Northern Star Resources Limited (NST) Earnings Call Transcript & Summary

January 28, 2020

Australian Securities Exchange AU Materials Metals and Mining earnings 34 min

Earnings Call Speaker Segments

Operator

operator
#1

We appreciate everyone being on the line, and welcome to the conference call covering Northern Star's results for the December 2019 quarter. <<operator_script>> At this point I'll turn the conference over to the Executive Chairman, Mr. Bill Beament. Please proceed.

Bill Beament

executive
#2

Good morning, and thank you for being with us today. Joining us on this call are our Chief Executive Officer, Stuart Tonkin; Ryan Gurner, our CFO; and Michael Mulroney, our Chief Geological Officer. The results we're reporting today show just how exceptionally strong and strategic a position Northern Star now occupies. By every measure a gold miner ought to be judged on, the company sits extremely well. Our cash flow is strong and is poised for further significant growth as we bring the KCGM acquisition into the fold this quarter, keep up strong progress at Pogo, and take advantage of record-high gold prices. Our mine lives are long, every one of our assets is in a Tier 1 location, and we have substantial scope for ongoing organic growth. This platform now lays out the opportunity for Northern Star to keep growing earnings not only over the next few quarters but over the next few years. These key factors underpin our strategy to deliver strong, sustainable returns for all our stakeholders, including shareholders, the communities we operate in and workers alike. Our underlying free cash flow for the quarter came in very strong at $88 million, and that was despite investing $53 million in growth capital and exploration, which includes Jundee's mill upgrade to 2.7 million tonnes per annum.

Bill Beament

executive
#3

That cash flow came from selling 214,635 ounces at an all-in sustaining cost of AUD 1,421. Our Australian operations posted a standout quarter, with sales of almost 170,000 ounces at all-in sustaining costs of $1,263 per ounce. On an annualized basis, that beat the upper end of production guidance. At Pogo, the advantages of our revised mining methods and other efficiency efforts keep coming through, with more than 45,000 ounces sold at an all-in sustaining cost of USD 1,380 per ounce. Gold sold rose 56% and all-in sustaining costs fell 25% versus the September quarter. Pogo's December results are especially revealing and represented the inflection point for the operation: nearly 25,000 ounces mined at 9.8 grams, 22,500 ounces sold at an all-in sustaining cost of USD 964 an ounce. This extends the pattern of higher production and lower costs, which is now firmly in place. Notably, stoping tonnages at Pogo have risen each month. Stoping tonnes mined in the December quarter totaled 134,000 tonnes. That was nearly twice the September quarter figure. Stoping accounted for 60% of total mined ore tonnages in the December quarter.

Bill Beament

executive
#4

During December, stoping delivered more than 62,000 tonnes. Our previously stated goal is roughly 65,000 stoped tonnes each month, so we are nearly there. The grade shows the advantages of this, averaging 7.4 grams per tonne over the December quarter, a 26% increase compared with the September quarter. As I mentioned, in December it averaged 9.8 grams. With these results, we remain well positioned to meet our second half production guidance at Pogo. Turning back to Australia, we could not be more pleased about our KCGM acquisition. Opportunities to buy one of the world's greatest gold systems are extremely rare, especially when it sits in your own backyard. Doing so alongside Saracen makes this deal even more valuable for Northern Star. The partnership's benefits are already evident: we moved quickly to set up an executive management committee with 2 representatives from each company. We have likewise lost no time launching a broad strategic review covering every part of the operation, from mining and processing to exploration. I will now hand over to Stuart Tonkin, who will give more detail on our business for the quarter.

Stuart Tonkin

executive
#5

Thanks, Bill. It's truly been a busy quarter, and we're glad to show results throughout every operation as we add one more Tier 1 asset into our Tier 1 portfolio. At Pogo, we've reached the last phase of the 18-month transition plan, and the Pogo team is carrying out long-haul stoping mining methods successfully while improving metrics throughout the operation. The December quarter produced gold output up 56% quarter-on-quarter, with the long-haul stoping contribution now sitting at the targeted 60% of total ore tonnes — the crucial metric for achieving lower unit cost mining. December itself underscored this further, with results of 22,574 ounces of gold sold at an all-in sustaining cost of USD 964 an ounce, the milestone metrics we aimed for through the mining method change. It shows a highly profitable operation at more than 20,000 ounces per month and below USD 1,000 an ounce. And that gives us a solid platform to build on, with continued productivity gains and growing output to push all-in sustaining costs even lower. Our greater investment in development keeps opening up future production areas and adds flexibility to the mining schedule so long-hole stoping physicals stay more consistent.

Stuart Tonkin

executive
#6

During the December quarter, we averaged 1,200 meters of development per month, as stoping activity lowered the count of active development phases, and we are keeping a forecast target of 1,500 meters per month in order to satisfy long-term growth plans along with expanded mill capacity. More detail regarding Pogo is available in the accompanying slide presentation on the ASX platform, showing the ramp-up through the December quarter and an impressive exit rate, which positions us well for a second -- for the second half of the year. Now on to our Australian operations. Jundee continued to perform at a high level, with development physicals up 13% quarter-on-quarter, averaging nearly 1,800 meters per month across the 3 months. Production stoping averaged 121,000 tonnes per month in the quarter, with total ore of 525,000 tonnes from the underground, delivering an annualized mining rate of 2.1 million tonnes per annum. In the December quarter, Jundee sold 82,000 ounces at an all-in sustaining cost of AUD 1,030, generating continued strong cash flows. The Ramone open pit advanced mining at a reduced strip ratio and is building ore stockpiles, with 340,000 ore tonnes mined in the quarter at 1.5 grams. The capital works, as Bill spoke about, are now underway to increase milling capacity at Jundee, with civils having commenced for the new ball mill to meet a nominal 2.7 million tonnes per annum capacity.

Stuart Tonkin

executive
#7

Commissioning for this project is scheduled for June — the quarter that's coming up. With such robust underground output and the open pit potential around Jundee, this expansion stands out as an attractive investment that pays back quickly. Turning to Kalgoorlie operations. Grade came in higher at Kanowna Belle, and every operation showed improvement, which produced a 7% rise in total ore tonnes mined along with a 15% jump in gold ounces mined versus the prior quarter, reaching 90,724 ounces. We kept development meters at a high level throughout all operations, including the capital accesses at the Moonbeam underground, to set up production growth for the year's second half. Kalgoorlie operations sold 87,000 ounces at an all-in sustaining cost of $1,483 an ounce, with costs pressured by stockpile adjustments made during that quarter. Mike will soon discuss exploration work around Kalgoorlie aimed at sustaining a project pipeline, and I'm eager to report on KCGM performance at our March quarterly, since that will include the consolidated addition of the Super Pit to our business. The Kalgoorlie gold field stays a premium location for future gold discovery and production growth, and our newly expanded footprint will support Northern Star's continued financial performance for decades ahead.

Stuart Tonkin

executive
#8

At this point, I’d like to hand things over to Ryan Gurner for the financial discussion.

Ryan Gurner

executive
#9

Yes. Thanks, Stu. Good morning, everyone. I'll now walk you through some of the key elements of the company's December quarterly results. In the course of the quarter, Northern Star successfully wrapped up its takeover of Echo Resources Limited and finished an equity raise amounting to $765 million to help fund, in part, the acquisition of 50% KCGM. With an early January completion for KCGM expected, bank debt of $425 million was drawn on 31 December. Bank debt overall at quarter's end stood at $500 million, alongside cash and bullion of roughly $247 million once the purchase consideration held on hand for KCGM was removed. Turning to the cash flow waterfall chart on Page 5. We give an overview of movements in cash, bullion and investments for the December quarter and show the generation of $179 million in operating cash flow and $88 million of underlying free cash flow, which, of course, are adjusted for working capital, financing cash flows and movements in the company's equity investments. A substantial portion of the quarterly free cash flow came about in the December month, with a stronger contribution from Pogo. This underlying free cash flow came after a total of $53 million was invested into organic growth across exploration, to set up future production areas, and expansionary capital, to increase production.

Ryan Gurner

executive
#10

That investment covered the Moonbeam decline as well as development at the Kundana operation, which is 100% owned; expansions of the Jundee and Pogo process plants; development and related infrastructure at Pogo; an exploration emphasis at Kanowna, South Kalgoorlie after recent successes; and the exciting Goodpaster Project at Pogo. Last, on cash flow, a fully franked dividend of $0.075 per share, totaling $49 million, was paid to shareholders on the 20th of November. That brought the full year FY '19 dividend to $0.135 per share and reflects the targeted payout at 6% of revenue. In the December quarter, the Australian operations sold 169,000 ounces at an all-in sustaining cost per ounce of $1,263. With a solid contribution from Ramone, Jundee delivered another great quarter, mining 97,000 ounces and selling 82,500 ounces at a cash cost per ounce of $783 and all-in sustaining cost of $1,030 per ounce sold. At quarter end, Jundee held 60,000 ounces in stockpiles and GIC. Mine grade across all sites rose in the December quarter at the Kalgoorlie operations, with just over 90,000 ounces mined and 87,000 ounces sold at a cash cost per ounce of $1,134 and all-in sustaining cost of $1,483, all improvements over the September quarter. Higher noncash stock movement cost and resource definition drilling were realized primarily at Kanowna Belle during the quarter.

Ryan Gurner

executive
#11

At Kalgoorlie, all-in sustaining costs should keep moving downward through the rest of the financial year. Turning to Pogo, in the December quarter it mined 53,000 ounces and sold 45,000 ounces, with an all-in sustaining cost per ounce of USD 1,380. The shift in mining method keeps progressing, with long-hole stoping tonnes as a share of development tonnes climbing to 60% in the quarter. As we said before, December was a much stronger month at Pogo, with 22.5 ounces (sic) 22,500 ounces sold. Pogo's total site cost, excluding exploration investments, corporate costs and ore stock movements, came in at an average of USD 22.8 million per month across the December quarter. The quarter's highest total cash expenditure at Pogo stemmed from planned mill maintenance; nonsustaining spend on the processing infrastructure expansion project, which is designed to lift plant capacity 30% to 1.3 million tonnes; a significant increase in meters of grade control diamond drilling; and seasonal spending on propane. Given the greater leverage we expect from the KCGM acquisition, 283,000 ounces of gold were added to our hedge book during the quarter. With this additional cover in place, Northern Star has roughly 16% of production hedged across the next 3 calendar years on FY '20 midpoint guidance, including our 50% share of KCGM.

Ryan Gurner

executive
#12

At this point I’ll pass things along to Mike, and he’ll talk about exploration.

Michael Mulroney

executive
#13

Thanks, Ryan, and good morning, everyone. At the corner, Northern Star maintained a substantial amount of in-mine drilling work throughout the Australian operations, with activity stepped up at Pogo. At Jundee, the underground diamond drill fleet grew to 14 rigs, with a broader emphasis on exploration drilling across every mining area. Resource extension drilling inside the existing mine areas carried on, and particularly strong results were recorded in the Deakin system, both north and south of current mine infrastructure. In-mine exploration drilling has picked up pace, with early positive results coming from the Lyons South/Hughes area, the southern portions of the Invicta Gap, which takes in Deakin and Cardassian, and the Gateway South area, while initial drilling in the northern areas pointed to possible extensions of the Cook mineralization. Turning to Kalgoorlie. Underground diamond drilling at Kanowna Belle keeps defining strongly mineralized structures in the hanging wall Sims and Troy trends across the C Block area, with scattered high-grade intersections now extending up-dip into the A and B Blocks of the mine. Extensional drilling at Velvet also keeps extending the current system, both up and down plunge. Over at Kundana, the underground resource definition programs were finished at Millennium, Pope John, Moonbeam and Christmas during the quarter, with modest depth extensions identified at Millennium.

Michael Mulroney

executive
#14

Over at the nearby East Kundana joint venture, the underground diamond drilling was aimed at resource definition programs targeting the new Falcon trend, which sits midway between the Pegasus and Raleigh mines. Beyond that, underground development work began in the quarter to reach the Falcon mineralized corridor from the Pegasus infrastructure. At Pegasus as well, resource definition drilling on the Hera Lode delivered results that came in better than anticipated, and exploration drilling from a platform at Hornet got underway late in the quarter, targeting possible southern extensions of the Falcon trend, with some early positive indications showing. At South Kalgoorlie, in-mine and surface resource definition drilling keep extending the north trend down plunge in the Mutooroo area and also found a new mineralized trend in the footwall of the NOZ system. Turning to Pogo. The changeover of the underground diamond drill fleet was finished during the quarter, with 8 rigs now fully operational in the mine area. Underground drilling was concentrated on infill and reserve definition drilling within the main Liese Vein, North Zone, X-Vein, South Pogo and Fun Zone areas, with results generally beating expectations. In addition, numerous unmodeled structures were intersected across all areas, particularly the Fun Zone and the North Zone, which provide possible extensions to all known systems.

Michael Mulroney

executive
#15

Next, turning to what we're doing on the exploration side regionally. At Pogo, diamond drilling from surface carried on at the Goodpaster Project, and it keeps verifying that the flat-dipping Liese-type veins are continuous, as well as the steep-dipping structures of the North Zone veins, throughout the central and southern portions of the known mineralization footprint. Toward the end of the quarter, surface diamond drilling got underway on the new Lily Zone target, which is a set of outcropping flat-dipping vein structures of the Liese type situated roughly 400 meters above and to the southwest of the main production areas. Every drill hole finished so far has hit one or more stacked quartz-sulfide veins with visible gold, which are interpreted as representing the main Lily vein structure, near the north-northwest striking fault zone. Assays from this program are all still pending. Back to Australia. At Jundee, RC drilling programs surrounding the Ramone open pit verify the shallow mineralized trends at Tosh, while results for the Marley North area remain pending. After the Echo Resources acquisition closed, data integration and a full review of the exploration projects began late in the quarter. In the Kalgoorlie area, surface diamond drilling started at the Fitzroy Chasers trend, running between the Kanowna Belle mine eastward to the Red Hill deposit within the prospective Kanowna Belle mine stratigraphy.

Michael Mulroney

executive
#16

Every assay result from this program is still pending. Over at Carbine, RC drilling that is ongoing keeps defining possible extensions of the primary Phantom trend inside the Carbine shear zone. And on the South Kalgoorlie tenements, additional extensional RC and diamond drilling is underway at Triumph, following the high-grade intersections announced previously. In other places, comprehensive RC and diamond drilling programs have been finished at a number of locations, among them Samphire, Golden Eagle, Stockyard Dam, Abattoir, Greenback, Steinway and Enigma South areas. And lastly, within the Central Tanami joint venture in the Northern Territory, RC drilling at the Ripcord prospect, situated southeast of the Groundrush mining area, produced early results pointing to possible strike extensions of the resource that already exists. Our reconnaissance aircore drilling across the untested Ripcord-Groundrush corridor turned up several geochemical anomalies for drilling in the future. In the Suplejack area, roughly 120 kilometers north of the Central Tanami plant site, early RC drilling results confirmed and upgraded the resource area that already exists, while farther north along the same trend at Kokoda, initial RC drilling of an untested geochemical anomaly cut minor gold mineralization, with additional drilling planned. And finally, throughout the Western Tanami, co-funded surface RC and diamond drilling at the Gremlin prospect pointed to the presence of several mafic intrusive bodies at depth that show significantly elevated base metal anomalism.

Michael Mulroney

executive
#17

I'll hand the call back over to the moderator now so we can take questions.

Operator

operator
#18

<<operator_script>> Our first question is from Levi Spry with JPM.

Levi Spry

analyst
#19

I’ve got two questions about Jundee, if that’s all right. Could you expand a bit more on the plant expansion? You’ve already shared the CapEx and the time lines, so where will the feed come from? What does the ramp-up profile roughly look like? And then, on FY ’20 guidance for Jundee specifically, it appears to be going quite well. Could you remind me what you said? I believe you’ve already done 160,000-odd ounces, so it seems to be tracking above. What happens over the next 6 months?

Stuart Tonkin

executive
#20

Yes, thanks, Levi. This is Stuart speaking. So the guidance for Jundee was 260,000 to 280,000 ounces at that. And that moves us from, let's say, roughly 2.2 million to 2.7 million tonnes per annum of capacity. Plus, it lets us achieve a finer grind size. We needed to bring that P80 down to approximately 110 micron. So there will be a recovery benefit associated with that too. Those are the metrics. It isn't part of that 116 expansionary capital figure we published, but the payback is very fast. And they've always mined it and then stockpiled it, and we can process that material through. So it won't make a huge difference to this financial year. We're shutting down some tie-ins, but it will definitely position us well for next year.

Operator

operator
#21

Daniel Morgan of UBS has the next question.

Dan Morgan

analyst
#22

I don't know whether the rest of the people on this call had the same experience, but I believe we lost you after you were restating the 260,000 to 280,000 — sorry, when you said guidance stood at 260,000 to 280,000. The connection dropped, and then, at least as far as I could tell, you reappeared online at 2.2 million to 2.7 million tonne milling capacity. I was just wondering whether you might — I assume it isn't just me. Could you simply go over your answers again? It seemed to be a technical issue.

Stuart Tonkin

executive
#23

All right, so that explains why I figured Levi had gone completely quiet. Either you were thoroughly impressed, or you had dropped off the line. Look, yes — the guidance of 260,000 to 280,000 and a cost of $1,115 to $1,195, we're currently running above that rate. We laid out that the ore sources would come from the stockpiled open pit Ramone area along with the northern opportunities at Echo with Julius. And we basically indicated that to reach, hold, and build beyond those 300,000 ounces, we would need either to expand the Jundee processing facility, make use of regional third-party toll treatments, or examine refurbishing the Bronzewing facility. So right now, it's AUD 22 million. We added a ball mill — sorry, we installed a brand-new ball mill at 4.5 megawatts, which replaces the existing 1.8-megawatt ball mill. And we brought our grind size back down to 110 micron. So all of those things, knock on... <<inaudible>>

Operator

operator
#24

Sorry about that — it looks like the line to our speaker dropped. <<operator_script>>

Stuart Tonkin

executive
#25

Is anyone on the line?

Dan Morgan

analyst
#26

Absolutely.

Stuart Tonkin

executive
#27

Daniel, can you hear us?

Dan Morgan

analyst
#28

Correct.

Stuart Tonkin

executive
#29

We are back. I am not sure — were you able to catch any of that?

Dan Morgan

analyst
#30

I believe I caught the majority of that. So, assuming my feed matches what everyone else on the call has, I think those questions have now been fully answered. You dropped off at about the same point as during the earlier call, if that's any help. Turning to my question, I'm simply trying to get an answer on the earlier ones. Regarding the Super Pit, what stood out is that Saracen said yesterday you two would be cooperating more closely than appeared to be contemplated back when the plan involved Saracen and Newmont. They mentioned joint operatorship. I'm curious whether you could explain how the asset will be run. Have you shifted to a joint operatorship structure? And I'm also curious about the purchase price — you paid a bit more, which is what secured control — and I'd like to hear about that in this context.

Stuart Tonkin

executive
#31

Yes. So look, regarding the price difference, there were a few other tenements in the boundary area that weren’t part of the other half, plus the $25 million option on the power business that we’ll be assessing. So other factors make that a different transaction from the headline number. It has reverted to joint management, which is excellent for both parties, bringing both skill sets together in a complementary way. So it’s not that one party is the lead manager. And we’ve formed those committees quickly. We’ve been on-site with the teams there, spent time up at Raleigh recently going through those matters. And we’ve sat down together, compared our due diligence findings, and are prioritizing those actions. So I think both parties are very motivated and are working through those things. And we’ll begin to give color over the coming 6 months on the progress, the plans, and the updates in that regard. So to be clear, it is joint management between Saracen and Northern Star, which is a great positive benefit for our skill set.

Dan Morgan

analyst
#32

And then, I suppose, on the disclosure front, in what way will you be reporting the grade at Kalgoorlie ops? Will Kalgoorlie ops be reported separately from the Super Pit, or will we receive both?

Stuart Tonkin

executive
#33

This is going to be fully ring-fenced. Reporting for the Kalgoorlie operations will stay exactly as it is today. And KCGM is going to be reported on a separate basis, and that reporting will line up with the joint venture's schedule for resources, reserves, and all the listings that are released and sent out, given that both companies are listed on the ASX.

Operator

operator
#34

Matthew Frydman of Goldman Sachs has the next question.

Matthew Frydman

analyst
#35

I hope I don't freeze up during this Q&A, but moving on, I have a few questions about Pogo. In your operational update, you said all low-grade material has been taken out of the mine plan. From what I gather, that's come about because of the increase in stoping tonnes, which made it possible. Could you walk me through how that's actually being done on the ground? Is it by making your development headings tighter so they now target only the high-grade core? And do you see that as fully sustainable from here on?

Stuart Tonkin

executive
#36

Yes. Matt, Stuart here again. So, I mean, in terms of not mining it, that hasn't happened. That material still sits in the subgrade, but it does get stockpiled, and what we're saying is we've taken it out of the feed. So previously, when we weren't hitting the stoped tonnes we wanted, we were essentially running that lower-grade development material through the plant. We were also range-testing the plant and getting things sorted on the throughput side. So what this quarter has shown is that when we suddenly get these stopes — multiple production fronts humming — you see that 80% of our tonnes in the December month came from long-hole stoping. And you can see the effect on grade when we get that high grade, which is very productive material. So the quarter is back weighted. Viewed as a whole quarter, it's really about looking at the exit rate of December, and it sets us up well for the March quarter. But that low grade at the mine, I mean, it's still there, still available. Should there be any disruptions, production-wise or otherwise, we can utilize that material. But — hence why our view to expand the processing facility from 1 to 1.3.

Stuart Tonkin

executive
#37

That work is going to start with the new season or once the weather improves, and obviously we'll have that done by the end of calendar year '21 so we can take that additional material.

Matthew Frydman

analyst
#38

Yeah, absolutely — just to follow up on that point. You touched on what caused development meters to fall in Q2. So when do you expect to reach the 1,500-meter rate for development? And is that the level needed to feed the mill once it's expanded to that 1.3? Theoretically, would 1,500 meters be enough to sustain a 1.3 million tonne per annum mining rate? Or might it actually be able to handle something bigger?

Stuart Tonkin

executive
#39

Right, so the 1,500 meters each month definitely underpins that 1.3. We showed we reached it during the September quarter, proving in the September month that the fleet and the people can deliver those physicals. As you can see, there was a natural trade-off in December, when you're in congested areas. But once the capital declines are in place, multiple areas open up. Your plan gains more flexibility. If you look at Jundee, it's producing 1,800 meters a month, and it's doing twice the stoped tonnes of Pogo. So it's doing 120,000 tonnes a month, while obviously we're trying to get 65,000 tonnes a month at Pogo. It manages that because of the multiple areas. And basically that's the extra real estate. So you're not congested. You're not sharing vent, power and those things. So ideally, it comes down to the geography, or the -- where you can actually work. And we're setting it up. The 1,500 meters, as we've said, just gives us that consistency in the flexibility and sets us up for a very consistent 1.3 million tonnes per annum.

Matthew Frydman

analyst
#40

So it sounds like you'd anticipate reaching that rate potentially around the close of this financial year.

Stuart Tonkin

executive
#41

By the close of this fiscal year, and keeping it there. And the steadier we hold that level, the more we can push past it to make up ground. But honestly — that simply provides us with stability. So you don't get the sawtooth pattern. Still, these are ordinary growing pains. That sawtooth shows up in our charts. It's essentially about getting everyone lined up together in the underground mine.

Matthew Frydman

analyst
#42

Sure. Then a fast update on the mill expansion — how is it tracking, and have you placed orders for any long lead time items? Is that what's driving the time line right now? I suppose, given that — now that you've clearly been showing your turnaround in the mine productivity, you've clearly got a lot of confidence there...

Stuart Tonkin

executive
#43

Yeah. See, it's quite unlike Jundee, where you have lots of space and open air, and essentially you can put down your footings and have your milling running quickly. At Pogo, there are infrastructure constraints you have to deal with — and your available space there too. So every one of those long-lead items is being ordered and is being arranged right now. And clearly, the contractor is arriving to handle that job along with the tolling work. And we're attempting to — not attempting to, we will schedule it. We've provided that plan accounting for seasonal weather for moving items along the roads and getting construction done. So ahead of the coming winter, everything will be enclosed. And then clearly, through that winter stretch, tie-ins and electrical infrastructure will happen. So every one of those long-lead items remains on schedule under that commitment. Roughly USD 10 million — pardon me, roughly USD 20 million will be spent this year, and then a further USD 10 million for tying it in, in the next budget year.

Matthew Frydman

analyst
#44

Sure. And perhaps just a few quick items regarding Jundee. First, about the mill expansion, I appreciate the extra detail on that. Going back to the feed sources question, I'm curious whether you have a notion in mind of what the optimal mix would be between underground feed and the open pit sources you have. And then, I suppose, in your view, how does Bronzewing also fit within that strategy?

Bill Beament

executive
#45

Yeah, it's Bill. So, yeah, obviously, underground is producing 2 million to 2.1 million tonnes of ore. And like Stu mentioned earlier, we've been stockpiling Ramone ore. That was a full business case based solely on Ramone. But with our Echo transaction, we're adding a shovel-ready pit at Julius to the south. And as we've said on several con calls, we stopped drilling our open pit resources around Jundee because we lacked mill infrastructure. We've already made multiple discoveries in that region that Mike has again highlighted over a number of quarters. We can begin rebuilding that open pit mine plan. But we can't do so without an expanded mill.

Matthew Frydman

analyst
#46

Absolutely. And then lastly, I believe Stu was interrupted earlier when he brought up the idea of possibly moving that 1.8-megawatt ball mill down to South Kalgoorlie. I'm curious what sort of uplift we could anticipate there in terms of your processing capacity at the Jubilee mill.

Stuart Tonkin

executive
#47

Right, so it likely has more to do with grind size than with capacity. What we've observed is that it delivers improved recovery for us. As a result, at the moment we're simply examining every business case surrounding it. That said, yes, you do attempt to upsize throughput, and clearly, we — every loss costs you AUD 2,300 an ounce. At the back end, throwing a percent away isn't something you want to do, and there's no need to.

Operator

operator
#48

That brings us to the end of the question-and-answer session. I'll turn things back over to Mr. Beament for his closing comments.

Bill Beament

executive
#49

The figures we're reporting today send a clear signal: the business is in excellent shape. Our operations in Australia are doing very well indeed. At Pogo, the gains are meaningful, with plenty more improvement still ahead, and that asset is positioning itself to become a major contributor to the group. We also have a huge opportunity before us now at KCGM. Over the current half, the inclusion of KCGM in our results will deliver a substantial benefit. That will carry implications for our dividend as well, since the company's policy is to return dividends equal to 6% of revenue. Beyond our rising cash flow, we hold exceptional strategic organic growth opportunities in the near term. This has been at the heart of our strong financial returns and our outperformance across many years. And we remain fully committed to sustaining our substantial investment in this area. Given all of this, I look forward to reporting to you on our continuing progress at Pogo and to updating you on KCGM over the coming months. Thank you for joining us today.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Northern Star Resources Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Northern Star Resources Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Northern Star Resources Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.