be finalized by the Commission for the benefit of our shareholders, our Indigenous Nation partners, the province of Saskatchewan, Canada, and the planet. Clarity on the timeline comes from these hearing dates, and they allow us to strategically optimize our construction schedule, advance procurement initiatives and detailed engineering work, and implement our construction hiring plan with precision, positioning us to maximize efficiency once we transition from permitting to construction execution. Canada's evolving regulatory landscape is also being monitored by us, with its increased focus on streamlining approvals for projects of national significance and that have provincial approval. That is NexGen. "One and done," newly elected Canadian Prime Minister Mark Carney has stated, which is extremely positive and recognizes the opportunity Canada has, but also his willingness to sensibly streamline the rigorous approval process to actually deliver Canada's economic, trade, and energy security interests.
Leigh Curyer
executiveNow, moving on to Patterson Corridor East, an area that keeps surpassing—and in fact redefining—what we had anticipated. During 2025, we kicked off the biggest drilling initiative ever undertaken at PCE: a 43,000-metre exploration program, among the largest anywhere in the Athabasca Basin this year. Our objective is straightforward—to build on the remarkable mineralization found so far and to gain a clearer picture of the size and continuity of what is looking like a major discovery, one that carries every one of those distinctive hallmarks of the mighty Arrow deposit. On March 24, 2025, we announced what stands today as the finest discovery-stage intercept ever recorded on any NexGen property. Drill hole RK-25 to 232 cut 3.9 meters of off-scale readings above 61,000 counts per second, with uranium mineralization sitting inside a wider 13.8-meter zone. Four more holes—each spaced no less than 50 meters from that intercept—delivered the same intense, ultra-high-grade mineralization. Since our previous update, the high-grade zones have grown to twice their size, now spanning 210 meters along strike and 335 meters vertically, and they stay open in every direction. These results are truly exceptional, especially considering that PCE remains in its discovery phase. By way of comparison, intercepts of this quality at Arrow only showed up considerably later, during the targeted resource definition stage.
Leigh Curyer
executiveI want to remind everybody that NexGen controls the largest land footprint — more than 190 hectares — in the southwest Athabasca Basin of Saskatchewan, an area widely regarded as where uranium output in the West is headed. PCE sits only 3.5 km to the east of the world-class Arrow deposit, and that places us to substantially grow our resource base over the years ahead and to make a positive difference in the communities where we work for many generations to come. NexGen is capitalized exceptionally well. We have roughly CAD 435 million in cash on hand, which is sufficient to fund the beginning of construction activities over the next 12 to 18 months. On top of that, we hold more than $1.6 billion in expressions of interest from leading banks and export credit agencies that would form the base of our project funding. As with any Tier one project, we are working through numerous financial options to optimize how this project is funded. On timing, our focus stays on year-end 2025 for settling on the best financing package — one that gives certainty of capital, lets us keep our marketing strategy of maximizing exposure to prevailing prices in the future, and lets us preserve flexibility in our production output. Meanwhile, demand for our future production has never been stronger.
Leigh Curyer
executiveDiscussions on off-take continue with a wide range of counterparties worldwide. We anticipate announcing further agreements during this year, which will strengthen our market position even more as we head toward construction and production. Federal approval is getting close, and the integrated project team is now assembled. Procurement and detailed engineering are fully in place, and with a strong balance sheet we are set to begin construction. We stand ready and are extremely well placed to move ahead into the next stage of development. With that, I'd like to open the floor for questions.
Operator
operatorLadies and gentlemen, the question and answer session is starting now. If you'd like to join the question queue, press star then one on your telephone keypad. A tone will sound to confirm your request. Should you be on a speakerphone, please lift your handset before you press any keys. To take yourself out of the question queue, press star then two. Our first question comes from Ralph Profiti with Stifel. Please go ahead.
Ralph Profiti
analystHello there, and thank you, Operator. Leigh, I want to follow up with a question about how things are moving along in more granular terms when it comes to securing equipment and long-lead items. Does the position you hold in the queue leave you satisfied, and are your suppliers bringing up broad inflationary pressure or delivery timelines that could be at risk, or do those discussions match what you had anticipated?
Leigh Curyer
executiveYeah, thanks, Ralph. Look, we've got a construction execution plan that's very detailed and, once approval comes, it's mapped out to the day. One thing that helps — or is a sort of indirect help — is that the Commission hearing dates are now set for November 2025 and February 2026, and that gives us the ability to plan the procurement process for key inputs exceptionally well, especially for the first 12 to 18 months of construction. As I speak, that's well in hand, and a significant focus of the executive team's time is on that execution plan. As I speak, I'm very comfortable with where that's heading. On pricing, look, the industry broadly is always under pricing pressure. We're not excluded from that, but we are maintaining what we expect things to cost as we've previously forecasted. That's also been supported by due diligence by a number of the debt and equity providers that have been running a process on our project. The good thing about the Rook I Arrow project is that the economics are extraordinarily robust. If there is CPI pressure, it won't be as material as you would see in a marginal project. Further, with the payback period being so short, approximately 13 months at current prices, the impact of any CPI increase on the finance ability of the project will also be immaterial.
Leigh Curyer
executiveYou're absolutely right about that, Ralph. That's an area we focus on heavily and plan for carefully. Right now, we're in good shape. I remain — and I don't expect that to shift going forward either, given how much detailed planning has gone into the construction execution schedule.
Ralph Profiti
analystThanks, Leigh, that's helpful. I have a separate question. With more focus now on exploration, I'm curious how you weigh the push to get out the mineral resource estimate — the first one for PCE — against what the drills are showing you, which suggests the longer it takes, the more potential there is. How are you balancing those two sides, potential versus getting an MRE delivered?
Leigh Curyer
executiveYeah, absolutely. So first off, that's the exploration group, and none of this takes anything away from the focus on the final federal permitting or the execution schedule. On the exploration side, I have to emphasize that PCE is still at a definition stage — as in, what exactly are we dealing with. I don't see us moving into delineation resource definition drilling right now. The earliest that would happen is 2026. Every direction remains open. It's looking better than what Arrow had at a comparable point in drilling. As everyone knows, Arrow grew substantially once we hit the high-grade subdomain. We're at a very, very early stage here. There's no — we don't view it as pressure. Our exploration approach is very well thought out: we first aim to establish the area of mineralization, where we intersect a high-grade subdomain. We then put somewhat more drill-bit weighting toward that, because the result of hitting that high-grade, intense mineralization has an extremely material effect on resource definition. Once we feel we understand both of those, that's when we'll move that attention to measuring volume and grade — but not before.
Leigh Curyer
executiveAs of right now, I don't see us being anywhere close to that point. Look, that's exciting news for everybody. It is far too soon to figure out exactly what we're facing at PCE, since it's showing incredibly similar characteristics to what Arrow is.
Ralph Profiti
analystMuch appreciated, Leigh. Those responses are helpful.
Leigh Curyer
executiveAppreciate that, Ralph.
Operator
operatorOur next question comes from Julio Mondragon — excuse me — of BMO Capital Markets. You may proceed.
Julio Mondragon
analystMorning Leigh, Julio here. My first question concerns what you have planned for Rook I development during this year — the budget and the activities that are possible — while you wait for the hearing dates later this year and in early 2026.
Leigh Curyer
executiveSo yes, Julio, if I've got your question right — on the hearing date, we're ready at this very moment. If approvals came through right now, we would already be building. Since 2017 we've had a very clear picture of what we're constructing and the method we'll use, and we've kept sharpening it ever since. An extraordinary amount of time and attention has gone into this project to make sure it's executed well. Add to that the fact that, technically, it's very simple compared with other mines globally — the basement rock is extremely competent. Physically, the footprint is actually very small, and it's a very small mine. Each day we'll be taking out roughly one and a half double-decker buses' worth of ore. For a mine, that is tiny. The metallurgy is very clean. The processing plant itself, in a relative sense, is a more straightforward, simplified version of what's seen in other parts of the world. All of that bodes well for executing well once approval arrives. From a company perspective and mindset — and as everyone knows — we are very, very diligent when it comes to risk analysis. We're looking forward to construction given how much time and energy we've invested in it over the last — well, it's almost eight years.
Leigh Curyer
executiveOur team is fully assembled, and every step of execution has been mapped out right down to specific days. We're eager to reach that point, and we anticipate getting there in early 2026, once the federal permitting process with the CNSC wraps up.
Julio Mondragon
analystThank you. I’d like to get a slightly clearer picture of what’s coming up soon: what development activities will you be undertaking during 2025, and, if I may ask, what budget might those activities require?
Leigh Curyer
executiveYeah. Look, our focus is on exploration in 2026 — sorry, in 2025. We keep that site on an exploration footing to support the drilling work in the region and to maintain it in an environmentally elite way. Right now we hold CAD 435 million in the treasury. On top of that, we have roughly another CAD 300 million in liquid assets. Once construction begins, that is when you will see the budget speed up. At this moment we are well funded, well into the back end of 2026, to cover all of our general and administrative expenses, to keep the site ready for construction as well, and to support exploration activities.
Julio Mondragon
analystOh, great. Thanks so much. Could I squeeze in one more question? How are those contracting talks with utilities progressing right now? If you could give us a bit more detail on that, thank you.
Leigh Curyer
executiveAbsolutely. On that topic, I'll pass things along to Travis.
Travis McPherson
executiveYeah, perfect. This is Travis, and I appreciate the question. As Leigh mentioned earlier in his opening comments, the contracting conversations have been extremely strong and active, with a great many of them taking place. You should expect additional contracts to be signed and announced soon and over the course of the year. On the broader context and color, there is certainly a rising recognition of how acute the supply deficit is, especially later this decade and into the 2030s, when Arrow will be producing. People, and utilities in particular, are extremely worried about that window of time, and rightly so. That clearly puts NexGen in a strong and very unique position. The utilities also recognize that not all uranium is created equal, and purchasing uranium from us offers them a different value proposition than purchasing from an incumbent producer, since an incumbent producer does not provide them with net new diversification and new sources of supply, while backing our mine and all the other emerging developers does provide that. That recognition exists, and it strongly supports our initiatives and, I'm sure, those of other developers. Yeah, very, very good and robust, with more to come on that front.
Julio Mondragon
analystExcellent. Many thanks to all of you, and thanks again.
Operator
operatorAndrew Wong from RBC Capital Markets has the next question. Go ahead, please.
Andrew Wong
analystHello, and thank you for taking my question. Perhaps, returning to the topic of contracting, could you describe the terms of the contracts currently under discussion? Regarding NexGen, my understanding is that you would favor greater exposure to spot-related markets. Is that what we should expect in your upcoming contract settlements? Are the utilities amenable to that? And any indication as to whether floors or ceilings are part of the discussions? How much vulnerability exists at present?
Travis McPherson
executiveYeah, thanks, Andrew. Travis here again — obviously, we can’t discuss specific terms. What I’d say is that the details we shared in December regarding those first 5 million pounds of contracts, where we laid out what the sensitivities looked like and so on, are consistent with what we’re talking about moving forward, and our emphasis on getting as much exposure as possible to the future prevailing uranium price — the uranium spot price at the moment we make delivery — stays the same, and so does the willingness of utilities, along with our read on utilities generally, to move in that direction and how it works to the benefit of both sides, actually, in the sense that our overall philosophy isn’t one where only we gain — utilities gain too — and you don’t end up back in a post-Fukushima world where producers oversupply a market for far, far too long because they have floor prices that give them an incentive to break even and a contractual obligation to keep producing. Our marketing philosophy and strategy removes that possibility, because we shorten how long the contract runs and link it to the price at that time. So if something shifts down the road, the industry can adjust — or at least we can under these contracts.
Travis McPherson
executiveThat understanding is in place, and yes, they’re receptive to it, as we’ll show in December through the disclosure.
Leigh Curyer
executiveYeah, Andrew, let me just build on what Travis said earlier — utilities don't sign identical contracts with every producer or advanced developer. Each agreement really mirrors the distinctive character of the individual project. Our approach simply captures the technical, economic, and environmental dimensions of our own project. We sit in competent basement rock. We're able to increase output, and we can dial output back when market conditions call for it. That benefits the producers, and it benefits the utilities purchasing the offtake as well. I'm aware there's some commentary floating around that this only works one way, and that it has always worked that way. This mine — there has never been a mine quite like it when it comes to technical certainty along with economic and environmental performance. Our contracting approach simply mirrors those characteristics, and that is exactly what the utilities we've already signed with have appreciated, and what those we will sign with in the near term will appreciate too.
Andrew Wong
analystThat's really helpful context. Thanks. On the federal election point, I'm wondering what effect it's had on your talks with the government about approvals? Since the election, have you spoken at all with the new government? And is there any wiggle room when it comes to those public hearing dates?
Leigh Curyer
executiveHonestly, the nice part about those dates is that they're fixed now as boundaries, and we're certain they're settled. Honestly, I've found Mark Carney's remarks about a single review for big energy projects in Canada to be extremely heartening. Should that turn into a regulatory system that works better, where a project holding provincial approval wouldn't need a later federal approval, then I believe that benefits every uranium project currently underway as well as those still to come that are heading toward production. Honestly, there are elements involved in having dual regulators, one provincial and one federal. The two do overlap. Nobody gains from that. Honestly, I've been quite struck by Mark Carney's dedication to making the process more efficient and to Canada leveraging its advantages and getting these energy projects operating right away. Should it actually turn into that, I'd be extremely, extremely happy to share it. Without question, Saskatchewan's Premier, Scott Moe, has spoken very openly about what he wants to see regarding how the federal government handles projects like ours. Sure, let's wait and see. Honestly, November is coming up fast, there's no question about it. We're at the last stages right now, as we speak.
Andrew Wong
analystExcellent. I appreciate it very much.
Operator
operatorAgain, should you wish to ask something, hit star followed by one. Joining us now is Craig Hutchison of TD Cowen. Your line is open.
Craig Hutchison
analystMorning, everyone, and thanks for having my question. I just have one thing to ask. Early on you said you expect to identify the optimal financing package before year-end. At this stage, are you still open to bringing in a strategic investor at the asset level?
Leigh Curyer
executiveYes. Oh, my apologies. Travis, go ahead and take that one.
Travis McPherson
executiveYes, thank you, Leigh. So Craig, to put it briefly, the answer is affirmative — that is indeed what we're doing. As we've mentioned previously, this is a highly focused, hand-picked group we've been in discussions with, certain ones across the past several years, and some in depth over the last 12 months. It continues to be just one among the numerous alternatives available to us. Regarding timing, all parties engaged in that effort — both the prepayment work and the debt work — are converging on a timeline centered around year-end of this year, as we've observed.
Craig Hutchison
analystAll right. That would likely happen prior to the permits.
Leigh Curyer
executiveYes. It could happen. Clearly, those permits hinge heavily on getting that financing piece finalized.
Craig Hutchison
analystAll right. Regarding the contracting piece — do you folks have some kind of target volume, or an approximate volume, that you'd like to see locked in before the final investment decision gets made?
Travis McPherson
executiveRight, Craig, no, we don’t have that. Certain options are going to need some amount of offtake in place, though it won’t have to be in place for construction to begin. Take the debtor’s example — part of it calls for certain volumes to be demonstrated. As we’ve said before, they don’t require price hedging in that sense. What price or pricing mechanism gets used doesn’t matter to the lenders, but some volumes will need to be there. Those aren’t needed until the first part — they won’t actually be needed until you start drawing down the debt, and that won’t happen until early in 2027 at the earliest. With others, it isn’t part of the discussion. No volume is required for us to start construction. As Leigh said, we’re ready to go. If approval came tomorrow, we’d be in construction right away. Yeah, we’re in a good position there. Even over the longer term, we don’t really have a — because people sometimes ask us this, like, “What’s the split of term contracts or whatever?” — over the long term, we don’t have a set percentage in mind. We’ll always keep our ability to take advantage of the production output flexibility that the mine has.
Travis McPherson
executiveWhat really matters most is simply how closely we and the party—or parties—across the table see eye to eye on where uranium supply and demand are headed. When views match, a contract becomes achievable. When they don't match, that's precisely when we hold off and wait. We've held off and waited throughout, and doing so has plainly paid off for us in a substantial way, and we'll keep doing so.
Craig Hutchison
analystAlright. Great. Perhaps one final question from me, returning to PCE. My understanding was that the assays were expected out in April. Is it running a little behind schedule, or are you simply holding off to group those results together with some newer ones?
Leigh Curyer
executiveNo, things have been extremely hectic at the lab. Given how much material has been processed, Craig, they should be delivering those results very soon. Whenever we put something out, we include context on materiality. Without question, 232 will get a news release of its own because of how material it is, and that will most likely come separately from the assay results for the drilling done in 2024. I would stress once more that we are only at the very beginning of understanding how large PCE really is, but it looks exceptionally, exceptionally strong when you compare it with Arrow at a comparable amount of drilling.
Craig Hutchison
analystAlright, that all sounds good. Best of luck to all of you, and thank you.
Operator
operatorBrian MacArthur from Raymond James has the next question, so please go ahead.
Brian MacArthur
analystMorning, and thanks for taking my question. I want to pick up a bit on what Ralph was saying. Suppose approval comes through — let's say we receive it in February next year — is there anything you can do to pull the entire construction schedule forward? If you could, maybe walk us through how you expect things to unfold from here on a timeline, and where the critical path to production sits once the permits are in hand.
Leigh Curyer
executiveRight, thanks, Brian. So the shaft really is the item with the longest lead time, and it also calls for the most preparation. According to the feasibility study we updated in August 2024, construction takes four years. It's better to begin either as you come out of winter, which is roughly when we anticipate the CNSC hearing process wrapping up. Everyone, I think, should shift that to the start of construction, which depends on the CNSC completing the process. From that date, the process runs 48 months. I don't want to — as far as speeding up those 48 months, there's really nothing material. It will be 48 months.
Brian MacArthur
analystThanks. I believe that's also how I took it. To flip it around, though, just so I'm certain — since it ties back to what Ralph asked, there isn't anything where you've had items stuck in queues or similar, which would stretch it beyond 48 months, that you're able to see at this point, simply owing to how the timing has played out?
Leigh Curyer
executiveActually no — the reverse is true. Because the hearings have slipped, we get the chance to sharpen the timeline for delivering critical inputs much further ahead than would otherwise be possible. So for everyone, that lowers the risk on execution once we break ground, thanks to the hearings moving to November of 2025 and February of 2026. So from that execution standpoint, when you do get started, it's genuinely a plus.
Brian MacArthur
analystGreat, thanks. And perhaps one last item so I have this completely clear. As I understood it, a good deal of the sourcing for what you require was also based in Canada. Is that correct? So really, there isn’t much supply chain exposure ahead. Would that be a fair statement?
Leigh Curyer
executiveThat's a fair point. And the opportunities in Canada will be our first and foremost priority as we optimize them. There is some specialization of particular equipment items when it comes to the shaft and the mill, but nothing that's really material in that sense. Yeah, no, Canada will get priority. I'd say that prioritization does—as everyone knows, given how we focus on local communities—begin in the local communities and then expand outward from there.
Brian MacArthur
analystPerfect, thank you so much, Leigh. That comes through very clearly.
Leigh Curyer
executiveI appreciate that, Brian.
Operator
operatorThat brings the Q&A portion to an end. I'll now hand the conference back to Mr. Curyer for any closing remarks he'd like to make.
Leigh Curyer
executiveThank you, Kaitlyn. Yes, we truly value the continued interest and support from everyone, as we always do. As I mentioned earlier in this call, NexGen is on the verge of receiving final federal permitting approval. With all the news that keeps coming out, the market and fundamentals for nuclear energy are getting better nearly every day. NexGen stands ready to play its part in bringing Canada back to the top spot among producers of this extraordinarily important fuel—one that powers economies and households across the globe. With that, I appreciate everyone's time and attention. If any further questions come up, as always, please feel free to contact Monica, Stacey, Travis, or me. Thank you.
Operator
operatorThat wraps up today's conference call. You can go ahead and disconnect your lines now. Thanks for joining us, and have a pleasant day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete NexGen Energy Ltd. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to NexGen Energy Ltd. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in NexGen Energy Ltd. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.