NextEra Energy, Inc. (NEE) Earnings Call Transcript & Summary
April 23, 2026
What were the key takeaways from NextEra Energy, Inc.'s April 23, 2026 earnings call?
In the first quarter of 2026, NextEra Energy, Inc. (NEE) reported adjusted earnings per share (EPS) growth of 10% year-over-year, driven by strong performance in both Florida Power & Light (FPL) and Energy Resources. Total revenue figures were not disclosed, but management highlighted a robust demand for electricity and a strategic focus on infrastructure investment, particularly in Florida, where FPL expects to invest between $90 billion and $100 billion through 2032. The company maintained its adjusted EPS guidance for 2026 at a range of $3.92 to $4.02, targeting the high end of this range, indicating confidence in future growth despite ongoing market challenges.
What topics did NextEra Energy, Inc. cover?
- Strong Customer Growth: FPL added nearly 100,000 customers year-over-year, reflecting the robust economic growth in Florida. Management noted, "Florida's GDP is forecasted to grow 4.7% annually through 2040," showcasing the state's economic resilience.
- Significant Capital Investment Plans: FPL plans to invest between $90 billion and $100 billion through 2032 to support the growing electricity demand. This investment is crucial for maintaining low bills while expanding infrastructure, as stated by management, "FPL expects to invest between $90 billion and $100 billion through 2032, primarily to support Florida's growing economy."
- Record Quarter for Energy Resources: Energy Resources reported a record quarter with 4 gigawatts of new long-term contracted renewables and storage projects added to its backlog. This reflects strong demand, as management noted, "Energy Resources had a record quarter of new renewables and storage origination with 4 gigawatts added to the backlog."
- Guidance Maintained: Management reaffirmed the adjusted EPS guidance for 2026 at $3.92 to $4.02, indicating confidence in achieving growth targets. They stated, "Our 2026 adjusted earnings per share expectations range of $3.92 to $4.02 remains unchanged, and we are targeting the high end of that range."
- Focus on Infrastructure and Technology: The company is leveraging technology through its Rewire initiative to enhance operational efficiency and reduce costs. Management emphasized, "We believe these tools have the potential to drive significant savings for customers," highlighting the importance of innovation in their strategy.
What were NextEra Energy, Inc.'s April 23, 2026 results?
- Adjusted EPS: $3.92 to $4.02 (remains unchanged)
- Customer Growth: 100,000 (compared to the prior year)
- Capital Expenditures: $12 billion to $13 billion
- New Renewables and Storage Projects: 4 gigawatts (added to the backlog)
- Return on Equity: 11.7% (for regulatory purposes)
NextEra Energy's strong first quarter results and maintained guidance reflect a solid growth trajectory, driven by customer demand and strategic investments. However, challenges in gas generation development and labor constraints could pose risks to achieving future targets. Investors should monitor the execution of capital plans and the progress of new projects, particularly in the context of rising electricity demand.
Earnings Call Speaker Segments
Mark Eidelman
executiveHi everyone, and thank you for joining this call about NextEra Energy's first-quarter 2026 results. Present with me are John Ketchum, our Chairman, President, and Chief Executive Officer at NextEra Energy; Michael Dunne, who is Executive Vice President and Chief Financial Officer of NextEra Energy; Armando Pimentel, Chief Executive Officer of Florida Power & Light Company; Scott Voorhees, President of Florida Power & Light Company; Brian Bolster, President and Chief Executive Officer of NextEra Energy Resources; and Mark Hickson, Executive Vice President of NextEra Energy. John will begin by sharing a few opening remarks, and then Mike will take us through the results. After we wrap that up, members of our leadership group will be available to answer whatever you'd like to ask. Today we'll share certain statements about the future, which are based on where things stand now and on the assumptions we're making, and by nature those carry exposure to risk and uncertainty. If it turns out that any of the assumptions we consider important are wrong, or if additional elements enter the picture—the ones laid out in the earnings press release issued today, in remarks made during this call, in the Risk Factors portion of the company presentation, or in the latest reports and documents we've filed with the Securities and Exchange Commission, every one of which is available on our site, www.nexteraenergy.com—then what actually happens could end up differing substantially from what was implied by those future-oriented statements. We assume no duty to revise any statement that looks ahead. Also, today's presentation makes reference to non-GAAP financial measures. For details on definitions and for reconciliations of historical non-GAAP measures to the nearest GAAP financial measure, please look at the information in the slides that go along with today's presentation. With all of that out of the way, I'll hand the call over to John.
John W. Ketchum
executiveMark, thank you, and good morning everyone. This year has begun exceptionally well for NextEra Energy, with strong first-quarter results. Compared with the prior-year period, adjusted earnings per share rose 10%, reflecting sound financial and operational performance at both FPL and Energy Resources. During recent months, I have devoted considerable time to collaborating with our customers, policymakers, and stakeholders. Two things have become unmistakably evident to me. To begin with, the need for electricity throughout this country is not slowing down. In fact, it is accelerating. Our customers need power immediately, and the speed at which we can supply that power is hugely important. Second, any new power infrastructure we construct has to tackle affordability concerns and keep bills manageable for customers we already serve. NextEra Energy is accomplishing both; we can satisfy this rising demand for power while holding power prices down, and we're achieving that by making use of our common platform. We construct every type of energy infrastructure. We bring experience spanning the whole energy value chain at enormous scale, supported by a balance sheet that can handle it, and we're constantly improving operational efficiency throughout our portfolio to create value and affordability for customers. Here's how we'd put it on the call: over at FPL, the value proposition is simple — we lean on a diverse generating fleet and a sturdy grid so that every day our customers get power that's cheap and remarkably reliable. When it comes to Energy Resources, the reason customers choose us is that they see a track record nobody else can match, built over decades, for developing energy infrastructure that delivers affordable answers tailored to what they specifically require. This era of extraordinary expansion is exactly what NextEra Energy was built to serve. Serving 49 states and holding more than 12 avenues for growth, there's simply no limit to how enthusiastic I am about what we're positioned to do for our customers, our shareholders, and our country. And here's the key point: the expansion we're projecting is something we can see clearly, and it's divided right down the middle between the businesses we have under regulation and those held under long-term contracts. Florida stands out as a prime illustration of how we serve growth dependably while holding bills down. The Sunshine State has ranked among the fastest-growing states for many decades and keeps expanding rapidly right now. Florida already boasts a $1.8 trillion economy, the 15th largest worldwide, and that growth shows no sign of slowing. Florida's GDP is projected to expand 4.7% each year through 2040. In fact, during Q1, FPL brought on close to 100,000 customers relative to the comparable period a year earlier; to put that in perspective, about 90% of utilities across the country serve fewer than that on a day-to-day basis. FPL added these customers to our system over merely the last 12 months. FPL enables this growth by constructing the appropriate new power generation and the appropriate new transmission infrastructure throughout the state. In fact, FPL anticipates investing somewhere between $90 billion and $100 billion through 2032, mainly to bolster Florida's expanding economy. Earlier this month, FPL submitted its annual 10-year site plan, laying out its strategy for meeting Florida's rising electricity needs dependably and cost-effectively. The plan calls for about 4 GW of fresh gas-fired generation, which would pair with more than 12 GW of solar plus over 7 GW of storage solutions across the coming 10 years, further diversifying FPL's generation fleet. Even so, despite substantial capital investment, customer bills have actually declined over time. Once inflation is factored in, the typical FPL residential customer bill today sits 20% below where it stood 20 years ago; measured in nominal terms, FPL's bills run approximately 30% under the national average and are only expected to rise by about 2% per year on average through the end of the decade. Beyond that, FPL provides customers top decile reliability that comes in approximately 68% better than the national average. Low bills and high reliability aren't accidental. Instead, these results come from investing capital wisely and with discipline, combined with an unwavering commitment to running things efficiently. That proposition delivers value not just to the customers we already have, but it also appeals strongly to new large load customers — hyperscalers among them — who value reliability, cost, and speed to market, and those are all things we're able to provide. Through the four-year rate settlement agreement for FPL that regulators approved and that kicked in during January, we took the initiative to establish a large load tariff, which gives customers and regulators alike the certainty they need, while weighing consumer protections against a rate that stays competitive. Once more, when the structure is right and the approach is smart, you can achieve both objectives. The speed to market that FPL offers, along with its best-in-class service, is drawing considerable large load interest. At FPL, our pipeline of large load interest sits at approximately 21 GW. Of that total, we are engaged in advanced talks covering around 12 GW, and we think a share of it might start being served as early as 2028. Progress on this front has been solid, and our expectation remains that before this year is over, at least one large load customer will commit to capacity through FPL's tariff. For each gigawatt initially, we anticipate that large load served under FPL's approved tariff translates into about $2 billion in CapEx, while delivering a return on equity matching that of FPL's other investments. Meanwhile, Energy Resources continues to expand its regulated electric and gas transmission portfolio; this point cannot be emphasized enough. Okay, so first, when we talk about satisfying the power needs of the United States, the backbone systems are truly essential. Power plants get their fuel through pipelines, while transmission lines are what carry that electricity to towns and cities. Among the top independent electric transmission firms in the country is NextEra Energy Transmission. Because of the size we operate at and what we've learned, we're in a strong spot to take on fresh transmission projects throughout the U.S. Actually, only this week, Lone Star Transmission — which is one of NextEra Energy Transmission's subsidiaries — got the go-ahead from ERCOT to construct parts of two additional transmission lines located in North Central Texas, all aimed at boosting dependability for that area. The portion Lone Star is putting in, worth about $300 million, means an increase of roughly 40% to Lone Star's rate base. So far, since 2023, NextEra Energy Transmission has locked in over $5 billion worth of new projects. All told, at NextEra Energy Transmission we've got $8 billion in regulated and secured capital — that's nearly double the rate base Gulf Power had back in 2019 when we acquired it. On top of that, we keep delivering on the strategy for expanding our gas transmission operation. Energy Resources holds an ownership stake now in over 1,000 miles of pipelines regulated by FERC. And the key thing is, this portfolio comes with quite a few organic expansion possibilities. So when you put all of that together, what we expect is that by 2032, the electric and gas transmission operations at Energy Resources combined will hit $20 billion in total regulated and investment capital. That translates into a 20% compound annual growth rate starting from a 2025 base. Not long ago, we brought in new senior leadership for our pipeline business, and the specific reason was to go after growth opportunities — that really demonstrates how committed we are to growing the gas transmission side. Let me now turn to Energy Resources' long-term contracted business. As I said at the start, its importance truly cannot be overstated. Our customers need a tremendous amount of power, and they need it right away. Until more gas-fired generation gets built, renewables and storage remain the quickest route to putting new electrons onto the grid. That's the reason Energy Resources had a record quarter, bringing 4 GW of newly contracted long-term renewables and storage projects into backlog. That figure covers yet another robust quarter of battery storage origination totaling 1.3 GW. And crucially, battery storage gives us four avenues for growth.
John W. Ketchum
executiveWe construct standalone battery storage, we place storage alongside existing sites, we create storage as a grid solution, and at existing storage projects we take batteries from four hours up to eight hours. Our pipeline for standalone and co-located battery storage stands at more than 110 GW, leaving out expansion opportunities. In short, within a market pushed by a major need for fast capacity solutions, Energy Resources stays well-positioned to serve customers through battery storage. We have likewise gotten off to a fantastic start carrying out our data center hub strategy, which rests on the strength of scale. When we build the infrastructure needed to meet data center power demand, scale allows us to shorten development timelines, reduce execution risk, and keep costs in check. In line with that, the U.S. Department of Commerce selected Energy Resources last month to construct 9.5 GW of new gas-fired generation aimed at serving large loads. Under the U.S.-Japan trade deal, those projects connect to Japan's $550 billion commitment to invest in the United States. Two distinct projects are involved — one located in Texas, the other in Pennsylvania. In each case, the design is meant to serve large load within its own state. Ownership of the projects would sit with the U.S. and Japan, whereas Energy Resources would take on development, construction, and operations. Both of these projects are moving ahead right now. We're advancing work on the sites themselves, on procurement, on permits, and on the commercial arrangements, all while we aim to finalize definitive agreements with the U.S. and Japan. These projects sit within our current portfolio of data center hubs — that portfolio numbers over 30 hubs, and by year-end we're targeting about 40. Four origination channels now feed our base case objective of locking in 15 GW of new generation meant to serve large load by 2035. Those same four origination channels could also carry us to our upside case of at least 30 GW by 2035. To hit that target, we're pursuing every kind of energy, with roughly half coming from gas-fired generation and the rest supplied by all remaining sources. Channel one involves partnering straight with hyperscalers to supply power for their data centers — firms we've enjoyed strong, long-standing ties with. One standout illustration is the work we're doing alongside Google to bring our Duane Arnold nuclear plant, located outside Cedar Rapids, Iowa, back into service. Channel two centers on collaborating with investor-owned utilities. A prime case is the joint development agreement we inked with Xcel earlier this week, aimed at jointly planning and swiftly rolling out new generation, storage, and transmission so we can seize the accelerating data center demand spanning Xcel's eight-state service territory. The third avenue we have involves the solid ties we've built with cooperatives and municipal entities. A prime illustration is the initiative we've got with Basin Electric to put up a 1.5 GW combined cycle facility in North Dakota. What our co-op and municipality clients appreciate is our expertise, what we're able to do, the connections we hold with hyperscalers, plus our financial strength — all of which position us as the ideal collaborator. The fourth avenue is partnering with the federal government on constructing fresh natural gas generation capacity. Regarding Duane Arnold, things keep moving along well. At the start of this month, approval came through from the Nuclear Regulatory Commission for a transfer of licensing tied to the plant's minority stakeholders — Central Iowa Power Cooperative and Corn Belt Power Cooperative — handing those rights to NextEra Energy. Now that this key federal authorization is secured, Energy Resources is positioned to finalize acquiring that 30% ownership share, which will make Duane Arnold fully ours. In the meantime, work to bring back interconnection rights for Duane Arnold remains on track. We still anticipate the plant returning to service by no later than Q1 2029. On top of that, we continue evaluating advanced nuclear, closely examining the offerings of various SMR OEMs. Our nuclear locations give us the ability to co-locate 6 GW of SMR capacity, and on top of that, we're pursuing greenfield development. Obviously, building new nuclear would require appropriate commercial terms and conditions — things like risk-sharing arrangements that put a ceiling on what we could ultimately lose. Given that no other company has built more energy infrastructure over the last twenty years, we end up with a large stock of operating assets whose contracts are rolling off. To be precise, between now and 2032, we can recontract as much as 6 GW of renewables plus 1.5 GW of nuclear. The timing couldn't be better. Most of these projects were constructed and contracted long ago, under market conditions that were significantly worse than today's. As the PPAs lapse over the coming years, we expect recontracting to bring a higher price. In fact, during the Q1, we signed contracts for over 600 MW of existing projects, securing deals at an average of more than 18 years, which speaks to the robust electricity demand environment we see right now. In the Q1, Energy Resources' customer supply business pushed its growth strategy forward, with our strategic acquisition of Symmetry Energy Solutions standing out — Symmetry being one of the U.S.'s top natural gas suppliers. Symmetry does business in 34 states and gives us access to additional physical assets, allowing us to provide a wide range of solutions to our customers. In fact, across every one of our businesses, we now move and deliver roughly 2.9 trillion cu ft of natural gas each year, or around 8 billion cu ft per day, which makes us one of the biggest and most active gas suppliers for wholesale, retail, and industrial customers across the nation. Even as we keep growing, delivering value, and offering innovative solutions to customers daily, we're also intent on improving ourselves and taking action to reshape the future of the whole electric industry; that's what our new Rewire initiative, done in partnership with Google Cloud, is about. Rewire is something everyone across the company is involved in — it's about rethinking the way we work and the way we do business. Alongside that, we're pursuing an AI transformation that touches the whole enterprise, and we expect it to create opportunities for top-line growth and cost savings for our customers. At the same time, Rewire serves as the platform on which we build AI products. We firmly believe that the new AI tools and solutions we develop will do more than change how we operate and give us an advantage over rivals — they'll also help transform the way the entire industry generates and delivers electricity and serves customers. Working together with Google, we're delivering these offerings to utilities, which unlocks savings for households and companies across America. During the first quarter, we launched our initial Rewire offerings. Take Conduit, for instance: it's a tool powered by AI built to upskill a renewables workforce that is already best-in-class, boosting how efficiently those workers perform in the field and ensuring our power plants keep running. Generation Entitlement, a different offering, finds abnormal equipment conditions before they escalate, which lets teams act early and get the most out of power plant performance throughout the fleet. Grid Composer, another offering, applies AI to optimize and orchestrate every part of the power generation process. It consolidates real-time recommendations in a single location so decisions about unit commitment, power and fuel dispatch, plus maintenance scheduling, can be made faster and with better information. Crucially, we think there's potential in these tools to generate meaningful savings for customers. As it stands, FPL's bill sits at roughly 30% under the national average. Our unwavering emphasis on technology and on removing costs from the business is one factor making that achievable. FPL's non-fuel O&M comes in more than 71% beneath the industry average. In fact, when measured against the second-most efficient utility in America, we're 50% more cost-efficient.
John W. Ketchum
executiveWe think our Rewire offerings strengthen our standing as the electric utility operator with the lowest costs in the nation, and that's not the whole picture. Through close collaboration with hyperscalers, we're putting together solutions that back growth while preserving affordable electricity rates for families across America. As we've said before, that's the reason Energy Resources has concentrated on the Bring Your Own Generation, or BYOG, approach, which guarantees that big load customers cover their fair portion. It's no accident that this lines up exactly with the direction the market and policy makers are heading. The idea is straightforward. We construct energy infrastructure for hyperscalers, and they foot the bill. Ordinary Americans don't. That's how to fuel America's growth and keep electric bills within reach; we think there's a great deal more to it. Keep in mind, lots of regions around the country are beginning from genuine capacity shortfalls as the decade draws to a close. BYOG power solutions might turn into essential pieces of a resilient grid if we begin viewing them as dispatchable resources when demand hits extremes. That's precisely what we're doing alongside NVIDIA, a collaboration we made public in the Q1. Just imagine being able to briefly cycle down or shift data center activity for a few hours when it's extremely cold or extremely hot. That would let local load-serving entities draw on that power to satisfy customer demand at moments when power is scarce and costs more, boosting reliability and bringing down electric bills for ordinary Americans; here's another instance of how we're attempting to lead a shift toward where we think the market is headed. Ultimately, at this singular moment for our industry, scale, experience, and innovation count more than they ever have, and our common platform gives us what we consider an unrivaled competitive edge; it goes beyond our operating scale; we possess a strong supply chain. We hold global banking relationships. We've labored to keep one of the biggest and most solid balance sheets in the sector, and we leverage technology and data to provide solutions for our customers. This platform is what lets us build every form of energy throughout the energy value chain. It's also difficult to copy. That's since we've spent decades building it, refining it, and optimizing it; it's how we give customers the dependable and affordable solutions they require, whenever they require them, wherever they are in America. As power demand climbs, these distinctive capabilities grow more and more vital, all of which amounts to a major win for our customers, stakeholders, and shareholders we are privileged to serve. I'm happy with how we've kicked off the year and even more eager for the remainder of 2026 as we carry out our more than 12 ways to grow; with that, I'll hand the call over to Mike.
Michael Dunne
executiveThanks, John. We'll start by going through FPL's results in detail. In the first quarter of 2026, FPL's earnings per share rose $0.06 compared with the same period a year earlier. Regulatory capital, along with growth of roughly 8.8%, was a major factor behind the increase in FPL's earnings per share relative to the comparable quarter last year. FPL's capital expenditures came to about $3.2 billion during the quarter, and for the full year we anticipate FPL's capital investments will land somewhere between $12 billion and $13 billion. Over the 12 months that ended in March 2026, FPL's return on equity as reported for regulatory purposes will come in at approximately 11.7%. In Q1, we drew roughly $306 million from the rate stabilization mechanism, which left FPL with an after-tax balance of about $1.2 billion. During this quarter, FPL brought roughly 600 MW of new cost-effective solar into service, which pushed FPL's owned and operated solar portfolio past 8.5 GW. The indicators tell us Florida's economy is still healthy. Florida remains among the fastest-growing states nationwide, and between 2024 and 2025 it was home to three of the five fastest-growing U.S. metro areas. As John noted, FPL enjoyed a strong quarter for customer growth, with the average customer count up by nearly 100,000 versus the comparable period a year ago. FPL's Q1 retail sales grew approximately 3.4% year-over-year. Once weather is factored in, Q1 retail sales were up about 0.3% on a weather-normalized basis versus the comparable prior year period, mainly because of continued favorable underlying population growth. Let's now shift to Energy Resources, which posted adjusted earnings growth of about 14% year-over-year. New investments contributed an additional $0.04 per share year-over-year, largely reflecting ongoing growth in our power generation portfolio. Our existing clean energy portfolio added $0.01 per share during the quarter. The comparative contribution from our customer supply business fell by $0.04 per share, mainly because of lower production volume in our upstream operations and continued margin normalization in our full requirements business. NextEra Energy Transmission's contributions rose $0.05 per share year-over-year, net of financing costs, thanks to the sale of a 50% equity interest in a transmission asset in California; other impacts were unchanged, as lower tax costs were mostly offset by higher financing costs, which stem primarily from new borrowings supporting our new investments; through our interest rate hedging program of over $43 billion, we remain well-positioned to handle the current interest rate environment. We've also planned for possible trade impacts and positioned ourselves to deliver and execute for our customers; that's why we've proactively locked in supply to support the development plans at both FPL and Energy Resources, including building out our national data center hub footprint; on solar, we've secured panels through 2029; we're likewise well-protected on battery storage, with competitively priced domestic supply also locked in through 2029. Domestically, we've secured key wind components for our new build expectations through 2027, and we hold sufficient transformer capacity to support our build forecast through the end of the decade. For new renewables and storage origination, Energy Resources just posted its best-ever quarter, bringing 4 GW into the backlog. Once you factor in the 0.3 GW of fresh projects that have entered service since the previous earnings call, that backlog stands at roughly 33 GW — a figure that underscores how robust demand remains for renewables and storage. The mix of power demand we see from customers shows up in what we've added. Hyperscalers account for about 30% of those additions, with the other 70% coming from power utility customers, cooperatives and municipalities among them. Now to our Q1 2026 consolidated results. Adjusted earnings from corporate and other fell $0.02 per share versus a year ago. Our unchanged expectation for 2026 adjusted earnings per share is a range of $3.92-$4.02, and we're aiming for the top of it. Through 2032, we anticipate adjusted earnings per share climbing at a compound annual growth rate of +8%, and we're targeting the same pace from 2032 through 2035. That's all built on the 2025 base of $3.71 in adjusted earnings per share. Between 2025 and 2032, we expect average annual growth in operating cash flow to land at or above our adjusted earnings per share compound annual growth rate range; dividends per share should likewise keep rising at about 10% annually through 2026, measured off a 2024 base, then 6% annually from year-end 2026 through 2028. Naturally, our expectations come with our caveats; that wraps up our prepared remarks, so we'll now open the line for questions.
Steve Fleishman
analystYeah, hi. Morning, everybody. I've got a few questions about those U.S.-Japan projects. To start, is there anything you can tell us regarding the milestones and the timeline needed to reach a final agreement? Also, do you have the turbines lined up for these projects? And what about pipeline and transmission access — could you potentially get involved there too, helping to construct pipe or transmission for them? Thanks.
John W. Ketchum
executiveYeah, Steve, let me take that one. It's John here, and good morning. First, regarding milestones, we remain deeply engaged, as you'd expect, with the Department of Commerce as well as the Japanese government. At this moment, while we're negotiating definitive agreements, our aim is to have them finished within the next two-to-three-month window for both projects. That covers the first part on milestones and timeline. Once those are signed, you can imagine the agreements themselves will include a set of milestones, with payments linked to hitting each one; as for the second part, on product development or project development, we're heavily involved at both locations — the Texas site and the Pennsylvania site — pushing those forward. On turbine supply, we'll have plenty of turbines available. No worries there for either project. Regarding gas pipeline access, clearly that's one of the capabilities we bring. Anderson County in Texas sits in a strategic spot because one of our partners there is Comstock Resources, so we've got abundant gas supply in that region, which makes the project very attractive. As we move Pennsylvania ahead, that will be a crucial element of the decision-making matrix when we pursue further development activities there. Clearly, transmission access at both sites is something we will secure as we move those projects forward along with the development pieces. That's our business. That's what we do daily. I believe that was a major part of what I was attempting to convey in my remarks. Looking at today's environment, I think a big reason we received these awards from the DOC is that really nobody resembles us right now. Nobody else is out building generation at scale. We deliberately went out and changed our strategy last year to bring our own generation. We understood that was where the market was headed; we anticipated it. Given where our peers stand, we built our strategy around it, our supply chain around it, our development activities around it. Much of what we're doing, not just with the federal hubs but beyond them with the data center hubs, is because we know the market wants power solutions at scale. Achieving that requires blending the kinds of abilities and expertise this company has spent 2 to 3 decades assembling. Such things are extremely difficult to locate. If you don't already possess them, they're extremely difficult to assemble. Operating as a builder in the current market throughout 49 states, with every bit of the know-how and the capability sets we possess, I believe truly distinguishes us from our rivals.
Steve Fleishman
analystExcellent. One more item, not connected to that. It's encouraging that the 600 MW of recontracting got completed. Is there anything you can share about how much prices went up, or how they shifted, when comparing the fresh agreements with the earlier ones?
John W. Ketchum
executiveYes, Steve, on those fresh agreements the pricing reflects an average bump of about $20 per megawatt hour compared with what was previously realized.
Steve Fleishman
analystThanks a lot.
Julien Dumoulin-Smith
analystMorning, everyone. Honestly, impressive work. I simply hoped to dig a bit deeper regarding the linear infrastructure. In what ways are you considering growing that operation? You mention bringing people on board and so forth, yet could you elaborate on whether this might involve acquiring companies, or what your approach is toward developing it—or redeveloping it, whatever way you'd prefer to describe that?
John W. Ketchum
executiveSure. I'll handle this section by section, beginning with transmission and then moving on to pipelines. When it comes to the transmission segment, what we're really doing is applying every capability we've developed on the generation side. If you consider what's needed to develop generation and what's needed to develop linear infrastructure, the required capabilities overlap considerably, correct? A highly sophisticated land operation is essential. You need genuine expertise in navigating the permitting and approval process. A strong ground game matters too — engaging local communities and coordinating with stakeholders at both the state and federal levels. And you must identify projects that are sensible and that deliver affordability for customers. Those are things we handle daily on the generation side, and they carry over directly to linear infrastructure such as transmission. With all the expertise we've built at FPL and our track record constructing transmission in Florida, everything from an operational perspective carries into what we're pursuing there. Outstanding greenfield opportunities exist; the strategic steps involved mirror what we take with generation. I believe that provides us a substantial advantage. Regarding acquisitions — absolutely. Should the right project come along and it made sense, we could explore an acquisition. What stage of development it's in would be a factor. Occasionally there are solid development assets that are sensible and could fit well within our broader portfolio. We prefer greenfield, for the reasons I just mentioned. Purchasing operating transmission assets — certainly. If we could act opportunistically and those assets were sensible and located in the right areas, that's something we could keep evaluating too. Our ability to partner with incumbents is where we've achieved considerable success on the transmission side. The relationships we've established throughout the investor-owned utility, co-op, and municipality space, I believe, not only benefits and serves us well regarding generation, but regarding transmission too. Through those partnering arrangements, we're simply seeing a great deal of success. I'm very confident about where the transmission and linear infrastructure opportunity set stands. Now, on pipelines, that's simply a natural extension of those same greenfield capabilities I mentioned earlier concerning generation and transmission; they apply just as much to the pipeline business. Consider all the various capabilities we possess specifically around market knowledge regarding where gas transmission makes sense. The Symmetry acquisition plays a major role in that. When you rank among the largest movers of gas molecules in the United States, you likely also hold more information and more knowledge about where gas pipeline expansions are needed. That genuinely helps guide our decision-making regarding our data center hubs — where they'll be most economical and where they can truly be optimized around gas. Everything we've put into customer supply and Symmetry, along with our other investments, carries over just as effectively into the pipeline segment. It's a logical outgrowth of what we can do to make data center hubs possible, correct? Through our capacity to construct gas or transmission infrastructure that serves hyperscalers. Since we've genuinely shifted away from the mindset of, hey, let's go put up 200 MW or 300 MW. For a hyperscaler, that simply isn't sufficient. What we're contemplating is 2 GW-5 GW builds for hyperscalers. The level of interest and the level of demand we're witnessing in the market for that solution would truly astonish you. Our capability to deliver that product is genuinely distinctive, because doing it, and doing it properly, requires all the elements I mentioned during my prepared remarks.
Julien Dumoulin-Smith
analystGreat. If I could just slip in one more quick question, perhaps this is the direction Steve was heading. How would you go about setting expectations for additional projects outside Japan when it comes to the ETM effort? This time, clearly, ETM is tied to power dynamics.
John W. Ketchum
executiveYeah.
Julien Dumoulin-Smith
analystI'd guess that speeds the timeline up somewhat, but I'm interested in how you'd put it.
John W. Ketchum
executiveYes. No, that's an excellent question, Julien. We have discussed at length our capacity to collaborate with cooperatives and municipalities, and that genuinely assists in creating scenarios where we're able to operate behind the meter within those service areas. Perhaps develop something there that eventually includes what I refer to as the extension cord, correct? The connection to the grid eventually. Since even when you begin behind the meter, you must show a route to being in front of the meter inside 3, 4, or 5 years. Many of the conversations we are having regarding our data center hubs commence behind the meter, correct? Islanded solutions. I believe an increasing portion of the market will move in that direction, especially in regions of the country where the load interconnect process requires 5 to 7 years to complete. People cannot afford to wait. The opportunity cost tied to the data center business model and the cloud storage model is simply too large to wait 5 to 7 years for load interconnect; we address that issue through a behind the meter solution, yet you must understand what you are doing. You must understand where to locate those. You must understand how to employ a variety of technologies. You must possess the foresight to construct, to plan, and to convincingly present a scenario in which you can be interconnected inside 3, 4, or 5 years. Since that interconnection lets you genuinely maximize the worth of that data center, because I firmly believe that we must, as a nation, view data centers as enormous batteries positioned behind the grid. I mentioned our Nvidia collaboration concerning the ability to flex chips regarding how they consume and utilize power. With all the software we have created concerning the dispatch ability of batteries, we are positioned in a unique way to design a product. If you pair them with our customer supply business to firm and shape products during scarcity intervals, hot summer day, cold winter day, where a data center can be dispatched like a battery. Consider what that accomplishes for affordability for customers in the region when you are supplying that excess supply. That genuinely assists in removing a significant hit from the bill for everyday Americans who may find it difficult to pay those during those scarcity times that we have witnessed over the last 5, 10 years in this industry. Something we are extremely focused on, something hyperscalers are extremely interested in. I believe it is unique for NextEra because we possess all this expertise around technology, our partnership with Google being a part of that.
Julien Dumoulin-Smith
analystGreat, I'm looking forward to seeing what you accomplish alongside Google. Wishing you the best. OK, thanks.
John W. Ketchum
executiveHey, thanks, Julien.
Shar Pourreza
analystHey, guys. Good morning.
John W. Ketchum
executiveMorning to you, John.
Shar Pourreza
analystSo, John, turning to large scale nuclear — from what I understand, both the government and the hyperscalers have signaled a certain degree of interest in the AP1000, and it looks like a consortium of regulated utilities is coming together that might look at developing new nuclear as a group, with a substantial share of the cost inflation beyond the budgeted amounts being carried by the hyperscalers, so the off-takers. Turkey Point, of course, is currently under an active review with the NRC. Are you, in some way, involved in this consortium? Would this be something you'd look at if the right cost overrun protections were in place, or is your focus really just on recontracting assets like Point Beach and Seabrook?
John W. Ketchum
executiveSure, let me address those one at a time. On the first point, you're correct. Turkey Point occupies a somewhat atypical spot, since units six and seven there already hold their licenses — so you effectively move straight to the head of the queue, bypassing the seven to eight years of approvals that would otherwise be needed. We've long viewed Turkey Point as, to use my term, a hedge on natural gas fuel, should we choose to pursue something involving an AP1000 at that location. That said, on our end, my sense is we'd likely prefer to wade in gradually, perhaps with an SMR at Turkey Point instead of an AP1000. We'd approach it in a manner allowing us to combine efforts. I'm fond of referring to the four wallets — meaning the OEM, the developer, the hyperscaler, and the federal government — because we must, first, feel at ease with the technology and whether it's technically feasible. Will it actually function in the end? Second, as we continually say, the structure has to safeguard both our customers and our shareholders. That's our preference; joining forces with a consortium holds no appeal for us. We possess substantial expertise in this area and are quite confident in our capacity to handle it independently. You need to establish the insurance tower, as it were — determining who ultimately bears that cost overrun risk. Moving past Turkey Point, and considering locations beyond Florida, we're collaborating intently with SMR OEMs and hyperscalers. As you know, we have a national partnership with Google, for instance, focused on advanced nuclear. Together with Google, we're examining where that would be most logical. At our current sites, we have 6 GW of SMR capacity. We're also capable of greenfield development. Once more, every one of those possibilities must involve those four wallets, and we need to nail the technical and commercial risk-sharing arrangements for them to move forward.
Shar Pourreza
analystUnderstood. So your position, as I take it, is that even after accounting for what was learned the hard way at Vogtle, small modular reactors still come out cheaper than an AP1000.
John W. Ketchum
executiveRight. When I consider it, there are really two categories of SMRs, correct? You've got Gen-3s, and those are essentially, as I'd describe them, an AP1000 that's been scaled down, right? What you're contemplating is constructing an AP1000 but in a reduced size, making a somewhat smaller wager. GE currently has the Ontario project underway. A great deal of lessons will emerge from that effort. With the Gen-4s, you're genuinely making two-step transformations relative to a Gen-4. Gen-4 represents the technology that isn't truly an outgrowth of an AP1000, the tested, demonstrated design. You're taking on an extra fuel hazard involving high-assay low-enriched uranium, something we still haven't truly mastered here in this country. Our emphasis would lean more toward the Gen-3 technology.
Shar Pourreza
analystUnderstood. Then finally, regarding Point Beach, the moment is approaching when a choice must be made about the PPA, particularly for the offtaker, since they will need to plan in advance for new generation requirements should those PPAs not be renewed. I suppose, how are the discussions progressing with Xcel? Is there any interest on your side from a hyperscaler? I suppose, when might we receive an update on Point Beach? Thanks.
John W. Ketchum
executiveYes. Thank you, Shar. As you can probably guess, Point Beach has drawn quite a bit of attention, correct? Numerous parties have shown considerable interest. We're simply being thorough and ensuring we reach the proper conclusion regarding Point Beach. I won't name precisely whom we're engaged with, or identify those parties. It goes without saying that there's substantial interest in that asset for clear reasons, considering its location and every hyperscaler opportunity nearby. Those talks keep moving forward; we're pleased with what we're seeing. It's a valuable and appealing asset.
Shar Pourreza
analystGot it. Fantastic. Thanks, guys. Appreciate it.
John W. Ketchum
executiveThanks, Shar.
Bill Appicelli
analystHey there, morning. Turning to what's new with backlog — I believe you've noticed meaningful momentum, moving from roughly 3 gigs during Q3, then 3.6, and reaching 4 gigs at present. In your view, does that point to contracting speeding up because tax credits are set to roll off as the decade closes, or does it simply mean the demand underneath is remarkably robust, with no connection to those credits?
Brian Bolster
executiveBrian here. What I would say is that we have not truly entered the acceleration phase as of yet. What you're seeing is simply a mirror of a portion of the expansion we've observed in the marketplace. It truly represents that expansion rather than an acceleration. We will likely witness that once we begin to progress in the quarters ahead. What we have right now is simply basic demand tied to basic growth, connected to what makes the most economic sense for the demand sitting right in front of us, rather than folks attempting to get ahead of the tax credits.
John W. Ketchum
executiveYeah. Another point I'd mention there is that during my prepared remarks I talked about our supply chain situation — with solar panels secured through 2029, transformers secured through the end of the decade, batteries secured through 2029, wind components, and so forth. Our positioning is extremely strong when it comes to taking advantage of the demand we anticipate arriving, and I believe that will be a wonderful opportunity for this business. When you put that together with the safe harbor status we've already secured, which we pursued quite aggressively some time ago, I simply cannot think of another American company that is better situated to capture the demand we're going to witness across the coming three to four years and past that, for renewables as well as storage. Especially considering how slowly gas-fired generation gets built in this nation. As I often say, we're constructing all of it; we strongly believe gas is necessary and will deliver a major effect, yet bringing it to market takes time, whereas solar and storage move fast. Our organization has been built around being able to grab those opportunities. I believe what you're witnessing this quarter is the initial demonstration of that, and we anticipate plenty more robust quarters ahead.
Bill Appicelli
analystIf you want to frame it differently, a quarterly run rate of 4 gig presumably leaves room for growth.
John W. Ketchum
executiveWell, you said it, I didn't. We feel really good about where we sit.
Bill Appicelli
analystAlright. Let's change topics for a moment. Beyond what's happening in Texas and Pennsylvania, could you touch on contracting for newly constructed gas generation? I realize this largely falls under the hub approach, but the market does appear to have certain complications when it comes to announcing agreements for your new-build gas contracts. Given what you mentioned in response to my earlier question, are there any gating factors you could identify? Is it simply the difficulty of handling fuel risk, or does it involve getting offtakers into a position where they can make that commitment? I'm just wondering.
John W. Ketchum
executiveRight. No, I mean, the expansion of gas is still moving forward across the nation. Keep in mind, as an industry, we were kicking off gas-fired generation projects from basically a cold start a year or two back; we've watched manufacturing begin to scale up; we've also seen EPC labor step up. What I view as the single largest bottleneck in today's market, when it comes to constructing gas more quickly, is labor. That means EPC contractors. A decade or two ago, there were 9, 10, 11 EPC contractors constructing gas plants. A few went bankrupt, a few shifted into different lines of work. If you consider essentially the 4 EPC contractors that we work with now, that's significantly fewer than we've ever had. The tightness of labor in today's market when you're putting up a gas plant — pipe fitters, welders, and so forth — those very same EPC companies are constructing LNG terminals. They're constructing data centers. They're involved in other segments of the market. Getting labor lined up, getting labor locked in and on site, that's one component. Then, based on where you're constructing, permitting. We continue to discuss permitting reform. We absolutely must accomplish permitting reform in this nation; it's essential that we accomplish that both for linear facilities and simply to speed up permitting at the state and federal levels; those are the factors, above all else, that I believe are playing a role. The gas will get built, it will come online, and NextEra is among the businesses that will make that happen. It's simply not as quick as other kinds of generation. That's the reason we keep stating you need it all. You need to bring it all together. When you get each electron onto this grid as rapidly as possible, speed to power is critical, and that will let us unleash American energy dominance throughout America.
Bill Appicelli
analystThanks a lot, that's great.
Nick Campanella
analystMorning, and thanks for taking my questions. There's been a lot of solid news. I wanted to touch briefly on the 1 GW that you plan to deliver at FPL — is that essentially already baked into the plan? We saw that capital expenditures now sit at $12 billion-$13 billion for 2026, whereas I believe at the analyst event the figure was $10 billion-$11 billion. That's a nice step up, and I'm curious whether it relates to the 1 GW you'd already been discussing. Should we treat that as the new run rate for FPL going forward, given that, as I understand it, you just reaffirmed the total CapEx outlook today? Thanks.
Michael Dunne
executiveHi Nick, this is Michael Dunne. Let me address a few points there. First off, regarding how many gigawatts of large load we anticipate at FPL, we haven't provided that figure. What we've stated is that a large load transaction should be completed within this year, but we haven't specified whether it's 1 gigawatt or some other amount. The second point: when you examine the CapEx increase, it truly ties to what John mentioned before about readiness. Since we secured and brought in solar supply, part of that involves acquiring it now at locked-in prices so that any trade impacts get removed. Down the road, that lets us serve our Florida customers cost-effectively. That's the element driving some of those capital expenditures. By taking proactive steps to lessen any trade impacts, FPL is positioned very well to deliver low cost to our customers.
Nick Campanella
analystGot it. All right, thanks. If I may, I'd like to ask one more thing about the Japan deal and framework. From what we gather, this is somewhat of a capital-light chance, with them as the owners and you as the builders. So how would you see the return on that chance relative to the 13%-20% plus equity IRR that you presented at the investor conference? The reason I ask is that 9.5 GW is a very big figure, and I'm trying to grasp how it backs or speeds up the +8% EPS deal. Thank you.
Michael Dunne
executiveOkay, regarding your first item — keep in mind that this is a capital-light investment, with basically no capital coming from us. When you look at returns, they're basically unlimited. We're not putting any money down, and there's a chance we'd get fee streams over a lengthy stretch of time. What matters is that to secure that, our incentives line up completely with both the U.S. government and Japan, since we'll have to deliver results to get those payments. Those payments also run for the life of the asset; they aren't limited to development or construction payments, but include ongoing O&M payments too. When you consider what those fees might amount to and what that value might mean for NextEra, I think we'd prefer to take the time to make sure the contracts are locked in before we determine what that figure will be. We're planning to make this investment of time and work through these matters, because they can add value for our shareholders.
Nick Campanella
analystThank you.
Operator
operatorThat wraps up both the question-and-answer portion and today's call. We appreciate your participation in today's presentation. You're welcome to hang up now, and we hope the rest of your day goes well.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete NextEra Energy, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to NextEra Energy, Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in NextEra Energy, Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.