Northern Star Resources Limited (NST) Earnings Call Transcript & Summary
July 22, 2020
Earnings Call Speaker Segments
Operator
operatorWe appreciate everyone being on the line, and thanks for joining us for Northern Star's conference call on the results for the June 2020 quarter. <<operator_script>> At this point I'll turn things over to the Executive Chair, Mr. Bill Beament. Go ahead, please.
Bill Beament
executiveGood morning, everyone, and thank you for being with us. Joining me on today's call are Stuart Tonkin, our Chief Executive Officer; Ryan Gurner, our CFO; and Mike Mulroney, our Chief Geological Officer. The results we're reporting today speak to the fundamental strength of the business. They show that, to a considerable degree, we have come through the COVID-19 storm and produced record underlying free cash flow. Solid results were fueled by strong production and robust margins across every one of our operations. Having said that, the guidance we set out early to help safeguard our people from COVID clearly hurt how we performed over the past 2 quarters. That effect was especially noticeable at Pogo, where we safely and effectively handled 36 cases of the virus during the June quarter. Labor availability was directly affected. With fewer people on hand, we inevitably delivered lower operating physicals. It was even more disappointing because, during that quarter, we completed the switch to long-hole open stoping. The advantages of this new mining method show up in ore tonnage, grades, ounces, costs and free cash flow generation. Every one of those metrics would plainly have been stronger if the virus had not constrained our workforce.
Bill Beament
executiveThe fact is, for as long as the virus remains widespread in Alaska, volumes at Pogo are going to be lower — likely by roughly 25%. Even so, those results demonstrate that our approach at Pogo is delivering, and that the mine will produce the tonnages, grades and output we expected when we acquired it. It's a Tier 1 asset in a Tier 1 location, and once we come out of the COVID downturn, the results will show it. Our performance across the last 2 quarters has also been constrained somewhat by our choice to shrink our hedge book. We sold 170,000 ounces into hedges, which is approximately 34% of our production during the past 6 months, and that trimmed our margins to some extent. We plan to keep pursuing this strategy in the current half as we look to gain more exposure to the much higher spot gold price, in both Australia and U.S. The fact is, a meaningful share of gold production listed on the ASX isn't being sold anywhere near the current spot price. Northern Star already ranks among the least hedged ASX gold producers. Our hedge book today accounts for just 15% of the production we forecast over the next 3 years.
Bill Beament
executiveYet even as our hedge positions come down, the balance sheet is getting stronger too. At the beginning of this month, we paid back the AUD 200 million of debt that we had drawn at the onset of the pandemic, and today we sit in a net cash position. On top of that, we brought forward settlement of our interim dividend, which came to $55 million in total. Our CEO, Stuart Tonkin, will now walk us through how operations went over the quarter.
Stuart Tonkin
executiveThanks, Bill. Finishing the fiscal year with a quarter 4 that strong is something we're really happy about, and it positions FY '21 for additional expansion and robust cash flow generation off a very sturdy base. In Alaska, the Pogo operation turned in a solid result with 50,000 ounces sold, even with the restrictions brought on by COVID's effects. The operational team on-site deserves credit for stepping up the control measures and containing, to the greatest extent possible, those 36 active COVID cases over the quarter. I want to thank them for their extraordinary work getting through this and for keeping at it. Development rates stayed at 1,200 meters per month in priority areas so new stoping fronts could be accessed, and our focus is on 3 of the 5 main stoping zones. Ore tonnes averaged 68,000 tonnes each month at an impressive grade of 8.4 grams per tonne, which demonstrates the strength of the mineralized system, in line with our models. Our current COVID measures correspond to an impact of approximately a 25% reduction in mining physicals, as Bill said, since we are reallocating teams in response to isolated personnel. Until the state and the operation are free of COVID, this is the probable average run rate for the third quarter, and it will be reflected in upcoming guidance for Pogo, given how prevalent COVID is in the state of Alaska.
Stuart Tonkin
executiveEven with that setback, our people stay committed to adjusting and adapting to the changing conditions, and Pogo is still generating robust U.S. dollar cash flow, even at the reduced operating volumes we are seeing. That gives us a lot of confidence in Pogo's growth potential and in the fundamentals of this Tier 1 asset. We will keep building continuously to lessen the COVID impact on these operations. Turning to the Jundee operations. The June quarter wrapped up a very strong year, with 78,000 ounces sold at $1,078 all-in sustaining costs, bringing the full year to a 300,000 ounce produced operation. Underground production was up 10% from the March quarter, with 584,000 total ore tonnes at 4.5 grams produced. That works out to an underground mining rate of 2.34 million tonnes per annum. Also in the quarter, our projects team successfully completed and commissioned a new 4.5 megawatt ball mill, lifting installed mill capacity from 2.2 million to 2.7 million tonnes per annum so we can accommodate various open pit sources to complement the underground feed. Ramone open pit mining carried on during the quarter, and planning work tied to the Julius pit moved forward during the quarter. Contained gold in stockpiles at Jundee rose by 49,000 ounces over the year, with 84,000 ounces in stockpiles at the end of the June quarter.
Stuart Tonkin
executiveRegional project evaluation also carried on across the Southern Yandal tenements, pushing forward the organic growth chance that comes from the Bronzewing area. At Kalgoorlie operations, delivery went as planned, and mining volumes rose 13% versus the March quarter, reaching 850,000 tonnes. Milling likewise climbed 10% compared with the March quarter, hitting 974,000 tonnes at 3 grams per tonne, drawing on stockpiles built up over the whole year. Costs at Kalgoorlie stay elevated because the average grade mined across the sites is lower, yet Kalgoorlie operations keeps producing robust cash flow and carries meaningful leverage to the gold price we see right now. Kalgoorlie sold 79,000 tonnes -- 79,000 ounces -- at all-in sustaining costs of $1,615 during the June quarter, giving a full year outcome of 317,000 ounces sold. Contained gold in stockpiles as of the close of the June quarter came to 26,000 ounces. Turning to KCGM, together with our JV partner we are advancing strongly toward unlocking the opportunities inside this impressive asset. Material moved grew 43% from the March quarter, reflecting a high level of activity across the 3 main pit zones: Golden Pike, Morrison and Brownhill.
Stuart Tonkin
executiveWe're putting that idle fleet to work, and we're still actively recruiting—urging both current and new Kalgoorlie residents to come aboard the KCGM team at this long-life asset. Relocating to Kalgoorlie and applying for a role at KCGM is a solid use of your job safety dollars. Physicals for underground mining at Mount Charlotte rose 25% versus the March quarter, while milling throughput was up 7% compared with the March quarter—clear evidence of the KCGM team's considerable efforts and of new ownership being embraced there. Alongside our JV partner, we're eager to share more detail on this asset in the quarter ahead. Northern Star's portion of contained gold in KCGM stockpiles exceeded 1.5 million ounces, which gives the company a substantial contingency and a derisked asset. On that note, I want to thank you, our shareholders, for standing with us through a difficult stretch. With our Tier 1 portfolio, we're well placed to keep delivering organic growth and ongoing superior financial returns for many years ahead. I'll now pass things over to Ryan for the financials.
Ryan Gurner
executiveYes. Thanks, Stu. Morning, everyone. I'll now walk through some of the main financial points from the June quarter results. To begin, on Page 5 there's the cash flow waterfall chart, which gives an overview of how cash bullion and investments moved — and at June 30 those stand at an impressive $770 million, which is up $218 million from March. Record production and sales across the June quarter produced $332 million of operating cash flow — that's up 80% from the March quarter — along with $218 million in underlying free cash flow, and both are records for the company. That underlying free cash flow came after roughly $44 million was invested into organic growth spanning exploration, setting up future production areas, and expansionary capital aimed at raising output. Thanks to that outstanding June quarter performance, a key milestone was hit at year-end: the company became net cash positive, with cash and bullion of $748 million against corporate bank debt of $700 million — a fantastic achievement just 6 months after the transformational acquisition of KCGM. And as Bill said, on the back of this exceptional performance, we repaid $200 million of that debt and moved our interim dividend forward to early July. In the June quarter, the Australian operations sold just over 212,000 ounces at an all-in sustaining cost of $1,360 per ounce, which brings full year performance to 727,000 ounces sold at $1,350 per ounce.
Ryan Gurner
executiveAt the close of the fiscal year, both Jundee and Kalgoorlie delivered an excellent quarter, posting gains in every production measure while achieving lower cash and all-in sustaining unit costs. Turning to Pogo, following a tough June quarter, our team showed its resilience, selling 50,000 ounces at all-in sustaining costs of USD 1,276 per ounce, which brought the full-year result to 173 ounces (sic) 173,000 ounces sold at USD 1,402 per ounce. With U.S. gold trading at a spot price of USD 1,870 per ounce, Pogo's cash generation should increase. Our procurement efforts are also bearing fruit: Pogo's total site costs — excluding exploration investment, the plant expansion costs and our corporate allocation — averaged USD 20.5 million per month across the June quarter, roughly $1.5 million per month lower than in the March quarter. Pogo did bear some extra operational costs tied to COVID-19, involving employee benefits, certain personal transport and accommodation, freight and cleaning. Those costs show up in the all-in sustaining metrics. KCGM turned in another solid quarter, contributing $47 million in pretax free cash flow for the June quarter, with 56 ounces -- 56,000 ounces sold at all-in sustaining costs per ounce of $1,400. Under Northern Star's ownership, full-year results were 116,000 ounces sold at $1,427 per ounce, with a pretax cash flow contribution of $88 million.
Ryan Gurner
executiveOne thing worth pointing out is that the all-in sustaining costs Northern Star reports for KCGM differ from those of our joint venture partner. The main reason is that Northern Star calculates all-in sustaining metrics using sold ounces as the basis, and naturally there are also differences in how corporate costs get allocated to the operation. Lastly, regarding the company's hedge commitments, we have been accelerating delivery of ounces from our book, and we will keep doing so, in line with our strategy of raising our exposure to future spot prices. During the June quarter, no additional hedging commitments were executed. And as of 30 June, the company's hedge commitment stands at 536,000 ounces at $2,085 per ounce, which works out to roughly 15% of annualized production across the next 3 years. Mike, over to you now for exploration.
Michael Mulroney
executiveThanks, Ryan, and good morning, everyone. Across the Australian operations, in-mine exploration drilling at the group level held steady, while activity at Pogo declined, which reflects how COVID-19 travel restrictions affected operations there. In-mine exploration was mostly focused inside existing mine corridors and kept delivering consistently strong results, especially at Jundee and Kanowna Belle. At Pogo, underground drilling centred on infill and definition programs supporting production, yet excellent intersections came from a number of unmodeled structures, notably in the Liese "LQ" area, Leise 2 and the North Zones. Regional activity was limited during the quarter. Even so, substantial effort went into integrating and valuing the recently acquired Echo Resources into the regional exploration portfolio. Looking ahead, Northern Star's planned FY '21 exploration program will carry forward our firm commitment to reinvesting in organic growth opportunities within the group's existing asset portfolio. An extensive schedule of in-mine and regional exploration work is under way across all areas to grow Northern Star's resource and reserve inventory. At Jundee, for instance, we'll enter the second year of a 14-rig underground drilling campaign, building on the resource and reserve growth achieved over the past year. Total in-mine drilling is expected to rise by roughly 25% to approximately 444 -- 440,000 meters over the year.
Michael Mulroney
executiveBeyond that, resource definition and exploration programs have begun across the wider Yandal region, which takes in the Echo Resources assets we acquired recently. At Kalgoorlie, the underground and surface exploration work will build on what we achieved lately in the upper levels of the Kanowna Belle mine and the surrounding area, on continued resource growth in the Carbine area, and on long-term exploration of the extensive South Kalgoorlie exploration portfolio. At Pogo, alongside the in-mine exploration expansion program, we have made a significant investment in the first stage of resource definition drilling into the core of the Goodpaster area, where initial exploration drilling has outlined a mineralized corridor 2.5 kilometers long. The benefit of sustained exploration investment in our operational centers will be reflected in Northern Star's annual resource and reserve update, which will be released in the next few weeks. I'll now hand the call back to the moderator for questions.
Operator
operator<<operator_script>> Our first question is from Sophie Spartalis at Bank of America.
Sophie Spartalis
analystI have just a couple of questions. First, Kalgoorlie — Stu, could you walk us through how costs are going to come down from here? I realize that's clearly a result of the lower grades, but roughly how long will those lower grades persist?
Stuart Tonkin
executiveAll right. At that 3, it's fairly average. So that's basically how things are going to look from here on, Sophie. So yes, we're seeing higher — or accelerated — all-in sustaining costs per unit, since it's the same work being done for somewhat less contained metal. But we've got quite a few other initiatives underway across the site aimed at finding some productivity gains as well as some absolute cost reductions. That decline in grade really comes from taking out the high-grade ore at Raleigh, which we suspended during the quarter.
Sophie Spartalis
analystAll right. Could you walk us through a few of those initiatives and give a sense of the size of the cost reductions we might expect? And on that basis, what the potential new normal might be for Kalgoorlie's all-in sustaining costs?
Stuart Tonkin
executiveSo, we came in at 16 — just slightly above AUD 1,600 on all-in sustaining. There's likely $100 to $200 per ounce that can be addressed. Obviously, with KCGM, we now have additional purchasing leverage in that region. We're examining procurement capability and some synergies across those areas, but as things stand, that's the difficulty at the site. That said, they're already accomplishing a tremendous amount on many of the productivities in development. The real focus is on the production side of the activities.
Sophie Spartalis
analystAll right, that was actually the next thing I wanted to ask. So regarding the potential that comes from the regions, are there any high-grade satellite pits you believe could be brought online within the next 3 years to help lower those costs?
Stuart Tonkin
executiveLook, it doesn't have to be high grade, but what matters is achieving reduced mining costs through those satellite pits. So Carbine, in the Paradigm region — lower grade, yes, but cheaper to mine. Those are the leading opportunities, and with the blended fee, they can push the unit cost down.
Bill Beament
executiveSophie, this is Bill. Look, Q4 tells you a lot about how Kalgoorlie is performing. As we mentioned earlier, the grade isn't the highest, but its exposure to the gold price is enormous. There is plenty of gold in the ground there. It operates under its current cost structure, yet it generates very large free cash flow. So it contributes enormously to cash flow across the group as a whole.
Sophie Spartalis
analystAlright, sure. And Ryan, one question regarding hedges. Clearly, you're aiming to keep speeding up the process of closing out those hedges, and the gold price is still looking pretty elevated. You didn't make a commitment in the June quarter. Should we expect that you'll keep up that 15% average annualized rate in a sort of rolling 3-year way? So can we look for you to be adding to those hedges in order to capitalize on the high gold prices over the coming quarters?
Ryan Gurner
executiveSophie, honestly, these are topics we discuss and review constantly. As you're aware, we've reworked our book. That means there's no hard commitment on our side for the coming half. Still, as we've shown and made clear, our intent is to bring them back. So the discretion rests entirely with us. Our way of seeing it is a share somewhere between 20% and 30% — likely of our book, or of our sales, that we'd want hedged. That's essentially what we're working toward.
Bill Beament
executiveYes. So Sophie, we clearly picked up some hedging through the KCGM deal, and that will likely leave us at the upper end of our policy. We're really just moving our book back toward the lower end of that policy. And on top of that, we've been using put options, which have been excellent. We generated a lot of money from put options without locking ourselves into hedges — obviously, a cheap insurance policy. So my expectation is that we'll probably also use that behind the scenes, since those are very inexpensive right now given what you can secure from a book in the insurance policy.
Sophie Spartalis
analystAlright. Alright. Then one last item from my side regarding Pogo. I get it and I appreciate the enormously difficult circumstances you’re facing there with COVID. As for the lower operating rate, how long do you expect that to last? I know you said it would be until you’re COVID-free. Or does that mean until a vaccine arrives? Could you perhaps expand a bit on possible timing there, purely for modeling purposes—is it roughly 12 to 18 months?
Stuart Tonkin
executiveHonestly, hard to say for certain, but I'd note that we aren't standing still on those measures. A great many things are still underway on our side to add contingency around that. My expectation is that disruption will persist through the first half of our financial year at that rate. Yet each single case forces you to remove 3 people, meaning a ratio of 1 to 3 staff isolated. In terms of what's happening across the state, testing regimes are improving, visibility is greater, and those tests come back faster. Essentially, we're running those tests through on a weekly basis. Our guidance will capture whatever that turns out to be, though as we've shown, we expect to keep operating right through cases, and the great outcome is that the site keeps getting better and better at managing it. What's also pleasing for us is how the health effect on our staff has played out — their quick recovery and return to operations has been positive as well. So with the health and the demographic of our staff, I'd say recovery comes quickly. Even at these lower levels, as you can see with the U.S. gold price and the U.S. cost base, $1,200 and $1,800, it's still generating significant U.S.
Stuart Tonkin
executiveFrom Pogo, we get dollar cash flow. So even if this impact stretched it out, in my view it remains an extremely profitable operation.
Sophie Spartalis
analystAll right. Could there be a chance to speed up or pull ahead any of the desktop work that needs doing, and as a result, might we see some positive surprises coming out of the situation at Pogo?
Stuart Tonkin
executiveLook, the plans exist. What really matters is who's sitting in those seats. And I suppose there are certain fixed constraints at the site. On the drilling side, that's likely to be the new approach. You're putting a lot more drilling back in and getting — basically we keep on with production drilling, not so much resource or reserve growth, since we already have decent visibility of the base there. Those are the kinds of things that will come through. As Mike showed, we'll be placing assets into the Goodpaster over the coming 12 months to drill it out. So possibly a new slate from Pogo expanding the resource base comes over the next couple of years.
Operator
operatorDaniel Morgan of UBS has the next question.
Dan Morgan
analystStarting with the super pit, I’d just like to understand how you’re viewing things across the next couple of quarters. It looks as though during the last quarter you were really pushing hard on material movements and handling the waste. Clearly, productivity there was much higher. Should we expect that in the near term you’ll concentrate on clearing that waste rather than on gold?
Bill Beament
executiveYeah, thanks — good question, Dan. So, this sits between the JV partners and us, and we're speeding things up. As we've said over the past couple of quarters, we're unlocking that flexibility. Our aim is to have several mining fronts, so we're moving that material to get there. And the team on-site, with the fleet they have, is doing a remarkable job. So expect that to keep going. We'll provide far more detail and clarity on KCGM later this quarter together with our JV partner, but expect the coming couple of quarters and beyond to look somewhat similar. We have some excellent opportunities to open up all of those multiple mining fronts. So yes, expect material movement to be higher this financial year.
Dan Morgan
analystAlright, so regarding Pogo — I have to say I've been both impressed and taken aback by the level of productivity and output, given all the difficulties. Obviously, COVID created enormous obstacles during the quarter. So in plain terms, I'm curious: if you faced an identical quarter with the same level of disruption, would you be able to deliver what you delivered this quarter? Or did you use up some portion of the investments you've already made? I'm just trying to figure out whether we'll see the same thing over the coming quarter or so. Is this the level we should anticipate from this operation while you're dealing with these challenges? Or might it come in somewhat softer?
Stuart Tonkin
executiveRight. So the updated approach is to make the most of what we currently have. You noticed a quarter-over-quarter rise in development meters, and we nudged that figure up a bit to 1,200 meters per month. But as we've consistently said, the goal is to reach 1,500 meters a month so that 5 main production stoping areas can be online. So we simply had to triage and put priority on 3 of those 5 areas in order to direct the effort there. As conditions improve, we can gradually bring more areas into operation. So yes, you've highlighted that the ore quality coming out is adequate. From here it's really about volume. Just to give some context, when we had these cases, it was mostly the operating teams underground. So yes, potentially your entire crew can be knocked out for days. It doesn't spread evenly across milling, mining, your admin, and those sorts of functions. So modeling that risk is very difficult. So I suppose what we're saying is that even with those cases and the adoption we carried out, we genuinely saw something like a 20%, 25% reduction in volumes. And for days it could mean a 100% reduction, and then things return to normal.
Stuart Tonkin
executiveFiguring out how that plays out ahead is genuinely tough. So under the disruption we're dealing with right now, the 45,000 to 50,000 ounces per quarter is probably what we can deliver.
Operator
operatorNick Herbert of Crédit Suisse has our next question.
Nick Herbert
analystI want to begin with Pogo too, if I may. I understand there's a lot of uncertainty around COVID. Looking past COVID, given the operating experience you now have there, once things run without interruption, how much time do you figure it would take to build up to that 1,500 meters per month rate? And with that 1,500, does that get you to 1.5 million tonnes per annum for the mill?
Stuart Tonkin
executiveThe 1,500 meters per month is really about preparing those new stoping areas. And our expanded mill is being installed—it's going in for our further processing and the items tied to the mill expansion. So that work is still underway during the summer season right now. And it's there to carry us from 1 million to 1.3 million tonnes per annum. So if you look at our total ore tonnes, 68,000 tonnes a month, we clearly want to push that past 100,000 tonnes a month, with roughly 60%, 65% coming from stopes and the remainder from development ore. So the leading indicator is development—capital development and operating development that turns into long haul stoping. We're just quoting 3 to 5 active areas because we're prioritizing. We know we can genuinely deliver those physicals once the people are there. And we've demonstrated instantaneous run rates with the teams on site. But the ability to bring expats out of Australia and run long rosters—we've had Australians stay there for 5 months straight without seeing their families. We've had the low 48 stage staff commit and relocate to Alaska to limit the—being locked in for entering the state.
Stuart Tonkin
executiveThere has been some tiredness and some logistical friction, though we're also examining backup options running in parallel to handle it. So yes, we could open the tap wide and obtain those physicals. The thing is — it's — even with conditions in place, we're having to implement every one of those precautionary steps.
Nick Herbert
analystThanks, that's quite useful. I just want to get one thing straight there. Regarding the mill expansion work you managed to carry out through COVID, when would you say — what's your best estimate for completion of that work?
Stuart Tonkin
executiveWhen you take a look at the quarter, we turned out 200,000 tonnes. That means, given those disruptive conditions, we're mining at a run rate of roughly 800,000 tonnes annually based on the quarter, correct? So the expansion lifts us to between 1 million and 1.3 million tonnes, and we're probably still 12 months away from needing that expanded mill, but we made that capital commitment early so the work gets completed in the proper season, avoiding doing it at minus 43. It's ready, then, so we won't be mill-constrained once the mining physicals are available.
Nick Herbert
analystUnderstood. Then just one question, a bit wider in scope, at the group level. I realize you haven't provided guidance for next year. But I'm simply attempting to get a sense of what level of growth CapEx and exploration spend per annum would be sustainable and sit outside your all-in sustaining costs. And should we treat the year just gone as a guide to a sustainable go-forward rate? Or does it sit somewhat above or below that?
Bill Beament
executiveNick, guidance is coming in the next few weeks when we release the quarterly, so in a couple of weeks all of that will be laid out clearly and spelled out.
Operator
operatorLevi Spry with JPM is our next caller with a question.
Levi Spry
analystTo build on what Nick asked, guidance is coming in a couple of weeks, though you did provide a data point: 15% of the hedge book, which equals 15% of production, so 1.2 million ounces incurred over the next couple of years — 3 years. Could you speak to what assumption on Pogo sits behind that? Is it business as usual?
Bill Beament
executiveLook, like I mentioned, mate, we’ll spell that out clearly in a couple of weeks’ time. And something else we’ll spell out is our organic production growth, which has us very excited. So all of that will be included. And clearly spelled out CapEx exploration and our forecast production going forward.
Stuart Tonkin
executiveReaching that rate takes time, Levi. So the effect on Pogo and the revised guidance will reflect a gradual ramp toward it rather than an immediate step change.
Operator
operator<<operator_script>> Our following question is from Eagle Research Advisory's Keith Goode.
Keith Goode
analystMy question comes in two parts. First, do you plan to recommission Paulsens, and second, the Bronzewing plant?
Bill Beament
executiveYes. Thanks, Keith. Good question. Yes, look, at Paulsens we're still crunching the numbers. We went in there and did some drilling during the prior financial year, so that has turned out pretty well. So we're just re-evaluating that mine plan. We'll look into options on that. It's probably not the right size and scale for Northern Star, but it's a great little project there. So as you would have seen, we divested our Ashburton project. So some of the smaller stuff, we will definitely consider corporate options. On the Bronzewing side, look, in a couple of weeks' time, we'll clearly lay out what we do there. But we're very excited about what the Yandal operations look like, Jundee and Bronzewing, with the brother and sister back in the same family again. We're really excited about that. So we'll clearly lay out our strategy on that. I think Mike already said in his spiel that we've committed large funds to basically grade control and infill drill the current reserves and resources there. So we expect to generate a mine plan on that in the coming 12 months. So we still haven't made a decision on refurbing that plan or not, or we look at potentially expanding Jundee again.
Bill Beament
executiveThere are a handful of paths available to us. Even so, we're making a commitment to the Julius pit, and at this moment we're handling all of the permitting work on that front. So that's a pit we intend to dig up. And I believe we've got spending allocated in the budget so that excavation can get underway afterward in this financial year.
Operator
operatorStuart McKinnon of The West Australian has the next question.
Stuart McKinnon
unknownI wanted to circle back with you, Bill, about some remarks you made in April regarding how extended rosters and greater on-site social distancing could affect mental health. At that time, you said the entire industry needed to be on red alert about mental health problems among its workforce. So I'm curious whether, since then, you've noticed any decline in your staff. Has that issue gotten worse, or are they coping reasonably well? Three months on from when you first said those things, what's your view?
Bill Beament
executiveYes. Look, that was a genuine problem, and we witnessed — we did witness major surges with the providers of our EAP. So yes, it has been — it was — amid the thick of things, it was certainly an enormous problem. Naturally, the sector going back to standard rosters has improved that a great deal. And clearly, over in WA, we're quite fortunate that society there is more or less fully back to normal. And so that has helped enormously for everybody, whichever industry you happen to be in, but I'm certain everyone's mental health is much improved compared with how it stood in March. So look, we have strong support networks within our company, and I believe the sector does too. So it's far from being as heightened as it once was, but there were all the very same difficulties you were hearing about across the community. It made no difference which sector — domestic violence, all those kinds of things were heightened, but I think we are coming back and have come back over roughly the last 1, 5 to 6 weeks to a state as normalized as we can manage.
Operator
operatorMatthew Frydman with Goldman Sachs has the next question.
Matthew Frydman
analystI’ve got one quick question about Pogo, and about the pace of development as well as sustaining CapEx spending. Clearly, you’ve been putting that investment in, so I take it you’re building the development buffer ahead of production and opening up all of those spaces. I’m just wondering whether that current spending rate — taking everything into account, including COVID and so on — is how we ought to think about it as we move into FY ’21, or whether you feel there is now a sufficient buildup or still more investment to make in that area?
Stuart Tonkin
executiveFor the current physicals, Matt, that's likely a steady state. Like every other operation we run, we'd probably still prefer to get ahead — building contingency into the mine plan is what gives you optionality. So on sustaining expenditure, if I could get 1,600, 1,700 meters at Pogo and have all of those developed tonnes sitting there, that's akin to having our gold and stockpiles above ground as the derisked mine plan. So yes, we'll put that — we'll include that in the guidance, but we never hold our teams back by saying you can only get so many meters. We try to give them as much clear highway as we can so they get in front with our mine plan. So there is a bit of a balance there. And obviously, that reflects back into — when you're building a new mine, that sustaining CapEx is lifted — is lifting your instantaneous all-in sustaining costs, separated to a growth capital investment.
Operator
operatorThank you. At this point, I'll return the floor to Mr. Beament for his closing comments.
Bill Beament
executiveFor more than 3 years now, we've been getting our business ready for this kind of gold price setting. Our attention is on long-life assets located in Tier 1 jurisdictions, and those hold serious potential to deliver organic growth for our shareholders. That's the formula behind our better financial returns. COVID is clearly having an effect on how we perform in Alaska, but the hit would be much worse if we were running operations in certain other parts of the world. That's among the reasons our strategy of concentrating solely on Tier 1 locations makes sense. As I mentioned before, we've trimmed our head book so we can take advantage of this opportunity. Things at Pogo are going according to plan, and we'll keep seeing those benefits as our workforce gets back to normal, assuming COVID allows it. And our portfolio holds meaningful medium and long-term growth prospects. We'll share more on that when we put out our FY '21 guidance, reserves, resources and our exciting organic growth update in a couple of weeks' time, plus a full update on KCGM later in the September quarter. Thanks for joining us.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Northern Star Resources Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to Northern Star Resources Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Northern Star Resources Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.