Nickel Industries Limited (NIC) Earnings Call Transcript & Summary

October 30, 2024

Australian Securities Exchange AU Materials Metals and Mining earnings 21 min

Earnings Call Speaker Segments

Operator

operator
#1

At this point, I'd like to pass the call to our Managing Director, Justin Werner. Justin, the floor is yours.

Justin Werner

executive
#2

Thanks, and if you could move us along to the following slide, please. Hello, everyone, and welcome to the September Quarterly Activities Results Presentation for Nickel Industries Limited. Starting with safety and sustainability: at the close of September, the company-wide Lost Time Injury Frequency Rate for the trailing 12 months stood at 0.12. One LTI occurred during the quarter, set against 4.6 million man-hours worked, and the company-wide TRIFR — that's the Total Recordable Injury Frequency Rate — came in at 1.24 as at the end of September. We're very happy to report that, for a third year running, we've been shortlisted for a Green PROPER Rating. To repeat, last year we were among just two companies to be awarded a Green PROPER Rating. With three consecutive ratings now behind us — assuming we do land a full Green PROPER this year, having already made the shortlist — that would qualify us for a Gold PROPER Rating, and our target is to become the first nickel mining company in Indonesia to secure a Gold PROPER Rating. In addition, our S&P Global ESG Score was updated to 37 for 2024. That compares with seven in 2021 and sits well above the worldwide average for metal and mining companies, which stands at 29.

Justin Werner

executive
#3

Independent third parties are acknowledging our efforts and the work completed through their audits and reviews. In addition, we obtained formal endorsement to establish a biodiversity area of 197 hectares. We have been working on this area for a long period of time. A great deal of work went into determining which flora and fauna species are present, mapping them, measuring them, and monitoring them, and this now creates an area that can serve protection, education, and further monitoring purposes. So once again, we are very pleased with the award and with the hard work that went into identifying this biodiversity area and now being able to manage it, which sits in close proximity to our mine. We also received the Nusantara CSR Awards, an award for our program that aims to improve health and nutrition among local communities, and we were honored with the Best Climate Reporting and Transparency Award at the 2024 GRIT Awards, which are held on the 28th of October, 2024. So there are a number of milestones across our ESG activities, and we remain the leader in Indonesia when it comes to ESG. Could we move to the next slide, please?

Justin Werner

executive
#4

Nickel metal output came in at 30,663 tons on a 100% basis, a touch below the June quarter. The main reason was eight days of planned maintenance, predominantly, at our RNI RKEF operations, plus somewhat weaker output from our Angel operations at IWIP, since we keep drawing down lower-grade ore while IWIP seeks to raise its ore quota. RKEF EBITDA reached $60 million, up 43% versus the June quarter. EBITDA per ton came to $1,919, 48% above June's $1,296. That said, FX gains were included in that figure across the quarter, and stripping out that FX gain brought the margin back to $1,144 — a modest decline against the June quarter. That fall in EBITDA per ton stems mainly from higher ore costs, and this is exactly where the Hengjaya Mine serves as a very strong hedge against that pressure. We're delighted to report record ore sales from the mine of almost three million tons, which delivered mine EBITDA of $37.3 million, 51% higher than the June quarter. We're equally pleased to report our maiden dividend distribution back from the Hengjaya Mine. Given the impact we're already seeing from ore shortages within Indonesia and the hedge that provides against these ore shortages and premium prices currently being played, very pleased to announce during the quarter the conditional acquisition of the world-class Sampala Project.

Justin Werner

executive
#5

It sits right next to IMIP. There's already a very sizable JORC-compliant resource there, and we think it will grow considerably — I'll go into a bit more detail on later slides about the Sampala Project. We increased our stake to 51% in the Siduarsi Project, and at the same time announced the maiden JORC resource for it of roughly 500,000 tons of contained nickel metal. The resource is mostly limonite, but it's a high-quality limonite, quite similar to the Ramu resource on the neighboring island of Papua New Guinea, and it would serve as excellent feed for HPAL, most likely at any one of a number of the HPALs at IWIP. We also successfully syndicated a $250 million loan facility, arranged by DBS and BNI, and we're also pleased to announce that the first autoclave has arrived and been installed at our ENC HPAL project. That's a significant milestone, as good progress keeps being made in delivering the ENC HPAL project. Let's just move to the next slide, please. Here you can see quarterly RKEF production, which, as I mentioned, is down slightly from the June quarter because of scheduled maintenance on RNI and lower than expected production from ANI.

Justin Werner

executive
#6

HNC is still doing nicely, and 2,125 tons of nickel as nickel in mixed hydroxide precipitate came out of HNC, reflecting NIC's 10% stake in that HPAL project. Let's move on to the following slide, if you don't mind. NPI pricing keeps on recovering. On this quarterly chart you can see the average price we received. We've climbed from the March-quarter low of 11,688 up to 12,400 in the September quarter, and prices are still rising through the current quarter. So that, hopefully, again points to a solid second half, likely along the lines of what 2023 gave us, when our second-half results were clearly much stronger than the first half. Onto the next slide, please. ENC is coming along very nicely. In that first photo you can see all the earthworks, which are finished. A number of concrete foundations and footings are already there in place. Many of the key critical items destined for the top — all those footings — have already been fabricated or procured and are now being shipped to site progressively for erection.

Justin Werner

executive
#7

I was glad to be on site only last week to greet the arrival of the first of our three autoclaves. It's visible in the bottom right-hand side there, and that represents a tremendous achievement. As I mentioned, the autoclave is truly the heart of the HPAL operations, and the first one is now in place, and as I said, we look forward to continued arrival and installation of key parts of the ENC — not just the HPAL, but also the nickel cathode and nickel sulfate plant — so progress is being made. If we could just move to the next slide, please. The Hengjaya Mine, given that we've now moved into the dry season, you can see the significant improvement there in nickel ore mined, up from 3 million tons to 5.7 million tons, and also almost a million-ton increase in nickel ore sales, so 2.97 million tons of nickel ore sales, almost 3 million tons for the quarter, which is a new record in terms of ore sales. That helped to deliver the $37.3 million in EBITDA, and we're seeing continued strong performance from the mine across this quarter, and so we expect that to continue into Q4. A lot of work is being done on upgrading the haul road, including rebasing it, geotextiles.

Justin Werner

executive
#8

The whole point there is making sure that as the wet season arrives, roughly March through April next year, we're aiming to cut down in a big way how much weather-related disruption hits us during those months. And work on upgrading that haul road is coming along really nicely. Let's move to the following slide, if we may. The conditional acquisition of the Sampala Project. We told the market we had signed a conditional agreement, a CSPA, covering three contiguous, highly prospective advanced IUPs. The overall footprint comes to 6,654 hectares. A JORC-compliant resource is already in place there, containing 2.3 million tons of nickel metal and 0.2 million tons of cobalt. That resource sits inside only 900 hectares, while more than 4,000 hectares of prospective laterite area has been mapped. So the chance of getting this close to 10 million tons of contained nickel metal is definitely realistic, and that would place it among the top five known nickel resources anywhere in the world. Logistics are excellent. On the map you can see just how near it lies to IMIP, and the project itself is in fact already quite advanced. Feasibility studies have been submitted. Environmental studies have been submitted. An RKAB, which is an activities license, is already approved, and we're targeting first ore shipments from the Sampala Project by the end of next year.

Justin Werner

executive
#9

So what this does is let our RKEF operations at IMIP become completely self-sufficient when it comes to ore supply. To go back to those premiums currently being paid and the ore shortages Indonesia is experiencing right now — with these integrated mining and processing operations fully self-sufficient, we get a natural hedge against any ore price increases, or against the risk of ore shortages that could constrain or hurt production. The acquisition price is also very low: $43 per ton of contained nickel metal, well below the Indonesian average, where past transactions have come in above $140 a ton. And on a global basis, figures have reached as high as $2,000 per ton of contained nickel metal. So very favorable acquisition terms, structured in stages, which gives us 18 months to prove up the resource before payment is required. As for CapEx, we've already estimated the CapEx needed to bring this into operation at under $50 million. And given the kind of numbers the Hengjaya Mine generates — $30 to 40 million of EBITDA each quarter — payback comes very fast on a very small capital base.

Justin Werner

executive
#10

When it comes to the haul road, there's already one in place — and if you look at the map, the green section is the new haul road that will need to be constructed. That's roughly 20 km. The purple section, meanwhile, is an existing haul road of approximately 34 km. So really, only about 20 km of new haul road requires building. And again, to put this project into perspective against our Hengjaya mine, Hengjaya holds around 3.6 million tons of contained nickel metal and is currently producing in excess of 10 million tons per annum. We've submitted an application to raise our RKAB to 22 million tons, and we're hopeful of securing that approval — if not at the end of this year, then certainly early next year. So we expect to see another ramp up from our Hengjaya mine. But given the financials and the performance you can see from Hengjaya, we expect Sampala to be of a similar size and economics. So for us, it's a highly valuable critical deal and provides ore security. If we could just go to the next slide, please. On the corporate front, I mentioned we completed acquisition of a 51% interest in the Siduarsi Project.

Justin Werner

executive
#11

We reported an inaugural JORC resource of 52 million dry metric tons, grading 1.1% nickel — roughly 500,000 tons of contained nickel metal. It sits inside an area covering 1,614 hectares. Another 1,374 hectares of prospective laterite ground exists there, and that ground hasn't been tested yet. Within that ground we also hold an exploration target of somewhere between 22 and 110 million wet metric tons. So the chance exists to potentially double the resource, taking it to approximately 1 million tons of contained nickel metal. Through resource ownership, these projects keep Nickel Industries among the biggest holders of nickel tons worldwide. Over the last two to three years, our focus has been finding projects like these that we can pick up on favorable commercial terms, projects that will deliver substantial contained nickel tons and can be moved into production as direct shipping operations from a very low capital base. Siduarsi is coming along well. As a refresher, we earned that 51% by spending just AUD 5 million across a two-year period. We successfully syndicated a $250 million term loan facility, jointly provided by Bank Negara Indonesia (BNI) — our second loan alongside BNI — and we appreciate their support.

Justin Werner

executive
#12

DBS Bank got the facility successfully syndicated among a group of banks spanning Asia, Europe, the Middle East, and India. Support was very strong and broad-based, and I think that says something about the company's reputation as it grows and its established ESG credentials. Then last, we're glad to welcome Mr. Simon Miller as the ENC HPAL manager. Most recently, Simon served as our director of Northvolt's Raw Materials Division. He therefore has a very solid background in and grasp of the worldwide EV and battery supply chain, plus very strong relationships throughout that chain. Before he was promoted to head Northvolt's Raw Materials Division, he also served as director of their cathode materials. So he'll bring significant value to ENC and to the diverse product mix it will produce — mixed hydroxide precipitate, nickel cathode, and nickel sulfate. We welcome Simon to the Nickel Industries' team. That concludes the presentation, and with that, I'll hand things over to Q&A.

Operator

operator
#13

Thank you. To ask a question, hit star and then one on your phone and hold until your name is called. Should you want to withdraw that request, press star two, and when using a speakerphone, lift the handset first before posing your question. Our first question today is from Mitch Ryan at Jefferies. Please go ahead.

Mitch Ryan

analyst
#14

Good morning, Justin and the team, and thanks for fielding my question. This is a fairly straightforward one. Clearly, you benefited from currency fluctuations in the quarter, which is great. How do you view that in terms of risk going forward? Would you consider implementing hedges, and how are you thinking about currency movements from here?

Justin Werner

executive
#15

Appreciate that, Mitch. Chris is going to take this one from here.

Chris Shepherd

executive
#16

Appreciate the question, Mitch. So, FX is certainly a risk. The FX gains — last quarter we had losses. This quarter we've got gains, and those are a mix of gains across the cash we hold in our Indonesian operations, net of accounts receivable and accounts payable. As you know, all of our invoicing has to be done in Indonesian rupiah, and with the rupiah strengthening against the dollar, we've seen gains there. On top of that, there's the effect of gains in our receivables balance for VAT receivable from the government. That particular one is hard to hedge, but we're examining the others and asking what the most appropriate way to hedge these would be. In the past, the swings weren't as large. But while a gain this quarter is lovely, we'd rather seek to take the volatility out of earnings. So we're looking into it, and we'll update the market in due course.

Mitch Ryan

analyst
#17

Alright, I truly appreciate you taking the call. Thanks so much for spending the time with me.

Chris Shepherd

executive
#18

Appreciate it, Mitch.

Operator

operator
#19

Thank you. And just to repeat, if you'd like to pose a question, please sign up by hitting star and then one on your telephone. Right now we're not showing any additional questions, so I'll return things for the full closing remarks.

Justin Werner

executive
#20

Thanks once more, everybody, for joining us. As we said, we expect a solid second half, especially from continued robust results at our Hengjaya mining operations. Work will keep moving forward on the Sampala Project, and we'll share updates regarding delivery of our first haul at the close of next year. Construction progress at ENC remains very strong. We anticipate giving further updates as we move toward commissioning and first product in next year's second half. With ENC joining the picture, that brings meaningful diversification. It places us where we're seeing products earning considerably higher margins than what NPI currently delivers. That said, NPI pricing is strengthening. So once all shortages are resolved, we believe NPI pricing will keep getting stronger, which ought to mean stronger NPI margins through the end of this year as well. So thanks again, everyone, and we appreciate your time.

Operator

operator
#21

Thanks. That brings today’s conference to an end. At this point, you’re welcome to hang up your lines.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Nickel Industries Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Nickel Industries Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Nickel Industries Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.