Operator

operator
#1

We appreciate everyone being on the line, and we're glad to have you join Northern Star's conference call on the March 2020 quarter results. <<operator_script>> At this point I'll turn the call over to the Executive Chair, Mr. Bill Beament. Please proceed.

Bill Beament

executive
#2

Morning, everyone, and thank you for being with us. Joining us today are Chief Executive Officer Stuart Tonkin and CFO Ryan Gurner. Many aspects made this quarter a hard one. The expenses and difficulties tied to the steps we took around coronavirus have been considerable. Most of those effects, though, are non-recurring and were largely experienced during the March quarter. That said, we've achieved substantial progress in offsetting impacts wherever we could. A fresh operating environment is now solidly established. It isn't a flawless operational platform at present, but it is manageable and lets us keep producing profitably. Early on, we put in place several swift and vital actions, among them switching Jundee's mining crew to even-time rosters — moving from a 3-panel roster to 4, which means we need to bring in extra skilled personnel. Those people are scarce. I'm happy to report that solid headway is being made toward closing that skills gap. Labor shortages likewise weighed heavily on production at Pogo, an operation that depends greatly on specialized skills from the Lower 48 states and Australian expats, and both groups present numerous difficulties when it comes to traveling to and from site.

Bill Beament

executive
#3

There are also smaller details that don't typically cross your mind. For instance, at Pogo, having indoor room is a luxury, and the March quarter there is extremely cold. That makes social distancing hard to pull off by swapping out crews, which is different from Australia, where we've been doing those changeovers outdoors. As a result, we've got staggered shift start times, and that has cut the work hours available per shift by roughly 10%. The good news, I'm happy to report, is that spring is arriving and things are getting warmer. Still, don't underestimate what all these steps are doing to costs and productivity. My view is that, for the industry as a whole, the consequences of the actions we've taken will show up more clearly as this quarter plays out. The fresh rosters being rolled out across WA are going to lower productivity. Handling fatigue and safety is going to be both essential and expensive. And industry-wide, we also need to stay on high alert regarding mental health concerns. At one of our operations recently, the emergency assistance provider, EAP, logged more inquiries in 1 week than it had over the prior 12 months. Here at Northern Star, we grasped early on what responses this virus would demand at Pogo in the United States. It was a steep learning curve, and it forced us to put a whole host of changes in place.

Bill Beament

executive
#4

All of that carried a meaningful price tag. Yet it also left us in a stronger position to implement adjustments at our Western Australian operations before they became necessary, and that is exactly what we did. At Jundee, the mine sequence resulted in a low stope grade during the quarter, though it should rise in the current quarter, and we are already witnessing signs of that. At the Kalgoorlie operations, gold output came in 10% under forecast, reflecting the effect of the extra health and operating protocols as well as the reprioritization of mining areas for future work, especially at the Raleigh deposit. Near the end of the quarter, the mining crew by itself lost over 1,500 shifts, while unplanned leave rose 80%. Even so, the Kalgoorlie operations are set for a stronger June quarter as the workforce settles and production from the new Moonbeam deposit begins. At Pogo, we recorded 6 coronavirus cases, and I am pleased to report that all of them have recovered. That said, at Pogo the virus measures dealt a severe blow to our performance in the early stage. Even with that, we keep making excellent headway on the shift to bulk mining, which is the heart of our business improvement strategy at that time. Without the virus, Pogo would have delivered a very solid quarter, and output would be approaching our annualized targets.

Bill Beament

executive
#5

At KCGM, having a residential workforce has reduced how much the operations were exposed to virus measures. The steps required to safeguard residential workforces were less extensive than those for FIFO workforces, where our social license to operate was at stake. The new management team at KCGM has settled in well and acted quickly to put operational changes in place aimed at bringing the joint venture together and aligning it with the systems and methods used at both Northern Star and Saracen. It soon became clear that we needed to open up more mining areas within the pit to give us greater operational flexibility going forward. As part of this strategy, we have begun development of Brownhill area Stage 1. Brownhill offers 2 potential benefits. First, it is shallow and shovel ready. Second, it could connect to the existing pit. That would happen if we choose the cutback option to remediate the East Wall. In this scenario, the synergies would be valuable, and so we have started a review of that remediation option. The higher gold price also improves the economics of the cutback option, raising the return on capital tied to the cutback.

Bill Beament

executive
#6

We anticipate wrapping up that review during the September quarter, and at that point we'll share further specifics. Today I'm also glad to report that Northern Star has set up a COVID community fund of as much as $10 million. Those funds will go toward helping local communities cope with the virus's immediate effects and rebuild once they emerge on the other side. We have already allocated $2 million toward buying PPE in Alaska and COVID testing facilities in regional parts of Western Australia. Throughout the crisis, we'll keep evaluating how we can put this money to work. I'll now hand things over to Stuart Tonkin, who will give a more detailed rundown of our operations.

Stuart Tonkin

executive
#7

Thanks, Bill. As is the case at KCGM, the elevated gold price opens up meaningful opportunities throughout our whole portfolio. Naturally, though, a strong gold price only counts for something when we keep up our gold output. That has been our focus and our effort across the last 2 months, so that we safeguard the health of our employees, their families, and the communities where we work, while at the same time keeping gold production going to sustain business activities through the unprecedented COVID-19 threat. Consistent with the approach of saving lives and livelihoods, I want to sincerely thank every one of our employees and contractors for their immediate and ongoing efforts to mitigate COVID-19 risks and to build a more resilient business able to manage through this environment. At the Pogo operation, long-hole stoping is now running successfully in 3 of the 5 planned areas, and stoping during the quarter accounted for 68% of total ore tonnes at an impressive 8.4 grams per tonne. We averaged 1,150 meters per month of development, which had an impact in the second half of the quarter because of the roster measures Bill mentioned. Our target is 1.5 kilometers, 1,500 meters a month, to build more productive production fronts and contingency into the mine plan, and to keep upskilling the team there.

Stuart Tonkin

executive
#8

Better development grades at Liese, Fun Zone and South Pogo drove a quarter-on-quarter rise of 14%, reaching 7.9 grams per tonne in development ore, and that should serve us well for stoping grades down the road. Once infrastructure upgrades are finished and the development team is at full staffing, the undeveloped areas of East Deeps and North Veins will feed into the plan. With solid grades and cost reductions feeding strong free cash flow, Pogo is in a good position to step up quarter-on-quarter. As stoping volumes increase, every key metric at this operation should keep getting better, and it will become a cornerstone asset for the company. I'm happy to say that the 6 positive COVID cases at Pogo have all fully recovered, and the major measures we took on site kept these cases from having a potentially much bigger impact. It speaks to the team culture at Pogo that they managed through a whole series of challenges while still lifting site performance. Turning to Jundee operations. Production in the March quarter was lower because we ran a 10-day planned shutdown at the processing plant, and lower grade stoping zones made up most of the mine feed during that quarter. Jundee is still ahead of forecast year-to-date, with 219,000 ounces delivered across the past 9 months.

Stuart Tonkin

executive
#9

The expanded mill capacity is going to be commissioned in the June quarter, which will enable a throughput rate of 2.7 million tonnes per annum at a finer grade — and that also helps with improved recovery. Managing the shutdown crews and the construction crews through this quarter has been exceptional. The Ramone open pit is still mining and building stockpiles to supply supplementary feed to the underground primary ore, and we've cut back regional exploration activity across the Yandal operations during the current restrictions. Turning to our Kalgoorlie operations. We saw some different forces in the March quarter — seismicity at Raleigh limited activity there, and we've redirected mining resources to the Pegasus and Pode mines and the new Falcon access. Higher rehabilitation costs and elevated development meters affected both grade and unit costs in the quarter. Kalgoorlie mined 750,000 tonnes at 3.2 grams and milled 890,000 tonnes at 2.9 grams for 75,000 ounces produced, using lower grade stockpiles for the balance of processing. Roster changes and health screening across the Kalgoorlie operations had a significant impact on productivity and logistics. Few of the synergies we typically encourage across these mines were realized, since we practiced social distancing and fixed roster teams. Kanowna upper levels kept yielding encouraging drill results, and we plan to stope bulk zones as a further trial in the A block hanging wall.

Stuart Tonkin

executive
#10

The HBJ mine is also delivering encouraging drill results as we plunge to the north in the North Ore Zone and the Mutooroo zones. And our Moonbeam development mine is turning into production, starting in this June quarter, and it will contribute to production at the Kundana field. But while these COVID protection measures are in place, the all-in sustaining cost at Kalgoorlie ops remains high. Now Bill has spoken about the progress and opportunities at KCGM, but I would also like to thank and further acknowledge the Newmont transitional team that has now left site, and I thank them for the professional manner in which they assisted the handover. I would now like to hand over to Ryan for the financials.

Ryan Gurner

executive
#11

Yes, thank you, Stu, and good morning, everyone. I’ll now walk you through some of the financial dimensions of the company’s March 2020 quarterly results. The cash flow waterfall charts on Page 6 give an overview of cash bullion and investment movements during the March quarter and show $185 million generated in operating cash flow and $89 million in underlying free cash flow, which naturally adjusts for working capital, M&A, financing cash flows and movements in our equity investments. That $89 million of underlying free cash flow came after investing $66 million in organic growth across exploration to establish future production areas and expansionary capital to raise production. On the corporate side, it was a busy quarter, with the successful completion of 50% of KCGM and the associated $55 million share purchase plan. To support our suppliers, Northern Star made early creditor payments in March totaling $58 million, which ordinarily would have been scheduled in April. As previously announced, during the quarter the company undertook several capital management initiatives to maximize on-hand available liquidity, including drawing $200 million from revolving facilities, extending maturities of our calendar ’20 hedge commitments and deferring payment of our interim dividend until the 27th of October.

Ryan Gurner

executive
#12

Cash and bullion stand at $531 million, and with the sole scheduled debt repayment over the coming 12 months being the $25 million due on 31 December, we're well positioned to handle any scenario in order to safeguard our people and our business through these dynamic and challenging times. Turning to costs. In the March quarter, the Australian operations, KCGM included, sold 182,000 ounces at an all-in sustaining cost of $1,506 per ounce. Another 7,600 ounces were sold from the Morrison starter pit at KCGM. Jundee mined roughly 75,000 ounces during the quarter but sold only 53,000 ounces, at an all-in sustaining cost of $1,389 per ounce sold. Jundee finished the quarter with 76,000 ounces sitting in stockpiles and gold in circuit. Kalgoorlie operations mined and sold 77,000 ounces at a cash cost of $1,307 per ounce and all-in sustaining of $1,619. Reduced stoping tonnes were partly offset by development ore directed toward processing lower-grade stockpiles, which weighed on the all-sustaining metrics for the quarter. Moving to Pogo, where in the March quarter 56,500 ounces were mined and 49,000 ounces sold at a cost of USD 1,254 per ounce, a 10% all-in sustaining cost reduction from Q2.

Ryan Gurner

executive
#13

Pogo's total site costs — leaving out exploration, corporate, ore stock movements and the processing expansion project — came to an average of $21.8 million each month across the March quarter, a decline of roughly USD 800,000 per month versus Q2. The operations did take on certain added expenses from COVID-19 that were being realized, tied to personnel transport, accommodation, extra cleaning, freight and catering. We anticipate no savings on costs from the supply contract reviews that wrapped up early in the year, with those set to start in Q4. And KCGM delivered a solid first quarter under the joint ownership we share with Saracen, contributing $41 million in pretax cash flow for the quarter, with slightly more than 60,000 ounces sold at an all-in sustaining cost of $1,452 per ounce. Given the greater leverage stemming from the KCGM acquisition, 160,000 ounces of gold were hedged when the transaction closed. Furthermore, in the quarter the company delivered early roughly 49,000 ounces against future commitments, which will allow for greater participation in spot prices over the months and quarters to come. As at 31 March, Northern Star had hedged approximately 18% of production across the following 3 years. And as we said before, the company pushed out the maturities of its undelivered 2020 calendar year hedge commitments, bringing calendar year '21 to a total of 258,000 ounces, a step taken to lower the delivery risk tied to COVID-19 disruption.

Ryan Gurner

executive
#14

NST still has the option to fulfill these hedge commitments whenever it makes sense, up to any extended maturity dates, and our plan is to meet the commitments as they currently exist. At this point I'll turn things over to the moderator for questions.

Operator

operator
#15

<<operator_script>> Our initial question is from Daniel Morgan of UBS.

Dan Morgan

analyst
#16

The first question is only about Pogo. Considering the COVID-19 backdrop, it seemed like a really strong quarter. I'm wondering whether you could speak a bit or elaborate more regarding what you observed in January and February before you started seeing the COVID impact — for instance, your development-meter productivity. And I'd just like to get a sense of how the operation felt on an underlying basis before COVID.

Stuart Tonkin

executive
#17

Yes. Thanks, Dan. Stuart here. So look, this was planned to be — yes, it was a reasonable quarter. We're expecting a much stronger quarter in March quarter. So yes, we've come out of the back of December strong month. We've set up lots of stopes online. We're still developing pretty strongly, and we had all our teams on ground to do that. If you recall that back in February coming into March, we basically said to the crews, stay or go. And so we actually had quite a lot of disruption in activity throughout March. So yes, that's really setting us up for a good run rate for the March quarter. Now this is delayed. It's not lost. And obviously, with the stabilized teams there at the moment, we're well positioned for a much — going for a much further improvement into the June quarter as well as just the easing of the weather, generally, coming of the coldest months, the ability to move, as Bill said, move to the outside, than them sort of holed up in those rooms, trying to have less people standing around, meeting, talking. The shift changes has occurred now with some Lower 48 state people coming up, and we're also planning the next expat shift change.

Stuart Tonkin

executive
#18

The figure that truly matters to us is that 1,150 meters. Our target on average is to be at a minimum of roughly 1,300, and then clearly 1,500 meters per month, so we can get ahead and develop those additional 5 stoping areas. At present, 3 of those 5 stoping areas are under mining. Until East Deeps, North Zone/X Veins are developed, we genuinely lack that flexibility within the mine plan, and we simply have to take what we have to take. So look, it was a decent month and still produced solid cash flow — or a decent quarter, but we had been expecting the second half, yes, to be considerably stronger. So we are not — the team's actions have pleased us, but yes, in terms of where we'll land, we expect to be somewhat ahead of that.

Dan Morgan

analyst
#19

Let me expand on that a bit further. Where do things stand right now with staffing numbers and skills at the site? My guess is — I'd have assumed — that the COVID effects seen so far are going to build up during this quarter, because travel restrictions make it hard to bring Australian skilled operators onto the site and back off it. How would you respond to that — that the June quarter will see a bigger impact?

Stuart Tonkin

executive
#20

We're running with fewer people, and we've spaced everyone apart since folks were sharing spaces—rooms used for operations and the like—given how much activity there was. You can appreciate items such as diamond drills, because we've gone from 11 diamond drills to 3. We've removed any activity that isn't immediately necessary, all the staff, people are working remotely from Fairbanks, the technical folks on the computers. So there are a few things there we've just done, thinning out, spreading out people. And you'll appreciate, we had 6 positive COVID cases across the quarter that were handled extremely well and kept any impacts of that kind from snowballing. So we still have those restricted labor levels. We've got few—there are a lot of people there doing like 4 weeks straight and some of those have chosen to live there 3 to 6 months last year without going back to their home state, which is much appreciated. So all those things at the moment are stabilized, but it's at a reduced total skill level. So as soon as we can start to bring back more of those skills, and to Bill's point earlier, just managing people's fatigue and managing their general outlook through this period is a challenge.

Stuart Tonkin

executive
#21

We're in a solid position with the asset holding steady. We continue to anticipate that the June quarter will outperform the March quarter, and our expectation was that the full year would bring us to that run rate. Then there's all the other work in terms of getting the mill improvements going so the thickener can be installed and we can handle that additional volume. But the strongest fundamentals of this asset are the grades that are coming through. You can see the head grade at 8 grams plus. So once those stope tonnes arrive, it's pretty straightforward to see those metrics getting better across the board.

Dan Morgan

analyst
#22

Moving on to the Australian operations now. So you've pointed out that the COVID measures you implemented have clearly had an effect on productivity. But it seems grades were a significant factor too, since your tonnes from both operations remained fairly reasonable, yet the grades came in much lower. I'm wondering if you could discuss grades. And then, more importantly, looking ahead to the June quarter, should we expect a solid recovery at both Jundee and Kalgoorlie?

Stuart Tonkin

executive
#23

Yes. So there are a few separate problems in that area. The grade came in lower at Jundee for the quarter, but on a year-to-date basis it remains above both the forecast and the planned shutdown in the plant. With expanded plans scheduled for the back end of the quarter and just the normal mining sequence, we still expect a pretty solid performance across Jundee. Kalgoorlie is probably — all eyes are on our Kalgoorlie operations since it's one of our elevated — high unit costs. That's largely a function of grade, and there isn't much to be done there beyond productivities and general cost outs, which — while these measures are in place. Now we accept that those unit costs are high. I mean, we had extra planning for FIFO, people, extra buses, vehicles, the reduced team sizes. There's a point there where I think we had 7 long-hole drillers not report to work, and that was due to the measures we put in for screening, not in a negative sense, just as a proactive measure. We can't drill — couldn't drill our long-hole plans through the month. So those are things that are happening on a day-to-day basis that we're managing through. And we have restricted the things we typically would do, which is move equipment and people from mine to mine as required to fill the hole.

Stuart Tonkin

executive
#24

Right now, that’s been locked out. Their schedule is 14 days on and 14 days off, they go nowhere during their breaks, and we don’t have the flexibility we usually enjoy.

Dan Morgan

analyst
#25

Got it — and one final item. The mill expansion at Jundee is arriving during this quarter. How much will that switchover disrupt milling rates in the quarter? And where in the quarter does it happen? And when do you expect it to reach full run rate?

Stuart Tonkin

executive
#26

Yes. Look, those two factors essentially offset each other. Any ounces lost because of when the new ball mill gets shut down are balanced out by the ounces that do flow through. There's no real material impact on that front. The old ball mill continues operating right now, up until the point we make that changeover. So no real material impact there either. The open pit is what it is. The underground is still — Jundee contributed 2-plus million tonnes. And then, obviously, the stockpile depth from Ramone will provide future supplemental feed for that mill expansion. So the other added benefit, ideally, once everything settles in, is a finer grind and, as a result, better recovery. So — but all of these will — we'll have a team ready to put in place, get it moving and bedded down. And the team has done a fantastic job there continuing to work through this construction phase with that extra labor, whilst trying to put these controls in place.

Operator

operator
#27

Our following question is from Levi Spry at JPMorgan.

Levi Spry

analyst
#28

Could I dig into the productivity losses you're seeing across this quarter so far? And given what you observed late in the prior quarter, what's the reason for holding at 4 panels instead of 3, and that kind of thing? What level of productivity loss do you consider sustainable?

Bill Beament

executive
#29

Yes. So, as we mentioned in the quarterly and in today's speech, we implemented every protocol extremely early and got them settled in. We carried that through the March quarter and have it established now, though at minimum what we have is a — the operating platform isn't ideal. It's not perfect, but it is certainly manageable. Anybody out there claiming otherwise — well, I'd say it's an easy goal. We've already seen that at the back end of our rosters. Very quickly we brought in longer rosters in the U.S. and here. If you work underground and you go beyond 10 days, you're completely done at the end of it. We're asking people to go longer than that. So there is an effect. And since we're predominantly underground, we are seeing it. On the whole, you're probably looking at as much as a 10% drop in productivity levels. That's probably a decent rule of thumb to use. But it is early days, and we'll monitor it and try to improve. Still, that's roughly our gut feel right now — that's roughly the effect across the portfolio.

Operator

operator
#30

<<operator_script>> Our following question is from Sophie Spartalis at Bank of America.

Sophie Spartalis

analyst
#31

You said that after all these changes, operations are now looking relatively stable. With that in mind, can you give us a bit more clarity on what to expect in the June quarter? And you've mentioned that grades should recover quarter on quarter across all the operations — we're not asking you to issue any specific guidance, but given that you've already had 1 month of lockdown, could you just share how you're viewing the June quarter?

Bill Beament

executive
#32

Yes. Look, as we've mentioned, we're anticipating a better quarter, as Stu noted, at Pogo. We're expecting Kalgoorlie and Jundee to perform more strongly. So — and Kalgoorlie's operation is touched in running as usual. So June will definitely bring a better quarter.

Sophie Spartalis

analyst
#33

Could you give us any sense of how strong that is? You’re not willing to?

Bill Beament

executive
#34

No.

Sophie Spartalis

analyst
#35

Alright, let me just jump in here for a moment...

Stuart Tonkin

executive
#36

We aren't going to offer detailed guidance on that.

Sophie Spartalis

analyst
#37

Sorry, could you repeat that, Stu?

Stuart Tonkin

executive
#38

On the guidance front, Sophie, we're deliberately providing none. Right, just as a reminder, there were cases at Pogo. The risk is still there whenever cases come up. We're seeing some strong improvements throughout Australia, and you're beginning to see people start to relax. But no operator with a case at their site can promise they'll be able to keep operating in that kind of environment. So we still need to be very cautious about what we say going forward.

Bill Beament

executive
#39

Absolutely, Sophie, and it really matters to grasp this: we've been through it at Pogo. Once a COVID case shows up, the people who've been in close contact with that person are pulled out. You end up losing a substantial portion of your workers extremely fast. So for any operation in Australia that gets a case, those close contacts — you can lose entire crews. You witnessed that across in New South Wales at Welcon. Operations there were shut down. So you've got to be extremely cautious. Still, we haven't had that happen to us as of yet, Sophie.

Sophie Spartalis

analyst
#40

Yeah, absolutely, I get that. And on the hedging side, I see the flexibility and how those hedges get deferred. But with the risks the business faces, how are you viewing that hedge profile from here on out? Would you consider expanding that hedging program?

Bill Beament

executive
#41

Look, we went with the early productive move on the roll — pushing out hedges — and we were the first to do it. So we managed to get that done with the banks quite easily. The back-end effort wasn't as easy. But our thinking was that we removed delivery risk in case the worst-case scenario happened, though we still intend to deliver those hedges. As a matter of fact, we're speeding up. Ryan, I believe in the last quarter we delivered half of our gold production into the hedge book in the March quarter, and we're being very aggressive this quarter too, since we like the gold price and we want to deliver into it. So we want to try to clear our hedge book as fast as we can.

Sophie Spartalis

analyst
#42

All right. So despite the fact that the table in your quarterly shows nothing hedged for June '20 or December '20, you're still going to deliver a sizable portion of production and aim to finish those out as quickly as you can, even with the option to push them out further.

Bill Beament

executive
#43

That's right. So we extended our hedges out by 12 months, but we're still delivering those hedges that ought to have been delivered and that we pushed out. We are delivering against those hedge commitments.

Sophie Spartalis

analyst
#44

All right, so should we also be anticipating 50% of the June quarter's production?

Bill Beament

executive
#45

Somewhere in the range of 35% to 40%, most likely.

Operator

operator
#46

Matthew Frydman of Goldman Sachs has the next question.

Matthew Frydman

analyst
#47

Could you please elaborate on what drove the lower grade at the Kalgoorlie operations in the quarter? In particular, I'm curious about how the split worked out for stockpiled material as far as mill feed goes. I'd like to know what grade that material carried. Then, looking ahead, can you share any details about the grade benefit you expect once Moonbeam comes online? Is Moonbeam a higher-grade ore body compared with the rest of the Kundana system, or should we view it as broadly similar to the rest of Kundana?

Stuart Tonkin

executive
#48

Yes. Thanks, Matt. Stuart here. We mined 750,000 tonnes at 3.2, which is roughly the grade we've averaged throughout the Kalgoorlie operations. The milled grade, I'd say, came in at 2.9. We milled an additional — 887,000 tonnes were milled, so essentially we're drawing from those low-grade stockpiles to blend down to 2.9 grams. So higher tonnes, greater throughput. Obviously that carried through to all-in sustaining costs as well, with processing cost per ounce rising for the quarter as we drew down the stockpile. So look, the key item is Raleigh. Raleigh was formerly a fairly high-grade mine, though with low volumes. We've largely been rehabilitating it and halted production there, shifting our focus across into a bulk zone called Pode, which carries a lower grade than Raleigh. So that displacement has carried through. Look, the grade across all those mines is fairly — or let's simply say, average. They're not — there are no hotspots of high grades, the way we have the variability at Pogo and/or Jundee, so there's no cherry picking. You follow the mine schedule as planned. You stick to the regime through your seismic sequencing, and you carry that through the entire plan.

Stuart Tonkin

executive
#49

We're clearly focused on maintaining those operations over the long haul, but the grades we're dealing with are lower. So right now, given those constraints, we really need to be cautious about productivities, unit costs, and every other cost input. Everything is measured by gold sold, which ultimately is driven by grade. So look, it isn't perfect, but the current gold price lets us accept that material. Kanowna Belle has had decent grade and is doing well on cash flow. We'll take another look at the A block hanging wall bulk zones, and we're seeing some very strong development grades coming through in parts of that. But as it gets bulked out, we're still working to see whether we can resolve the larger picture at Kanowna. And HBJ is also showing higher grades at depth. When I say higher grades, mid-3s and 4s is impressive in that vein, where at Pogo we're obviously at double that. So somewhere around that mid-3s is probably where average grades could sit around Kalgoorlie.

Matthew Frydman

analyst
#50

Thank you, that's quite useful. And then, second, I'm curious about your contracted third-party processing position for 2020 at the moment — do you still have some capacity available there, and would you be looking to make use of it should the need come up in the June quarter, or does that hinge on the productivity you're able to get out of the mines at this point?

Stuart Tonkin

executive
#51

Yes. Well, you'll notice that during the quarter we made use of third-party mills, along with a portion of those low grade stockpiles, so that's simply the balance involved. At the end of the day, we possess milling capacity for the amounts we mine, with the remainder being our joint venture partners or at East Kundana joint venture and separating -- fully separating KCGM, where there is no interactional movement of materials whatsoever between our Kal ops and KCGM. Yes. So look, right now, we have secured the milling capacity we need. It isn't a problem. It isn't really an opportunity or a risk either. We're just obviously attempting to plan out, quarter by quarter, what our volumes would be. Moonbeam, I believe you also asked about this in the earlier part, it's roughly the same average grade for the Kundana belt. Those higher volumes potentially will displace lower grade from other mines or simply absorb that. But we're also looking ahead, for the Paradigm, Carbine area, it's clearly an open pit with underground potential there that we fundamentally need a solution for. But that's likely 12 to 18 months of thinking and planning at the moment.

Matthew Frydman

analyst
#52

Alright. I suppose this will be my final question, then — is there any sort of update on what you're planning for Bronzewing and Yandal? From what I'm hearing, though, it sounds like you're still working through that, and it's probably 12 to 18 months out, is that fair?

Stuart Tonkin

executive
#53

A lot of that likely comes simply from adding staff in the present environment. We'll come back to that — the thinking and the planning — while the desktop work carries on. In the near term, Ramone will serve as the additional feed for Jundee. Clearly, the Julius deposit will also add to that over time, though constraints remain throughout the Yandal Belt when it comes to accessing the ground for heritage surveys and similar matters, which could delay some of it, and we're mindful of that. We don't require it, but we would just be prepared while the desktop work proceeds, so that when conditions loosen and improve, we can look at whether the work at Bronzewing can be sped up.

Operator

operator
#54

Thank you. We'll now take the following question from David Radclyffe at Global Mining Research.

David Radclyffe

analyst
#55

My first question, then, is whether there's any news regarding the option to buy the Newmont power business. I noticed you obtained that 30-day extension. Has it in fact expired by now? I'm simply curious whether weaker prices for energy products affect how you view the value here.

Bill Beament

executive
#56

Yes, David, this is Bill, and I appreciate the question. No, it hasn't expired. Newmont granted us an extension, an offer has been put forward, and now we're awaiting their response.

David Radclyffe

analyst
#57

All right. So the next question concerns the potential you see in the KCGM remediation study. Could you shed a bit more light on what those options actually look like? And if we assume the gold price stays where it is now, is the cutback clearly the right move? Then what kind of lead times should we have in mind for that? Also, do you already have sufficient equipment to carry it out, or would you have to bring in extra equipment and fleet, and so on?

Bill Beament

executive
#58

Yes. Look, as we mentioned in the quarterly and as I noted in my prepared remarks, we're currently examining those options. It looks appealing, and we're carrying out that evaluation work right now, and we'll wrap it up in the September quarter and share those details at that point. Thanks.

Operator

operator
#59

Our following question is from Nick Herbert at Crédit Suisse.

Nick Herbert

analyst
#60

I have just a couple of quick questions, please. I apologize if these have already come up — I missed a portion of your presentation. First, regarding the remark in your quarterly about accessing some new mining areas in the pit: could you give some detail on what extraction rate you expect from those in the June quarter, and any implications for average grade compared with what you reported in the March quarter? And then, also, any planned maintenance for the June quarter — specifically the major one you had in your March quarter? And also any plans over the second half of this year?

Bill Beament

executive
#61

Yes. Thanks, Nick. Now look, we won’t get into the precise specifics of the amounts and totals that come from the volumes for each pit, but just as we’ve stated in our guidance that we’ve released for this half, we’ll update it for FY 2021 in July/August.

Nick Herbert

analyst
#62

All right, got it. And regarding the plant shutdowns — is there anything significant scheduled for those?

Bill Beament

executive
#63

No. No, it was simply a significant shutdown that had been scheduled for that time. So it was a long shot, and clearly it hit production, because things don't all go well with prediction. The next big shutdown, I believe, falls in the September quarter.

Operator

operator
#64

Nick Evans from The Australian has the next question.

Nick Evans

unknown
#65

I just want to ask — have you all noticed any kind of supply chain disruptions when it comes to getting people spare parts, reagents, that sort of thing out of China or other places, as part of the coronavirus impact on your own supply chain?

Ryan Gurner

executive
#66

Nick, it's Ryan. Well, we haven't done that. Clearly, we've handled it, and we've stayed in tight contact with every one of our suppliers and all of our supply chains. So nothing at this point.

Bill Beament

executive
#67

To build on that point, one thing I believe was necessary — something the industry is, I think, handling really well is that suppliers across the industry stay in very close contact regarding anybody who attempts the toilet roll scenario. And suppliers are ensuring that all of us basically order just what we require and don't go beyond that and try to hoard. So I think we're doing a fantastic job with our own suppliers on that and not doing the toilet roll scenario.

Operator

operator
#68

Stuart McKinnon of the West Australian has our final question.

Stuart McKinnon

unknown
#69

Bill, you said earlier that because of the roster changes the coronavirus made necessary, you've had to consider bringing on additional staff. Could you give us a sense of how many extra positions you're adding, how many of those are getting filled, and whether there are requests for more?

Stuart Tonkin

executive
#70

Yes. Thanks, Stuart. Fundamentally, if you did it literally, that adds an extra 33%. So we could move from the 2 and 1 roster to a 2 and 2 roster. That requires a 4-panel. It hasn't been quite so dramatic, but adding those skills has mattered because it basically supplements our fly-in, fly-out operations. In Kalgoorlie we now have greater flexibility, which has probably contributed about 5% to 10% of those. We've since brought in some temporary skills and labor hire to close that gap, and our contractors have worked hard to close those gaps. And potentially, we must make sure we've tried to keep every job we currently have. The trade-off is that some nonessential activity has been stood down to lower the risk of multiple people being on sites, so some of that exploration expenditure. So ultimately, over time, we want to rebalance back to the norm and keep all the activities there, with people proactively working and jobs getting done. But yes, there's obviously been a lot of focus on China, protection of lives and livelihoods, particularly in regional communities, to support all the people we employ as we have them with remuneration through the quarantine periods and standbys and having the flexibility in those teams that are there to keep us operating.

Operator

operator
#71

Appreciate it. That brings the Q&A portion to a close. At this point I'll turn things over for the closing comments.

Bill Beament

executive
#72

So as you can see, the past quarter brought us some difficulties, yet because of the enormous work put in by our people, we've come through what I regard as among the strongest health and safety steps anywhere in global mining related to corona. And we introduced those measures at a very early stage. Looked at that way, the whole team delivered an outstanding result. There's no denying that production and financial performance took a hit, but it was small next to what halting output over the virus would have cost us. Our new systems are now in place, and wherever we could, we've offset the expenses. We're now positioned for an improved June quarter, both regarding lower costs and productivity effects tied to the virus and from the standpoint of more conventional operations. Still, health and safety will always come first for us, and should that mean putting additional measures in place to handle things, then that's what we'll do. Thank you for being with us today.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Northern Star Resources Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Northern Star Resources Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Northern Star Resources Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.