Thanks for holding, and welcome to Nickel Industries Limited's 2024 HY Results. <<operator_script>> At this point I'll turn the conference over to Mr. Justin Werner, Managing Director. Please go ahead, sir.

Justin Werner

executive
#2

Thanks, and welcome everyone to the Nickel Industries 2024 Half Year Results Call. Could I ask the moderator to please move to Slide 2. Thank you. Beginning with safety, at the Hengjaya Mine 3.25 million man hours were worked with no recorded LTI. That gives a lost time injury frequency rate of 0.07, which is world class. Likewise, at our RKEF operations during the first half of 2024, 4.93 million cumulative hours were worked. That's a lost time injury frequency rate of 0.316, and 1 LTI was reported at the ONI operation. On group safety, in the first half of 2024, 8.18 million man hours were worked with 1 LTI, and that's a lost time injury frequency rate of 0.182 per million work hours. On ESG, we remain a leader in the sector. We've maintained the highest MSCI ESG rating through an Indonesia-based mining and metals company. Then throughout the first half of this year, we continued to receive a number of awards, including 2 Gold Awards at the Nusantara CSR Awards and winner of the ESG Award for the nickel sector by TrenAsia and ENSIA, local domestic groups that have recognized and awarded us for our work in the industry -- sector.

Justin Werner

executive
#3

Lastly, our Green PROPER rating—we have once again retained it, and we earned the top score among all nickel mining firms in Indonesia, plus the fourth-best score of every mining company audited across all commodities. Could we turn to Slide 3, please. This is something the company is truly proud of. We have now set up a local foundation. Through it, we launched a university scholarship program, and we are delighted to welcome our first 10 local indigenous students. Nickel Industries will be supporting them through undergraduate degrees in a range of different fields, among them metallurgy engineering, mining engineering, and environmental engineering, and we will keep this going. So by the end of year 5, there will be 50 students annually going through these various fields. It is one of the—it is the first initiative, but one of many under our recently established foundation in Indonesia. So we look forward to tracking those students' progress and obviously are very proud of what they achieve and wish them well in their studies. Could we just move to Slide 4, please. First half review, challenging because of its exceptional circumstances, but still robust EBITDA across our operations, just challenges, including the delay in issuing mining licenses and then exceptionally high rainfall for the second quarter of this year.

Justin Werner

executive
#4

We're maintaining and declaring an interim dividend of AUD 0.025 per share, and that was fully funded by 100% of our conduit foreign income. On nickel production, we had 63,000 tonnes for the first half of the year, plus 4,117 tonnes of nickel in MHP from HNC. I'll get into HNC and ENC a bit more later, but HNC is delivering exceptional results and strong EBITDA, and the tonne margins bode well for ENC as we look at commissioning toward the end of next year. The mine keeps going from strength to strength. We saw realized mine EBITDA of USD 39 million. That was impacted somewhat by the first 2 months of this year — January and February, we couldn't make any sales — but we're now catching up. In fact, we're on track for August to be a record for ore sales to the mine. And then finally, on the corporate side, we've raised our equity interest in the ENC HPAL project to 44%, so there's only a remaining 11% to be acquired. We announced trial sales of nickel cathode to a leading western space and aeronautical company, and we're seeing a lot of interest in cathode, particularly for the alloying industries.

Justin Werner

executive
#5

And that's a market we find quite exciting, and I'll get into that a bit more later on. We managed to syndicate 2 loans successfully — a USD 400 million facility from BNI, plus a $250 million term loan facility. And as I said, we received the highest sustainability score in the Indonesian mining sector, our Green PROPER rating. Let's turn to Slide 5, if we could. Key numbers here. Sales fell slightly, by roughly 9.5%, and EBITDA from RKEF operations declined, but the pleasing part is a significant rise in EBITDA from mine operations. That was up nearly 50%, from $26 million to $39.1 million. As I mentioned, we kept the dividend at AUD 0.025 per share. And this covers the first half of this year. If you look at what's been going on in the global nickel market, we've seen major global shutdowns and a number of operations that are loss making. And so despite that, as I said, EBITDA remains robust, and we're looking ahead with optimism to a strong second half of this year, which actually probably reflects similar sorts of conditions to 2023. Our first half of 2023 was somewhat slower, and then we finished very strongly in the second half of '23.

Justin Werner

executive
#6

We’re focused and optimistic about achieving the same result in 2024. If we could move to Slide 6, please. This is the EBITDA to profit reconciliation, and you can see the figures there as we walk through them: an increase in interest expenses, obviously, with the loans, plus some increase in interest due to the difference in cash. That has led to a profit after tax of USD 40 million. So the numbers are pretty consistent there. If we go across to the next slide, please, Slide 7, looking a bit more closely at our RKEF and HPAL operations, nickel and NPI tonnes rose 25%, and that’s really just because we have ONI fully ramped up. Nickel in matte tonnes decreased. At the beginning of this year we decided to convert back to nickel pig iron, and total nickel production tonnes increased from the first half of ’23 to first half of 2024. Here you can see the significant decline in the weighted average contract price, down 27%. So it averaged 15,476 in the first half of ’23, and fell to an average of 11,290 in the first half of ’24. Pleasingly, though, our cash costs are trending down in line with that contract pricing.

Justin Werner

executive
#7

Our costs have dropped from $12,800 down to $9,700, and we keep concentrating on the levers available to us to bring cash costs lower and also lift the yield coming out of our RKEF operations. Overall, that produced EBITDA of USD 90.9 million from RKEF operations. Switching over to HNC. Nickel in MHP comes in at 41,000. Annualized, that works out to more than 80,000 tonnes. HNC's nameplate capacity is 60,000. So you can see the material where you'll exceed nameplate capacity, which is what HNC is delivering. And we'd be hoping for a comparable outcome from ENC. We've laid out there both the EBITDA and the equity accounted profit from HNC. And also at the bottom there, the combined pro forma HPAL EBITDA of USD 22.6 million. Over the first 6 months, that works out to an EBITDA per tonne figure of roughly $5,500. And pleasingly, that figure currently sits at around $7,000 to $8,000 a tonne. So we're witnessing very strong margins in the HPAL business in intermediary and class 1 nickel. And so that's a very good sign for ENC coming online next year. If we could just move to Slide 8, please.

Justin Werner

executive
#8

Our balance sheet remains conservative. The asset movement essentially reflects lower cash and inventory. However, at 30 June, we had debt totaling USD 753 million and cash amounting to USD 350 million, giving net debt of USD 402 million. After the quarter ended, we utilized the USD 250 million 5-year loan facility, and we completed a U.S. round involving a $379.5 million acquisition payment that raised our stake in ENC to 44%. We accelerated that payment from its original timeline, aiming to move up cathode and sulfate production from the contractual October date next year. Let's turn to Slide 9, if we may. At Hengjaya Mine, the first half proved difficult—as you noted, there were RKAB licensing delays—and this year that simply stems from heightened scrutiny of mining operators throughout Indonesia. We ranked among the initial 40 companies to obtain our RKAB, and those RKABs now cover a 3-year span. Fortunately, that means we won't need to undertake this process at the start of next year. Consequently, we experienced 2 months without sales during this year's first quarter.

Justin Werner

executive
#9

Then we got into the second quarter, and rainfall was unusually heavy — 1.3 meters across that quarter, which comes in 48% and 91% above the comparable periods a year earlier in 2022 and 2023. We're in the dry season now — but, as I said, August, we're on course for record production and sales. Through the dry season, our focus is on extensive work on our haul rate, with the objective of having it running 24 hours through that stretch, and that means plenty of activity around resurfacing, sheeting the road, geotechnical work, drainage and the like. So the aim is to be ready for the next season, when we'll seek to greatly reduce how much rain affects ore sales. Still, on a positive note, despite those difficulties, as I noted, mine EBITDA rose 50%, from $26 million in the first half of '23 to nearly $40 million in the first half of 2024, and once more, we anticipate a robust second half from the mine. Ore pricing is trending upward. In fact, premiums are reaching as much as $20 per tonne over the present HPM price.

Justin Werner

executive
#10

That should set us up for a solid showing from our mine over the rest of this year. Let's turn to Slide 10, if you would. We've made excellent headway on the ENC HPAL. Earthworks and footings are now mostly finished. And the key long lead critical items — the autoclaves, the preheaters and the flash vessels, which really form the heart of HPAL — have all been fabricated. There are some photos of the autoclave you can see there. They're ready for shipment during September, together with other critical equipment. And that equipment is partly being sourced from Australia, from the U.S., Germany. So all of those parts are ready to go out. We're especially excited to reveal that Tsingshan has committed to this project becoming a Green Forest living precinct. And this precinct is one that Tsingshan is building. It's not part of the ENC project, but it will house ENC staff, and it will serve as the support base for all of the ENC operations. And this will be a state-of-the-art living precinct. There's a photo of the living accommodation you can see there. And shops, restaurants, sports fields will surround it, so it really is going to be a world-class operation.

Justin Werner

executive
#11

All of it is going to be electric—electric trucks, electric transport, electric forklifts, that kind of thing. The goal, then, is for this to genuinely serve as a showcase for sustainable, world-class nickel production right in the middle of Indonesia. Naturally, we're very pleased that Tsingshan picked the ENC HPAL for this project, which I believe—as I mentioned—will stand as a world-class showcase. Let's turn to Slide 11, if we may. This is essentially a recap of the first half. I touched on nickel cathode, and we're getting solid interest in nickel cathode. A key appealing aspect of ENC's capacity to make nickel cathode is that it is also LME deliverable. That gives us a market available at all times, one that can capture the spot price. Let's move to Slide 12, please. Once more, we addressed all of these points. Lastly, we announced that Emma Hall has been appointed as an Independent Non-Executive Director. We give her a warm welcome to Nickel Industries. She brings a wide range of varied industry experience, especially throughout the global battery metal chain, and she has held a variety of roles. These are engineers and manufacturers across the U.S.A., Europe, Japan, China and South Korea.

Justin Werner

executive
#12

With the company’s shift into HPAL and toward that EV battery market, we warmly welcome Emma. And as I mentioned, she brings a tremendous amount of experience and expertise on the industry side. So in summary, despite some exceptional circumstances and challenges this year, we were still able to maintain robust EBITDA, again, against the backdrop of the global nickel environment in which numerous producers were going out of business or shutting down. We are now set up for a strong second half of the year given much drier conditions, so -- and very strong ore pricing coming through for the Hengjaya Mine as well as an improvement in the nickel pig iron price. And then looking at our HPAL. Again, we’ve seen margins increase here, as I mentioned, $7,000 to $8,000 a tonne for MHP. So with that, I’ll hand over to Q&A. Thank you.

Operator

operator
#13

<<operator_script>> Our first question is from David Coates at Bell Potter Securities.

David Coates

analyst
#14

Nice work on the results this morning. On the dividend — for me, anyway, that increase was a genuinely positive surprise. We'd been looking for it to come through, but it arrived a little ahead of schedule, and I see that as a strong signal. Could you share a bit more context on what's behind that raise in the dividend?

Justin Werner

executive
#15

Sure, Chris — go ahead if you'd like.

Chris Shepherd

executive
#16

Absolutely, and thank you, Justin, and thank you, Coates, for raising that. Yeah, so the dividend is clearly higher than it was in the first half of last year, yet it matches the amount we paid as our final dividend in February, so that's Q1. As you're aware, we set out a revised dividend policy on 30 January, under which we shift away from simply holding the dividend steady and instead tie it to our free cash flows. You'll see that for our free cash flow, this dividend — sorry, the range, and it is guidance, I want to be clear it's guidance, is 30% to 60% of free cash flows. We landed slightly above that, at 65%. That said, as Justin mentioned when we walked you through our quarterlies, this quarter was exceptional and was abnormally affected by some exceptional items hitting our EBITDA and our free cash flow. So once we strip those out, the figure — when we take out those items, the payout ratio comes to roughly 45%. That places it inside the range we've given investors in the market as well. Still, you're correct that some people would view it as a positive surprise.

Chris Shepherd

executive
#17

I think that simply demonstrates what we expect the market to look like as it develops across the coming 6 to 12 months, along with how strong our cash flows are and how we see the company positioned once ENC comes online early next year and we receive the lift from it.

Operator

operator
#18

The following question is from Adam Baker of Macquarie.

Adam Baker

analyst
#19

Appreciate the results. Just a single question on the buyback that was announced earlier — the $100 million repurchase. I'm wondering where that stands at present and how it slots into the capital management framework.

Chris Shepherd

executive
#20

Sure, I’ll address that too, Justin. And Adam, I appreciate the question. Clearly, what happened on January 30 wasn’t only a changed dividend policy. As you said, it was in fact a wider capital framework initiative. One component involved the dividend, and another involved share buybacks. For the first 6 or 7 months after we announced it, we were unable to act on the buyback at all, since we were awaiting FIRB approval so our second largest shareholder could go beyond 20%. After that, obviously, we had — during that period — after the January 30 announcement, on the same date when we reported a record EBITDA quarter of $135 million, I think it’s reasonable to say the following 2 quarters came in significantly below that level because of those abnormal factors Justin took you through. Obviously, we have also just announced a Sampala acquisition, a project acquisition. So we are balancing returns of capital to shareholders, as we said we always would, against the company’s actual capital requirements, and keeping in mind the company’s operations while we do that — we are positive on the outlook, which is why the interim dividend has been increased.

Chris Shepherd

executive
#21

At this point, we believe it makes sense to lean toward a somewhat careful stance, especially given that our cash flows are coming in well below what we had anticipated at the time we announced that share buyback. We're not indicating that it has been ruled out, though — the management team keeps watching it closely all the time. And should we identify a need to move forward — or should we identify a wish to do so — I believe we still have 10 or 11 months remaining under that existing approval to keep going with that buyback.

Operator

operator
#22

<<operator_script>> Our next follow-up comes from David Coates at Bell Potter Securities.

David Coates

analyst
#23

I got stuck on the first one last time, but I may toss you a couple this time, guys. Let's see. So the margins you're getting from HPAL production—they're obviously not really, really strong and good compared with the current offtake. How is that—has that kind of been impacting or affecting the consideration of a sell-down in the Excelsior Nickel Cobalt project interest?

Justin Werner

executive
#24

Yeah, thanks, David. We're still working through that process, and we've got a number of interested parties — some of them have submitted a nonbinding offer. They're now in the process of appointing advisers and moving into a more thorough due diligence phase. So that's progressing well, and we're also in dialogue with a number of groups around offtake of MHP cathode and sulfate. So that process is progressing, and we look forward to updating the market, hopefully more towards the end of this year.

Chris Shepherd

executive
#25

Coates, you just mentioned there's no way to misinterpret that — any sell-down would come from Tsingshan state, rather than from Nickel Industries. Our stake will stay at 55%.

David Coates

analyst
#26

Yes, great, got it. And second, Justin, you said that oil pricing right now is bringing in some fairly strong premiums. Could you walk us through a few of the things behind that?

Justin Werner

executive
#27

Yeah, several things played a part. The reduction in RKAB license issuance meant that poor operators, or ones with a poor mining track record, received no allowance for any sales until they fix the defects identified in their mining operations. So the result has been a smaller volume of ore being available for sale. Heavy rainfall clearly also affected ore mining and ore sales. That, in turn, produced a short squeeze in the ore market, which showed up in June, when nearly 1 million tonnes of ore was bought from the Philippines. I think this again highlights the advantage of NIC being fully integrated from the mine through to our RKEF and HPAL operations. Right now we are 50% self-sufficient in ore for our RKEF operations — HNI, RNI and ONI in IMIP. And with the Sampala acquisition that we announced just this week, that takes us to 100% self-sufficiency for the next 40 to 50 years or so. So it won't be something we'll have to worry about. But it is something that came about through a number of factors.

Justin Werner

executive
#28

Yet once more, this simply underscores how crucial—and how beneficial—it is to be integrated across the whole chain, from mining right through processing.

Operator

operator
#29

Dim Ariyasinghe from UBS has the next question on the line.

Dim Ariyasinghe

analyst
#30

I have just a couple of questions. Perhaps starting with the market. Earlier you mentioned that NPI pricing is recovering. Could you expand on that a bit more for us? What is behind it? Is demand the driver, or is it partly the supply correction we are observing? I will follow up with my second one.

Justin Werner

executive
#31

Yes. Thanks, Jim. No, you've pointed out that there's been a bit of a supply correction, and what's interesting in the NPI market is that, for the first time, we're now seeing a market outside of China. So we have European stainless steel producers that are actually now purchasing nickel pig iron as opposed to scrap nickel just given the cost benefits. And despite the sluggish conditions in China, stainless steel growth still, it looks relatively robust moving forward. And again, there has been a supply correction. So we have seen higher cost. It hasn't just been producers of class 1 and intermediaries globally that have been affected. There has been NPI producers in China that have also come out of the market, some of the higher-cost producers. So that's what sort of led to a strengthening and improvement in the NPI price as well as in Indonesia, there has been a lot of conversion of RKEF lines from nickel pig iron to nickel in matte, which has also taken a considerable sum of NPI out of the market.

Dim Ariyasinghe

analyst
#32

Then I have one more question about Sampala. Securing ore supply and pushing integration further looks like a fairly smart strategic step. I'm just curious about it. Was there a competitive process involved? And there were a few questions the other day as well. Did you start the proceedings? I'm simply trying to understand who the competitors are for Indonesian ore supply and for actually locking up volumes the way you have.

Justin Werner

executive
#33

Yeah. No, look, fortunately this wasn’t a competitive process for us. It was carried out together with our long-term local partner, with whom we’ve had a 15-year relationship that goes back a long way, and he has been our local partner at the Hengjaya Mine. And I say thankfully it wasn’t competitive because, if you look at the valuations included in the presentation, the latest nickel mine transaction was completed at a multiple of USD 272 per tonne of contained nickel metal. We are acquiring Sampala right now at USD 39. So that’s a very attractive acquisition price and very attractive terms as far as deferred payment is concerned — for 18 months or longer. And look, our local partners always take a long-term view. We’ve said that we have worked together for a long time. With Hengjaya Mine now producing the volumes and the EBITDA that it is as a 20% shareholder, he is going to receive a very strong dividend for the next 20 to 30 years from Hengjaya and likewise from the Sampala project. And I think if you take those multiples even outside Indonesia, if you look at IGO’s acquisition of WSA, that was done at a $900 a tonne multiple, and Mincor was done at $2,100, so USD 39 per tonne is a very compelling acquisition, with already over 2 million tonnes of contained nickel metal and just 20% of the project area.

Justin Werner

executive
#34

The chance for this to rank among the biggest nickel resources worldwide, situated near our current operations, was extremely appealing to us. Yet once more, the fact that this opportunity came our way solely stemmed from the solid ties we share with our local partner, and we have managed to take full advantage of it.

Dim Ariyasinghe

analyst
#35

All right. Great. If it's okay, I'll try to fit in one more question here. I may need to follow up with you separately, though. And this one might be for Chris. It's about the reclassification of certain prior period expenses. I believe there was a list of consensus around that. Is there a straightforward explanation for it? I might circle back next week, but yes.

Chris Shepherd

executive
#36

Yes. All right. Sorry, we lost part of what you said there. Could you repeat the question about reclassification?

Dim Ariyasinghe

analyst
#37

Yeah. So just to explain it at a high level, what you've done — I note there was a bit of a news to NPAT stemming from those reclassified expenses.

Chris Shepherd

executive
#38

Yeah, yeah. So during the audit process with KPMG, I believe you're referring to the point where we reclassified certain dividend distributions — specifically, the withholding taxes on those dividend distributions. While working through this with KPMG, we simply concluded that the best approach was to move that out of other expenses, where it had previously been recorded, and place it into income tax expense. There was also a foreign exchange gain in there, which we have reclassified to financial expenses.

Operator

operator
#39

Moving on to Eddie Lee from MetLife Investment Management, who has a question.

Eddie Lee

analyst
#40

I have just a couple of questions. First, could you give us some idea about the funding plan for the Sampala acquisition? I know the actual payment could be delayed further, but I'm just curious what your thoughts are on the funding side. That's my first one.

Justin Werner

executive
#41

Right. So there’s a 3-month due diligence window prior to when we must pay a commitment fee of USD 2.965 covering 2 of the projects, followed by an 18-month stretch during which we’ve committed to an exploration program, and we’ll drill it out. Then it’s based only on heavy dry metric tonne at 1.7%, so whatever falls below 1.7%, we don’t pay for. We pay a multiple of $2.50 per dry metric tonne. That payment, under the agreement, sits more than 18 months out. And happily, the ETL IUP — the one furthest north — has already had a great deal of work completed: feasibility studies have been submitted, an environmental study has been submitted. A haul road has already been planned, geotechnical work has been carried out on it, so applications to begin construction of that haul road have been submitted, along with a mine plan for ETL. Our target, therefore, is to aim to start mining from ETL by the end of next year, which means we should actually be able to be in production before we make the final acquisition payments. Our local partners are comfortable with that. So for us, deferring the deployment of payments and letting money go into the ground in exploration and then in mine development to see us through the cash flow is obviously very attractive.

Justin Werner

executive
#42

When it comes to CapEx, it's under $50 million. There's no jetty to construct since we aren't located on the coast. We will need to build 22 kilometers of haul road, but that connects to 30 kilometers of haul road that already exists, and that runs straight into IMIP. So from a CapEx standpoint, it's quite low. Then, looking at the current ore margins, using an average of roughly $15 a tonne, our initial plan calls for 6 million tonnes per annum, ramping up to 12 million to reflect the run rate at Hengjaya Mine. If you apply a $15 margin to those figures, the payback is very quick and the ARR comes in at around 50%. So it's very healthy. These mining operations are long-term, low cost and extremely profitable.

Eddie Lee

analyst
#43

Yes. What I was really asking about is the actual cash consideration you'll be handing to your partner to buy Sampala. So I'm just curious about the mix of debt and equity funding for that, or whether internal cash is used.

Justin Werner

executive
#44

Yeah. I mean, obviously, until that exploration program is finished, we won’t have the final figure. But with the really strong cash flows coming from Hengjaya Mine, we’d be able to fund the acquisition through cash flows from our current mining operation. And in fact, we did include in the presentation that, as things stand right now, the acquisition price would be approximately $42 million for 62%.

Eddie Lee

analyst
#45

All right, understood. My follow-up question concerns the naming of Ms. Emma Hall to the role of Independent Nonexecutive Director. I'm just wondering: what number of Independent Directors do you currently have serving?

Justin Werner

executive
#46

Right now, the count stands at 2.

Eddie Lee

analyst
#47

And does that figure take Ms. Emma Hall into account?

Justin Werner

executive
#48

Yes. Absolutely.

Operator

operator
#49

<<operator_script>> The following question comes from Tim Zhao at Lazard.

Tim Zhao

analyst
#50

Two things I'd like to ask. The first is specifically about the acquisition. Could you verify — I mean, I get the picture of the haulage road that you've got or that you're attempting to construct. My understanding is it likely goes around a portion of Medecas acreage. Are you able to confirm that building a haulage road there isn't a problem for you folks? The second one is whether you can — I realize you don't give any cost guidance, but perhaps you could offer a bit of directional guidance regarding where you see costs. I mean, clearly, take into account where the coal price sits right now, or even where the soft price sits today. And I believe your comments earlier about the ore price becoming rather expensive at the moment. So yes, could you just share some directional remarks on where you see costs going from here today?

Justin Werner

executive
#51

Alright, sorry — the line was bad for some reason, so I didn't catch everything you said, but I gather the question concerned costs and coal pricing. So, look — costs have declined, as is evident when you compare the first half of '23 with the first half of '24. Given the ore supply problems we've described, we expect a modest rise. Still, the advantage of owning the mine is that although costs may be higher in our RKEF operations, that is in fact being mirrored in stronger NPI pricing. As a result, we're seeing margins held up to some degree through that. And happily, we're capturing a substantial margin gain at our mining operation.

Chris Shepherd

executive
#52

The second question concerned the haul road and which property it crosses. Tim may have been under the impression that it passes through Medecas, but you may want to discuss BDM with him.

Justin Werner

executive
#53

Alright, I’m assuming this refers to the Sampala haul road. It’ll run 22 kilometers from our project to Bintang Delapan — a mine held 49% by Tsingshan and 51% by a local partner — and from there we’ll use 34 kilometers of haul road that already exists. That’s where things stand right now.

Operator

operator
#54

That brings us to the end of the Q&A. I'll turn things back over to Mr. Werner for some closing remarks.

Justin Werner

executive
#55

All right, and once more, thanks to all of you for joining us today. And again, the closing point I'd like to leave with you is this: the skies have cleared, and we're already seeing that reflected in mine production, in strengthening NPI, and in strengthening HPAL margins. So we remain very focused, and we look forward to delivering a strong second half of the year. So thank you again for your time.

Operator

operator
#56

Appreciate it. That brings today's conference to a close. Thanks for joining us. You're free to disconnect at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Nickel Industries Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Nickel Industries Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Nickel Industries Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.