Operator
operatorWe appreciate everyone being on the line. Welcome to the call covering Northern Star’s results for the September 2021 quarter. Everybody is connected in listen-only mode at this point. A presentation will be given, and after that we’ll open things up for questions and answers. Operator Instructions At this time, I’ll pass the conference to Mr. Stuart Tonkin, Managing Director. Please proceed.
Stuart Tonkin
executiveGood morning, and thank you for being with us. Joining me today are Simon Jessop, Chief Operating Officer of Australian Operations, and Morgan Ball, Chief Financial Officer. I'm happy to share that production for quarter one came in at 386,000 ounces, with an all-in sustaining cost of A$1,594 per ounce. That result followed a simplified portfolio after the Kundana assets divestment was completed in the quarter. Meanwhile, our growth projects are progressing nicely across our long-life key production centers at Kalgoorlie, Yandal and Pogo. In the quarter, we laid out a clear five-year strategy of active portfolio management, built to deliver superior shareholder returns by lifting output to 2 million ounces per annum, reducing costs, and extending mine lives responsibly and sustainably. Through the September quarter, we posted safety performance that continues to lead the sector, with lost time injuries at below half the industry index. We've set a target of net zero greenhouse gas emissions by 2050, and we'll give greater detail on near-term decarbonization progress in a sustainability report to be published in the coming March quarter. We kept strong quarterly cash earnings of roughly A$170 million, and our balance sheet sits at net cash of nearly A$500 million, which shows the strength of the business and its capacity to deliver consistent dividends and fund organic growth.
Stuart Tonkin
executiveOur full-year guidance remains on track: 1.55 million to 1.65 million ounces, with an all-in sustaining cost between A$1,475 and A$1,575 per ounce. That's as production rises across this year and in the years ahead, reaching 2 million ounces per annum by 2026. In our guidance we noted that this year is second half weighted, reflecting higher grades at Yandal and greater volumes at Pogo. Simon will give some detail on the Australian operations, but first, at Pogo we had a softer production quarter, with 44,000 ounces sold. As planned for quarter one, we finished and commissioned the processing plant expansion at Pogo to support 1.3 million tonnes per annum throughput, which is key to delivering growth to 300,000 ounces per annum. Continuing this expansion work despite COVID's impact on labor was important. However, we had extended unplanned downtime from a failure at the primary conveyor and from commissioning ramp up. Planned and unplanned works together cost us 24 days of no downtime during the quarter. With this work now complete, our focus is on ramping up mining development and stoking volumes throughout FY 2022, and I thank the Pogo team, who continue to manage the associated impacts of COVID while adjusting to the challenges to make the growth plan.
Stuart Tonkin
executiveAt this point, I'd like to hand things over to Simon, who will walk us through the Australian operations.
Simon Jessop
executiveThank you, Stuart. Turning to the Kalgoorlie production center — that includes KCGM, Carosue Dam, Kanowna Belle, and South Kalgoorlie — our gold sales came to 232,000 ounces, at an Australian all-in sustaining cost of A$1,533 per ounce. That brought mine operating cash flow down to A$212 million and net mine cash flow to A$155 million, after we invested A$57 million in significant growth capital projects. Within that total for mine growth capital, A$40 million went toward open pit mine development. At KCGM specifically, the biggest operating assets in the Kalgoorlie production center, open pit material movement reached 18 million tonnes — an annualized rate of 72 million tonnes and a new quarterly record. We took delivery of the first two new open pit mining trucks, 793F Class, and they were successfully commissioned, with additional deliveries and commissioning set to continue through FY 2022 as the whole open pit fleet gets replaced. We expect the new haulage fleet to have a positive effect, driving lower open pit costs and better productivity. Underground mining delivered 1.6 million tonnes at an average grade of A$2.6 grams per tonne for 134,000 ounces. The production center's processing capacity of 20 million tonnes is unlocking resources that were previously mine constrained, along with stranded high value stockpile ore.
Simon Jessop
executiveAt Mt. Charlotte, the KCGM underground operation keeps ramping up output while drilling is sped up so we can grasp these sizable opportunities. Kanowna Belle, too, has better mining tonnes at reduced unit growth, getting the most from the new infrastructure already installed. The platform at KCGM that previously lacked approval remains on schedule for completion in Q2, and drilling there will begin at the same time. It's an exciting area to develop away from the mine pit, to the South of Mt. Charlotte. KCGM processing volume came in lower during quarter one, with planned grade volumes from the Fimiston and Mt. Charlotte service. I'll note that Carosue Dam processing likewise set a fresh quarterly record of 970,000 tonnes, a full 20% above mine grade capacity. At Carosue Dam as well, Stage II of the solar farm was successfully commissioned, lifting total solar power generation to 4.3 megawatts, or roughly 8% of the site's total power usage. This delivers more than style — it gives invaluable data for the long-term group direction in the green energy space. Turning to the Yandal production center, which includes Jundee, Thunderbox and Bronzewing, we sold 110,000 ounces of gold at an Australian all-in sustaining costs of A$1,345 an ounce, generating mine operating cash flow of A$97 million and net mine cash flow of A$62 million after spending A$35 million on growth capital projects.
Simon Jessop
executiveThe Thunderbox mill expansion is really what's going to drive Yandal's output up to 600,000 ounces a year and bring all-in sustaining costs down. We put A$25 million of major growth capital into the expansion over the quarter. At Jundee, operations kept performing strongly and set a fresh quarterly record for development advance at 6.6 kilometers in the quarter, which opens up future areas for ore extraction. Julius open pit, one of Jundee's satellite ore sources, produced an impressive 18,000 ounces of gold in the quarter. At Thunderbox, we kept investing growth capital in pre-stripping the D Zone and ramping up underground production. The new price plan, I can tell you, is now fully commissioned and pouring at pace as part of normal underground production operations. On the Thunderbox mill expansion project, GR Engineering Services has mobilised, major bulk earthworks are complete — including deployment of the SAG mill raft, roughly 780 cubic meters of concrete — and commissioning remains on track for December of calendar year 2022. We're very pleased to have this material growth project underway. I'd now like to hand over to Morgan Ball, Chief Financial Officer, to discuss the financials.
Morgan Ball
executiveThanks, Simon, and good morning everyone. As today’s quarterly shows, Northern Star continues to be a very strong financial solution. Table three on page six, at 30 September, sets out cash and bullion of A$756 million. Also, as mentioned before, we used the proceeds from selling the Kundana assets during the quarter to reduce our corporate bank debt. So our net cash position at quarter end came to a healthy A$494 million after we ended corporate bank debt of A$262 million. On that same page, a larger section details the company’s cash movements for the quarter. Total cash bullion and investments of A$771 million reflected a decrease of A$55 million after payment of the FY 2021 final dividend totaling A$110 million. Once cash flow and one-off items are adjusted for, normalized operating cash flow for the quarter exceeded A$100 million. You’ll remember that after finalizing our FY 2021 account, including the merger accounting impact, the company updated its dividend policy, which is now based on 20% to 30% of cash earnings generated. For this quarter, estimated cash earnings fell within the range of A$165 million to A$175 million.
Morgan Ball
executiveLooking at the consolidated group, output and expenses are both tracking as expected, and all-in sustaining costs will come down during the second half of the financial year as we produce more. Gold sales in the quarter included 24,000 pre-commercial production assets, mainly from the Thunderbox underground and data and open pit operation. Those pre-production ounces will decline over the remainder of the year now that these operations have reached commercial production. As we noted when releasing our FY 2021 accounts, you'll see that the fair value uplift tied to merger accounting shows up in higher D&A and non-cash inventory charges for the group. Table four on page seven lays out the company's updated hedge position. The overall hedge book is now approximately 840,000 ounces at an average price of A$2,347 an ounce. That book represents 50% of our rolling three-year production profile. Happily, the average hedge book price has risen A$61 quarter-on-quarter. I'll now hand you back to Tammy for the question-and-answer session. Thank you.
Operator
operatorThanks. Our opening question today is from David Radcliffe of Global Mining Research. You have the floor.
David Radclyffe
analystHello, and good morning to you, Stuart, and everyone else. I have a few questions for you. Perhaps we could begin with Pogo, which clearly had a difficult quarter. With an eye to what lies ahead, could you tell us when the work was finished and how it has performed since then? And then perhaps give us a sense of when you expect it to be running at those targeted volumes, and of course at the targeted costs? Also, do you think there is a possibility of bringing operating costs down to roughly US$150 per tonne?
Stuart Tonkin
executiveThanks, David. So, even with where production stood at Pogo during the quarter, we're quite happy. The works that got completed actually left us very pleased. The mill's capabilities — that 1.3 million tonnes per annum, along with the producing sizes on site — it simply took longer than we'd anticipated, and obviously the primary conveyor repair did too. So those items are now in commissioning and ramping up. This year the real focus is underground development and raising the start tonnes so we can try to meet and match that volume for FY 2023, which is key to reaching 300,000 ounces per annum. So FY 2022 is still a building year for us, building out that ounce profile quarter by quarter. So that mill upgrade, which was going to be a bottleneck, was going to address that. We pushed through the seasonal weather all summer to make sure it was finished and commissioned, and now we're able to swap out those construction group people for production people in the mining camp.
David Radclyffe
analystAlright, thank you. Perhaps we can turn next to Carosue — clearly the mill has done very well, and it keeps running at an annualized rate roughly 10% to 20% higher than the capacity it was originally designed for. Could you perhaps tell us what is behind that, whether it can be sustained as we go forward, and what has been limiting us in terms of actually keeping the mill full from the underground or the open pit?
Simon Jessop
executiveYes, thanks, David. So we definitely view a run rate of 3.8 million tonnes to 4 million tonnes per annum as something we can sustain going forward. As part of the design, we built some additional upside into the processing plants. So it's really about maximizing and making use of all that installed capacity. When it comes to executing that process plan going forward, there are no issues whatsoever. We have 28 million tonnes and 1.8 million ounces in reserves. So there's ample ore to feed the Carosue plant at that size, or that truck.
David Radclyffe
analystAlright, perhaps just a brief final question regarding Fimiston underground — since that site visit, it seems as though progress has slowed somewhat. Is that a reasonable read, or had I assumed you'd already be drilling and might even have some kind of results to share with us by now? How should we think about the way you'll be able to report on that going forward, and about how things are advancing?
Stuart Tonkin
executiveRight, so first off, those drill drives are substantial — multi-kilometer drilling drives. We currently have a single diamond rig in place there, and once the development crews finish up, we'll have several diamond rigs operating in there. What that does is set up a drilling campaign spanning multiple years for that particular quadrant — roughly the northwest quadrant of Fimiston. Building out that resource definition is going to take a good number of years. Still, it represents progress of a kind that hasn't been seen in open pit operations for decades. Mt. Charlotte continues to ramp up and is producing nicely. The real upside comes from the exploration work being secured at Fimiston. That isn't part of the plan for roughly 7 years. Reaching 2 million ounces from any phase of the Fimiston underground doesn't depend on it. There's an opportunity there to define and assess the scale and size of what they can be.
David Radclyffe
analystOkay, that's great, thank you. I'll be sure to share that.
Operator
operatorThank you. The next question is from Daniel Morgan at Barrenjoey. Please go ahead. Sorry about that, Daniel. Your line is open now.
Dan Morgan
analystApologies — I had myself muted. So, Pogo, I was hoping you could help me grasp a little more about what was going on at the mine. My sense is that your stockpile capacity isn't especially large. So my guess is that the mill outage and the conveyor changeover meant you really weren't able to mine as much. I'm just trying to work out whether, on an underlying basis, mine productivity was considerably stronger than the 840,000 tonne per annum rate that the quarter implies. Thank you.
Stuart Tonkin
executiveThanks, Daniel. And you're right, in the sense that we don't have low-grade stockpiles sitting over the ore body that let us put broken material all on the surface the way you can in Australia. So we turned our attention to waste development and sought to get as much as possible out of the waste development that was lost while the mill was down. We also made use of trucking over the surface from the eight fleet at a reduced throughput rate while the main conveyor was out. So when you mention 24 months, or 24 days out of the quarter, yeah, roughly 25% of the quarter is gone. So to normalize that back to an ounce profile, yeah, we did the best we could with the days available. It's different from the Australian operations, where you're able to build a low-grade stockpile — that isn't possible there. But we're putting investment into underground storage bins, developing those this quarter, which will decouple things and give us some surge capacity for mine to mill on site.
Dan Morgan
analystAll right, got it. I was just curious whether you might share the development meters for the quarter. That isn’t something I can find in the report, and it would help me get a sense of what was going on with development right, if you ended up placing more emphasis on it during the quarter?
Stuart Tonkin
executiveYeah. So that comes to 3.6K, which is 1.200 per month, and our target is 1,500 meters a month.
Dan Morgan
analystAll right, thanks. I see you've been quite busy with your hedge book. You delivered quite a bit, yet you also added more to it. So what's the approach you're taking here, and what should we — what can we look forward to from here?
Morgan Ball
executiveRight. This is Daniel Morgan speaking, and we do, in fact, recognize that those hedging policies have been established and are well understood, so we'll always remain inside them. And the real approach was to raise the price of the book at moments when we observe our pit capital spending, which essentially aligns our operating cash needs with a degree of certainty and risk management around the ore price.
Dan Morgan
analystAll right, thanks a lot. I'll relay that message.
Operator
operatorThanks. Our following question is from Levi Spry at UBS. You have the floor.
Levi Spry
analystMorning, everyone, and thank you. Appreciate you joining the call. Just on the KCGM extension project — the big belly driver, I believe, comes in during the June quarter. Could you remind me what sort of work is underway there, what the key inputs are, and what we should expect to see as things progress up to that point?
Simon Jessop
executiveYeah. Thanks, Levi. This is Simon speaking. As we more or less laid out in the strategy document, there are a couple of key options we intend to pursue fully. So it all centers on reducing how many mills are on site. Right now we operate five mills, with one KCs to install one larger mill, dropping to two, dropping to four for 17 million tonnes, and then another KCs to reach 22 million tonnes using three mills. So look, that study is advancing quite well. We are definitely on track for a December half, sorry, a June half update. But that represents substantial growth labor for us. Yet once we have that in place, KCGM in terms of reserves, we hold 270 million tonnes of ore there. So we want to try and capture the value from that as fast as we can. Even at the present processing rate, right, that is roughly 20 years of processing, and alongside that, we see the chance to bring our processing costs down.
Levi Spry
analystYeah. Thanks. Thanks, Simon. And just to check on Kalgoorlie in the meantime — is that roughly the processing level, or the production rate, that we can expect going forward, plus the sale of Kundana?
Stuart Tonkin
executiveRight. So we clearly witnessed that moment at the mill. At present we have roughly 20 million tonnes of regional capacity, and that capacity is being utilized, and they haven't been phased around. So that remains in place; the base extension projects are simply the Fimiston expansion of it. So that is where the added capacity would be concentrated, and afterward the other mills alone.
Levi Spry
analystYeah, thanks. And I suppose just the final question on Thunderbox — it's a difficult climate, I guess, in which to be constructing a new brownfields project. But over the next 12 months, what risks are you observing out there regarding the timelines for that, and what are you concentrating on in order to address them…
Stuart Tonkin
executiveRight, so things look quite encouraging since we gave that update back in February — the big mill and many of the units that feed into it. The team has done a tremendous job, people on the ground, breaking soil and getting the foundations in place. So on progress there, we're genuinely ahead of schedule. As you can appreciate, we'll feel more at ease once power is running through a port and it's sitting on the ground. So we'll get it through one port, if not the perimeter, and then — yes, it will likely be the second quarter of next financial year when we're working through that commissioning, moving up toward buy on that. So we have to be the buffer there, because TBO is still running and producing at that 150,000 ounces without disruption, with this upgrade sitting adjacent to it. So if there were any slippage in timing, it isn't a material gap or downtime.
Levi Spry
analystUnderstood — thanks, and thank you.
Operator
operatorThanks. We’ll take the next question from Matthew Frydman at Goldman Sachs. Please go ahead.
Matthew Frydman
analystYes, thanks, and good morning, Stu and team. I have a few questions for you. First, on the operational side at Pogo, I suppose we could describe the recoveries during the quarter as somewhat weaker, at 84% for the September quarter. Certainly, one possible factor is the lower head grade. I’m just wondering whether there is anything else you would like to highlight regarding what has driven that in your view, and I guess, can we expect a return to 90-plus percent as you have commissioned the additional milling capacity and potentially a return to higher grade feed?
Stuart Tonkin
executiveYes, that's a fair observation. Banks tend to favor stability, and what we've had is commissioning ramping up and then down. Losses occurred there, which explains why that recovery figure is a bit lower, along with the slower head grade growth you mentioned. Still, head grade should come back to the 8 grams reserve grade, and once the plant stabilizes, we'll get back to 90%. Whether we can push meaningfully beyond that 90%, I'm not sure, but 90% is what our current plans call for. Some final projects remain to be done. At the moment, we're finishing and stabilizing the base load of that upgrade.
Matthew Frydman
analystUnderstood. Thanks, Stu. Moving on to KCGM, we can note that grades from the open pit were somewhat lower in the quarter. I believe you mentioned that, I think, mine scheduling placed some limits on how much high-grade material you were able to access. I'm just curious whether there's anything you can update us on regarding the progress of the wall mediation, and when you expect to reach that high-grade material at Golden Pike. And then also the delivery of the extra haulage fleet — has that stayed on schedule? I think you noted some of the timing around the additional trucks. I'm just wondering whether that matches your, I guess, your plan or your schedule for the additional fleets?
Simon Jessop
executiveAbsolutely, Matt. This is Simon speaking. Regarding the increase from the open pit, it truly comes down to scheduling and where we directed our attention. During quarter one, we extracted significantly fewer tonnes from Golden Pike compared with quarter four of the prior year. That means roughly 250,000 tonnes in quarter one against approximately 1 million tonnes at a considerably higher grade in Q4. Our attention was squarely on OBH and the cutback. As a result, we shifted considerably more ore from OBH, essentially making that the priority given the value it will release later in FY 2024 once Golden Pike North begins operation. So, no problems at all — simply a matter of grade timing and the sequencing of where we were digging in the pit; the cutback is progressing nicely, it's on plan, and we see that as our key priority when it comes to bringing down the wall. One final question regarding the haulage fleet? Yes, during the last quarter we received two trucks. This month we anticipate another four, or four arriving on site. So essentially it's just the steady rollout across FY 2022. From where we sit, there are no genuine concerns — we're in the rather fortunate situation that ore supply is coming along quite well and those trucks are steadily moving through the system.
Matthew Frydman
analystAppreciate the details, Simon. Last thing, a few questions for Morgan, if I may. First, you mentioned the solid balance sheet, so just to confirm A%500 million in cash and bullion, and as we all know, assuming nothing else changes, operational cash flows ought to improve in the second half, thanks to higher production and reduced all-in sustaining costs. So first, could you remind us when any upcoming tax or stamp duty payments fall due, related to the merger accounting, the Kundana divestment, or anything else? That's the first one. Second, more broadly, how do you view the balance sheet strength, given that net cash position, heading into the second half of the year when things should improve? What level of cash and liquidity would you consider comfortable to hold, and what options do you see beyond that, or in excess of it? Thanks.
Morgan Ball
executiveYes, thanks, Matt. Turning first to the question about cash and liquidity: as we've said in our guidance, we prefer to hold between A$1 billion and A$1.5 billion in liquid assets, and right now we're comfortably above that. Roughly a third of it is what we'd want sitting in cash, so going forward you should expect that mix to stay in place. Sorry — and what was the first question, Matt?
Stuart Tonkin
executiveRegarding the timing of taxes.
Morgan Ball
executiveOh, right—sorry, it's about tax timing. On stamp duty, clearly, the valuation work is still in progress, and we've been in touch—and will be in touch—with the Office of State Revenue regarding it. From a tax standpoint, we'd anticipate stamp duty landing in Q3 of this financial year, and naturally I'll pin down tax within that too. As a result of the merger, we would have reflected it in the balances, where in fact we expect a tax refund to be received sometime this year, arriving during Q3.
Matthew Frydman
analystUnderstood, and thanks — that’s useful, Morgan. Nothing further from my side.
Operator
operatorThanks. We’ll take the next question from Jason Mennell of Kalgoorlie Miner. Go right ahead.
Jason Mennell
unknownMorning, Stu and everyone, and thanks for fielding my questions. I’ve just got two quick ones. Pogo clearly experienced 24 days of downtime in total—what portion of that was unplanned?
Stuart Tonkin
executiveTen days were unplanned, while fourteen days had been planned.
Jason Mennell
unknownAlright.
Stuart Tonkin
executiveAnd so, look, we stuck with it, and the team gave it their all despite having fewer hands available. If you think about KCGM, whenever we had a 14-day shot, we brought in 900 additional people. At Pogo, that option simply isn't available to us. So we worked with the crews already on site, and we got through those TB problems that come up whenever you upgrade a plant. So, once again, we appreciate the time and effort they put in to finish the job. But those additional 10 days, of course, hurt us through net production deferred.
Jason Mennell
unknownAlright, thank you for that. And I have one more question for you. The record material movements at the Super Pit — can those be attributed to the two new machines arriving during the quarter, or does it come down to something else?
Stuart Tonkin
executiveNo. Look at the luxury and the insurance we’ve got, since the fleet is already there despite its age, and upgrading to the new fleet is going to mean lower unit costs and better availability, with fewer machines able to work. So at this point, I think it’s a credit to the team that they’re maintaining the uptime and keeping things active across the multiple working fronts that we have. So they’ve got optionality, they can go to the bottom, they felt prospect and got — actually you can go to Fimiston South and just take the wheels turning. I think it’s a credit to how we organized the mine and keep volume to move.
Jason Mennell
unknownGreat, thank you. That’s everything from my side.
Operator
operatorThank you. Hayden Bairstow from Macquarie is our next questioner. Go right ahead.
Hayden Bairstow
analystMorning, everyone. Stu, I’ve got a wider question about Pogo and the overall North American approach, and obviously today has been tough. So I mean, at what stage do you figure — or how much runway do you have to allow yourselves to bring that mine up to 300 and then get it steady before you feel more confident about the entire operating model of possibly buying additional assets in that region? Thanks.
Stuart Tonkin
executiveThanks. It's been 3 years now, and I'd say we're roughly a year away from where we'd like to be. And we've seen — the pandemic disruptions, among other things — just to give some perspective, right now we have more active COVID cases of Pogos in Western Australia. And we describe FY 2022 as that build-out year. We have development taking place across multiple stoping fronts that need to be opened up. We've sort of been tracking toward that 800,000 tonnes per annum, or 900,000 tonnes per annum of ore. Obviously, we need to build that up to 1.3 million tonnes to reach the 300,000 ounces. A critical piece of that was getting the mill upgraded, and that's now complete. It's really about getting those development meters in. But everything we've done to date — in the reserves, in the infrastructure, that investment — is for the long-term, decade-plus asset. So we're still laboring away and still working on those key milestones to deliver that 300,000 ounce operation. So we're pleased with the progress, even though it's slower than planned — we were too aggressive at the start. In hindsight, you might say that, but we still see great fundamentals in that asset.
Stuart Tonkin
executiveWhen it comes to growth past that point, we’d like North America to have a single jurisdiction such as Western Australia, and we see asset opportunities there. Consolidation is still occurring across the sector, yet high-grade underground operations plus all open pit operations remain available in North America. So we’ll be watching closely.
Hayden Bairstow
analystAnd regarding WA operations specifically, you clearly have those medium-term targets in place — how much further do you need to go before all the optimization work on the ore fleet and so on is finished? There is some M&A activity happening right now, small scale though it is, but would you be ready beforehand to consider perhaps bringing in extra ore sources to fill gaps as they come up, or do you think that is something they already have covered, and if something does arise, you will take a pretty hard look at it?
Stuart Tonkin
executiveWell, look — Simon brought that up. We had a substantial amount of stockpiled ore. We’ve managed to get 3.1 million ounces of stockpiled ore right there in our own backyard. So we’ll be using and managing all of it in the first instance, rather than something of that kind looking better or coming sooner than what we had in our life of mine. So we think we have everything needed to deliver our growth plans organically without resorting to any of that M&A. There are natural bolt-on opportunities you always consider, but it always has to be at the right price. So we just — it’s more a want than a need, and we will keep our eyes active on all of those things. But at the moment, there’s plenty to do within our own portfolio, and we’ve got a really solid team, and we want to simplify the business as we’re continuing to do, so adding things sometimes like a simple.
Hayden Bairstow
analystAll right, and then just one last question, more about after the Kundana divestment — I mean, from the figures we see, those operations really appear to be performing pretty well. So does that, in a sense, take the brakes off a bit regarding what you're doing at KB and Millennium and that kind of thing?
Stuart Tonkin
executiveDuring the quarter, we put in significant effort to move Kundana through the transition alongside the team toward evolution. I believe that process has been handled and managed extremely well, and it frees up team capacity to concentrate on a smaller set of priorities. We constantly evaluate where capital invested generates the strongest return. This quarter has been a robust one for kicking off those growth projects, so please don't overlook the start of the TBO upgrade, which will deliver 600,000 ounces in fairly short order. Yet all of that waste movement along with the volume increases at KCGM matters enormously for the long-term growth story there, and clearly the key upgrades at Pogo that are planned. Each of these items represents a box to tick demonstrating their capacity to grow organically to 2 million ounces. Our primary focus right now is not the 25% uplift, taking 1.6 million ounces to 2 million ounces across five years. Few peer gold companies can point to that kind of organic growth while also bringing costs down.
Hayden Bairstow
analystAll right, that's excellent. Appreciate it, everyone.
Operator
operatorThanks. We’ll take the next question from Al Harvey at J.P. Morgan. Go ahead, please.
Al Harvey
analystMorning to Stu, Simon, and Morgan. One quick question about Jundee: once the open pit ore contribution from Julius is removed, could you remind us what the reserves look like there and what the regional open pits will contribute to Jundee going forward? And could you walk us through which other regional pits you have coming online, and how that material will flow between the Jundee plant and the expanded Thunderbox mill?
Stuart Tonkin
executiveRight. So for Jundee in the North, we're going to keep it at that 300,000 ounces. Roughly two-thirds comes from underground and one-third from open pit, and the reserve is a little more weighted toward underground — so around 2.2 million ounces of reserves underground and 0.8 million open pit ounces — and then sort of phased through that 3 million tonne plant, it's about the same: 2 million from underground and roughly 1 million tonnes of open pit. So you'll keep seeing, like mine Julius, satellite pits built and ground contributing to that to hold that 300,000 ounces, while we still have 15 underground diamond rigs at Jundee extending those persistent zones from the underground side. So we see a long wall there to be able to capture that opportunity, and we keep a nice new coming stockpile, so we're not spending capital too aggressively ahead of time — we'll keep that buffer of many times stockpile of open pit fleet, should you have any disruptions otherwise in the underground base. Just on the second part of that, the Thunderbox area, by doubling that hedge book from 3 million to 6 million tonnes, a third will come from the design Thunderbox pit, a third from the Thunderbox underground, and a third will come from satellite pits — like, really half of that is done would base into that 6 million tonnes also get thrown out of that mill and to sale.
Al Harvey
analystGreat, thank you, Stu.
Operator
operatorThanks. We’ll take the next question from Mitch Ryan at Jefferies. Go ahead, please.
Mitch Ryan
analystYes, thank you. A lot of the main questions have clearly already been covered, but I just wanted to get a handle on this: with the truck change at KCGM, you obviously noted that it would help reduce operating costs. I'm just curious whether you can attach any metrics to that yet — as in, are they performing to the degree you believed they might be capable of, or is it not yet statistically relevant?
Stuart Tonkin
executiveYes. Thank you, Mitch. Naturally, this — I believe it's a matter of the old fleet going out and the new fleet coming in, so stabilizing and working through that is going to take a while. But what we are seeing is that with the F trucks, we get less downtime during the summer months, so there's less done over heat on the ramp than with the old trucks, and the new modern air trucks are in fact a couple of kilometers faster than the older model phase. So look, that will take some time. It's a big fleet that we're changing, so winding down the old fleet and its operating costs will take some time. And the new equipment, which is fast and more efficient and has a lower operating cost, is really kicking. So the transition will simply take its time. But we do see good upside once the fleet is all consistent and the same across KCGM, obviously, going on a mixed fleet. It's a little bit difficult with fast trucks catching up to the slower trucks, so it's probably FY 2023 onwards that we will really see some improved productivity, significantly improved productivity from that fleet.
Mitch Ryan
analystAll right, thanks, everyone. All right, many thanks.
Operator
operatorThank you. Our following question is from Peter O'Connor at Shaw and Partners. Please proceed.
Peter O'Connor
analystMorning, Stu. Morning, Morgan. I have a couple of questions. First, Stuart, on cost headwinds — speaking generally about WA, both from where COVID impact still stands and from other wider industry issues, what's your view? Then the second one, returning to your point on North America, Stu: when you mentioned how attractive the T1 jurisdiction is and the potential for opportunistic moves, possibly M&A — does Northern Star require paper in the North American market to carry out deals of that kind down the road?
Stuart Tonkin
executiveYes. Great question, Peter. So if you look at domestic, or really labor and input costs overall, that's likely where those headwinds show up — in labor and turnover. The needless expense of simply churning through workers who get picky and jumpy in this kind of environment. I still believe that within six months we'll see borders open up, whether international and/or interstate, as vaccines become widespread, and that will ease some of that pressure, along with various commodities. So I'd say those cost inputs right now are building up across the sector. Luckily, we have the synergies that came from the merger, plus the economies of scale from the five production plans laid out, so we can still bring down our all-in costs even with some of those headwinds — meaning we offset part of them through the synergy savings. On the North American outlook and paper, and the fact that it doesn't call for equity and/or secondary dual listings or anything like that — look, what fewer questions came up before were about the balance sheet and the strength of our balance sheet being net cash at present, also funding our growth capital of 2 million ounces, plus dividend payments, plus exploration resource reserve growth, plus surplus cash.
Stuart Tonkin
executiveWhen we aren't acquiring anything, that cash goes back to shareholders as a special dividend, or we look at options such as share buybacks and the rest of those capital sources and uses. The great thing is that Northern Star has these choices at our disposal. So we're able to — we consistently weigh every capital management option, and in my opinion we carry substantial debt capacity, yet we also generate plenty of free cash flow that in the years ahead will be enough to put to good use earning superior returns, and should superior returns prove elusive, we give the money back to shareholders.
Operator
operatorThanks. We'll now take a question from Matt Greene of Credit Suisse. The line is yours.
Matt Greene
unknownHello there. Good morning to Stu and the team. I really just have one follow-up on the cost base. Could you remind me roughly how the diesel contracts are put together, particularly regarding timing lags relative to where spot pricing sits? And then, roughly speaking as well, on KCGM, I guess, what share of that cost base is tied to ore?
Stuart Tonkin
executiveI think that moving forward, that's the diesel, and the way we handle diesel is identical to everyone else—they've operated with no heating and no late or lag, just as you purchased. But luckily, I suppose, for the 8% of our production that comes from underground, it's less diesel intensive, obviously; it has a large fleet that's diesel intensive relative to the cost base. So there isn't a huge import or flux on it, which is why we don't attempt to hedge it or guess it. And all of that power primarily comes off grid or gas fed into our power plants at the moment as we're transitioning toward a renewable type program. So, with that, it isn't a massive lever or change or sensitivity driven. Thanks. How many, I think, we're — any more questions?
Operator
operatorThanks. That brings us to the end of the question period. I'll turn it back now for some closing comments.
Stuart Tonkin
executiveThanks very much, and good to have everyone with us on today's call. As you've heard, the Australian operations delivered a solid quarter, while at Pogo we ran into a couple of one-off issues that weighed on results there. With the strong results coming out of the Australian operations, and given that the benefits from the investment in the Pogo plant will start to show, we remain well on track to hit our full year guidance. We're also right in the middle of an exciting expansion phase, with meaningful organic growth projects kicked off during the quarter at Kalgoorlie, Yandal and Pogo. Solid production to 2 million ounces per annum by 2026 and lower our costs, continue to generate significant cash flow and superior shareholder returns. Have a good day.
Operator
operatorThanks. That brings today's conference to a close. We appreciate everyone taking part. You're free to disconnect now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Northern Star Resources Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Northern Star Resources Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Northern Star Resources Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.