We appreciate everyone being on the line, and we're glad to have you join the Nickel Industries Limited webcast on activities for the December quarter. Everybody attending is currently muted and can only listen. After the presentation, we'll hold a question-and-answer session. <<operator_script>> At this point, I'll pass things over to the Managing Director, Mr. Justin Werner. The floor is yours.

Justin Werner

executive
#2

Thank you, and welcome everyone to the Nickel Industries December 2024 quarterly results call. If I could just ask the slide moderator to move to Slide 2, and we'll kick off with safety and sustainability. Across 2024, 17.4 million man hours was worked across all of our operations with only two LTIs recorded. However, that is still two LTIs too many, and we remain steadfastly focused on safety. But our LTIFR and TRIFR measurements, which was 0.11 and 1.43 respectively, still remain well below the world steel average of 0.64 and 3.46. At sustainability basis, again we're pleased to announce that we've been shortlisted for a Green PROPER rating for the third consecutive year. Last year, we achieved the highest score of any nickel mining company, and we are targeting to become the first company to achieve a Gold rating. We remain the ESG leader in Indonesia, with numerous awards once again received during the quarter. And across 2024, we recorded the highest MSCI rating of any Indonesian metals and mining company. And we've also seen our S&P rating rise from seven in 2021 to 37 for 2024. And that's well above the global metals and mining average of 29.

Justin Werner

executive
#3

To wrap up, we were really delighted to launch a pair of programs during this year that make us quite proud. The first one is the creation of a Nickel Industries foundation, and its inaugural effort was setting up a university scholarship scheme aimed at students who come from disadvantaged backgrounds. Our initial group of recipients has already started working toward degrees in a range of disciplines, among them accounting and engineering, and they are doing extremely well. The second is the creation of a biodiversity zone along the border of the Hengjaya Mining tenement. If we might go to the following slide, please. Turning to the December quarter — another robust quarter even as nickel prices stayed persistently weak — we generated US$72.4 million from our operations. Yet again, several new records were achieved. That includes a record quarterly contribution of US$14.7 million stemming from our 10% stake in the HNC, HPAL. This is a very encouraging sign for our ENC, HPAL, where building work is advancing remarkably well and is definitely on schedule to achieve first production during the second half of 2025. We also posted a record month for mining. We mined beyond 7 million tonnes across the quarter, plus a record November in which we sold more than 1.3 million tonnes within a single month.

Justin Werner

executive
#4

And then, our ONI RKEF operations set a fresh record too — 12,362 tonnes of nickel in MPI — which helped lift total output for the quarter to 32,784 tonnes. That came in roughly 7% above the 30,663 tonnes produced in the September quarter. At the same time, reported EBITDA from RKEF operations of US$22.1 million was much lower than the US$60 million posted in the September quarter. If you strip out the US$23 million FX gain from the September quarter and the US$20 million FX loss booked this quarter, underlying EBITDA was in fact US$42 million for this quarter — 17.5% above the September underlying EBITDA of US$35.8 million. Looking at EBITDA per tonne, reported EBITDA of US$687 was below the US$1,909 a tonne in September, yet on an adjusted basis it was actually higher, at US$1,309 a tonne against US$1,144 a tonne. The Hengjaya Mine has done exceptionally well through the back half of the year, posting EBITDA of US$37.3 million in September and then US$35.6 million in the December quarter. We had been on track for a new record in the December quarter, but sadly, because we hit our RKAB quota of 9 million tonnes very early in December, we couldn't sell ore for most of December.

Justin Werner

executive
#5

However, mining did carry on, and we achieved a record 7 million tonnes during the quarter. At ENC, every one of the three autoclaves has now arrived on site, and one of them is already in place. As I mentioned, progress there is excellent. Finally, we are happy to report that the exploration program at our recently acquired Sampala Project has been extremely successful, and I will cover that on a slide coming up. Could I ask the moderator to advance to the next slide, please. For 2024, the story has really been one of operational consistency and stability in spite of a soft nickel price, and that carried through into the December quarter. Costs declined slightly, from 10,882 in September to 10,576. The average price received rose a little, from 11,840 to 11,884. That fall in costs together with the rise in pricing is reflected in the adjusted EBITDA figure I mentioned earlier. While our older HNI and RNI operations did struggle in the quarter, this was mainly caused by higher ore prices, with premiums currently sitting above the HBM ore price of $15 to $22 a wet metric tonne. Our ONI and ANI operations, by contrast, keep performing strongly, and it should be noted that they account for roughly 75% of our nickel tonnes from NPI, so they represent the bulk of both our production and our EBITDA contribution.

Justin Werner

executive
#6

That being said, this year we are rolling out several programs designed to lower costs at our RKEF operations, along with a gradual overhaul of the RNI and HNI furnaces throughout the year, and these will deliver better operational efficiency. Lastly, 2,099 tonnes of nickel from MHP and a record EBITDA of US$14.7 million from our 10% interest in the agency HNC, HPAL. Could I ask the moderator to move us to Slide 5, please. NPI pricing has stayed fairly steady. Our integrated next generation RKEF plants of ANI and ONI are doing very well, even with a soft nickel price environment, and once again, they show the competitive and cost advantage of fully integrated operations. If we could go to Slide 6, please. As I said, progress at ENC is going very well. I was actually on site just a week ago, and I mentioned that all of the three autoclaves, which really are the heart of the HPAL operation, are now on site, and the first of those has been installed. You can see from the aerial photographs there, especially the ENC sulfate and cathode plant at the bottom, that it is well advanced and ahead of schedule. And so, as I said, we look forward to first production from the ENC HPAL in the second half of this year.

Justin Werner

executive
#7

Moving on to Page 7, if we may. We had record quarterly mine production of 7 million tonnes, and in November a record 1.3 million tonnes was sold. November alone actually generated US$27 million in EBITDA for that single month. And across the first two months of the quarter, HM Mine actually brought in US$42 million. So we were definitely on track for a new record at the HM Mine. I think US$60 million would have been within reach. But as I said, because we hit our 9 million tonne RKAB quota in early December, we were limited to roughly 200,000 tonnes of sales that month, while mining carried on, and that actually resulted in an 8.5 million loss in December. Even so, a still very strong EBITDA figure of US$35.6 million for the Hengjaya Mine. Our 9 million tonne quota has now reset as of the 1st of January. We're off to a very good start in the first month. And we are in the process of raising the quota to 19 million tonnes. And we've submitted a feasibility study, an environmental study. We're aiming for approval of that increase to 19 million tonnes, hopefully to be approved in the second half of this year. And the HM Mine has really been the standout performer of 2024.

Justin Werner

executive
#8

When you look at annual EBITDA — and this is unaudited — I think it will come in above US$110 million for 2024, which is significantly higher than the US$87.9 million we saw in 2023. And looking at the second half of 2024, 65% of that 110 million EBITDA was generated in the second half. So across the last two quarters, we delivered US$72.9 million in EBITDA from the Hengjaya Mine operations. If we could move to Slide 8, please. I'm very pleased to give an update on the Sampala project. In 2024, we completed 48,646 meters of drilling, which brings total drilling at the project to-date to 95,630 meters. We've still only tested about 2,500 hectares out of 4,700 hectares of prospective laterite area. And we're seeing consistent, strong and long drill hole intercepts in both saprolite and limonite, with spectacular grades of up to 7.41% nickel and 1.37% cobalt. Those cobalt numbers are obviously important, because cobalt gives a very good credit for both MHP, and it can be further converted into cobalt sulfate. We have an exploration target at Sampala of 350 million to 700 million dry metric tonnes, on top of the existing resource of 187 million dry metric tonnes. This exploration target is at 0.9% to 1.1% nickel.

Justin Werner

executive
#9

Converting that from dry to wet metric tonnes, it really appears we'll go past 1 billion wet metric tonnes of ore. And when you consider today's pricing conditions, with saprolites going for $45 per wet metric tonne and limonite at $20 per wet metric tonne — if you take our average margin at Hengjaya last year of $12, a blended figure combining saprolite and limonite, and apply it to that 1 billion wet metric tonnes exploration target at the Sampala Project, the sheer size and scale of Sampala becomes apparent, and that's exactly why this project has us so enthusiastic. Its capital development base is very low, and we're already quite far along — we've begun work on internal haul roads. A mine design is complete, one that at first will center on a 6 million tonne per annum operation, then ramp up within two to three years to roughly a 20 million tonne per annum operation, subject to approvals. The terms on which we're acquiring the Sampala Project are very favorable as well. There's an 18-month window before we're actually obligated to pay for the project.

Justin Werner

executive
#10

And what we're paying for is ore graded at 1.7%. A significant portion of the ore body sits below that 1.7% threshold, so in effect we're acquiring millions of tonnes of nickel metal — profitable nickel metal — at nil consideration. That makes it a very compelling acquisition for us. To close, as I said, if you backed out the FX — the US$20 million FX loss and the US$8.5 million loss in December at the HM Mine — quarterly EBITDA for this quarter, I think, would have easily surpassed US$100 million. But even with the challenges of 2024, which included RKAB issues at the beginning of January and the end of December, some unseasonably high rainfall along the way, and continued soft nickel and NPI prices, we've still performed very strongly versus our peers, when many have gone out of business or been put on care and maintenance over the course of last year. We remain the world's largest diversified pure nickel producer, and we're looking forward to a very strong 2025, with a number of significant catalysts upcoming, which includes commissioning of our ENC, HPAL where we expect to see significantly higher margins, which is supported by the performance of our HNC, HPAL in the December quarter.

Justin Werner

executive
#11

A rise in the RKAB for our Hengjaya Mine, from 9 million up to 19 million, plus advancing the world-class Sampala Project, which I just mentioned. Each of those three is going to bring substantial EBITDA growth to the company. That supports our goal of US$1 billion in annualized EBITDA within the next two to three years. And what matters most, I believe, is that every one of those items I just listed — every one of those catalysts — is completely funded. With that said, I'll open it up to Q&A.

Operator

operator
#12

Appreciate it. <<operator_script>>. Our first question is from Dim Ariyasinghe at UBS.

Dim Ariyasinghe

analyst
#13

Hello, everyone, and thank you for joining the call. I'd say I share the view that there's clearly plenty of encouraging news as we look ahead. Perhaps, though, for my first question, could you refresh my memory? It does seem as if cash at the close of the year came in somewhat below what people had expected. Could you remind us how the ENC calls are shaping up for next year, and what your thinking is on the funding side going forward, particularly regarding the price outlook?

Justin Werner

executive
#14

Chris, would you like to handle that one?

Christopher Shepherd

executive
#15

Sure, I'll take that one. Thanks for asking, Dim. So on the ENC payments — there are two remaining. At present we hold 44%, and we have binding agreements that take us up to 55%. That means two payments of 5.5% each. The first falls due on the first of July, at 126.5 mill, and the second comes on the 1st of October, also 126.5 mill. Naturally, Dim, we're watching these margins closely going forward. Throughout the year we've held discussions with Shanghai Decent about these payments, and they've been very supportive of us when it comes to the timing of those payments. Still, given where things stand right now, we're keeping a close eye on the margins. And really keeping a close eye on the markets. We do have — and by that I mean the debt markets. We've got outstanding bonds and bank loans, and we're obviously in discussions, ongoing discussions, about refinancing those over the course of this year, and we'll manage that appropriately. As things stand right now — as I said, we remain fully funded for those payments, and I'm quite comfortable with where we are. Should margins deteriorate, we might then consider refinancing part of our debt stack.

Dim Ariyasinghe

analyst
#16

Yeah, thanks. And maybe I can fit one more, one mill <<inaudible>> in there, if that works. Just regarding the cash cost outlook. It does seem like some items are coming back your way. Perhaps just a bit of color on where you folks are seeing costs heading into next year?

Christopher Shepherd

executive
#17

What's the cash cost associated with the RKEF business?

Dim Ariyasinghe

analyst
#18

Absolutely, go right ahead.

Christopher Shepherd

executive
#19

Justin, would you like to handle that question?

Justin Werner

executive
#20

Yes. I think across all of 2024, costs stayed fairly steady, though we did experience a rise during this year's second half tied to certain ore shortages. We believe the premiums currently being paid for ore — which we've already watched decline — will keep falling. That should result in reduced cash costs at our RKEF operations. And power has held — or rather, our power cost has held fairly steady through all of 2024. We expect that to persist. So we do believe there could be a decrease in cash costs for our RKEF. Happily, we're observing modest, step-by-step declines in our mining cost, and that's really happening because of some of the volume gains we're recording month over month and quarter over quarter. So, to wrap up your question: stable, with potential to come down.

Dim Ariyasinghe

analyst
#21

Great. All right, nice — thanks, everyone.

Justin Werner

executive
#22

Appreciate it, Dim.

Operator

operator
#23

Richard Knights from Barrenjoey has the next question.

Richard Knights

analyst
#24

Hello Justin and Chris, appreciate you taking the call. My question concerns the higher mining quota at Hengjaya. That increase to 19 million tonnes being shifted into the second half represents, I believe, somewhat of a postponement relative to what had been expected before. And clearly — there has been plenty of discussion in the press about Indonesia looking to cut nickel ore mining quotas. I am just wondering how confident you are regarding the timing of that? And then, with Sampala as well, how will the apparent restriction on nickel ore mining from the Indonesian government affect the timeline for Sampala?

Justin Werner

executive
#25

Yes. Thanks, Richard. On the timing of raising HM from 9 million to 19 million: we've had a change of government, and the new administration was only installed at the start of January. Because of that, a number of the mines and environmental departments changed, and in fact we've seen the mines and environmental department consolidated into one single department. That has altered some of the processing requirements, or the processing of permits, somewhat. However, we — so we — there's a somewhat newer process now, not too different from how it originally ran, but it has reset things to a degree. Still, we remain confident that we'll achieve that RKAB increase, especially given our ESG track record. I'm glad to share with you that — there was some press in the local papers about RKAB, and we were among roughly four companies named as most likely to receive an increase this year. So I'm happy to share that with you too. That carries through into development of the Sampala Project. Again, the 6 million tonnes is modest for our initial RKAB. And we're — in both cases, we've submitted feasibility studies to the mines department.

Justin Werner

executive
#26

Once approvals come through for those, we’ll keep the market informed about how things are going with each of the various permits and approvals, so people can see that we’re moving forward toward securing a final approval.

Richard Knights

analyst
#27

All right, that's clear. Appreciate it. But regarding that 6 million tonne figure at Sampala — so that's the initial license quota you're aiming for, though past that point, I'd imagine you'd want to grow it?

Justin Werner

executive
#28

Right, yes. So we would be targeting 6 million tonnes in 2026, and then growing that to somewhere around 19 million to 20 million tonnes over the longer term, so that it roughly matches what we have at Hengjaya. Obviously, the ore body supports that, and it is sizable. And again, I can't stress enough the very strong track record we have on environmental matters, along with our reporting record and credentials, which we believe places us in a priority position for any RKAB increases.

Richard Knights

analyst
#29

Right, and one more thing while I have you. On HNI and RNI, obviously the cost is higher there, and you said during the call that an overhaul was coming this year aimed at optimizing those assets and bringing costs down. Could you give me a little more detail on what the capital outlay for that would look like, and what kind of potential cost impact we'd be talking about?

Justin Werner

executive
#30

Yes. So right now we're working through that plan and putting it together. My sense is we likely wouldn't aim to kick off that overhaul until roughly May of this year. That means we should be in a position to offer more guidance, probably once we reach the end of the first quarter of this year.

Richard Knights

analyst
#31

Alright, that's fine. Appreciate it, everyone.

Justin Werner

executive
#32

Thanks, Rich.

Operator

operator
#33

The following question is from Cameron Taylor at Bank of America.

Cameron Taylor

analyst
#34

Yes, thank you Justin, Chris. I just want to follow up on what was asked before. Is the timing for the existing three-year RKAB license still the same, or has it been shortened? I didn't catch the first part of your answer, Justin, about reapplying. Do you have to reapply annually for that 9 million metric tonne quota?

Justin Werner

executive
#35

Previously, companies had to reapply each year, and that frequently caused major delays, since a flood of RKABs gets issued at the start of every year. Now the government has extended this so that the RKAB is granted for a three-year period. As a result, we've been awarded the next three years starting from 2024 at 9 million tonnes per annum per year. Part of the reduction in the RKAB that's been reported in the press actually involves companies that received 2 million to 3 million tonnes for year one but then have a zero quota for year two and year three. Why would that happen? The reason is that those companies couldn't submit a meaningful feasibility study or environmental management plan demonstrating that they can keep managing the mining and rehabilitation beyond what they were issued for year one. So we're secured for the first year, which we've already achieved, and over the remaining two years, to increase the RKAB, we need to revise our feasibility study and show that we can hit the target we're seeking, along with a revised environmental and rehab plan that accounts for the higher production.

Justin Werner

executive
#36

Our rehab obligations are going to need to double, and we have to show we can actually carry out that rehab work before we can effectively mine at twice what we're running now. So those studies are done and have been handed in, and peer review comes next. There will be several rounds of back-and-forth, along with questions and changes that have to be worked through. But they're in. And as I mentioned, we'll give updates whenever we secure approval on the different permits.

Cameron Taylor

analyst
#37

Yeah, okay, thanks Justin. I suppose the thing is, there's obviously been a lot of talk, as was mentioned earlier, about the government sort of cutting those quotas, but you're looking at nearly a fourfold increase, right? So is that, like, likely — are you getting 40 million tonnes of licenses over the next few years, given that they're looking at slashing, sort of, mining quarters this year? I mean, are you fairly confident, given your credentials — is that really the only thing to look at here, your ESG credentials and your ability to mine that ore body and rehabilitate it?

Justin Werner

executive
#38

Yes, and I think that point matters. There isn't really any slashing, as such. So if you hold an RKAB, it isn't being revised back down. If you have an approved RKAB, well, that RKAB is approved. The question is simply what those volumes will look like going forward. As I mentioned, some parties hold approvals under which their volumes actually decline across the next three years. Ours stay stable, though we're confident we can raise them. And I'm glad to share this with everyone: there's press from a local Indonesian paper that lists us among, as I said, a small handful of mines that they believe will most likely receive an increase.

Cameron Taylor

analyst
#39

All right, Justin, thank you — that's clear.

Justin Werner

executive
#40

Absolutely, Cam — appreciate it.

Operator

operator
#41

The following question is from Adam Baker at Macquarie.

Adam Baker

analyst
#42

Justin, Chris, and the team — I appreciate you getting back to us on those questions regarding the Hengjaya mining quota. I just have one more about the stockpiles at Hengjaya. From the two half data you gave, it looks like there are currently more than 7 million tonnes of stockpile sitting there. I was just wondering whether you could break that down for us — is the majority of it limonite, or are there any saprolite stockpiles tied to that stockpile? And would you likely sell more than you produced in the first quarter of this year? Or do you expect to keep building that stockpile up ahead of the ENC start-up later in the year? Thank you.

Justin Werner

executive
#43

Yes. Thanks, Adam. Most of that stockpile consists of limonite, which we're building ahead of ENC's commissioning. ENC is going to need roughly 11 million tonnes of limonite each year. So we want something like one or two years' worth already piled up before ENC starts up. There's a modest accumulation of saprolite stockpiles as well, largely because we couldn't sell during most of December. So we'll aim to catch up on that over — we're already catching up during January and this quarter. And we're adding to the count of haul trucks we presently have on site. So we — and pulling down some of that stockpile involves lower grade saprolite at roughly 1.3% to 1.4%. We've actually secured a buyer for it. So we've actually added one to two barges to sell that lower grade saprolite too. So to answer: mostly limonite. And we've had a modest saprolite accumulation, but we'll be looking to draw it down and sell it off during this quarter.

Adam Baker

analyst
#44

That's great, thank you. And regarding Sampala, there are clearly some encouraging exploration results there, and they've allowed you to publish an exploration target. I'm just wondering what the timeline looks like for an updated resource on that project?

Justin Werner

executive
#45

Honestly, I doubt we'll conduct one until the point of setting the final price for the acquisition. That being said, we — I expect we'll see how the exploration results arrive across this year. And maybe in the second half of this year, we might aim to release an updated resource. For now, though, our attention really stays on drilling out the remaining roughly 2,500 hectares.

Adam Baker

analyst
#46

Thanks a lot — I’ll share that with the team.

Justin Werner

executive
#47

Appreciate that, Adam.

Operator

operator
#48

Daniel Roden of Jefferies has our next question.

Daniel Roden

analyst
#49

Good day, Justin and Chris and team — thanks for taking the call. I wanted to begin by emphasizing the points about the RKAB losses, but I just wanted to clarify: you mentioned you're making up some volume over January from the 1st of December, just with the expectation that the license gets approved in H2. How should we think about, I guess, the profile of H1 in FY '25 — sorry, in calendar year '25? Are you kind of gearing that production profile up to hit that 19 million tonnes for 2025, with the expectation that the permit gets approved? Or is it more of a conservative balance close to the 9 million tonnes until it is approved?

Justin Werner

executive
#50

Yes, I think we're still aiming for sales of roughly 1 million tonnes each month, and mining will keep going at about 5 million to 6 million tonnes per month, and that will build up — keep building up the limonite stockpiles. So that's roughly how we see the profile for the first half, so around 1 million tonnes a month of sales. With approval coming, we're looking at or expecting the third quarter of this year. And what that means is that with those limonite stockpiles built up, the slurry plant will then be able to feed ore directly into the slurry plant. We won't need to mine it. It will already be stockpiled. And as I mentioned, the requirement for our ENC HPAL is significant. It's 11 million tonnes per annum. The slurry plant is built to process at 11 million tonnes. It's within the HM Mine concession. And so that's the kind of profile we're looking at. And that will coincide with the commissioning of ENC, which contractually is targeted for October of the year.

Daniel Roden

analyst
#51

Thanks, that was quite useful. I'd like to ask for your thoughts on something. The Indonesian Chief Economic Minister said the other week that every natural resource exporter must keep proceeds onshore for a minimum of 12 months, starting March 1. That's up from 30% of proceeds right now. I was hoping you could comment on what this could mean for your business, and whether it raises working capital needs for the Indonesian assets.

Justin Werner

executive
#52

Chris, I’ll have you handle that.

Christopher Shepherd

executive
#53

Yes, thank you, Justin, and thanks for raising that, Daniel. So, the first point is that we've seen this comment. We're waiting on the official regulation and on the specifics of whatever restriction may apply, Dan. To be precise about what I mean there, there have been comments regarding exports and also regarding proceeds from commodities, and we simply need to understand those details. As you're probably aware, 65% of our NPI is in fact sold within the country inside the IMIP — the NPI from HNI, RNI and ONI — so that portion wouldn't be affected. We wouldn't anticipate any impact on it. Then, as for exports from ANI at the IWIP, we would aim to — as we previously alluded to when this subject came up in recent years — we would aim to work alongside Shanghai Decent and work with Tsingshan so that, potentially, instead of exporting that NPI, we also route it over to the IMIP. That gives us a couple of ways to handle it from the NPI standpoint. Regarding our ENC project as it comes on stream and the current MHP from HNC, we genuinely do need the specifics, because — as you know, or as we believe — MHP sulfide and cathode aren't commodities; they are value-added products. So whether any restriction would capture them is something we're not yet certain about.

Christopher Shepherd

executive
#54

If any portion of our cash were tied up, then naturally—and there would be no way for us to get around it—some build-up in working capital would follow. We would then aim to handle that as time goes on. Still, I believe it is premature for me to offer anything conclusive at this point, until the details are available.

Daniel Roden

analyst
#55

Absolutely, that's not a problem at all. It's straightforward. Thanks, everyone — I'll make sure to share it. Many thanks.

Christopher Shepherd

executive
#56

Appreciate it.

Operator

operator
#57

David Coates from Bell Potter Securities has the next question for you.

David Coates

analyst
#58

Good morning, Justin. Good morning, Chris. Appreciate you both making time for us today. I have just a couple of questions. First, regarding the FX impact — could you provide a bit more detail on the mechanics behind how those effects work? We've seen the Aussie dollar decline. I realize multiple factors are at play, but we had a declining Aussie dollar and a benefit last quarter, and an impact this quarter. How should we be thinking about which direction these will swing from quarter to quarter?

Christopher Shepherd

executive
#59

Yes, thank you Coates. Justin, I'll handle that question. It relates more to the fluctuation involving the IDR and the U.S. dollar, Coates. And it spans — much of it is mainly non-cash, and it covers — by that I mean translation of balance sheet items, which obviously we're required to convert back at each month's end and each quarter's end. It touches all three main buckets. That's accounts receivable and accounts payable — and that exposure. We hold a fair amount — as of the end of December, we had roughly $150 million of that exposure in it, stemming from fairly old historical VAT for ANI and ONI. Predicting when we'll get that VAT refunded by the Indonesian government is nearly impossible for us. So doing anything on the hedging side around that is very hard. Getting it wrong could be quite costly. On the accounts receivable and accounts payable side, we've found that over the last quarter we worked with Shanghai Decent to, in some cases, shorten our accounts receivable timing or payment schedule. That has worked well for us. And what we're seeing with — we keep optimizing, further optimizing that and aligning the accounts receivable and accounts payable, and that should nearly eliminate any residual exposure beyond the VAT.

Christopher Shepherd

executive
#60

Still, VAT is genuinely the major issue that we keep discovering we have difficulty handling.

David Coates

analyst
#61

That’s reasonable. If all of you arrive quickly, that will make things difficult for us, won’t it? So let’s see how it goes. Justin, you said that you were at the ENC on a visit with a JV partner. Can you share any further specifics and updates regarding what resulted from that site visit last week?

Justin Werner

executive
#62

No. Look, aside from that, we've made excellent progress. Most of the long lead critical items have now arrived on site. Nearly all of the earthworks piling is finished. The cathode plant especially is coming along very strongly. So yes, we'll obviously keep providing an update next quarter as well, but things are moving along very well.

David Coates

analyst
#63

Great. And back on project development, returning to Sampala — you said the focus is clearly on drilling out and perhaps a resource update in the second half. Could you give some kind of rough longer-term picture of how the Sampala development timeline is shaping up?

Justin Werner

executive
#64

Our goal is for every approval and the haul road build to be finished by year-end. Then in 2026, we'd aim to hit that 6 million tonnes of mining, beginning the following year.

David Coates

analyst
#65

Great. Thank you so much, everyone. That's all I have.

Justin Werner

executive
#66

Appreciate that, David.

Christopher Shepherd

executive
#67

Appreciate that, David.

Operator

operator
#68

That brings us to the end of the question-and-answer session. At this point, I'll return the call to Mr. Werner, who will offer some closing comments.

Justin Werner

executive
#69

All right. Thanks once more, everybody, for spending time with us. To restate it, several exciting catalysts lie ahead for the company across 2025, and we’re eager to share the updates. And as ever, we remain available for whatever questions anyone might have. So — thanks again.

Operator

operator
#70

That brings today's conference to a close. We appreciate everyone joining us. You're welcome to disconnect at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Nickel Industries Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Nickel Industries Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Nickel Industries Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.