Operator
operatorWe appreciate everyone being on the line, and we're glad to have you with us for the Nickel Industries Limited 2023 Fiscal Year Results. <<operator_script>> At this point, I'll turn the call over to Mr. Justin Werner, Managing Director. Over to you.
Justin Werner
executiveI appreciate the opportunity, and thanks to all of you for being on the Nickel Industries full year results call. Slide moderator, could you please advance the presentation to Page 2. I'm very happy to report record Group EBITDA for the full year of USD 403 million, which is a 19% rise compared with the $339 million posted in FY '22. My apologies, moderator — it's the following slide, number 2. We achieved record gross profit of USD 338 million and a record operating profit of USD 280.7 million, and that converted to profit after tax of USD 176.2 million. Nickel production rose substantially, climbing from 70,079 tonnes in FY '22 to 131,126 tonnes — an 87% lift in nickel tonnes — and that fed through to record RKEF EBITDA of USD 337 million and NIC, or Nickel Industries attributable nickel, of 103,364 tonnes. At the mine, we had an excellent year. Hengjaya Mine delivered record production of 13.4 million, 97% higher than the 6.8 million recorded in FY '22, along with record mine EBITDA of USD 87.9 million, and that result was driven by finishing the Hengjaya Mine into IMIP haul road, which generated USD 42 million in EBITDA during the December quarter by itself. So we're looking forward to the Hengjaya Mine continuing to perform strongly.
Justin Werner
executiveThe mine also received a Green PROPER rating once more, marking the second year in a row. Those very <<inaudible>> results led to the declaration of a final dividend of AUD 0.025 per share, a full-year dividend of AUD 0.045 per share, and an announcement of an on-market share buyback of up to USD 100 million across the coming 12 months. I believe this signals to the market that financially NIC stands in a very strong position and that, at the current share price, we view the share price as very undervalued. Our balance sheet is very strong. Net debt stands at USD 66.2 million. Importantly, in my view, we are fully funded for our transition into the class-1 nickel space. On the ESG side, there were a number of important milestones, including execution of an operational lease agreement for Indonesia's largest 200-megawatt peak solar project, along with electric vehicle trucks, and completion of an AUD 943 million placement to United Tractors, plus an invitation to present at the COP28 Climate Summit in Dubai, where we unveiled our carbon targets of 50% reduction by 2035 and net zero by 2050. Next slide, please. Safety. An excellent year for safety, with 16.7 million LTI-free man hours worked across all of NIC operations in 2023, which is a very good result, and we continue to focus on leading the way in safety and continuous improvement.
Justin Werner
executiveMoving to Slide 4, if you look at the numbers, group revenue rose 54.5% to $1.8 billion. Gross profit climbed 15% to $338 million. Operating profit came in at $280 million, up 8%. Profit after tax fell to $176 million, and Chris will address that during Q&A — it was driven by finance and interest expenses. Profit attributable to NIC was $121 million, and group EBITDA was $403 million, which as I said is up 19%. EBITDA from RKEF operations reached $337 million, up 13%. EBITDA from the mine was $87.9 million, up 63%, and we expect EBITDA from mine operations to keep growing. On the strength of these results, the full year dividend was increased, bringing the final result to AUD 0.045, a 12.5% increase. I should point out that these results were delivered despite a materially lower LME Nickel price, which fell from $25,623 to $21,487 — a 19% decrease. Also, we only captured Oracle Nickel production in Q3 of last year. And if you look at how our newer Oracle and Angel Nickel RKEF assets are performing, they're doing very well. Oracle delivered $82.5 million of EBITDA, and Angel Nickel, fully ramped up for the year, delivered USD 179.5 million.
Justin Werner
executiveThere's clearly additional upside available this year, since Oracle Nickel will give us a full 12 months of production. Let's move to Slide 5, if we may. As I noted, our balance sheet is quite strong, with net debt of USD 66.2 million, and we're fully funded as we make our transition into the class-1 battery-grade nickel space. Once again, we're leading the way as the first company to develop an HPAL that will yield 3 class-1 Nickel projects. Our capacity to fund operations across the year came from successful equity and debt raisings, among them a $185 million institutional placement, a $270 million placement to Shanghai Decent, a $20 million retail share purchase plan, an AUD 943 million strategic placement to United Tractors — executed under AUD 1.10 at a 30% premium, more than a 30% premium to today's share price — plus USD 400 million in senior unsecured notes. We've also set up USD 400 million in maiden funding lines with Bank Negara Indonesia, one of Indonesia's largest banks. That was successfully syndicated out to an additional 8 banks, with a strong mix of Asian, European, and global banking institutions involved. And as I said, that marks the first time an Indonesian bank has come in to fund an HPAL.
Justin Werner
executiveThat really stems from the very strong ESG credentials that Nickel Industries and our operations hold. Taken together, these initiatives enabled us, over the course of the year, to pick up an extra 10% in the ONI RKEF project, to obtain an initial 10% interest in the HNC HPAL Project, and to lock in an option to invest in a nickel matte converter for our ONI RKEF project. It also means we were able to reach a final investment decision for a 55% interest in the ENC HPAL Project. Let's turn to Slide 6. Here you can see the EBITDA reconciliation, and on the table at right, those interest and expense amounts. A number of them are financial items that affected our EBITDA, along with some withholding tax for FY '23. On to Slide 7, please. Throughout the year you can see the robust quarter-on-quarter ramp-up. Beginning in March '23, we delivered 27,398 tonnes. That's shown in the white bubble chart. For that quarter, the average LME price stood at $173, and that produced USD 113.2 million in EBITDA from operations. Over at the far right of the chart, output reached 36,273 tonnes in the quarter, in the December quarter.
Justin Werner
executiveOnce more, on the white bubble chart, the LME price fell 48% to $17,288, and yet our EBITDA from operations actually rose to USD 135 million, up from $113 million at the start of the year. So I think that really underscores how robust the business has been through the year and, as I said earlier, in a challenging nickel price environment. If we could just go to Slide 8, please. At the Hengjaya Mine, we're seeing very strong results coming through as a result of the haul road being completed, which has let us sell significantly larger tonnes. Annual EBITDA of $87.9 million, up 63% on FY '22. And we also expect to capture a full year now of this steady run rate of sales of about 10 million tonnes a year. Again, as I mentioned, in the fourth quarter, during the December quarter, USD 42.5 million EBITDA from the mine alone for that single quarter. So it's performing extremely well. Slide 9, ESG. We continue to play a leadership role in sustainable mining in Indonesia. Some of the awards and accolades that were received throughout the year. With the S&P, we're in the second top quartile worldwide of ESG performers as ranked by S&P.
Justin Werner
executiveWe hold the top MSCI ESG rating among Indonesian metal and mining companies. Underneath that, as you can see across several categories, there are various awards. Gold awards. Over in the next column, we earned our second Green PROPER rating in a row. Once again, out of all mining companies in Indonesia, just 1 of 2 holds a Green PROPER rating. And we are working toward becoming, hopefully, the first company to reach gold. For some context, this rating, which is carried out by the Indonesian Ministry of Environment and Forestry, involves audits of many different companies. It is not limited to mining companies — agricultural companies and shipping companies are included too. So out of the 3,694 companies audited last year, only 196, or less than 5%, attained this rating. Building on the work we have been doing, we were invited to present at the COP28 Climate Summit in Dubai, and there we unveiled our net zero targets: a 50% reduction by 2035 and net zero by 2050. Another ESG initiative we undertook during the year was the first successful trial of electric vehicle trucks in Indonesia, and we will be looking to ramp those numbers up toward the end of this year.
Justin Werner
executiveAnd as I said before, we have a binding agreement in place to become the sole off-taker for Indonesia's biggest solar project — a 200 megawatt peak facility plus a 20 megawatt hour battery energy storage system. Let's move to Slide 10, if we can. This company is now diversifying production into class-1 nickel in a big and meaningful way. That happens through the Excelsior or ENC Nickel project. Once again, we'll build it alongside our partners at Shanghai Decent. Capacity will be 72,000 tonnes. Globally, it will be the first project able to produce MHP, nickel sulfate, and nickel cathode, which gives us product diversification plus the flexibility to sell into different segments of the class-1 nickel market where we might find superior margin opportunities. NIC will hold 55%. Like all our other projects, it carries a construction guarantee, and CapEx comes to USD 2.3 billion on a 100% basis, covering all auxiliary facilities, including tailing, the sulfuric acid plant, and other supporting infrastructure. There's a time frame guarantee of no more than 2 years as well as a nameplate guarantee. We've been successfully awarded a 15-year tax holiday from the Indonesian government.
Justin Werner
executiveSo ENC pays no tax at all for 15 years, followed by 2 more years at 11%. Our 55% interest in ENC — that's $1.265 billion — is completely funded out of cash already sitting on the balance sheet, and that cash was generated through robust EBITDA, a strong RKEF, and mine operations, along with the AUD 943 million Australian placement to United Tractors, which, as I said, came in at AUD 1.10, a 30% premium, and in part through USD 400 million in loan facilities from BNI, which for us serve as a bridge toward potential project financing. If we could move to Slide 11. This really just lays out the milestones quarter by quarter for 2023. Once again, a very busy and productive year, beginning with the Institutional Placement and retail SPP being completed in the March quarter and the electric vehicle battery supply chain framework being executed. So that was kind of — it signaled our intention to move into the class-1 market in a big way. In the June quarter, the 5-year USD 400 million senior unsecured notes were completed, first commercial sales from Oracle Nickel commenced, and the AUD 943 million placement to United Tractors was announced.
Justin Werner
executiveThrough that, we were able to raise our stake in Oracle Nickel by 10%, taking it to 80%. We additionally finished an equity issuance to Shanghai Decent worth USD 270 million, picked up a 10% interest in HN rating HPAL, and that has opened up access to mix hydroxide precipitate we can market to prospective new customers — samples have already gone out to some of them, and we are negotiating sales of that MHP. During the September quarter, we likewise finished the Hengjaya Mine to IMIP haul road, and the benefits of that really came through in the December quarter, when, as I noted, USD 42 million in EBITDA was delivered from the Hengjaya Mine. Then a very busy last December quarter: signing of the solar agreement and its presentation at the COP28 summit in Dubai, a good fit for ENC, the trial of the electric vehicle trucks, and the announcement of nickel matte sales to Glencore. So we announced the first sales outside of our nickel pig iron sales to Tsingshan. We acquired our initial 13.75% in ENC, and construction there is moving along very well. And after year-end came the announcement of a capital management framework featuring an increased final dividend and an on-market share buyback.
Justin Werner
executiveTo sum things up, then: even with a considerable drop in the nickel price across 2023, EBITDA has risen from each of our operations, and they are all doing very well. Funding is fully in place for our shift toward class-1 nickel, which carries higher margins and lower carbon intensity and will give us a more diversified customer base. Very soon we will kick off a process aimed at drawing in a strategic investor and off-taker for the ENC HPAL project, and interest so far has been very strong. We therefore look forward to getting that process underway. That said, we'll turn things over to Q&A.
Operator
operator<<operator_script>> The initial question will be from Cameron Taylor of Bank of America.
Cameron Taylor
analystI have a couple of questions, if I could. First, on the RKAB approvals in Indonesia. There are worries about nickel ore shortages, since fewer than 40 miners there had gotten those approvals. Obviously, that's a net benefit for Hengjaya as well as for NPI prices. Could you speak a little about that and what it means for Nickel Industries?
Justin Werner
executiveYes. So, look, there have been delays when it comes to the issuance of RKAB approvals. I'm pleased to report that ours has been issued, though it certainly did take quite a while to get issued. That was partly impacted as well by the elections that we had on February 14. I think what it does signal is that the Indonesian government is cracking down on the quality of mining operations and certainly, they are undergoing much tighter scrutiny. That delay in RKAB has led to a bit of a decline in NPI grades, as it's taken time for mines to be issued their RKAB and then start supplying ore again. In the interim, it's meant that we've had to go into some of our lower-grade ore stockpiles for our RKEFs. But on the positive side, these new RKAB approvals are now a 3-year duration rather than historically, when it was always required to be done at the beginning of every year. And unfortunately, very often there were delays. So I think with the new 3-year issuance, that will set a much clearer runway for the next 3 years and won't certainly limit the impact of delays in issuing RKAB and delays in ore supply to our RKEF operations.
Cameron Taylor
analystAnd then second, regarding ENC, is United Tractors still keen on buying that 20% stake? You noted on Slide 10 that stage two depends on funding. But would you also take into account that China is kind of close to turning into a net exporter of refined nickel? That might weigh on demand for ENC's products. Would that factor into the decision to approve the second stage?
Justin Werner
executiveYes. UT remains welcome, of course, to take part at 20%. They have not yet reached a decision. So we will kick off that strategic partnering and offtake process. We have 20 of the leading global EV and battery makers, roughly speaking, and interest has been extremely strong — a number of them have already taken samples and carried out site visits. The process has now formally begun. As for Phase 2, look, I think Phase 2 is obviously dependent on the market, dependent on funding, and I think it will also depend on the demand we see coming out of this strategic partnering process. I think we may see more demand than we will actually have available just from ENC phase 1. And then just on the class-1 nickel currently coming out of China — interestingly, many of the RKEF lines that have been producing nickel matte that goes to China and gets refined into nickel sulfate are being switched back to producing nickel pig iron. The reason is that Tsingshan is quite bullish on stainless in China, and they were the only profitable stainless producer in China last year — they made a net profit of about <<inaudible>>.
Justin Werner
executiveSo I believe they expect to grow their market share considerably, and that’s going to call for additional nickel pig iron. Which means those lines converting from nickel matte back to nickel pig iron should, we hope, ease the surplus of class-1 nickel sulfate and nickel matte that China has right now. And honestly, when all is said and done, class-1 nickel produced via HPAL will invariably be less expensive than nickel matte made from RKEFs, and its carbon intensity will be substantially lower. That’s why, for our ENC products, we’re aiming at customers in North America, Europe, Japan, and Korea instead of essentially every market outside China.
Cameron Taylor
analystAll right, and just a quick follow-up on that. How does this factor into the choices you're making about transferring the Angel lines or converting them to matte, and possibly also switching back to Hengjaya?
Justin Werner
executiveWe’re currently examining that and reviewing what our approach should be for matte or nickel pig iron.
Operator
operatorMitch Ryan with Jefferies has the next question.
Mitch Ryan
analystStarting with the stockpiles, could you share any details on what stockpile levels currently look like at IMIP and IWIP? Also, are those stockpiles under your own control, or do they operate under a blended stockpile arrangement?
Justin Werner
executiveYes. So, on stockpile levels, I’m not able to provide specific figures. Obviously, they are — our stockpiles consist of a blended mix, and every bit of ore from Hengjaya Mine goes straight into our own RKEF operations, after which we add more ore when needed. As for our RKAB, during the second half of this year we’re aiming to raise our quota to 22 million tonnes per annum, with the goal of reaching a point where, across all of our IMIP RKEF operations, self-sufficiency from Hengjaya Mine would be achievable if required.
Mitch Ryan
analystApologies—you mentioned that some lower-grade stockpiles were being used. Is that still happening? And does that lower grade result in a lower NPI grade, or does it simply raise RKEF cost? In what way does that show up?
Justin Werner
executiveYes. So ore grades feeding into the RKEF have dropped. That does mean lower NPI grades, and because of that, fewer nickel tonnes come out at the back end. But what we're seeing is that with the LME price so depressed, ore prices are actually quite low, and coal prices have come down somewhat too. So power costs have fallen as well.
Mitch Ryan
analystSwitching gears slightly toward the buyback — clearly, you made that announcement alongside your quarterly. My assumption is that a blackout period was in effect for you up until these results came out. Now that they're released, might we begin to see Nickel Industries potentially buying back its own stock in the market?
Justin Werner
executiveWe only need to satisfy a single requirement prior to beginning that. And since UT stands at 19.9%, we are currently in the process of requesting additional approval. Once we obtain it, then indeed, we will be out in the market searching.
Mitch Ryan
analystI apologize — that condition had slipped my mind. Is there any expectation on your end for when that will get resolved, or at this point is it simply up to the government?
Justin Werner
executiveCorrect — that sits with the government now. Still, I really don't see any problems arising. And hopefully it gets done sooner rather than later.
Operator
operatorAdam Baker of Macquarie has our next question.
Adam Baker
analystPerhaps just one item regarding the balance sheet and future cash flows. I noticed that you began drawing on the PT Bank facility prior to year-end. I'm just curious about the mechanics going forward. This quarter, I understand you have the senior secured notes coming due in April. When should we expect the rest of the PT Bank facility drawdown? And how are you approaching repayment of the senior secured notes? Is that more likely to come from a drawdown of cash or from drawing down what remains on the PT Bank facility?
Chris Shepherd
executiveAdam, Chris Shepherd here. Our current expectation is that the rest of that BNI facility gets drawn down during the month ahead. There's a payment coming due to Shanghai Decent at the end of March. As you may recall, we had earmarked that BNI facility to fund the ENC project. So at present I expect we will draw the remainder. That means when the quarter closes, we'll have $400 million outstanding on the syndicated bank loan. As for the options open to us, yes, we have a $245 million maturity in April. The team — management, together with our bankers and investors — is analyzing that right now. The range of options runs from, as I said earlier, at one book end, having sufficient cash on the balance sheet, which gives us plenty of flexibility across the next few months. At the other end, obviously, we could pursue bond refinancing, be it a new bond or a tap, and whether or not it's interesting, you've seen that we syndicated out that bank loan on top of BNI, which I believe has only further improved our access to bank capital as well, for this purpose.
Chris Shepherd
executiveThat's really all the detail I can provide. We're evaluating every option available to us, but I'm quite confident about the balance sheet and its cash position — we'll settle on the best-timed choice regarding capital structure within the coming month or 2.
Adam Baker
analystAnd regarding that term deposit — the $490 million one — what was the thinking behind it? Was it mainly about putting the Indonesian lenders at ease, or was that something coming from Nickel Industries' side? Yeah, I'm just curious why you chose to go that route.
Chris Shepherd
executiveIt's simply a more favorable rate. When we place a set sum in term deposits, that gives us access to elevated rates, which of course generates income for us.
Adam Baker
analystThat makes sense. And just one last question. BNI showed a bit of an increase compared with a year earlier. What should we expect going forward? Should we assume it will stay roughly at these levels?
Chris Shepherd
executiveYes. I’d say at this point it probably looks like the right figure. All the assets are now on the balance sheet. And as we’ve made very clear, we don’t see any new deals of any size coming on. I think the present level is fairly appropriate.
Operator
operator<<operator_script>> We'll take our next question from David Coates of Bell Potter Securities.
David Coates
analystA lot of what I wanted to ask has already been addressed. Well, to start with, the process for selling the ENC, that 20%. I brought it up earlier. I don't believe you said anything regarding timing. Can you give us any sense of how long that process will take?
Justin Werner
executiveHonestly, I'd expect this to play out over the majority of this year. Right now we're wrapping up discussions with our bankers about what the best timeline ought to look like. Since we've got a varied set of groups spread over quite a few countries, we've found that certain ones will act fast while others will take their time. So that's what we're currently sorting out — namely, how much time we should allow people in order for them to...
Chris Shepherd
executiveLet me just add something to that. The 55% on our side is locked in. Regardless of whether the process moves ahead, we are committed to 55%. Whatever sell-down occurs would be taken out of the 45% stake held by Shanghai Decent.
David Coates
analystAnd, Justin, this might be somewhat of a philosophical question about the markets, if you will. But some views have been expressed that we — similarly to, I suppose, the way class-1 and class-2 nickel markets have bifurcated, there's a view that perhaps we need to see a bifurcation of nickel that's more ESG compliant in some people's view versus nickel that's less ESG compliant, or nickel — what's your view on that? Do you kind of see how that sort of mild plays out, or doesn't?
Justin Werner
executiveI mean, a green premium would definitely be something we'd welcome. Our ENC HPAL—look, the goal is for it to have the lowest carbon intensity of any nickel units in the world. And that comes from a combination of solar, from our fleet of electric vehicle trucks, and from the fact that over 60% of the power is produced by a sulfuric acid plant or by the heat that plant generates. Our mine, as you've seen, which is going to supply the ore, is an ESG leader in Indonesia. So yes, we would absolutely welcome it. But is it going to happen? I don't think so. We've been talking with a number of EV and battery makers, and cost is the only thing they care about. That's all they're focused on, purely. And EV penetration rates are stalling, as we're seeing. So these companies are under pressure to get costs down. So not a single one of the ones we've spoken with—they're comfortable with Indonesia's ESG credentials. I mean, you only need to look at the names already invested in the country. You've got Ford, you've got BASF, you've got Hyundai, you've got LG, Volkswagen. So I think this whole idea of a green premium—really, is there actually going to be any difference at all between nickel mined in Australia and nickel mined for HPALs in Indonesia?
Justin Werner
executiveAnd that entire idea of a green premium — I don't think it's going to pan out. And like I said, what really matters is that the end customer is the one telling us they wouldn't be willing to pay it.
Operator
operatorLazard Asset Management's Tim Zhao is up next with a question.
Tim Zhao
analystI have a couple of questions. First, I'm not sure whether you can give us any kind of guidance or outlook on margin per tonne for each of your RKEF lines over the next couple of quarters of the year. I'm assuming nickel prices remain where they are now.
Justin Werner
executiveChris, would you like to cover the guidance?
Chris Shepherd
executiveYeah, Tim, I think we lost you for roughly the final 10 seconds there — right around where you were saying, assuming the nickel price?
Tim Zhao
analystWe’re going to remain where we are right now.
Chris Shepherd
executiveYes. Look, I believe everyone is quite familiar with where we stand. Guidance is not something we offer. And it's tricky, since we have commodities affecting revenue and commodities affecting costs as well. So guidance isn't possible from me. But what I would point out is what Justin showed during the presentation — he walked through the decline in the LME price, the average LME price quarter by quarter, and even so, thanks to the volume of nickel units we've been delivering, EBITDA, and still through the cycle, if we think the price sits at a low level — the LME price is at a low level — we continue to post record EBITDA each quarter. That's all I can offer you, Tim.
Tim Zhao
analystPerhaps I'll take another shot at this. I mean, regarding what you're paying for inputs. Clearly, the coal price has been easing somewhat. I mean, as you noted, the LME nickel price has been easing somewhat too. How much of that do you figure has already shown up in your cost for the most recent quarter, or how much is still to come, I suppose, in this quarter?
Chris Shepherd
executiveOnce more, that really comes back to what we hold in our stockpiles, and unfortunately, while you'd like some detail on that, providing stockpile information just isn't something we do.
Tim Zhao
analystAlright, that's fine. The second thing, I think, concerns the debt facility — I mean, could you discuss your bank covenant? I realize there's probably a substantial amount of cash in there. Could you address the bank covenants across those various debt instruments? And additionally, are there any limits on dividends or buybacks tied to any of those kinds of instruments?
Chris Shepherd
executiveYes, absolutely. Look, I’m not going to reveal the specific covenants tied to the bank facilities. We’ve already addressed that matter with KPMG, and disclosure isn’t required. Those covenants are quite standard. As part of our audit efforts over the past week or 2, we have been supplying thorough covenant calculations covering both our senior secured notes and the BNI loan, or the syndicated loan. Naturally, when BNI syndicates a loan, every new bank joining is testing those covenants and, clearly, becoming quite comfortable with them, or they wouldn’t participate. So when we pay dividends for the trustee on the senior secured bonds or senior unsecured bonds, we obviously also submit calculations concerning the dividend. And additionally, assuming United Tractors receives its further approval, and then assuming we complete the share buyback, which, as Justin has explained, we will obviously have calculations for under both the bank facility and the bond facilities.
Tim Zhao
analystAll right, let me just grab one final question here. I believe I caught Justin referring to obtaining approval for 20 million tonnes out of the Hengjaya Mine. Was that what I heard?
Justin Werner
executiveYou've got it right there, Tim.
Tim Zhao
analystAlso, when would that happen? And on the haulage road, I get it — you probably can't move all 422 million tonnes on it. So how do you solve that?
Justin Werner
executiveThe increased RKAB quota is being worked on alongside the ENC HPAL Project. Therefore, within the ENC HPAL Project, a dedicated limonite slurry pipeline with a capacity of 11 million tonnes will be constructed. Essentially, that is the main thing this RKAB will enable us to accomplish.
Tim Zhao
analystOkay, so approximately how much capital expenditure goes toward the slurry line? Could you give me some idea?
Chris Shepherd
executiveThat figure hasn't been made public.
Justin Werner
executiveCorrect, it's not large. We're talking tens of millions. It isn't a major CapEx item.
Operator
operatorOur next question comes from Kate McCutcheon at Citi.
Kate McCutcheon
analystOne quick thing for you, Chris. On the revenue you reported, I just want to confirm: are the MH but MHP cells included in that figure, and is that your share of HNC? Hello?
Chris Shepherd
executiveMy apologies, Kate — I had my line muted the whole time. Sorry about that; I was just talking away to myself.
Kate McCutcheon
analystAlright, Chris — go ahead, we can hear you now.
Chris Shepherd
executiveSorry about that. I’d like to step back briefly regarding HNC and provide a bit of context. Clearly, we hold only a 10% stake in that company, and it isn’t typical to regard yourself as having significant influence for equity accounting purposes. That said, because of the minority protections we have and our shareholders agreements, we concluded together with the auditors that we will apply equity accounting to all of it here—so that’s some context for the analysts. It explains, for you and others, why we are in fact taking this route. I was cut off earlier, though. Could I get the rest—the remainder of the question?
Kate McCutcheon
analystI believe that was my question. I just want to confirm those MHP cells flowed through the revenue line and represented your share of HNC revenue. And then going forward, what portion should we account for through your P&L?
Chris Shepherd
executiveYes. Well, HNC has 2 aspects to it. You'll find that reflected in Note 17. Clearly, our 10% share of HNC is included, and beyond that, through our right, the entity holding that 10% stake in HNC is Tsing Creation, which we fully own at 100%, and Tsing Creation holds offtake rights covering 10.3% of the product. So if you're examining HNC while attempting to get a look-through on MHP margins and what MHP looks like, those elements need to be viewed in totality. Where things get somewhat tricky, clearly, on the equity accounting side, is that HNC generates greater EBITDA. Its EBITDA is larger than the figures you'll find in the presentation and in the results. Yet we can't account for that entire 10% since we're equity accounting. We're actually required to take the profit and loss, which consequently includes all of HNC's financial expenses and includes depreciation, et cetera. So my caution would be against trying to add those 2 together to get a see-through on HNC numbers. One more bit of complication in all of this is that it's 4.5 months' worth of operations.
Chris Shepherd
executiveAs a result, there aren't even two quarters of figures available for performing any kind of genuine visibility analysis.
Kate McCutcheon
analystAll right, understood. Chris, I may reach out to you afterward.
Chris Shepherd
executiveAbsolutely. We're in talks with KPMG, and we realized the ENC — sorry, the HNC figures would matter to people like you and other investors. So we're glad to do it.
Operator
operatorWith that, we have no more questions in the queue. I'll turn things back to Mr. Werner now for his closing remarks.
Justin Werner
executiveThanks again, everybody, for being here. We're eager for another robust 2024 as the company shifts into becoming a major class-1 nickel producer. So once more, thank you all for your time.
Operator
operatorThat brings us to the end of today's conference. Thanks for joining in. You can go ahead and disconnect now. Have a wonderful day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Nickel Industries Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Nickel Industries Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Nickel Industries Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.