We appreciate everyone being on the line, and we're glad to have you join the webcast on Nickel Industries Limited's results for the September quarter. Everyone attending is currently in listen-only mode. A presentation will come first, and after that we'll hold a question-and-answer session. Should you want to pose a question, press the star key and then the number one on your telephone keypad. At this point I'll pass the conference to Mr. Justin Werner, Managing Director. Over to you.

Justin Werner

executive
#2

Thanks, and welcome everybody to the September quarterly results call for Nickel Industries. If the moderator could move the presentation along to slide three, we'll begin from there. It was another strong quarter for Nickel Industries, with a number of records again achieved and a number of significant milestones, including the recognition of Hengjaya Mine's environmental performance, which I'll touch on a little bit later on. In terms of the numbers, record nickel metal production of over 20,000 tons. That's 30% higher than the September quarter, which was about 15,567 tons. A lot of that was driven through ANI, which continues to ramp up very strongly. Contribution from ANI was almost 10,000 tons, up 56% from the June quarter. We expect further production increases from ANI, and pleasingly now with the power commission, we're starting to see costs come down significantly, and we expect that to continue. We also, during the quarter, commenced production from HNI to produce nickel matte, and that's part of our strategy of diversification into the Class 1 market, and I'll talk about that a little bit later on as well. There was record RKEF revenue, which was driven by the record production. There was weaker NPI pricing during the quarter.

Justin Werner

executive
#3

The average we received came to roughly $15,950. That said, I'm glad to report that this month we are definitely witnessing a significant rise in NPI pricing, so we think the bottom may now be behind us — and that applies not only to NPI pricing but to costs as well, which I'll get into. RKEF EBITDA came in at $45 million. The Hengjaya Mine posted record output, and it keeps breaking records each successive quarter. Ore production totaled nearly 1.7 million tons, made up of both saprolite and limonite. During the quarter we hit a major milestone at the Hengjaya Mine: a JORC resource upgrade to 300 million dry metric tons grading 1.22% nickel. That equates to 3.7 million tons of contained nickel metal, which firmly positions us among the world's top 10 known nickel resources. It underscores the size, scale and quality of the Hengjaya Mine and, once again, its important strategic value to the operations inside the Indonesian Morowali Industrial Park. Mine EBITDA for the quarter was $10.2 million. That figure was lower, mainly because of reduced saprolite ore costs — prices fell from roughly $52 in the June quarter to about $43 in the September quarter. Mind you, although prices at the mine were lower, that has likewise brought down costs at our RKEF operations, and as we've said, the mine does act as a hedge on our ore costs.

Justin Werner

executive
#4

We generated close to $55 million in underlying cash from operations. On the corporate side, we added another 40% interest in the Oracle Nickel project. That brings us to 70% now, and commissioning got underway on 28th of October, when the first kiln was warmed, and we anticipate the first NPI to come out in roughly the next two weeks. Once again, Oracle Nickel has progressed well ahead of schedule, and the CapEx guarantee is in place. As I mentioned, we are now fully funded and hold our 70% interest. Lastly, during the quarter we signed a strategic cooperation agreement with QMB New Energy Materials, which is currently commissioning a 73,000 ton per annum HPAL project. This is a 20-year strategic supply agreement, and its value in terms of revenue for the Hengjaya Mine exceeds $1.5 billion. What I consider more important is that it also opens the door for Nickel Industries to take an equity participation in that high-pressure acid leach plant, and we are beginning to see more of these plants commissioned and built in Indonesia, following on from the initial HPAL plant, which has proven itself to be operating among the world's best HPAL projects.

Justin Werner

executive
#5

And lastly, this quarter we obtained the environmental approval needed to finish the haul road linking the Hengjaya Mine with the IMIP, which opens the door to substantial ore transport going forward and will clearly translate into a meaningful revenue contribution from Hengjaya. Let's turn to slide four, please. Looking at the figures, as I mentioned, we had record output — 20,000 tons of nickel or more, with Nickel's attributable production above 16,000 tons — and record sales revenue. Another figure worth noting there is obviously Hengjaya Mine, which produced nearly 1.7 million tons of ore in the quarter. Let's go to slide five, please. There you can see the quarterly production figures. You're beginning to see the sizable contribution from Angel Nickel. Happily, we're also seeing quite robust output from both HNI and RNI, which came back to historical levels of more than 10,000 tons combined in the quarter. As I said, ONI is commissioned, and ANI is commissioned. ONI is now commissioning, and we anticipate a swift ramp-up, just as we've seen historically with all of our lines. Let's move to slide six, please.

Justin Werner

executive
#6

We clearly experienced some margin compression this quarter, mainly because NPI contract pricing went down. Costs came down as well, and, you know, September costs dropped from $14,509 to $13,597 for this quarter. That's nearly a 1,000-ton reduction in our costs, and part of that comes through the benefit of ANI power. Just to give you a sense of the significant cost savings and benefits we're getting from ANI: ANI's September average quarter costs were $13,167. ANI's cost in September was slightly under $12,000 a ton. You can really see that, you know, as ANI keeps ramping up, we expect continued cost improvement from ANI. If you compare that cost of $12,000 a ton or less with our September average contract pricing of $15,950, you know, that's close to the sort of $3,000-$4,000 a ton margin we're used to experiencing. Again, that puts ANI right at the very bottom quartile of NPI producers. As I said, we're also pleasingly seeing NPI pricing improve more recently. If we could just move to slide seven, please. The Hengjaya Mine, again, another record quarter, 1.7 million tons. That was despite higher rainfall for the period.

Justin Werner

executive
#7

Rainfall came in at 1,359 mm against a historical average of 849 mm. Even so, we still managed to post a record result, which was pleasing. I touched on the approval we secured for the haul road. Roughly 6.6 km of that haul road is still left to construct. Contractors are on site working on it right now and mobilizing. That will let us hit our target — you know, moving 10 million tons of ore between the Hengjaya Mine and the IMIP. That represents more than a threefold rise, you know, in the volumes and revenue coming out of the Hengjaya Mine and, you know, on a quarter-on-quarter basis we're pleased to see very strong EBITDA figures. Last, we picked up a number of accolades at Indonesia's 2022 Environmental and Social Innovation Awards. In fact, we took home seven awards altogether for various initiatives and recognition — water reduction, domestic waste management, biodiversity protection, just to name a couple. We're heavily focused on making the Hengjaya Mine a showpiece for laterite mining within Indonesia. If we could turn to slide eight, please. I mentioned the Hengjaya resource upgrade that took place during the quarter, and you can see where we rank among known global nickel resources, you know, in the top 10, 3.7 million tons.

Justin Werner

executive
#8

That resource spans 1,789 hectares. Happily, another 525 hectares of highly prospective laterite exist, and drilling has not yet touched them. Permitting that ground up is our priority. We think there's more upside still to come inside the Hengjaya resource. Beyond that, we keep pursuing further resource acquisitions. Drilling at the Sidoasih project is going extremely well indeed, with more than 15,000 meters now completed. Results coming out of there look very good. As I mentioned, we aim to advance other nickel projects, with the idea that on a combined basis they take Nickel Industries toward holding, you know, the second, third, potentially the largest known nickel resources anywhere in the world. Those are certainly a major focus for us going forward. Let's turn to slide nine, please. Once again, excellent conversion of EBITDA into cash flow, at 99%. As a reminder, we benefit from a significant tax holiday, and our sustaining CapEx is very small. Moving to slide 10, please. On the corporate front, we signed a binding term sheet for a 200 MW peak plus 20 MW battery solar project, building on the MOU that was signed. That project is coming along very well.

Justin Werner

executive
#9

Happily, Nic doesn’t have to put in any capital. The power rate is set and will stay unchanged over the coming 15 years without inflation-based increases, which is clearly something we see as highly appealing. We additionally have a further 220 MW peak project moving along quite nicely. That takes us beyond 400 MW, with, as you know, a stated aim of hopefully lifting that to roughly 1 GW. We keep making solid headway. In the quarter, we raised our stake in the Oracle Nickel project from 30%-70% by paying $212 million early. A remaining payment balance of $72 million stands, with just $11.2 million owed by the close of this year, followed by another $61 million by the close of March next year. As I said, happily, on 28th of October, electrification ignition began on the first RKEF lines. The furnaces are warming up, and we anticipate our first NPI flowing by mid-November. Once more, just reminding everyone of what we saw at Angel Nickel regarding production capacity, but more importantly than that alone, the meaningful cost benefit from having the related power.

Justin Werner

executive
#10

So this now brings our nickel metal output, on a 100% basis, to more than 130,000 tons annualized. We've also finished converting our HNI line over to nickel matte production. And happily, we have contracts locked in through the end of March 2023 that carry very attractive payabilities — and those payabilities rise as the nickel price rises. Pricing is tied to the Shanghai Futures Exchange, SHFE, though it tracks the LME very closely. Basically, this diversifies us and makes us one of the few global listed nickel producers with exposure and diversification spanning both the Class I and Class II nickel complexes. Lastly, we signed a strategic cooperation agreement with PT QMB New Energy Materials, which involves a slurry pipeline being built, or commissioned, inside our Hengjaya Mine area, aiming to supply roughly 5 to 7 million tons of limonite ore per annum to their newly commissioned HPAL plant. As I said earlier, the revenue value of that could exceed $1.5 billion across the 20-year period. And a key part of that agreement was Nickel Industries' opportunity to take a potential equity participation in that HPAL plant.

Justin Werner

executive
#11

So what this means is that the Hengjaya Mine is now a significant supplier of material to both HPAL plants running at IMIP today. Again, it highlights how strategically important Hengjaya is to IMIP and to its operating partners. To sum up, it was another really solid quarter. We hit quite a few records and some very meaningful milestones, and that includes the JORC resource upgrade. Once more, we sit among the top 10 nickel resources worldwide, with more upside still to come. We also secured environmental approval for a haul road that will connect us straight into IMIP and, once it's finished, will lift our mine production by threefold. Then there's the strategic agreement with QMB, whose biggest shareholder, GEM, ranks among the largest Chinese recyclers and is a producer of PCAM. As I said, there's the potential revenue coming from selling that limonite ore, plus the possibility of equity participation in an operating, proven HPAL plant. We also have nickel matte production, which diversifies us into the Class 1 EV battery space. We look forward to giving updates next quarter on how that nickel matte performs. As I mentioned, this makes us the only diversified globally listed nickel producer exposed to both the Class 1 and Class 2 pricing complexes.

Justin Werner

executive
#12

We've finished the shift at Oracle from 30% to 70%, and we're clearly happy to report that commissioning has begun, and we look forward to updating the market when the first NPI is tapped. Just a quick touch on the market.

Operator

operator
#13

Ladies and gentlemen, the conference operator here. Our connection to the speaker line has been temporarily dropped. Kindly stay on the line, and the conference will pick back up in a moment.

Justin Werner

executive
#14

Has Alan returned yet?

Operator

operator
#15

Everyone, the operator here again. Justin, your line is back with us. Go ahead, please.

Justin Werner

executive
#16

Thanks. And, well, sorry, everybody. The reality is I'm in Australia, so the blame for this one has to go to Telstra rather than the Indonesian phone system. I'm not certain what point we'd reached, but to recap as I said: another strong quarter, a number of milestones, record production, and then finishing up with costs and the market. Costs at ANI are pleasingly coming down, and the advantages of the integrated power are really showing, especially with September costs under $12,000 a ton. Set that against the average price received in the September quarter of $15,950, and you can see very strong margins. NPI pricing has improved considerably, from a low of $1,250 earlier in the quarter to close to $1,400 renminbi today. Our contracts are also now progressing with penalties cut substantially, by several hundred dollars, for production of grades above 12%. I think when you look at the NPI market and certainly inside China, GDP growth in China came in at 3.9% this quarter versus 0.4% the quarter before. Obviously the Communist Party re-elections went smoothly, so nothing significant has changed there.

Justin Werner

executive
#17

So ONI is commissioning at this point, and our output is expected to rise a lot beyond 130,000 tons annually. Margins don't last, but production does, so we're in a really strong position to benefit from what we hope will be better margins. We believe the toughest stretch is behind us, and honestly we came through it without much damage. We could still generate very solid EBITDA for the quarter and hit several milestones, and we're eager to keep moving ahead and expanding our production base. With that, I'll turn it over to questions.

Operator

operator
#18

Thanks. Should you want to pose a question, hit star one on your phone and hold until your name is called. To withdraw that request, hit star two instead. When using a speakerphone, kindly lift the handset before asking. Adam Baker of Macquarie has our first question. Go right ahead.

Adam Baker

analyst
#19

Yeah. Good day, everyone. I was just wondering, with Angel ramping up pretty quickly there, how things are looking for the fourth quarter. Do you figure you'll hit that 130% capacity level this quarter? Or do you think it'll take another quarter or so before we reach that 130% of nameplate capacity?

Justin Werner

executive
#20

Yes. We reached that point near the close of this quarter. Yeah, I think it's reasonable to expect that in Q4, you'll see Angel at 100%. And I think, you know, costs have leveled off, and we'll also see the benefit of significantly lower costs compared with what Angel costs were at the start of the quarter.

Adam Baker

analyst
#21

Yeah, absolutely. Regarding the ONI ramp-up, should we expect a trajectory fairly comparable to what we saw with ANI's ramp-up? Something like a ramp-up period of six to nine, 12 months.

Justin Werner

executive
#22

That's right. What it'll look like is this: it will run at roughly 60% of capacity until the power is commissioned, which we expect around March. Once that power is commissioned, the ramp-up to 130% is actually pretty quick. So about one to two months after March, we'd expect Oracle to be at that 130% capacity as well.

Adam Baker

analyst
#23

Yeah, great. Just on your quarterly, I was interested in your remark about a change in the composition of the met coal that gets injected into the rotary kilns. I'm just wondering whether any cost savings have been achieved there, and maybe you could walk us through what you know and what you've actually done there.

Justin Werner

executive
#24

Right. So that shift in the mix has produced a real reduction in costs. That's one reason we're so pleased to have Tsingshan on board as a partner and major shareholder. They never stop innovating. They're always searching for ways to bring costs down. They've applied creative approaches, such as using nut coke as a substitute, for instance. On the technical side, I can't explain what the gain is beyond the fact that it has yielded a cost saving. Again, it's just one more illustration of the kind of innovation and the manner in which these folks are continually striving to hold their place at the very bottom of the cost curve and to boost the profitability of their operations.

Adam Baker

analyst
#25

Okay, sure. And maybe as a final point, regarding that better NPI pricing you've been seeing just in the last month or so — is that thanks to stronger stainless steel demand coming out of China, or what would you say is behind it right now?

Justin Werner

executive
#26

Yeah, stainless steel demand is getting better. We've also observed roughly 20 RKEF lines that used to make nickel pig iron now turning out nickel matte. You know, a portion of that NPI that had been available in the market won't be there anymore. On the back of that, we've also seen the NPI price improve. Yeah, look, it's really kind of twofold. The stainless steel market is improving, and also, you know, there's a reduction in the NPI units coming out of Indonesia as some of that RKEF capacity gets switched over to producing nickel matte.

Adam Baker

analyst
#27

Yes, that's much appreciated. Thank you all. I'll make sure to share that.

Justin Werner

executive
#28

Appreciate that, Adam.

Operator

operator
#29

Thanks. Just a reminder — if you'd like to pose a question, hit star one on your phone and hold until your name is called. We're going to take a brief pause now so any last questioners can get signed up. Thanks. Our next question is from David Coates at Bell Potter Securities. Go ahead, please.

David Coates

analyst
#30

Morning, Justin. Thanks for taking the call, and congratulations on the production cost performance this quarter. Moving to a somewhat different topic — you mentioned it near the close of your presentation — the potential opportunities tied to HPAL plants. Could you walk us through how the Hengjaya Mine is perhaps assisting you with that, and what opportunities might arise regarding taking up that equity ownership, and how such deals might be structured — perhaps around some kind of ore feed arrangement, I'm not certain — but maybe give us some color on that.

Justin Werner

executive
#31

Right, well, thanks Coates. Both HPAL operations inside IMIP — namely HNC and QMB — receive ore from the Hengjaya mine. With QMB specifically, under that strategic ore supply agreement, we'll be providing roughly 50%-60% of what they need going forward. They're clearly a crucial component of their business. That's why there's that clause covering the chance to acquire, you know, potential future equity stakes in that operating HPAL. And we're now kind of heading in that direction. Plenty of work lies ahead regarding the construction of the plant at the Hengjaya Mine, along with permitting and licensing and matters of that nature. Of course, there are the commercial talks concerning how our limonite gets priced and, obviously, how equity participation in the QMB plant gets priced. That represents a very genuine opportunity, and, you know, it's something both sides want to move into, since we think it makes a great deal of sense. What we find appealing, I suppose, is that obviously it would mean an equity interest in a plant that's already operating. You know, that's substantially de-risked. All those conversations about, you know, whether a portion of the ore body could be valued as part of consideration are kind of ongoing right now.

Justin Werner

executive
#32

You know, that's a matter we'll keep working on. That relates to the QMB plant. We also provide ore to the HNC plant, which holds the world record for the quickest build and the quickest ramp up. We've observed how it operates and, you know, we've had visibility into its costs and margins, and it's, you know, performing really well. You know, we're also still in conversations with Huayou, since as you know, we're a key supplier to their operations too. Then lastly, if you remember, there's the new energy and collaboration agreement signed with Tsingshan roughly a year ago, which likewise envisioned Nickel Industries taking, you know, or being involved in a new HPAL build. Those talks are continuing as well. You know, as we seek to diversify the business, we're aiming to do so across a number of fronts. I think those will be, you know, a small interest in operating plants, which I think, you know, will give people confidence regarding these plants — that they work, and their financials. Then a longer-term strategy of, you know, our own standalone HPAL plant of, you know, anywhere from 60 to 120,000 ton capacity, depending on the size and where we build it.

David Coates

analyst
#33

That's quite an enticing prospect looking ahead. And once more, on the topic of diversification, the nickel matte you folks produce — if I've got it right — is essentially headed to or being sold to existing counterparties involving Tsingshan or SDI. Are there chances for you to broaden that customer base, perhaps toward your own sort of direct downstream customers? Is that a significant goal, or not really?

Justin Werner

executive
#34

No, not at all. From the very beginning, we had the choice to sell it to third parties if we judged that to be the right move. Look, selling into existing contracts simply made more sense, and it let prospective customers see the grade specifications, delivery, all of those sorts of things. We've received a number of inbound inquiries from global third parties. We'll keep holding those discussions over the months ahead, with an eye toward potentially a standalone contract with a third party — perhaps even a Western party — that could be finalized when that contract, or when our contracted volumes, come up for renewal at the end of March. Yeah, that's a conversation we're having right now, and we look forward to carrying on the search for potential markets for that nickel matte, potential buyers outside of the current buyers that Tsingshan currently has.

David Coates

analyst
#35

Great. Nope, I’m all set on my end. Thank you so much, Justin. Cheers.

Justin Werner

executive
#36

Appreciate that, David Coates.

Operator

operator
#37

Thanks. There are no more questions in the queue right now. I'll turn things back over to Mr. Werner for some closing comments.

Justin Werner

executive
#38

Alright, thanks once more to all of you for being here. Just to go over it again, we delivered another robust quarter, with a host of records and major milestones. As I mentioned, it's pleasing that NPI pricing has moved higher. Costs are heading lower. Honestly, even amid a very challenging backdrop, I believe we've shown everybody just how resilient our business is. It continues to produce very healthy margins and, you know, we're in an extremely strong position as output keeps rising. When mean reversion occurs back toward margins seen historically, Nickel Industries is very well positioned to keep earning substantial profits. Beyond that, we keep advancing our diversification into the Class 1 battery segment. It has begun in earnest with nickel matte. We're now examining HPAL opportunities and supplying our ore into those HPAL opportunities, and we're building potential partners and relationships with existing HPAL producers that we can leverage further down the track. Thanks again, everyone, and I appreciate your attendance on the call.

Operator

operator
#39

This brings today's conference to a close. Thanks for joining us. You can go ahead and disconnect now.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Nickel Industries Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Nickel Industries Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Nickel Industries Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.