Nickel Industries Limited (NIC) Earnings Call Transcript & Summary
August 28, 2025
Earnings Call Speaker Segments
Operator
operatorThanks for holding, and welcome to the Nickel Industries Limited 2025 Half Year Results. <<operator_script>> At this point I'd like to pass the conference over to the Managing Director, Mr. Justin Werner.
Justin Werner
executiveThanks very much, and thanks to all of you for joining us at the Nickel Industries 2025 half year results presentation. Could I ask the moderator to advance to the following slide, please. At the Hengjaya Mine we keep playing a leading part in responsible and sustainable mining — 22.6 million work hours have been recorded since our last LTI, and that last LTI was more than 5 years back, in November of 2021. Across group operations, the 12-month lost time injury frequency rate, LTFR (sic) LTIFR, at the end of June stood at 0.05, with no lost time injuries, and that came against 4.6 million man hours worked. In the 12 months to 30 June 2025, 18.6 million work hours were registered, with just 1, a single LTI, taking place. On the sustainability side, strong progress keeps being made. We set up the Nickel Industries foundation, which lets us become even more embedded in Indonesia through social and economic development projects. Those projects centre on education, health, environment and economic empowerment. We took a maiden intake for our first 10 University scholarship recipients, and they are doing very well at university and achieving excellent results. And lastly, we established 1 of only in Indonesia for nickel mining a conservation and biodiversity area, inside our Hengjaya mining concession, which will serve as an area to protect, promote and study endemic flora and fauna species.
Justin Werner
executiveLet's go ahead and advance to the following slide, please. Turning to the first half of 2025: adjusted EBITDA came in at USD 159.3 million, a touch higher than the $155.7 million posted in the first half of 2024. Profit after tax reached $25.5 million, which represents an 80% jump from the $14 million booked in the first half of 2024. On the production side, we turned out more than 62,000 tonnes of nickel contained in NPI, along with over 4,000 tonnes of nickel contained in MHP. Our RKEF figure was USD 78.3 million, and I'll go into RKEF EBITDA performance a bit more shortly. The Hengjaya Mine has truly stood out, especially during the first half of this year. Mine production surpassed 11.5 million wet metric tonnes. Mine adjusted EBITDA was USD 70.3 million, a meaningful gain versus the first half of 2024 as the mine keeps ramping up. We remain focused on growing mine output through an increased RKAB, raised from 9 million to 19 million tonnes, and that work is moving along nicely. We have already secured approval for a feasibility study. Sign-off on the environmental study is at the final stage and due imminently, and that will let us raise the RKAB further at the Hengjaya Mine, where margins are coming in very strong.
Justin Werner
executiveAnd lastly, responsible mining remains an area where the mine keeps setting the standard. We received our third Green PROPER rating in a row. And across the coming year or 2, we'll be working hard toward reaching the highly sought-after gold status. Turning to other corporate matters, we're continuing to advance the world-class Sampala project, where a great deal of drilling — over 160,000 meters of drilling — has been carried out, and we hold a strong belief that it has the potential to host more than 1 billion wet metric tonnes, which at today's margin of roughly $10 to $11, lets you begin to grasp the size and scale of that Sampala project. Considerable work is already being finished when it comes to haul roads and feasibility studies, and we therefore look forward to bringing it into production next year. Lastly, very strong progress is being achieved at the ENC HPAL. The cathode plant is now complete. As for the sulfate plant, we're expecting completion around October or November. And then lastly, the MHP plant near the end of this year. And we'll be aiming to target production probably early in 2026. And we're reviewing options for once again commissioning the cathode plant sometime in October and November, simply to pull that a little forward ahead of schedule.
Justin Werner
executiveLet's go ahead and advance to the following slide. The table on this page shows the key metrics, and I'll highlight just a handful of them. Gross profit came in at $114.8 million, an increase of 19%, while operating profit reached $98.7 million, up 12%. Profit after tax rose 81%. What happened was that we saw weaker EBITDA from our RKEF operations, and that occurred even as the NPI price improved, mainly because of greater costs, and those costs stem from ore shortages along with substantial premiums being paid for ore. I believe this underscores that businesses with integrated operations like ONI — which benefits from integrated ore supply and integrated power — are delivering much stronger results than those without that integration. That said, this is what drove the decline in RKEF EBITDA. On a positive note, that decline has been more than offset by a very strong showing from our Hengjaya Mine. As a result, adjusted EBITDA climbed 76%, from $39.9 million to $70.3 million. Economics of this kind point to a very favorable outlook for developing the Sampala project, given the very low capital base but at present, very strong margins. And lastly, on a positive note, we are seeing higher EBITDA from our — attributable EBITDA from our 10% stake in the HNC HPAL.
Justin Werner
executiveAnd that, again, is a really positive signal for ENC's commissioning, which we expect near the end of this year. If you could move to the next slide, please. On the balance sheet, total liabilities have edged down a bit, and the reason is that some of our debt is now amortizing. So our focus is on refinancing our entire debt stack, since we have both bank and bond debt beginning to amortize — the bond study in October, and the bank debt has already started. That refinancing will center on lengthening the tenor and bringing down the cost of money, so we can optimize the current debt stack. Related to this, we deferred our remaining payments for ENC — USD 126.5 million to 1st of January and another USD 126.5 million to the 1st of April. That lets us benefit from 2 or 3 more quarters of production and EBITDA, and it also gives us breathing space, as I mentioned, hopefully to refinance that debt stack, remove a lot of that amortization, and simply push out the tenor. If we could move to the next slide, please.
Justin Werner
executiveWhat we have here is simply a reconciliation from adjusted EBITDA to profit. The effect of FX losses, interest expense, and depreciation and amortization is visible in that bridge. The key takeaway, though, is net profit after tax, which, as I said earlier, has risen by nearly 80%, from $14 million in the first half of last year to $25.5 million in the first half of this year. Let's move on to the next slide, if we may. Production from our NPI operations came in slightly lower this year. That reflected maintenance work that has been carried out. We needed to realign certain kilns following heavy rainfall and flooding, and maintenance was also performed at 2 of the power plants. The major factor behind RKEF EBITDA has been the rise in cash costs, which you can see went from $9,716 to $10,117. Higher ore prices drove that, with premiums running as much as $25 over the market price. On a positive note, the NPI price has increased, moving from $11,290 to $11,350, and it remains on a modest upward trend. That cost increase is what produced the lower adjusted EBITDA and the lower EBITDA per tonne margins, which fell from $1,677 last year to $1,251.
Justin Werner
executiveLet's move on to the following slide, please. HPAL operations are still doing really well through the first half of '25. Output once again came in higher than the first half of 2024, and HNC is now running consistently well above nameplate capacity. Cash costs have stayed fairly steady. There was a modest rise from $7,155 to $7,538 (sic) 7, 536. However, the EBITDA margin per tonne is running at more than $5,900 a tonne. When you look at that HNC table, those figures show $4,562. But keep in mind this is HNC selling to Sync Creation, the marketing company, so there's an additional margin of roughly $1,400 a tonne from Sync Creation, the marketing company, through to the end buyer. So margins have stayed stable, which we view as a positive. And as you can see, in the first half of 2024 combined EBITDA across HNC and Sync Creation was $22.6 million. In the first half of 2025, that's 20% higher. And up to 27.7-- so $27.1 million. So again, that bodes very well for ENC. Margins are holding up strongly in the HPAL space. Let's go to the next slide, please. This is where I think we've seen the most pleasing improvement.
Justin Werner
executiveAdjusted EBITDA, we've watched that climb from USD 39.9 million in the first half of '24 up to $70.3 million in the first half of 2025 — a 76% increase. And we're confident we can double that and bring those production figures up to the 19 million tonne RKAB we're aiming for. On a positive note, costs have come down, and that's likely mostly a function of the higher volumes being sold and mined. So Hengjaya Mine continues to be a strong, steady contributor within the portfolio. Let's move to the next slide, if we can. And lastly, an update on our ENC project. As I said, the cathode plant is complete now. We may be looking at commissioning it in October or November of this year. We made the decision to push it back from the original July date, simply because of the timing of the commercial sales license, which we'd expect to get around January or early Q1. From the photos, you can see that essentially all of the key equipment has been fabricated and erected. So commissioning the ENC project toward the end of this year will be an exciting milestone. So all in all, a robust first half performance in spite of quite a few challenges and nickel prices that remain soft.
Justin Werner
executiveThe Hengjaya Mine is delivering really strong results, and we intend to double that output. Sampala's development is clearly moving along nicely, and we'd anticipate comparable figures there. RKEF remains stable even with a modest cost uptick, and one goal for Sampala will be to make our IMIP RKEFs self-sufficient, which ought to deliver a meaningful gain in their EBITDA per tonne margins. Also, as I mentioned, it's encouraging that HNC HPAL margins are staying at roughly $6,000 a tonne — that's a very good sign for first production from ENC and demonstrates the substantial EBITDA per tonne uplift over RKEF, where our better RKEF is running at about $1,700 to $2,000 compared with $6,000 to $7,000 from our HPAL operations. With that, I'll gladly turn things over to questions.
Operator
operator<<operator_script>> Our initial question comes from Adam Baker of Macquarie.
Adam Baker
analystIf I could, perhaps just one question about the balance sheet. And looking specifically at the refinancing of debt. In the slide deck, I saw that you referenced possible refinancing in 4Q or 1Q of next year. Given that you have cash and cash reserves of $145 million, $228 million of current borrowings, and then $253 million of ENC HPAL acquisition payments across the next 7 months, I'm just curious whether you could walk us through what additional levers remain available that you could pull besides the potential debt refinancing you flagged?
Justin Werner
executiveYes. Thank you, Adam. I’ll let—Chris, would you like to…
Chris Shepherd
executiveSure, Adam, I can take that one. Adam, we have in fact just signed a commitment letter with 2 financial institutions for a USD 100 million loan facility. That's going to support our near-term working capital needs, and we anticipate wrapping up the long-form binding facility agreement over the next few weeks. Alongside that, it's accurate that we're actively assessing a variety of alternative debt funding options aimed at optimizing the capital structure. As Justin said earlier, those will strengthen the company's credit profile and boost our liquidity by refinancing the existing senior unsecured notes and/or the bank facilities. And as Justin said, we're looking at, and focusing on, extending the debt tenor, optimizing the amort schedule or removing the amort schedule, particularly out of the bond, and lowering our funding costs wherever we can. Other levers, obviously, a significant lever in there is the ENC CapEx payments. We'll keep having discussions with Shanghai Decent; no formal discussions have taken place yet about pushing those payments back if they were in fact needed. The reason we haven't held formal discussions is that we don't believe they're needed based on our — on how we're viewing our debt refinancing. However, if it did come to pass that we needed it, we believe Shanghai Decent remains very supportive of the company, as they've demonstrated throughout, I guess, our whole listed history.
Adam Baker
analystThat’s great. And then maybe just a second point about the dividends. I saw that you’ve pulled that. Is this simply a matter of prudent balance sheet management, or how should we be thinking about — how should we think about the way you guys view the dividend going forward?
Chris Shepherd
executiveYou basically gave the answer there, Adam, so it comes down to managing the balance sheet prudently while we aim to keep it strong and refinance. Paying out money at this moment isn't something I'd consider sensible.
Operator
operatorMoving on, the following question comes from Jack Whelan at Citi.
Jack Whelan
analystChris, I’ve got a couple of questions this morning. First, is there any update on the $110 million of VAT refunds you expect? Do you feel confident that amount will come through? And what should we expect on timing?
Chris Shepherd
executiveYes. Justin, I'll handle that one too. Thanks for asking, Jack. As for timing, there's nothing new to share. I believe I mentioned during our previous call that we expect it somewhere in the next 6 to 12 months, and that remains unchanged. We do talk with the Indonesian government every so often. This is simply their standard procedure — as you'd have noticed with other projects, getting that approval back from the government just takes some time. Still, we're quite confident it will arrive within that window.
Jack Whelan
analystAnd I said that you're waiting for the final environmental study approval so the RKAB for the Hengjaya Mine can go to 19 million tonnes per annum. What's the expected timing for that? And also for Sampala to get to 6 million tonnes per annum?
Justin Werner
executiveCorrect. As for the RKAB, the timing is by the end of September, and the timing for an RKAB at Sampala covering 6 million is also by the end of this year.
Operator
operator<<operator_script>> Our following question comes from David Coates at Bell Potter Securities.
David Coates
analystI’ll start with a quick question. I was just hoping you could provide a little more context on what factors are being weighed when deciding whether to commission the cathode plant at the ENC HPAL.
Justin Werner
executiveYeah. Thanks, Dave. So we did move the construction up to July this year. The plan was to begin commissioning at that point, though we understood — and this is something we've done before with RKEF — that the sales license doesn't actually arrive until the entire plant reaches full physical completion. So our intention was simply to begin producing cathode and stockpiling it in readiness for the IUI. Given the draw on working capital and then the need to buy MHP, and MHP right now has payabilities that are actually very high — so it's really the working capital draw and the high cost of MHP — we've just decided to push that back slightly. And again, it comes down to making sure we keep the balance sheet in strong shape. We don't want to be drawing down working capital and then holding finished stock that we can't sell for a number of months.
David Coates
analystGot it. But now that it's moved up from January to October — sorry.
Justin Werner
executiveYes, October and November are the months we're considering.
Operator
operatorThat brings us to the end of the question-and-answer session. At this point, I'll return the call to Mr. Werner, who will offer some closing comments.
Justin Werner
executiveYes. Well, thank you all. In my view, even with the nickel price difficulties that persist, the companies did quite well and posted EBITDA above the prior year, with really robust expansion in mining, and we anticipate more of that growth soon as an RKAB comes out that calls for no CapEx to support the higher mine sales. Then there's ENC, which is set to commission shortly, and margins there are still solid at roughly $7,000 a tonne. That's all from me. Thanks, everybody.
Operator
operatorThat brings today's conference to a close. We appreciate everyone for joining in. You're free to disconnect at this time.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Nickel Industries Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to Nickel Industries Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Nickel Industries Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.